File #: 10-870    Name:
Type: Minutes Status: Passed
File created: 7/27/2010 In control: Board of Supervisors
On agenda: 7/27/2010 Final action: 7/27/2010
Title: a. Conduct a Public Hearing to Consider Modifications to Mitigation Monitoring and Reporting Program for the State a. Conduct a Public Hearing to Consider Modifications to Mitigation Monitoring and Reporting Program for the State
Attachments: 1. Completed Board Order, 2. Completed Resolution No. 10-238, 3. Signed Board Report, 4. Attachment - Discussion, 5. Project Budget - Contract No. 10-111065, 6. Notice to Bidders - Contract No. 10-111065, 7. Proof of Publication - July 27, 2010 Hearing, 8. Exhibit A - Mitigation Monitoring and Reporting Program, 9. Book One - Contract No. 10-111065, 10. Book Two - Contract No. 10-111065
COMPLETED BOARD ORDER?"???S-6 Revised) Before the Board of Supervisors in and for the County of Monterey, State of California Construction No: 2010 006 a. Conduct a Public Hearing to Consider Modifications to Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements by Substituting Equivalent or More Effective Mitigation Measures; b. Consider adopting a Resolution making Appropriate Findings and adopting the Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements; c. Consider approving Plans and Special Provisions for the State Route 68 at San Benancio Road Intersection Improvements, State Project No. EA 05-0H8220, Contract No. 10-111065; d. Consider authorizing the Director of Public Works to sign the approved Plans and Specifications; and e. Consider authorizing the Director of Public Works to advertise the Notice to Bidders" in The Californian on January 17, 2011 and January 24, 2011, contingent upon passage of the State Budget. Upon motion of Supervisor Potter, seconded by Supervisor Calcagno, and carried by those members present, the Board hereby: a. Conducted a Public Hearing to Consider Modifications to Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements by Substituting Equivalent or More Effective Mitigation Measures; b. Considered and adopted Resolution No. 10-238 making Appropriate Findings and adopting the Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements; c. Considered and approved Plans and Special Provisions for the State Route 68 at San Benancio Road Intersection Improvements, State Project No. EA 05-0H8220, Contract No. 10-111065; d. Considered and authorized the Director of Public Works to sign the approved Plans and Specifications; and e. Considered and authorized the Director of Public Works to advertise the Notice to Bidders" in The Californian on January 17, 2011 and January 24, 2011, contingent upon passage of the State Budget. PASSED AND ADOPTED this 27th day of July, 2010, by the following vote, to wit: AYES: Supervisors Armenta, Calcagno, Salinas, Parker, Potter NOES: None ABSENT: None I, Gail T. Borkowski, Clerk of the Board of Supervisors of the County of Monterey, State of California, hereby certify that the foregoing is a true copy of an original order of said Board of Supervisors duly made and entered in the minutes thereof of Minute Book 75 for the meeting on July 27, 2010. Dated: November 12, 2010 Gail T. Borkowski, Clerk of the Board of Supervisors County of Monterey, State of California BIB] 40528-U01 COMPLETED-U02 BOARD-U02 ORDER-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94099-U03 C15-U03 COMPLETED-U03 BOARD-U03 ORDER-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 THE-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 THE-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 THE-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 THE-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 THE-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 THE-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 THE-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 THE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 THE-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 THE-U012 STATE-U012 BUDGET.-U012 COMPLETED BOARD ORDER?"???S-6 Before the Board of Supervisors in and for the County of Monterey, State of California Construction No: 2010 006 a. Conduct a Public Hearing to Consider Modifications to Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements by Substituting Equivalent or More Effective Mitigation Measures; b. Consider adopting a Resolution making Appropriate Findings and adopting the Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements; c. Consider approving Plans and Special Provisions for the State Route 68 at San Benancio Road Intersection Improvements, State Project No. EA 05-0H8220, Contract No. 10-111065; d. Consider authorizing the Director of Public Works to sign the approved Plans and Specifications; and e. Consider authorizing the Director of Public Works to advertise the Notice to Bidders" in The Californian on January 17, 2011 and January 24, 2011, contingent upon passage of the State Budget. Upon motion of Supervisor Potter, seconded by Supervisor Calcagno, and carried by those members present, the Board hereby: a. Conducted a Public Hearing to Consider Modifications to Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements by Substituting Equivalent or More Effective Mitigation Measures; b. Considered and adopted Resolution No. 10-238 making Appropriate Findings and adopting the Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements; c. Considered approving Plans and Special Provisions for the State Route 68 at San Benancio Road Intersection Improvements, State Project No. EA 05-0H8220, Contract No. 10-111065; d. Considered authorizing the Director of Public Works to sign the approved Plans and Specifications; and e. Considered authorizing the Director of Public Works to advertise the Notice to Bidders" in The Californian on January 17, 2011 and January 24, 2011, contingent upon passage of the State Budget. PASSED AND ADOPTED this 27th day of July, 2010, by the following vote, to wit: AYES: Supervisors Armenta, Calcagno, Salinas, Parker, Potter NOES: None ABSENT: None I, Gail T. Borkowski, Clerk of the Board of Supervisors of the County of Monterey, State of California, hereby certify that the foregoing is a true copy of an original order of said Board of Supervisors duly made and entered in the minutes thereof of Minute Book 75 for the meeting on July 27, 2010. Dated: July 29, 2010 Gail T. Borkowski, Clerk of the Board of Supervisors County of Monterey, State of California By"' 1 IL 1 Deputy BIB] 40528-U01 COMPLETED-U02 BOARD-U02 ORDER-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94099-U03 C15-U03 COMPLETED-U03 BOARD-U03 ORDER-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 THE-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 THE-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 THE-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 THE-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 THE-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 THE-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 THE-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 THE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 THE-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 THE-U012 STATE-U012 BUDGET.-U012 COMPLETED RESOLUTION NO. 10-2?}?S-6 Before the Board of Supervisors in and for the County of Monterey, State of California Resolution No: 10 238 Resolution approving and adopting a Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements project, State Project No. EA 05-0118220, Contract No. 10-111065. WHEREAS, A proposal to construct certain intersection improvements on Highway 68 at the San Benancio Road intersection, State Route 68 at San Benancio Road Intersection Improvements project, State Project No. EA 05-0H8220, Contract No. 10-111065 the Project"), was the subject of environmental analysis and an Initial Study with a Mitigated Negative Declaration IS/MND), which was certified and adopted on June, 23, 2009, by Caltrans as Lead Agency; and WHEREAS, the County of Monterey County") is a Responsible Agency under the Project; and WHEREAS, the County adopted Resolution No. 10-123, on May 18, 2010, wherein the County certified that it had reviewed and considered the information contained in the IS/MND for the Project; and WHEREAS, as a Responsible Agency, the County has reviewed the proposed mitigation measures with respect to its actions, and desires to substitute one mitigation measure and include three additional mitigation measures to the Mitigation Monitoring and Reporting Program to be adopted by the County; and WHEREAS, the Project will significantly enhance turning movements and improve the operation and safety of the Highway 68-San Benancio Road intersection, and it is specifically designed to ease congestion at the intersection during peak commute hours; and WHEREAS, the proposed Mitigation Monitoring and Reporting Program, as revised, came on for public hearing before the Board of Supervisors of the County of Monterey on July 27, 2010. NOW, THEREFORE, BE IT RESOLVED by the Board of Supervisors of the County of Monterey as follows: A. The above recitals are true and correct. B. Having considered all written and documentary information submitted, the staff reports, oral testimony, other evidence presented, and the administrative record as a whole, the Board of Supervisors hereby finds and decides as follows. FINDINGS FOR THE SUBSTITUTION AND ADDITION OF MIGITATION MEASURES |1013| BIB] 40394-U01 COMPLETED-U02 RESOLUTION-U02 NO.-U02 10-238-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94100-U03 C13-U03 RESOLUTIONS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 COMPLETED RESOLUTION NO. 10-2?}?S-6 1. FINDING: The substitution of the Type ST-20S split rail" design in Mitigation Measure V-2 Bridge Railing," identified in the County's Mitigation Monitoring and Reporting Program Caltrans Bridge Standard Detail Sheet XS-16-205) is equivalent or more effective than the Type ST-40 split rail" design identified in the Caltrans Mitigated Negative Declaration as V-2 Bridge Railing" Caltrans Standard Plan B 11-66), and will not, in itself, cause any potentially significant effect on the environment. EVIDENCE: a) ST-20S is stronger and higher than Caltrans Standard Plan B11-66, thereby providing greater protection for pedestrians and cyclists. b) Caltrans Standard ST-20S still maintains a split rail" design, reducing visual impacts to a less than significant level, consistent with the IS/MND. c) The rails will be painted brown, to blend better with the rural nature of the area. 2. FINDING: The addition of Mitigation Measures BR-41, BR-42 and BR-43 provide additional mitigation measures protecting the California Tiger Salamander and are equivalent or more effective as Biological Resource mitigation measures related to the California Tiger Salamander than the Biological Resources Mitigation Measures identified in the Caltrans IS/MND, and will not, in themselves, cause any potentially significant effect on the environment. EVIDENCE: a) At the time that the IS/MND was prepared and certified by Caltrans, the California Tiger Salamander was not listed by the California Department of Fish and Game CDFG) as either a threatened or endangered species. Accordingly, no mitigation measures specific to the California Tiger Salamander were identified. b) Consultation with the California Department of Fish and Game confirmed that no revisions to the IS/MND were required due to the subsequent listing of the California Tiger Salamander. c) Mitigation Measure BR-41 calls for the survey of the work site for California Tiger Salamander CTS) 72 hours prior to the commencement of construction activities, and prohibits the start of construction work, if CTS are found, until all CTS are removed from the site, by a qualified biologist. It also calls for the erection of appropriate fencing to prevent CTS from entering onto the worksite after the survey is performed. d) Mitigation Measure BR-42 requires a qualified biologist to conduct training for all construction personnel on the project, in order to identify and protect CTS during construction. e) Mitigation Measure BR-43 requires the presence of a qualified biologist during construction activities, and authorizes the biologist to halt any action that might result in impacts to the CTS, and also requires immediate notification of the California Department of Fish and Game. f) None of these Mitigation Measures themselves create environmental impacts, but call for monitoring and halting activities that may cause environmental impacts. |1013| BIB] 40394-U01 COMPLETED-U02 RESOLUTION-U02 NO.-U02 10-238-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94100-U03 C13-U03 RESOLUTIONS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 COMPLETED RESOLUTION NO. 10-2?}?S-6 FINDINGS WITH RESPECT TO ENVIRONMENTAL IMPACTS 1. FINDING: The Board of Supervisors of the County of Monterey certifies that it has reviewed and considered the information contained in the Caltrans Initial Study with Mitigated Negative Declaration dated June 23, 2009, and the County Mitigation Monitoring and Reporting Program. EVIDENCE: a) Resolution 10-132. b) Staff Report dated July 27, 2010, including the Mitigation Monitoring and Reporting Program, attached as Exhibit A to the Staff Report. 2. FINDING: Based upon the whole record, the Project will not have a significant effect on the environment because changes or alterations have been required in, or incorporated into, the Project which avoid or substantially lessen the significant environmental effects of the Project, as described in the Caltrans Initial Study with Mitigated Negative Declaration dated June 23, 2009. EVIDENCE: a) Caltrans adopted the Initial Study with Mitigated Negative Declaration for the Project on June 23, 2009 State Clearing House # 2008061098), as Lead Agency. b) No action challenging the IS/MND has been filed. c) The County has previously reviewed and considered the IS/MND through Resolution 10-132. d) With respect to the Mitigation Measures identified in the Negative Declaration, the County will substitute one measure V-2, Bridge Railing") with a mitigation measure that has been found to be equivalent or more effective than the measure identified in the certified IS/MND. e) In addition, the County has added three new Mitigation Measures related to the California Tiger Salamander, which were not included in the certified IS/MND and are therefore more effective than the mitigation measures relating to Biological Resources, with respect to the California Tiger Salamander. f) Staff Report dated July 27, 2010, including the Mitigation Monitoring and Reporting Program, attached as Exhibit A to the Staff Report. 3. FINDING: The determination by the Board of Supervisors reflects its independent judgment and analysis. EVIDENCE: a) The Board Report dated July 27, 2010, and material referenced therein. b) Comments from staff at the hearing on the proposed adoption of the Mitigation Monitoring and Reporting Program. c) The fact that the County has proposed and adopted substitute and additional Mitigation Measures for its Mitigation Monitoring and Reporting Program, compared to the Mitigation Measures identified in the MND. |1013| BIB] 40394-U01 COMPLETED-U02 RESOLUTION-U02 NO.-U02 10-238-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94100-U03 C13-U03 RESOLUTIONS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 COMPLETED RESOLUTION NO. 10-2?}?S-6 BE IT FURTHER RESOLVED THAT, the Board of Supervisors hereby adopts and approves the County's Mitigation Monitoring and Reporting Program as consistent with the spirit and intent of the California Environmental Quality Act, the Initial Study with Mitigated Negative Declaration first certified by Caltrans in June, 2009, and reviewed and certified by the County on May 18, 2010, and approves the Project known as Highway 68 at the San Benancio Road intersection, State Route 68 at San Benancio Road Intersection Improvements project, State Project No. EA 05-0H8220, Contract No. 10-111065. The documents and material constituting the record of these proceedings are to be held by the County Department of Public Works. PASSED AND ADOPTED on this 27th day of July, 2010, upon motion of Supervisor Potter, seconded by Supervisor Calcagno, by the following vote, to-wit: AYES: Supervisors Armenta, Calcagno, Salinas, Parker, Potter NOES: None ABSENT: None I, Gail T. Borkowski, Clerk of the Board of Supervisors of the County of Monterey, State of California, hereby certify that the foregoing is a true copy of an original order of said Board of Supervisors duly made and entered in the minutes thereof of Minute Book 75 for the meeting on July 27, 2010. Dated: July 29, 2010 Gail T. Borkowski, Clerk of the Board of Supervisors County of Monterey, State of California By C. Deputy |1013| BIB] 40394-U01 COMPLETED-U02 RESOLUTION-U02 NO.-U02 10-238-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94100-U03 C13-U03 RESOLUTIONS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 SIGNED BOARD REPORTX??"???MONTEREY COUNTY BOARD OF SUPERVISORS MEETING: July 27,2010-1:30 p.m. AGENDA NO.: SUBJECT: a. c. Conduct a Public Hearing to Consider Modifications to Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements by Substituting Equivalent or More Effective Mitigation Measures; Consider adopting a Resolution making Appropriate Findings and adopting the Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements; Consider approving Plans and Special Provisions for the State Route 68 at San Benancio Road Intersection Improvements, State Project No. d. e. EA 05-0118220, Contract No. 10-111065; Consider authorizing the Director of Public Works to sign the approved Plans and Specifications; and Consider authorizing the Director of Public Works to advertise the Notice to Bidders" in The Californian on January 17, 2011 and January 24, 2011, contingent upon passage of the State Budget. DEPARTMENT: RMA Public Works RECOMMENDATIONS: It is recommended that the Board of Supervisors: a. Conduct a Public Hearing to Consider Modifications to Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements by Substituting Equivalent or More Effective Mitigation Measures; b. Consider adopting a Resolution making Appropriate Findings and adopting the Mitigation Monitoring and Reporting Program for the State Route 68 at San Benancio Road Intersection Improvements; c. Consider approving Plans and Special Provisions for the State Route 68 at San Benancio Road Intersection Improvements, State Project No. EA 05-0118220, Contract No. 10-111065; d. Consider authorizing the Director of Public Works to sign the approved Plans and Specifications; and e. Consider authorizing the Director of Public Works to advertise the Notice to Bidders" in The Californian on January 17, 2011 and January 24, 2011, contingent upon passage of the State Budget. SUMMARY: The State Route 68 at San Benancio Road Intersection Improvements project State Project No. EA 05-0118220, Contract No. 10-111065) consists of adding a left-turn land and widening the northbound approach on San Benancio Road. The Project was the subject of an Initial Study/Mitigated Negative Declaration IS/MND) prepared and certified by Caltrans in June, 2009. As a Responsible Agency for the Project, the County needs to adopt a Mitigation Monitoring and Reporting Program MMRP), ensuring that measures to mitigate environmental impacts will occur. The County's MMRP substitutes one mitigation measure with respect to the design of bridge rails on San Benancio Road, and adds three mitigation measures related to protection of the California Tiger Salamander. In order to adopt this MMRP, the County needs to hold a public hearing and make findings that the changes to the MMRP are equivalent or more effective" than the related measures described in the IS/MND, and that they do not themselves cause environmental impacts. BIB] 40394-U01 SIGNED-U02 BOARD-U02 REPORT-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94101-U03 C10-U03 BOARD-U03 REPORTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 SIGNED BOARD REPORTX??"???Plans and Specifications for State Route 68 at San Benancio Road Intersection Improvements July 27, 2010 Page 2 DISCUSSION: See attached Discussion. OTHER AGENCY INVOLVEMENT: County Counsel and Risk Management have reviewed and approved the Mitigation Monitoring and Reporting Program and the Special Provisions as to form, and insurance provisions, respectively. The Transportation Agency for Monterey County TAMC) and Caltrans have also actively participated in the development of the project. FINANCING: Project costs do not impact the General Fund or Road Fund. Total project cost, including engineering, environmental, right-of-way and construction, is estimated at $4.8 million. The project is funded by County Traffic Impact fees collected from developments in the Highway 68 corridor, TAMC Traffic Impact fees, State Transportation Improvement Program funds and State Minor A funds. Richard P. 5uerwein, P.X. 831) 796-3071 Senior Civ Yazdan T. Emrani, P.E. Director of Public Works Attachments: Board Order; Board Resolution; Discussion; Project Budget; Proof of Publication; Notice to Bidders; Exhibit A: Mitigation Monitoring and Reporting Program; Plans and Special Provisions on file with the Clerk of the Board); Location Map BIB] 40394-U01 SIGNED-U02 BOARD-U02 REPORT-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94101-U03 C10-U03 BOARD-U03 REPORTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 ATTACHMENT - DISCUSSION"???DISCUSSION: The Department of Public Works has been working with Caltrans and the Transportation Agency for Monterey County TAMC) in developing the proposed State Route 68 at San Benancio Road Intersection Improvements, State Project No. EA 05-0H8220, Contract No. 10-111065. The project, consisting of adding a westbound left-turn lane on SR 68 and widening the northbound approach on San Benancio Road, will significantly enhance turning movements and improve the operation and safety of the intersection. The project is also designed to ease existing congestion at the intersection during peak commute hours. Caltrans, as the CEQA Lead Agency for the project, prepared the Initial Study with Mitigated Negative Declaration IS/MND). Caltrans certified and approved the IS/MND in June, 2009. This Board, as a Responsible Agency under CEQA, first considered the IS/MND on May 18, 2010 when it ratified the acquisition of easements necessary for the project. The easements were necessary to meet a Caltrans requirement of site control" prior to final determination of funding for the project. The California Transportation Commission allocated construction funding on July 1, 2010 contingent upon passage of the FY 2010-11 State Budget. Adoption of a Mitigation Monitoring and Reporting Program MMRP) at this time is required to fulfill the County's obligations as a Responsible Agency under CEQA. One minor modification is proposed to be made to the mitigation measures noted in the IS/MND. It is proposed that Measure V-2 be changed to reflect on alternative split rail design to assure the safety of pedestrians, cyclists and motorists. The ST-20S design referencing bridge standard XS-16-205) is stronger to withstand crash impacts and higher than the Caltrans Standard Plan B 11-66 Type ST-40) referenced in the IS/MND. The recommended standard will provide adequate protection for pedestrians and cyclists while still utilizing the split rail design to preserve rural character. This substitute mitigation measure is considered to be an equivalent or more effective" mitigation measure, in that it continues to mitigate visual impacts by keeping to a split rail" design, but provides more protection than the standard described in the IS/MND Mitigation Measure V-2. The rails will also be painted brown, to blend more with the rural setting. In addition, three new mitigation measures are proposed for the protection of California Tiger Salamander, should it be found at the site. The California Tiger Salamander CTS) was not listed as a threatened species by the California Department of Fish and Game CDFG) until May 20, 2010, after adoption and certification of the IS/MND by the Lead Agency. Staff consulted with CDFG and was informed that no revision to the IS/MND was required, but mitigation measures designed to search for, identify, and if located, protectively relocate the CTS are recommended for inclusion in the County's MMRP. These new Mitigation Measures were developed in consultation with CDFG and are identified as BR-41, BR-42 and BR-43 in the MMRP which is included in this package. None of these changes to the MMRP create environmental impacts in and of themselves. The different design of the guard rail for the bridge is still a split rail" design, and is similar, yet stronger than the design standard identified in the IS/MND. The three mitigation measures relative to the CTS do not create any impacts, but include a survey, training, monitoring, and, if necessary, the relocation of CTS under the guidance of the CDFG. A public hearing is required on a proposal to modify or substitute mitigation measures identified in a Mitigated Negative Declaration. Notice of today's hearing was published in The Californian on July 16, 2010. Discussion, Page 1 BIB] 40394-U01 ATTACHMENT-U02 U02 DISCUSSION-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94102-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 ATTACHMENT - DISCUSSION"???The prior action presented to the Board the acquisition of easements) did not impact the environment. Additionally, it was unknown if Caltrans would approve necessary funding. The present action is the approval of plans and specifications leading to construction, which will cause environmental impacts. Additionally, with the approval of funding, it is much more likely that the project will go forward. While the mitigation measures described in the MMRP have been incorporated into the plans and specifications with the substituted mitigation measures described above), adoption of the MMRP will help to ensure compliance with those measures. Part of the original MMRP referenced the possible use of an off-site location a portion of Toro Park) for the replacement of oak trees removed as part of the project. The plans and specifications presented for approval do not require use of this off-site location, as the final design was able to reduce the footprint of construction and reduce the number of trees to be removed from 19 to 14. As such, all vegetation mitigation measures, including tree replacement, can occur on-site, consistent with the MMRP. Because the original MMRP contemplated on-site replacement to the extent feasible," there is no need to modify the MMRP for this issue. Approval of the Plans and Special Provisions will authorize the Department of Public Works to proceed with advertising for the State Route 68 at San Benancio Road Intersection Improvements, State Project No. EA 05-0H8220, Contract No. 10-111065. The bid opening is set for February 17, 2011, at 3:00 p.m., in the Board of Supervisors' Conference Room 1032, Monterey County Government Center, 168 West Alisal Street, 1st Floor, Salinas, CA 93901. Project construction is scheduled to begin in April 2011. Discussion, Page 2 BIB] 40394-U01 ATTACHMENT-U02 U02 DISCUSSION-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94102-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 PROJECT BUDGET - CONTRACT NO.???MONTEREY COUNTY DEPARTMENT OF PUBLIC WORKS STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS STATE PROJECT NO. EA 05-0H8220 CONTRACT NO. 10-111065 PROJECT BUDGET Design Engineering/Environmental $1,088,455 Right-of-Way/Utilities 67,058 Construction Management 370,000 Construction Engineer's Estimate $2,980,000 10% Contingencies 298,000 3,278,000 TOTAL ESTIMATED PROJECT COST: $4,803,513 REVENUE County Traffic Impact Fees $749,082 State Transportation Improvement Program Funds 3,155,500 State Minor A Funds 750,000 TAMC Fees 148,931 TOTAL: $4,803,513 BIB] 40394-U01 PROJECT-U02 BUDGET-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94103-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 NOTICE TO BIDDERS - CONTRACT ???RESOURCE MANAGEMENT AGENCY DEPARTMENT OF PUBLIC WORKS COUNTY OF MONTEREY STATE OF CALIFORNIA NOTICE TO BIDDERS STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS STATE PROJECT NO. EA 05-0H8220 CONTRACT NO. 10-111065 Sealed bids will be received at the OFFICE OF THE CLERK OF THE BOARD OF SUPERVISORS, COUNTY OF MONTEREY, 168 W. ALISAL STREET 1ST FLOOR, SALINAS, CALIFORNIA 93901 MAILING ADDRESS: P 0 Box 1728, SALINAS CA 93902-1728), until February 17, 2011 at 3:00 p.m., for the State Route 68 at San Benancio Road Intersection Improvements, State Project No. EA 05-0H8220, Contract No. 10-111065, as shown on the plans and in accordance with the specifications and other requirements therefore, at which time they will be publicly opened and read by the Purchasing Agent in the County of Monterey Government Center, Board of Supervisors' Conference Room 1032, 168 West Alisal Street 1St Floor, Salinas, California 93901. Special attention of prospective bidders is called to the Proposal Requirements and Conditions" of the Special Provisions. A bidder's bond, issued by an admitted corporate surety company in an amount equal to at least ten percent of the amount bid, must accompany the bid. A blank Bidder's Bond form is attached to the proposal. The Bidder shall possess a valid Class A Contractor's License at the time this contract is awarded. The project consists of widening approximately 1800 feet of state highway and county roadway, widening the El Toro Creek Bridge at San Benancio Road with precast I" girders, retaining wall construction with architectural surfacing, installation of hot mix asphalt dike, guard railing, concrete barrier, including, but not limited to, grading, clearing and grubbing, revegetation and plant establishment and traffic control. The Engineer's Estimate for the construction cost is $3.3 million. A payment bond and a performance bond each in the amount of 100 percent of the Contract are required as specified by Section 3-1.02, Contract Bonds," of the Special Provisions. Bids are required for the entire work described herein. Prices on alternate construction methods or materials will be considered only when specifically called for. The CONTRACT DOCUMENTS may be examined at the following locations: Monterey County Salinas Valley Builders Exchange Department of Public Works 20 Quail Run Circle 168 W. Alisal Street, 2"d Floor Salinas, CA 93907 Salinas, CA 93901 BIB] 40394-U01 NOTICE-U02 TO-U02 BIDDERS-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94105-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 NOTICE TO BIDDERS - CONTRACT ???San Francisco Builders Exchange 850 S. Van Ness Avenue San Francisco, CA 94110 Builders Exchange of the Central Coast 100 12th Street, Bldg. 2861 Marina, CA 93933 Fresno Builders Exchange 1244 North Mariposa Avenue Fresno, CA 93703 Sacramento Builders Exchange 1331 T Street Sacramento, CA 95811 Santa Cruz Builders Exchange 1248 Thompson Avenue Santa Cruz, CA 95062 McGraw Hill 11875 Dublin Blvd. Suite A-118 Dublin, CA 94568 The Contract Documents will be made available ELECTRONICALLY and can be downloaded for free at the following Monterey County website: http://www.co.monterey.ca.us/publicworks/bids.htm. a.us/publicworks/bids.ht,m. Plan holders must register before they can view or download the documents. A copy of the electronic files on compact-disc CD) is also available at MONTEREY COUNTY DEPARTMENT OF PUBLIC WORKS, 168 W. ALISAL STREET, 2ND FLOOR, SALINAS, CALIFORNIA 93901 for a nonrefundable fee of $5.00. The electronic files can be used to print the project plans full or half size), project specifications, and other such documents at various printing companies. Pursuant to Section 1773 of the Labor Code, the Director of the California Department of Industrial Relations has ascertained the general prevailing rate or per diem wages and the general prevailing rate for holiday and overtime work in this locality for each craft, classification, or type of worker needed to execute the Contract and are available on the internet at http:/www.dir.ca.gov/dlsr/pwd/. Copies thereof are on file in the office of Department of Public Works, Salinas, California, and may be examined by any interested party on request. These wage determinations for this project as predetermined by the Director of the California Department of Industrial Relations are set forth in these Special Provisions. Addenda to modify wage rates, if necessary, will be issued to the holders of these Special Provisions. Future effective General Prevailing Wage Determinations, which have been predetermined and are on file with the California Department of Industrial Relations http://www.dir.ca.gov/dlsr/pwd/), are referenced but not printed in these Special Provisions. Upon the Contractor's request, the County of Monterey will make payment of funds withheld from progress payments pursuant to the requirements of Public Contract Code Section 22300 if the Contractor deposits in escrow with the County Treasurer or with a bank acceptable to the County of Monterey, securities eligible for the investment of State funds under Government Code Section 16430 or bank or savings and loan certificates of deposit, upon conditions specified in Contract documents. The Resource Management Agency, Department of Public Works reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. The quantities in the Bid Book Book Two) are approximate only, being given as a basis for the comparison of bids; and the Department of Public Works does not, expressly or by implication, agree that the actual amounts of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work as may be deemed BIB] 40394-U01 NOTICE-U02 TO-U02 BIDDERS-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94105-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 NOTICE TO BIDDERS - CONTRACT ???necessary or expedient by the Engineer. All bids are to be compared on the Bid Form Book Two) of the quantities to be done. YAZDAN T. EMRANI, P.E. DIRECTOR OF PUBLIC WORKS RMA DEPARTMENT OF PUBLIC WORKS COUNTY OF MONTEREY STATE OF CALIFORNIA DATED: BIB] 40394-U01 NOTICE-U02 TO-U02 BIDDERS-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94105-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 PROOF OF PUBLICATION - JULY 2???T hc'? Sulirc~~ www.thecalifornian.com This space is for the County Clerk's Filing Stump PROOF OF RECEIVED PUBLICATION U' l a 2015.5 C.C.P.) RESOURCE M AGEMENT AGENCY p j J WORKS ADM IN STATE OF CALIFORNIA County of Monterey I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the above-entitled matter. I am the principal clerk of the printer of The Salinas Californian, a newspaper of general circulation, printed and published daily except Sunday in the City of Salinas, County of Monterey and which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Monterey, State of California; that the notice, of which the annexed is a printed copy set in type no smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: Notice of Public Hearing: Monterey County Board of Supervisors Hearing: Tuesday, July 27, 2010, at 1:30pm 1N.'O1TII.C?E rAF PSLIiBsL`I,C,~HiEtA1R.I1N',G Monterey County Board= of-.Supervisors NOTIO'E IS.HEREBY'GIUENrthat~the MontereytCounty?Boardsof Superv sors will con- duct:a~Public Hearing:,#o'Consider!Modificationslto:aMitigation.Monitoringtand6Reporting 4Program.;by Substituting Equivalent,.or More: Effective., Mitigation 4Measures--Consider Adopting a Resolution"Making Appropriate Findings and Adopting thefMitigatton Monitor ing'and ReportingaProgram'forthg;State Route?68_~at#San-Benancio"Road Intersection-Im= provements gStatefProject3No?EAiOB#OH8220,??a copy of the written recommendation report to the DRB Coordinator, Division of Construction, MS 44, P.O. Box 942874, Sacramento, CA 94274. f. Within 30 days after receiving the DRB's report, the parties shall respond to the DRB in writing signifying that the dispute is either resolved or remains unresolved. Failure to provide the written response within the time specified, or a written rejection of the DRB's recommendation or a written response requesting the DRB reconsider their recommendation, shall conclusively indicate that the party(s) failing to respond accepts the DRB recommendation. Immediately after responses have been received from both parties, the DRB shall provide copies of both responses to the parties simultaneously. Either party may request clarification of elements of the DRB's report from the DRB prior to responding to the report. The DRB shall consider any clarification request only if submitted within 10 days of receipt of the DRB's report, and if submitted simultaneously in writing to both the DRB and the other party. Each party may submit only one request for clarification for any individual DRB report. The DRB shall respond, in writing, to requests for clarification within 10 days of receipt of such requests. g. Either party may seek a reconsideration of the DRB's recommendation. The DRB shall only grant reconsideration based upon submission of new evidence and if the request is submitted within the 30 day time limit specified for response to the DRB's written report. Each party may submit only one request for reconsideration regarding an individual DRB recommendation. h. If the parties are able to settle their dispute with the aid of the DRB's report, the STATE and the CONTRACTOR shall promptly accept and implement the settlement of the parties. If the parties cannot agree on compensation within 60 days of the acceptance by both parties of the settlement, either party may request the DRB to make a recommendation regarding compensation. 2. INFORMAL DISPUTE MEETING An informal dispute meeting shall be convened, only if, the parties and the DRB agree that this dispute resolution process is appropriate to settle the dispute. The following procedure shall be used for the informal dispute meeting: a. The parties shall furnish the DRB with one copy of pertinent documents requested by the DRB that are or may become necessary for the DRB to perform its function. The party furnishing documents shall furnish such documents to the other party at the same time the document is provided to the DRB. b. After the dispute meeting has concluded, the DRB members shall deliberate in private the same day until a response to the parties is reached or as otherwise agreed to by the parties. c. The DRB then verbally delivers its recommendation with findings, including minority opinion, if any, to the parties. d. After the recommendation is presented, the parties may ask for clarifications. e. Occasionally the DRB may be unable to formulate a recommendation based on the information given at a dispute meeting. However, the DRB may provide the parties with advice on strengths and weaknesses of their prospective positions, in the hope of the parties reaching settlement. f. If the parties are able to settle their dispute with the aid of the DRB's opinion, the STATE and the CONTRACTOR shall promptly accept and implement the settlement of the parties. g. The DRB will not be bound by its verbal recommendation in the event that a dispute is later heard by the DRB in a traditional dispute meeting. Book One- State Route 68 at San Benancio Road Intersection Improvements 54 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Unless the dispute is settled, use of the informal dispute meeting does not relieve the parties of their responsibilities under Section 5-1.15C, Dispute Resolution Board," of the Standard Specifications or subsection, Traditional Dispute Meeting," of this AGREEMENT. There will be no extension of time allowed for the process to permit the use of the informal dispute meeting, unless otherwise agreed to by the parties. SECTION IV TIME FOR BEGINNING AND COMPLETION DRB members shall not begin work under the terms of this AGREEMENT, until authorized in writing by the STATE or as agreed to by the parties. Once established, the DRB shall be in operation until the Director accepts the contract. If the contract is terminated in accordance with Section 8-1.08, Termination of Control," of the Standard Specifications, the DRB will be dissolved. SECTION V PAYMENT Each DRB member shall be compensated at an agreed rate of $1,500 per day for time spent per meeting, either at start of project, or a scheduled progress or a dispute meeting. A member serving on more than one State DRB or DRA, regardless of the number of meetings per day, shall not be paid more than the agreed rate per day. The agreed rate shall be considered full compensation for on site time, travel expenses, transportation, lodging, time for travel and incidentals for each day, or portion thereof that the DRB member is at an authorized DRB meeting. No additional compensation will be made for time spent by DRB member to review and research activities outside the official DRB meetings unless that time, such as time spent evaluating and preparing recommendations on specific issues presented to the DRB, has been specifically agreed to in advance by the parties. Time away from the project, which has been specifically agreed to in advance by the parties, will be compensated at an agreed rate of $150 per hour. The agreed amount of $150 per hour shall include all incidentals including expenses for telephone, fax, and computer services. The State will provide administrative services such as conference facilities to the DRB. A. PAYMENT PROCESSING The CONTRACTOR shall make direct payments to each DRB member for their participation in authorized meetings and approved hourly rate charges, from invoices submitted by each DRB member, and technical services. DRB members may submit invoices to the CONTRACTOR for partial payment for work performed and services rendered for their participation in authorized meetings not more often than once per month during the progress of the work. The invoices shall be in a format approved by the parties and accompanied by a general description of activities performed during that billing period. Payment for hourly fees, at the agreed rate, shall not be paid to a DRB member until the amount and extent of those fees are approved by the STATE and the CONTRACTOR. B. INSPECTION OF COSTS RECORDS DRB members and the CONTRACTOR shall keep available for inspection by representatives of the STATE and the United States federal government, for a period of 3 years after final payment, the cost records and accounts pertaining to this AGREEMENT. If any litigation, claim, or audit arising out of, in connection with, or related to this contract is initiated before the expiration of the 3-year period, the cost records and accounts shall be retained until such litigation, claim, or audit involving the records is completed. Book One- State Route 68 at San Benancio Road Intersection Improvements 55 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??@??SECTION VI ASSIGNMENT OF TASKS OF WORK DRB members shall not assign the work of this AGREEMENT. SECTION VII TERMINATION OF A DRB MEMBER DRB members may resign after providing not less than 15 days written notice of their resignation to the STATE and the CONTRACTOR. A DRB member may be terminated, by either party, for failing to comply at all times with all required employment or financial disclosure conditions of DRB membership in conformance with the terms of the contract and this AGREEMENT. Service of a DRB member may be terminated at any time with not less than 15 days notice as follows: A. The State may terminate service of the State appointed member. B. The Contractor may terminate service of the Contractor appointed member. C. Upon the written recommendation of the State and Contractor appointed members for the removal of the third member. D. Upon resignation of a member. When a member of the DRB is replaced, the replacement member shall be appointed in the same manner as the replaced member was appointed. The appointment of a replacement DRB member will begin promptly upon determination of the need for replacement and shall be completed within 15 days. Changes in either of the DRB members chosen by the 2 parties will not require re-selection of the third member, unless both parties agree to such re-selection in writing. The Dispute Resolution Board Agreement shall be amended to reflect the change of a DRB member. Each party shall document the need for replacement and substantiate the replacement request in writing to the other party and DRB members. SECTION VIII LEGAL RELATIONS The parties hereto mutually understand and agree that each DRB member in the performance of duties is acting in the capacity of an independent agent and not as an employee of either party. No party to this AGREEMENT shall bear a greater responsibility for damages or personal injury than is normally provided by Federal or State of California Law. Notwithstanding the provisions of this contract that require the CONTRACTOR to indemnify and hold harmless the STATE, the parties shall jointly indemnify and hold harmless the DRB members from and against all claims, damages, losses, and expenses, including but not limited to attorney's fees, arising out of and resulting from the findings and recommendations of the DRB. SECTION IX CONFIDENTIALITY The parties hereto mutually understand and agree that all documents and records provided by the parties in reference to issues brought before the DRB, which documents and records are marked Confidential for use by the DRB only," shall be kept in confidence and used only for the purpose of resolution of subject disputes, and for assisting in development of DRB findings and recommendations; that such documents and records will not be utilized or revealed to others, except to officials of the parties who are authorized to act on the subject disputes, for any purposes, during the life of this AGREEMENT. Upon termination of this AGREEMENT, said confidential documents and records, and all copies thereof, shall be returned to the parties who furnished them to the DRB. However, the parties understand that such documents may be Book One- State Route 68 at San Benancio Road Intersection Improvements 56 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??A??subsequently discoverable and admissible in court or arbitration proceedings unless a protective order has been obtained by the party seeking further confidentiality. SECTION X DISPUTES Disputes between the parties arising out of the work or other terms of this AGREEMENT, which cannot be resolved by negotiation and mutual concurrence between the parties, or through the administrative process provided in the contract, shall be resolved by arbitration as provided in Section 9-1.10, Arbitration," of the Standard Specifications. Disputes between the DRB and either party, which cannot be resolved by negotiation and mutual concurrence, shall be resolved in the appropriate forum. SECTION XI VENUE, APPLICABLE LAW, AND PERSONAL JURISDICTION In the event that any party deems it necessary to institute arbitration proceedings to enforce any right or obligation under this AGREEMENT, the parties hereto agree that such action shall be initiated in the Office of Administrative Hearings of the State of California. The parties hereto agree that all questions shall be resolved by arbitration by application of California law and that the parties to such arbitration shall have the right of appeal from such decisions to the Superior Court in conformance with the laws of the State of California. Venue for the arbitration shall be Sacramento or any other location as agreed to by the parties. SECTION XII FEDERAL REVIEW AND REQUIREMENTS On Federal-Aid contracts, the Federal Highway Administration shall have the right to review the work of the DRB in progress, except for private meetings or deliberations of the DRB that do not become part of the project records. Other Federal requirements in this agreement shall only apply to Federal-Aid contracts. SECTION XIII CERTIFICATION OF CONTRACTOR, DRB, AND STATE IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT as of the day and year first above written. DRB MEMBER DRB MEMBER By: By: Title: DRB CHAIRPERSON By: Title Title Book One- State Route 68 at San Benancio Road Intersection Improvements 57 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??B??CONTRACTOR CALIFORNIA DEPARTMENT OF TRANSPORTATION By: By: Title: Title: Add: 5-1.16-5-17 BLANK) Add: 5-1.18 PROPERTY AND FACILITY PRESERVATION 5-1.18A General Preserve property and facilities, including: 1. Adjacent property 2. Department's instrumentation 3. ESAs 4. Lands administered by other agencies 5. Railroads and railroad equipment 6. Roadside vegetation not to be removed 7. Utilities 8. Waterways Immediately report damage to the Engineer. If you cause damage, you are responsible. Install sheet piling, cribbing, bulkheads, shores, or other supports necessary to support existing facilities or support material carrying the facilities. Dispose of temporary facilities when they are no longer needed. If you damage plants not to be removed: 1. Dispose of them outside the right of way unless the Engineer allows you to reduce them to chips and spread the chips within the highway at locations designated by the Engineer 2. Replace them Replace plants with plants of the same species. Replace trees with 24-inch-box trees. Replace shrubs with No. 15 container shrubs. Replace ground cover plants with plants from flats. Replace Carpobrutus ground cover plants with plants from cuttings. Plant ground cover plants 1 foot on center. If a plant establishment period is specified, replace plants before the start of the plant establishment period; otherwise, replace plants at least 30 days before Contract acceptance. Book One- State Route 68 at San Benancio Road Intersection Improvements 58 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??C??Water each plant immediately after planting and saturate the backfill soil around and below the roots or ball of earth around the roots of each plant. Water as necessary to maintain plants in a healthy condition until Contract acceptance. The Department may make a temporary repair to restore service to a damaged facility. If working on or adjacent to railroad property, do not interfere with railroad operations. For an excavation on or affecting railroad property, submit work plans showing the system to be used to protect railroad facilities. Allow 65 days for the Engineer's review of the plans. Do not perform work based on the plans until the Engineer notifies you they are accepted. 