File #: 11-695    Name:
Type: Minutes Status: Passed
File created: 6/14/2011 In control: Board of Supervisors
On agenda: 6/14/2011 Final action: 6/14/2011
Title: a. Award a contract to MCM Construction, Inc., the lowest responsible base bidder, for the Lonoak Road Bridge at a. Award a contract to MCM Construction, Inc., the lowest responsible base bidder, for the Lonoak Road Bridge at
Attachments: 1. Signed Board Report, 2. Revised Completed Board Order, 3. Executed Agreement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SIGNED BOARD REPORT"�|E�X�MONTEREY COUNTY BOARD OF SUPERVISORS

MEETING: June 14,2011  Consent AGENDA NO.: s-2

SUBJECT: a. Award a contract to MCM Construction, Inc., the lowest responsible base

bidder, for the Lonoak Road Bridge at Lewis Creek Replacement Project,

Bridge No. 402, Federal Aid Project No. BRLOZB-5944 035), Project

No. 11-220565; in the total amount of $1,499,999;

b. Approve the Performance and Payment Bonds executed and provided by

MCM Construction, Inc.;

c. Authorize a contingency not to exceed 10% of the Contract amount) to

provide funding for approved contract change orders; and

d. Authorize the Director of Public Works to execute the contract and subject

to the terms of the Public Contract Code, approve change orders to the

contract that do not exceed 10% of the original contract amount and do not

significantly change the scope of work.

DEPARTMENT: RMA  Public Works

RECOMMENDATIONS:

It is recommended that the Board of Supervisors:

a. Award a contract to MCM Construction, Inc., the lowest responsible base bidder, for the

Lonoak Road Bridge at Lewis Creek Replacement Project, Bridge No. 402, Federal Aid

Project No. BRLOZB-5944(035), Project No. 11-220565; in the total amount of

$1,499,999;

b. Approve the Performance and Payment Bonds executed and provided by MCM

Construction, Inc.;

c. Authorize a contingency not to exceed 10% of the Contract amount) to provide funding for

approved contract change orders; and

d. Authorize the Director of Public Works to execute the contract and subject to the terms of

the Public Contract Code, approve change orders to the contract that do not exceed 10% of

the original contract amount and do not significantly change the scope of work.

SUMMARY/DISCUSSION:

The Board approved the Plans and Special Provisions for the Lonoak Road Bridge at Lewis

Creek Replacement Project, Bridge No. 402, Federal Aid Project No. BRLOZB-5944 035),

Project No. 11-220565, on March 15, 2011. The project was subsequently advertised and bids

were solicited. The bids were opened on April 14, 2011, and the lowest responsible base bidder

was MCM Construction, Inc. in the amount of $1,499,999. The Engineer's Estimate is

$2,000,000 for the project.

The Lonoak Road Bridge at Lewis Creek Replacement Project consists of construction of a new

two lane bridge on the existing alignment, a detour constructed adjacent to the existing bridge,

associated approach embankment grading and paving, removal of the existing bridge, and

associated improvements on Lewis Creek and Lonoak Road.

 

 

BIB]

 

40723-U01

SIGNED-U02

BOARD-U02

REPORT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103566-U03

C10-U03

BOARD-U03

REPORTS-U03

6/28/2011-U04

HANCOCKD-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

SIGNED BOARD REPORT"�|E�X�Award MCM Construction, Inc. contract for Lonoak Road Bridge at Lewis Creek Project

June 14, 2011

Page 2

OTHER AGENCY INVOLVEMENT:

County Counsel and Contracts/Purchasing attended the bid opening and reviewed the low bid for

conformance with applicable regulations. County Counsel and Risk Management approved the

Contract and Bonds as to form, and insurance provisions, respectively.

FINANCING:

There is no financial impact to the General Fund for FY 2010/11 or FY 2011/12. The estimated

total cost of the project, including engineering, environmental, right-of-way and construction, is

$3,227,675. The project is funded by Federal Highway Administration FHWA) and Highway

Bridge Replacement and Rehabilitation Program HBRR) funds, State Seismic Retrofit Funds

and Road Funds.

Prepared by: Approved by:

 

fA Arturo A. Adlawan, P.E. 831) 755-4823 azdan T. Emrani, M.S., P.E.

Senior Civil Engineer Director of Public Works

Dated: June 6, 2011

Attachments: Board Order; Project Budget; Bid Summary; Contract; Bonds on file with the

Clerk of the Board); Location Map

 

 

BIB]

 

40723-U01

SIGNED-U02

BOARD-U02

REPORT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103566-U03

C10-U03

BOARD-U03

REPORTS-U03

6/28/2011-U04

HANCOCKD-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

 

 

REVISED COMPLETED BOARD ORDERm�57

Before the Board of Supervisors in and for the

County of Monterey, State of California

Agreement No. A-12007; Construction No. 2011-005

a. Award a contract to MCM Construction, Inc., the

lowest responsible base bidder, for the Lonoak Road

Bridge at Lewis Creek Replacement Project, Bridge

No. 402, Federal Aid Project No. BRLOZB-5944

035), Project No. 11-220565; in the total amount of

$1,499,999;

b. Approve the Performance and Payment Bonds

executed and provided by MCM Construction, Inc.;

c. Authorize a contingency not to exceed 10% of the

Contract amount) to provide funding for approved

contract change orders; and

d. Authorize the Director of Public Works to execute

the contract and subject to the terms of the Public

Contract Code, approve change orders to the

contract that do not exceed 10% of the original

contract amount and do not significantly change the

scope of work... 

Upon motion of Supervisor Salinas, seconded by Supervisor Armenta, and carried by

those members present, the Board hereby;

a. Awarded a contract to MCM Construction, Inc., the lowest responsible base

bidder, for the Lonoak Road Bridge at Lewis Creek Replacement Project, Bridge

No. 402, Federal Aid Project No. BRLOZB-5944 035), Project No. 11-220565;

in the total amount of $1,499,999;

b. Approved the Performance and Payment Bonds executed and provided by MCM

Construction, Inc.;

c. Authorized a contingency not to exceed 10% of the Contract amount) to provide

funding for approved contract change orders; and

d. Authorized the Director of Public Works to execute the contract and subject to the

terms of the Public Contract Code, approve change orders to the contract that do

not exceed 10% of the original contract amount and do not significantly change

the scope of work.

PASSED AND ADOPTED on this 14th day of June, 2011, by the following vote, to wit:

AYES: Supervisors Armenta, Calcagno, Salinas, Parker, and Potter

NOES: None

ABSENT: None

I, Gail T. Borkowski, Clerk of the Board of Supervisors of the County of Monterey, State of California, hereby

certify that the foregoing is a true copy of an original order of said Board of Supervisors duly made and entered

in the minutes thereof of Minute Book 75 for the meeting on June 14, 2011.

Dated: June 20, 2011 Gail T. Borkowski, Clerk of the Board of Supervisors

Revised: July 7, 2011 County of Monterey, State of California

By

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�CONTRACT FOR PUBLIC WORK

COUNTY OF MONTEREY

STATE OF CALIFORNIA

CONTRACT NO. 11-220565

THIS AGREEMENT, made in triplicate by and between the COUNTY OF MONTEREY, a

political subdivision of the State of California, hereinafter called the County," and

MCM CONSTRUCTION, INC., hereinafter called the Contractor,"

WITNESSETH:

1) THE WORK

The Contractor shall do all the work and furnish all the materials, except such as

are mentioned in any of the contract documents to be furnished by the County, necessary to

construct and complete in a good, workmanlike and substantial manner and to the satisfaction of

the County, the following public work:

LONOAK ROAD BRIDGE

AT LEWIS CREEK

COUNTY BRIDGE NO. 402, STATE BRIDGE NO. 44C-0158

PROJECT NO. 11-220565

STATE PROJECT NO. NO. EA 05-927094L

FEDERAL AID PROJECT NO. BRLOZB-5944 035)

in accordance with this agreement and with all of the following additional contract documents

which are incorporated into and made a part of this agreement:

a) The Standard Specifications, dated July 2002 and the Standard Specifications

dated May 2006 with Amendments issue date 11-30-10 were referenced; and

the Standard Plans, dated July 2002 and May 2006 of the State of California,

Department of Transportation.

b) A set of plans and cross sections when applicable) entitled:

LONOAK ROAD BRIDGE AT LEWIS CREEK,

STATE BRIDGE NO. 44C-0158) 44C-0179, COUNTY BR. NO. 402

FEDERAL-AID PROJECT NO. BRLOZB-5944 035)

PROJECT NO. 11-220565

c) The Special Provisions for the work.

d) The Notice to Bidders calling for bids.

e) The Payment and Performance bonds required.

LONOAK ROAD BRIDGE 1

CONTRACT NO. 11-220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�f)

Local Agency Bidder  DBE information, Exhibit 15-G(2)

g) Certificate of Insurance.

h) The accepted bid/proposal including the following:

1)  List of Subcontractors

2)  Equal Employment Opportunity Certification

3)  Public Contract Code

  Section 10285.1 Statement

  Section 10162 Questionnaire

  Section 10232 Statement

4)  Non-Collusion Affidavit

5)  Debarment and Suspension Certification

6)  Non-Lobbying Certification for Federal Aid Contracts

7)  Disclosure of Lobbying Activities

8)  Statement Concerning Employment of Undocumented Aliens

9)  Contractor's Certificate as to Worker's Compensation

10)  List of Satisfied Public Agencies

11)  Bidder's Bond

12)  Bidder's List

13)  Local Agency Bidder  UDBE Commitment, Exhibit 15-G(1)

14)  UDBE Information  Good Faith Efforts, Exhibit 15-H

All contract documents are intended to cooperate, so that any work called for in one and

not mentioned in another is to be executed the same as if mentioned in all. However, should

there be any conflict between the terms of this instrument and the Contractor's bid or proposal,

then this instrument shall control.

2. WORKERS' COMPENSATION

In accordance with the provisions of Section 3700 of the Labor Code, the Contractor

and every Subcontractor will be required to secure the payment of compensation to his

employees.

