Title: Consider receiving the Annual Report to the U. S. Army Corps of Engineers for the Salinas River Stream Maintenance Program 2016 Work Season; and, authorizing the General Manager to execute the Certification of Compliance verifying compliance with the Terms and Conditions of the Regional General Permit.
Attachments: 1. Board Report, 2. SMP Annual Report 201 - USACE, 3. 2016 USACE Work Plan Certification, 4. Board Order
Title
Consider receiving the Annual Report to the U. S. Army Corps of Engineers for the Salinas River Stream Maintenance Program 2016 Work Season; and, authorizing the General Manager to execute the Certification of Compliance verifying compliance with the Terms and Conditions of the Regional General Permit.
Report
RECOMMENDATION:
It is recommended that the Monterey County Water Resources Agency Board of Directors:

Receive the Annual Report to the U. S. Army Corps of Engineers for the Salinas River Stream Maintenance Program 2016 Work Season; and, authorize the General Manager to execute the Certification of Compliance verifying compliance with the Terms and Conditions of the Regional General Permit.

SUMMARY/DISCUSSION:

This report summarizes the 2016 activities of the Salinas River Stream Maintenance Program (SMP). The objective for the SMP is to reduce flood risk to land adjacent to the Salinas River while maintaining or enhancing natural habitat and ecological and hydrological processes. This is achieved through vegetation maintenance, sediment management, and non-native vegetation removal primarily in designated secondary or high flow channels outside of the low flow channel. This Annual Report provides regulatory agencies and interested parties with an overview of the work completed during the 2016 maintenance season and the program's compliance with the U. S. Army Corps of Engineers' permit conditions. It also allows the MCWRA to summarize and analyze the project success and impacts for future planning activities.

The 2016 work season was the first to include both Phase 1 and Phase 2, implementing a uniform approach for the entire program. Phase 1 includes two River Management Units (RMUs) along the Salinas River at river miles that were permitted in 2014 as a pilot program. Phase 2 of the SMP was developed following the same process as Phase 1 and includes five additional RMUs within the SMP Program Area (river miles 2 to 94). Stream maintenanc...