5-1.18B Nonhighway Facilities Including Utilities) The Department may rearrange a nonhighway facility during the Contract. Rearrangement of a nonhighway facility includes installation, relocation, alteration, or removal of the facility.The Department may authorize facility owners and their agents to enter the highway to perform rearrangement work for their facilities or to make connections or repairs to their property. Coordinate activities to avoid delays. Notify the Engineer at least 3 business days before you contact the regional notification center under Govt Code 4216 et seq. Failure to contact the notification center prohibits excavation. Before starting work that could damage or interfere with underground infrastructure, locate the infrastructure described in the Contract, including laterals and other appurtenances, and determine the presence of other underground infrastructure inferred from visible facilities such as buildings, meters, or junction boxes. Notify the Engineer if the infrastructure described in the Contract cannot be found. If after giving the notice, you find the infrastructure in a substantially different location than described, finding the infrastructure is paid for as extra work as specified in Section 4-1.03D, Extra Work." Underground infrastructure described in the Contract may be in different locations than described, and additional infrastructure may exist. Upon discovering an underground main or trunk line not described in the Contract, immediately notify the Engineer and the infrastructure owner. The Engineer orders the locating and protecting of the infrastructure. The locating and protecting is paid for as extra work as specified in Section 4-1.03D, Extra Work." If ordered, repair infrastructure damage. If the damage is not due to your negligence, the repair is paid for as extra work as specified in Section 4-1.03D, Extra Work." If necessary underground infrastructure rearrangement is not described in the Contract, the Engineer may order you to perform the work. The rearrangement is paid for as extra work as specified in Section 4-1.03D, Extra Work." If you want infrastructure rearrangement different from that described in the Contract: 1. Notify the Engineer 2. Make an arrangement with the infrastructure owner 3. Obtain authorization for the rearrangement 4. The Department does not adjust time or payment for rearrangement different from the Contract 5. Pay the infrastructure owner any additional cost Immediately notify the Engineer of a delay due to the presence of main line underground infrastructure not described in the Contract or in a substantially different location or due to rearrangement different from the Contract. The Department pays for one of these delays in the same manner as specified for a right of way delay in Section 8-1.09, Right of Way Delays." Book One- State Route 68 at San Benancio Road Intersection Improvements 59 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??D??AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 6 CONTROL OF MATERIALS Issued 05-01-09) Replace Section 6-1.05 with: 6-1.05 SPECIFIC BRAND OR TRADE NAME AND SUBSTITUTION A reference to a specific brand or trade name establishes a quality standard and is not intended to limit competition. You may use a product that is equal to or better than the specified brand or trade name if approved. Submit a substitution request within a time period that: 1. Follows Contract award 2. Allows 30 days for review 3. Causes no delay Include substantiating data with the substitution request that proves the substitution: 1. Is of equal or better quality and suitability 2. Causes no delay in product delivery and installation Add: 6-1.075 GUARANTEE Guarantee the work remains free from substantial defects for 1 year after contract acceptance except for work parts for which you were relieved of maintenance and protection. Guarantee each of these relieved work parts for 1 year after the relief date. The guarantee excludes damage or displacement caused by an event outside your control including: 1. Normal wear and tear 2. Improper operation 3. Insufficient maintenance 4. Abuse 5. Unauthorized change 6. Act of God During the guarantee period, repair or replace each work portion having a substantial defect. The Department does not pay for corrective work. During corrective work activities, provide insurance coverage specified for coverage before contract acceptance. The contract bonds must be in full force and effect until the later of: 1. Expiration of guarantee period 2. Completion of corrective work Book One- State Route 68 at San Benancio Road Intersection Improvements 60 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??E??If a warranty specification conflicts with Section 6-1.075, Guarantee," comply with the warranty specification. During the guarantee period, the Engineer monitors the completed work. If the Engineer finds work having a substantial defect, the Engineer lists work parts and furnishes you the list. Within 10 days of receipt of the list, submit for authorization a detailed plan for correcting the work. Include a schedule that includes: 1. Start and completion dates 2. List of labor, equipment, materials, and any special services you plan to use 3. Work related to the corrective work, including traffic control and temporary and permanent pavement markings The Engineer notifies you when the plan is authorized. Start corrective work and related work within 15 days of notice. If the Engineer determines corrective work is urgently required to prevent injury or property damage: 1. The Engineer furnishes you a request to start emergency repair work and a list of parts requiring corrective work 2. Mobilize within 24 hours and start work 3. Submit a corrective work plan within 5 days of starting emergency repair work If you fail to perform work as specified, the Department may perform the work and bill you. In Section 6-1.08 delete the 2nd paragraph. Add: 6-1.085 BUY AMERICA 23 CFR 635.410) For a Federal-aid contract, furnish steel and iron materials to be incorporated into the work that are produced in the United States except: 1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials 60 Fed Reg 15478 03/24/1995)] 2. If the total combined cost of the materials does not exceed the greater of 0.1 percent of the total bid or $2,500, material produced outside the United States may be used Production includes: 1. Processing steel and iron materials, including smelting or other processes that alter the physical form or shape such as rolling, extruding, machining, bending, grinding, and drilling) or chemical composition 2. Coating application, including epoxy coating, galvanizing, and painting, that protects or enhances the value of steel and iron materials For steel and iron materials to be incorporated into the work, submit a Certificate of Compliance under Section 6-1.07, Certificates of Compliance," of the Standard Specifications that certifies all production processes occurred in the United States except for the above exceptions. Book One- State Route 68 at San Benancio Road Intersection Improvements 61 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??F??Add: 6-1.087 BUY AMERICA PUB RES CODE 42703(d)) Furnish crumb rubber to be incorporated into the work that is produced in the United States and is derived from waste tires taken from vehicles owned and operated in the United States. For crumb rubber to be incorporated into the work, submit a Certificate of Compliance under Section 6-1.07, Certificates of Compliance," of the Standard Specifications that certifies only crumb rubber manufactured in the United States and derived from waste tires taken from vehicles owned and operated in the United States is used. In Section 6-2.01 delete the 4th paragraph. In Section 6-2.01 replace the 7th paragraph with: Upon the Contractor's written request, the Department tests materials from an untested local source. If satisfactory material from that source is used in the work, the Department does not charge the Contractor for the tests; otherwise, the Department deducts the test cost. In Section 6-2.01 delete the 8th paragraph. In Section 6-2.02 delete the 3rd paragraph. In Section 6-2.02 in the 7th paragraph, replace the 2nd sentence with: The Department deducts the charges for the removed material. In Section 6-2.03 in the 3rd paragraph, replace the 5th sentence with: No allowance or additional compensation will be made for lost time or for delay in completing the work due to moving the Contractor's plant from the designated mandatory source to the alternative mandatory source, other than a time adjustment as specified in Section 8-1.09, Delays." In Section 6-3.01 delete the 4th paragraph. In Section 6-3.01 in the 6th paragraph, delete the lst sentence. In Section 6-3.01 add: As used in Section 6-3.01, Testing," tests are tests to assure the quality and to determine the acceptability of the work. The Department deducts costs of testing work found to be noncompliant. Book One- State Route 68 at San Benancio Road Intersection Improvements 62 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??G??AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 7 LEGAL RELATIONS AND RESPONSIBILITY Issued 09-25-09) Replace Section 7-1.01 with: 7-1.01 LAWS TO BE OBSERVED Comply with laws, regulations, orders, decrees, and PLACs applicable to the project. Indemnify and defend the State against any claim or liability arising from the violation of a law, regulation, order, decree, or PLAC by you or your employees. Immediately report to the Engineer in writing a discrepancy or inconsistency between the contract and a law, regulation, order, decree, or PLAC. In Section 7-1.01A replace the 1st clause with: Work on the job site must comply with Labor Code 1727 and 1770-1815 and 8 CA Code of Regs 16000 et seq. Work includes roadside production and processing of materials. In Section 7-1.01A(2) in the 1st paragraph, replace item 3 with: 3. Upon becoming aware of the subcontractor's failure to pay the specified prevailing rate of wages to the subcontractor's workers, the Contractor must diligently take corrective action to stop or rectify the failure, including withholding sufficient funds due the subcontractor for work performed on the public works project. In Section 7-1.01A(2), replace the 2nd paragraph with: Pursuant to Section 1775 of the Labor Code, the Division of Labor Standards Enforcement must notify the Contractor on a public works project within 15 days of the receipt by the Division of Labor Standards Enforcement of a complaint of the failure of a subcontractor on that public works project to pay workers the general prevailing rate of per diem wages. If the Division of Labor Standards Enforcement determines that employees of a subcontractor were not paid the general prevailing rate of per diem wages and if the Department did not withhold sufficient money under the contract to pay those employees the balance of wages owed under the general prevailing rate of per diem wages, the Contractor must withhold an amount of moneys due the subcontractor sufficient to pay those employees the general prevailing rate of per diem wages if requested by the Division of Labor Standards Enforcement. The Contractor must pay any money withheld from and owed to a subcontractor upon receipt of notification by the Division of Labor Standards Enforcement that the wage complaint has been resolved. If notice of the resolution of the wage complaint has not been received by the Contractor within 180 days of the filing of a valid notice of completion or acceptance of the public works project, whichever occurs later, the Contractor must pay all moneys withheld from the subcontractor to the Department. The Department withholds these moneys pending the final decision of an enforcement action. Book One- State Route 68 at San Benancio Road Intersection Improvements 63 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??H??In Section 7-1.01A(2) replace 7th paragraph with: Changes in general prevailing wage determinations apply to the contract when the Director of Industrial Relations has issued them at least 10 days before advertisement Labor Code 1773.6 and 8 CA Code of Regs 16204). In Section 7-1.01A(3) replace the 2nd paragraph with: The Department withholds the penalties specified in subdivision g) of Labor Code 1776 for noncompliance with the requirements in Section 1776. In Section 7-1.01A(3) replace the 4th paragraph with: The Department withholds for delinquent or inadequate payroll records Labor Code 1771.5). If the Contractor has not submitted an adequate payroll record by the month's 15th day for the period ending on or before the 1st of that month, the Department withholds 10 percent of the monthly progress estimate, exclusive of mobilization. The Department does not withhold more than $10,000 or less than $1,000. In Section 7-1.01A(3) delete the 5th paragraph. Replace Section 7-1.01A(6) with: 7-1.01A(6) Blank) Replace Section 7-1.01A(7) with: 7-1.01A(7) Blank) Replace Section 7-1.01F with: 7-1.01F Environmental Stewardship Comply with Section 14. Replace Section 7-1.011 with: 7-1.011 Blank) In Section 7-1.02 in the 2nd paragraph, replace the 4th sentence with: Trucks used to haul treated base, portland cement concrete, or hot mix asphalt shall enter onto the base to dump at the nearest practical entry point ahead of spreading equipment. In Section 7-1.02 between the 4th and 5th paragraphs, add: Loads imposed on existing, new, or partially completed structures shall not exceed the load carrying capacity of the structure or any portion of the structure as determined by AASHTO Book One- State Route 68 at San Benancio Road Intersection Improvements 64 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??I??LRFD with interims and California Amendments, Design Strength Limit State II. The compressive strength of concrete f,) to be used in computing the load carrying capacity shall be the smaller of the following: 1. Actual compressive strength at the time of loading 2. Value of fe shown on the plans for that portion of the structure or 2.5 times the value of fe extreme fiber compressive stress in concrete at service loads) shown on the plans for portions of the structure where no fe is shown Replace Section 7-1.04 with: 7-1.04 PERMITS, LICENSES, AGREEMENTS, AND CERTIFICATIONS 7-1.04A General Comply with PLACs. The Department makes PLAC changes under Section 4-1.03, Changes." 7-1.04B Before Award To make a change to a PLAC made available to you before award, submit the proposed change. The Department sends the proposed change to the appropriate authority for consideration. 7-1.04C After Award Confirm with the Engineer which after-award PLACs are obtained by the Department and which are obtained by the Contractor. To make a change to an after-award PLAC obtained by the Department, submit the proposed change. The Department sends the proposed change to the appropriate authority for consideration. Obtain those PLACs to be issued to you and pay fees and costs associated with obtaining them. Submit copies of Contractor-obtained after-award PLACs for review. In Section 7-1.06 in the 1st paragraph, add: The Contractor's Injury and Illness Prevention Program shall be submitted to the Engineer. The program shall address the use of personal and company issued electronic devices during work. The use of entertainment and personal communication devices in the work zone shall not be allowed. Workers may use a communication device for business purposes in the work area, at a location where their safety and the safety of other workers and the traveling public is not compromised. Replace Section 7-1.07 with: 7-1.07 Lead Compliance Plan Section 7-1.07 applies if a bid item for a lead compliance plan is included in the Contract. Prepare a work plan to prevent or minimize worker exposure to lead while managing and handling earth materials, paint system debris, traffic stripe residue, and pavement marking residue containing lead. Regulations containing specific Cal/OSHA requirements when working with lead include 8 CA Code of Regs 1532.1. The plan must contain the items listed in 8 CA Code of Regs 1532.1(e)(2)(B). Before submittal, a CIH must sign and seal the plan. Submit the plan at least 7 days before starting any activity that presents the potential for lead exposure. The Engineer notifies you of the acceptability of the plan within 4 business days of receipt. Book One- State Route 68 at San Benancio Road Intersection Improvements 65 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??J??Before starting any activity that presents the potential for lead exposure to employees who have no prior training, including State employees, provide a safety training program to these employees that complies with 8 CA Code of Regs 1532.1 and your lead compliance program. Submit copies of air monitoring or job site inspection reports made by or under the direction of the CIH under 8 CA Code of Regs 1532.1 within 10 days after the date of monitoring or inspection. Supply personal protective equipment, training, and washing facilities required by your lead compliance plan for 5 State employees. The contract lump sum price paid for lead compliance plan includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in preparing and implementing the plan as specified in this section. Replace Section 7-1.08 with: 7-1.08 PUBLIC CONVENIENCE Compliance with the provisions of this section does not relieve you of your responsibility for public safety. Construction activities must not inconvenience the public or abutting property owners. Schedule and conduct work to avoid unnecessary inconvenience to the public and abutting property owners. Avoid undue delay in construction activities to reduce the public's exposure to construction. Where possible, route traffic on new or existing paved surfaces. Maintain convenient access to driveways, houses, and buildings. When the abutting property owner's access across the right of way line is to be eliminated or replaced under the contract, the existing access must not be closed until the replacement access facilities are usable. Construct temporary approaches to crossings and intersecting highways. Provide a reasonably smooth and even surface for use by traffic at all time during excavation of roadways and construction of embankments. Before other grading activities, place fill at culverts and bridges to allow traffic to cross. If ordered, excavate roadway cuts in layers and construct embankments in partial widths at a time alternating construction from one side to the other and routing traffic over the side opposite the one under construction. Install or construct culverts on only 1/2 the width of the traveled way at a time; keep the traveled way portion being used by traffic open and unobstructed until the opposite side of the traveled way is ready for use by traffic. Upon completion of rough grading or placing any subsequent layer, bring the surface of the roadbed to a smooth and even condition, free of humps and depressions and satisfactory for the use of the public. After subgrade preparation for a specified layer of material has been completed, repair any damage to the roadbed or completed subgrade, including damage due to use by the public. While subgrade and paving activities are underway, allow the public to use the shoulders. If half-width paving methods are used, allow the public to use the side of the roadbed opposite the one under construction. If enough width is available, keep open a passageway wide enough to accommodate at least 2 lanes of traffic at locations where subgrade and paving activities are underway. Shape shoulders or reshape subgrade as necessary to accommodate traffic during subgrade preparation and paving activities. Apply water or dust palliative for the prevention or alleviation of dust nuisance. Install signs, lights, flares, temporary railing Type K), barricades and other facilities to direct traffic. Furnish flaggers whenever necessary to direct the movement of the public through or around the work. Book One- State Route 68 at San Benancio Road Intersection Improvements 66 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??K??You will be required to pay the cost of replacing or repairing all facilities installed under extra work for the convenience or direction or warning of the public which are lost while in your custody, or are damaged by your operations to such an extent as to require replacement or repair. The Engineer may order or consent to your request to open a completed section of surfacing, pavement, or structure roadway surface for public use. You will not be compensated for any delay to your construction activities caused by the public. This does not relieve you from any other contractual responsibility. Replace Section 7-1.09 with: 7-1.09 PUBLIC SAFETY You are responsible to provide for public safety. Do not construct a temporary facility that interferes with the safe passage of traffic. Control dust resulting from the work, inside and outside the right-of-way. Move workers, equipment, and materials without endangering traffic. Whenever your operations create a condition hazardous to the public, furnish, erect and maintain those fences, temporary railing, barricades, lights, signs, and other devices and take any other necessary protective measures to prevent damage or injury to the public. Any fences, temporary railing, barricades, lights, signs, or other devices furnished, erected and maintained by you are in addition to those for which payment is provided elsewhere in the specifications. Provide flaggers whenever necessary to ensure that the public is given safe guidance through the work zone. Except as ordered, at locations where traffic is being routed through construction under one-way controls, move your equipment in compliance with the one-way controls. Use of signs, lights, flags, or other protective devices must conform with the California MUTCD and as ordered. Signs, lights, flags or other protective devices must not obscure the visibility of, nor conflict in intent, meaning and function of either existing signs, lights and traffic control devices or any construction area signs or traffic control devices. Keep existing traffic signals and highway lighting in operation. Other entities perform routine maintenance of these facilities during the work. Cover signs that direct traffic to a closed area. Providing, maintaining, and removing the covers on construction area signs is paid as extra work under Section 4-1.03D, Extra Work." Install temporary illumination in a manner which the illumination and the illumination equipment does not interfere with public safety. The installation of general roadway illumination does not relieve you from furnishing and maintaining any protective devices. Equipment must enter and leave the highway via existing ramps and crossovers and must move in the direction of public traffic. All movements of workmen and construction equipment on or across lanes open to public traffic must be performed in a manner that will not endanger the public. Your vehicles or other mobile equipment leaving an open traffic lane to enter the construction area, must slow down gradually in advance of the location of the turnoff to give traffic following an opportunity to slow down. When leaving a work area and entering a roadway carrying public traffic, your vehicles and equipment must yield to public traffic. Immediately remove hauling spillage from roadway lanes or shoulders open to traffic. When hauling on roadways, trim loads and remove material from shelf areas to minimize spillage. Notify the Engineer not less than 20 days and not more than 90 days before the anticipated start of an activity that will change the vertical or horizontal clearance available to public traffic, including shoulders. If vertical clearance is temporarily reduced to 15.5 feet or less, place low clearance warning signs in accordance with the California MUTCD and as ordered. Signs must comply with the dimensions, color, and legend requirements of the California MUTCD and these specifications Book One- State Route 68 at San Benancio Road Intersection Improvements 67 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??L??except that the signs must have black letters and numbers on an orange retroreflective background. W12-21' signs must be illuminated so that the signs are clearly visible. Pave or provide full width continuous and cleared wood walks for pedestrian openings through falsework. Protect pedestrians from falling objects and curing water for concrete. Extend overhead protection for pedestrians not less than 4 feet beyond the edge of the bridge deck. Illuminate all pedestrian openings through falsework. Temporary pedestrian facilities must comply with the American with Disabilities Act of 1990 ADA). Do not store vehicles, material, or equipment in a way that: 1. Creates a hazard to the public 2. Obstructs traffic control devices Do not install or place temporary facilities used to perform the work which interfere with the free and safe passage of public traffic. If you appear to be neglectful or negligent in furnishing warning devices and taking protective measures, the Engineer may direct your attention to the existence of a hazard and the necessary warning devices must be furnished and installed and protective measures taken by you. If the Engineer points out the inadequacy of warning devices and protective measures, that action on the part of the Engineer does not relieve you from your responsibility for public safety or abrogate the obligation to furnish and pay for these devices and measures. Install temporary railing Type K) or other approved protection system under the following conditions: 1. Excavations: Where the near edge of the excavation is within 15 feet from the edge of an open traffic lane 2. Temporarily Unprotected Permanent Obstacles: When the work includes the installation of a fixed obstacle together with a protective system, such as a sign structure together with protective railing, and you elect to install the obstacle before installing the protective system; or you, for your convenience and as authorized, remove a portion of an existing protective railing at an obstacle and do not replace such railing completely the same day 3. Storage Areas: When material or equipment is stored within 15 feet of the edge of an open traffic lane and the storage is not otherwise prohibited by the provisions of these Standard Specifications and the special provisions 4. Height Differentials: When construction operations create a height differential greater than 0.15 feet within 15 feet of the edge of traffic lane Temporary railing Type K) does not need to be installed where excavations within 15 feet from edge of an open traffic lane are: 1. Covered with steel plates or concrete covers of adequate thickness to prevent accidental entry by traffic or the public 2. In side slopes, where the downhill slope is 4:1 horizontal:vertical) or less unless a naturally occurring condition 3. Protected by existing barrier or railing Offset the approach end of temporary railing Type K) a minimum of 15 feet from the edge of an open traffic lane. Install the temporary railing on a skew toward the edge of the traffic lane of not more than one foot transversely to 10 feet longitudinally with respect to the edge of the traffic lane. If the 15-foot minimum offset cannot be achieved, the temporary railing must be installed on the 10 to 1 skew to obtain the maximum available offset between the approach end Book One- State Route 68 at San Benancio Road Intersection Improvements 68 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??M??of the railing and the edge of the traffic lane, and an array of temporary crash cushion modules must be installed at the approach end of the temporary railing. Secure in place temporary railing Type K) before starting work for which the temporary railing is required. Where 2 or more lanes in the same direction are adjacent to the area where the work is being performed, including shoulders, the adjacent lane must be closed under any of the following conditions: 1. Work is off the traveled way but within 6 feet of the edge of traveled way, and approach speed is greater than 45 miles per hour 2. Work is off the traveled way but within 3 feet of the edge of traveled way, and approach speed is less than 45 miles per hour Closure of the adjacent traffic lane is not required when: 1. Performing work behind a barrier 2. Paving, grinding, or grooving 3. Installing, maintaining, or removing traffic control devices except temporary railing Type K) Do not reduce an open traffic lane width to less than 10 feet. When traffic cones or delineators are used for temporary edge delineation, the line of cones or delineators is considered the edge of the traveled way. If a traffic lane is closed with channelizers for excavation work, move the devices to the adjacent edge of the traveled way when not excavating. Space the devices the same as specified for the lane closure. Do not move or temporarily suspend anything over a traffic lane open to the public unless the public is protected. Replace Section 7-1.11 with: 7-1.11 PRESERVATION OF PROPERTY Comply with Section 5-1.18, Property and Facility Preservation." Replace Section 7-1.12 with: 7-1.12 INDEMNIFICATION AND INSURANCE The Contractor's obligations regarding indemnification of the State of California and the requirements for insurance shall conform to the provisions in Section 3-1.05, Insurance Policies," and Sections 7-1.12A, Indemnification," and 7-1.12B, Insurance," of this Section 7- 1.12. 7-1.12A Indemnification The Contractor shall defend, indemnify, and save harmless the State, including its officers, employees, and agents excluding agents who are design professionals) from any and all claims, demands, causes of action, damages, costs, expenses, actual attorneys' fees, losses or liabilities, in law or in equity Section 7-1.12A Claims) arising out of or in connection with the Contractor's performance of this contract for: Book One- State Route 68 at San Benancio Road Intersection Improvements 69 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??N??1. Bodily injury including, but not limited to, bodily injury, sickness or disease, emotional injury or death to persons, including, but not limited to, the public, any employees or agents of the Contractor, the State, or any other contractor; and 2. Damage to property of anyone including loss of use thereof; caused or alleged to be caused in whole or in part by any negligent or otherwise legally actionable act or omission of the Contractor or anyone directly or indirectly employed by the Contractor or anyone for whose acts the Contractor may be liable. Except as otherwise provided by law, these requirements apply regardless of the existence or degree of fault of the State. The Contractor is not obligated to indemnify the State for Claims arising from conduct delineated in Civil Code Section 2782 and to Claims arising from any defective or substandard condition of the highway that existed at or before the start of work, unless this condition has been changed by the work or the scope of the work requires the Contractor to maintain existing highway facilities and the Claim arises from the Contractor's failure to maintain. The Contractor's defense and indemnity obligation shall extend to Claims arising after the work is completed and accepted if the Claims are directly related to alleged acts or omissions by the Contractor that occurred during the course of the work. State inspection is not a waiver of full compliance with these requirements. The Contractor's obligation to defend and indemnify shall not be excused because of the Contractor's inability to evaluate liability or because the Contractor evaluates liability and determine that the Contractor is not liable. The Contractor shall respond within 30 days to the tender of any Claim for defense and indemnity by the State, unless this time has been extended by the State. If the Contractor fails to accept or reject a tender of defense and indemnity within 30 days, in addition to any other remedy authorized by law, the Department may withhold such funds the State reasonably considers necessary for its defense and indemnity until disposition has been made of the Claim or until the Contractor accepts or rejects the tender of defense, whichever occurs first. With respect to third-party claims against the Contractor, the Contractor waives all rights of any type to express or implied indemnity against the State, its officers, employees, or agents excluding agents who are design professionals). Nothing in the Contract is intended to establish a standard of care owed to any member of the public or to extend to the public the status of a third-party beneficiary for any of these indemnification specifications. 7-1.12B Insurance 7-1.12B(1) General Nothing in the contract is intended to establish a standard of care owed to any member of the public or to extend to the public the status of a third-party beneficiary for any of these insurance specifications. 7-1.12B(2) Casualty Insurance The Contractor shall procure and maintain insurance on all of its operations with companies acceptable to the State as follows: 1. The Contractor shall keep all insurance in full force and effect from the beginning of the work through contract acceptance. 2. All insurance shall be with an insurance company with a rating from A.M. Best Financial Strength Rating of A- or better and a Financial Size Category of VII or better. Book One- State Route 68 at San Benancio Road Intersection Improvements 70 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??O??3. The Contractor shall maintain completed operations coverage with a carrier acceptable to the State through the expiration of the patent deficiency in construction statute of repose set forth in Code of Civil Procedure Section 337.1. 7-1.12B(3) Workers' Compensation and Employer's Liability Insurance In accordance with Labor Code Section 1860, the Contractor shall secure the payment of worker's compensation in accordance with Labor Code Section 3700. In accordance with Labor Code Section 1861, the Contractor shall submit to the Department the following certification before performing the work: I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Contract execution constitutes certification submittal. The Contractor shall provide Employer's Liability Insurance in amounts not less than: 1. $1,000,000 for each accident for bodily injury by accident 2. $1,000,000 policy limit for bodily injury by disease 3. $1,000,000 for each employee for bodily injury by disease If there is an exposure of injury to the Contractor's employees under the U.S. Longshoremen's and Harbor Workers' Compensation Act, the Jones Act, or under laws, regulations, or statutes applicable to maritime employees, coverage shall be included for such injuries or claims. 7-1.12B(4) Liability Insurance 7-1.12B(4)(a) General The Contractor shall carry General Liability and Umbrella or Excess Liability Insurance covering all operations by or on behalf of the Contractor providing insurance for bodily injury liability and property damage liability for the following limits and including coverage for: 1. Premises, operations, and mobile equipment 2. Products and completed operations 3. Broad form property damage including completed operations) 4. Explosion, collapse, and underground hazards 5. Personal injury 6. Contractual liability 7-1.12B(4)(b) Liability Limits/Additional Insureds The limits of liability shall be at least the amounts shown in the following table: Book One- State Route 68 at San Benancio Road Intersection Improvements 71 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??P??Total Bid For Each Aggregate for General Umbrella or Occurrence' Products/Completed Aggregate2 Excess Liability3 Operation $1,000,000 $1,000,000 $2,000,000 $2,000,000 $5,000,000 $ 1,000,000 $10,000,000 $1,000,000 $2,000,000 $2,000,000 $10,000,000 $10,000,000 $25,000,000 $2,000,000 $2,000,000 $4,000,000 $15,000,000 $25,000,000 $2,000,000 $2,000,000 $4,000,000 $25,000,000 1. Combined single limit for bodily injury and property damage. 2. This limit shall apply separately to the Contractor's work under this contract. 3. The umbrella or excess policy shall contain a clause stating that it takes effect drops down) in the event the primary limits are impaired or exhausted. The Contractor shall not require certified Small Business subcontractors to carry Liability Insurance that exceeds the limits in the table above. Notwithstanding the limits specified herein, at the option of the Contractor, the liability insurance limits for certified Small Business subcontractors of any tier may be less than those limits specified in the table. For Small Business subcontracts, Total Bid" shall be interpreted as the amount of subcontracted work to a certified Small Business. The State, including its officers, directors, agents excluding agents who are design professionals), and employees, shall be named as additional insureds under the General Liability and Umbrella Liability Policies with respect to liability arising out of or connected with work or operations performed by or on behalf of the Contractor under this contract. Coverage for such additional insureds does not extend to liability: 1. Arising from any defective or substandard condition of the roadway which existed at or before the time the Contractor started work, unless such condition has been changed by the work or the scope of the work requires the Contractor to maintain existing roadway facilities and the claim arises from the Contractor's failure to maintain; 2. For claims occurring after the work is completed and accepted unless these claims are directly related to alleged acts or omissions of the Contractor that occurred during the course of the work; or 3. To the extent prohibited by Insurance Code Section 11580.04 Additional insured coverage shall be provided by a policy provision or by an endorsement providing coverage at least as broad as Additional Insured Form B) endorsement form CG 2010, as published by the Insurance Services Office ISO), or other form designated by the Department. 7-1.12B(4)(c) Contractor's Insurance Policy is Primary The policy shall stipulate that the insurance afforded the additional insureds applies as primary insurance. Any other insurance or self-insurance maintained by the State is excess only and shall not be called upon to contribute with this insurance. 7-1.12B(5) Automobile Liability Insurance The Contractor shall carry automobile liability insurance, including coverage for all owned, hired, and nonowned automobiles. The primary limits of liability shall be not less than $1,000,000 combined single limit each accident for bodily injury and property damage. The umbrella or excess liability coverage required under Section 7-1.12B(4)(b) also applies to automobile liability. Book One- State Route 68 at San Benancio Road Intersection Improvements 72 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Q??7-1.12B(6) Policy Forms, Endorsements, and Certificates The Contractor shall provide its General Liability Insurance under Commercial General Liability policy form No. CG0001 as published by the Insurance Services Office ISO) or under a policy form at least as broad as policy form No. CG0001. 7-1.12B(7) Deductibles The State may expressly allow deductible clauses, which it does not consider excessive, overly broad, or harmful to the interests of the State. Regardless of the allowance of exclusions or deductions by the State, the Contractor is responsible for any deductible amount and shall warrant that the coverage provided to the State is in accordance with Section 7-1.12B, Insurance." 7-1.12B(8) Enforcement The Department may assure the Contractor's compliance with its insurance obligations. Ten days before an insurance policy lapses or is canceled during the contract period, the Contractor shall submit to the Department evidence of renewal or replacement of the policy. If the Contractor fails to maintain any required insurance coverage, the Department may maintain this coverage and withhold or charge the expense to the Contractor or terminate the Contractor's control of the work in accordance with Section 8-1.08, Termination of Control." The Contractor is not relieved of its duties and responsibilities to indemnify, defend, and hold harmless the State, its officers, agents, and employees by the Department's acceptance of insurance policies and certificates. Minimum insurance coverage amounts do not relieve the Contractor for liability in excess of such coverage, nor do they preclude the State from taking other actions available to it, including the withholding of funds under this contract. 7-1.12B(9) Self-Insurance Self-insurance programs and self-insured retentions in insurance policies are subject to separate annual review and approval by the State. If the Contractor uses a self-insurance program or self-insured retention, the Contractor shall provide the State with the same protection from liability and defense of suits as would be afforded by first-dollar insurance. Execution of the contract is the Contractor's acknowledgement that the Contractor will be bound by all laws as if the Contractor were an insurer as defined under Insurance Code Section 23 and that the self-insurance program or self- insured retention shall operate as insurance as defined under Insurance Code Section 22. Replace Section 7-1.125 with: 7-1.125 Legal Actions Against the Department If legal action is brought against the Department over compliance with a State or Federal law, rule, or regulation applicable to highway work, then: 1. If the Department, in complying with a court order, prohibits you from performing work, the resulting delay is a suspension related to your performance, unless the Department terminates the contract. 2. If a court order other than an order to show cause or the final judgment in the action prohibits the Department from requiring you to perform work, the Department may delete the prohibited work or terminate the contract. Book One- State Route 68 at San Benancio Road Intersection Improvements 73 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??R??In Section 7-1.13 delete the 5th and 6th paragraphs. Add: 7-1.50 FEDERAL LAWS FOR FEDERAL-AID CONTRACTS 7-1.50A General Section 7-1.50, Federal Laws for Federal-Aid Contracts," includes specifications required in a Federal-aid construction contract and applies to a Federal-aid contract. Form FHWA-1273 is included in the contract in Section 7-1.50B, FHWA-1273." Some contract terms on the form are different than those used in other contract parts as shown in the following table: FHWA-1273 Term Equivalent Term Used in Other Contract Parts SHA Department SHA contracting officer Engineer SHA resident engineer Engineer 7-1.50B FHWA-1273 FHWA-1273 Electronic version March 10, 1994 with revised Section VI REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS 1. General II. Nondiscrimination III. Nonsegregated Facilities IV. Payment of Predetermined Minimum Wage V. Statements and Payrolls VI. Record of Materials, Supplies, and Labor VII. Subletting or Assigning the Contract VIII. Safety: Accident Prevention IX. False Statements Concerning Highway Projects X. Implementation of Clean Air Act and Federal Water Pollution Control Act XI. Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion XII. Certification Regarding Use of Contract Funds for Lobbying ATTACHMENTS A. Employment Preference for Appalachian Contracts included in Appalachian contracts only) 1. GENERAL 1. These contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 2. Except as otherwise provided for in each section, the contractor shall insert in each subcontract all of the stipulations contained in these Required Contract Provisions, and further require their inclusion in any lower tier subcontract or purchase order that may in FHWA-1273 Terms and Department Equivalencies Book One- State Route 68 at San Benancio Road Intersection Improvements 74 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??S??turn be made. The Required Contract Provisions shall not be incorporated by reference in any case. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with these Required Contract Provisions. 3. A breach of any of the stipulations contained in these Required Contract Provisions shall be sufficient grounds for termination of the contract. 4. A breach of the following clauses of the Required Contract Provisions may also be grounds for debarment as provided in 29 CFR 5.12: Section I, paragraph 2; Section IV, paragraphs 1, 2, 3, 4, and 7; Section V, paragraphs 1 and 2a through 2g. 5. Disputes arising out of the labor standards provisions of Section IV except paragraph 5) and Section V of these Required Contract Provisions shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the U.S. Department of Labor DOL) as set forth in 29 CFR 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor or any of its subcontractors) and the contracting agency, the DOL, or the contractor's employees or their representatives. 6. Selection of Labor: During the performance of this contract, the contractor shall not: a. discriminate against labor from any other State, possession, or territory of the United States except for employment preference for Appalachian contracts, when applicable, as specified in Attachment A), or b. employ convict labor for any purpose within the limits of the project unless it is labor performed by convicts who are on parole, supervised release, or probation. II. NONDISCRIMINATION Applicable to all Federal-aid construction contracts and to all related subcontracts of $10,000 or more.) 1. Equal Employment Opportunity: Equal employment opportunity EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations 28 CFR 35, 29 CFR 1630 and 41 CFR 60) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140 shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The Equal Opportunity Construction Contract Specifications set forth under 41 CFR 60-4.3 and the provisions of the American Disabilities Act of 1990 42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29 CFR 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO: a. The contractor will work with the State highway agency SHA) and the Federal Government in carrying out EEO obligations and in their review of his/her activities under the contract. b. The contractor will accept as his operating policy the following statement: It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color, national origin, age or disability. Such action shall include: employment, Book One- State Route 68 at San Benancio Road Intersection Improvements 75 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??T??upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, preapprenticeship, and/or on-the-job training." 2. EEO Officer: The contractor will designate and make known to the SHA contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active contractor program of EEO and who must be assigned adequate authority and responsibility to do so. 3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action, or who are substantially involved in such action, will be made fully cognizant of, and will implement, the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum: a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer. b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor. c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minority group employees. d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees. e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means. 4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minority groups in the area from which the project work force would normally be derived. a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minority group applicants. To meet this requirement, the contractor will identify sources of potential minority group employees, and establish with such identified sources procedures whereby minority group applicants may be referred to the contractor for employment consideration. b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, he is expected to observe the provisions of that agreement to the extent that the system permits the contractor's compliance with EEO contract provisions. The DOL has held that where implementation of such agreements have the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Executive Order 11246, as amended.) Book One- State Route 68 at San Benancio Road Intersection Improvements 76 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??U??c. The contractor will encourage his present employees to refer minority group applicants for employment. Information and procedures with regard to referring minority group applicants will be discussed with employees. 5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, national origin, age or disability. The following procedures shall be followed: a. The contractor will conduct periodic inspections of project sites to insure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel. b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices. c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons. d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with his obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of his avenues of appeal. 6. Training and Promotion: a. The contractor will assist in locating, qualifying, and increasing the skills of minority group and women employees, and applicants for employment. b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs, i.e., apprenticeship, and on-the-job training programs for the geographical area of contract performance. Where feasible, 25 percent of apprentices or trainees in each occupation shall be in their first year of apprenticeship or training. In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. c. The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each. d. The contractor will periodically review the training and promotion potential of minority group and women employees and will encourage eligible employees to apply for such training and promotion. 7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use his/her best efforts to obtain the cooperation of such unions to increase opportunities for minority groups and women within the unions, and to effect referrals by such unions of minority and female employees. Actions by the contractor Book One- State Route 68 at San Benancio Road Intersection Improvements 77 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??V??either directly or through a contractor's association acting as agent will include the procedures set forth below: a. The contractor will use best efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minority group members and women for membership in the unions and increasing the skills of minority group employees and women so that they may qualify for higher paying employment. b. The contractor will use best efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, national origin, age or disability. c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the SHA and shall set forth what efforts have been made to obtain such information. d. In the event the union is unable to provide the contractor with a reasonable flow of minority and women referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, national origin, age or disability; making full efforts to obtain qualified and/or qualifiable minority group persons and women. The DOL has held that it shall be no excuse that the union with which the contractor has a collective bargaining agreement providing for exclusive referral failed to refer minority employees.) In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these specifications, such contractor shall immediately notify the SHA. 8. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. a. The contractor shall notify all potential subcontractors and suppliers of his/her EEO obligations under this contract. b. Disadvantaged business enterprises DBE), as defined in 49 CFR 23, shall have equal opportunity to compete for and perform subcontracts which the contractor enters into pursuant to this contract. The contractor will use his best efforts to solicit bids from and to utilize DBE subcontractors or subcontractors with meaningful minority group and female representation among their employees. Contractors shall obtain lists of DBE construction firms from SHA personnel. c. The contractor will use his best efforts to ensure subcontractor compliance with their EEO obligations. 9. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following completion of the contract work and shall be available at reasonable times and places for inspection by authorized representatives of the SHA and the FHWA. a. The records kept by the contractor shall document the following: Book One- State Route 68 at San Benancio Road Intersection Improvements 78 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??W??1. The number of minority and non-minority group members and women employed in each work classification on the project; 2. The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; 3. The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minority and female employees; and 4. The progress and efforts being made in securing the services of DBE subcontractors or subcontractors with meaningful minority and female representation among their employees. b. The contractors will submit an annual report to the SHA each July for the duration of the project, indicating the number of minority, women, and non-minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. If on-the-job training is being required by special provision, the contractor will be required to collect and report training data. III. NONSEGREGATED FACILITIES Applicable to all Federal-aid construction contracts and to all related subcontracts of $10,000 or more.) a. By submission of this bid, the execution of this contract or subcontract, or the consummation of this material supply agreement or purchase order, as appropriate, the bidder, Federal-aid construction contractor, subcontractor, material supplier, or vendor, as appropriate, certifies that the firm does not maintain or provide for its employees any segregated facilities at any of its establishments, and that the firm does not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The firm agrees that a breach of this certification is a violation of the EEO provisions of this contract. The firm further certifies that no employee will be denied access to adequate facilities on the basis of sex or disability. b. As used in this certification, the term segregated facilities" means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, timeclocks, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive, or are, in fact, segregated on the basis of race, color, religion, national origin, age or disability, because of habit, local custom, or otherwise. The only exception will be for the disabled when the demands for accessibility override e.g. disabled parking). c. The contractor agrees that it has obtained or will obtain identical certification from proposed subcontractors or material suppliers prior to award of subcontracts or consummation of material supply agreements of $10,000 or more and that it will retain such certifications in its files. IV. PAYMENT OF PREDETERMINED MINIMUM WAGE Applicable to all Federal-aid construction contracts exceeding $2,000 and to all related subcontracts, except for projects located on roadways classified as local roads or rural minor collectors, which are exempt.) 1. General: a. All mechanics and laborers employed or working upon the site of the work will be paid unconditionally and not less often than once a week and without subsequent deduction or rebate on any account except such payroll deductions as are permitted Book One- State Route 68 at San Benancio Road Intersection Improvements 79 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??X??by regulations 29 CFR 3) issued by the Secretary of Labor under the Copeland Act 40 U.S.C. 276c)] the full amounts of wages and bona fide fringe benefits or cash equivalents thereof) due at time of payment. The payment shall be computed at wage rates not less than those contained in the wage determination of the Secretary of Labor hereinafter the wage determination") which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor or its subcontractors and such laborers and mechanics. The wage determination including any additional classifications and wage rates conformed under paragraph 2 of this Section IV and the DOL poster WH-1321) or Form FHWA-1495) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. For the purpose of this Section, contributions made or costs reasonably anticipated for bona fide fringe benefits under Section 1(b) 2) of the Davis- Bacon Act 40 U.S.C. 276a) on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of Section IV, paragraph 3b, hereof. Also, for the purpose of this Section, regular contributions made or costs incurred for more than a weekly period but not less often than quarterly) under plans, funds, or programs, which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in paragraphs 4 and 5 of this Section IV. b. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein, provided, that the employer's payroll records accurately set forth the time spent in each classification in which work is performed. c. All rulings and interpretations of the Davis-Bacon Act and related acts contained in 29 CFR 1, 3, and 5 are herein incorporated by reference in this contract. 2. Classification: a. The SHA contracting officer shall require that any class of laborers or mechanics employed under the contract, which is not listed in the wage determination, shall be classified in conformance with the wage determination. b. The contracting officer shall approve an additional classification, wage rate and fringe benefits only when the following criteria have been met: 1. the work to be performed by the additional classification requested is not performed by a classification in the wage determination; 2. the additional classification is utilized in the area by the construction industry; 3. the proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination; and 4. with respect to helpers, when such a classification prevails in the area in which the work is performed. c. If the contractor or subcontractors, as appropriate, the laborers and mechanics if known) to be employed in the additional classification or their representatives, and the contracting officer agree on the classification and wage rate including the amount Book One- State Route 68 at San Benancio Road Intersection Improvements 80 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Y??designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the DOL, Administrator of the Wage and Hour Division, Employment Standards Administration, Washington, D.C. 20210. The Wage and Hour Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. d. In the event the contractor or subcontractors, as appropriate, the laborers or mechanics to be employed in the additional classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Wage and Hour Administrator for determination. Said Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. e. The wage rate including fringe benefits where appropriate) determined pursuant to paragraph 2c or 2d of this Section IV shall be paid to all workers performing work in the additional classification from the first day on which work is performed in the classification. 3. Payment of Fringe Benefits: a. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor or subcontractors, as appropriate, shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly case equivalent thereof. b. If the contractor or subcontractor, as appropriate, does not make payments to a trustee or other third person, he/she may consider as a part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, provided, that the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. 4. Apprentices and Trainees Programs of the U.S. DOL) and Helpers: a. Apprentices: 1. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the DOL, Employment and Training Administration, Bureau of Apprenticeship and Training, or with a State apprenticeship agency recognized by the Bureau, or if a person is employed in his/her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Bureau of Apprenticeship and Training or a State apprenticeship Book One- State Route 68 at San Benancio Road Intersection Improvements 81 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Z??agency where appropriate) to be eligible for probationary employment as an apprentice. 2. The allowable ratio of apprentices to journeyman-level employees on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any employee listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate listed in the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor or subcontractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates expressed in percentages of the journeyman- level hourly rate) specified in the contractor's or subcontractor's registered program shall be observed. 3. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeyman-level hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator for the Wage and Hour Division determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. 4. In the event the Bureau of Apprenticeship and Training, or a State apprenticeship agency recognized by the Bureau, withdraws approval of an apprenticeship program, the contractor or subcontractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the comparable work performed by regular employees until an acceptable program is approved. b. Trainees: 1. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the DOL, Employment and Training Administration. 2. The ratio of trainees to journeyman-level employees on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. 3. Every trainee must be paid at not less than the rate specified in the approved program for his/her level of progress, expressed as a percentage of the journeyman-level hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee Book One- State Route 68 at San Benancio Road Intersection Improvements 82 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??[??program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman-level wage rate on the wage determination which provides for less than full fringe benefits for apprentices, in which case such trainees shall receive the same fringe benefits as apprentices. 4. In the event the Employment and Training Administration withdraws approval of a training program, the contractor or subcontractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. c. Helpers: Helpers will be permitted to work on a project if the helper classification is specified and defined on the applicable wage determination or is approved pursuant to the conformance procedure set forth in Section IV.2. Any worker listed on a payroll at a helper wage rate, who is not a helper under an approved definition, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. 5. Apprentices and Trainees Programs of the U.S. DOT): Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal-aid highway construction programs are not subject to the requirements of paragraph 4 of this Section IV. The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs. The ratio of apprentices and trainees to journeymen shall not be greater than permitted by the terms of the particular program. 6. Withholding: The SHA shall upon its own action or upon written request of an authorized representative of the DOL withhold, or cause to be withheld, from the contractor or subcontractor under this contract or any other Federal contract with the same prime contractor, or any other Federally-assisted contract subject to Davis-Bacon prevailing wage requirements which is held by the same prime contractor, as much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the SHA contracting officer may, after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. 7. Overtime Requirements: No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers, mechanics, watchmen, or guards including apprentices, trainees, and helpers described in paragraphs 4 and 5 above) shall require or permit any laborer, mechanic, watchman, or guard in any workweek in which he/she is employed on such work, to work in excess of 40 hours in such workweek unless Book One- State Route 68 at San Benancio Road Intersection Improvements 83 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??\??such laborer, mechanic, watchman, or guard receives compensation at a rate not less than one-and-one-half times his/her basic rate of pay for all hours worked in excess of 40 hours in such workweek. 8. Violation: Liability for Unpaid Wages; Liquidated Damages: In the event of any violation of the clause set forth in paragraph 7 above, the contractor and any subcontractor responsible thereof shall be liable to the affected employee for his/her unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory) for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer, mechanic, watchman, or guard employed in violation of the clause set forth in paragraph 7, in the sum of $10 for each calendar day on which such employee was required or permitted to work in excess of the standard work week of 40 hours without payment of the overtime wages required by the clause set forth in paragraph 7. 9. Withholding for Unpaid Wages and Liquidated Damages: The SHA shall upon its own action or upon written request of any authorized representative of the DOL withhold, or cause to be withheld, from any monies payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other Federally-assisted contract subject to the contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph 8 above. V. STATEMENTS AND PAYROLLS Applicable to all Federal-aid construction contracts exceeding $2,000 and to all related subcontracts, except for projects located on roadways classified as local roads or rural collectors, which are exempt.) 1. Compliance with Copeland Regulations 29 CFR 3): The contractor shall comply with the Copeland Regulations of the Secretary of Labor which are herein incorporated by reference. 2. Payrolls and Payroll Records: a. Payrolls and basic records relating thereto shall be maintained by the contractor and each subcontractor during the course of the work and preserved for a period of 3 years from the date of completion of the contract for all laborers, mechanics, apprentices, trainees, watchmen, helpers, and guards working at the site of the work. b. The payroll records shall contain the name, social security number, and address of each such employee; his or her correct classification; hourly rates of wages paid including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalent thereof the types described in Section 1(b)(2)(B) of the Davis Bacon Act); daily and weekly number of hours worked; deductions made; and actual wages paid. In addition, for Appalachian contracts, the payroll records shall contain a notation indicating whether the employee does, or does not, normally reside in the labor area as defined in Attachment A, paragraph 1. Whenever the Secretary of Labor, pursuant to Section IV, paragraph 3b, has found that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in Section 1(b)(2)(B) of the Davis Bacon Book One- State Route 68 at San Benancio Road Intersection Improvements 84 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??]??Act, the contractor and each subcontractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, that the plan or program has been communicated in writing to the laborers or mechanics affected, and show the cost anticipated or the actual cost incurred in providing benefits. Contractors or subcontractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprentices and trainees, and ratios and wage rates prescribed in the applicable programs. c. Each contractor and subcontractor shall furnish, each week in which any contract work is performed, to the SHA resident engineer a payroll of wages paid each of its employees including apprentices, trainees, and helpers, described in Section IV, paragraphs 4 and 5, and watchmen and guards engaged on work during the preceding weekly payroll period). The payroll submitted shall set out accurately and completely all of the information required to be maintained under paragraph 2b of this Section V. This information may be submitted in any form desired. Optional Form WH-347 is available for this purpose and may be purchased from the Superintendent of Documents Federal stock number 029- 005-0014-1), U.S. Government Printing Office, Washington, D.C. 20402. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. d. Each payroll submitted shall be accompanied by a Statement of Compliance," signed by the contractor or subcontractor or his/her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: 1 that the payroll for the payroll period contains the information required to be maintained under paragraph 2b of this Section V and that such information is correct and complete; 2. that such laborer or mechanic including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in the Regulations, 29 CFR 3; 3. that each laborer or mechanic has been paid not less that the applicable wage rate and fringe benefits or cash equivalent for the classification of worked performed, as specified in the applicable wage determination incorporated into the contract. e. The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the Statement of Compliance" required by paragraph 2d of this Section V. f. The falsification of any of the above certifications may subject the contractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 231. g. The contractor or subcontractor shall make the records required under paragraph 2b of this Section V available for inspection, copying, or transcription by authorized representatives of the SHA, the FHWA, or the DOL, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the SHA, the FHWA, the DOL, or all may, after written notice to the contractor, sponsor, applicant, or owner, take such actions as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Book One- State Route 68 at San Benancio Road Intersection Improvements 85 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??^??Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. VI. RECORD OF MATERIALS, SUPPLIES, AND LABOR As of May 22, 2007, Form FHWA-47 is no longer required.) VII. SUBLETTING OR ASSIGNING THE CONTRACT 1. The contractor shall perform with its own organization contract work amounting to not less than 30 percent or a greater percentage if specified elsewhere in the contract) of the total original contract price, excluding any specialty items designated by the State. Specialty items may be performed by subcontract and the amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the contractor's own organization 23 CFR 635). a. Its own organization" shall be construed to include only workers employed and paid directly by the prime contractor and equipment owned or rented by the prime contractor, with or without operators. Such term does not include employees or equipment of a subcontractor, assignee, or agent of the prime contractor. b. Specialty Items" shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid on the contract as a whole and in general are to be limited to minor components of the overall contract. 2. The contract amount upon which the requirements set forth in paragraph 1 of Section VII is computed includes the cost of material and manufactured products which are to be purchased or produced by the contractor under the contract provisions. 3. The contractor shall furnish a) a competent superintendent or supervisor who is employed by the firm, has full authority to direct performance of the work in accordance with the contract requirements, and is in charge of all construction operations regardless of who performs the work) and b) such other of its own organizational resources supervision, management, and engineering services) as the SHA contracting officer determines is necessary to assure the performance of the contract. 4. No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the SHA contracting officer, or authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfillment of the contract. Written consent will be given only after the SHA has assured that each subcontract is evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract. VIII. SAFETY: ACCIDENT PREVENTION 1. In the performance of this contract the contractor shall comply with all applicable Federal, State, and local laws governing safety, health, and sanitation 23 CFR 635). The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions as it determines, or as the SHA contracting officer may determine, to be reasonably necessary to protect the life and health of employees on the job and the safety of the public and to protect property in connection with the performance of the work covered by the contract. 2. It is a condition of this contract, and shall be made a condition of each subcontract, which the contractor enters into pursuant to this contract, that the contractor and any Book One- State Route 68 at San Benancio Road Intersection Improvements 86 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??_??subcontractor shall not permit any employee, in performance of the contract, to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as determined under construction safety and health standards 29 CFR 1926) promulgated by the Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and Safety Standards Act 40 U.S.C. 333). 3. Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or authorized representative thereof, shall have right of entry to any site of contract performance to inspect or investigate the matter of compliance with the construction safety and health standards and to carry out the duties of the Secretary under Section 107 of the Contract Work Hours and Safety Standards Act 40 U.S.C. 333). IX. FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by Engineers, contractors, suppliers, and workers on Federal-aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible. Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness of these and similar acts, the following notice shall be posted on each Federal-aid highway project 23 CFR 635) in one or more places where it is readily available to all persons concerned with the project: NOTICE TO ALL PERSONNEL ENGAGED ON FEDERAL-AID HIGHWAY PROJECTS 18 U.S.C. 1020 reads as follows: Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation; or Whoever knowingly makes any false statement, false representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or Whoever knowingly makes any false statement or false representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal-aid Roads Act approved July 1, 1916, 39 Stat. 355), as amended and supplemented; Shall be fined not more that $10,000 or imprisoned not more than 5 years or both." X. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT Applicable to all Federal-aid construction contracts and to all related subcontracts of $100,000 or more.) By submission of this bid or the execution of this contract, or subcontract, as appropriate, the bidder, Federal-aid construction contractor, or subcontractor, as appropriate, will be deemed to have stipulated as follows: 1. That any facility that is or will be utilized in the performance of this contract, unless such contract is exempt under the Clean Air Act, as amended 42 U.S.C. 1857 et seq., Book One- State Route 68 at San Benancio Road Intersection Improvements 87 CONTRACT NO. 10- H 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??`??as amended by Pub.L. 91-604), and under the Federal Water Pollution Control Act, as amended 33 U.S.C. 1251 et seq., as amended by Pub.L. 92-500), Executive Order 11738, and regulations in implementation thereof 40 CFR 15) is not listed, on the date of contract award, on the U.S. Environmental Protection Agency EPA) List of Violating Facilities pursuant to 40 CFR 15.20. 2. That the firm agrees to comply and remain in compliance with all the requirements of Section 114 of the Clean Air Act and Section 308 of the Federal Water Pollution Control Act and all regulations and guidelines listed thereunder. 3. That the firm shall promptly notify the SHA of the receipt of any communication from the Director, Office of Federal Activities, EPA, indicating that a facility that is or will be utilized for the contract is under consideration to be listed on the EPA List of Violating Facilities. 4. That the firm agrees to include or cause to be included the requirements of paragraph 1 through 4 of this Section X in every nonexempt subcontract, and further agrees to take such action as the government may direct as a means of enforcing such requirements. XI. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION 1. Instructions for Certification Primary Covered Transactions: Applicable to all Federal-aid contracts 49 CFR 29) a. By signing and submitting this proposal, the prospective primary participant is providing the certification set out below. b. The inability of a person to provide the certification set out below will not necessarily result in denial of participation in this covered transaction. The prospective participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective primary participant to furnish a certification or an explanation shall disqualify such a person from participation in this transaction. c. The certification in this clause is a material representation of fact upon which reliance was placed when the department or agency determined to enter into this transaction. If it is later determined that the prospective primary participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause of default. d. The prospective primary participant shall provide immediate written notice to the department or agency to whom this proposal is submitted if any time the prospective primary participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. e. The terms covered transaction," debarred," suspended," ineligible," lower tier covered transaction," participant," person," primary covered transaction," principal," proposal," and voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of rules implementing Executive Order 12549. You may contact the department or agency to which this proposal is submitted for assistance in obtaining a copy of those regulations. f. The prospective primary participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared Book One- State Route 68 at San Benancio Road Intersection Improvements 88 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??a??ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction. g. The prospective primary participant further agrees by submitting this proposal that it will include the clause titled Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," provided by the department or agency entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions. h. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may, but is not required to, check the nonprocurement portion of the Lists of Parties Excluded From Federal Procurement or Nonprocurement Programs" Nonprocurement List) which is compiled by the General Services Administration. i. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. j. Except for transactions authorized under paragraph f of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion--Primary Covered Transactions 1. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals: a. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; b. Have not within a 3-year period preceding this proposal been convicted of or had a civil judgement rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; c. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity Federal, State or local) with commission of any of the offenses enumerated in paragraph lb of this certification; and Book One- State Route 68 at San Benancio Road Intersection Improvements 89 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??b??d. Have not within a 3-year period preceding this application/proposal had one or more public transactions Federal, State or local) terminated for cause or default. 2. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. 2. Instructions for Certification Lower Tier Covered Transactions: Applicable to all subcontracts, purchase orders and other lower tier transactions of $25,000 or more 49 CFR 29) a. By signing and submitting this proposal, the prospective lower tier is providing the certification set out below. b. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department, or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. c. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances. d. The terms covered transaction," debarred," suspended," ineligible," primary covered transaction," participant," person," principal," proposal," and voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of rules implementing Executive Order 12549. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. e. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated. f. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions. g. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may, but is not required to, check the Nonprocurement List. h. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required to exceed that Book One- State Route 68 at San Benancio Road Intersection Improvements 90 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??c??which is normally possessed by a prudent person in the ordinary course of business dealings. i. Except for transactions authorized under paragraph e of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-- Lower Tier Covered Transactions: 1. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. 2. Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. XII. CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR LOBBYING Applicable to all Federal-aid construction contracts and to all related subcontracts which exceed $100,000 49 CFR 20) 1. The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: a. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. b. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, Disclosure Form to Report Lobbying," in accordance with its instructions. 2. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a Book One- State Route 68 at San Benancio Road Intersection Improvements 91 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??d??prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. 3. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such recipients shall certify and disclose accordingly. 7-1.50C Female and Minority Goals To comply with Section II, Nondiscrimination," of Required Contract Provisions Federal- Aid Construction Contracts," the Department is including in Section 7-1.50C, Female and Minority Goals," female and minority utilization goals for Federal-aid construction contracts and subcontracts that exceed $10,000. The nationwide goal for female utilization is 6.9 percent. The goals for minority utilization 45 Fed Reg 65984 10/3/1980)] are as follows: Book One- State Route 68 at San Benancio Road Intersection Improvements 92 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??e??Economic Area Goal Percent) 174 Redding CA: Non-SMSA Counties: 6.8 CA Lassen; CA Modoc; CA Plumas; CA Shasta; CA Siskiyou; CA Tehema 175 Eureka, CA Non-SMSA Counties: 6.6 CA Del Norte; CA Humboldt; CA Trinity 176 San Francisco-Oakland-San Jose, CA: SMSA Counties: 7120 Salinas-Seaside-Monterey, CA 28.9 CA Monterey 7360 San Francisco-Oakland 25.6 CA Alameda; CA Contra Costa; CA Marin; CA San Francisco; CA San Mateo 7400 San Jose, CA CA Santa Clara, CA 19.6 7485 Santa Cruz, CA CA Santa Cruz 14.9 7500 Santa Rosa CA Sonoma 9.1 8720 Vallejo-Fairfield-Napa, CA CA Napa; CA Solano 17.1 Non-SMSA Counties: CA Lake; CA Mendocino; CA San Benito 23.2 177 Sacramento, CA: SMSA Counties: 6920 Sacramento, CA 16.1 CA Placer; CA Sacramento; CA Yolo Non-SMSA Counties 14.3 CA Butte; CA Colusa; CA El Dorado; CA Glenn; CA Nevada; CA Sierra; CA Sutter; CA Yuba 178 Stockton-Modesto, CA: SMSA Counties: 5170 Modesto, CA 12.3 CA Stanislaus 8120 Stockton, CA 24.3 CA San Joaquin Non-SMSA Counties 19.8 CA Alpine; CA Amador; CA Calaveras; CA Mariposa; CA Merced; CA Toulumne 179 Fresno-Bakersfield, CA SMSA Counties: 0680 Bakersfield, CA 19.1 CA Kem 2840 Fresno, CA 26.1 CA Fresno Non-SMSA Counties: 23.6 CA Kings; CA Madera; CA Tulare 180 Los Angeles, CA: SMSA Counties: 0360 Anaheim-Santa Ana-Garden Grove, CA 11.9 CA Orange 4480 Los Angeles-Long Beach, CA 28.3 CA Los Angeles 6000 Oxnard-Simi Valley-Ventura, CA 21.5 CA Ventura 6780 Riverside-San Bernardino-Ontario, CA 19.0 CA Riverside; CA San Bernardino 7480 Santa Barbara-Santa Maria-Lompoc, CA 19.7 Minority Utilization Goals Book One- State Route 68 at San Benancio Road Intersection Improvements 93 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??f?? CA Santa Barbara Non-SMSA Counties 24.6 CA Inyo; CA Mono; CA San Luis Obispo 181 San Diego, CA: SMSA Counties 7320 San Diego, CA 16.9 CA San Diego Non-SMSA Counties 18.2 CA Imperial For each July during which work is performed under the contract, you and each non- material-supplier subcontractor with a subcontract of $10,000 or more must complete Form FHWA PR-1391 Appendix C to 23 CFR 230). Submit the forms by August 15. 