3. CONTRACT PRICE

The County shall pay the Contractor the following prices for the performance of this

contract:

ITEM ITEM CODE ITEM DESCRIPTION UNIT OF ESTIMATE UNIT PRICE ITEM TOTAL

NO   MEASURE QUANTITY In Figures) In Figures)

1 066072 Maintain Detour LS 1 $5,000.00 $5,000.00

LONOAK ROAD BRIDGE

AT LEWIS CREEK

COUNTY BRIDGE NO. 402, STATE BRIDGE NO. 44C-0158

PROJECT NO. 11-220565

STATE PROJECT NO. EA 05-927094L

FEDERAL AID PROJECT NO. BRLOZB-5944 035)

LONOAK ROAD BRIDGE 2

CONTRACT NO. 11-220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�ITEM ITEM CODE ITEM DESCRIPTION UNIT OF ESTIMATE UNIT PRICE ITEM TOTAL

NO   MEASURE QUANTITY In Figures) In Figures)

2 066105 Resident Engineer's Office LS 1 $35,000.00 $35,000.00

  Project Schedule   

3 070010 Critical Path Method) LS 1 $5,000.00 $5,000.00

     

  Temporary Fence   

4 071302 Type BW) m 200 $25.00 $5,000.00

  Temporary Fence   

5 071325 Type ESA) m 75 $20.00 $1,500.00

6 073031 900 mm Temporary Culvert m 100 $100.00 $10,000.00

  900 mm Temporary   

7 073031A Flared End Section EA 8 $400.00 $3,200.00

  Prepare Storm Water Pollution   

8 074019 Prevention Program S) LS 1 $1,200.00 $1,200.00

     

9 074020 Water Pollution Control LS 1 $10,000.00 $10,000.00

     

10 120090 Construction Area Signs LS 1 $3,000.00 $3,000.00

11 120100 Traffic Control System LS 1 $12,000.00 $12,000.00

12 129000 Temporary Railing Type K) m 50 $150.00 $7,500.00

13 129100 Temporary Crash Cushion   

  Module EA 22 $350.00 $7,700.00

     

14 150605 Remove Fence m 325 $8.00 $2,600.00

15 151554 Install Salvaged) Gate with   

  Posts EA 3 $1,4 00.00 $4,200.00

16 152386 Relocate Roadside   

  Sign  One Post EA 2 $250.00 $500.00

17 152423 Adjust Monument to Grade   

   EA 2 $600.00 $1,200.00

18 153103 Cold Plane AC Pavement   

  60 mm) m2 15 $250.00 $3,750.00

     

19 157550 Bridge Removal   

   LS 1 $45,000.00 $45,000.00

     

20 160101 Clearing and Grubbing   

   LS 1 $10,000.00 $10,000.00

     

21 170101 Develop Water Supply   

   LS 1 $10,000.00 $10,000.00

     

22 190101 Roadway Excavation F)   

   m3 850 $25.00 $21,250.00

23 190136 Roadway Excavation   

  Detour) F) m3 315 $85.00 $26,775.00

24 192003 Structure Excavation

m3

207 

  Bridge) F)   $50.00 $10,350.00

25 192020 Structure Excavation   

  Type D) F) m3 7 $120.00 $840.00

26 193003 Structure Backfill   

  Bridge) F) m3 115 $125.00 $14,375.00

     

27 198001 I mport Borrow Detour)   

   m3 440 $85.00 $37,400.00

LONOAK ROAD BRIDGE 3

CONTRACT NO. 11-220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�ITEM ITEM CODE ITEM DESCRIPTION UNIT OF ESTIMATE UNIT PRICE ITEM TOTAL

NO   MEASURE QUANTITY In Figures) In Figures)

28 203016A Erosion Control   

  Type D-Seed Mix #1) S) m2 700 $3.00 $2,100.00

29 203016B Erosion Control   

  Type D-Seed Mix #2) S) m2 3,300 $3.00 $9,900.00

30 208252A 38 mm Plastic Pipe   

  PR 200) Supply Line) m 30 $120.00 $3,6 00.00

31 208751A 102 mm Galvanized Steel   

  Pipe Conduit m 15 $150.00 $2,250.00

32 220101 Finish Roadway   

   LS 1 $5,000.00 $5,000.00

     

33 260200A Detour Baserock   

   m3 460 $85.00 $39,100.00

34 260201 Aggregate Base Class 2)   

   m3 910 $70.00 $63,700.00

35 390102 Hot Mix Asphalt Type A)   

   to 610 $140.00 $85,400.00

36 393001 Pavement Reinforcing   

  Fabric m2 13 $25.00 $325.00

37 490663 1.5 m Cast-In-Drilled Hole   

  Concrete Piling S) m 30 $4,900.00 $147,000.00

38 490696 Furnish Piling Class   

  900) P) m 360 $165.00 $59,400.00

39 490697 Drive Pile Class 900)   

   EA 24 $2,200.00 $52,800.00

40 500001 Prestressing Cast-In-Place   

  Concrete S) LS 1 $25,000.00 $25,000.00

41 510051 Structural Concrete,   

  Bridge Footing m3 26 $430.00 $11,180.00

42 510053 Structural Concrete,   

  Bridge m3 280 $1,167.00 $326,760.00

43 519129A Joint Seal Assembly   

  Type B MR=50 mm) m 21 $250.00 $5,250.00

44 520102 Bar Reinforcing Steel   

  Bridge) P)(S) kg 63,000 $1.80 $113,400.00

     

45 566011 Roadside Sign-One Post   

   EA 8 $400.00 $3,200.00

46 721007 RSP 220 kg 1/4 Ton)   

  Method B) m3 125 $93.00 $11,625.00

47 729010 Rock Slope Protection   

  Fabric m2 250 $2.00 $500.00

48 731507 Minor Concrete   

  Gutter Depression) m3 1.6 $2,200.00 $3,520.00

49 750501 Miscellaneous Metal   

  Bridge) kg 66 $20.00 $1,320.00

50 800002 Fence Type BW, Wood   

  Post) m 270 $33.00 $8,910.00

51 800701 Reconstruct Pipe Fence   

   m 20 $330.00 $6,600.00

52 810110 Survey Monument   

   EA 2 $1,400.00 $2,800.00

     

53 820118 Guard Railing Delineator   

   EA 4 $140.00 $560.00

LONOAK ROAD BRIDGE 4

CONTRACT NO. 11-220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�ITEM

ITEM CODE

ITEM DESCRIPTION UNIT OF ESTIMATE UNIT PRICE ITEM TOTAL

NO   MEASURE QUANTITY In Figures) In Figures)

54 820152 Object Marker   

  Type L-2 CA) EA 4 $130.00 $520.00

55 832003 Metal Beam Guard Railing   

  Wood Post) S) m 31 $75.00 $2,325.00

56 839565 Terminal System   

  Type SRT) S) EA 4 $2,400.00 $9,600.00

57 839720 Concrete Barrier Type 732)   

   m 112 $340.00 $38,080.00

58 840561 100 mm Thermoplastic   

  Traffic Stripe S) m 1,414 $2.00 $2,828.00

59 840656 Paint Traffic Stripe 2-Coat)   

   m 186 $4.00 $744.00

60 850111 Pavement Marker   

  Retroreflective) S) EA 110 $6.00 $660.00

61 860791A 4) 102 mm Direct Buried   

  Utility Conduit at&t) m 50 $85.00 $4,250.00

62 860792A 102 mm Utility Conduit in   

  bridge at&t) m 47 $100.00 $4,700.00

63 994629 Relocate Building Barn) LS 1 

     $1,000.00 $1,000.00

64 999990 Mobilization 10%)   

   LS 1 $149,752.00 $149,752.00

P)  Denotes Partial Pay Item 

F)  Denotes Final Pay Item TOTAL BID $1,499,999.00

S)  Denotes Specialty Item 

LONOAK ROAD BRIDGE 5

CONTRACT NO. 1 1 220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the

dates appearing below their respective signatures.

CONTRACTOR:

By:

Name:

MCM CONSTRUCTION, INC.

EDMUNDO A. PUCHI

Title: TREASURER

Date: APRIT. 28, 2011

COUNTY OF MONTEREY:

By:

Name: Yazdan T. Emrani, P.E.

Title: Director of Public Works

Date:

By:

APPROVE AS TO FORM

Name: Cynthia L. Hasson

Title: Deputy County Counsel

Date:

APPROVE AS TO INDEMNITY/

R1%jrx bW c Vi~I UAGE

COUNTY OF MONTEREY

By: APPROVED

Name:i N SL&PAl`1i'Q94AN G UAG E

LONOAK ROAD BRIDGE

6

CONTRACT NO. 11-220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�CERTIFICATE OF AUTHORITY

I, EDMUNDO A. PUCHI, Treasurer, General Counsel and Assistant Secretary of MCM

Construction, Inc. hereby certify that the company is a corporation duly organized pursuant to

and under the laws of the State of California. The Company was first incorporated in 1973 and

is in good standing in this State.

I further attest that the following persons are officers of the Corporation:

James A. Carter President

Harry D. McGovern Vice President, General Manager and Secretary

Edmundo A. Puchi Treasurer, General Counsel and Assistant Secretary

James R. Coppini Assistant Secretary

I further attest that the President, Vice President and Treasurer of the Corporation,

are authorized to execute all documents necessary to bind the Corporation to any bid,

contract or similar offer or obligation.

I certify under penalty of perjury that the above statements are true and correct as

reflected in the Corporation's records of Corporate acts and resolutions.

Executed this date of May 27, 2011 at North Highlands, California.

EDMUNDO A. PUCHI

Treasurer, General Counsel and Assistant Secretary

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm                     �COUNTY OF MONTEREY

PERFORMANCE BOND

WHEREAS, the County of Monterey has awarded to Principal, M M. C  M

as Contractor, a contract for the following project:

Construction, Inc.

LONOAK ROAD BRIDGE

AT LEWIS CREEK

COUNTY BRIDGE NO. 402, STATE BRIDGE NO.44C-0158

PROJECT NO. 11-220565

STATE PROJECT NO. EA 05-927094L

FEDERAL AID PROJECT NO. BRLOZB-5944 035)

BOND #105471528

Premium: $6,750.00

WHEREAS, Principal, as Contractor, is required to furnish a bond in connection with said

contract, to secure the faithful performance of said contract.

NOW, THEREFORE, we M.C.M. Construction, Inc.  as Principal,

and Travelers Casualty and Surety Company of America

as Surety, are held and firmly

bound unto the County of Monterey, a political subdivision of the State of California hereinafter

called Count  lri the penal Sum Of

O payme1 aNl 4 payment of which sum in lawful money of the United States, well and truly to be made, we bind

ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,

firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT:

If the Principal, as Contractor, or Principal's heirs, executors, administrators, successors,

or assigns, 1) shall in all things stand to and abide by and well and truly keep and perform the

covenants, conditions, and agreements in said contract and any alteration thereof made as therein

provided, on Principal's part to be kept and performed, at the time and in the manner therein

specified and in all respects according to their true intent and meaning, and 2) shall defend,

indemnify and save harmless the County, the members of its board of supervisors, and its

officers, agents and employees as therein stipulated, then this obligation shall become null and

void; otherwise, it shall be and remain in full force and virtue.

Surety hereby stipulates and agrees that no change, extension of time, alteration, or addition

to the terms of the contract or the call for bids, or to the work to be performed thereunder, or the

specifications accompanying the same, shall in any way affect its obligation under this bond, and

it does hereby waive notice of any such change, extension of time, alteration or addition to the

terms of said contract or the call for bids, or to the work, or to the specifications.

