Steve Mason, project planner presented the item.
Applicant Representative: Tony Lombardo
Public Comment: None
It was moved by Commissioner Shaw, seconded by Commission Mendoza and
passed by the following vote to find the project is Categorically Exempt
pursuant to CEQA Guidelines sections 15305 and 15325, and none of the
exceptions under 15300.2 apply and approve a Coastal Development Permit
for a Minor Subdivision and Vesting Tentative Parcel Map to allow the
division of a 151-acre parcel into two parcels containing approximately
83-acres and 68-acres.
AYES: Getzelman, Mendoza, Gomez, Diehl, Hartzell, Gonzalez, Work,
Monsalve, Shaw, Roberts
NOES: None
ABSENT: None
ABSTAIN: None
The Commission recessed at 10:03 a.m. and returned at 10:19 a.m.
PLN240077 - SIGNAL HILL LLC
4.
Public hearing to consider design approval for the construction of an approximately 8,290 square foot
two-story single family dwelling with an attached three car garage with light brown stucco exterior,
black metal clad wood accents, and a gravel roof, an approximately 180 square foot stairwell, and
approximately 695 square feet of terrace (identified as the “Reduced Project,” Alternative 6 in the
Final EIR) and the relocation of three Monterey Cypress trees.
Project Location: 1170 Signal Hill Road, Pebble Beach.
Proposed CEQA Action: Consider the previously certified Final Environmental Impact Report
(FEIR) (SCH#2015021054) for the Signal Hill LLC project and find the project consistent with the
FEIR which does not warrant additional environmental review pursuant to CEQA Guidelines section
15162.
Mary Israel, project planner presented the item.
Applicant Representative: Massy Mehdipour
Public Comment: Tony Lombardo, D. Estrada, Kent Seavey, Mr. Kadivar
It was moved by Commissioner Diehl, seconded by Commission Roberts and
passed by the following vote to adopt a previously certified Final
Environmental Impact Report (FEIR) (SCH#2015021054) for the Signal Hill
LLC project, and find that the Proposed Project is consistent with Alternative
6 of the FEIR and does not warrant an addendum pursuant to CEQA