7-1.50D Training Section 7-1.50D, Training," applies if a number of trainees or apprentices is specified in the special provisions. As part of your equal opportunity affirmative action program, provide on-the-job training to develop full journeymen in the types of trades or job classifications involved. You have primary responsibility for meeting this training requirement. If you subcontract a contract part, determine how many trainees or apprentices are to be trained by the subcontractor. Include these training requirements in your subcontract. Where feasible, 25 percent of apprentices or trainees in each occupation must be in their 1st year of apprenticeship or training. Distribute the number of apprentices or trainees among the work classifications on the basis of your needs and the availability of journeymen in the various classifications within a reasonable recruitment area. Before starting work, submit to the Department: 1. Number of apprentices or trainees to be trained for each classification 2. Training program to be used 3. Training starting date for each classification Obtain the Department's approval for this submitted information before you start work. The Department credits you for each apprentice or trainee you employ on the work who is currently enrolled or becomes enrolled in an approved program. The primary objective of Section 7-1.50D, Training," is to train and upgrade minorities and women toward journeymen status. Make every effort to enroll minority and women apprentices or trainees, such as conducting systematic and direct recruitment through public and private sources likely to yield minority and women apprentices or trainees, to the extent they are available within a reasonable recruitment area. Show that you have made the efforts. In making these efforts, do not discriminate against any applicant for training. Do not employ as an apprentice or trainee an employee: 1. In any classification in which the employee has successfully completed a training course leading to journeyman status or in which the employee has been employed as a journeyman 2. Who is not registered in a program approved by the US Department of Labor, Bureau of Apprenticeship and Training Book One- State Route 68 at San Benancio Road Intersection Improvements 94 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??g??Ask the employee if the employee has successfully completed a training course leading to journeyman status or has been employed as a journeyman. Your records must show the employee's answers to the questions. In your training program, establish the minimum length and training type for each classification. The Department and FHWA approves a program if one of the following is met: 1. It is calculated to: 1.1. Meet the your equal employment opportunity responsibilities 1.2. Qualify the average apprentice or trainee for journeyman status in the classification involved by the end of the training period 2. It is registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training and it is administered in a way consistent with the equal employment responsibilities of federal-aid highway construction contracts Obtain the State's approval for your training program before you start work involving the classification covered by the program. Provide training in the construction crafts, not in clerk-typist or secretarial-type positions. Training is allowed in lower level management positions such as office engineers, estimators, and timekeepers if the training is oriented toward construction applications. Training is allowed in the laborer classification if significant and meaningful training is provided and approved by the division office. Off-site training is allowed if the training is an integral part of an approved training program and does not make up a significant part of the overall training. The Department reimburses you 80 cents per hour of training given an employee on this contract under an approved training program: 1. For on-site training 2. For off-site training if the apprentice or trainee is currently employed on a federal-aid project and you do at least one of the following: 2.1. Contribute to the cost of the training 2.2. Provide the instruction to the apprentice or trainee 2.3. Pay the apprentice's or trainee's wages during the off-site training period 3. If you comply with Section 7-1.50D, Training" Each apprentice or trainee must: 1. Begin training on the project as soon as feasible after the start of work involving the apprentice's or trainee's skill 2. Remain on the project as long as training opportunities exist in the apprentice's or trainee's work classification or until the apprentice or trainee has completed the training program Furnish the apprentice or trainee: 1. Copy of the program you will comply with in providing the training 2. Certification showing the type and length of training satisfactorily completed Book One- State Route 68 at San Benancio Road Intersection Improvements 95 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??h??Maintain records and submit reports documenting your performance under Section 7-1.50D, Training." AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 8 PROSECUTION AND PROGRESS Issued 06-05-09) Replace Section 8 with: SECTION 8 PROSECUTION AND PROGRESS 8-1.01 BLANK) 8-1.02 ASSIGNMENT No third-party agreement relieves you or your surety of your responsibility to complete the work. Do not sell, transfer, or otherwise dispose of any contract part without prior written consent from the Department. If you assign the right to receive contract payments, the Department accepts the assignment upon the Engineer's receipt of a notice. Assigned payments remain subject to deductions and withholds described in the contract. The Department may use withheld payments for work completion whether payments are assigned or not. 8-1.025 PRECONSTRUCTION CONFERENCE Attend a preconstruction conference with key personnel, including your assigned representative, at a time and location determined by the Engineer. Submit documents as required before the preconstruction conference. You may begin work before the preconstruction conference. Be prepared to discuss the following topics and documents: Book One- State Route 68 at San Benancio Road Intersection Improvements 96 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??i??Topics Document Potential claim and dispute resolution Potential claim forms Contractor's representation Assignment of Contractor's representative DBE and DVBE Final utilization reports Equipment Equipment list Labor compliance and equal employment opportunity Job site posters and benefit and payroll reports Material inspection Notice of Materials to be Used Materials on hand Request for Payment for Materials on Hand Measurements Partnering Field Guide to Partnering on Caltrans Construction Projects Quality control QC plans Safety Injury and Illness Prevention Program and job site posters Schedule Baseline schedule and Weekly Statement of Working Days Subcontracting Subcontracting Request Surveying Survey Request Traffic control Traffic contingency plan and traffic control plans Utility work Weight limitations Water pollution control SWPPP or WPCP Work restrictions PLACs Working drawings 8-1.03 BEGINNING OF WORK Begin work within 15 days after receiving notice that the contract has been approved by the Attorney General or the attorney appointed and authorized to represent the Department. Submit a written notice 72 hours before beginning work. If the project has more than one location of work, submit a separate notice for each location. You may begin work before receiving the notice of contract approval if you: 1. Deliver the signed contract, bonds, and evidence of insurance to the Department 2. Submit 72-hour notice 3. Obtain an encroachment permit from the Department 4. Are authorized by the Department to begin 5. Perform work at your own risk 6. Perform work under the contract The Engineer does not count working days for days worked before contract approval. If the contract is approved, work already performed that complies with the contract is authorized. If the contract does not get approved, leave the job site in a neat condition. If a facility has been changed, restore it to its former or equivalent condition at your expense. The Department does not adjust time for beginning before the approval date. 8-1.04 PROGRESS SCHEDULE 8-1.04A General Reserved 8-1.04B Critical Path Method Schedule The following definitions apply to critical path method schedules: Book One- State Route 68 at San Benancio Road Intersection Improvements 97 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??j??activity: Task, event, or other project element on a schedule that contributes to completing the project. Activities have a description, start date, finish date, duration, and one or more logic ties. baseline schedule: The initial schedule showing the original work plan beginning on the date of contract approval. This schedule shows no completed work to date and no negative float or negative lag to any activity. controlling activity: Construction activity that extends the scheduled completion date if delayed. critical path: Longest continuous chain of activities for the project that has the least amount of total float of all chains. In general, a delay on the critical path extends the scheduled completion date. critical path method CPM): Network based planning technique using activity durations and relationships between activities to calculate a schedule for the entire project. revised schedule: Schedule that incorporates a proposed or past change to logic or activity durations. scheduled completion date: Planned project completion date shown on the current schedule. updated schedule: Current schedule developed from the accepted baseline and any subsequent accepted updated or revised schedules through regular monthly review to incorporate actual past progress. Before or at the preconstruction conference, submit a CPM baseline schedule. Submit a monthly updated schedule that includes the status of work completed to date and the work yet to be performed as planned. On each schedule, show: 1. Planned and actual start and completion date of each work activity, including applicable: 1.1. Submittal development 1.2. Submittal review and approval 1.3. Material procurement 1.4. Contract milestones and constraints 1.5. Equipment and plant setup 1.6. Interfaces with outside entities 1.7. Erection and removal of falsework and shoring 1.8. Test periods 1.9. Major traffic stage change 1.10. Final cleanup 2. Order that you propose to prosecute the work 3. Logical links between the time-scaled work activities 4. All controlling activities 5. Legible description of each activity 6. At least one predecessor and one successor to each activity, except for project start and project end milestones 7. Duration of not less than one working day for each activity 8. Start milestone date as the contract approval date You may include changes on updated schedules that do not alter the critical path or extend the schedule completion date compared to the current schedule. Changes may include: Book One- State Route 68 at San Benancio Road Intersection Improvements 98 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??k??1. Adding or deleting activities 2. Changing activity constraints 3. Changing durations 4. Changing logic If any proposed change in planned work results in altering the critical path or extending the scheduled completion date, submit a revised schedule within 15 days of the proposed change. For each schedule submittal: 1. Submit a plotted original, time-scaled network diagram on a sheet of at least 8.5" x 11" with a title block and timeline 2. If a computer program is used to make the schedule, submit a read-only compact disc or diskette containing the schedule data. Label the compact disc or diskette with: 2.1. Contract number 2.2. CPM schedule number and date produced 2.3. File name If there is no contract item for progress schedule critical path method), full compensation for this work is included in the contract prices paid for the items of work involved, and no additional compensation will be allowed therefor. 8-1.05 TEMPORARY SUSPENSION OF WORK 8-1.05A General The Engineer may suspend work wholly or in part due to any of the following: 1. Conditions are unsuitable for work progress. 2. You fail to do any of the following: 2.1. Fulfill the Engineer's orders. 2.2. Fulfill a contract part. 2.3. Perform weather-dependent work when conditions are favorable so that weather- related unsuitable conditions are avoided or do not occur. Upon the Engineer's written order of suspension, suspend work immediately. Provide for public safety and a smooth and unobstructed passageway through the work zone during the suspension as specified in Sections 7-1.08, Public Convenience," and 7-1.09, Public Safety." Resume work when ordered. 8-1.05B Suspensions Unrelated to Contractor Performance For a suspension unrelated to your performance, providing for a smooth and unobstructed passageway through the work during the suspension will be paid for as extra work as specified in Section 4-1.03D, Extra Work." The days during a suspension unrelated to your performance are non-working days. 8-1.05C Suspensions Related to Contractor Performance For a suspension related to your performance, the Department may provide for a smooth and unobstructed passageway through the work during the suspension and deduct the cost from payments. Book One- State Route 68 at San Benancio Road Intersection Improvements 99 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??l??The days during a suspension related to your performance are working days. 8-1.06 TIME OF COMPLETION The time to complete the work is specified in the special provisions. The Engineer issues a Weekly Statement of Working Days by the end of the following week unless the contract is suspended for reasons unrelated to your performance. The Weekly Statement of Working Days shows: 1. Working days and non-working days during the reporting week 2. Time adjustments 3. Work completion date computations, including working days remaining 4. Controlling activities You may protest a Weekly Statement of Working Days. 8-1.07 LIQUIDATED DAMAGES 8-1.07A General The Department specifies liquidated damages Pub Cont Code 10226). Liquidated damages, if any, accrue starting on the 1st day after the expiration of the working days through the day of contract acceptance except as specified in Sections 8-1.07B, Failure to Complete Work Parts within Specified Times," and 8-1.07C, Failure to Complete Work Parts by Specified Dates." The Department withholds liquidated damages before the accrual date if the anticipated liquidated damages may exceed the value of the remaining work. Liquidated damages for all work, except plant establishment, are: Liquidated Dam ges Total Bid Liquidated Damages per From over To Day $0 $50,000 $1,200 $50,000 $120,000 $1,500 $120,000 $1,000,000 $1,900 $1,000,000 $5,000,000 $3,000 $5,000,000 $10,000,000 $5,400 $10,000,000 $30,000,000 $8,300 $30,000,000 $100,000,000 $10,500 $100,000,000 $250,000,000 $28,500 If all work, except plant establishment, is complete and the total number of working days has expired, liquidated damages are $950 per day. 8-1.07B Failure to Complete Work Parts within Specified Times The Department may deduct specified damages from payments for each day in completing a work part beyond the time specified for completing the work part. Damages for untimely completion of work parts may not be equal to the daily amount specified as liquidated damages for the project as a whole, but the Department does not simultaneously assess damages for untimely completion of work parts and for the whole work. Damages accrue starting the 1st day after a work part exceeds the specified time through the day the specified work part is complete. Book One- State Route 68 at San Benancio Road Intersection Improvements 100 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??m??8-1.07C Failure to Complete Work Parts by Specified Dates The Department may deduct specified damages from payments for each day in completing a work part beyond the specified completion date for the work part. Damages for untimely work part completion may not be equal to the daily amount specified as liquidated damages for the project as a whole, but the Department does not simultaneously assess damages for untimely work part completion and the whole work. Damages accrue starting the 1st day after an unmet completion date through the day the work part is complete. 8-1.07D Director Days If the work is not completed within the working days, the Director may grant director days if it serves the State's best interest. By granting director days, the Director adds working days to the contract. The Director may either grant enough days to eliminate the liquidated damages or fewer. In the latter case, the Department deducts liquidated damages for the remaining overrun in contract time. The Director may deduct the Department's engineering, inspection, and overhead costs incurred during the period of extension granted as director days. 8-1.08 TERMINATION OF CONTROL The Department may terminate your control of the work for failure to do any of the following Pub Cont Code 10253): 1. Supply an adequate workforce 2. Supply material as described 3. Pay subcontractors Pub Cont Code 10262) 4. Prosecute the work as described in the contract The Department may also terminate your control for failure to maintain insurance coverage. For a Federal-aid contract, the Department may terminate your control of the work for failure to include Required Contract Provisions, Federal-Aid Construction Contracts" in subcontracts. The Department gives you and your surety notice at least 5 days before terminating control. The notice describes the failures and the time allowed to remedy the failures. If failures are not remedied within the time provided, the Department takes control of the work. The Department may complete the work if the Department terminates your control or you abandon the project Pub Cont Code 10255). The Department determines the unpaid balance under Pub Cont Code 10258 and the contract. At any time before final payment of all claims, the Department may convert a termination of control to a termination of contract. 8-1.09 DELAYS 8-1.09A General An excusable delay is a delay of a controlling activity beyond your control, not foreseeable when the work began such as: 1. Change in the work 2. Department action that is not part of the contract 3. Presence of an underground utility main not described in the contract or in a location different from that specified Book One- State Route 68 at San Benancio Road Intersection Improvements 101 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??n??4. Described facility reconstruction not reconstructed as described, by the utility owner by the date specified, unless the reconstruction is solely for your convenience 5. Department's failure to obtain timely access to the right-of-way 6. Department's failure to perform an action in the time specified A critical delay is a delay that extends the schedule completion date. To request a delay-related time or payment adjustment, submit an RFI. 8-1.09B Time Adjustments For an excusable critical delay, the Department may make a time adjustment. The Engineer uses information from the schedule to evaluate requests for time adjustments. If requesting an adjustment, submit a revised schedule showing the delay's effect on the controlling activity. If the delay has: 1. Occurred, submit records of dates and what work was performed during the delayed activity 2. Not occurred, submit the expected dates or duration of the delayed activity If the Engineer requests, update the schedule to the last working day before the start of the delay. 8-1.09C Payment Adjustments The Department may make a payment adjustment for an excusable delay that affects your costs. Only losses for idle equipment, idle workers, and equipment moving or transporting are eligible for delay-related payment adjustments. The Engineer determines payment for idle time of equipment in the same manner as determinations are made for equipment used in the performance of force account work under Section 9-1.03, Force Account," with the following exceptions: 1. Delay factor in the Labor Surcharge and Equipment Rental Rates applies to each equipment rental rate. 2. Daily number of payable hours equals the normal working hours during the delay, not to exceed 8 hours per day. 3. Delay days exclude non-working days. 4. Markups are not added. The Engineer determines payment adjustment for idle workers under Section 9-1.03B, Labor," but does not add markups. The Engineer includes costs due to necessary extra equipment moving or transporting. 8-1.10 BLANK) 8-1.11 TERMINATION OF CONTRACT 8-1.11A General The Director may terminate the contract if it serves the State's best interest. The Department issues you a written notice, implements the termination, and pays you. Book One- State Route 68 at San Benancio Road Intersection Improvements 102 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??o??8-1.11B Relief from Responsibility for Work On receiving a termination notice: 1. Stop work 2. Notify subcontractors and suppliers of the contract termination and stop contract-related work 3. Perform the Engineer-ordered work to secure the job site for termination 4. Remove equipment 5. If authorized, settle termination-related claims and liabilities involving subcontractors and suppliers; assign to the Department the rights, titles, or interests held by you with respect to these parties 8-1.11C Responsibility for Materials On receiving a termination notice, protect unused material until: 1. You submit an inventory of materials already produced, purchased, or ordered but not yet used; include the location of the material. 2. The Engineer identifies materials that will be retained by the Department. Submit bills of sales or other records of material title. 3. The Engineer confirms that unused materials paid by progress payment and materials furnished by the State have been delivered and stored as ordered. 4. Titles are transferred for materials purchased by the Department. Dispose of materials that will not be retained by the Department. 8-1.11D Contract Acceptance after Termination The Engineer recommends contract acceptance after determining completion of: 1. Contract work ordered to be completed before termination 2. Other work ordered to secure the project before termination 3. Material delivery and title transfer The Department pays you under Section 9-1.08, Payment After Contract Acceptance." 8-1.11E Payment Adjustment for Termination If the Department issues a termination notice, the Engineer determines payment for termination based on the following: 1. Direct cost for the work: 1.1. Including mobilization, demobilization, securing the job site for termination, and losses from the sale of materials 1.2. Not including the cost of materials you keep, profit realized from the sale of materials, the cost of material damaged by an occurrence as defined in Section 7- 1.165, Damage by Storm, Flood, Tsunami or Earthquake," and other credits. 2. Cost of remedial work, as estimated by the Engineer, is not reimbursed. 3. Allowance for profit not to exceed 4 percent of the cost of the work. Prove a likelihood of having made a profit had the contract not been terminated. 4. Material handling costs for material returned to the vendor or disposed of as ordered. Book One- State Route 68 at San Benancio Road Intersection Improvements 103 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??p??5. Costs in determining the payment adjustment due to the termination, excluding attorney fees and litigation costs. Termination of the contract does not relieve the surety of its obligation for any just claims arising out of the work performed. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 9 MEASUREMENT AND PAYMENT Issued 03-11-10) Replace Section 9 with: SECTION 9 MEASUREMENT AND PAYMENT 9-1.01 MEASUREMENT OF QUANTITIES 9-1.01A General The Department determines bid item quantities under U.S. customary units. 9-1.01B Weighing Equipment and Procedures 9-1.01B(1) General The Engineer measures material quantities for payment with devices that comply with: 1. 4 CA Code of Regs 4000 et seq. 2. Bus & Prof Code 12001 et seq. To determine the material payment quantities, use measuring devices that have been sealed by the Department of Food and Agriculture's Division of Measurement Standards or its designated representative. If a device is not type approved by the Division of Measurement Standards, type approve it under California Test 109. Notify the Engineer at least 1 business day in advance of equipment testing. Use material plant controllers having elements affecting the data accuracy and delivery that have been sealed by the Engineer. Make these elements available to the Engineer for inspection. If the elements are adequate for use, the Engineer seals them. If security seal manipulation occurs, stop material production. Do not resume production until the Engineer reinspects and reseals the device. The Engineer measures material paid for by weight on Contractor-furnished sealed scales regularly inspected by the Department of Food and Agriculture's Division of Measurement Standards or its designated representative. Obtain authorization of portable vehicle scale installations before sealing. Proportioning scales must comply with Section 5-1.10, Equipment." 9-1.01B(2) Equipment Each scale must be long enough to fit an entire vehicle or a combination vehicle on the scale deck. The Department allows you to weigh a combination vehicle separately if you disconnect the vehicles. Construct scale undersupports: Book One- State Route 68 at San Benancio Road Intersection Improvements 104 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??q??1. Using portland cement concrete containing at least 470 pounds of cement per cubic yard produced from commercial quality materials 2. Such that footing heights are at least 20 inches thick 3. With a bearing surface at least 30 inches wide and bearing pressure on the footing not over 4000 pounds per square foot In constructing a scale: 1. Furnish drainage to prevent water from saturating the ground under the scale 2. Use bulkheads that prevent displacement 3. If shimming is necessary: 3.1. Use securely attached metal shims or grout 3.2 Do not use wedges to shim the supports 3.3. Do not use shim material in excess of 3 inches 4. Install mechanical indicating elements level, plumb, and rigidly mounted on the concrete undersupports 5. For a hopper scale, rigidly attach hopper scale lever systems and mechanical indicating elements so no weight is lost from bending or support distortion Each scale used to determine material payment quantities must be operated by a licensed weighmaster Bus & Prof Code 12700 et seq.). Submit a public weighmaster's certificate or certified daily summary weigh sheets for each weighed material quantity. The Department may witness material weighing and check and compile the daily scale weight record. Each vehicle operator must obtain weight or load slips from the weighmaster. Submit these records at the delivery point. 9-1.01B(3) Procedures Daily, weigh empty vehicles used to haul material paid for by weight. Each vehicle must have a legible identification mark. The Department may verify material weight by having an empty and loaded vehicle weighed on any scale the Engineer designates. For imported topsoil measured by volume, soil amendment, and mulch: 1. Each vehicle must allow a ready and accurate contents determination 2. Unless vehicles are of uniform capacity, each vehicle must have a legible identification mark showing its volume capacity 3. Load vehicles to at least the volume capacity 4. Level vehicle loads on arrival at the delivery point If determining a quantity paid on a volume basis is impractical or if you request and the Engineer authorizes the request, the Engineer weighs the material and converts the result to a volume measurement. The Engineer determines the conversion factors and, if you agree, adopts this method of measurement. Book One- State Route 68 at San Benancio Road Intersection Improvements 105 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??r??9-1.01C Final Pay Items The Department shows a bid item quantity as a final pay item for payment purposes only. For a final pay item, accept payment based on the verified Bid Item List quantity, regardless of actual quantity used unless dimensions are changed by the Engineer. 9-1.01D Quantities of Aggregate and Other Roadway Materials The Engineer determines the weight of aggregate and other roadway materials that are being paid for by weight as shown and does not include the deducted weight of water in their payment quantities. Material Quantity Determination Aggregate or other roadway material except as otherwise By deducting the weight of water in the materials in shown in this table excess of 3 percent of the dry weight of the material from the weight of the material Imported borrow, imported topsoil, aggregate subbase By deducting the weight of water in the materials in excess of 6 percent of the dry weight of the material from the weight of the material Straw By deducting the weight of water in the materials in excess of 15 percent of the dry weight of the material from the weight of the material Fiber Engineer does not deduct the weight of water Aggregate base and aggregate for cement treated bases As specified in Section 26, Aggregate Bases," and Section 27, Cement Treated Bases" NOTE: Percentage of water is determined by California Test 226. At the time of weighing bWeight of water in the fibers must not exceed 15 percent of the dry weight of the fiber. 9-1.02 SCOPE OF PAYMENT The Department pays you for furnishing the resources and activities required to complete the Contract work. The Department's payment is full compensation for furnishing the resources and activities, including: 1. Risk, loss, damage repair, or cost of whatever character arising from or relating to the work and performance of the work 2. PLACs and taxes Full compensation for work specified in Sections 1 through 9 is included in the payment for the bid items involved unless: 1. Bid item for the work is shown on the verified Bid Item List 2. Work is specified as paid for as extra work The Department does not pay for your loss, damage, repair, or extra costs of whatever character arising from or relating to the work that is a direct or indirect result of your choice of construction methods, materials, equipment, or manpower, unless specifically mandated by the Contract. Payment is: 1. Full compensation for each bid item specified by the description and measurement unit shown on the verified Bid Item List 2. For the price bid for each bid item shown on the verified Bid Item List or as changed by change order with a specified price adjustment Book One- State Route 68 at San Benancio Road Intersection Improvements 106 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??s??If an alternative is described in the Contract, the Department pays based on the bid items for the details and specifications not described as an alternative. The Department pays for work performed by change order based on one or a combination of the following: 1. Bid item prices 2. Force account 3. Agreed price 4. Specialist billing If the Engineer chooses to pay for work performed by change order based on an agreed price, but you and the Engineer cannot agree on the price, the Department pays by force account. If a portion of extra work is covered by bid items, the Department pays for this work as changed quantities in those items. The Department pays for the remaining portion of the extra work by force account or agreed price. The Department pays 10 percent annual interest for unpaid and undisputed: 1. Progress payments 2. After-acceptance payment except for claims For these payments, interest starts to accrue 30 days after the 1st working day following the 20th day of the month payment is due. For extra work bills not submitted within 7 days after performing the work as specified in 5-1.015E, Extra Work Bills," interest starts to accrue 60 days after the 1st working day following the 20th day of the month payment is due. The Department pays 6 percent annual interest for unpaid and undisputed claims. Interest starts to accrue 61 days after the Department accepts a claim statement. The Department pays 6 percent annual interest for awards in arbitration Civ Code 3289). If the amount of a deduction or withhold exceeds final payment, the Department invoices you for the difference, to be paid upon receipt. 9-1.03 FORCE ACCOUNT PAYMENT 9-1.03A General For work paid by force account, the Engineer compares the Department's records to your daily force account work report. When you and the Engineer agree on the contents of the daily force account work reports, the Engineer accepts the report and the Department pays for the work. If the records differ, the Department pays for the work based only on the information shown on the Department's records. If a subcontractor performs work at force account, accept an additional 10 percent markup to the total cost of that work paid at force account, including markups specified in Section 9-1.03, as reimbursement for additional administrative costs. The markups specified in labor, materials, and equipment include compensation for all delay costs, overhead costs, and profit. If an item's payment is adjusted for work-character changes, the Department excludes your cost of determining the adjustment. Payment for owner-operated labor and equipment is made at the market-priced invoice submitted. Book One- State Route 68 at San Benancio Road Intersection Improvements 107 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??t??9-1.03B Labor Labor payment is full compensation for the cost of labor used in the direct performance of the work plus a 35 percent markup. Force account labor payment consists of: 1. Employer payment to the worker for: 1.1. Basic hourly wage 1.2. Health and welfare 1.3. Pension 1.4. Vacation 1.5. Training 1.6. Other State and federal recognized fringe benefit payments 2. Labor surcharge percentage in Labor Surcharge and Equipment Rental Rates current during the work paid at force account for: 2.1. Workers' compensation insurance 2.2. Social security 2.3. Medicare 2.4. Federal unemployment insurance 2.5. State unemployment insurance 2.6. State training taxes 3. Subsistence and travel allowances paid to the workers 4. Employer payment to supervisors, if authorized The 35 percent markup consists of payment for all overhead costs related to labor but not designated as costs of labor used in the direct performance of the work including: 1. Home office overhead 2. Field office overhead 3. Bond costs 4. Profit 5. Labor liability insurance 6. Other fixed or administrative costs that are not costs of labor used in the direct performance of the work 9-1.03C Materials Material payment is full compensation for materials you furnish and use in the work. The Engineer determines the cost based on the material purchase price, including delivery charges, except: 1. A 15 percent markup is added. 2. Supplier discounts are subtracted whether you took them or not. 3. If the Engineer believes the material purchase prices are excessive, the Department pays the lowest current wholesale price for a similar material quantity. 4. If you procured the materials from a source you wholly or partially own, the determined cost is based on the lower of the: 4.1. Price paid by the purchaser for similar materials from that source on Contract items Book One- State Route 68 at San Benancio Road Intersection Improvements 108 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??u??4.2. Current wholesale price for those materials 5. If you do not submit a material cost record within 30 days of billing, the determined cost is based on the lowest wholesale price: 5.1. During that period 5.2. In the quantities used 9-1.03D Equipment Rental 9-1.03D(1) General Equipment rental payment is full compensation for: 1. Rental equipment costs, including moving rental equipment to and from the site of work performed by change order using its own power. 2. Transport equipment costs for rental equipment that cannot be transported economically using its own power. No payment is made during transport for the transported equipment. 3. 15 percent markup. If you want to return the equipment to a location other than its original location, the payment to move the equipment must not exceed the cost of returning the equipment to its original location. If you use the equipment for work other than work paid by force account, the transportation cost is included in the other work. Before moving or loading the equipment, obtain authorization for the equipment rental's original location. The Engineer determines rental costs: 1. Using rates in Labor Surcharge and Equipment Rental Rates: 1.1. By classifying equipment using manufacturer's ratings and manufacturer-approved changes. 1.2. Current during the work paid by force account. 1.3. Regardless of equipment ownership; but the Department uses the rental document rates or minimum rental cost terms if. 1.3.1. Rented from equipment business you do not own. 1.3.2. The Labor Surcharge and Equipment Rental Rates hourly rate is $10.00 per hour or less. 2. Using rates established by the Engineer for equipment not listed in Labor Surcharge and Equipment Rental Rates. You may submit cost information that helps the Engineer establish the rental rate; but the Department uses the rental document rates or minimum rental cost terms if: 2.1. Rented from equipment business you do not own. 2.2. The Engineer establishes a rate of $10.00 per hour or less. 3. Using rates for transport equipment not exceeding the hourly rates charged by established haulers. Book One- State Route 68 at San Benancio Road Intersection Improvements 109 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??v??Equipment rental rates include the cost of: 1. Fuel 2. Oil 3. Lubrication 4. Supplies 5. Small tools that are not consumed by use 6. Necessary attachments 7. Repairs and maintenance 8. Depreciation 9. Storage 10. Insurance 11. Incidentals The Department pays for small tools consumed by use. The Engineer determines payment for small tools consumed by use based on Contractor-submitted invoices. 9-1.03D(2) Equipment On the Job Site For equipment on the job site at the time required to perform work paid by force account, the time paid is the time: 1. To move the equipment to the location of work paid by force account plus an equal amount of time to move the equipment to another location on the job site when the work paid by force account is completed 2. To load and unload equipment 3. Equipment is operated to perform work paid by force account and: 3.1. Hourly rates are paid in 1/2-hour increments 3.2 Daily rates are paid in 1/2-day increments When rented equipment on the job site is used to perform work at force account not required by the original contract work, the Engineer may authorize rates in excess of those in Labor Surcharge and Equipment Rental Rates if 1. You submit a request to use rented equipment 2. Equipment is not available from your owned equipment fleet or from your subcontractors 3. Rented equipment is from an independent rental company 4. Proposed equipment rental rate is reasonable 5. Engineer authorizes the equipment source and the rental rate before you use the equipment The Department pays for fuel consumed during operation of rented equipment not included in the invoiced rental rate. 9-1.03D(3) Equipment Not On the Job Site Required for Original Contract Work For equipment not on the job site at the time required to perform work paid by force account and required for original Contract work, the time paid is the time the equipment is operated to perform work paid by force account and the time to move the equipment to a location on the job site when the work paid by force account is completed. The minimum total time paid is: Book One- State Route 68 at San Benancio Road Intersection Improvements 110 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??w??1. 1 day if daily rates are paid 2. 8 hours if hourly rates are paid If daily rates are recorded, equipment: 1. Idled is paid as 1/2 day 2. Operated 4 hours or less is paid as 1/2 day 3. Operated 4 hours or more is paid as 1 day If the minimum total time exceeds 8 hours and if hourly rates are listed, the Department rounds up hours operated to the nearest 1/2-hour increment and pays based on the following table. The table does not apply when equipment is not operated due to breakdowns; in which case rental hours are the hours the equipment was operated. Hours operated Hours aid 0.0 4.00 0.5 4.25 1.0 4.50 1.5 4.75 2.0 5.00 2.5 5.25 3.0 5.50 3.5 5.75 4.0 6.00 4.5 6.25 5.0 6.50 5.5 6.75 6.0 7.00 6.5 7.25 7.0 7.5 7.5 7.75 8.0 hours used 9-1.03D(4) Equipment Not On the Job Site Not Required for Original Contract Work For equipment not on the job site at the time required to perform work paid by force account and not required for original Contract work, the time paid is the time: 1. To move the equipment to the location of work paid by force account plus an equal amount of time to return the equipment to its source when the work paid by force account is completed 2. To load and unload equipment 3. Equipment is operated to perform work paid by force account For this equipment, the Engineer may authorize rates in excess of those in Labor Surcharge and Equipment Rental Rates subject to the following: 1. Equipment is not available from your normal sources or from one of your subcontractors 2. Proposed equipment rental rate is reasonable 3. Engineer authorizes the equipment source and the rental rate before you use the equipment Equipment Rental Hours Book One- State Route 68 at San Benancio Road Intersection Improvements 111 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??x??9-1.03D(5) Non-Owner-Operated Dump Truck Rental Submit the rental rate for non-owner-operated dump truck rental. The Engineer determines the payment rate. Payment for non-owner-operated dump truck rental is for the cost of renting a dump truck, including its driver. For the purpose of markup payment only, the non-owner- operated dump truck is rental equipment and the owner is a subcontractor. 9-1.04 EXTRA WORK PERFORMED BY SPECIALISTS If the Engineer determines that you or your subcontractors are not capable of performing specialty extra work, a specialist may be used. Itemize the labor, material, and equipment rental costs unless it is not the special service industry's established practice to provide itemization; in which case, the Engineer accepts current market-priced invoices for the work. The Engineer may accept an invoice as a specialist billing for work performed at an off-job site manufacturing plant or machine shop. The Engineer determines the cost based on the specialist invoice price minus any available or offered discounts plus a 10 percent markup. 9-1.05 CHANGED QUANTITY PAYMENT ADJUSTMENTS 9-1.05A General The unit prices specified in Section 9-1.05 are adjusted under Section 9-1.03, Force Account." 9-1.05B Increases of More Than 25 Percent If the total bid item quantity exceeds 125 percent of the quantity shown on the verified Bid Item List and if no approved Contract Change Order addresses payment for the quantity exceeding 125 percent, the Engineer may adjust the unit price for the excess quantity under Section 9-1.03, Force Account," or the following: 1. The adjustment is the difference between the unit price and the unit cost of the total item pay quantity. 2. In determining the unit cost, the Engineer excludes the item's fixed costs. You have recovered the fixed costs in the payment for 125 percent shown on the verified Bid Item List. 3. After excluding fixed costs, the Engineer determines the item unit cost under Section 9- 1.03, Force Account." If the payment for the number of units of a bid item in excess of 125 percent of the verified Bid Item List is less than $5,000 at the unit price, the Engineer may not adjust the unit price unless you request it. 9-1.05C Decreases of More Than 25 Percent If the total item pay quantity is less than 75 percent of the quantity shown on the verified Bid Item List and if no approved Contract Change Order addresses payment for the quantity less than 75 percent, you may request a unit price adjustment. The Engineer may adjust the unit price for the decreased quantity under Section 9-1.03, Force Account" or the following: 1. The adjustment is the difference between the unit price and the unit cost of the total pay quantity. 2. In determining the unit cost, the Engineer includes the item's fixed costs. Book One- State Route 68 at San Benancio Road Intersection Improvements 112 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??y??3. After including fixed costs, the Engineer determines the item unit cost under Section 9- 1.03, Force Account." The Department does not pay more than 75 percent of the item total in the verified Bid Item List. 9-1.05D Eliminated Items If the Engineer eliminates an item, the Department pays your costs incurred before the Engineer's elimination notification date. If you order authorized material for an eliminated item before the notification date and the order cannot be canceled, either of the following occurs: 1. If the material is returnable to the vendor, the Engineer orders you to return the material and the Department pays your handling costs and vendor charges. 2. The Department pays your cost for the material and its handling and becomes the material owner. The Engineer determines the payment for the eliminated bid item under Section 9-1.03, Force Account." 9-1.06 WORK-CHARACTER CHANGES The Department adjusts a bid item unit price based on the difference between the cost to perform the work as planned and the cost to perform the work as changed. The Engineer determines the payment adjustment under Section 9-1.03, Force Account." The Department adjusts payment for only the work portion that changed in character. 9-1.07 PROGRESS PAYMENTS 9-1.07A General The Department pays you based on Engineer-prepared monthly progress estimates. Each estimate reflects: 1. Total work completed during the pay period 2. Extra work bills if: 2.1. Submitted by the 15th of a month 2.2. Approved by the 20th of a month 3. Amount for materials on hand 4. Amount earned for mobilization 5. Deductions 6. Withholds 7. Resolved potential claims 8. Payment adjustments Submit certification stating the work complies with the QC procedures. The Engineer does not process a progress estimate without a signed certification. You may protest a progress payment. 9-1.07B Schedule of Values Section 9-1.07B applies to a lump sum bid item for which a schedule of values is specified to be submitted. Book One- State Route 68 at San Benancio Road Intersection Improvements 113 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??z??The sum of the amounts for the work units listed in the schedule of values must equal the lump sum price bid for the bid item. Obtain authorization of a schedule of values before you perform work shown on the schedule. The Department does not process a progress payment for the bid item without an authorized schedule of values. Accept progress payments for overhead, profit, bond costs, and other fixed or administrative costs as distributed proportionally among the items listed except that for a contract with a bid item for mobilization, accept progress payments for bond costs as included in the mobilization bid item. For changed quantities of the work units listed, the Department adjusts payments in the same manner as specified for changed quantities of bid items under Section 9-1.05, Changed Quantity Payment Adjustments." 9-1.07C Materials On Hand A material on hand but not incorporated into the work is eligible for progress payment if: 1. Listed in a special provision as eligible and is in compliance with other Contract parts 2. Purchased 3. An invoice is submitted 4. Stored within the State and you submit evidence that the stored material is subject to the Department's control 5. Requested on the Department-furnished form 9-1.07D Mobilization Mobilization is eligible for partial payments if the Contract includes a bid item for mobilization. The Department makes the partial payments under Pub Cont Code 10264. If the Contract does not include a mobilization bid item, mobilization is included in the payment for the various bid items. The Department pays the item total for mobilization in excess of 10 percent of the total bid in the 1st payment after Contract acceptance. 9-1.07E Withholds 9-1.07E(1) General The Department may withhold payment for noncompliance. The Department returns the noncompliance withhold in the progress payment following correction of noncompliance. Withholds are not retentions under Pub Cont Code 7107 and do not accrue interest under Pub Cont Code 10261.5. Withholds are cumulative and independent of deductions. Section 9-1.07E does not include all withholds that may be taken; the Department may withhold other payments as specified. 9-1.07E(2) Progress Withholds The Department withholds 10 percent of a partial payment for noncompliant progress. Noncompliant progress occurs when: 1. Total days to date exceed 75 percent of the revised Contract working days 2. Percent of working days elapsed exceeds the percent of value of work completed by more than 15 percent Book One- State Route 68 at San Benancio Road Intersection Improvements 114 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??{??The Engineer determines the percent of working days elapsed by dividing the total days to date by the revised Contract working days and converting the quotient to a percentage. The Engineer determines the percent of value of work completed by summing payments made to date and the amount due on the current progress estimate, dividing this sum by the current total estimated value of the work, and converting the quotient to a percentage. These amounts are shown on the Progress Payment Voucher. When the percent of working days elapsed minus the percent of value of work completed is less than or equal to 15 percent, the Department returns the withhold in the next progress payment. 9-1.07E(3) Performance Failure Withholds During each estimate period you fail to comply with a Contract part, including submittal of a document as specified, the Department withholds a part of the progress payment. The documents include QC plans, schedules, traffic control plans, and water pollution control submittals. For 1 performance failure, the Department withholds 25 percent of the progress payment but does not withhold more than 10 percent of the total bid. For multiple performance failures, the Department withholds 100 percent of the progress payment but does not withhold more than 10 percent of the total bid. 9-1.07E(4) Stop Notice Withholds The Department may withhold payments to cover claims filed under Civ Code 3179 et seq. Stop notice information may be obtained from the Office of External Accounts Payable, Division of Accounting. 9-1.07E(5) Penalty Withholds Penalties include fines and damages that are proposed, assessed, or levied against you or the Department by a governmental agency or private lawsuit. Penalties are also payments made or costs incurred in settling alleged violations of federal, state, or local laws, regulations, requirements, or PLACs. The cost incurred may include the amount spent for mitigation or correcting a violation. If you or the Department is assessed a penalty, the Department may withhold the penalty amount until the penalty disposition has been resolved. The Department may withhold penalty funds without notifying you. Instead of the withhold, you may provide a bond equal to the highest estimated liability for any disputed penalties proposed. 9-1.07E(6)-9-1.07E(10) Reserved 9-1.07F Retentions The Department does not retain moneys from progress payments due to the Contractor for work performed Pub Cont Code 7202). 