Whenever the Principal, as Contractor, is in default, and is declared in default, under the

contract by the County of Monterey, the County of Monterey having performed its obligation

under the contract, Surety may promptly remedy the default, or shall promptly:

1) Complete the contract in accordance with its terms or conditions, or

LONOAK ROAD BRIDGE 3

CONTRACT NO. 11-220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm

�2) Obtain a bid or bids for submission to County of Monterey for completing the

contract in accordance with its terms or conditions, and upon determination by

County of Monterey and Surety of the lowest responsible and responsive bidder,

arrange for a contract between such bidder and County of Monterey, and make

available as work progresses even though there should be a default or a

succession of defaults under the contract or contracts of completion arranged

under this paragraph) sufficient funds to pay the cost of completion less the

balance of contract price.

If suit is brought upon this bond by the County and judgment is recovered, the Surety shall

pay all litigation expenses incurred by the County in such suit, including attorney's fees, court

costs, expert witness fees and investigation expenses.

IN WITNESS WHEREOF, the above-bounden parties have executed this instrument under

their several seals this 27th day of AFril  20 11 the name and

corporate seal of each corporate party being hereto affixed and these presents duly signed by its

undersigned representative, pursuant to authority of its governing body.

Corporate Seal)

Corporate Seal)

M.C.M. Construction, Inc.

Name and Title EDMUNDO A. PUCHI, TREASURER

Surety

Travelers Casualty and Surety Company of America

Attorney-in-Fact

Attach notary acknowledgment for all signatures and attorney-in-fact certificate for signature by surety's

representative)

LONOAK ROAD BRIDGE 4

CONTRACT NO. 11-220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm
�ACKNOWLEDGMENT

State of California

County of Santa Clara

On April 27, 2011 before me, Erin Bautista, Notary Public

insert name and title of the officer)

personally appeared Jean L. Neu

who proved to me on the basis of satisfactory evidence to be the person(a) whose name(&) is/aizx

subscribed to the within instrument and acknowledged to me that kshel!t e* executed the same in

JQis/her/t thE authorized capacity and that by Wher/ t signature(s) on the instrument the

person( R), or the entity upon behalf of which the person(x) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing

paragraph is true and correct.

WITNESS my hand and official seal.

Signature

ERIN BAUTISTA F

Commission # 1884542

Notary Public  California

z  Santa Clara County

Seal) My Comm. Expires Apr 25, 2014

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm

�WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

TRAVELERS J

POWER OF ATTORNEY

Farmington Casualty Company St. Paul Mercury Insurance Company

Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company

Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America

St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company

St. Paul Guardian Insurance Company

Attorney-In Fact No. 223488

Certificate No. 004157516

KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance

Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and

Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty

Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under

the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin

herein collectively called the Companies"), and that the Companies do hereby make, constitute and appoint

Bryan D. Martin, Bradley N. Wright, Jean L. Neu, Erin Bautista, and Frances Murphy

of the City of San Jose  State of California  their true and lawful Attorney(s)-in-Fact,

each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and

other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of

contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.

11th

IN WITNESS WHEREOF, the Companies have caused this instrument to be signed arid their corporate seals to be hereto affixed, this

day of April 2011

Farmington Casualty Company

Fidelity and Guaranty Insurance Company

Fidelity and Guaranty Insurance Underwriters, Inc.

St. Paul Fire and Marine Insurance Company

St. Paul Guardian Insurance Company

State of Connecticut

City of Hartford ss.

By:

St. Paul Mercury Insurance Company

Travelers Casualty and Surety Company

Travelers Casualty and Surety Company of America

United States Fidelity and Guaranty Company

On this the 11 th day of April 2011  before me personally appeared George W. Thompson, who acknowledged

himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters,

Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety

Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do,

executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.

In Witness Whereof, I hereunto set my hand and official seal.

My Commission expires the 30th day of June, 2011.

58440-4-09 Printed in U.S.A.

can C

Marie C. Tetreault, Notary Public

WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm

�A

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT

State of California

County of Sacramento

 

On April 28, 2011 before me, Christine Golden, Notary Public

Date

personally appeared Edmundo A. Puchi

Here Insert Name and Title of the Officer

Name(s) of Signer(s)

Place Notary Seal Above

who proved to me on the basis of satisfactory evidence to

be the person(s) whose name(s) is/are-subscribed to the

within instrument and acknowledged to me that

ho/che hoy executed the same in his/hor/thoir authorized

capacity(ies), and that by his/hortheir signature(s)-on the

instrument the person(s)1 or the entity upon behalf of

which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws

of the State of California that the foregoing paragraph Is

true and correct.

WITNESS y and anid official seal.

Signature

OPTIONAL

Though the information below Is not required by law, it may prove valuable to persons relying on the document

and could prevent fraudulent removal and reattachment of this form to another document.

Description of Attached Document

Title or Type of Document: Performance Bond

Document Date: April 27, 2011

Signer(s) Other Than Named Above: None

Capacity(ies) Claimed by Signer(s)

Signer's Name: Edmundo A. Puchi

 Individual

Number of Pages: 2

Signer's Name:

 Individual

0 Corporate Officer  Title(s): reasurer

 Corporate Officer  Title(s):

 

 Partner   Limited El General Recd rr l Ilur,1BFF IrJT  Partner   Limited  General

 Attorney in Fact OF SIGNER  Attorney in Fact

  Top of thumb here  Top of thumb here

 Trustee   Trustee

 Guardian or Conservator   Guardian or Conservator

 Other:   Other:

  

Signer Is Representing:  Signer Is Representing:

MCM Construction, Inc.  

  

  

T

02007 National Notary Association  935.,0 De Soto Ave., P0. Box 2402  Chatsworth, CA 91313.2402� www.NasonalNolarxorg Item #6907 Reorder: CallTdl-Free 1-800-878-6827

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�COUNTY OF MONTEREY

PAYMENT BOND

Civil Code Section 3249)

BOND #105471528

Premium: Incl. in

Performance Bond

WHEREAS, the County of Monterey has awarded to Principal, as Contractor, a

contract for the following project:

LONOAK ROAD BRIDGE

AT LEWIS CREEK

COUNTY BRIDGE NO. 402, STATE BRIDGE NO.44C-0158

PROJECT NO. 11-220565

STATE PROJECT NO. EA 05-927094L

FEDERAL AID PROJECT NO. BRLOZB-5944 035)

AND WHEREAS, Principal, as Contractor, is required to furnish a bond in connection

with said contract, to secure the payment of claims of laborers, mechanics, materialmen, and

other persons furnishing labor and materials on the project, as provided by law.

NOW, THEREFORE, we M.C.M. Construction, Inc.  as

Principal, and Travelers Casualty and Surety Company of America

as Surety, are held and firmly

bound unto the County of Monterey, a political subdivision of the State of California hereinafter

called County"), and to the persons named in California Civil Code section 3181 in the penal

One Nli lion Four Hundred Ninety Nine Thousand Nine Hundred for the

sum of Ninety Nin~/100s--=(1.499.999.00)

payment of which sum in lawful money of the United States, well and truly to be made, we bind

ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,

firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT:

If the Principal, or any of Principal's heirs, executors, administrators, successors,

assigns, or Subcontractors, 1) fails to pay in full all of the persons named in Civil Code Section

3181 with respect to any labor or materials furnished by said persons on the project described

above, or 2) fails to pay in full all amounts due under the California Unemployment Insurance

Code with respect to work or labor performed on the project described above, or 3) fails to pay

for any amounts required to be deducted, withheld, and paid over to the Employment

Development Department from the wages of employees of the Principal and Subcontractors

pursuant to Unemployment Insurance Code section 13020 with respect to such work and labor,

then the Surety shall pay for the same.

Surety hereby stipulates and agrees that no change, extension of time, alteration or

addition to the terms of the contract on the call for bids, or to the work to be performed there

under, or the specifications accompanying the same, shall in any way affect its obligation under

this bond, and it does hereby waive notice of any such change, extension of time, alteration or

addition to the terms of said contract or the call for bids, or to the work, or to the specifications.

LONOAK ROAD BRIDGE

CONTRACT NO. 11-220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�If suit is brought upon this bond by the County and judgment is recovered, the Surety

shall pay all litigation expenses incurred by the County in such suit, including attorney's fees,

court costs, expert witness fees and investigation expenses.

This bond inures to the benefit of any of the persons named in Civil Code section 318 1,

and such persons or their assigns shall have a right of action in any suit brought upon this bond,

subject to any limitations set forth in Civil Code sections 3247 et seq. Civil Code, Division 3,

Part 4, Title 15, Chapter 7: Payment Bond for Public Works).

IN WITNESS WHERE OF the above-bounden parties have executed this instrument

under their several seals this 27th day of April  20 11  the name and corporate

seal of each corporate party being hereto affixed and these presents duly signed by its

undersigned representative, pursuant to authority of its governing body.

Corporate Seal)

Corporate Seal)

M.C.M. Construction, Inc.

EDMUNDO A. PUCHI, TREASURER

Name and Title

Surety

Travelers Casualty and Surety Company of America

Attorney-in-Fact

Attach notary acknowledgment for all signatures and attorney-in-fact certificate for signature by surety's

representative)

LONOAK ROAD BRIDGE 2

CONTRACT NO. 11-220565

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�ACKNOWLEDGMENT

State of California

County of Santa Clara

On April 27, 2011 before me, Erin Bautista, Notary Public

insert name and title of the officer)

personally appeared Jean L. Neu

who proved to me on the basis of satisfactory evidence to be the person(a) whose name(a) is/auax

subscribed to the within instrument and acknowledged to me that sheflbe executed the same in

his/her/M* authorized capacity(, and that by his/her/ft j signature(;) on the instrument the

person(J, or the entity upon behalf of which the person(a) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing

paragraph is true and correct.

WITNESS my hand and official seal.

Signature   l1 Seal)

ERIN BAUTISTA

Commission # 1884542

z  d Notary Public  California Z

Z c--.-  n-_..

 

My Comm. Expires Apr 25. 2014

7

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

TRAVELERS

POWER OF ATTORNEY

Farmington Casualty Company St. Paul Mercury Insurance Company

Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company

Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America

St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company

St. Paul Guardian Insurance Company

Attorney-In Fact No. 223488

Farmington Casualty Company

Fidelity and Guaranty Insurance Company

Fidelity and Guaranty Insurance Underwriters, Inc.

St. Paul Fire and Marine Insurance Company

St. Paul Guardian Insurance Company

KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance

Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and

Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty

Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under

the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin

herein collectively called the Companies"), and that the Companies do hereby make, constitute and appoint

Bryan D. Martin, Bradley N. Wright, Jean L. Neu, Erin Bautista, and Frances Murphy

of the City of San Jose  State of California  their true and lawful Attorney(s)-in-Fact,

each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and

other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of

contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.

