Legislation Details

File #: WRAG 26-307    Name: TCB Industrial Inc. Amendment No. 3
Type: WR General Agenda Status: Agenda Ready
File created: 10/12/2026 In control: Water Resources Agency Board of Directors
On agenda: 10/19/2026 Final action:
Title: Approve Amendment No. 3 to the Agreement for Services with TCB Industrial, Inc., to increase the dollar amount by $175,000 for a total contract amount not-to-exceed $815,000 to provide diagnostic evaluation and repairs to the Unit 1 hydraulic controls system and to continue providing as needed maintenance and repair services for the Nacimiento Dam Hydroelectric Power Plant; and authorize the General Manager to execute the Amendment. (Staff: Manuel Saavedra)
Attachments: 1. Board Report, 2. Executed - TCB Industrial, Inc. Agreement, 3. Executed - Amendment No. 1 (TCB Industrial), 4. Executed - Amendment No. 2 (TCB Industrial), 5. Amendment No. 3 - TCB Industrial
Date Action ByActionResultAction DetailsSearchable Meeting DetailsVideo
No records to display.

Title

Approve Amendment No. 3 to the Agreement for Services with TCB Industrial, Inc., to increase the dollar amount by $175,000 for a total contract amount not-to-exceed $815,000 to provide diagnostic evaluation and repairs to the Unit 1 hydraulic controls system and to continue providing as needed maintenance and repair services for the Nacimiento Dam Hydroelectric Power Plant; and authorize the General Manager to execute the Amendment. (Staff: Manuel Saavedra)

Report

RECOMMENDATION:

It is recommended that the Monterey County Water Resources Agency Board of Directors:

 

Approve Amendment No. 3 to the Agreement for Services with TCB Industrial, Inc., to increase the dollar amount by $175,000 for a total contract amount not-to-exceed $815,000 to provide diagnostic evaluation and repairs to the Unit 1 hydraulic controls system and to continue providing as needed maintenance and repair services for the Nacimiento Dam Hydroelectric Power Plant; and authorize the General Manager to execute the Amendment.

 

SUMMARY/DISCUSSION:

On April 25, 2024, the Monterey County Water Resources Agency entered into a three-year term Agreement for Services (Agreement) with TCB Industrial in the amount of $100,000 to partially fund the refurbishment of Unit 2 and to provide as needed repair services for the Power Plant.

 

In September 2024, the Board of Directors approved Amendment No.1, increasing the Agreement by $265,000 for the overhaul of the Unit 2 generator and turbine.  The Board subsequently approved Amendment No. 2, adding $275,000 for the replacement of the Power Plant’s cooling coils, preventive maintenance on Unit 1, and continued as needed maintenance and repair services.

 

On September 21, 2026, during a PG&E power outage event, the Power Plant operator observed that Unit 1 required an abnormally long time to complete its shutdown sequence following a trip event.  Preliminary evaluation indicates a potential issue with the hydraulic controls system.  Additional inspection by a contractor specializing in mechanical system repairs (i.e., TCB Industrial) is needed to perform diagnostic troubleshooting and complete the necessary hydraulic control repairs.  Amendment No. 3 will fund the hydraulic control system diagnostic work and repairs and support future as needed repair services to maintain operational reliability of the Power Plant.

 

OTHER AGENCY INVOLVEMENT:

None. 

 

FINANCING:

Amendment No. 3 is financed from hydroelectric power sales revenue in Fund 1508.  Sufficient appropriations in Fund 1508 are included in the FY2025-26 Adopted Budget to pay for this amendment.

 

Prepared by: Manuel Saavedra, Associate Water Resources Engineer, (831) 755-4860

Approved by: Ara Azhderian, General Manager, (831) 755-4860

 

Attachments:

1.                     Original Agreement for Services.

2.                     Amendment No. 1.

3.                     Amendment No. 2.

4.                     Amendment No. 3.