9-1.07G-9-1.07K Reserved 9-1.08 PAYMENT AFTER CONTRACT ACCEPTANCE 9-1.08A General Reserved Book One- State Route 68 at San Benancio Road Intersection Improvements 115 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??|??9-1.08B Payment Before Final Estimate After Contract acceptance, the Department pays you based on the Engineer-prepared estimate that includes withholds and the balance due after deduction of previous payments. 9-1.08C Proposed Final Estimate The Engineer estimates the amount of work completed and shows the amount payable in a proposed final estimate based on: 1. Contract items 2. Payment adjustments 3. Work paid by force account or agreed price 4. Extra work 5. Deductions Submit either a written final estimate acceptance or a claim statement no later than the 30th day after receiving the proposed final estimate. Evidence of the Contractor's receipt of the final estimate and the Engineer's receipt of the Contractor's written acceptance or claim statement is a delivery service's proof of delivery or Engineer's written receipt if hand delivered. If you claim that the final estimate is less than 90 percent of your total bid, the Department adjusts the final payment to cover your overhead. The adjustment is 10 percent of the difference between the total bid and the final estimate. The Department does not make this adjustment on a terminated contract. 9-1.08D Final Payment and Claims 9-1.08D(1) General If you accept the proposed final estimate or do not submit a claim statement within 30 days of receiving the estimate, the Engineer furnishes the final estimate to you and the Department pays the amount due within 30 days. This final estimate and payment is conclusive except as specified in Sections 5-1.015, Records," 6-1.075, Guarantee," and 9-1.09, Clerical Errors." If you submit a claim statement within 30 days of receiving the Engineer's proposed final estimate, the Engineer furnishes a semifinal estimate to the Contractor and the Department pays the amount due within 30 days. The semifinal estimate is conclusive as to the amount of work completed and the amount payable except as affected by the claims or as specified in Sections 5- 1.015, Records," 6-1.075, Guarantee," and 9-1.09, Clerical Errors." 9-1.08D(2) Claim Statement 9-1.08D(2)(a) General For each claim, submit a claim statement showing only the identification number that corresponds to the Full and Final Potential Claim Record and the final amount of additional payment requested except: 1. If the final amount of requested payment differs from the amount requested in the Full and Final Potential Claim Record 2. For a claim for quantities, withholds, deductions, liquidated damages, or change order bills 3. For an overhead claim Book One- State Route 68 at San Benancio Road Intersection Improvements 116 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??}??If the final amount of requested payment differs from the amount requested in the Full and Final Potential Claim Record, submit: 1. Identification number that corresponds to the Full and Final Potential Claim Record 2. Final amount of additional payment requested 3. Basis for the changed amount 4. Contract documentation that supports the changed amount 5. Statement of the reasons the Contract documentation supports the claim The Engineer notifies you of an omission of or a disparity in the exclusive identification number. Within 15 days of the notification, correct the omission or disparity. If the omission or disparity is not resolved after the 15 days, the Engineer assigns a new number. For a claim for quantities, withholds, deductions, or change order bills submit: 1. Final amount of additional payment requested 2. Enough detail to enable the Engineer to determine the basis and amounts of the additional payment requested 9-1.08D(2)(b) Overhead Claims Include with an overhead claim: 1. Final amount of additional payment requested 2. Independent CPA audit report Failure to submit the audit report with an overhead claim with the claim statement is a waiver of the overhead claim and operates as a bar to arbitration on the claim Pub Cont Code 10240.2). The Department deducts an amount for field and home office overhead paid on added work from any claim for overhead. The value of the added work equals the value of the work completed minus the total bid. The home office overhead deduction equals 5 percent of the added work. The field office overhead deduction equals 5-1/2 percent of the added work. If you intend to pursue a claim for reimbursement for field or home office overhead beyond that provided expressly by the Contract: 1. Notify the Engineer within 30 days of receipt of the proposed final estimate of your intent to seek reimbursement for specific overhead costs beyond that provided by the Contract 2. Specifically identify each claim and each date associated with each claim from which you seek reimbursement for specific overhead costs beyond that provided by the Contract 3. Timely submit all other claims 4. Within 30 days of receipt of the proposed final estimate, submit an audit report prepared by an independent CPA 4.1. The audit report must show calculations with supporting documentation of actual home office and project field overhead costs 4.2. The calculations must specify the actual daily rates for both field and home office overhead for the entire duration of the project expressed as a rate per working day 4.3. The start and end dates of the actual project performance period, number of working days, overhead cost pools, and all allocation bases must be disclosed in the calculations of your actual field and home office overhead daily rates 4.4. Neither daily rate may include a markup for profit Book One- State Route 68 at San Benancio Road Intersection Improvements 117 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??~??5. Field overhead costs from which the daily rate is calculated must be: 5.1. Allowable under 48 CFR 31 5.2. Supported by reliable records 5.3. Related solely to the project 5.4. Incurred during the actual project performance period 5.5. Comprised of only time-related field overhead costs 5.6. Not a direct cost 6. Home office overhead costs from which the daily rate is calculated must be: 6.1. Allowable under 48 CFR 31 6.2. Supported by reliable records 6.3. Incurred during the actual project performance period 6.4. Comprised of only fixed home office overhead costs 6.5. Not a direct cost The actual rate of time-related overhead is subject to authorization by the Engineer. The CPA's audit must be performed under the Attestation Standards published by the American Institute of Certified Public Accountants. The CPA's audit report must express an opinion whether or not your calculations of your actual field and home office overhead daily rates comply with Section 9-1.08D(2)(b), Overhead Claims." The attest documentation prepared by the CPA in connection with the audit must be reproduced and submitted for review with the audit report. The Department provides markups for all work paid by force account. Overhead for field and home office costs are included in the markups. Overhead claims in excess of Contract markups are not allowed under the Contract. If you seek reimbursement for costs not allowed under the Contract, the Department does not pay your cost of performing the independent CPA examination specified in section 9-1.08D(2)(b), Overhead Claims," including preparation of the audit report. 9-1.08D(2)(c) Declaration Submit a declaration that includes the following language with the claim statement: I declare under penalty of perjury, according to the laws of the State of California, that the foregoing claims, with specific reference to the California False Claims Act Govt Code 12650 et seq.) and to the extent the project contains federal funding, the U.S. False Claims Act 31 USC 3729 et seq.), are true and correct, and that this declaration was signed on date) 20_ at California. 9-1.08D(2)(d) Waiver A claim is waived if: 1. Claim does not have a corresponding Full and Final Potential Claim Record identification number 2. Claim does not have the same nature, circumstances, and basis of claim as the corresponding Full and Final Potential Claim Record 3. Claim is not included in the claim statement 4. You do not comply with the claim procedures Book One- State Route 68 at San Benancio Road Intersection Improvements 118 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????5. You do not submit the declaration specified in 9-1.08D(2)(c), Declaration" 9-1.08D(3) Final Determination of Claims Failure to allow timely access to claim supporting data when requested waives the claim. The Department's costs in reviewing or auditing a claim not supported by the Contractor's accounting or other records are damages incurred by the State within the meaning of the California False Claims Act. If the Engineer determines that a claim requires additional analysis, the Engineer schedules a board of review meeting. Meet with the board of review and make a presentation supporting the claim. After claim review completion by the Engineer or board of review, the Department makes the final determination of claims and furnishes it to the Contractor. After the determination, the Engineer furnishes a final estimate to the Contractor and the Department pays the amount due within 30 days. The final estimate is conclusive as to the amount of work completed and the amount payable except as specified in Sections 5-1.015, Records," 6-1.075, Guarantee," and 9-1.09, Clerical Errors." The Contractor's failure to comply with the claim procedures is a bar to arbitration under Pub Cont Code 10240.2. 9-1.09 CLERICAL ERRORS For 3 years after Contract acceptance, estimates and payments are open to correction and adjustment for clerical errors. Either the Department or the Contractor pays to the other the amount due except for clerical errors resulting in an adjustment less than $200; in which case, no payment is made. 9-1.10 ARBITRATION Pub Cont Code 10240 through 10240.13 provides for the resolution of contract claims by arbitration. Start arbitration by filing a complaint with the Office of Administrative Hearings in Sacramento 1 CA Code Regs 1350). File the arbitration complaint no later than 90 days after receiving the Department's final written decision on a claim Pub Cont Code 10240.1). AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 10 DUST CONTROL Issued 02-06-09) Replace Section 10 with: SECTION 10 BLANK) AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Book One- State Route 68 at San Benancio Road Intersection Improvements 119 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???SECTION 11 MOBILIZATION Issued 06-05-09) Replace Section 11 with: SECTION 11 BLANK) AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 12 CONSTRUCTION AREA TRAFFIC CONTROL DEVICES Issued 11-07-08) In Section 12-1.01 in the 2nd paragraph, replace the 1st sentence with: Attention is directed to Part 6 of the California MUTCD. Replace Section 12-2.01 with: 12-2.01 FLAGGERS Flaggers while on duty and assigned to traffic control or to give warning to the public that the highway is under construction and of any dangerous conditions to be encountered as a result thereof, shall perform their duties and shall be provided with the necessary equipment in conformance with Part 6 of the California MUTCD. The equipment shall be furnished and kept clean and in good repair by the Contractor at the Contractor's expense. All flaggers shall wear safety apparel meeting the requirements of ANSI/ISEA 107-2004 for Class 2 or 3 garment and complying with 71 Fed Reg 67792. In Section 12-3.01 replace the 1st paragraph with: In addition to the requirements in Part 6 of the California MUTCD, all devices used by the Contractor in the performance of the work shall conform to the provisions in this Section 12-3. In Section 12-3.06 in the 1st paragraph, replace the 2nd sentence with: Construction area signs are shown in or referred to in Part 6 of the California MUTCD. In Section 12-3.06 in the 4th paragraph, replace the 1st sentence with: All construction area signs shall conform to the dimensions, color and legend requirements of the plans, Part 6 of the California MUTCD and these specifications. In Section 12-3.06 in the 8th paragraph, replace the 1st sentence with: Used signs with the specified sheeting material will be considered satisfactory if they conform to the requirements for visibility and legibility and the colors conform to the requirements in Part 6 of the California MUTCD. Book One- State Route 68 at San Benancio Road Intersection Improvements 120 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 14 BLANK) Issued 06-05-09) Replace Section 14 with: SECTION 14 ENVIRONMENTAL STEWARDSHIP 14-1 GENERAL 14-1.01 GENERAL Environmental stewardship includes both environmental compliance and environmental resource management. If an ESA is shown on the plans: 1. The boundaries shown are approximate; the Department marks the exact boundaries on the ground 2. Do not enter the ESA unless authorized 3. If the ESA is breached, immediately: 3.1. Secure the area and stop all operations within 60 feet of the ESA boundary 3.2. Notify the Engineer 4. If the ESA is damaged, the Department determines what efforts are necessary to remedy the damage and who performs the remedy; you are responsible for remedies and charges. 14-2 CULTURAL RESOURCES 14-2.01 GENERAL Reserved 14-2.02 ARCHAEOLOGICAL RESOURCES If archaeological resources are discovered at the job site, do not disturb the resources and immediately: 1. Stop all work within a 60-foot radius of the discovery 2. Protect the discovery area 3. Notify the Engineer The Department investigates. Do not take archaeological resources from the job site. Do not resume work within the discovery area until authorized. If, in the opinion of the Engineer, completion of the work is delayed or interfered with by reason of an archaeological find, or investigation or recovery of archeological materials, you will be compensated for resulting losses, and an extension of time will be granted, in the same manner as provided for in Section 8-1.09, Right of Way Delays." If ordered, furnish resources to assist in the investigation or recovery of archaeological resources. This work will be paid for as extra work as specified in Section 4-1.03D, Extra Work." 14-2.03 ARCHAEOLOGICAL MONITORING AREA Section 14-2.03 applies if an AMA is described in the Contract. Book One- State Route 68 at San Benancio Road Intersection Improvements 121 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The Department assigns an archaeological monitor to monitor job site activities within the AMA. Do not work within the AMA unless the archeological monitor is present. The Engineer and the Department archaeological monitor conduct an AMA location field review with you at least 5 business days before start of work. The Department marks the exact boundaries of the AMA on the ground. If temporary fence Type ESA) for an AMA is described in the Contract, install temporary fence Type ESA) to define the boundaries of the AMA during the AMA location field review. At least 5 business days before starting work within an AMA, submit a schedule of days and hours to be worked for the Engineer's approval. If you require changes in the schedule, submit an update for the Engineer's approval at least 5 business days before any changed work day. If archaeological resources are discovered within an AMA, comply with Section 14-2.02, Archaeological Resources." 14-2.04 HISTORIC STRUCTURES Reserved 14-3 COMMUNITY IMPACTS AND ENVIRONMENTAL JUSTICE Reserved Reserved Reserved 14-6.01 GENERAL Reserved 14-4 NATIVE AMERICAN CONCERNS 14-5 AESTHETICS 14-6 BIOLOGICAL RESOURCES 14-6.02 BIRD PROTECTION Protect migratory and nongame birds, their occupied nests, and their eggs. The Department anticipates nesting or attempted nesting from February 15 to September 1. The federal Migratory Bird Treaty Act, 16 USC 703-711, and 50 CFR Pt 10 and Fish & Game Code 3503, 3513, and 3800 protect migratory and nongame birds, their occupied nests, and their eggs. The federal Endangered Species Act of 1973, 16 USC 1531 and 1543, and the California Endangered Species Act, Fish & Game Code 2050-2115.5, prohibit the take of listed species and protect occupied and unoccupied nests of threatened and endangered bird species. The Bald and Golden Eagle Protection Act, 16 USC 668, prohibits the destruction of bald and golden eagles and their occupied and unoccupied nests. If migratory or nongame bird nests are discovered that may be adversely affected by construction activities or an injured or killed bird is found, immediately: 1. Stop all work within a 100-foot radius of the discovery. 2. Notify the Engineer. The Department investigates. Do not resume work within the specified radius of the discovery until authorized. Book One- State Route 68 at San Benancio Road Intersection Improvements 122 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???When ordered, use exclusion devices, take nesting prevention measures, remove and dispose of partially constructed and unoccupied nests of migratory or nongame birds on a regular basis to prevent their occupation, or perform any combination of these. This work will be paid for as extra work as specified in Section 4-1.03D, Extra Work." Prevent nest materials from falling into waterways. Bird protection that causes a delay to the controlling activity is a condition unfavorable to the suitable prosecution of work as specified in Section 8-1.05, Temporary Suspension of Work." 14-7 PALEONTOLOGICAL RESOURCES If paleontological resources are discovered at the job site, do not disturb the material and immediately: 1. Stop all work within a 60-foot radius of the discovery 2. Protect the area 3. Notify the Engineer The Department investigates and modifies the dimensions of the protected area if necessary. Do not take paleontological resources from the job site. Do not resume work within the specified radius of the discovery until authorized. 14-8 NOISE AND VIBRATION 14-8.01 GENERAL Reserved 14-8.02 NOISE CONTROL Do not exceed 86 dBa at 50 feet from the job site activities from 9 p.m. to 6 a.m. Equip an internal combustion engine with the manufacturer-recommended muffler. Do not operate an internal combustion engine on the job site without the appropriate muffler. 14-9 AIR QUALITY 14-9.01 AIR POLLUTION CONTROL Comply with air pollution control rules, regulations, ordinances, and statutes that apply to work performed under the Contract, including air pollution control rules, regulations, ordinances, and statutes provided in Govt Code 11017 Pub Cont Code 10231). Do not burn material to be disposed of. 14-9.02 DUST CONTROL Prevent and alleviate dust by applying water, dust palliative, or both under Section 14-9.01. Apply water under Section 17, Watering." Apply dust palliative under Section 18,"Dust Palliative." If ordered, apply water, dust palliative, or both to control dust caused by public traffic. This work will be paid for as extra work as specified in Section 4-1.03D, Extra Work." 14-10 SOLID WASTE DISPOSAL AND RECYCLING 14-10.01 SOLID WASTE DISPOSAL AND RECYCLING Submit an annual Solid Waste Disposal and Recycling Report between January 1 and 15 for each year work is performed under the Contract at any time during the previous calendar year. Book One- State Route 68 at San Benancio Road Intersection Improvements 123 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Show the types and amounts of project-generated solid waste taken to or diverted from landfills or reused on the project from January 1 through December 31 of the previous calendar year. Submit a final annual Solid Waste Disposal and Recycling Report within 5 business days after Contract acceptance. Show the types and amounts of project-generated solid waste taken to or diverted from landfills or reused on the project from January 1 to Contract acceptance. For each failure to submit a completed form, the Department withholds $10,000. 14-11 HAZARDOUS WASTE AND CONTAMINATION 14-11.01 GENERAL Reserved 14-11.02 ASBESTOS AND HAZARDOUS SUBSTANCES Upon discovery, immediately stop working in and notify the Engineer of areas where asbestos or a hazardous substance is present if the: 1. Contractor reasonably believes the substance is asbestos as defined in Labor Code 6501.7 or a hazardous substance as defined in Health & Safety Code 25316 and 25317 2. Presence is not described in the Contract 3. Substance has not been made harmless 14-12 OTHER INTERAGENCY RELATIONS Reserved 14-13 PAYMENT Payment for work specified in Section 14 is included in the payment for the bid items involved unless: 1. Bid item for the work is shown in the verified Bid Item List 2. Work is specified as paid for as extra work AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 15 EXISTING HIGHWAY FACILITIES Issued 05-01-09) In Section 15-1.02 replace the 1st paragraph with: Existing facilities which are to remain in place shall be protected in conformance with the provisions in Sections 5-1.18, Property and Facility Preservation," and 7-1.12, Indemnification and Insurance." AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 19 EARTHWORK Issued 11-21-08) Book One- State Route 68 at San Benancio Road Intersection Improvements 124 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Replace Section 19-1.02 with: 19-1.02 BLANK) Replace Section 19-1.03 with: 19-1.03 GRADE TOLERANCE Immediately prior to placing subsequent layers of material thereon, the grading plane shall conform to one of the following: A. When hot mix asphalt is to be placed on the grading plane, the grading plane at any point shall not vary more than 0.05 foot above or below the grade established by the Engineer. B. When subbase or base material to be placed on the grading plane is to be paid for by the ton, the grading plane at any point shall not vary more than 0.10 foot above or below the grade established by the Engineer. C. When the material to be placed on the grading plane is to be paid for by the cubic yard, the grading plane at any point shall be not more than 0.05 foot above the grade established by the Engineer. In Section 19-3.025C replace the 1st paragraph with: Cementitious material used in soil cement bedding shall conform to the provisions in Section 90-2.01, Cementitious Materials." Supplementary cementitious material will not be required. In Section 19-3.025C replace the 4th paragraph with: The aggregate, cementitious material, and water shall be proportioned either by weight or by volume. Soil cement bedding shall contain not less than 282 pounds of cementitious material per cubic yard. The water content shall be sufficient to produce a fluid, workable mix that will flow and can be pumped without segregation of the aggregate while being placed. In Section 19-3.062 replace the 1st paragraph with: Slurry cement backfill shall consist of a fluid, workable mixture of aggregate, cementitious material, and water. In Section 19-3.062 replace the 5th paragraph with: Cementitious material shall conform to the provisions in Section 90-2.01, Cementitious Materials." Supplementary cementitious material will not be required. In Section 19-3.062 replace the 8th paragraph with: The aggregate, cementitious material, and water shall be proportioned either by weight or by volume. Slurry cement backfill shall contain not less than 188 pounds of cementitious material per cubic yard. The water content shall be sufficient to produce a fluid, workable mix that will flow and can be pumped without segregation of the aggregate while being placed. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Book One- State Route 68 at San Benancio Road Intersection Improvements 125 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???SECTION 20 EROSION CONTROL AND HIGHWAY PLANTING Issued 08-17-07) Replace Section 20-2.03 with: 20-2.03 SOIL AMENDMENT Soil amendment shall comply with the requirements in the California Food and Agricultural Code. Soil amendment producers shall comply with the following: 1. Be fully permitted to produce compost as specified under the California Integrated Waste Management Board, Local Enforcement Agencies and any other State and Local Agencies that regulate Solid Waste Facilities. If exempt from State permitting requirements, the composting facility must certify that it follows guidelines and procedures for production of compost meeting the environmental health standards of Title 14, California Code of Regulations, Division 7, Chapter 3.1, Article 7. 2. Be a participant in United States Composting Council's Seal of Testing Assurance program. Soil amendment shall be composted and may be derived from any single, or mixture of any of the following feedstock materials: 1. Green material consisting of chipped, shredded, or ground vegetation; or clean processed recycled wood products 2. Biosolids 3. Manure 4. Mixed food waste Soil amendment feedstock materials shall be composted to reduce weed seeds, pathogens and deleterious materials as specified under Title 14, California Code of Regulations, Division 7, Chapter 3.1, Article 7, Section 17868.3. Soil amendment shall not be derived from mixed municipal solid waste and must be reasonably free of visible contaminates. Soil amendment must not contain paint, petroleum products, pesticides or any other chemical residues harmful to animal life or plant growth. Soil amendment must not possess objectionable odors. Metal concentrations in soil amendment must not exceed the maximum metal concentrations listed in Title 14, California Code of Regulations, Division 7, Chapter 3.1, Section 17868.2. Soil amendment must comply with the following: Book One- State Route 68 at San Benancio Road Intersection Improvements 126 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Property Test Method Requirement pH *TMECC 04.1 1-A, Elastometric pH 1:5 Slurry 6.0-8.0 Method, pH Units Soluble Salts TMECC 04.10-A, Electrical Conductivity 1:5 Slurry 0-10.0 Method dS/m mmhos/cm) Moisture Content TMECC 03.09-A, Total Solids & Moisture at 70+/- 5 30-60 deg C, % Wet Weight Basis Organic Matter TMECC 05.07-A, Loss-On-Ignition Organic Matter 30-65 Content Method LOI), % Dry Weight Basis Maturity TMECC 05.05-A, Germination and Vigor Seed Emergence 80 or Above Seedling Vigor 80 or Above % Relative to Positive Control Stability TMECC 05.08-B, Carbon Dioxide Evolution Rate 8 or below m CO2-C/g OM per day Particle Size TMECC 02.02-B Sample Sieving for Aggregate Size 95% Passing 5/8 inch Classification % Dry Weight Basis 70% Passing 3/8 inch Pathogen TMECC 07.01-B, Fecal Coliform Bacteria 1000 MPN/gram dry wt. Pass Pathogen TMECC 07.01-B, Salmonella 3 MPN/4 grams dry wt. Pass Physical TMECC 02.02-C, Man Made Inert Removal and Contaminants Classification: Plastic, Glass and Metal, % 4mm fraction Combined Total: 1.0 Physical TMECC 02.02-C, Man Made Inert Removal and Contaminants Classification: Sharps Sewing needles, straight pins and hypodermic None Detected needles), % 4mm fraction United States Department of Agriculture and the United States Compost Council USCC). *TMECC refers to Test Methods for the Examination of Composting and Compost," published by the Prior to application, the Contractor shall provide the Engineer with a copy of the soil amendment producer's Compost Technical Data Sheet and a copy of the compost producers STA certification. The Compost Technical Data Sheet shall include laboratory analytical test results, directions for product use, and a list of product ingredients. Prior to application, the Contractor shall provide the Engineer with a Certificate of Compliance in conformance with the provisions in Section 6-1.07, Certificates of Compliance," of the Standard Specifications. In Section 20-2.10 delete the 8th, 9th, and 10th paragraphs. In Section 20-3.04A delete the last paragraph. Replace Section 20-4.055 with: 20-4.055 PRUNING Pruning of plants shall be consistent with American National Standards Institute ANSI), Tree, Shrub and Other Woody Plant Maintenance Standard Practices," ANSI 300 Part 1)-2001 and Best Management Practices Tree Pruning," 2002 ISBN 1-881956318), published by the International Society of Arboriculture, P.O. Boc 3129, Champaign, IL 61826. Physical/Chemical Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 127 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 24 LIME STABILIZATION Issued 06-05-09) Replace Section 24 with: SECTION 24 LIME STABILIZED SOIL 24-1.01 GENERAL 24-1.01A Summary Section 24 includes specifications for stabilizing soil by mixing lime and water with soil and compacting the mixture to the specified dimensions. 24-1.01B Definitions lime: Quicklime made from high-calcium or dolomitic sources specified under ASTM C 51. For high-calcium quicklime, the calcium oxide content must be greater than 90 percent. For dolomitic quicklime, the calcium oxide content must be greater than 55 percent and the combined calcium oxide and magnesium oxide content must be greater than 90 percent, mellowing period: The time between the initial and final mixing to promote initial chemical reactions between lime, water, and soil. 24-1.01C Submittals From 30 to 180 days before use, submit one 10-pound sample of each lime product proposed and from each source. Submit lime samples in airtight containers under ASTM C 50. Mark the sample date on the container. Include the MSDS and chemical and physical analysis with the submittal. With the lime samples, submit a Certificate of Compliance from the pre-qualified lime source under Section 6-1.07, Certificates of Compliance," with a statement certifying the lime furnished is the same as that pre-qualified. Fifteen days before starting soil stabilization activities, submit for the Engineer's approval a laboratory to perform quality control tests. The laboratory must be qualified under the Department's Independent Assurance Program. Before you apply lime in slurry form, submit the slurry's lime content for Engineer's approval 25 days before application. Before performing quality control sampling and testing, submit the time and location the sampling and testing will occur. Submit quality control testing results within 24 hours of receiving the results. Submit a weighmaster certificate or bill of lading with each load of lime delivered to the jobsite. 24-1.01D Quality Control and Assurance General Perform quality control testing in the presence of the Engineer. Place unique, sequentially numbered lock seals on each load and affix them to trailer blow down valves that are locked open. The bill of lading for each lime delivery must have that specific lock seal number legibly and visibly imprinted. Book One- State Route 68 at San Benancio Road Intersection Improvements 128 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The Engineer samples each lime delivery truck at the job site and randomly tests them off- site. Pre-qualification of Lime Sources Lime sources must be listed on the Department's pre-qualified products list. The list is available at the METS web site. The pre-qualified list for lime sources describes the application procedures for inclusion on the list. Preparing Soil After you prepare an area for lime soil stabilization, test the soil to be stabilized every 500 cubic yards for relative compaction under California Test 231 and moisture content under California Test 226, and verify the surface grades. Applying Lime The Engineer determines the final application rate for each lime product proposed from the samples submitted. If the soil being stabilized changes, the Engineer changes the application rate. Based on California Test 373, the Engineer reports the application rates as the percent of lime by dry weight of soil. The Engineer provides the optimum moisture content determined under California Test 373 for each application rate. Before applying lime, measure the temperature at the ground surface. If lime in dry form is used, the Engineer verifies the application rate using the drop pan method once per 40,000 square feet stabilized, or twice per day, whichever is greater. If lime in slurry form is used, report the quantity of slurry placed by measuring the volume of slurry in the holding tank once per 40,000 square feet stabilized, or twice per day, whichever is greater. Mixing For each day of initial mixing, test the moisture content. Sample the material immediately after initial mixing. Randomly test the adequacy of the final mixing with a phenolphthalein indicator solution. During mixing operations, measure the ground temperature at full mixing depth. After mixing and before compacting, determine maximum density under California Test 216 from composite samples of the mixed material and at each distinct change in material. Test the moisture content of the mixed material under California Test 226. Test the gradation for compliance with Materials." Compaction Test relative compaction on a wet weight basis. After initial compaction, determine in-place density under California Test 231 and moisture content under California Test 226 at the same locations. The testing frequency must be 1 test per 250 cubic yards of lime stabilized soil. Test in 0.50-foot depth intervals. Before requesting to compact material in layers greater than 0.50 foot, construct a test strip in the production area and demonstrate the test strip passes compaction tests using the proposed thickness. The test strip must contain no more material than 1 day's production. The Engineer tests at not more than 0.50-foot depth intervals regardless of the thickness of your layers. Construct test pads by scraping away material to the depth ordered by the Engineer. If a compaction test fails corrective action must include the layers of material already placed above the test pad elevation. Book One- State Route 68 at San Benancio Road Intersection Improvements 129 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Finish Grading Do not proceed with construction activities for subsequent layers of material until the Engineer verifies the final grades of the lime stabilized soil. Dispute Resolution You and the Engineer must work together to avoid potential conflicts and to resolve disputes regarding test result discrepancies. Notify the Engineer within 5 days of receiving a test result if you dispute the test result. If you or the Engineer dispute each other's test results, submit written quality control test results and copies of paperwork including worksheets used to determine the disputed test results to the Engineer. An Independent Third Party ITP) performs referee testing. Before the ITP participates in a dispute resolution, the ITP must be accredited under the Department's Independent Assurance Program. The ITP must be independent of the project. By mutual agreement, the ITP is chosen from: 1. A Department laboratory 2. A Department laboratory in a district or region not in the district or region the project is located 3. The Transportation Laboratory 4. A laboratory not currently employed by you or your lime producer If split quality control or acceptance samples are not available, the ITP uses any available material representing the disputed material for evaluation. 24-1.02 MATERIALS 24-1.02A Lime Lime must comply with ASTM C 977 and the following: Lime Quality ASTM Specification Characteristic Available C 25a High Calcium Calcium and Quicklime: Magnesium CaO 90 Oxide(min., %) Dolomitic Quicklime: CaO 55 and CaO+M O>90 Loss on ignition C 25 7 total loss) max., %) 5 carbon dioxide) 2 free moisture) Slaking rate C 110 30 C rise in 8 minutes Notes: a You may use ASTM C25 or ASTM C 1301 and ASTM C1271. A 0.5-pound sample of lime dry-sieved in a mechanical sieve shaker for 10 minutes 30 seconds must comply with: Book One- State Route 68 at San Benancio Road Intersection Improvements 130 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Sieve Sizes Percentage Passing 3/8-inch 98-100 Slurry must: 1. Be free of contaminants 2. Contain at least the minimum dry solids 3. Have uniform consistency If you prepare lime slurry, prepare it at the jobsite. 24-1.02B Water If available, use potable water. Inform the Engineer if a water source other than potable water is used. If not using potable water, water for mixing soil and lime must: 1. Contain no more than 650 parts per million of chlorides as Cl, and no more than 1,300 parts per million of sulfates as SO4 2. Not contain an amount of impurities that will cause a reduction in the strength of the stabilize soil 24-1.02C Mixed Material Take a composite sample from 5 random locations after initial mixing. The moisture content of the composite sample tested under California Test 226 must be a minimum of 3 percent greater than optimum. Determine the moisture versus density relationship of the composite sample material determined under California Test 216, except Part 2, Section E, Paragraph 6 is modified as follows: After adjustment of the moisture content, compact each of the remaining test specimens in the mold, then record the water adjustment, tamper reading, and the corresponding adjusted wet density from the chart on Table 1 using the column corresponding to the actual wet weight of the test specimen compacted. Note each of these wet weights on Line I. The mixed material before compaction excluding rock must comply with: Sieve Sizes Percentage Passin 1" 98 100 No. 4 60- 100 24-1.02D Curing Treatment Curing treatment may be any of the following: 1. Water cure 2. Curing seal 3. Moist material blanket Curing seal must be SS or CSS grade asphaltic emulsion under Section 94, Asphaltic Emulsions." Book One- State Route 68 at San Benancio Road Intersection Improvements 131 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???24-1.03 CONSTRUCTION 24-1.03A General If using different types of lime or lime from more than one source, do not mix them. The Engineer determines separate application rates. Deliver lime in full loads unless it is the last load needed for a work shift. Apply lime at ground temperatures above 35 F. Do not apply lime if you expect the ground temperature to drop below 35 F before you complete mixing and compacting. During mixing, maintain the in-place moisture of the soil to be stabilized a minimum 3 percent above the optimum moisture determined under California Test 216 as modified in Mixed Material." During compaction and finish grading, add water to the surface to prevent drying until the next layer of mixed material is placed, or until you apply curing treatment. Scarify the surface of lime stabilized soil at least 2 inches between each layer. Do not scarify the final surface of the lime stabilized soil. Between the time of applying lime and 3 days after applying curing treatment, only allow equipment or vehicles on the soil being stabilized that are essential to the work. 24-1.03B Preparing Soil Except for soil clods, remove rocks or solids larger than 1/3 of the layer thickness. Regardless of the layer thickness, remove rocks and solids greater than 4 inches. Notify the Engineer if you encounter rocks or solids greater than 1 /3 of the layer thickness. Before adding lime, place the soil to be stabilized to within 0.08 foot of the specified lines and grades and compact to not less than 90 percent relative compaction. 24-1.03C Applying Lime Apply lime uniformly over the area to be stabilized using a vane spreader. The Engineer determines the final application rate. Do not vary from this application rate by more than 5 percent. Apply lime in dry form. If you request and the Engineer approves, you may apply lime in slurry form. Lime slurry must be in suspension during application. Apply lime slurry uniformly making successive passes over a measured section or roadway until the specified lime content is reached. Apply the residue from lime slurry over the length of the roadway being processed. 24-1.03D Mixing Lime and soil to be stabilized must be mixed uniformly at least twice to within 0.10 foot of the specified depth at any point. If the mixing depth exceeds the specified depth by more than 10 percent, add lime in proportion to the exceeded depth. The Department does not pay for this added lime. Mix lime on the same day it is applied. After the initial mixing, allow a mellowing period for at least 36 hours before final mixing. Moisture content during the mellowing period determined under California Test 226 must be at least 3 percent higher than the optimum moisture content. You may add water and mix during the mellowing period. Remix until the mixture is uniform with no streaks or pockets of lime. Except for clods larger than 1 inch, mixed material must have a color reaction with sprayed phenolphthalein alcohol indicator solution. Complete all the mixing work within 7 days of the initial application of lime. Book One- State Route 68 at San Benancio Road Intersection Improvements 132 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???24-1.03E Compaction Begin compacting immediately after final mixing, but not less than 36 hours after the beginning of initial mixing. Compact by using sheepsfoot or segmented wheel rollers immediately followed by steel drum or pneumatic-tired rollers. Do not use vibratory rollers. If you request and the Engineer approves, you may compact mixed material in layers greater than 0.50 foot. If the specified thickness is 0.50 foot or less, compact in one layer. If the specified thickness is more than 0.50 foot, compact in 2 or more layers of approximately equal thickness. The maximum compacted thickness of any one layer must not exceed 0.50 foot unless you first demonstrate your equipment and methods provide uniform distribution of lime and achieve the specified compaction. Use other compaction methods in areas inaccessible to rollers. Compact the lime stabilized soil to at least 95 percent relative compaction determined under California Test 216 as modified under Mixed Material." The relative compaction is determined on a wet weight basis. 24-1.03F Finish Grading Maintain the moisture content of the lime stabilized soil through the entire finish grading operation at a minimum of 3 percent above optimum moisture content. The finished surface of the lime stabilized soil must not vary more than 0.08 foot above or below the grade established by the Engineer unless the lime stabilized soil is to be covered by material paid for by the cubic yard, in which case the finished surface may not vary above the grade established by the Engineer. If lime stabilized soil is above the allowable tolerance, trim, remove, and dispose of the excess material. Do not leave loose material on the finished surface. If finish rolling cannot be completed within 2 hours of trimming, defer trimming. If lime stabilized soil is below the allowable tolerance, you may use trimmed material to fill low areas only if final grading and final compaction occurs within 48 hours of beginning initial compaction. Before placing trimmed material, scarify the surface of the area to be filled at least 2 inches deep. Finish rolling of trimmed surfaces must be performed with at least 1 complete coverage with steel drum or pneumatic-tired rollers. 24-1.03G Curing General Choose the method of curing. Apply the chosen cure method within 48 hours of completing the sheepsfoot or segmented wheel compaction. Apply the chosen cure method within the same day of any trimming and finish grading. Water Cure Water may be used to cure the finished surface before you place a moist material blanket, or apply curing seal. Keep the surface above the optimum moisture content of the lime stabilized soil. Use this method for no more than 3 days, after which you must place a curing seal or moist material blanket. Book One- State Route 68 at San Benancio Road Intersection Improvements 133 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Curing Seal Curing seal equipment must have a gage indicating the volume of curing seal in the storage tank. If curing seal is used, apply it: 1. To the finished surface of lime stabilized soil under Section 94-1.06, Applying," of the Standard Specifications 2. At a rate from 0.10 to 0.20 gallon per square yard. The Engineer determines the exact rate 3. When the lime stabilized soil is at optimum moisture 4. When the ambient temperature is above 40 F and rising Repair damaged curing seal the same day the damage occurs. Moist Material Blanket Moist material blanket consists of moist structural material. Moist material blanket maybe a temporary or permanent layer of material of sufficient thickness to prevent drying of the lime stabilized soil. You may use moist material blanket if the lime stabilized soil can bear the weight of construction equipment. Maintain the moist material blanket above the optimum moisture content, as appropriate, until the next structural layer is placed. 