11th

IN WITNESS WHEREOF, the Comp tze have caused this instrument to be signed and their-corporate seals to be hereto affixed, this

day of April Lll1J 1

State of Connecticut

City of Hartford as.

By:

Certificate No.004157517

St. Paul Mercury Insurance Company

Travelers Casualty and Surety Company

Travelers Casualty and Surety Company of America

United States Fidelity and Guaranty Company

On this the 11th da April 2011

Y of  before me personally appeared George W. Thompson, who acknowledged

himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters,

Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety

Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do,

executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.

In Witness Whereof, I hereunto set my hand and official seal.

My Commission expires the 30th day of June, 2011.

58440-4-09 Printed in U.S.A.

t'n can C

Marie C. Tetreault, Notary Public

WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

REVISED COMPLETED BOARD ORDERm�CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT

 

State of California

County of Sacramento

 

on April 28, 2011 before me, Christine Golden, Notary Public

Date Here Insert Name and Title of the Officer

personally appeared Edmundo A. Puchi

Name(s) of Signer(s)

who proved to me on the basis of satisfactory evidence to

be the person(s) whose name(s) is/acs-subscribed to the

within instrument and acknowledged to me that

he/she/they executed the same in his/her eir authorized

capacity(ies), and that by his/her leir signature(s)-on the

instrument the person(s)1 or the entity upon behalf of

which the person(s) acted, executed the instrument.

CHRISTINE GOLDEN

Commission # 1895518

Notary Public  California

Sacramento County

My Comm. Expires Aug 9, 2014

Place Notary Seal Above

I certify under PENALTY OF PERJURY under the laws

of the State of California that the foregoing paragraph is

true and correct.

WITNESS and ar1d official

Signature  INVA AiL

Si

P

bfi

N

gnature

otary

u

c

OPTIONAL

Though the Information below Is not required by law, it may prove valuable to persons relying on the document

and could prevent fraudulent removal and reattachment of this form to another document.

Description of Attached Document

Title or Type of Document: Payment Bond

Document Date: April 27, 2011 Number of Pages: 2

Signer(s) Other Than Named Above: None

Capacity(ies) Claimed by Signer(s)

Signer's Name: Edmundo A. Puchi

0 Individual

 

Corporate Officer  Title(s): Treasurer

 Partner  0 Limited  General

 Attorney in Fact

0 Trustee

 Guardian or Conservator

 Other:

Signer Is Representing:

MCM Construction. Inc.

RIG, I I Ii:~F,1BFriIIIT

OF SIGNER

Top of thumb here

Signer's Name:

 Individual

 Corporate Officer  Title(s):

 Partner   Limited  General

 Attorney in Fact

 Trustee

 Guardian or Conservator

 Other:

Signer Is Representing:

RIC T T! IUh.1B i,mrI1

OF SIG'JER

Top of thumb here

02007 National Notary AssociatIon  9350 Do Solo Ave R.0. Box 2402  Chatsworth, CA 91313-2402� www NatlonaP4otarxorg Item 116907 Reorder. CaIIT7ll-Free 1-800-876-6927

 

 

BIB]

 

40732-U01

REVISED-U02

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO103975-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

7/8/2011-U04

MARCELLAC-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

 

 

EXECUTED AGREEMENT"�|Em��CONTRACT FOR PUBLIC WORK

COUNTY OF MONTEREY

STATE OF CALIFORNIA

CONTRACT NO. 11-220565

THIS AGREEMENT, made in triplicate by and between the COUNTY OF MONTEREY, a

political subdivision of the State of California, hereinafter called the County," and

MCM CONSTRUCTION, INC., hereinafter called the Contractor,"

WITNESSETH:

1) THE WORK

The Contractor shall do all the work and furnish all the materials, except such as

are mentioned in any of the contract documents to be furnished by the County, necessary to

construct and complete in a good, workmanlike and substantial manner and to the satisfaction of

the County, the following public work:

LONOAK ROAD BRIDGE

AT LEWIS CREEK

COUNTY BRIDGE NO. 402, STATE BRIDGE NO.44C-0158

PROJECT NO. 11-220565

STATE PROJECT NO. NO. EA 05-927094L

FEDERAL AID PROJECT NO. BRLOZB-5944 035)

in accordance with this agreement and with all of the following additional contract documents

which are incorporated into and made a part of this agreement:

a) The Standard Specifications, dated July 2002 and the Standard Specifications

dated May 2006 with Amendments issue date 11-30-10 were referenced; and

the Standard Plans, dated July 2002 and May 2006 of the State of California,

Department of Transportation.

b) A set of plans and cross sections when applicable) entitled:

LONOAK ROAD BRIDGE AT LEWIS CREEK,

STATE BRIDGE NO. 44C-0158) 44C-0179, COUNTY BR. NO. 402

FEDERAL-AID PROJECT NO. BRLOZB-5944 035)

PROJECT NO. 11-220565

c) The Special Provisions for the work.

d) The Notice to Bidders calling for bids.

e) The Payment and Performance bonds required.

LONOAK ROAD BRIDGE

CONTRACT NO. 11-220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��f)

Local Agency Bidder  DBE information, Exhibit 15-G(2)

g) Certificate of Insurance.

h) The accepted bid/proposal including the following:

1)  List of Subcontractors

2)  Equal Employment Opportunity Certification

3)  Public Contract Code

  Section 10285.1 Statement

  Section 10162 Questionnaire

  Section 10232 Statement

4)  Non-Collusion Affidavit

5)  Debarment and Suspension Certification

6)  Non-Lobbying Certification for Federal Aid Contracts

7)  Disclosure of Lobbying Activities

8)  Statement Concerning Employment of Undocumented Aliens

9)  Contractor's Certificate as to Worker's Compensation

10)  List of Satisfied Public Agencies

11)  Bidder's Bond

12)  Bidder's List

13)  Local Agency Bidder  UDBE Commitment, Exhibit 15-G(1)

14)  UDBE Information  Good Faith Efforts, Exhibit 15-H

All contract documents are intended to cooperate, so that any work called for in one and

not mentioned in another is to be executed the same as if mentioned in all. However, should

there be any conflict between the terms of this instrument and the Contractor's bid or proposal,

then this instrument shall control.

2. WORKERS' COMPENSATION

In accordance with the provisions of Section 3700 of the Labor Code, the Contractor

and every Subcontractor will be required to secure the payment of compensation to his

employees.

3. CONTRACT PRICE

The County shall pay the Contractor the following prices for the performance of this

contract:

LONOAK ROAD BRIDGE

AT LEWIS CREEK

COUNTY BRIDGE NO. 402, STATE BRIDGE NO.44C-0158

PROJECT NO. 11-220565

STATE PROJECT NO. EA 05-927094L

FEDERAL AID PROJECT NO. BRLOZB-5944 035)

ITEM   UNIT OF ESTIMATE UNIT PRICE ITEM TOTAL

NO ITEM CODE ITEM DESCRIPTION MEASURE QUANTITY In Figures) In Figures)

1 066072 Maintain Detour LS 1 $5,000.00 $5,000.00

LONOAK ROAD BRIDGE 2

CONTRACT NO. 11-220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��ITEM ITEM CODE ITEM DESCRIPTION UNIT OF ESTIMATE UNIT PRICE ITEM TOTAL

NO   MEASURE QUANTITY In Figures) In Figures)

2 066105 Resident Engineer's Office LS 1 $35,000.00 $35,000.00

  Project Schedule   

3 070010 Critical Path Method) LS 1 $5,000.00 $5,000.00

  Temporary Fence   

4 071302 Type BW) m 200 $25.00 $5,000.00

  Temporary Fence   

5 071325 Type ESA) m 75 $20.00 $1,500.00

6 073031 900 mm Temporary Culvert m 100 $100.00 $10,000.00

  900 mm Temporary   

7 073031A Flared End Section EA 8 $400.00 $3,200.00

  Prepare Storm Water Pollution   

8 074019 Prevention Proram S) LS 1 $1,200.00 $1,200.00

9 074020 Water Pollution Control LS 1 $10,000.00 $10,000.00

10 120090 Construction Area Signs LS 1 $3,000.00 $3,000.00

11 120100 Traffic Control System LS 1 $12,000.00 $12,000.00

12 129000 Temporary Railing Type K) m 50 $150.00 $7,500.00

13 129100 Temporary Crash Cushion   

  Module EA 22 $350.00 $7,700.00

14 150605 Remove Fence m 325 $8.00 $2,600.00

  Install Salvaged) Gate with   

15 151554 Posts EA 3 $1,4 00.00 $4,200.00

16 152386 Relocate Roadside   

  Sign  One Post EA 2 $250.00 $500.00

17 152423 Adjust Monument to Grade EA 2 $600.00 $1,200.00

18 153103 Cold Plane AC Pavement   

  60 mm) m2 15 $250.00 $3,750.00

19 157550 Bridge Removal LS 1 $45,000.00 $45,000.00

20 160101 Clearing and Grubbing LS 1 $10,000.00 $10,000.00

21 170101 Develop Water Supply LS 1 $10,000.00 $10,000.00

22 190101 Roadway Excavation F) m3 850 $25.00 $21,250.00

23 190136 Roadway Excavation   

  Detour) F) m3 315 $85.00 $26,775.00

24 192003 Structure Excavation m3 207 

  Bridge) F)   $50.00 $10,350.00

25 192020 Structure Excavation   

  Type D) F) m3 7 $120.00 $840.00

  Structure Backfill   

26 193003 Bridge) F) m3 115 $125.00 $14,375.00

27 198001 Import Borrow Detour) m3 440 $85.00 $37,400.00

LONOAK ROAD BRIDGE 3

CONTRACT NO. 11-220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��ITEM ITEM CODE ITEM DESCRIPTION UNIT OF ESTIMATE UNIT PRICE ITEM TOTAL

NO   MEASURE QUANTITY In Figures) In Figures)

28 203016A Erosion Control   

  Type D-Seed Mix #1) S) m2 700 $3.00 $2,100.00

29 203016B Erosion Control   

  Type D-Seed Mix #2) S) m2 3,300 $3.00 $9,900.00

30 208252A 38 mm Plastic Pipe   

  PR 200) Supply Line) m 30 $120.00 $3,6 00.00

31 208751A 102 mm Galvanized Steel   

  Pipe Conduit m 15 $150.00 $2,250.00

32 220101 Finish Roadway

LS

1

$5,000.00

$5,000.00

33 260200A Detour Baserock

m3

460

$85.00

$39,100.00

34 260201 Aggregate Base Class 2)

M3

910

$70.00

$63,700.00

35 390102 Hot Mix Asphalt Type A)

to

610

$140.00

$85,400.00

36 393001 Pavement Reinforcing   

  Fabric m2 13 $25.00 $325.00

37 490663 1.5 m Cast-In-Drilled Hole   

  Concrete Piling S) m 30 $4,900.00 $147,000.00

38 490696 Furnish Piling Class   

  900) P) m 360 $165.00 $59,400.00

39 490697 Drive Pile Class 900)