24-1.04 MEASUREMENT AND PAYMENT Lime stabilized soil is measured by the square yard determined from horizontal measurements of the planned surface of the lime stabilized soil. Curing seal is measured under Section 94, Asphaltic Emulsions." The amount of curing seal used is determined from the gauge specified for the curing equipment. The contract item prices for the work involved with lime stabilized soil are paid: 1. Per square yard for lime stabilized soil 2. Per ton for lime 3. Per ton for asphaltic emulsion curing seal) Payment for the contract items involved with lime stabilized soil includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing the lime stabilized soil, complete in place, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. The Department does not adjust payment for lime. Quantities of lime wasted or disposed of in a manner not specified, or remaining on hand after completion of the work, will not be paid for. If you use a partial load of lime, weigh the truck and the remaining lime on a scale under Section 9-1.01, Measurement of Quantities," and submit a weighmaster certificate to the Engineer. Full compensation for preparing soil to be stabilized is included in the contract price paid per square yard for lime stabilized soil, and no separate payment is made therefor, except removing and disposing of rocks and solids larger 1/3 of the layer thickness and larger than 4 inches from native soil or embankment other than imported borrow is paid for as extra work as provided in Section 4-1.03D, Extra Work." Removing and disposing of rocks and solids larger than 1/3 of the lift thickness and larger than 4 inches from imported borrow is at your expense. Full compensation for mixing, compacting, and maintaining the moisture content of the lime stabilized soil is included in the contract price paid per square yard for lime stabilized soil, and no separate payment is made therefor. Book One- State Route 68 at San Benancio Road Intersection Improvements 134 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Full compensation for applying lime is included in the contract price paid per ton for lime, and no additional compensation is allowed therefor. If the dispute resolution ITP determines the Engineer's test results are correct, the Engineer deducts the ITP's testing costs from payments. If the ITP determines your test results are correct, the State pays the ITP testing costs. AA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 25 AGGREGATE SUBBASES Issued 02-16-07) In Section 25-1.02A replace the 1st paragraph with: Aggregate must be clean and free from organic matter and other deleterious substances. Aggregate must consist of any combination of: 1. Broken stone 2. Crushed gravel 3. Natural rough surfaced gravel 4. Sand 5. Up to 100 percent of any combination of processed: 5.1. Asphalt concrete 5.2. Portland cement concrete 5.3. Lean concrete base 5.4. Cement treated base Replace Section 25-1.02B with: 25-1.02B Class 4 Aggregate Subbase Aggregate must be clean and free from organic matter and other deleterious substances. Aggregate must consist of any combination of: 1. Broken stone 2. Crushed gravel 3. Natural rough surfaced gravel 4. Sand 5. Up to 100 percent of any combination of processed: 5.1. Asphalt concrete 5.2. Portland cement concrete 5.3. Lean concrete base 5.4. Cement treated base AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Book One- State Route 68 at San Benancio Road Intersection Improvements 135 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???SECTION 26 AGGREGATE BASES Issued 02-16-07) In Section 26-1.02A replace the 1st paragraph with: Aggregate must be clean and free from organic matter and other deleterious substances. Aggregate must consist of any combination of: 1. Broken stone 2. Crushed gravel 3. Natural rough surfaced gravel 4. Sand 5. Up to 100 percent of any combination of processed: 5.1. Asphalt concrete 5.2. Portland cement concrete 5.3. Lean concrete base 5.4. Cement treated base In Section 26-1.02B replace the 1st paragraph with: Aggregate must be clean and free from organic matter and other deleterious substances. Aggregate must consist of any combination of: 1. Broken stone 2. Crushed gravel 3. Natural rough surfaced gravel 4. Sand 5. Up to 100 percent of any combination of processed: 5.1. Asphalt concrete 5.2. Portland cement concrete 5.3. Lean concrete base 5.4. Cement treated base AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 27 CEMENT TREATED BASES Issued 07-31-07) In Section 27-1.02 replace the 1st paragraph with: Cement shall be Type II portland cement conforming to the provisions in Section 90-2.01A, Cement." In Section 27-1.02 replace the 3rd paragraph with: Aggregate for use in Class A cement treated base shall be of such quality that when mixed with cement in an amount not to exceed 5 percent by weight of the dry aggregate and compacted Book One- State Route 68 at San Benancio Road Intersection Improvements 136 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???at optimum moisture content, the compressive strength of a sample of the compacted mixture shall not be less than 750 pounds per square inch at 7 days, when tested by California Test 312. In Section 27-1.02 replace the 4th paragraph with: Aggregate for use in Class B cement treated base shall have a Resistance R-value) of not less than 60 before mixing with cement and a Resistance R-value) of not less than 80 after mixing with cement in an amount not to exceed 2.5 percent by weight of the dry aggregate. In Section 27-1.07 replace the 9th paragraph with: When surfacing material is hot mix asphalt, the low areas shall be filled with hot mix asphalt conforming to the requirements for the lowest layer of hot mix asphalt to be placed as surfacing. This filling shall be done as a separate operation prior to placing the lowest layer of surfacing, and full compensation for this filling will be considered as included in the contract price paid for cement treated base and no additional compensation will be allowed therefor. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 28 LEAN CONCRETE BASE Issued 05-15-09) In Section 28-1.02 replace the 1st paragraph with: Cement shall be Type II portland cement conforming to the provisions in Section 90-2.01A, Cement." In Section 28-1.02 replace the 6th paragraph with: Aggregate shall be of such quality that, when mixed with cement in an amount not to exceed 300 pounds per cubic yard, and tested in conformance with the requirements in California Test 548, the compressive strength of a sample will be not less than 700 pounds per square inch at 7 days. Replace Section 28-1.05 with: Placing of lean concrete base shall conform to the provisions for placing concrete pavement in Section 40-3.04, Placing Concrete," except that the third paragraph in Section 40-3.04A, General," shall not apply. Unless otherwise required by the plans or the special provisions, lean concrete base shall be constructed in not less than 12-foot widths separated by construction joints. Lean concrete base constructed monolithically in widths greater than 26 feet shall be constructed with a longitudinal contraction joint offset not more than 3 feet from the centerline of the width being constructed. Longitudinal contraction joints in lean concrete base shall be constructed in conformance with the provisions in Section 40-3.08E, Sawing Method." When concrete pavement is to be placed over lean concrete base, longitudinal construction joints and longitudinal contraction joints in the lean concrete base shall not be within one foot of planned longitudinal contraction joints nor longitudinal constuction joints in the concrete pavement. Lean concrete base shall not be mixed nor placed while the atmospheric temperature is below 35 F, and shall not be placed on frozen ground. Book One- State Route 68 at San Benancio Road Intersection Improvements 137 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???In Section 28-1.06 replace the 1st and 2nd paragraphs with: Lean concrete base shall be spread, compacted, and shaped in conformance with the provisions in Section 40-3.04D, Stationary Side Form Construction," and Section 40-3.04E, Slip-Form Construction." In advance of curing operations, lean concrete base to be surfaced with hot mix asphalt shall be textured with a drag strip of burlap, a broom or a spring steel tine device which will produce scoring in the finished surface. The scoring shall be parallel with the centerline or transverse thereto. The operation shall be performed at a time and in a manner to produce the coarsest texture practical for the method used. In Section 28-1.08 replace the 2nd paragraph with: Hardened lean concrete base with a surface lower than 0.05 foot below the grade established by the Engineer shall be removed and replaced with lean concrete base which complies with these specifications, or if permitted by the Engineer, the low areas shall be filled with pavement material as follows: 1. When pavement material is hot mix asphalt, the low areas shall be filled with hot mix asphalt conforming to the requirements for the lowest layer of hot mix asphalt to be placed as pavement. This shall be done as a separate operation prior to placing the lowest layer of pavement, and full compensation for this filling will be considered as included in the contract price paid per cubic yard for lean concrete base and no additional compensation will be allowed therefor. 2. When pavement material is portland cement concrete, the low areas shall be filled with pavement concrete at the time and in the same operation that the pavement is placed. Full compensation for this filling will be considered as included in the contract price paid per cubic yard for lean concrete base and no additional compensation will be allowed therefor. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 29 TREATED PERMEABLE BASES Issued 05-15-09) In Section 29-1.02B replace the 2nd paragraph with: Cement shall be Type II portland cement conforming to the provisions in Section 90-2.01A, Cement." In Section 29-1.04A replace the 1st paragraph with: Aggregates and asphalt for asphalt treated permeable base shall be stored, proportioned and mixed in the same manner provided for storing, proportioning and mixing aggregates and asphalt for hot mix asphalt in Section 39-1.08, Production," except as follows: 1. The aggregate need not be separated into sizes. 2. The temperature of the aggregate before adding the asphalt binder shall be not less than 275? F nor more than 325? F. Book One- State Route 68 at San Benancio Road Intersection Improvements 138 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???3. Asphalt treated permeable base stored in excess of 2 hours shall not be used in the work. 4. The aggregate shall be combined with 2.5 percent paving asphalt by weight of the dry aggregate. After testing samples of the Contractor's proposed aggregate supply, the Engineer may order an increase or decrease in the asphalt content. If an increase or decrease is ordered, and the increase or decrease exceeds the specified amount by more than 0.1 percent by weight of the dry aggregate, the compensation payable to the Contractor for the asphalt treated permeable base will be increased or decreased on the basis of the total increase or decrease in asphalt. 5. The asphalt content of the asphalt mixture will be determined, at the option of the Engineer, by extraction tests in conformance with the requirements in California Test 310 or 362, or will be determined in conformance with the requirements in California Test 379. The bitumen ratio pounds of asphalt per 100 pounds of dry aggregate shall not vary by more than 0.5 pound of asphalt above or 0.5 pound of asphalt below the amount designated by the Engineer. Compliance with this requirement will be determined either by taking samples from trucks at the plant or from the mat behind the paver before rolling. If the sample is taken from the mat behind the paver, the bitumen ratio shall be not less than the amount designated by the Engineer, less 0.7 pound of asphalt per 100 pounds of dry aggregate. In Section 29-1.04B replace the 2nd paragraph with: Cement treated permeable base shall contain not less than 287 pounds of cement per cubic yard. In Section 29-1.05 replace the 1st paragraph with: Asphalt treated permeable base shall be spread and compacted as specified for hot mix asphalt under the Method" construction process in Section 39, Hot Mix Asphalt," and these specifications. In Section 29-1.05 in the 8th paragraph, replace the 2nd sentence with: The filter fabric shall conform to the provisions in Section 88-1.02, Filtration," and shall be placed in conformance with the provisions for placing filter fabric for edge drains in Section 68- 3.03, Installation." In Section 29-1.06 replace the 1st and 2nd paragraphs with: Cement treated base shall be placed, spread, compacted, and shaped in conformance with the provisions in Section 40-3.04D, Stationary Side Form Construction," and Section 40-3.04E, Slip-Form Construction," except that vibrators shall not be used and the third paragraph in Section 40-3.04A, General," shall not apply. In Section 29-1.06 in the 9th paragraph, replace the 2nd sentence with: The filter fabric shall conform to the provisions in Section 88-1.02, Filtration," and shall be placed in conformance with the provisions for placing filter fabric for edge drains in Section 68- 3.03, Installation." Book One- State Route 68 at San Benancio Road Intersection Improvements 139 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???In Section 29-1.07 replace the 2nd paragraph with: Hardened treated permeable base with a surface lower than 0.05 foot below the grade established by the Engineer shall be removed and replaced with treated permeable base which complies with these specifications, or if permitted by the Engineer, the low areas shall be filled with pavement material as follows: 1. When pavement material is hot mix asphalt, the low areas shall be filled with hot mix asphalt conforming to the requirements for the lowest layer of hot mix asphalt to be placed as pavement. This shall be done as a separate operation prior to placing the lowest layer of pavement. 2. When pavement material is portland cement concrete, the low areas shall be filled with pavement concrete at the time and in the same operation in which the pavement is placed. 3. Full compensation for filling low areas will be considered as included in the contract price paid per cubic yard for treated permeable base and no additional compensation will be allowed therefor. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 37 BITUMINOUS SEALS Issued 06-05-09) In Section 37-1.03 replace the 4th through 6th paragraphs with: On 2-lane two-way roadways, W8-7 LOOSE GRAVEL" signs and W13-1 35) speed advisory signs shall be furnished and placed adjacent to both sides of the traveled way where screenings are being spread on a traffic lane. The first W8-7 sign in each direction shall be placed where traffic first encounters loose screenings, regardless of which lane the screenings are being spread on. The W13-1 35) signs need not be placed in those areas with posted speed limits of less than 40 MPH. The signs shall be placed at maximum 2,000-foot intervals along each side of the traveled way and at public roads or streets entering the seal coat area as directed by the Engineer. On multilane roadways freeways, expressways and multilane conventional highways) where screenings are being spread on a traffic lane, W8-7 LOOSE GRAVEL" signs and W13-1 35) speed advisory signs shall be furnished and placed adjacent to the outside edge of the traveled way nearest to the lane being worked on. The first W8-7 sign shall be placed where the screenings begin with respect to the direction of travel on that lane. The W13-1 35) signs need not be placed in those areas with posted speed limits of less than 40 MPH. The signs shall be placed at maximum 2,000-foot intervals along the edge of traveled way and at on-ramps, public roads or streets entering the seal coat area as directed by the Engineer. The W8-7 and W13-1 signs shall be maintained in place at each location until final brooming of the seal coat surface at that location is completed. The W8-7 and W13-1 signs shall conform to the provisions for construction area signs in Section 12, Construction Area Traffic Control Devices." The signs may be set on temporary portable supports with the W 13-1 below the W8-7 or on barricades with the W13-1 sign alternating with the W8-7 sign. Book One- State Route 68 at San Benancio Road Intersection Improvements 140 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???In Section 37-1.07 replace the 2nd paragraph with: Rollers shall be oscillating type pneumatic-tired rollers. A minimum of 2 pneumatic-tired rollers conforming to the provisions in Section 39-3.03 Spreading and Compacting Equipment," shall be furnished. In Section 37-1.09 replace the 2nd paragraph with: The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in applying seal coat, complete in place, including furnishing, placing, maintaining, and removing W8-7 and W13-1 signs, when required, and temporary supports or barricades for the signs, as shown on the plans, and as specified in these specifications and the special provisions, and as directed by the Engineer. In Section 37-2.05 replace the 6th paragraph with: In addition to conforming to the provisions in Section 5-1.10, Equipment," the identifying number of mixer-spreader trucks shall be at least 2 inches in height, located on the front and rear of the vehicle. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 39 ASPHALT CONCRETE Issued 06-05-09) Replace Section 39 with: SECTION 39 HOT MIX ASPHALT 39-1 GENERAL 39-1.01 DESCRIPTION Section 39 includes specifications for producing and placing hot mix asphalt HMA) by mixing aggregate and asphalt binder at a mixing plant and spreading and compacting the HMA mixture. The special provisions specify one or more type of HMA, including: 1. Type A 2. Type B 3. Open graded friction course OGFC). OGFC includes hot mix asphalt open graded), rubberized hot mix asphalt open graded) RHMA-O) and rubberized hot mix asphalt open graded high binder) RHMA-O-HB) 4. Rubberized hot mix asphalt gap graded) RHMA-G) The special provisions specify the HMA construction process, including: 1. Standard Book One- State Route 68 at San Benancio Road Intersection hnprovements CONTRACT NO. 10- 11 1 065 141 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???2. Method 3. Quality Control / Quality Assurance QC / QA) 39-1.02 MATERIALS 39-1.02A Geosynthetic Pavement Interlayer Geosynthetic pavement interlayer must comply with the specifications for pavement fabric or paving mat in Section 88-1.07, Pavement Interlayer." 39-1.02B Tack Coat Tack coat must comply with the specifications for asphaltic emulsion in Section 94, Asphaltic Emulsion," or asphalt binder in Section 92, Asphalts." Choose the type and grade. Notify the Engineer if you dilute asphaltic emulsion with water. The weight ratio of added water to asphaltic emulsion must not exceed 1 to 1. Measure added water either by weight or volume in compliance with the specifications for weighing, measuring, and metering devices under Section 9-1.01, Measurement of Quantities," or you may use water meters from water districts, cities, or counties. If you measure water by volume, apply a conversion factor to determine the correct weight. With each dilution, submit in writing: 1. The weight ratio of water to bituminous material in the original asphaltic emulsion 2. The weight of asphaltic emulsion before diluting 3. The weight of added water 4. The final dilution weight ratio of water to asphaltic emulsion 39-1.02C Asphalt Binder Asphalt binder in HMA must comply with Section 92, Asphalts," or Section 39-1.02D, Asphalt Rubber Binder." The special provisions specify the grade. Asphalt binder for geosynthetic pavement interlayer must comply with Section 92, Asphalts." Choose from Grades PG 64-10, PG 64-16, or PG 70-10. 39-1.02D Asphalt Rubber Binder General Use asphalt rubber binder in RHMA-G, RHMA-O, and RHMA-O-HB. Asphalt rubber binder must be a combination of: 1. Asphalt binder 2. Asphalt modifier 3. Crumb rubber modifier CRM) The combined asphalt binder and asphalt modifier must be 80.0 2.0 percent by weight of the asphalt rubber binder. Asphalt Modifier Asphalt modifier must be a resinous, high flash point, and aromatic hydrocarbon, and comply with: Book One- State Route 68 at San Benancio Road Intersection Improvements 142 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Quality Characteristic ASTM Specification Viscosity, m /s x 10) at 100 C D 445 X 3 a Flash Point, CL.O.C., C D 92 207 minimum Molecular Analysis Asphaltenes, percent by mass D 2007 0.1 maximum Aromatics, percent by mass D 2007 55 minimum Note: a The symbol X" is the proposed asphalt modifier viscosity. X" must be between 19 and 36. A change in X" requires a new asphalt rubber binder design. Asphalt modifier must be from 2.0 percent to 6.0 percent by weight of the asphalt binder in the asphalt rubber binder. Crumb Rubber Modifier CRM consists of a ground or granulated combination of scrap tire CRM and high natural CRM. CRM must be 75.0 2.0 percent scrap tire CRM and 25.0 2.0 percent high natural CRM by total weight of CRM. Scrap tire CRM must be from any combination of automobile tires, truck tires, or tire buffings. Sample and test scrap tire CRM and high natural CRM separately. CRM must comply with: Crumb Rubber Modifier for Asphalt Rubber Binder Quality Characteristic Test Method Specification Scrap tire CRM gradation LP-10 100 % passing No. 8 sieve) High natural CRM gradation LP-10 100 % passing No. 10 sieve) Wire in CRM % max.) LP-10 0.01 Fabric in CRM % max.) LP-10 0.05 CRM particle length inch max.) a 3/16 CRM specific ravity a CT 208 1.1-1.2 Natural rubber content in high natural CRM %) a ASTM D 297 40.0-48.0 Note: a Test at mix design and for Certificate of Compliance. Only use CRM ground and granulated at ambient temperature. If steel and fiber are cryogenically separated, it must occur before grinding and granulating. Only use cryogenically produced CRM particles that can be ground or granulated and not pass through the grinder or granulator. CRM must be dry, free-flowing particles that do not stick together. CRM must not cause foaming when combined with the asphalt binder and asphalt modifier. You may add calcium carbonate or talc up to 3 percent by weight of CRM. Asphalt Rubber Binder Design and Profile Submit in writing an asphalt rubber binder design and profile that complies with the asphalt rubber binder specifications. In the design, designate the asphalt, asphalt modifier, and CRM and their proportions. The profile must include the same component sources for the asphalt rubber binder used. Design the asphalt rubber binder from testing you perform for each quality characteristic and for the reaction temperatures expected during production. The 24-hour 1,440-minute) interaction period determines the design profile. At a minimum, mix asphalt rubber binder components, take samples, and perform and record the following tests: Asphalt Modifier for Asphalt Rubber Binder Book One- State Route 68 at San Benancio Road Intersection Improvements 143 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Asphalt Rubber Binder Reaction Design Profile Test Minutes of Reaction a Limits 45 60 90 120 240 360 1440 Cone penetration 77 F, 0.10-mm ASTM D 217) X X X 25 70 Resilience 77 F, percent rebound ASTM D 5329) X X X 18 min. Field softening point, F ASTM D 36) X X X 125 165 Viscosity, centipoises LP-11) X X X X X X X 1,500 4,000 Notes: a Six hours 360 minutes) after CRM addition, reduce the oven temperature to 275 F for a period of 16 hours. After the 16-hour 1320 minutes) cool-down after CRM addition, reheat the binder to the reaction temperature expected during production for sampling and testing at 24 hours 1440 minutes). b X" denotes required testing Asphalt Rubber Binder After interacting for a minimum of 45 minutes, asphalt rubber binder must comply with: Quality Characteristic Test for Quality Test Method Speci cation Control or Acceptance Minimum Maximum Cone penetration 77 F, 0.10-mm Acceptance ASTM D 217 25 70 Resilience 77 F, percent rebound Acceptance ASTM D 5329 18 Field softening point, F Acceptance ASTM D 36 125 165 Viscosity 375 F, centipoises Quality Control LP-11 1,500 4,000 39-1.02E Aggregate Aggregate must be clean and free from deleterious substances. Aggregate: 1. Retained on the No. 4 sieve is coarse 2. Passing the No. 4 sieve is fine 3. Added and passing the No. 30 sieve is supplemental fine, including: 3.1. Hydrated lime 3.2. Portland cement 3.3. Fines from dust collectors The special provisions specify the aggregate gradation for each HMA type. The specified aggregate gradation is before the addition of asphalt binder and includes supplemental fines. The Engineer tests for aggregate grading under California Test 202, modified by California Test 105 if there is a difference in specific gravity of 0.2 or more between the coarse and fine parts of different aggregate blends. Choose a sieve size target value TV) within each target value limit presented in the aggregate gradation tables. Asphalt Rubber Binder Book One- State Route 68 at San Benancio Road Intersection Improvements 144 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Aggregate Gradation Percentage Passing) HMA Types A and B 3/4-inch HMA Types A and B Sieve Sizes Target Value Limits Allowable Tolerance 1" 100 3/4" 90 100 TV 5 1/2" 70 90 TV 6 No. 4 45 55 TV 7 No.8 32-40 TV?5 No. 30 12 21 TV 4 No. 200 2-7 TV 2 Sieve Sizes Tar et Value Limits Allowable Tolerance 3/4" 100 1/2" 95 99 TV 6 3/8" 75 95 TV 6 No. 4 55 66 TV 7 No. 8 38 49 TV 5 No. 30 15 27 TV 4 No. 200 2-8 TV 2 Sieve Sizes Tar et Value Limits Allowable Tolerance 1/2" 100 3/8" 95 100 TV 6 No. 4 58 72 TV 7 No. 8 34 48 TV 6 No. 30 18 32 TV t5 No. 200 2-9 TV 2 Sieve Sizes Target Value Limits Allowable Tolerance 3/8" 100 No. 4 95 100 TV 7 No. 8 72 77 TV f7 No. 30 37 43 TV 7 No. 200 2-12 TV f4 1/2-inch HMA Types A and B 3/8-inch HMA Types A and B No. 4 HMA Types A and B Book One- State Route 68 at San Benancio Road Intersection Improvements 145 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Rubberized Hot Mix Asphalt Gap Graded RHMA-G) 3/4-inch RHMA-G Sieve Sizes Target Value Limits Allowable Tolerance 1" 100 3/4" 95 100 TV 5 1/2" 83 87 TV 6 3/8" 65 70 TV 6 No. 4 28 42 TV 7 No.8 14-22 TV?5 No.200 0-6 TV?2 1/2-inch RHMA-G Sieve Sizes Target Value Limits Allowable Tolerance 3/4" 100 1/2" 90 100 TV 6 3/8" 83 87 TV 6 No. 4 28 42 TV 7 No. 8 14 22 TV 5 No.200 0-6 TV?2 Open Graded Friction Course OGFC) 1-inch OGFC Sieve Sizes Target Value Limits Allowable Tolerance 1 1/2" 100 1" 99- 100 TV 5 3/4" 85 96 TV 5 1/2" 55 71 TV 6 No. 4 10 25 TV 7 No.8 6-16 TV?5 No. 200 1 6 TV 2 1/2-inch OGFC Sieve Sizes Target Value Limits Allowable Tolerance 3/4" 100 1/2" 95 100 TV 6 3/8" 78 89 TV 6 No.4 28-37 TV?7 No.8 7-18 TV?5 No. 30 0-10 TV 4 No.200 0-3 TV?2 3/8-inch OGFC Sieve Sizes Target Value Limits Allowable Tolerance 1/2" 100 3/8" 90 100 TV 6 No.4 29-36 TV?7 No.8 7-18 TV?6 No. 30 0-10 TV 5 No.200 0-3 TV?2 Before the addition of asphalt binder and lime treatment, aggregate must comply with: Book One- State Route 68 at San Benancio Road Intersection Improvements 146 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Quality Characteristic Test Method HMA Type A B RHMA-G OGFC Percent of crushed particles CT 205 Coarse aggregate % min.) One fractured face 90 25 90 Two fractured faces 75 90 75 Fine aggregate % min) Passing No. 4 sieve and retained on No. 8 sieve.) One fractured face 70 20 70 90 Los Angeles Rattler % max.) CT 211 Loss at 100 Rev. 12 12 12 Loss at 500 Rev. 45 50 40 40 Sand equivalent min.) a CT 217 47 42 47 Fine aggregate angularity % min.) AASHTO T 304 Method 45 45 45 A Flat and elongated particles % max. ASTM D by wei ht 5:1) 4791 10 10 10 10 Notes: a Reported value must be the average of 3 tests from a single sample. b The Engineer waives this specification if HMA contains less than 10 percent of nonmanufactured sand by weight of total aggregate. Manufactured sand is fine aggregate produced by crushing rock or gravel. 39-1.02F Reclaimed Asphalt Pavement You may produce HMA using reclaimed asphalt pavement RAP). HMA produced using RAP must comply with the specifications for HMA except aggregate quality specifications do not apply to RAP. You may substitute RAP aggregate for a part of the virgin aggregate in HMA in a quantity not exceeding 15.0 percent of the aggregate blend. Do not use RAP in OGFC and RHMA-G. Assign the substitution rate of RAP aggregate for virgin aggregate with the job mix formula JMF) submittal. The JMF must include the percent of RAP used. If you change your assigned RAP aggregate substitution rate by more than 5 percent within the 15.0 percent limit), submit a new JMF. Process RAP from asphalt concrete. You may process and stockpile RAP throughout the project's life. Prevent material contamination and segregation. Store RAP in stockpiles on smooth surfaces free of debris and organic material. Processed RAP stockpiles must consist only of homogeneous RAP. 39-1.03 HOT MIX ASPHALT MIX DESIGN REQUIREMENTS 39-1.03A General A mix design consists of performing California Test 367 and laboratory procedures on combinations of aggregate gradations and asphalt binder contents to determine the optimum binder content OBC) and HMA mixture qualities. If RAP is used, use Laboratory Procedure LP-9. The result of the mix design becomes the proposed JMF. Use Form CEM-3512 to document aggregate quality and mix design data. Use Form CEM- 3511 to present the JMF. Laboratories testing aggregate qualities and preparing the mix design and JMF must be qualified under the Department's Independent Assurance Program. Take samples under California Test 125. The Engineer reviews the aggregate qualities, mix design, and JMF and verifies and accepts the JMF. Aggregate Quality Book One- State Route 68 at San Benancio Road Intersection Improvements 147 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???You may change the JMF during production. Do not use the changed JMF until the Engineer accepts it. Except when adjusting the JMF in compliance with Section 39-1.03E, Job Mix Formula Verification," perform a new mix design and submit in writing a new JMF submittal for changing any of the following: 1. Target asphalt binder percentage 2. Asphalt binder supplier 3. Asphalt rubber binder supplier 4. Component materials used in asphalt rubber binder or percentage of any component materials 5. Combined aggregate gradation 6. Aggregate sources 7. Substitution rate for RAP aggregate of more than 5 percent 8. Any material in the JMF For OGFC, submit in writing a complete JMF submittal except asphalt binder content. The Engineer determines the asphalt binder content under California Test 368 within 20 days of your complete JMF submittal and provides you a Form CEM-3513. 39-1.03B Hot Mix Asphalt Mix Design Perform a mix design that produces HMA in compliance with: Quality Characteristic Test Method HMA Type A B RHMA-G Air voids content %) CT 367a 4.0 4.0 Special Provisions Voids in mineral aggregate % min.) LP-2 No. 4 grading 17.0 17.0 3/8" grading 15.0 15.0 1/2" grading 14.0 14.0 18.0-23 0b 3/4" grading 13.0 13.0 18.0-23 0b Voids filled with asphalt %) LP-3 No. 4 grading 76.0-80.0 76.0-80.0 Note d 3/8" grading 73.0-76.0 73.0-76.0 1/2" grading 65.0-75.0 65.0-75.0 3/4" grading 65.0-75.0 65.0-75.0 Dust proportion LP-4 No. 4 and 3/8" gradings 0.9-2.0 0.9-2.0 Note d 1/2" and 3/4" gradings 0.6-1.3 0.6-1.3 Stabilometer value min.) C CT 366 No. 4 and 3/8" gradings 30 30 1/2" and 3/4" gradings 37 35 23 Notes: a Calculate the air voids content of each specimen using California Test 309 and Lab Procedure LP-1. Modify California Test 367, Paragraph C5, to use the exact air voids content specified in the selection of OBC. b Voids in mineral aggregate for RHMA-G must be within this range. Modify California Test 304, Part 2.B.2.c: After compaction in the compactor, cool to 140 t 5 F by allowing the briquettes to cool at room temperature for 0.5-hour, then place the briquettes in the oven at 140 F for a minimum of 2 hours and not more than 3 hours." d Report this value in the JMF submittal. For stability and air voids content, prepare 3 briquettes at the OBC and test for compliance. Report the average of 3 tests. Prepare new briquettes and test if the range of stability for the 3 Hot Mix Asphalt Mix Design Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 148 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???briquettes is more than 8 points. The average air void content may vary from the specified air void content by +0.5 percent. You may use the briquettes used for stability testing to determine bulk specific gravity under CT 308. If you use the same briquettes and tests using bulk specific gravity fail, you may prepare 3 new briquettes and determine a new bulk specific gravity. 39-1.03C Job Mix Formula Submittal Each JMF submittal must consist of: 1. Proposed JMF on Form CEM-3511 2. Mix design documentation on Form CEM-3512 dated within 12 months of submittal 3. JMF verification on Form CEM-3513, if applicable 4. JMF renewal on Form CEM-3514, if applicable 5. Materials Safety Data Sheets MSDS) for: 5.1. Asphalt binder 5.2. Base asphalt binder used in asphalt rubber binder 5.3. CRM and asphalt modifier used in asphalt rubber binder 5.4. Blended asphalt rubber binder mixture 5.5. Supplemental fine aggregate except fines from dust collectors 5.6. Antistrip additives If the Engineer requests in writing, sample the following materials in the presence of the Engineer and place in labeled containers weighing no more than 50 pounds each: 1. Coarse, fine, and supplemental fine aggregate from stockpiles, cold feed belts, or hot bins. Samples must include at least 120 pounds for each coarse aggregate, 80 pounds for each fine aggregate, and 10 pounds for each type of supplemental fines. The Department combines these aggregate samples to comply with the JMF target values submitted on Form CEM-3511. 2. RAP from stockpiles or RAP system. Samples must be at least 60 pounds. 3. Asphalt binder from the binder supplier. Samples must be in two 1-quart cylindrical shaped cans with open top and friction lids. 4. Asphalt rubber binder with the components blended in the proportions to be used. Samples must be in four 1-quart cylindrical shaped cans with open top and friction lids. Notify the Engineer in writing at least 2 business days before sampling materials. For aggregate and RAP, split the samples into at least 4 parts. Submit 3 parts to the Engineer and use 1 part for your testing. 39-1.03D Job Mix Formula Review The Engineer reviews each mix design and proposed JMF within 5 business days from the complete JMF submittal. The review consists of reviewing the mix design procedures and comparing the proposed JMF with the specifications. The Engineer may verify aggregate qualities during this review period. 39-1.03E Job Mix Formula Verification If you cannot submit a Department-verified JMF on Form CEM-3513 dated within 12 months before HMA production, the Engineer verifies the JMF. Book One- State Route 68 at San Benancio Road Intersection Improvements 149 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Based on your testing and production experience, you may submit on Form CEM-3511 an adjusted JMF before the Engineer's verification testing. JMF adjustments may include a change in the: 1. Asphalt binder content target value up to 0.6 percent from the optimum binder content value submitted on Form CEM-3512 except do not adjust the target value for asphalt rubber binder for RHMA-G below 7.0 percent 2. Aggregate gradation target values within the target value limits specified in the aggregate gradation tables For HMA Type A, Type B, and RHMA-G, the Engineer verifies the JMF from samples taken from HMA produced by the plant to be used. Notify the Engineer in writing at least 2 business days before sampling materials. In the Engineer's presence and from the same production run, take samples of: 1. Aggregate 2. Asphalt binder 3. RAP 4. HMA Sample aggregate from cold feed belts or hot bins. Sample RAP from the RAP system. Sample HMA under California Test 125 except if you request in writing and the Engineer approves, you may sample from any of the following locations: 1. The plant 2. A truck 3. A windrow 4. The paver hopper 5. The mat behind the paver You may sample from a different project including a non-Department project if you make arrangements for the Engineer to be present during sampling. For aggregate, RAP, and HMA, split the samples into at least 4 parts and label their containers. Submit 3 split parts to the Engineer and use 1 part for your testing. The Engineer verifies each proposed JMF within 20 days of receiving verification samples. If you request in writing, the Engineer verifies RHMA-G quality requirements within 3 business days of sampling. Verification is testing for compliance with the specifications for: 1. Aggregate quality 2. Aggregate gradation JMF TV tolerance) 3. Asphalt binder content JMF TV tolerance) 4. HMA quality specified in the table Hot Mix Asphalt Mix Design Requirements except: 4.1. Air voids content design value 2.0 percent) 4.2. Voids filled with asphalt report only if an adjustment for asphalt binder content target value is less than or equal to 0.3 percent from OBC) 4.3. Dust proportion report only if an adjustment for asphalt binder content target value is less than or equal to 0.3 percent from OBC) Book One- State Route 68 at San Benancio Road Intersection improvements 150 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The Engineer prepares 3 briquettes from a single split sample. To verify the JMF for stability and air voids content, the Engineer tests the 3 briquettes and reports the average of 3 tests. The Engineer prepares new briquettes if the range of stability for the 3 briquettes is more than 8 points. The Engineer may use the briquettes used for stability testing to determine bulk specific gravity under CT 308. If the Engineer uses the same briquettes and the tests using bulk specific gravity fail, the Engineer prepares 3 new briquettes and determines a new bulk specific gravity. If the Engineer verifies the JMF, the Engineer provides you a Form CEM-3 513. If the Engineer's tests on plant-produced samples do not verify the JMF, the Engineer notifies you in writing and you must submit a new JMF submittal or submit an adjusted JMF based on your testing. JMF adjustments may include a change in the: 1. Asphalt binder content target value up to 0.6 percent from the optimum binder content value submitted on Form CEM-3512 except do not adjust the target value for asphalt rubber binder for RHMA-G below 7.0 percent 2. Aggregate gradation target values within the target value limits specified in the aggregate gradation tables You may adjust the JMF only once due to a failed verification test. An adjusted JMF requires a new Form CEM-3511 and verification of a plant-produced sample. The Engineer reverifies the JMF if HMA production has stopped for longer than 30 days and the verified JMF is older than 12 months. For each HMA type and aggregate size specified, the Engineer verifies at the State's expense up to 2 proposed JMF including a JMF adjusted after verification failure. The Engineer deducts $3,000 from payments for each verification exceeding this limit. This deduction does not apply to verifications initiated by the Engineer or if a JMF expires while HMA production is stopped longer than 30 days. 39-1.03F Job Mix Formula Renewal You may request a JMF renewal by submitting the following: 1. Proposed JMF on Form CEM-3511 2. A previously verified JMF documented on Form CEM-3513 dated within 12 months 3. Mix design documentation on Form CEM-3512 used for the previously verified JMF If the Engineer requests in writing, sample the following materials in the presence of the Engineer and place in labeled containers weighing no more than 50 pounds each: 1. Coarse, fine, and supplemental fine aggregate from stockpiles, cold feed belts, or hot bins. Samples must include at least 120 pounds for each coarse aggregate, 80 pounds for each fine aggregate, and 10 pounds for each type of supplemental fines. The Department combines these aggregate samples to comply with the JMF target values submitted on Form CEM-3511. 2. RAP from stockpiles or RAP system. Samples must be at least 60 pounds. 3. Asphalt binder from the binder supplier. Samples must be in two 1-quart cylindrical shaped cans with open top and friction lids. 4. Asphalt rubber binder with the components blended in the proportions to be used. Samples must be in four 1-quart cylindrical shaped cans with open top and friction lids. Book One- State Route 68 at San Benancio Road Intersection Improvements 151 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Notify the Engineer in writing at least 2 business days before sampling materials. For aggregate and RAP, split samples into at least 4 parts. Submit 3 parts to the Engineer and use 1 part for your testing. The Engineer reviews each complete JMF renewal submittal within 5 business days. The Engineer may verify aggregate qualities during this review period. Notify the Engineer in writing at least 2 business days before sampling materials. For aggregate, RAP, and HMA, split the samples into at least 4 parts. Submit 3 parts to the Engineer and use 1 part for your testing. The Engineer verifies the JMF renewal submittal under Section 39-1.03E, Job Mix Formula Verification," except: 1. The Engineer retains samples until you provide test results for your part on Form CEM- 3514. 2. The Engineer tests samples of materials obtained from the HMA production unit after you submit test results that comply with the specifications for the quality characteristics under Section 39-1.03E, Job Mix Formula Verification." 3. The Engineer verifies each proposed JMF within 30 days of receiving verification samples. 4. You may not adjust the JMF due to a failed verification. 5. For each HMA type and aggregate gradation specified, the Engineer verifies at the State's expense 1 proposed JMF. If the Engineer verifies the JMF renewal, the Engineer provides you a Form CEM-3513. 39-1.03G Job Mix Formula Acceptance You may start HMA production if 1. The Engineer's review of the JMF shows compliance with the specifications. 2. The Department has verified the JMF within 12 months before HMA production. 3. The Engineer accepts the verified JMF. 39-1.04 CONTRACTOR QUALITY CONTROL 39-1.04A General Establish, maintain, and change a quality control system to ensure materials and work comply with the specifications. Submit quality control test results to the Engineer within 3 days of a request except when QC / QA is specified. You must identify the HMA sampling location in your Quality Control Plan. During production, take samples under California Test 125 except if you request in writing and the Engineer approves, you may sample HMA from: 1. The plant 2. The truck 3. A windrow 4. The paver hopper 5. The mat behind the paver 39-1.04B Prepaving Conference Meet with the Engineer at a prepaving conference at a mutually agreed time and place. Discuss methods of performing the production and paving work. Book One- State Route 68 at San Benancio Road Intersection Improvements 152 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???39-1.04C Asphalt Rubber Binder Take asphalt rubber binder samples from the feed line connecting the asphalt rubber binder tank to the HMA plant. Sample and test asphalt rubber binder under Laboratory Procedure LP- 11. Test asphalt rubber binder for compliance with the viscosity specifications in Section 39- 1.02, Materials." During asphalt rubber binder production and HMA production using asphalt rubber binder, measure viscosity every hour with not less than 1 reading for each asphalt rubber binder batch. Log measurements with corresponding time and asphalt rubber binder temperature. Submit the log daily in writing. Submit a Certificate of Compliance under Section 6-1.07, Certificates of Compliance." With the Certificate of Compliance, submit test results in writing for CRM and asphalt modifier with each truckload delivered to the HMA plant. A Certificate of Compliance for asphalt modifier must not represent more than 5,000 pounds. Use an AASHTO-certified laboratory for testing. Sample and test gradation and wire and fabric content of CRM once per 10,000 pounds of scrap tire CRM and once per 3,400 pounds of high natural CRM. Sample and test scrap tire CRM and high natural CRM separately. Submit certified weight slips in writing for the CRM and asphalt modifier furnished. 39-1.04D Aggregate Determine the aggregate moisture content and RAP moisture content in continuous mixing plants at least twice a day during production and adjust the plant controller. Determine the RAP moisture content in batch mixing plants at least twice a day during production and adjust the plant controller. 39-1.04E Reclaimed Asphalt Pavement Perform RAP quality control testing each day. Sample RAP once daily and determine the RAP aggregate gradation under Laboratory Procedure LP-9 and submit the results to the Engineer in writing with the combined aggregate gradation. 39-1.04F Density Cores To determine density for Standard and QC / QA projects, take 4-inch or 6-inch diameter density cores at least once every 5 business days. Take 1 density core for every 250 tons of HMA from random locations the Engineer designates. Take density cores in the Engineer's presence and backfill and compact holes with material authorized by the Engineer. Before submitting a density core to the Engineer, mark it with the density core's location and place it in a protective container. If a density core is damaged, replace it with a density core taken within 1 foot longitudinally from the original density core. Relocate any density core located within 1 foot of a rumble strip to I foot transversely away from the rumble strip. 39-1.04G Briquettes Prepare 3 briquettes for each stability and air voids content determination. Report the average of 3 tests. Prepare new briquettes and test if the range of stability for the 3 briquettes is more than 12 points. You may use the briquettes used for stability testing to determine bulk specific gravity under CT 308. If you use these briquettes and tests using bulk specific gravity fail, you may prepare 3 new briquettes and determine a new bulk specific gravity. Book One- State Route 68 at San Benancio Road Intersection Improvements 153 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???39-1.05 ENGINEER'S ACCEPTANCE The Engineer's acceptance of HMA is specified in the sections for each HMA construction process. The Engineer samples materials for testing under California Test 125 and the applicable test method except samples may be taken from: 1. The plant from: 1.1. A truck 1.2. An automatic sampling device 2. The mat behind the paver Sampling must be independent of Contractor quality control, statistically-based, and random. If you request, the Engineer splits samples and provides you with a part. The Engineer accepts HMA based on: 1. Accepted JMF 2. Accepted QCP for Standard and QC / QA 3. Compliance with the HMA Acceptance tables 4. Acceptance of a lot for QC / QA 5. Visual inspection The Engineer prepares 3 briquettes for each stability and air voids content determination. The Engineer reports the average of 3 tests. The Engineer prepares new briquettes and test if the range of stability for the 3 briquettes is more than 8 points. The Engineer may use the briquettes used for stability testing to determine bulk specific gravity under CT 308. If the Engineer uses the same briquettes and the tests using bulk specific gravity fail, the Engineer prepares 3 new briquettes and determines a new bulk specific gravity. 39-1.06 DISPUTE RESOLUTION You and the Engineer must work together to avoid potential conflicts and to resolve disputes regarding test result discrepancies. Notify the Engineer in writing within 5 days of receiving a test result if you dispute the test result. If you or the Engineer dispute each other's test results, submit written quality control test results and copies of paperwork including worksheets used to determine the disputed test results to the Engineer. An Independent Third Party ITP) performs referee testing. Before the ITP participates in a dispute resolution, the ITP must be accredited under the Department's Independent Assurance Program. The ITP must be independent of the project. By mutual agreement, the ITP is chosen from: 1. A Department laboratory 2. A Department laboratory in a district or region not in the district or region the project is located 3. The Transportation Laboratory 4. A laboratory not currently employed by you or your HMA producer Book One- State Route 68 at San Benancio Road Intersection Improvements 154 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???If split quality control or acceptance samples are not available, the ITP uses any available material representing the disputed HMA for evaluation. 39-1.07 PRODUCTION START-UP EVALUATION The Engineer evaluates HMA production and placement at production start-up. Within the first 750 tons produced on the first day of HMA production, in the Engineer's presence and from the same production run, take samples of: 1. Aggregate 2. Asphalt binder 3. RAP 4. HMA Sample aggregate from cold feed belts or hot bins. Take RAP samples from the RAP system. Sample HMA under California Test 125 except if you request in writing and the Engineer approves, you may sample HMA from: 1. The plant 2. The truck 3. A windrow 4. The paver hopper 5. The mat behind the paver For aggregate, RAP, and HMA, split the samples into at least 4 parts and label their containers. Submit 3 split parts to the Engineer and keep 1 part. For Standard and QC / QA projects, you and the Engineer must test the split samples and report test results in writing within 3 business days of sampling. If you proceed before receipt of the test results, the Engineer may consider the HMA placed to be represented by these test results. For Standard and QC / QA projects, take 4-inch or 6-inch diameter density cores within the first 750 tons on the first day of HMA production. For each density core, the Engineer reports the bulk specific gravity determined under California Test 308, Method A in addition to the percent of maximum theoretical density. You may test for in-place density at the density core locations and include them in your production tests for percent of maximum theoretical density. 39-1.08 PRODUCTION 39-1.08A General Produce HMA in a batch mixing plant or a continuous mixing plant. Proportion aggregate by hot or cold feed control. HMA plants must be Department-qualified. Before production, the HMA plant must have a current qualification under the Department's Materials Plant Quality Program. During production, you may adjust: 1. Hot or cold feed proportion controls for virgin aggregate and RAP 2. The set point for asphalt binder content 39-1.08B Mixing Mix HMA ingredients into a homogeneous mixture of coated aggregates. Asphalt binder must be between 275 F and 375 F when mixed with aggregate. Asphalt rubber binder must be between 375 F and 425 F when mixed with aggregate. Book One- State Route 68 at San Benancio Road Intersection Improvements 155 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???When mixed with asphalt binder, aggregate must not be more than 325 F except aggregate for OGFC with unmodified asphalt binder must be not more than 275 F. Aggregate temperature specifications do not apply when you use RAP. HMA with or without RAP must not be more than 325 F. 39-1.08C Asphalt Rubber Binder Deliver scrap tire CRM and high natural CRM in separate bags. Either proportion and mix asphalt binder, asphalt modifier, and CRM simultaneously or premix the asphalt binder and asphalt modifier before adding CRM. If you premix asphalt binder and asphalt modifier, mix them for at least 20 minutes. When you add CRM, the asphalt binder and asphalt modifier must be between 375 F and 440 F. Do not use asphalt rubber binder during the first 45 minutes of the reaction period. During this period, the asphalt rubber binder mixture must be between 350 F and the lower of 425 F or 25 F below the asphalt binder's flash point indicated in the MSDS. If any asphalt rubber binder is not used within 4 hours after the reaction period, discontinue heating. If the asphalt rubber binder drops below 375 F, reheat before use. If you add more scrap tire CRM to the reheated asphalt rubber binder, the binder must undergo a 45-minute reaction period. The added scrap tire CRM must not exceed 10 percent of the total asphalt rubber binder weight. Reheated and reacted asphalt rubber binder must comply with the viscosity specifications for asphalt rubber binder in Section 39-1.02, Materials." Do not reheat asphalt rubber binder more than twice. 39-1.09 SUBGRADE, TACK COAT, AND GEOSYNTHETIC PAVEMENT INTERLAYER 39-1.09A General Prepare subgrade or apply tack coat to surfaces receiving HMA. If specified, place geosynthetic pavement interlayer over a coat of asphalt binder. 39-1.09B Subgrade Subgrade to receive HMA must comply with the compaction and elevation tolerance specifications in the sections for the material involved. Subgrade must be free of loose and extraneous material. If HMA is paved on existing base or pavement, remove loose paving particles, dirt, and other extraneous material by any means including flushing and sweeping. 39-1.09C Tack Coat Apply tack coat: 1. To existing pavement including planed surfaces 2. Between HMA layers 3. To vertical surfaces of- 3. 1. Curbs 3.2. Gutters 3.3. Construction joints Before placing HMA, apply tack coat in 1 application at the minimum residual rate specified for the condition of the underlying surface: Book One- State Route 68 at San Benancio Road Intersection Improvements 156 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??? Minimum Re sidual Rates gallons per square yard) CSS1/CSSIh, CRS1/CRS2, Asphalt Binder and SS1/SSlh and RS1/RS2 and PMRS2/PMCRS2 HMA over: QS1h/CQSlh QS1/CQS1 and Asphaltic Asphaltic PMRS2h/PMCRS2h Emulsion Emulsion As haltic Emulsion New HMA between layers) 0.02 0.03 0.02 Existing AC and PCC pavement 0.03 0.04 0.03 Planed pavement 0.05 0.06 0.04 Minimum Re sidual Rates allons per square yard) CSS1/CSS1h, CRS1/CRS2, Asphalt Binder and SS1/SSlh and RS1/RS2 and PMRS2/PMCRS2 OGFC over: QS1h/CQS1h QS1/CQS1 and Asphaltic Asphaltic PMRS2h/PMCRS2h Emulsion Emulsion Asphaltic Emulsion New HMA 0.03 0.04 0.03 Existing AC and PCC pavement 0.05 0.06 0.04 Planed pavement 0.06 0.07 0.05 If you dilute asphaltic emulsion, mix until homogeneous before application. Apply to vertical surfaces with a residual tack coat rate that will thoroughly coat the vertical face without running off. If you request in writing and the Engineer authorizes, you may: 1. Change tack coat rates 2. Omit tack coat between layers of new HMA during the same work shift if- 2. 1. No dust, dirt, or extraneous material is present 2.2. The surface is at least 140 F Immediately in advance of placing HMA, apply additional tack coat to damaged areas or where loose or extraneous material is removed. Close areas receiving tack coat to traffic. Do not track tack coat onto pavement surfaces beyond the job site. Asphalt binder tack coat must be between 285 F and 350 F when applied. 39-1.09D Geosynthetic Pavement Interlayer Place geosynthetic pavement interlayer in compliance with the manufacturer's recommendations. Before placing the geosynthetic pavement interlayer and asphalt binder: 1. Repair cracks 1/4 inch and wider, spalls, and holes in the pavement. The State pays for this repair work under Section 4-1.03D, Extra Work." 2. Clean the pavement of loose and extraneous material. Immediately before placing the interlayer, apply 0.25 gallon 0.03 gallon of asphalt binder per square yard of interlayer or until the fabric is saturated. Apply asphalt binder the width of the geosynthetic pavement interlayer plus 3 inches on each side. At interlayer overlaps, apply asphalt binder on the lower interlayer the same overlap distance as the upper interlayer. Tack Coat Application Rates for HMA Type A, Type B, and RHMA-G Tack Coat Application Rates for OGFC Book One- State Route 68 at San Benancio Road Intersection Improvements 157 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Align and place the interlayer with no overlapping wrinkles, except a wrinkle that overlaps may remain if it is less than 1/2 inch thick. If the overlapping wrinkle is more than 1/2 inch thick, cut the wrinkle out and overlap the interlayer no more than 2 inches. The minimum HMA thickness over the interlayer must be 0.12 foot thick including conform tapers. Do not place the interlayer on a wet or frozen surface. Overlap the interlayer borders between 2 inches and 4 inches. In the direction of paving, overlap the following roll with the preceding roll at any break. You may use rolling equipment to correct distortions or wrinkles in the interlayer. If asphalt binder tracked onto the interlayer or brought to the surface by construction equipment causes interlayer displacement, cover it with a small quantity of HMA. Before placing HMA on the interlayer, do not expose the interlayer to: 1. Traffic except for crossings under traffic control and only after you place a small HMA quantity 2. Sharp turns from construction equipment 3. Damaging elements Pave HMA on the interlayer during the same work shift. 39-1.10 SPREADING AND COMPACTING EQUIPMENT Paving equipment for spreading must be: 1. Self-propelled 2. Mechanical 3. Equipped with a screed or strike-off assembly that can distribute HMA the full width of a traffic lane 4. Equipped with a full-width compacting device 5. Equipped with automatic screed controls and sensing devices that control the thickness, longitudinal grade, and transverse screed slope Install and maintain grade and slope references. The screed must produce a uniform HMA surface texture without tearing, shoving, or gouging. The paver must not leave marks such as ridges and indentations unless you can eliminate them by rolling. Rollers must be equipped with a system that prevents HMA from sticking to the wheels. You may use a parting agent that does not damage the HMA or impede the bonding of layers. In areas inaccessible to spreading and compacting equipment: 1. Spread the HMA by any means to obtain the specified lines, grades and cross sections. 2. Use a pneumatic tamper, plate compactor, or equivalent to achieve thorough compaction. 39-1.11 TRANSPORTING, SPREADING, AND COMPACTING Do not pave HMA on a wet pavement or frozen surface. You may deposit HMA in a windrow and load it in the paver if: 1. Paver is equipped with a hopper that automatically feeds the screed 2. Loading equipment can pick up the windrowed material and deposit it in the paver hopper without damaging base material 3. Activities for deposit, pick-up, loading, and paving are continuous Book One- State Route 68 at San Benancio Road Intersection Improvements 158 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???4. HMA temperature in the windrow does not fall below 260 F You may pave HMA in 1 or more layers on areas less than 5 feet wide and outside the traveled way including shoulders. You may use mechanical equipment other than a paver for these areas. The equipment must produce a uniform smoothness and texture. HMA handled, spread, or windrowed must not stain the finished surface of any improvement including pavement. Do not use petroleum products such as kerosene or diesel fuel to release HMA from trucks, spreaders, or compactors. HMA must be free of. 1. Segregation 2. Coarse or fine aggregate pockets 3. Hardened lumps Longitudinal joints in the top layer must match specified lane edges. Alternate longitudinal joint offsets in lower layers at least 0.5 foot from each side of the specified lane edges. You may request in writing other longitudinal joint placement patterns. Until the adjoining through lane's top layer has been paved, do not pave the top layer of: 1. Shoulders 2. Tapers 3. Transitions 4. Road connections 5. Driveways 6. Curve widenings 7. Chain control lanes 8. Turnouts 9. Turn pockets If the number of lanes change, pave each through lane's top layer before paving a tapering lane's top layer. Simultaneous to paving a through lane's top layer, you may pave an adjoining area's top layer including shoulders. Do not operate spreading equipment on any area's top layer until completing final compaction. If HMA leveling) is specified, fill and level irregularities and ruts with HMA before spreading HMA over base, existing surfaces, or bridge decks. You may use mechanical equipment other than a paver for these areas. The equipment must produce a uniform smoothness and texture. HMA used to change an existing surface's cross slope or profile is not HMA leveling). If placing HMA against the edge of existing pavement, sawcut or grind the pavement straight and vertical along the joint and remove extraneous material without damaging the surface remaining in place. If placing HMA against the edge of a longitudinal or transverse construction joint and the joint is damaged or not placed to a neat line, sawcut or grind the pavement straight and vertical along the joint and remove extraneous material without damaging the surface remaining in place. Repair or remove and replace damaged pavement at your expense. Rolling must leave the completed surface compacted and smooth without tearing, cracking, or shoving. Complete finish rolling activities before the pavement surface temperature is: 1. Below 150 F for HMA with unmodified binder 2. Below 140 F for HMA with modified binder Book One- State Route 68 at San Benancio Road Intersection Improvements 159 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???3. Below 200 F for RHMA-G If a vibratory roller is used as a finish roller, turn the vibrator off. Do not use a pneumatic tired roller to compact RHMA-G. For Standard and QC/QA, if a 3/4-inch aggregate grading is specified, you may use a 1/2- inch aggregate grading if the specified paved thickness is from 0.15 foot to 0.20 foot thick. Spread and compact HMA under Section 39-3.03, Spreading and Compacting Equipment," and Section 39-3.04, Transporting, Spreading, and Compacting," for any of the following: 1. Specified paved thickness is less than 0.15 foot. 2. Specified paved thickness is less than 0.20 foot and a 3/4-inch aggregate grading is specified and used. 3. You spread and compact at: 3.1. Asphalt concrete surfacing replacement areas 3.2. Leveling courses 3.3. Areas the Engineer determines conventional compaction and compaction measurement methods are impeded Do not allow traffic on new HMA pavement until its mid-depth temperature is below 160 F. If you request in writing and the Engineer authorizes, you may cool HMA Type A and Type B with water when rolling activities are complete. Apply water under Section 17, Watering." Spread sand at a rate between 1 pound and 2 pounds per square yard on new RHMA-G, RHMA-O, and RHMA-O-HB pavement when finish rolling is complete. Sand must be free of clay or organic matter. Sand must comply with Section 90-3.03, Fine Aggregate Grading." Keep traffic off the pavement until spreading sand is complete. 39-1.12 SMOOTHNESS 39-1.12A General Determine HMA smoothness with a profilograph and a straightedge. Smoothness specifications do not apply to OGFC placed on existing pavement not constructed under the same project. If portland cement concrete is placed on HMA: 1. Cold plane the HMA finished surface to within specified tolerances if it is higher than the grade specified by the Engineer. 2. Remove and replace HMA if the finished surface is lower than 0.05 foot below the grade specified by the Engineer. 39-1.12B Straightedge The HMA pavement top layer must not vary from the lower edge of a 12-foot long straightedge: 1. More than 0.01 foot when the straight edge is laid parallel with the centerline 2. More than 0.02 foot when the straightedge is laid perpendicular to the centerline and extends from edge to edge of a traffic lane 3. More than 0.02 foot when the straightedge is laid within 24 feet of a pavement conform Book One- State Route 68 at San Benancio Road Intersection Improvements 160 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???39-1.12C Profilograph Under California Test 526, determine the zero null) blanking band Profile Index Plo) and must-grinds on the top layer of HMA Type A, Type B, and RHMA-G pavement. Take 2 profiles within each traffic lane, 3 feet from and parallel with the edge of each lane. A must-grind is a deviation of 0.3 inch or more in a length of 25 feet. You must correct must-grinds. For OGFC, only determine must-grinds when placed over HMA constructed under the same project. The top layer of the underlying HMA must comply with the smoothness specifications before placing OGFC. Profile pavement in the Engineer's presence. Choose the time of profiling. On tangents and horizontal curves with a centerline radius of curvature 2,000 feet or more, the Plo must be at most 3 inches per 0.1-mile section. On horizontal curves with a centerline radius of curvature between 1,000 feet and 2,000 feet including pavement within the superelevation transitions, the Plo must be at most 6 inches per 0.1-mile section. Before the Engineer accepts HMA pavement for smoothness, submit written final profilograms. Submit 1 electronic copy of profile information in Microsoft Excel and 1 electronic copy of longitudinal pavement profiles in erd" format or other ProVAL compatible format to the Engineer and to: Smoothness@dot.ca.gov The following HMA pavement areas do not require a PIo. You must measure these areas with a 12-foot straightedge and determine must-grinds with a profilograph: 1. New HMA with a total thickness less than or equal to 0.25 foot 2. HMA sections of city or county streets and roads, turn lanes and collector lanes that are less than 1,500 feet in length The following HMA pavement areas do not require a Plo. You must measure these areas with a 12-foot straightedge: 1. Horizontal curves with a centerline radius of curvature less than 1,000 feet including pavement within the superelevation transitions of those curves 2. Within 12 feet of a transverse joint separating the pavement from: 2.1. Existing pavement not constructed under the same project 2.2. A bridge deck or approach slab 3. Exit ramp termini, truck weigh stations, and weigh-in-motion areas 4. If steep grades and superelevation rates greater than 6 percent are present on: 4.1. Ramps 4.2. Connectors 5. Turn lanes 6. Areas within 15 feet of manholes or drainage transitions 7. Acceleration and deceleration lanes for at-grade intersections 8. Shoulders and miscellaneous areas Book One- State Route 68 at San Benancio Road Intersection Improvements 161 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???9. HMA pavement within 3 feet from and parallel to the construction joints formed between curbs, gutters, or existing pavement 39-1.12D Smoothness Correction If the top layer of HMA Type A, Type B, or RHMA-G pavement does not comply with the smoothness specifications, grind the pavement to within tolerances, remove and replace it, or place a layer of HMA. The Engineer must authorize your choice of correction before the work begins. Remove and replace the areas of OGFC not in compliance with the must-grind and straightedge specifications, except you may grind OGFC for correcting smoothness: 1. At a transverse joint separating the pavement from pavement not constructed under the same project 2. Within 12 feet of a transverse joint separating the pavement from a bridge deck or approach slab Corrected HMA pavement areas must be uniform rectangles with edges: 1. Parallel to the nearest HMA pavement edge or lane line 2. Perpendicular to the pavement centerline Measure the corrected HMA pavement surface with a profilograph and a 12-foot straightedge and correct the pavement to within specified tolerances. If a must-grind area or straightedged pavement cannot be corrected to within specified tolerances, remove and replace the pavement. On ground areas not overlaid with OGFC, apply fog seal coat under Section 37-1, Seal Coats." 39-1.13 MISCELLANEOUS AREAS AND DIKES Miscellaneous areas are outside the traveled way and include: 1. Median areas not including inside shoulders 2. Island areas 3. Sidewalks 4. Gutters 5. Gutter flares 6. Ditches 7. Overside drains 8. Aprons at the ends of drainage structures Spread miscellaneous areas in 1 layer and compact to the specified lines and grades. For miscellaneous areas and dikes: 1. Do not submit a JMF. 2. Choose the 3/8-inch or 1/2-inch HMA Type A and Type B aggregate gradations. 3. Minimum asphalt binder content must be 6.8 percent for 3/8-inch aggregate and 6.0 percent for 1/2-inch aggregate. If you request in writing and the Engineer authorizes, you may reduce the minimum asphalt binder content. 4. Choose asphalt binder Grade PG 70-10 or the same grade specified for HMA. Book One- State Route 68 at San Benancio Road Intersection Improvements 162 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???39-2 STANDARD 39-2.01 DESCRIPTION If HMA is specified as Standard, construct it under Section 39-1, General," this Section 39- 2, Standard," and Section 39-5, Measurement and Payment." 39-2.02 CONTRACTOR QUALITY CONTROL 39-2.02A Quality Control Plan Establish, implement, and maintain a Quality Control Plan QCP) for HMA. The QCP must describe the organization and procedures you will use to: 1. Control the quality characteristics 2. Determine when corrective actions are needed action limits) 3. Implement corrective actions When you submit the proposed JMF, submit the written QCP. You and the Engineer must discuss the QCP during the prepaving conference. The QCP must address the elements affecting HMA quality including: 1. Aggregate 2. Asphalt binder 3. Additives 4. Production 5. Paving The Engineer reviews each QCP within 5 business days from the submittal. Hold HMA production until the Engineer accepts the QCP in writing. The Engineer's QCP acceptance does not mean your compliance with the QCP will result in acceptable HMA. Section 39-1.05, Engineer's Acceptance," specifies HMA acceptance. 39-2.02B Quality Control Testing Perform sampling and testing at the specified frequency for the following quality characteristics: Book One- State Route 68 at San Benancio Road Intersection Improvements 163 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Minimum Ouali Control Standard Quality Test Minimum HMA Type Characteristic Method Sampling and A B RHMA-G OGFC Testing Frequency Aggregate gradationa CT 202 1 per 750 JMF b JMF JMF JMF t d Tolerance b Tolerance b Tolerance b Tolerance Sand equivalent CT 217 ons an 47 42 47 min.) any i i Asphalt binder CT 379 or rema n ng part JMF 0.45 JMF 0.45 JMF 0.50 JMF 0.50 content %) 382 HMA moisture CT 226 or 1 per 1.0 1.0 1.0 1.0 content %, max.) CT 370 2,500 tons but not less than I per paving day Percent of maximum Quality 2 per 91 97 91 97 91 97 theoretical density control business %) d, e plan day min.) Stabilometer value CT 366 One per min.) c f 4,000 tons No. 4 and 3/8" or 2 per 5 30 30 gradings business 1/2" and 3/4" days, 37 35 23 gradin s which- Air voids content CT 367 ever is 4+2 4 2 Specification %) c, B more 2 Aggregate moisture CT 226 or content at CT 370 continuous mixing plants and RAP 2 per day moisture content at during production continuous mixing plants and batch mixing plants h Percent of crushed CT 205 particles coarse aggregate %, min.) One fractured As 90 25 90 face Two fractured necessary 75 90 75 faces designat o Fine aggregate ed in the mi n) Passing No. 4 QCP. At sieve and least once retained on No. per project 8 sieve.) One fractured 70 20 70 90 face Los Angeles Rattler CT 211 %, max.) Loss at 100 rev. 12 12 12 Loss at 500 rev. 45 50 40 40 Flat and elongated ASTM D Report only Report only Report only Report only particles %, max. 4791 by weight 5:1) Book One- State Route 68 at San Benancio Road Intersection Improvements 164 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Fine aggregate AASHTO angularity %, min.) T 304, 45 45 45 Method A Voids filled with LP-3 asphalt %)' No. 4 grading 76.0-80.0 76.0-80.0 Report only 3/8" grading 73.0-76.0 73.0-76.0 1/2" grading 65.0-75.0 65.0-75.0 3/4" grading 65.0-75.0 65.0-75.0 Voids in mineral LP-2 aggregate % min.)' No. 4 grading 17.0 17.0 3/8" grading 15.0 15.0 1/2" grading 14.0 14.0 18.0 23.0 3/4" gradin 13.0 13.0 18.0 23.0 Dust proportion' LP-4 No. 4 and 3/8" gradings 0.9-2.0 0.9-2.0 Report only 1/2" and 3/4" gradings 0.6-1.3 0.6-1.3 Smoothness Section 12-foot 12-foot 12-foot 12-foot 39-1.12 straightedge, straightedge, straightedge, straightedge must-grind, must-grind, must-grind, and must- and PIo and PIo and Plo rind Asphalt rubber Section Section binder viscosity 39-1.02D 39-1.04C 1,500 4,000 1,500 4,000 350 F, centipoises Asphalt modifier Section Section Section 39- Section 39- 39-1.02D 39-1.04C 1.02D 1.02D Crumb rubber Section Section Section 39- Section 39- modifier 39-1.02D 39-1.04C 1.02D 1.02D Notes: a Determine combined aggregate gradation containing RAP under Laboratory Procedure LP-9. b The tolerances must comply with the allowable tolerances in Section 39-1.02E, Aggregate." Report the average of 3 tests from a single split sample. d Required for HMA Type A, Type B, and RHMA-G if the specified paved thickness is at least 0.15 foot. Determine maximum theoretical density California Test 309) at the frequency specified for Test Maximum Density under California Test 375, Part S.D. f Modify California Test 304, Part 2.B.2.c: After compaction in the mechanical compactor, cool to 140 F + 5 F by allowing the briquettes to cool at room temperature for 0.5 hour, then place the briquettes in the oven at 140 F for a minimum of 2 hours and not more than 3 hours." S Determine the bulk specific gravity of each lab-compacted briquette under California Test 308, Method A, and theoretical maximum specific gravity under California Test 309. h For adjusting the plant controller at the HMA plant. Report only if the adjustment for asphalt binder content target value is less than or equal to f 0.3 percent from OBC. Voids in mineral aggregate for RHMA-G must be within this range. For any single quality characteristic except smoothness, if 2 consecutive quality control test results do not comply with the action limits or specifications: 1. Stop production. 2. Notify the Engineer in writing. 3. Take corrective action. 4. Demonstrate compliance with the specifications before resuming production and placement on the State highway. Book One- State Route 68 at San Benancio Road Intersection Improvements 165 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???39-2.03 ENGINEER'S ACCEPTANCE 39-2.03A Testing The Engineer samples for acceptance testing and tests for: Book One- State Route 68 at San Benancio Road Intersection Improvements 166 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Quality Characteristic Test HMA Type Method A B RHMA-G OGFC Aggreg ate ra dation a CT 202 JMF JMF JMF JMF Sieve 3/4" 1/2" 3/8" Tolerance Tolerance Tolerance' Tolerance 1/2" X 3/8" X No. 4 X No.8 X X X No.200 X X X Sand equivalent min.) CT 217 47 42 47 Asphalt binder content %) CT 379 or JMF 0.45 JMF 0.45 JMF 0.50 JMF 0.50 382 HMA moisture content %, CT 226 or 1.0 1.0 1.0 1.0 max.) CT 370 Percent of maximum CT 375 91 97 91 97 91 97 theoretical density %) e, f Stabilometer value min.) s CT 366 No. 4 and 3/8" gradings 30 30 1/2" and 3/4" gradings 37 35 23 Air voids content CT 367 4 2 4 2 Specification 2 Percent of crushed particles CT 205 Coarse aggregate %, min.) One fractured face 90 25 90 Two fractured faces 75 90 75 Fine aggregate %, min) Passing No. 4 sieve and retained on No. 8 sieve.) One fractured face 70 20 70 90 Percent of crushed particles CT 205 Coarse aggregate %, min.) One fractured face 90 25 90 Two fractured faces 75 90 75 Los Angeles Rattler %, CT 211 max.) 12 12 12 Loss at 100 rev. 45 50 40 40 Loss at 500 rev. Fine aggregate angularity %, AASHTO min.) T 304, 45 45 45 Method A Flat and elongated particles ASTM D Report only Report only Report only Report only %, max. by weight 5:1) 4791 Voids filled with asphalt LP-3 No. 4 grading 76.0-80.0 76.0-80.0 Report only 3/8" grading 73.0-76.0 73.0-76.0 1/2" grading 65.0-75.0 65.0-75.0 3/4" grading 65.0-75.0 65.0-75.0 Voids in mineral aggregate LP-2 % min.)' No. 4 grading 17.0 17.0 3/8" grading 15.0 15.0 1/2" grading 14.0 14.0 18.0 23.0-'. 3/4" grading 13.0 13.0 18.0 23.0' Dust proportion' LP-4 No. 4 and 3/8" gradings 0.9-2.0 0.9-2.0 Report only 1/2" and 3/4" gradings 0.6-1.3 0.6-1.3 Smoothness Section 12-foot 12-foot 12-foot 12-foot HMA Acceptance Standard Book One- State Route 68 at San Benancio Road Intersection Improvements 167 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??? 39-1.12 straightedge, straightedge, straightedge, straightedge must-grind, must-grind, and must-grind, and and must-grind and PIo Plo PIo Asphalt binder Various Section 92 Section 92 Section 92 Section 92 Asphalt rubber binder Various Section 92- Section 92- 1.02(C) and 1.02(C) and Section 39- Section 39- 1.02D 1.02D Asphalt modifier Various Section 39- Section 39- 1.02D 1.02D Crumb rubber modifier Various Section 39- Section 39- 1.02D 1.02D a The Engineer determines combined aggregate gradations containing RAP under Laboratory Procedure LP-9. b X" denotes the sieves the Engineer considers for the specified aggregate gradation. The tolerances must comply with the allowable tolerances in Section 39-1.02E, Aggregate." d The Engineer reports the average of 3 tests from a single split sample. The Engineer determines percent of maximum theoretical density if the specified paved thickness is at least 0.15 foot under California Test 375 except the Engineer uses: 1. California Test 308, Method A, to determine in-place density of each density core instead of using the nuclear gauge in Part 4, Determining In-Place Density By The Nuclear Density Device." 2. California Test 309 to determine maximum theoretical density instead of calculating test maximum density in Part 5, Determining Test Maximum Density." f The Engineer determines maximum theoretical density California Test 309) at the frequency specified for Test Maximum Density under California Test 375, Part 5.D. S Modify California Test 304, Part 2.B.2.c: After compaction in the mechanical compactor, cool to 140 F 5 F by allowing the briquettes to cool at room temperature for 0.5 hour, then place the briquettes in the oven at 140 F for a minimum of 2 hours and not more than 3 hours." h The Engineer determines the bulk specific gravity of each lab-compacted briquette under California Test 308, Method A, and theoretical maximum specific gravity under California Test 309. Report only if the adjustment for asphalt binder content target value is less than or equal to 0.3 percent from OBC. Voids in mineral aggregate for RHMA-G must be within this range. No single test result may represent more than the smaller of 750 tons or 1 day's production. For any single quality characteristic except smoothness, if 2 consecutive acceptance test results do not comply with the specifications: 1. Stop production. 2. Take corrective action. 3. In the Engineer's presence, take samples and split each sample into 4 parts. Test 1 part for compliance with the specifications and submit 3 parts to the Engineer. The Engineer tests 1 part for compliance with the specifications and reserves and stores 2 parts. 4. Demonstrate compliance with the specifications before resuming production and placement on the State highway. The Engineer tests the density core you take from each 250 tons of HMA production. The Engineer determines the percent of maximum theoretical density for each density core by determining the density core's density and dividing by the maximum theoretical density. If the specified total paved thickness is at least 0.15 foot and any layer is less than 0.15 foot, the Engineer determines the percent of maximum theoretical density from density cores taken from the final layer measured the full depth of the total paved HMA thickness. For percent of maximum theoretical density, the Engineer determines a deduction for each test result outside the specifications in compliance with: Book One- State Route 68 at San Benancio Road Intersection Improvements 168 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???HMA Type A and B and RHMA-G Percent of Maximum Theoretical Density Reduced Payment Factor HMA Type A and B and RHMA-G Percent of Maximum Theoretical Density Reduced Payment Factor 91.0 0.0000 97.0 0.0000 90.9 0.0125 97.1 0.0125 90.8 0.0250 97.2 0.0250 90.7 0.0375 97.3 0.0375 90.6 0.0500 97.4 0.0500 90.5 0.0625 97.5 0.0625 90.4 0.0750 97.6 0.0750 90.3 0.0875 97.7 0.0875 90.2 0.1000 97.8 0.1000 90.1 0.1125 97.9 0.1125 90.0 0.1250 98.0 0.1250 89.9 0.1375 98.1 0.1375 89.8 0.1500 98.2 0.1500 89.7 0.1625 98.3 0.1625 89.6 0.1750 98.4 0.1750 89.5 0.1875 98.5 0.1875 89.4 0.2000 98.6 0.2000 89.3 0.2125 98.7 0.2125 89.2 0.2250 98.8 0.2250 89.1 0.2375 98.9 0.2375 89.0 0.2500 99.0 0.2500 89.0 Remove and Replace 99.0 Remove and Replace 39-2.04 TRANSPORTING, SPREADING, AND COMPACTING Determine the number of rollers needed to obtain the specified density and surface finish. 39-3 METHOD 39-3.01 DESCRIPTION If HMA is specified as Method, construct it under Section 39-1, General," this Section 39-3, Method," and Section 39-5, Measurement and Payment." 39-3.02 ENGINEER'S ACCEPTANCE 39-3.02A Testing The Engineer samples for acceptance testing and tests for: Reduced Pay ment Factors for Percent of Maximum Theoretical Densi Book One- State Route 68 at San Benancio Road Intersection Improvements 169 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Quality Characteristic Test HMA Type Method A B RHMA-G OGFC Aggregate gradation a CT 202 JMF JMF JMF JMF Tolerance b Tolerance b Tolerance b Tolerance b Sand equivalent min.) C CT 217 47 42 47 Asphalt binder content %) CT 379 or JMF 0.45 JMF 0.45 JMF 0.50 JMF 0.50 382 HMA moisture content %, CT 226 or 1.0 1.0 1.0 1.0 max.) CT 370 Stabilometer value min.) C' CT 366 d No. 4 and 3/8" 30 30 gradings 1/2" and 3/4" gradings 37 35 23 Percent of crushed CT 205 particles Coarse aggregate % min.) One fractured face 90 25 90 Two fractured faces 75 90 75 Fine aggregate % min) Passing No. 4 sieve and retained on No. 8 sieve.) One fractured face 70 20 70 90 Los Angeles Rattler % CT 211 max.) Loss at 100 rev. 12 12 12 Loss at 500 rev. 45 50 40 40 Air voids content %) C. e CT 367 4 2 4 2 Specification 2 Fine aggregate angularity AASHTO % min.) T 304, 45 45 45 Method A Flat and elongated particles ASTM D % max. by weight 5:1) 4791 Report only Report only Report only Report only Voids filled with asphalt LP-3 %), Report only No. 4 grading 76.0-80.0 76.0-80.0 3/8" grading 73.0-76.0 73.0-76.0 1/2" grading 65.0-75.0 65.0-75.0 3/4" grading 65.0-75.0 65.0-75.0 Voids in mineral aggregate LP-2 % min.)' No. 4 grading 17.0 17.0 3/8" grading 15.0 15.0 1/2" grading 14.0 14.0 18.0-23.09 3/4" grading 13.0 13.0 18.0-23.09 Dust proportion LP-4 No. 4 and 3/8" 0.9-2.0 0.9-2.0 Report only gradings 0.6-1.3 0.6-1.3 1/2" and 3/4" gradin s Smoothness Section 12-foot 12-foot 12-foot 12-foot 39-1.12 straightedge straightedge straightedge straightedge and must-grind and must-grind and must-grind and must-grind Asphalt binder Various Section 92 Section 92 Section 92 Section 92 Asphalt rubber binder Various Section 92- Section 92- 1.02(C) and 1.02(C) and Section 39- Section 39- 1.02D 1.02D HMA Acceptance Method Book One- State Route 68 at San Benancio Road Intersection Improvements 170 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Asphalt modifier Various Section 39- Section 39- 1.02D 1.02D Crumb rubber modifier Various Section 39- Section 39- 1.02D 1.02D a The Engineer determines combined aggregate gradations containing RAP under Laboratory Procedure LP-9. b The tolerances must comply with the allowable tolerances in Section 39-1.02E, Aggregate." The Engineer reports the average of 3 tests from a single split sample. d Modify California Test 304, Part 2.B.2.c: After compaction in the mechanical compactor, cool to 140 F 5 F by allowing the briquettes to cool at room temperature for 0.5 hour, then place the briquettes in the oven at 140 F for a minimum of 2 hours and not more than 3 hours." The Engineer determines the bulk specific gravity of each lab-compacted briquette under California Test 308, Method A, and theoretical maximum specific gravity under California Test 309. f Report only if the adjustment for asphalt binder content target value is less than or equal to 0.3 percent from OBC. t: Voids in mineral aggregate for RHMA-G must be within this range. No single test result may represent more than the smaller of 750 tons or 1 day's production. For any single quality characteristic except smoothness, if 2 consecutive acceptance test results do not comply with the specifications: 1. Stop production. 2. Take corrective action. 3. In the Engineer's presence, take samples and split each sample into 4 parts. Test 1 part for compliance with the specifications and submit 3 parts to the Engineer. The Engineer tests 1 part for compliance with the specifications and reserves and stores 2 parts. 4. Demonstrate compliance with the specifications before resuming production and placement on the State highway. 39-3.03 SPREADING AND COMPACTING EQUIPMENT Each paver spreading HMA Type A and Type B must be followed by 3 rollers: 1. One vibratory roller specifically designed to compact HMA. The roller must be capable of at least 2,500 vibrations per minute and must be equipped with amplitude and frequency controls. The roller's gross static weight must be at least 7.5 tons. 2. One oscillating type pneumatic-tired roller at least 4 feet wide. Pneumatic tires must be of equal size, diameter, type, and ply. The tires must be inflated to 60 psi minimum and maintained so that the air pressure does not vary more than 5 psi. 3. One steel-tired, 2-axle tandem roller. The roller's gross static weight must be at least 7.5 tons. Each roller must have a separate operator. Rollers must be self-propelled and reversible. Compact RHMA-G under the specifications for compacting HMA Type A and Type B except do not use pneumatic-tired rollers. Compact OGFC with steel-tired, 2-axle tandem rollers. If placing over 300 tons of OGFC per hour, use at least 3 rollers for each paver. If placing less than 300 tons of OGFC per hour, use at least 2 rollers for each paver. Each roller must weigh between 126 pounds to 172 pounds per linear inch of drum width. Turn the vibrator off. 39-3.04 TRANSPORTING, SPREADING, AND COMPACTING Pave HMA in maximum 0.25-foot thick compacted layers. If the surface to be paved is both in sunlight and shade, pavement surface temperatures are taken in the shade. Book One- State Route 68 at San Benancio Road Intersection Improvements 171 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Spread HMA Type A and Type B only if atmospheric and surface temperatures are: Compacted Layer Thickness, feet Atmos heric,? F Surface,? F Unmodified Asphalt Binder Modified Asphalt Binders Unmodified Asphalt Binder Modified Asphalt Binder a 0.15 55 50 60 55 0.15-0.25 45 45 50 50 Note: a Except asphalt rubber binder. If the asphalt binder for HMA Type A and Type B is: 1. Unmodified asphalt binder, complete: 1.1. First coverage of breakdown compaction before the surface temperature drops below 250 OF 1.2. Breakdown and intermediate compaction before the surface temperature drops below 200 OF 1.3. Finish compaction before the surface temperature drops below 150 OF 2. Modified asphalt binder, complete: 2.1. First coverage of breakdown compaction before the surface temperature drops below 240 OF 2.2. Breakdown and intermediate compaction before the surface temperature drops below 180 OF 2.3. Finish compaction before the surface temperature drops below 140 OF For RHMA-G: 1. Only spread and compact if the atmospheric temperature is at least 55 OF and the surface temperature is at least 60 OF. 2. Complete the first coverage of breakdown compaction before the surface temperature drops below 280 OF. 3. Complete breakdown and intermediate compaction before the surface temperature drops below 250 OF. 4. Complete finish compaction before the surface temperature drops below 200 OF. 5. If the atmospheric temperature is below 70 OF, cover loads in trucks with tarpaulins. The tarpaulins must completely cover the exposed load until you transfer the mixture to the paver's hopper or to the pavement surface. For OGFC with unmodified asphalt binder: 1. Only spread and compact if the atmospheric temperature is at least 55 OF and the surface temperature is at least 60 OF. 2. Complete first coverage using 2 rollers before the surface temperature drops below 240 OF. 3. Complete all compaction before the surface temperature drops below 200 OF. Minimum Atmospheric and Surface Temperatures Book One- State Route 68 at San Benancio Road Intersection Improvements 172 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???4. If the atmospheric temperature is below 70 OF, cover loads in trucks with tarpaulins. The tarpaulins must completely cover the exposed load until you transfer the mixture to the paver's hopper or to the pavement surface. For OGFC with modified asphalt binder except asphalt rubber binder: 1. Only spread and compact if the atmospheric temperature is at least 50 OF and the surface temperature is at least 50 OF. 2. Complete first coverage using 2 rollers before the surface temperature drops below 240 OF. 3. Complete all compaction before the surface temperature drops below 180 OF. 4. If the atmospheric temperature is below 70 OF, cover loads in trucks with tarpaulins. The tarpaulins must completely cover the exposed load until you transfer the mixture to the paver's hopper or to the pavement surface. For RHMA-O and RHMA-O-HB: 1. Only spread and compact if the atmospheric temperature is at least 55 OF and surface temperature is at least 60 OF. 2 Complete the 1st coverage using 2 rollers before the surface temperature drops below 280 OF. 3. Complete compaction before the surface temperature drops below 250 OF. 4. If the atmospheric temperature is below 70 OF, cover loads in trucks with tarpaulins. The tarpaulins must completely cover the exposed load until the mixture is transferred to the paver's hopper or to the pavement surface. For RHMA-G and OGFC, tarpaulins are not required if the time from discharge to truck until transfer to the paver's hopper or the pavement surface is less than 30 minutes. HMA compaction coverage is the number of passes needed to cover the paving width. A pass is 1 roller's movement parallel to the paving in either direction. Overlapping passes are part of the coverage being made and are not a subsequent coverage. Do not start a coverage until completing the prior coverage. Start rolling at the lower edge and progress toward the highest part. Perform breakdown compaction of each layer of HMA Type A, Type B, and RHMA-G with 3 coverages using a vibratory roller. The speed of the vibratory roller in miles per hour must not exceed the vibrations per minute divided by 1,000. If the HMA layer thickness is less than 0.08 foot, turn the vibrator off. The Engineer may order fewer coverages if the HMA layer thickness is less than 0.15 foot. Perform intermediate compaction of each layer of HMA Type A and Type B with 3 coverages using a pneumatic-tired roller at a speed not to exceed 5 mph. Perform finish compaction of HMA Type A, Type B, and RHMA-G with 1 coverage using a steel-tired roller. Compact OGFC with 2 coverages using steel-tired rollers. 39-4 QUALITY CONTROL / QUALITY ASSURANCE 39-4.01 DESCRIPTION If HMA is specified as Quality Control / Quality Assurance, construct it under Section 39-1, General," this Section 39-4, Quality Control / Quality Assurance," and Section 39-5, Measurement and Payment." Book One- State Route 68 at San Benancio Road Intersection Improvements 173 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???39-4.02 GENERAL The QC / QA construction process consists of 1. Establishing, maintaining, and changing if needed a quality control system providing assurance the HMA complies with the specifications 2. Sampling and testing at specified intervals, or sublots, to demonstrate compliance and to control process 3. The Engineer sampling and testing at specified intervals to verify testing process and HMA quality 4. The Engineer using test results, statistical evaluation of verified quality control tests, and inspection to accept HMA for payment A lot is a quantity of HMA. The Engineer designates a new lot when: 1. 20 sublots are complete 2. The JMF changes 3. Production stops for more than 30 days Each lot consists of no more than 20 sublots. A sublot is 750 tons except HMA paved at day's end greater than 250 tons is a sublot. If HMA paved at day's end is less than 250 tons, you may either make this quantity a sublot or include it in the previous sublot's test results for statistical evaluation. 39-4.03 CONTRACTOR QUALITY CONTROL 39-4.03A General Use a composite quality factor, QFc, and individual quality factors, QFQCi, to control your process and evaluate your quality control program. For quality characteristics without quality factors, use your quality control plan's action limits to control process. Control HMA quality including: 1. 2. 3. 4. Materials Proportioning Spreading and compacting Finished roadway surface Develop, implement, and maintain a quality control program that includes: 1. Inspection 2. Sampling 3. Testing 39-4.03B Quality Control Plan With the JMF submittal, submit a written Quality Control Plan QCP). The QCP must comply with the Department's Quality Control Manual for Hot Mix Asphalt Production and Placement. Discuss the QCP with the Engineer during the prepaving conference. The Engineer reviews each QCP within 5 business days from the submittal. Hold HMA production until the Engineer accepts the QCP in writing. The Engineer's QCP acceptance does not mean your compliance with the QCP will result in acceptable HMA. Section 39-1.05, Engineer's Acceptance," specifies HMA acceptance. Book One- State Route 68 at San Benancio Road Intersection Improvements 174 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The QCP must include the name and qualifications of a Quality Control Manager. The Quality Control Manager administers the QCP and during paving must be at the job site within 3 hours of receiving notice. The Quality Control Manager must not be any of the following on the project: 1. Foreman 2. Production or paving crewmember 3. Inspector 4. Tester The QCP must include action limits and details of corrective action you will take if a test result for any quality characteristic falls outside an action limit. As work progresses, you must submit a written QCP supplement to change quality control procedures, personnel, tester qualification status, or laboratory accreditation status. 