EA

24

$2,200.00

$52,800.00

40 500001 Prestressing Cast-In-Place   

  Concrete S) LS 1 $25,000.00 $25,000.00

41 510051 Structural Concrete,   

  Bridge Footing m3 26 $430.00 $11,180.00

42 510053 Structural Concrete,   

  Bridge m3 280 $1,167.00 $326,760.00

43 519129A Joint Seal Assembly   

  Type B MR=50 mm) m 21 $250.00 $5,250.00

44 520102 Bar Reinforcing Steel   

  Bridge) P)(S) kg 63,000 $1.80 $113,400.00

45 566011 Roadside Sign-One Post

EA

8

$400.00

$3,200.00

46 721007 RSP 220 kg 1/4 Ton)   

  Method B) m3 125 $93.00 $11,625.00

47 729010 Rock Slope Protection   

  Fabric m2 250 $2.00 $500.00

48 731507 Minor Concrete   

  Gutter Depression) m3 1.6 $2,200.00 $3,520.00

49 750501 Miscellaneous Metal   

  Bridge) kg 66 $20.00 $1,320.00

50 800002 Fence Type BW, Wood   

  Post) m 270 $33.00 $8,910.00

51 800701 Reconstruct Pipe Fence

m

20

$330.00

$6,600.00

52 810110 Survey Monument EA 2 $1,400.00 $2,800.00

53 820118 Guard Railing Delineator EA 4 $140.00 $560.00

LONOAK ROAD BRIDGE 4

CONTRACT NO. 11-220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��ITEM

ITEM CODE

ITEM DESCRIPTION UNIT OF ESTIMATE UNIT PRICE ITEM TOTAL

NO   MEASURE QUANTITY In Figures) In Figures)

54 820152 Object Marker   

  Type L-2 CA) EA 4 $130.00 $520.00

55 832003 Metal Beam Guard Railing   

  Wood Post) S) m 31 $75.00 $2,325.00

56 839565 Terminal System   

  Type SRT) S) EA 4 $2,400.00 $9,600.00

57 839720 Concrete Barrier Type 732)

m

112

$340.00

$38,080.00

58 840561 100 nun Thermoplastic   

  Traffic Stripe S) m 1,414 $2.00 $2,828.00

59 840656 Paint Traffic Stripe 2-Coat)

m

186

$4.00

$744.00

60 850111 Pavement Marker   

  Retroreflective) S) EA 110 $6.00 $660.00

61 860791A 4) 102 mm Direct Buried   

  Utility Conduit at&t) m 50 $85.00 $4,250.00

62 860792A 102 mm Utility Conduit in   

  bridge at&t) m 47 $100.00 $4,700.00

63 994629 Relocate Building Barn) LS 1

$1,000.00

$1,000.00

64 999990 Mobilization 10%) LS 1 $149,752.00 $149,752.00

P)  Denotes Partial Pay Item 

F)  Denotes Final Pay Item TOTAL BID $1,499,999.00

S)  Denotes Specialty Item 

LONOAK ROAD BRIDGE 5

CONTRACT NO. 11-220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the

dates appearing below their respective signatures.

CONTRACTOR:

MCM CONSTRUCTION, INC.

COUNTY OF MONTEREY:

By:

Name: Yazdan T. Emrani, P.E.

Title: Director of Public Works

Date: n e

APPROVE AS TO FORM

By:

Name:

Title:

Date:

Cynthia L. Hasson

APPROVE AS TO INDEMNITY/

R RIiJAGE

COUNTY OF M ONTERwEY

By: APPROVED S TO IN4DEMN

Name:1N�jiN1NGUAGE

Deputy County Counsel Title: Risk Mana

S  d 1 1/ Date: Efate:

LONOAK ROAD BRIDGE 6

CONTRACT NO. 11 220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��COUNTY OF MONTEREY

PAYMENT BOND

Civil Code Section 3249)

BOND #105471528

Premium: Incl. in

Performance Bond

WHEREAS, the County of Monterey has awarded to Principal, as Contractor, a

contract for the following project:

LONOAK ROAD BRIDGE

AT LEWIS CREEK

COUNTY BRIDGE NO. 402, STATE BRIDGE NO.44C-0158

PROJECT NO. 11-220565

STATE PROJECT NO. EA 05-927094L

FEDERAL AID PROJECT NO. BRLOZB-5944 035)

AND WHEREAS, Principal, as Contractor, is required to furnish a bond in connection

with said contract, to secure the payment of claims of laborers, mechanics, materialmen, and

other persons furnishing labor and materials on the project, as provided by law.

NOW, THEREFORE, we M.C.M. Construction, Inc.  as

Principal, and Travelers Casualty and Surety Company of America

as Surety, are held and firmly

bound unto the County of Monterey, a political subdivision of the State of California hereinafter

called County", and to the persons named in California Civil Code section 3181 in the penal

One Million Four Hundred Ninety Nine Thousand Nine Hundred for the

sum or Ninety Nine & 00/100a--=(81.499.999.00)

payment of which sum in lawful money of the United States, well and truly to be made, we bind

ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,

firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT:

If the Principal, or any of Principal's heirs, executors, administrators, successors,

assigns, or Subcontractors, 1) fails to pay in full all of the persons named in Civil Code Section

3181 with respect to any labor or materials furnished by said persons on the project described

above, or 2) fails to pay in full all amounts due under the California Unemployment Insurance

Code with respect to work or labor performed on the project described above, or 3) fails to pay

for any amounts required to be deducted, withheld, and paid over to the Employment

Development Department from the wages of employees of the Principal and Subcontractors

pursuant to Unemployment Insurance Code section 13020 with respect to such work and labor,

then the Surety shall pay for the same.

Surety hereby stipulates and agrees that no change, extension of time, alteration or

addition to the terms of the contract on the call for bids, or to the work to be performed there

under, or the specifications accompanying the same, shall in any way affect its obligation under

this bond, and it does hereby waive notice of any such change, extension of time, alteration or

addition to the terms of said contract or the call for bids, or to the work, or to the specifications.

LONOAK ROAD BRIDGE

CONTRACT NO. 11-220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��If suit is brought upon this bond by the County and judgment is recovered, the Surety

shall pay all litigation expenses incurred by the County in such suit, including attorney's fees,

court costs, expert witness fees and investigation expenses.

This bond inures to the benefit of any of the persons named in Civil Code section 3181,

and such persons or their assigns shall have a right of action in any suit brought upon this bond,

subject to any limitations set forth in Civil Code sections 3247 et seq. Civil Code, Division 3,

Part 4, Title 15, Chapter 7: Payment Bond for Public Works).

IN WITNESS WHERE OF the above-bounden parties have executed this instrument

under their several seals this 27th day of April  20 11  the name and corporate

seal of each corporate party being hereto affixed and these presents duly signed by its

undersigned representative, pursuant to authority of its governing body.

Corporate Seal)

Corporate Seal)

M.C.M. Construction, Inc.

Surety

Name and Title EDMUNDO A. PUCHI, TREASURER

Travelers Casualty and Surety Company of America

Attorney-in-Fact

Attach notary acknowledgment for all signatures and attorney-in-fact certificate for signature by surety's

representative)

LONOAK ROAD BRIDGE 2

CONTRACTNO, 11-220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em�                     �ACKNOWLEDGMENT

State of California

County of Santa Clara

On April 27, 2011 before me, Erin Bautista, Notary Public

insert name and title of the officer)

personally appeared Jean L. Neu

who proved to me on the basis of satisfactory evidence to be the person() whose name() is/aix

subscribed to the within instrument and acknowledged to me that kadsheAtmy executed the same in

its/her/1 i'F-authorized capacityb  and that by kWher/kt@k signature(;e) on the instrument the

person(), or the entity upon behalf of which the person() acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing

paragraph is true and correct.

WITNESS my hand and official seal.

Signature

Seal)

ERIN BAUTISTA

Commission # 1884542 Z

Notary Public  California

D

Z Santa Clara County

My Comm. Expires Apr 25, 2014

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em�

�TRAVELERS

WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

POWER OF ATTORNEY

Farmington Casualty Company St. Paul Mercury Insurance Company

Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company

Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America

St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company

St. Paul Guardian Insurance Company

Attorney-In Fact No. 223488

Certificate No. V lJ Y 57 s.,! 1 5

KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance

Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and

Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty

Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under

the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin

herein collectively called the Companies"), and that the Companies do hereby make, constitute and appoint

Bryan D. Martin, Bradley N. Wright, Jean L. Neu, Erin Bautista, and Frances Murphy

of the City of San Jose  State of California  their true and lawful Attomey(s)-in-Fact,

each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and

other writings obligatory in the nature thereof on behalf of the Companies in their-business of guaranteeing the fidelity of persons, guaranteeing the performance of

contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or-proceedings allowed by law.

1 1 th

IN WITNESS HEREOF, the CompaLIIJJ pjep have caused this instrument to be signed and their corporate seals to be hereto affixed, this

l

day of April

Farmington Casualty Company

Fidelity and Guaranty Insurance Company

Fidelity and Guaranty Insurance Underwriters, Inc.

St. Paul Fire and Marine Insurance Company

St. Paul Guardian Insurance Company

State of Connecticut

City of Hartford ss.

By:

St. Paul Mercury Insurance Company

Travelers Casualty and Surety Company

Travelers Casualty and Surety Company of America

United States Fidelity and Guaranty Company

11th April 2011

On this the day of  before me personally appeared George W. Thompson, who acknowledged

himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters,

Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety

Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do,

executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.

In Witness Whereof, I hereunto set my hand and official seal.

My Commission expires the 30th day of June, 2011.

58440-4-09 Printed in U.S.A.

Marie C. Tetreault, Notary Public

WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em�
�WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity

and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance

Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States

Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows:

RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice

President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf

of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the

Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any

of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is

FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may

delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy

thereof is filed in the office of the Secretary; and it is

FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking

shall be valid and binding upon the Company when a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice

President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the

Company's seal by a Secretary or Assistant Secretary; or b) duly executed under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power

prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is

FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President,

any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any

certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds

and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal

shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on

the Company in the future with respect to any bond or understanding to which it is attached.

1, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance

Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and

Surety Company, Travelers Casualty and Surety Company of America, and United'States Fidelity and Guaranty Company do hereby certify that the above and foregoing

is a true and correct copy of the Power of Attorney executed by said Compnies which is in full force and effect and has not been revoked.

 

IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of saidFCompanies this 2 7th day of April 2011

j/~OPPONq)f'~H /`OORPONgrf: jn:

cut  tml tf;  n~

t? SEAL%bn: J. i~t

 

 

Kori M. Johans Assistant Secretary

To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney-In-Fact number, the

above-named individuals and the details of the bond to which the power is attached.

WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em�

�CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT

State of California

County of Sacramento

 

on April 28, 2011 before me, Christine Golden, Notary Public

Date

personally appeared Edmundo A. Puchi

Here Insert Name and Title of the Officer

Name(s) of Signer(s)

who proved to me on the basis of satisfactory evidence to

be the person(s) whose name(s) isIac subscribed to the

within instrument and acknowledged to me that

her/sheAhey executed the same in his/horltheir authorized

capacity(ies), and that by his/her/their signature(s)-on the

instrument the person(s); or the entity upon behalf of

which the persons) acted, executed the instrument.

CHRISTINE GOLDEN

Commission # 1895518

Notary Public  California

My Comm. Expires Al c 9 2014

Sacramento County

Place Notary Seal Above

I certify under PENALTY OF PERJURY under the laws

of the State of California that the foregoing paragraph is

true and correct.

Signatur

OPTIONAL

Though the information below is not required by law, it may prove valuable to persons relying on the document

and could prevent fraudulent removal and reattachment of this form to another document.

Description of Attached Document

Title or Type of Document: Payment Bond

Document Date: April 27, 2011 Number of Pages: 2

Signer(s) Other Than Named Above: None

Capacity(ies) Claimed by Signer(s)

Signer's Name: Edmundo A. Puchi

 Individual

V

Treasurer

Corporate Officer  Title(s):

 Partner   Limited  General

 Attorney in Fact

 Trustee

 Guardian or Conservator

 Other:

Signer Is Representing:

MCM Construction, Inc.

a

RIGI Ir1I IUMBPRINT

OF SIGNER

Top of thumb here

Signer's Name:

 Individual

 Corporate Officer  Title(s):

 Partner   Limited  General

 Attorney in Fact

 Trustee

 Guardian or Conservator

 Other:

Signer Is Representing:

RIGIIT TI IUMBPRINI'

OF SIGNER

Top of thumb here

02007 National Notary Association- 9350 De Solo Ave., P.O. Box 2402 Chatsworth, CA 91313-2402� www.NationaiNotaryorg Item 56907 Reorder: CallToll-Free 1.800.876-6827

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em�

�COUNTY OF MONTEREY

PERFORMANCE BOND

WHEREAS, the County of Monterey has awarded to Principal, M M. C  M M. Construction, Inc.

as Contractor, a contract for the following project:

LONOAK ROAD BRIDGE

AT LEWIS CREEK

COUNTY BRIDGE NO. 402, STATE BRIDGE NO.44C-0158

PROJECT NO. 11-220565

STATE PROJECT NO. EA 05-927094L

FEDERAL AID PROJECT NO. BRLOZB-5944 035)

BOND #105471528

Premium: $6,750.00

WHEREAS, Principal, as Contractor, is required to furnish a bond in connection with said

contract, to secure the faithful performance of said contract.

NOW, THEREFORE, we M  C  M  Construction, Inc.  as Principal,

and Travelers Casualty and Surety Company of America

as Surety, are held and firmly

bound unto the County of Monterey, a political subdivision of the State of California hereinafter

called County"), in the anal sum of None Million & Four Hundred Ninety Nine ThousanioTNinet,Heundred

p /5-- csti 499.999.00) 1 I1]]

payment of which sum in lawful money of the United States, well and truly to be made, we bind

ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,

firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT:

If the Principal, as Contractor, or Principal's heirs, executors, administrators, successors,

or assigns, 1) shall in all things stand to and abide by and well and truly keep and perform the

covenants, conditions, and agreements in said contract and any alteration thereof made as therein

provided, on Principal's part to be kept and performed, at the time and in the manner therein

specified and in all respects according to their true intent and meaning, and 2) shall defend,

indemnify and save harmless the County, the members of its board of supervisors, and its

officers, agents and employees as therein stipulated, then this obligation shall become null and

void; otherwise, it shall be and remain in full force and virtue.

Surety hereby stipulates and agrees that no change, extension of time, alteration, or addition

to the terms of the contract or the call for bids, or to the work to be performed thereunder, or the

specifications accompanying the same, shall in any way affect its obligation under this bond, and

it does hereby waive notice of any such change, extension of time, alteration or addition to the

terms of said contract or the call for bids, or to the work, or to the specifications.

Whenever the Principal, as Contractor, is in default, and is declared in default, under the

contract by the County of Monterey, the County of Monterey having performed its obligation

under the contract, Surety may promptly remedy the default, or shall promptly:

1) Complete the contract in accordance with its terms or conditions, or

LONOAK ROAD BRIDGE 3

CONTRACT NO. 11 220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��2) Obtain a bid or bids for submission to County of Monterey for completing the

contract in accordance with its terms or conditions, and upon determination by

County of Monterey and Surety of the lowest responsible and responsive bidder,

arrange for a contract between such bidder and County of Monterey, and make

available as work progresses even though there should be a default or a

succession of defaults under the contract or contracts of completion arranged

under this paragraph) sufficient funds to pay the cost of completion less the

balance of contract price.

If suit is brought upon this bond by the County and judgment is recovered, the Surety shall

pay all litigation expenses incurred by the County in such suit, including attorney's fees, court

costs, expert witness fees and investigation expenses.

IN WITNESS WHEREOF, the above-bounden parties have executed this instrument under

their several seals this 27th day of Aril  20 11 the name and

corporate seal of each corporate party being hereto affixed and these presents duly signed by its

undersigned representative, pursuant to authority of its governing body.

Corporate Seal)

Corporate Seal)

M.C.M. Construction, Inc.

Name and Title EDMUNDO A. PUCHI, TREASURER

Surety

Travelers Casualty and Surety Company of America

Attorney-in-Fact

Attach notary acknowledgment for all signatures and attorney-in-fact certificate for signature by surety's

representative)

LONOAK ROAD BRIDGE 4

CONTRACT NO. 11-220565

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��ACKNOWLEDGMENT

State of California

County of Santa Clara

April 27, 2011 before me, Erin Bautista, Notary Public

insert name and title of the officer)

personally appeared Jean L. Neu

who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/arx

subscribed to the within instrument and acknowledged to me that iWshc/lbe~z executed the same in

iais/her/ft authorized capacity(e,t, and that by i /her/wit signature() on the instrument the

person(, or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing

paragraph is true and correct.

WITNESS my hand and official seal.

Signature

Seal)

ERIN BAUTISTA I

Commission # 1884542

Z W Notary Public  California D

Z Santa Clara County

My Comm. Expires Apr 25, 2014

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

TRAVELERS

POWER OF ATTORNEY

Farmington Casualty Company St. Paul Mercury Insurance Company

Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company

Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America

St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company

St. Paul Guardian Insurance Company

Attorney-In Fact No. 223488 Certificate No. 0 0 4 153 7 5 14

KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance

Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and

Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty

Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under

the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin

herein collectively called the Companies"), and that the Companies do hereby make, constitute and appoint

Bryan D. Martin, Bradley N. Wright, Jean L. Neu, Erin Bautista, and Frances Murphy

of the City of San Jose  State of California  their true and lawful Attorney(s)-in-Fact,

each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and

other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of

contracts and executing or guaranteeing bonds and undertakings required or permitted in any'actions or proceedings allowed by law.

11th

IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this

day of April 2011

Farmington Casualty Company

Fidelity and Guaranty Insurance Company

Fidelity and Guaranty Insurance Underwriters, Inc.

St. Paul Fire and Marine Insurance Company

St. Paul Guardian Insurance Company

State of Connecticut

City of Hartford ss.

By:

St. Paul Mercury Insurance Company

Travelers Casualty and Surety Company

Travelers Casualty and Surety Company of America

United States Fidelity and Guaranty Company

11th April 2011

On this the day of  before me personally appeared George W. Thompson, who acknowledged

himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters,

Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety

Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do,

executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.

In Witness Whereof, I hereunto set my hand and official seal.

My Commission expires the 30th day of June, 2011.

58440-4-09 Printed in U.S.A.

can C

Marie C. Tetreault, Notary Public

WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity

and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance

Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States

Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows:

RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice

President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf

of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the

Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any

of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is

FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may

delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy

thereof is filed in the office of the Secretary; and it is

FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of % bond, recognizance, or conditional undertaking

shall be valid and binding upon the Company when a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice

President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the

Company's seal by a Secretary or Assistant Secretary; or b) duly executed under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power

prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is

FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President,

any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any

certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds

and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal

shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on

the Company in the future with respect to any bond or understanding to which it is attached.

I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance

Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and

Surety Company, Travelers Casualty and Surety Company of America, and United'States Fidelity-and Guaranty Company do hereby certify that the above and foregoing

is a true and correct copy of the Power of Attorney executed by said Companieg,,which-is in full force and effect and has not been revoked.

IN TESTIMONY HEREOF, I have hereunto set my hand and affixed the-seals of said,. Companies this 2 7th

 

+coxroaatm

1951

day of April 2011

To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney-In-Fact number, the

above-named individuals and the details of the bond to which the power is attached.

WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT

State of California

County of Sacramento

On April 28, 2011

Date

 

before me, Christine Golden, Notary Public

Here Insert Name and Title of the Officer

personally appeared Edmundo A. Puchi

CHRISTINE GOLDEN

Commission # 1895518

Notary Public  California

Sacramento County

My Comm. Expires Aug 9, 2014

Name(s) of Signer(s)

who proved to me on the basis of satisfactory evidence to

be the person(s) whose name(s) is/ace-subscribed to the

within instrument and acknowledged to me that

he/she/t executed the same in his/hor/heir authorized

capacity{ies), and that by his/#her eir signature(s)-on the

instrument the person(s) or the entity upon behalf of

which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws

of the State of California that the foregoing paragraph is

true and correct.

WITNESS 1hand_arrd official se

 

Place Notary Seal Above

Signature

Signature o otary Public

OPTIONAL

Though the Information below is not required by law, it may prove valuable to persons relying on the document

and could prevent fraudulent removal and reattachment of this form to another document.

Description of Attached Document

Title or Type of Document: Performance Bond

Document Date: April 27, 2011

Signer(s) Other Than Named Above: None

Capacity(ies) Claimed by Signer(s)

Signer's Name: Edmundo A. Puchi

 Individual

 

Corporate Officer  Title(s): Treasurer

 Partner   Limited El General

 Attorney In Fact

 Trustee

 Guardian or Conservator

 Other:

Signer Is Representing:

MCM Construction, Inc.

RIGNt'111UMBPRINT

OF SIGNER

Top of thumb here

Number of Pages: 2

Signer's Name:

El Individual

 Corporate Officer Title(s):

 Partner   Limited  General

 Attorney in Fact

 Trustee

 Guardian or Conservator

 Other:

Signer Is Representing:

RIGIITTI-IUPIBPRINT

OF SIGNER

Top of thumb here

02007 National Notary Association  9350 De Soto Ave., P.O. Box 2402  Chatsworth, CA 91313-2402� www.NatlonalNoiaryorg Item 116907 Reorder: CaIIToll-Free 1-800.876-6827

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��AR  CERTIFICATE OF LIABILITY INSURANCE rIXATE MWDDNYM

Pag@ 1 of 2 04/28/2011

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES

BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED

REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies)must be endorsed. If SUBROGATION IS WAIVED, subject to

the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the

certificate holder in lieu of such endorsement(s).

PRODUCER CONTACT

 NAM

Willis Insurance Services of California, Inc. P

HONE

FAx

 

One Bush Street A/C Igo ExT).

877-945-7378

888-467-2378

AIC NO)

9th Floor E-MAIL C@rtlf cates�wili16  coin A S.

San Francisco, CA 94104 

 INSURER(S)AFFORDING COVERAGE NAIL #

 INSURERA:Zurich American Insurance Company 16535-100

INSURED

Inc

MCM Co

struction

INSURERS: American Guarantee and Liability Insuranc

26247-100

 

n

 

P. 0. Box 620 INSURERC:Zurich American Insurance Company 19356-900

North Highlands, CA 95660

INSURERD:Great American Assurance Company

26344-001

 INSURER E:

 INSURER F:

COVERAGES

CERTIFICATE NUMBER: 15879070

REVISION NUMBER:See Remarks

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD

INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,

EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

INSR

LTJL TYPE OF INSURANCE DD' SUB POLICY NUMBER POLICY EFF POLICY EXP LIMRS

 

A GENERAL LIABILITY Y  GL0475607600 3/1/2011 3/1/2012 EA

OCCURRENCE

H

CC $ 1,750,000

 X COMMERCIAL GENERAL LIABILITY      M

Aq

pp

FIR ISESOEa oocurenoe $ 100,000

  CLAIMS-MADE OCCUR      MED EXP Any one person) $ 5 0 0 0

 X SIR:$250,000 per occ      PERSONAL&ADVINJURY $ 1,750,000

 X XCU      GENERAL AGGREGATE $ 4,000,000

 GEN'L AGGREGATE LIMIT APPLIES PER:      PRODUCTS-COMP/OPAGG $ 4, 000 00,000

 POLICY X PRO X LOC       $

A AUTOMOBILE LIABILITY Y  BAP475607500 /1/2011 3/1/2012 COMBINED SINGLE LIMIT

Ea accident)

$ 2,000,000

 X ANY AUTO      BODILYINJURY(Perperson) $

  ALL OWNED

AUTOS  SCHEDULED

AUTOS     

BODILY INJURY(Peraccident)

$

  HIRED AUTOS  NON-OWNED

AUTOS      PROPER DA AG

Per accident)

$

          

B X UMBRELLAUAB X OCCUR   AUC475616100 3/1/2011 3/1/2012 EACH OCCURRENCE $ 5,000,000

         

  EXCESS LIAB CLAIMS-MADE      AGGREGATE $ 5 000 000

  DED RETENTION $       $

C WORKERS COMPENSATION   EWS475607800 3/1/2011 3/1/2012 X

 AND EMPLOYERS' LIABILITY

Y      

 ANYPROPRIETOR/PARTNER/EXECUTIVE N/A     E.L. EACH ACCIDENT $ 11000,000

 OFFICER/MEMBER EXCLUDED?

Mandatory in NH)     

E.L. DISEASE  EA EMPLOYEE I

s 1,000,000

 1f yes, describe under

DESCRIPTIONOFOPERATIONS below     

E.L. DISEASE  POLICY LIMIT

$ 1,000,000

D    EXC2098802 3/1/2011 3/1/2012

 Excess Liability      $8,000,000. Each Occurrence

       $8,000,000. Policy Aggregate

DESCRIPTION OF OPERATIONS I LOCATIONS /VEHICLES Attach Acord 101, Additonal Remarks Schedule, if more space Is required)

THIS VOIDS AND REPLACES PREVIOUSLY ISSUED CERTIFICATE DATED: 4/27/2011 WITH ID: 15875936

Re: MCM Job #347  Lonoak Road Bridge at Lewis Creek, King City, Monterey County

Excess Workers Compensation:

Excess of $500,000 Self-Insured Retention

The n Monterey, its officers. and employees Additional insureds as respects

 

CERTIFICATE HOLDER

CANCELLATION

 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

 THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN

 ACCORDANCE WITH THE POLICY PROVISIONS.

County of Monterey AUTHORIZED REPRESENTATIVE

Contracts/Purchasing Department

168 W Alisal Street, 3rd Floor

CA 93901

 

Salinas

 

Coll:3342940 Tpl:1257137 Cert:15879070 1988-2010ACORDCORPORATION. All rights reserved.

ACORD 25 2010/05) The ACORD name and logo are registered marks of ACORD

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��AGENCY CUSTOMER ID: 401000

LOC#:

ACO OR

ADDITIONAL REMARKS SCHEDULE

Page_ of 2

AGENCY NAMED INSURED

 MCM Construction, Inc.

Willis Insurance Services of California, Inc. P. 0. Box 620

POLICY NUMBER North Highlands, CA 9 5 6 6 0

See First Page

CARRIER NAIC CODE

See First Page  EFFECTIVE DATE: See First Page

ADDITIONAL REMARKS

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,

FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE

General Liability and Automobile Liability if required by written contract but only as respects to

operations of the Named Insured.

ACORD 101 2008/01) Coll:3342940 Tpl:1257137 Cert:15879070  2008ACORD CORPORATION. All rights reserved.

The ACORD name and logo are registered marks of ACORD

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��Additional Insured  Automatic  Owners, Lessees Or

0

ZURICH

Contractors

Policy No. Exp. Date of Pol. Eff. Date of End. Agency No. Addl. Prem. Return Prem.

GL0475607600 3/1/2012 3/1/2011  

THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

Named Insured: MCM Construction, Inc.

Address including ZIP Code): P. 0. Box 620

North Highlands, CA 95660

This endorsement modifies insurance provided under the:

Commercial General Liability Coverage Part

A. Section II  Who Is An Insured is amended to include as an insured any person or organization who you are re-

quired to add as an additional insured on this policy under a written contract or written agreement.

B. The insurance provided to the additional insured person or organization applies only to bodily injury", property

damage" or personal and advertising injury" covered under SECTION I  Coverage A  Bodily Injury And Prop-

erty Damage Liability and Section I  Coverage B  Personal And Advertising Injury Liability, but only with

respect to liability for bodily injury", property damage" or personal and advertising injury" caused, in whole or in

part, by:

1. Your acts or omissions; or

2. The acts or omissions of those acting on your behalf; and resulting directly from:

a. Your ongoing operations performed for the additional insured, which is the subject of the written contract or

written agreement; or

b. Your work" completed as included in the products-completed operations hazard", performed for the addi-

tional insured, which is the subject of the written contract or written agreement.

C. However, regardless of the provisions of paragraphs A. and B. above:

1. We will not extend any insurance coverage to any additional insured person or organization:

 a.

b. That is not provided to you in this policy; or

That is any broader coverage than you are required to provide to the additional insured person or organiza-

tion in the written contract or written agreement; and

2. We will not provide Limits of Insurance to any additional insured person or organization that exceed the lower

of:

a. The Limits of Insurance provided to you in this policy; or

Includes copyrighted material of Insurance Services Office, Inc., with its permission. U-GL-1 175-B CW 3/2007)

Page 1 o172

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��b. The Limits of Insurance you are required to provide in the written contract or written agreement.

D. The insurance provided to the additional insured person or organization does not apply to:

Bodily injury", property damage" or personal and advertising injury" arising out of the rendering or failure to

render any professional architectural, engineering or surveying services including:

1. The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field

orders, change orders or drawings and specifications; and

2. Supervisory, inspection, architectural or engineering activities.

E. The additional insured must see to it that:

1. We are notified as soon as practicable of an occurrence" or offense that may result in a claim;

2. We receive written notice of a claim or suit" as soon as practicable; and

3. A request for defense and indemnity of the claim or suit" will promptly be brought against any policy issued by

another insurer under which the additional insured may be an insured in any capacity. This provision does not

apply to insurance on which the additional insured is a Named Insured, if the written contract or written agree-

ment requires that this coverage be primary and non-contributory.

F. For the coverage provided by this endorsement:

1. The following paragraph is added to Paragraph 4.a. of the Other Insurance Condition of Section IV  Com-

mercial General Liability Conditions:

This insurance is primary insurance as respects our coverage to the additional insured person or organization,

where the written contract or written agreement requires that this insurance be primary and non-contributory. In

that event, we will not seek contribution from any other insurance policy available to the additional insured on

which the additional insured person or organization is a Named Insured.

2. The following paragraph is added to Paragraph 4.b. of the Other Insurance Condition of Section IV  Com-

mercial General Liability Conditions:

This insurance is excess over:

Any of the other insurance, whether primary, excess, contingent or on any other basis, available to an additional

insured, in which the additional insured on our policy is also covered as an additional insured by attachment of

an endorsement to another policy providing coverage for the same occurrence", claim or suit". This provision

does not apply to any policy in which the additional insured is a Named Insured on such other policy and where

our policy is required by written contract or written agreement to provide coverage to the additional insured on a

primary and non-contributory basis.

G. This endorsement does not apply to an additional insured which has been added to this policy by an endorsement

showing the additional insured in a Schedule of additional insureds, and which endorsement applies specifically to

that identified additional insured.

Any provisions in this Coverage Part not changed by the terms and conditions of this endorsement continue to apply as

written.

Includes copyrighted material of Insurance Services Office, Inc., with its permission. U-GL-1175 B CW 3/2007)

Page 2 of 2

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��POLICY NUMBER: BAP475607500

COMMERCIAL AUTO

CA 20 48 02 99

THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

DESIGNATED INSURED

This endorsement modifies insurance provided under the following:

BUSINESS AUTO COVERAGE FORM

GARAGE COVERAGE FORM

MOTOR CARRIER COVERAGE FORM

TRUCKERS COVERAGE FORM

With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless

modified by this endorsement.

This endorsement identifies person(s) or organization(s) who are insureds" under the Who Is An Insured Provision

of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form.

This endorsement changes the policy effective on the inception date of the policy unless another date is indicated

below.

Endorsement Effective: Countersigned By:

Named Insured: MCM Construction, Inc.

Authorized Representative)

SCHEDULE

Name of Person(s) or Organization(s):

The County of Monterey, its officers, agents and employees

If no entry appears above, information required to complete this endorsement will be shown in the Declarations as

applicable to the endorsement.)

Each person or organization shown in the Schedule is an insured" for Liability Coverage, but only to the extent that

person or organization qualifies as an insured" under the Who Is An Insured Provision contained in Section 11 of

the Coverage Form.

CA 983 2-99)

CA 20 48 02 99 Copyright, Insurance Services Office, Inc., 1998 Page 1 of I

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��POLICY NUMBER: BAP 4756075-00

B. General Conditions

1. Bank uptcy

Bankruptcy or insolvency of the insured" or

the insured's" estate will not relieve us of any

obligations under this coverage form.

2. Concealment, Misrepresentation Or Fraud

This coverage form is void in any case of fraud

by you at any time as it relates to this coverage

form. It is also void if you or any other in-

sured", at any time, intentionally conceal or

misrepresent a material fact concerning:

a. This coverage form;

b. The covered auto";

c. Your interest in the covered auto"; or

d. A claim under this coverage form.

3. Liberalization

If we revise this coverage form to provide more

coverage without additional premium charge,

your policy will automatically provide the addi-

tional coverage as of the day the revision is ef-

fective in your state.

4. No Benefit To Bailee  Physical Damage

Coverages

We will not recognize any assignment or grant

any coverage for the benefit of any person or

organization holding, storing or transporting

property for a fee regardless of any other pro-

vision of this coverage form.

5. Other Insurance

a. For any covered auto" you own, this cov-

erage form provides primary insurance. For

any covered auto" you don't own, the in-

surance provided by this coverage form is

excess over any other collectible insurance.

However, while a covered auto" which is a

trailer" is connected to another vehicle, the

Liability Coverage this coverage form pro-

vides for the trailer" is:

1) Excess while it is connected to a motor

vehicle you do not own.

2) Primary while it is connected to a cov-

ered auto" you own.

b. For Hired Auto Physical Damage Coverage,

any covered auto" you lease, hire, rent or

borrow is deemed to be a covered auto"

you own. However, any auto" that is

leased, hired, rented or borrowed with a

driver is not a covered auto".

c. Regardless of the provisions of Paragraph

a. above, this coverage form's Liability

Coverage is primary for any liability as-

sumed under an insured contract".

d. When this coverage form and any other

coverage form or policy covers on the same

basis, either excess or primary, we will pay

only our share. Our share is the proportion

that the Limit of Insurance of our coverage

form bears to the total of the limits of all the

coverage forms and policies covering on

the same basis.

6. Premium Audit

a. The estimated premium for this coverage

form is based on the exposures you told us

you would have when this policy began. We

will compute the final premium due when we

determine your actual exposures. The

estimated total premium will be credited

against the final premium due and the first

Named Insured will be billed for the bal-

ance, if any. The due date for the final pre-

mium or retrospective premium is the date

shown as the due date on the bill- If the es-

timated total premium exceeds the final

premium due, the first Named Insured will

get a refund.

b. If this policy is issued for more than one

year, the premium for this coverage form

will be computed annually based on our

rates or premiums in effect at the beginning

of each year of the policy.

7. Policy Period, Coverage Territory

Under this coverage form, we cover accidents"

and losses" occurring:

a. During the policy period shown in the Dec-

larations; and

b. Within the coverage territory.

The coverage territory is:

1) The United States of America;

2) The territories and possessions of the Unit-

ed States of America;

3) Puerto Rico;

4) Canada; and

5) Anywhere in the world if:

a) A covered auto" of the private passen-

ger type is leased, hired, rented or bor-

rowed without a driver for a period of 30

days or less; and

b) The insured's" responsibility to pay

damages is determined in a suit" on the

merits, in the United States of America,

the territories and possessions of the

United States of America, Puerto Rico or

Canada or in a settlement we agree to.

CA 00 0103 10  Insurance Services Office, Inc., 2009

Page 9 of 12 11

Insured Copy

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US

POLICY NO.

BAP 4756075-00

THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

EFF. DATE OF POL.

3/1/2011

EXP- DATE OF POL.

3/1/2012

Named Insured MCM Construction, Inc.

Address including ZIP Code)

EFF. DATE OF END.

3/1/2011

AGENCY NO.

This endorsement modifies insurance provided by the following:

Business Auto Coverage Part

Truckers Coverage Part

Garage Coverage Part

SCHEDULE

Name of Person or Organization:

ADD'L. PREM.

RETURN PREM.

ALL PERSONS AND/OR ORGANIZATIONS THAT ARE REQUIRED BY WRITTEN

CONTRACT OR AGREEMENT WITH THE INSURED, EXECUTED PRIOR TO THE

ACCIDENT OR LOSS, THAT WAIVER OF SUBROGATION BE PROVIDED UNDER THIS

POLICY.

We waive any right of recovery we may have against the designated person or organization shown in the schedule because of

payments we make for injury or damage caused by an accident" or loss' resulting from the ownership, maintenance, or use of a

covered auto" for which a Waiver of Subrogation is required in conjunction with work performed by you for the designated

person or organization. The waiver applies only to the designated person or organization shown in the schedule.

Countersigned

Authorized Representative

U-CA-320-A CW) 4/92)

insured Copy

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

NOTICE OF CANCELLATION  CERTIFICATE HOLDERS

SPECIFIED DAYS)

The person(s) or organization(s) listed or described in the Schedule below have requested that they

receive written notice of cancellation when this policy is cancelled by us. We will mail or deliver to the

Person(s) or Organization(s) listed or described in the Schedule a copy of the written notice of

cancellation that we sent to you. If possible, such copies of the notice will be mailed at least 60 days,

except for cancellation for non-payment of premium which will be mailed 10 days, prior to the effective

date of the cancellation, to the address or addresses of certificate holders as provided by your broker or

agent.

Schedule

Person(s) or Organization(s) including mailing address:

County of Monterey

Contracts/Purchasing Department

168 W Alisal Street, 3rd Floor

Salinas, CA 93901

This notification of cancellation of the policy is intended as a courtesy only. Our failure to provide such

notification to the person(s) or organization(s) shown in the Schedule will not extend any policy

cancellation date nor impact or negate any cancellation of the policy. This endorsement does not entitle

the person(s) or organization(s) listed or described in the Schedule above to any benefit, rights or

protection under this policy.

Any provision of this endorsement that is in conflict with a statute or rule is hereby amended to conform to

that statute or rule.

All other terms and conditions of this policy remain unchanged.

Endorsement Number:

Policy Number: BAP475607500

Named Insured: MCM Construction, Inc.

This endorsement is effective on the inception date of this Policy unless otherwise stated herein:

Endorsement Effective Date:

00 ML0087 00 11 10 Page 1 of 1

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em��THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

NOTICE OF CANCELLATION  CERTIFICATE HOLDERS

SPECIFIED DAYS)

The person(s) or organization(s) listed or described in the Schedule below have requested that they

receive written notice of cancellation when this policy is cancelled by us. We will mail or deliver to the

Person(s) or Organization(s) listed or described in the Schedule a copy of the written notice of

cancellation that we sent to you. If possible, such copies of the notice will be mailed at least 60 days,

except for cancellation for non-payment of premium which will be mailed 10 days, prior to the effective

date of the cancellation, to the address or addresses of certificate holders as provided by your broker or

agent.

Schedule

Person(s) or Organization(s) including mailing address:

County of Monterey

Contracts/Purchasing Department

168 W Alisal Street, 3rd Floor

Salinas, CA 93901

This notification of cancellation of the policy is intended as a courtesy only. Our failure to provide such

notification to the person(s) or organization(s) shown in the Schedule will not extend any policy

cancellation date nor impact or negate any cancellation of the policy. This endorsement does not entitle

the person(s) or organization(s) listed or described in the Schedule above to any benefit, rights or

protection under this policy.

Any provision of this endorsement that is in conflict with a statute or rule is hereby amended to conform to

that statute or rule.

All other terms and conditions of this policy remain unchanged.

Endorsement Number:

Policy Number: GL0475607600

Named Insured: MCM Construction, Inc.

This endorsement is effective on the inception date of this Policy unless otherwise stated herein:

Endorsement Effective Date:

00 ML0087 00 11 10 Page 1 of 1

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012

 

 

EXECUTED AGREEMENT"�|Em�� NOTEXTPAGE

 

 

BIB]

 

40956-U01

EXECUTED-U02

AGREEMENT-U02

LI21329-U03

FO96183-U03

FO96184-U03

FO99828-U03

MG99866-U03

AS99892-U03

AS99899-U03

AI102934-U03

DO109659-U03

C5-U03

AGREEMENTS-U03

2/13/2012-U04

BOYDA-U04

16667-U05

2-U06

A.-U07

AWARD-U07

A-U07

CONTRACT-U07

TO-U07

MCM-U07

CONSTRUCTION,-U07

INC.,-U07

THE-U07

LOWEST-U07

RESPONSIBLE-U07

BASE-U07

BIDDER,-U07

THE-U07

LONOAK-U07

ROAD-U07

BRIDGE-U07

AT-U07

300-PUBLIC-U08

WORKS-U08

ESTRADA-U09

IRMA-U09

ESTRADAI-U10

6/6/2011-U011

LEWIS-U012

CREEK-U012

REPLACEMENT-U012

PROJECT,-U012

BRIDGE-U012

NO.-U012

402,-U012

FEDERAL-U012

AID-U012

PROJECT-U012

NO.-U012

BRLOZB-5944(035),-U012

PROJECT-U012

NO.-U012

11-220565;-U012

IN-U012

THE-U012

TOTAL-U012

AMOUNT-U012

OF-U012

$1,499,999;-U012

B.-U012

APPROVE-U012

THE-U012

PERFORMANCE-U012

PAYMENT-U012

BONDS-U012

EXECUTED-U012

PROVIDED-U012

BY-U012

MCM-U012

CONSTRUCTION,-U012

INC.;-U012

C.-U012

AUTHORIZE-U012

A-U012

CONTINGENCY,-U012

TO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

CONTRACT-U012

AMOUNT,-U012

TO-U012

PROVIDE-U012

FUNDING-U012

APPROVED-U012

CONTRACT-U012

CHANGE-U012

ORDERS;-U012

D.-U012

AUTHORIZE-U012

THE-U012

DIRECTOR-U012

OF-U012

PUBLIC-U012

WORKS-U012

TO-U012

EXECUTE-U012

THE-U012

CONTRACT-U012

SUBJECT-U012

TO-U012

THE-U012

TERMS-U012

OF-U012

THE-U012

PUBLIC-U012

CONTRACT-U012

CODE,-U012

APPROVE-U012

CHANGE-U012

ORDERS-U012

TO-U012

THE-U012

CONTRACT-U012

DO-U012

EXCEED-U012

TEN-U012

PERCENT-U012

10%)-U012

OF-U012

THE-U012

ORIGINAL-U012

CONTRACT-U012

AMOUNT-U012

DO-U012

SIGNIFICANTLY-U012

CHANGE-U012

THE-U012

SCOPE-U012

OF-U012

WORK.-U012