39-4.03C Quality Control Inspection, Sampling, And Testing Sample, test, inspect, and manage HMA quality control. Provide a roadway inspector while HMA paving activities are in progress. Provide a plant inspector during HMA production. Inspectors must comply with the Department's Quality Control Manual for Hot Mix Asphalt Production and Placement. Provide a testing laboratory and personnel for quality control testing. Provide the Engineer unrestricted access to the quality control activities. Before providing services for the project, the Engineer reviews, accredits, and qualifies the testing laboratory and personnel under the Department's Independent Assurance Program. The minimum random sampling and testing for quality control is: Book One- State Route 68 at San Benancio Road Intersection Improvements 175 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Quality Test Min- HMA Type Location Max. Characteristic Method imum of Report- Sampl- Sampling ing Time ing and Allow- Testing ance Frequen A B RHMA-G cy Aggregate CT 202 JMF JMF b JMF b CT 125 gradation a b Tolerance Tolerance Tolerance Loose Mix Asphalt binder CT 379 or 1 per JMF 0.45 JMF 0.45 JMF 0.5 Behind content %) 382 750 tons Paver 24 hours See CT 125 Percent of maximum theoretical density QC Plan 92 96 92 96 91 96 QC Plan %) C,d Aggregate moisture content at continuous mixing plants and 2 per Stock- RAP CT 226 or piles or c onttent at continuous CT 370 during cold feed mixing plants and produc- belts batch mixing plants e tion Sanndj quivalent CT 217 750tons 47 42 47 CT 125 24 hours 1 per 2,500 tons but HMA moisture CT 226 or not less 1.0 1.0 1.0 24 hours content %,max.) CT 370 than 1 per Loose paving Mix day hi B d Stabilometer 1 per e n Paver Value min.) f g 4,000 See CT No. 4 and 3/8" CT 366 tons or 30 30 125 gradings 2 per 5 1/2" and 3/4" bus- 37 35 23 48 hours gradings iness days, Air voids content CT 367 which- 4 2 4 2 Specifica- %)f h ever is tion 2 more Minimum Quality Control QC / QA Book One- State Route 68 at San Benancio Road Intersection Improvements 176 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Percent of crushed particles coarse aggregate % min.) One fractured face 90 25 Two fractured faces 75 90 Fine aggregate % CT 205 CT 125 min) Passing No. 4 sieve and retained on No. 8 sieve.) One fractured 70 20 70 face Los Angeles Rattler % max.) Loss at 100 rev. CT 211 As 12 12 CT 125 Loss at 500 rev. neces- 45 50 40 AASHTO sary and Fine aggregate T 304, designat 45 45 45 CT 125 angularity % min.) Method A ed in Flat and elongated ASTM D QCP. At least Report Report Report particle % o max. by 4791 er once only only only CT 125 48 hours weight 5:1) p Voids filled with project. asphalt %)' No. 4 grading LP 3 76.0-80.0 76.0-80.0 Report only LP-3 3/8" grading 73.0-76.0 73.0-76.0 1/2" grading 65.0-75.0 65.0-75.0 3/4" grading 65.0-75.0 65.0-75.0 Voids in mineral aggregate % min.)' No. 4 grading LP 2 17.0 17.0 LP-2 3/8" grading 15.0 15.0 1/2" grading 14.0 14.0 18.0 23.0' 3/4" grading 13.0 13.0 18.0-23.01 Dust proportion' No. 4 and 3/8" 0.9-2.0 0.9-2.0 Report only gradings LP-4 0.6-1.3 0.6-1.3 LP-4 1/2" and 3/4" gradings Smoothness 12-foot 12-foot 12-foot straight- straight- straight- Section edge, edge, must- edge, must- 39-1.12 must- grind, and grind, and grind, and Plo PIa Plo Asphalt rubber Section 1,500- Section 24 hours binder viscosity 39-1.02D 4,000 39-1.02D 350 F, centipoises Crumb rubber Section Section 39- Section 48 hours modifier 39-1.02D 1.02D 39-1.02D Notes: a Determine combined aggregate gradation containing RAP under Laboratory Procedure LP-9. b The tolerances must comply with the allowable tolerances in Section 39-1.02E, Aggregate." Required for HMA Type A, Type B, and RHMA-G if the specified paved thickness is at least 0.15 foot. d Determine maximum theoretical density California Test 309) at the frequency specified for test maximum density under California Test 375, Part 5 D. For adjusting the plant controller at the HMA plant. Book One- State Route 68 at San Benancio Road Intersection Improvements 177 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???f Report the average of 3 tests from a single split sample. E Modify California Test 304, Part 2.B.2.c: After compaction in the mechanical compactor, cool to 140 IF 5 IF by allowing the briquettes to cool at room temperature for 0.5 hour, then place the briquettes in the oven at 140 IF for a minimum of 2 hours and not more than 3 hours." h Determine the bulk specific gravity of each lab-compacted briquette under California Test 308, Method A, and theoretical maximum specific gravity under California Test 309. Report only if the adjustment for asphalt binder content target value is less than or equal to 0.3 percent from OBC. Voids in mineral aggregate for RHMA-G must be within this range. Within the specified reporting time, submit written test results including: 1. Sampling location, quantity, and time 2. Testing results 3. Supporting data and calculations If test results for any quality characteristic are beyond the action limits in the QCP, take corrective actions. Document the corrective actions taken in the inspection records under Section 39-4.03E, Records of Inspection and Testing." Stop production, notify the Engineer in writing, take corrective action, and demonstrate compliance with the specifications before resuming production and placement on the State highway if: 1. A lot's composite quality factor, QFC, or an individual quality factor, QFQCi for i 3, 4, or 5, is below 0.90 determined under Section 39-4.03F, Statistical Evaluation" 2. An individual quality factor, QFQCi for i 1 or 2, is below 0.75 3. Quality characteristics for which a quality factor, QFQCi, is not determined has 2 consecutive acceptance or quality control tests not in compliance with the specifications 39-4.03D Charts And Records Record sampling and testing results for quality control on forms provided in the Quality Control Manual for Hot Mix Asphalt," or on forms you submit with the QCP. The QCP must also include form posting locations and submittal times. Submit quality control test results using the Department's statistical evaluation program, HMAPay, available at www.dot.ca.gov/hq/construc/hma/index.htm 39-4.03E Records Of Inspection And Testing During HMA production, submit in writing a daily: 1. HMA Construction Daily Record of Inspection. Also make this record available at the HMA plant and job site each day. 2. HMA Inspection and Testing Summary. Include in the summary: 2.1. Test forms with the testers' signatures and Quality Control Manager's initials. 2.2. Inspection forms with the inspectors' signatures and Quality Control Manager's initials. 2.3. A list and explanation of deviations from the specifications or regular practices. 2.4. A signed statement by the Quality Control Manager that says: Book One- State Route 68 at San Benancio Road Intersection Improvements 178 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???It is hereby certified that the information contained in this record is accurate, and that information, tests, or calculations documented herein comply with the specifications of the contract and the standards set forth in the testing procedures. Exceptions to this certification are documented as part of this record." Retain for inspection the records generated as part of quality control including inspection, sampling, and testing for at least 3 years after final acceptance. 39-4.03F Statistical Evaluation General Determine a lot's composite quality factor, QFc, and the individual quality factors, QFQCi. Perform statistical evaluation calculations to determine these quality factors based on quality control test results for: 1. Aggregate gradation 2. Asphalt binder content 3. Percent of maximum theoretical density The Engineer grants a waiver and you must use 1.0 as the individual quality factor for percent of maximum theoretical density, QFQC5, for HMA paved in: 1. Areas where the specified paved thickness is less than 0.15 foot 2. Areas where the specified paved thickness is less than 0.20 foot and a 3/4-inch grading is specified and used 3. Dig outs 4. Leveling courses 5. Areas where, in the opinion of the Engineer, compaction or compaction measurement by conventional methods is impeded Statistical Evaluation Calculations Use the Variability-Unknown / Standard Deviation Method to determine the percentage of a lot not in compliance with the specifications. The number of significant figures used in the calculations must comply with AASHTO R- 11, Absolute Method. Determine the percentage of work not in compliance with the specification limits for each quality characteristic as follows: 1. Calculate the arithmetic mean X) of the test values where: x individual test values n number of test values 2. Calculate the standard deviation n Ex2)-(Ex) 2 S n(n-1) Book One- State Route 68 at San Benancio Road Intersection Improvements 179 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???where: y(x2) sum of the squares of individual test values x)2 sum of the individual test values squared n number of test values 3. Calculate the upper quality index Qu) USL Qu S where: USL target value plus the production tolerance or upper specification limit s standard deviation X arithmetic mean 4. Calculate the lower quality index QL); X LSL where: LSL target value minus production tolerance or lower specification limit s standard deviation X arithmetic mean 5. From the table, Upper Quality Index Qu or Lower Quality Index QL, of this Section 39- 4.03F, Statistical Evaluation", determine Pu; where: Pu the estimated percentage of work outside the USL. PU 0, when USL is not specified. 6. From the table, Upper Quality Index Qu or Lower Quality Index QL, of this Section 39- 4.03F, Statistical Evaluation," determine PL; where: PL the estimated percentage of work outside the LSL. PL 0, when LSL is not specified. 7. Calculate the total estimated percentage of work outside the USL and LSL, percent defective Percent defective PU + PL Pu and PL are determined from: Book One- State Route 68 at San Benancio Road Intersection improvements 180 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???PU Upper Quality Index Qu or Lower Quality Index QL or Sam le Size n) PL 5 6 7 8 9 10-11 12-14 15-17 18-22 23-29 30-42 43-66 66 0 1.72 1.88 1.99 2.07 2.13 2.20 2.28 2.34 2.39 2.44 2.48 2.51 2.56 1 1.64 1.75 1.82 1.88 1.91 1.96 2.01 2.04 2.07 2.09 2.12 2.14 2.16 2 1.58 1.66 1.72 1.75 1.78 1.81 1.84 1.87 1.89 1.91 1.93 1.94 1.95 3 1.52 1.59 1.63 1.66 1.68 1.71 1.73 1.75 1.76 1.78 1.79 1.80 1.81 4 1.47 1.52 1.56 1.58 1.60 1.62 1.64 1.65 1.66 1.67 1.68 1.69 1.70 5 1.42 1.47 1.49 1.51 1.52 1.54 1.55 1.56 1.57 1.58 1.59 1.59 1.60 6 1.38 1.41 1.43 1.45 1.46 1.47 1.48 1.49 1.50 1.50 1.51 1.51 1.52 7 1.33 1.36 1.38 1.39 1.40 1.41 1.41 1.42 1.43 1.43 1.44 1.44 1.44 8 1.29 1.31 1.33 1.33 1.34 1.35 1.35 1.36 1.36 1.37 1.37 1.37 1.38 9 1.25 1.27 1.28 1.28 1.29 1.29 1.30 1.30 1.30 1.31 1.31 1.31 1.31 10 1.21 1.23 1.23 1.24 1.24 1.24 1.25 1.25 1.25 1.25 1.25 1.26 1.26 11 1.18 1.18 1.19 1.19 1.19 1.19 1.20 1.20 1.20 1.20 1.20 1.20 1.20 12 1.14 1.14 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 13 1.10 1.10 1.10 1.10 1.10 1.10 1.11 1.11 1.11 1.11 1.11 1.11 1.11 14 1.07 1.07 1.07 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 15 1.03 1.03 1.03 1.03 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 16 1.00 0.99 0.99 0.99 0.99 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 17 0.97 0.96 0.95 0.95 0.95 0.95 0.94 0.94 0.94 0.94 0.94 0.94 0.94 18 0.93 0.92 0.92 0.92 0.91 0.91 0.91 0.91 0.90 0.90 0.90 0.90 0.90 19 0.90 0.89 0.88 0.88 0.88 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 20 0.87 0.86 0.85 0.85 0.84 0.84 0.84 0.83 0.83 0.83 0.83 0.83 0.83 21 0.84 0.82 0.82 0.81 0.81 0.81 0.80 0.80 0.80 0.80 0.80 0.80 0.79 22 0.81 0.79 0.79 0.78 0.78 0.77 0.77 0.77 0.76 0.76 0.76 0.76 0.76 23 0.77 0.76 0.75 0.75 0.74 0.74 0.74 0.73 0.73 0.73 0.73 0.73 0.73 24 0.74 0.73 0.72 0.72 0.71 0.71 0.70 0.70 0.70 0.70 0.70 0.70 0.70 25 0.71 0.70 0.69 0.69 0.68 0.68 0.67 0.67 0.67 0.67 0.67 0.67 0.66 26 0.68 0.67 0.67 0.65 0.65 0.65 0.64 0.64 0.64 0.64 0.64 0.64 0.63 27 0.65 0.64 0.63 0.62 0.62 0.62 0.61 0.61 0.61 0.61 0.61 0.61 0.60 28 0.62 0.61 0.60 0.59 0.59 0.59 0.58 0.58 0.58 0.58 0.58 0.58 0.57 29 0.59 0.58 0.57 0.57 0.56 0.56 0.55 0.55 0.55 0.55 0.55 0.55 0.54 30 0.56 0.55 0.54 0.54 0.53 0.53 0.52 0.52 0.52 0.52 0.52 0.52 0.52 31 0.53 0.52 0.51 0.51 0.50 0.50 0.50 0.49 0.49 0.49 0.49 0.49 0.49 32 0.50 0.49 0.48 0.48 0.48 0.47 0.47 0.47 0.46 0.46 0.46 0.46 0.46 33 0.47 0.48 0.45 0.45 0.45 0.44 0.44 0.44 0.44 0.43 0.43 0.43 0.43 34 0.45 0.43 0.43 0.42 0.42 0.42 0.41 0.41 0.41 0.41 0.41 0.41 0.40 35 0.42 0.40 0.40 0.39 0.39 0.39 0.38 0.38 0.38 0.38 0.38 0.38 0.38 36 0.39 0.38 0.37 0.37 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 37 0.36 0.35 0.34 0.34 0.34 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.32 38 0.33 0.32 0.32 0.31 0.31 0.31 0.30 0.30 0.30 0.30 0.30 0.30 0.30 39 0.30 0.30 0.29 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 40 0.28 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 41 0.25 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 42 0.23 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 43 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 44 0.16 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 45 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 46 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 47 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 48 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 49 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1. If the value of Qu or QL does not correspond to a value in the table, use the next lower value. 2. If Qu or QL are negative values, Pu or PL is equal to 100 minus the table value for Pt, or PL. Quality Factor Determination Determine individual quality factors, QFQCi, using percent defective PU + PL and: Book One- State Route 68 at San Benancio Road Intersection Improvements 181 CONTRACT NO. 10-1 11065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??? Maximum Allowable Percent Defective PU + PL) Quality Sample Size n) Factor 5 6 7 8 9 10-11 12-14 15-17 18-22 23-29 30-42 43-66 66 1.05 0 0 0 0 0 0 0 0 0 0 1.04 0 1 3 5 4 4 4 3 3 3 3 1.03 0 2 4 6 8 7 7 6 5 5 4 4 1.02 1 3 6 9 11 10 9 8 7 7 6 6 1.01 0 2 5 8 11 13 12 11 10 9 8 8 7 1.00 22 20 18 17 16 15 14 13 12 11 10 9 8 0.99 24 22 20 19 18 17 16 15 14 13 11 10 9 0.98 26 24 22 21 20 19 18 16 15 14 13 12 10 0.97 28 26 24 23 22 21 19 18 17 16 14 13 12 0.96 30 28 26 25 24 22 21 19 18 17 16 14 13 0.95 32 29 28 26 25 24 22 21 20 18 17 16 14 0.94 33 31 29 28 27 25 24 22 21 20 18 17 15 0.93 35 33 31 29 28 27 25 24 22 21 20 18 16 0.92 37 34 32 31 30 28 27 25 24 22 21 19 18 0.91 38 36 34 32 31 30 28 26 25 24 22 21 19 0.90 39 37 35 34 33 31 29 28 26 25 23 22 20 0.89 41 38 37 35 34 32 31 29 28 26 25 23 21 0.88 42 40 38 36 35 34 32 30 29 27 26 24 22 0.87 43 41 39 38 37 35 33 32 30 29 27 25 23 0.86 45 42 41 39 38 36 34 33 31 30 28 26 24 0.85 46 44 42 40 39 38 36 34 33 31 29 28 25 0.84 47 45 43 42 40 39 37 35 34 32 30 29 27 0.83 49 46 44 43 42 40 38 36 35 33 31 30 28 0.82 50 47 46 44 43 41 39 38 36 34 33 31 29 0.81 51 49 47 45 44 42 41 39 37 36 34 32 30 0.80 52 50 48 46 45 44 42 40 38 37 35 33 31 0.79 54 51 49 48 46 45 43 41 39 38 36 34 32 0.78 55 52 50 49 48 46 44 42 41 39 37 35 33 0.77 56 54 52 50 49 47 45 43 42 40 38 36 34 0.76 57 55 53 51 50 48 46 44 43 41 39 37 35 0.75 58 56 54 52 51 49 47 46 44 42 40 38 36 60 57 55 53 52 51 48 47 45 43 41 40 37 61 58 56 55 53 52 50 48 46 44 43 41 38 Reject 62 59 57 56 54 53 51 49 47 45 44 42 39 63 61 58 57 55 54 52 50 48 47 45 43 40 64 62 60 58 57 55 53 51 49 48 46 44 41 Reject Val ues Greater Than Those Shown Above Notes: 1. To obtain a quality factor when the estimated percent outside specification limits from table, Upper Quality Index Qu or Lower Quality Index QL," does not correspond to a value in the table, use the next larger value. Compute the composite of single quality factors, QFc, for a lot using: |1013| QFc 1't't QF Qc i=1 where: QFc= the composite quality factor for the lot rounded to 2 decimal places. QFQci the quality factor for the individual quality characteristic. w the weighting factor listed in the table HMA Acceptance QC / QA. i the quality characteristic index number in the table HMA Acceptance QC / QA. Quality Factors Book One- State Route 68 at San Benancio Road Intersection Improvements 182 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???39-4.04 ENGINEER'S QUALITY ASSURANCE 39-4.04A General The Engineer assures quality by: 1. Reviewing mix designs and proposed JMF 2. Inspecting procedures 3. Conducting oversight of quality control inspection and records 4. Verification sampling and testing during production and paving 39-4.04B Verification Sampling And Testing General The Engineer samples: 1. Aggregate to verify gradation 2. HMA to verify asphalt binder content Verification For aggregate gradation and asphalt binder content, the ratio of verification testing frequency to the minimum quality control testing frequency is 1:5. The Engineer performs at least 3 verification tests per lot. Using the t-test, the Engineer compares quality control tests results for aggregate gradation and asphalt binder content with corresponding verification test results. The Engineer uses the average and standard deviation of up to 20 sequential sublots for the comparison. The Engineer uses production start-up evaluation tests to represent the first sublot. When there are less than 20 sequential sublots, the Engineer uses the maximum number of sequential sublots available. The 21st sublot becomes the 1st sublot n 1) in the next lot. The t-value for a group of test data is computed as follows: t= where: and S2_S,(rj 1)+S,?(n 1) P rt,+r,- nc Number of quality control tests 2 minimum, 20 maximum). nv Number of verification tests minimum of 1 required). X, Mean of quality control tests. Xv Mean of verification tests. Sp Pooled standard deviation When nv 1, Sp= Se). Sc Standard deviation of quality control tests. S? Standard deviation of verification tests when nv 1). The comparison of quality control test results and the verification test results is at a level of significance of a 0.025. The Engineer computes t and compares it to the critical t-value, teit, from: Book One- State Route 68 at San Benancio Road Intersection Improvements 183 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Critical T-Value Degrees of freedom n~+n?2) tcrjt for a 0.025) Degrees of freedom n~+n,,-2) tc.rr for a 0.025) 1 24.452 18 2.445 2 6.205 19 2.433 3 4.177 20 2.423 4 3.495 21 2.414 5 3.163 22 2.405 6 2.969 23 2.398 7 2.841 24 2.391 8 2.752 25 2.385 9 2.685 26 2.379 10 2.634 27 2.373 11 2.593 28 2.368 12 2.560 29 2.364 13 2.533 30 2.360 14 2.510 40 2.329 15 2.490 60 2.299 16 2.473 120 2.270 17 2.458 co 2.241 If the t-value computed is less than or equal to torit, quality control test results are verified. If the t-value computed is greater than tCi, and both X, and X, comply with acceptance specifications, the quality control tests are verified. You may continue to produce and place HMA with the following allowable differences: 1. X v X d 1.0 percent for any grading 2. Xv Xc 0.1 percent for asphalt binder content If the t-value computed is greater than tC17t and the X v X for grading and asphalt binder content are greater than the allowable differences, quality control test results are not verified and: 1. The Engineer notifies you in writing. 2. You and the Engineer must investigate why the difference exist. 3. If the reason for the difference cannot be found and corrected, the Engineer's test results are used for acceptance and pay. 39-4.05 ENGINEER'S ACCEPTANCE 39-4.05A Testing The Engineer samples for acceptance testing and tests for: Book One- State Route 68 at San Benancio Road Intersection Improvements 184 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Index Quality Characteristic Weight Test HMA Type i) ing Method Factor A B RHMA-G Aggreg ate gradati on a Sieve 3/4" 1/2" 3/8" 1 1/2" X 0.0 CT 202 JMF f Tolerance 1 3/8" X 0.05 1 No.4 X 0.05 2 No.8 X X X 0.10 3 No. 200 X X X 0.15 4 Asphalt binder content %) 0.30 CT 379 or JMF 0.45 JMF + 0.45 JMF 0.5 382 5 Percent of maximum theoretical 0.40 CT 375 92 96 92 96 91 96 density %) d,, Sand equivalent min.) CT 217 47 42 47 Stabilometer value min.) g CT 366 No. 4 and 3/8" gradings 30 30 1/2" and 3/4" gradings 37 35 23 Air voids content %)" CT 367 4 2 4 + 2 Specifica- tion 2 Percent of crushed particles coarse CT 205 aggregate % min.) One fractured face 90 25 Two fractured faces 70 90 Fine aggregate % min) Passing No. 4 sieve and retained on No. 8 sieve.) One fractured face 70 20 70 HMA moisture content %, max.) CT 226 or 1.0 1.0 1.0 CT 370 Los Angeles Rattler % max.) CT 211 Loss at 100 rev. 12 12 Loss at 500 rev. 45 50 45 Fine aggregate angularity % min.) AASHTO 45 45 45 T 304, Method A Flat and elongated particle % max. ASTM D Report Report Report by weight 5:1) 4791 only only only Voids in mineral aggregate % min.)' Note j) No. 4 grading 17.0 17.0 3/8" grading LP-2 15.0 15.0 1/2" grading 14.0 14.0 18.0-23.0 3/4" grading 13.0 13.0 18.0-23.0 Voids filled with asphalt %)' No. 4 grading LP-3 76.0-80.0 76.0-80.0 Report 3/8" grading 73.0-76.0 73.0-76.0 only 1/2" grading 65.0-75.0 65.0-75.0 3/4" grading 65.0-75.0 65.0-75.0 Dust proportion' LP-4 No. 4 and 3/8" gradings 0.9-2.0 0.9-2.0 Report 1/2" and 3/4" gradings 0.6-1.3 0.6 1.3 only HMA Acceptance QC / QA Book One- State Route 68 at San Benancio Road Intersection Improvements 185 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??? Smoothness Section 12-foot 12-foot 12-foot 39-1.12 straight- straight- straight- edge, must- edge, must- edge, grind, and grind, and must- PIo PIo grind, and PIo Asphalt binder Various Section 92 Section 92 Section 92 Section 92- Asphalt rubber binder Various 1.02(C) and Section 39-1.02D Asphalt modifier Various Section 39-1.02D Crumb rubber modifier Various Section 39-1.02D Notes: a The Engineer determines combined aggregate gradations containing RAP under Laboratory Procedure LP-9. b X" denotes the sieves the Engineer considers for the specified aggregate gradation. The tolerances must comply with the allowable tolerances in Section 39-1.02E, Aggregate." d The Engineer determines percent of maximum theoretical density if the specified paved thickness is at least 0.15 foot under California Test 375 except the Engineer uses: 1. California Test 308, Method A, to determine in-place density of each density core instead of using the nuclear gauge in Part 4, Determining In-Place Density By The Nuclear Density Device." 2. California Test 309 to determine maximum theoretical density instead of calculating test maximum density in Part 5, Determining Test Maximum Density." e The Engineer determines maximum theoretical density California Test 309) at the frequency specified for Test Maximum Density under California Test 375, Part 5.D. f The Engineer reports the average of 3 tests from a single split sample. B Modify California Test 304, Part 2.B.2.c: After compaction in the mechanical compactor, cool to 140 OF t 5 OF by allowing the briquettes to cool at room temperature for 0.5 hour, then place the briquettes in the oven at 140 OF for a minimum of 2 hours and not more than 3 hours." h The Engineer determines the bulk specific gravity of each lab-compacted briquette under California Test 308, Method A, and theoretical maximum specific gravity under California Test 309. Report only if the adjustment for asphalt binder content target value is less than or equal to 0.3 percent from OBC. i Voids in mineral aggregate for RHMA-G must be within this range. The Engineer determines the percent of maximum theoretical density from the average density of 3 density cores you take from every 750 tons of production or part thereof divided by the maximum theoretical density. If the specified total paved thickness is at least 0.15 foot and any layer is less than 0.15 foot, the Engineer determines the percent of maximum theoretical density from density cores taken from the final layer measured the full depth of the total paved HMA thickness. The Engineer stops production and terminates a lot if: 1. The lot's composite quality factor, QFC, or an individual quality factor, QFQci for i 3, 4, or 5, is below 0.90 determined under Section 39-4.03F, Statistical Evaluation" 2. An individual quality factor, QFQCi for i 1 or 2, is below 0.75 3. Quality characteristics for which a quality factor, QFQci, is not determined has 2 consecutive acceptance or quality control tests not in compliance with the specifications For any single quality characteristic for which a quality factor, QFQCi, is not determined, except smoothness, if 2 consecutive acceptance test results do not comply with specifications: Book One- State Route 68 at San Benancio Road Intersection Improvements 186 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Ð?1. Stop production. 2. Take corrective action. 3. In the Engineer's presence, take samples and split each sample into 4 parts. Test 1 part for compliance with the specifications and submit 3 parts to the Engineer. The Engineer tests 1 part for compliance with the specifications and reserves and stores 2 parts. 4. Demonstrate compliance with the specifications before resuming production and placement on the State highway. 39-4.05B Statistical Evaluation, Determination Of Quality Factors And Acceptance Statistical Evaluation and Determination of Quality Factors To determine the individual quality factor, QFQCi, for any quality factor i 1 through 5 or a lot's composite quality factor, QFc, for acceptance and payment adjustment, the Engineer uses the evaluation specifications under Section 39-4.03F, Statistical Evaluation," and: 1. Verified quality control test results for aggregate gradation 2. Verified quality control test results for asphalt binder content 3. The Engineer's test results for percent of maximum theoretical density Lot Acceptance Based on Quality Factors The Engineer accepts a lot based on the quality factors determined for aggregate gradation and asphalt binder content, QFQCi for i 1 through 4, using the total number of verified quality control test result values and the total percent defective PU+ PL). The Engineer accepts a lot based on the quality factor determined for maximum theoretical density, QFQC5, using the total number of test result values from density cores and the total percent defective PU+ PL). The Engineer calculates the quality factor for the lot, QFc, which is a composite of weighted individual quality factors, QFQCi, determined for each quality characteristic in the HMA Acceptance QC / QA table in Section 39-4.05A, Testing." The Engineer accepts a lot based on quality factors if: 1. The current composite quality factor, QFc, is 0.90 or greater 2. Each individual quality factor, QFQCi for i 3, 4, and 5, is 0.90 or greater 3. Each individual quality factor, QFQCi for i 1 and 2, is 0.75 or greater No single quality characteristic test may represent more than the smaller of 750 tons or 1 day's production. Payment Adjustment If a lot is accepted, the Engineer adjusts payment with the following formula: where: n PA=YHMACP*wi*QFQCi*(HMATT-WHMATT)+WHMATTi]-(HMACP*HMAT0 i=I PA Payment adjustment rounded to 2 decimal places. HMACP HMA contract price. HMA TT HMA total tons represented in the lot. WHMATTi Total tons of waived quality characteristic HMA. QFQCi Running quality factor for the individual quality characteristic. Book One- State Route 68 at San Benancio Road Intersection Improvements 187 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Ð?QFQCi for i 1 through 4 must be from verified Contractor's QC results. QFQC5 must be determined from the Engineer's results on density cores taken for percent of maximum theoretical density determination. w Weighting factor listed in the HMA acceptance table. i Quality characteristic index number in the HMA acceptance table. If the payment adjustment is a negative value, the Engineer deducts this amount from payment. If the payment adjustment is a positive value, the Engineer adds this amount to payment. The 21st sublot becomes the 1st sublot n 1) in the next lot. When the 21st sequential sublot becomes the 1st sublot, the previous 20 sequential sublots become a lot for which the Engineer determines a quality factor. The Engineer uses this quality factor to pay for the HMA in the lot. If the next lot consists of less than 8 sublots, these sublots must be added to the previous lot for quality factor determination using 21 to 27 sublots. 39-4.05C Dispute Resolution For a lot, if you or the Engineer dispute any quality factor, QFQCi, or verification test result, every sublot in that lot must be retested. Referee tests must be performed under the specifications for acceptance testing. Any quality factor, QFQCi, must be determined using the referee tests. For any quality factor, QFQCi, for i 1 through 5, dispute resolution: 1. If the difference between the quality factors for QFQCi using the referee test result and the disputed test result is less than or equal to 0.01, the original test result is correct. 2. If the difference between the quality factor for QFQCi using the referee test result and the disputed test result is more than 0.01, the quality factor determined from the referee tests supersedes the previously determined quality factor. 39-5 MEASUREMENT AND PAYMENT 39-5.01 MEASUREMENT The contract item for HMA is measured by weight. The weight of each HMA mixture designated in the Engineer's Estimate must be the combined mixture weight. If tack coat, asphalt binder, and asphaltic emulsion are paid with separate contract items, their contract items are measured under Section 92, Asphalts," or Section 94, Asphaltic Emulsions," as the case may be. If recorded batch weights are printed automatically, the contract item for HMA is measured by using the printed batch weights, provided: 1. Total aggregate and supplemental fine aggregate weight per batch is printed. If supplemental fine aggregate is weighed cumulatively with the aggregate, the total aggregate batch weight must include the supplemental fine aggregate weight. 2. Total asphalt binder weight per batch is printed. 3. Each truckload's zero tolerance weight is printed before weighing the first batch and after weighing the last batch. 4. Time, date, mix number, load number and truck identification is correlated with a load slip. 5. A copy of the recorded batch weights is certified by a licensed weighmaster and submitted to the Engineer. Book One- State Route 68 at San Benancio Road Intersection Improvements 188 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??O?The contract item for placing HMA dike is measured by the linear foot along the completed length. The contract item for placing HMA in miscellaneous areas is measured as the in-place compacted area in square yards. In addition to the quantities measured on a linear foot or square yard basis, the HMA for dike and miscellaneous areas are measured by weight. The contract item for geosynthetic pavement interlayer is measured by the square yard for the actual pavement area covered. 39-5.02 PAYMENT The contract prices paid per ton for hot mix asphalt as designated in the Engineer's Estimate include full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all the work involved in constructing hot mix asphalt, complete in place, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. If HMA is specified to comply with Section 39-4, Quality Control / Quality Assurance," the Engineer adjusts payment under that section. Full compensation for the Quality Control Plan and prepaving conference is included in the contract prices paid per ton for hot mix asphalt as designated in the Engineer's Estimate and no additional compensation will be allowed therefor. Full compensation for performing and submitting mix designs and for Contractor sampling, testing, inspection, testing facilities, and preparation and submittal of results is included in the contract prices paid per ton for HMA as designated in the Engineer's Estimate and no additional compensation will be allowed therefor. Full compensation for reclaimed asphalt pavement is included in the contract prices paid per ton for HMA as designated in the Engineer's Estimate and no additional compensation will be allowed therefor. The contract price paid per ton for hot mix asphalt leveling) includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all the work involved in hot mix asphalt leveling), complete in place, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. The State pays for HMA dike at the contract price per linear foot for place HMA dike and by the ton for HMA. The contract prices paid per linear foot for place hot mix asphalt dike as designated in the Engineer's Estimate include full compensation for furnishing all labor, tools, equipment, and incidentals, and for doing all the work involved in placing HMA dike, complete in place, including excavation, backfill, and preparation of the area to receive the dike, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. The State pays for HMA specified to be a miscellaneous area at the contract price per square yard for place hot mix asphalt miscellaneous area) and per ton for hot mix asphalt. The contract price paid per square yard for place hot mix asphalt miscellaneous area) includes full compensation for furnishing all labor, tools, equipment, and incidentals, and for doing all the work involved in placing HMA miscellaneous area) complete in place, including excavation, backfill, and preparation of the area to receive HMA miscellaneous area), as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. If the Quality Control / Quality Assurance construction process is specified, HMA placed in dikes and miscellaneous areas is paid for at the contract price per ton for hot mix asphalt under Section 39-4, Quality Control / Quality Assurance." Section 39-4.05B, Statistical Evaluation, Determination of Quality Factors and Acceptance," does not apply to HMA placed in dikes and miscellaneous areas. Book One- State Route 68 at San Benancio Road Intersection Improvements 189 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????If there are no contract items for place hot mix asphalt dike and place hot mix asphalt miscellaneous area) and the work is specified, full compensation for constructing HMA dikes and HMA miscellaneous areas) including excavation, backfill, and preparation of the area to receive HMA dike or HMA miscellaneous area) is included in the contract price paid per ton for the hot mix asphalt designated in the Engineer's Estimate and no separate payment will be made therefor. The contract price paid per square yard for geosynthetic pavement interlayer includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in placing geosynthetic pavement interlayer, complete in place, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. The contract price paid per ton for paving asphalt binder, geosynthetic pavement interlayer) includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in applying paving asphalt binder, geosynthetic pavement interlayer), complete in place, including spreading sand to cover exposed binder material, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. Full compensation for small quantities of HMA placed on geosynthetic pavement interlayer to prevent displacement during construction is included in the contract price paid per ton for the HMA being paved over the interlayer and no separate payment will be made therefor. The contract price paid per ton for tack coat includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in applying tack coat, complete in place, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. The Engineer does not adjust payment for increases or decreases in the quantities for tack coat, regardless of the reason for the increase or decrease. Section 4-1.03B, Increased or Decreased Quantities," does not apply to the items for tack coat. Full compensation for performing smoothness testing, submitting written and electronic copies of tests, and performing corrective work including applying fog seal coat is included in the contract price paid per ton for the HMA designated in the Engineer's Estimate and no separate payment will be made therefor. Full compensation for spreading sand on RHMA-G, RHMA-O, and RHMA-O-1413 surfaces and for sweeping and removing excess sand is included in the contract price paid per ton for rubberized hot mix asphalt as designated in the Engineer's Estimate and no separate payment will be made therefor. If the Engineer fails to comply with a specification within a specified time, and if, in the opinion of the Engineer, work completion is delayed because of the failure, the Engineer adjusts payment and contract time under Section 8-1.09, Right of Way Delays." If the dispute resolution ITP determines the Engineer's test results are correct, the Engineer deducts the ITP's testing costs from payments. If the ITP determines your test results are correct, the State pays the ITP's testing costs. If, in the Engineer's opinion, work completion is delayed because of incorrect Engineer test results, the Engineer adjusts payment and contract time under Section 8-1.09, Right of Way Delays." AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Book One- State Route 68 at San Benancio Road Intersection Improvements 190 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??i?SECTION 40 PORTLAND CEMENT CONCRETE PAVEMENT Issued 06-05-09) Replace Section 40 with: SECTION 40 CONCRETE PAVEMENT 40-1 GENERAL 40-1.01 SUMMARY Section 40 includes specifications for constructing concrete pavement on a prepared subgrade. 40-1.02 SUBMITTALS 40-1.02A Certificates of Compliance Submit Certificates of Compliance under Section 6-1.07, Certificates of Compliance." Include a test result report for any specified test with certification that test was performed within 12 months before the tested material's use. Submit Certificates of Compliance for: 1. Tie bars 2. Threaded tie bar splice couplers 3. Dowel bars 4. Tie bar baskets 5. Dowel bar baskets 6. Chemical adhesive drill and bond) 7. Silicone joint sealant 8. Asphalt rubber joint sealant 9. Preformed compression seal 10. Backer rods. Include the manufacturer's statement of compatibility with the sealant to be used. 11. Joint filler material 12. Curing compound. For each delivery to the job site, submit a copy of the Certificate of Compliance to the Engineer and the Transportation Laboratory. Each Certificate of Compliance must not represent more than 10,000 gallons and must include a test result report for: 12.1. Moisture loss at 24 hours under California Test 534 12.2. Reflectance under ASTM E 1347 12.3. Viscosity under ASTM D 2196 12.4. Nonvolatile content under ASTM D 3723 12.5. Pigment content under ASTM D 3723 13. Epoxy powder coating 40-1.02B Curing Compound Samples Submit split curing compound samples to the Transportation Laboratory. Book One- State Route 68 at San Benancio Road Intersection Improvements 191 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????40-1.02C Drilled Corings Submit each core taken for Engineer's acceptance in a plastic bag. Mark each core with a location description. 40-1.02D Independent Third Party Air Content Testing Laboratory Before testing, submit for the Engineer's approval the name of a laboratory that will test drilled core specimens for air content in cases of dispute. 40-1.02E Dowel Bars Before placing dowel bars, submit a procedure for identifying transverse contraction joint locations relative to the dowel bars' longitudinal center and a procedure for consolidating concrete around the dowel bars. 40-1.02F Concrete Field Qualification Submit field qualification data and test reports including: 1. Mixing date 2. Mixing equipment and procedures used 3. Batch volume in cubic yards 4. Type and source of ingredients used 5. Penetration of the concrete 6. Air content of the plastic concrete 7. Age and strength at time of concrete beam testing Field qualification test reports must be certified with a signature by an official in responsible charge of the laboratory performing the tests. 40-1.02G Frequency Measuring Device Tachometer) Submit calibration documentation and operational guidelines for frequency measuring devices for concrete consolidation vibrators. 40-1.02H Manufacturer's Recommendations and Instructions If used and at least 15 days before delivery to the job site, submit manufacturer's recommendations and instructions for storage and installation of: 1. 2. 3. 4. 5. 6. Threaded tie bar splice couplers Chemical adhesive drill and bond) Silicone liquid sealant Asphalt rubber liquid sealant Preformed compression seals Joint filler material 40-1.02I Mix Proportions At least 15 days before starting testing for mix proportions under California Test 559, submit a copy of the AASHTO accreditation for your laboratory determining the mix proportions. At least 30 days before starting field qualification, submit under California Test 559 the proposed concrete mix proportions, the corresponding mix identifications, and laboratory test reports including the modulus of rupture for each trial mixture at 10, 21, 28, and 42 days. Book One- State Route 68 at San Benancio Road Intersection Improvements 192 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????40-1.02J Preformed Compression Seal Submit the manufacturer's data sheet used to develop the recommended preformed compression seal based on the joint dimensions. 40-1.02K Concrete Pavement Early Age Crack Mitigation System At least 24 hours before each paving shift, submit: 1. Early age stress and strength predictions 2. Scheduled sawing and curing activities 3. Contingency plan if volunteer cracking occurs At least 24 hours before paving, meet with the Engineer to review the submittals for the early age crack mitigation system. During paving, update the system with current weather data obtained from a portable weather station. Before paving concrete pavement with these updates, submit new stress and strength predictions and curing and sawing activity schedules. 40-1.02L Profilograms Submit profilograms within 5 business days of initial profiling and within 2 business days of profiling corrected sections. Submit 1 electronic copy of profile information in erd" format or other ProVAL compatible format to the Engineer and to: Smoothness@dot.ca.gov Submit the original of final profilograms before the Engineer accepts the contract. Submitted profilograms become the Department's property. 40-1.02M Protecting Concrete Pavement During Cold Weather Submit a plan for protecting concrete pavement when the average ambient daily temperature is below 40 F and daytime ambient temperature is less than 50 F during the initial 72 hours after paving. 40-1.02N Quality Control Charts Submit updated quality control charts each paving day. 40-1.020 Quality Control Plan At least 30 days before the start of field qualification, submit a concrete pavement quality control plan QCP). 40-1.03 QUALITY CONTROL AND ASSURANCE 40-1.03A Contractor Quality Control Plan Establish, implement, and maintain a QCP for concrete pavement. the organization and procedures you use to: 1. Control the production process 2. Determine if changes to the production process are needed 3. Implement changes Book One- State Route 68 at San Benancio Road Intersection Improvements CONTRACT NO. 10- 111065 The QCP must describe 193 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????The QCP must address the elements affecting concrete pavement quality including: 1. Mix proportions 2. Aggregate gradation 3. Materials quality 4. Stockpile management 5. Line and grade control 6. Proportioning 7. Mixing and transportation 8. Placing and consolidation 9. Contraction and construction joints 10. Dowel bar placement, alignment, and anchorage 11. Tie bar placement 12. Modulus of rupture 13. Finishing and curing 14. Surface smoothness 15. Joint sealant and compression seal installation The QCP must include details of corrective action to be taken if any process is out of control. As a minimum, a process is out of control if any of the following occurs: 1. For fine and coarse aggregate gradation, 2 consecutive running averages of 4 tests are outside the specification limits 2. For fine and coarse aggregates, the moisture content of either aggregate changes by more than 0.5 percentage point from any reading 3. For individual penetration or air content measurements: 3.1. One point falls outside the suspension limit line 3.2. Two points in a row fall outside the action limit line Stop production and take corrective action for out of control processes except fine and coarse aggregate moisture content or the Engineer rejects subsequent material. 40-1.03B Quality Control Testing Select random locations and perform sampling and testing in compliance with: Book One- State Route 68 at San Benancio Road Intersection Improvements 194 CONTRACT NO. 10- I1 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Test Frequency Test Method Cleanness value 2 per day CT 227 Sand equivalent 2 per day CT 217 Aggregate gradation 2 per day CT 202 Air content freeze thaw) a 1 per hour CT 504 Air content non-freeze thaw) 1 per 4 hours CT 504 Density 1 per 4 hours CT 518 Penetration 1 per 4 hours CT 533 Calibration of moisture meter b, c 1 per day CT 223 or CT 226 Notes: a If air entrainment is specified, make at least I air content measurement per hour. If air entrainment is not specified, make at least 1 air content measurement per 4 hours. b Make at least 1 measurement of moisture content per week to check the calibration of an electronically actuated moisture meter. Random location sampling and testing is not applicable. If air entrainment is specified, the testing laboratory and tester must be qualified under the Department's Independent Assurance Manual. The manual is available from the Transportation Laboratory. 40-1.03C Control Charts Maintain control charts to identify potential problems and assignable causes. Post a copy of each control chart at a location determined by the Engineer. Individual measurement control charts must use the target values in the mix proportions as indicators of central tendency. Develop linear control charts for: 1. Cleanness value 2. Sand equivalent 3. Fine and coarse aggregate gradation 4. Air content 5. Penetration Control charts must include: 1. Contract number 2. Mix proportions 3. Test number 4. Each test parameter 5. Action and suspension limits 6. Specification limits 7. Quality control test results For fine and coarse aggregate gradation control charts, record the running average of the previous 4 consecutive gradation tests for each sieve and superimpose the specification limits. For penetration and air content control charts, record the individual measurements and superimpose the following action and suspension limits: Quality Control Testin Book One- State Route 68 at San Benancio Road Intersection Improvements 195 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???? Individual Measurements Control Parameter Action Limit Suspension Limit Penetration, CT 533 1 inch 1-1/2 inch Air content, CT 504 1.0 percent 1.5 percent 40-1.03D Contractor's Laboratory Use a laboratory that complies with ASTM C 1077 to determine the mix proportions for concrete pavement. The laboratory must have a current AASHTO accreditation for: 1. AASHTO T 97 or ASTM C 78 2. ASTM C 192/C 192M 40-1.03E Joint Sealant and Compression Seal Installation Training Before installing joint sealant or compression seals, arrange for a representative from the joint sealant or compression seal manufacturer to provide training on the cleaning and preparation of the joint and installing the sealant or seal. Until your personnel and the Department's personnel have been trained, do not install joint sealant or compression seals. 40-1.03F Frequency Measuring Device Tachometer) Before each day's concrete pavement placement and at intervals not to exceed 4 hours of production, test and record vibration frequency and amplitude for concrete consolidation vibrators. 40-1.03G Early Age Concrete Pavement Crack Mitigation System Develop and implement a system for predicting concrete pavement stresses and strength during the initial 72 hours after paving. The system must include: 1. Subscribing to a weather service to obtain forecasts for wind speed, ambient temperatures, humidity, and cloud cover 2. Portable weather station with anemometer, temperature and humidity sensors, located at the paving site 3. Early age concrete pavement stress and strength prediction computer program 4. Analyzing, monitoring, updating, and reporting the system's predictions 40-1.03H Curing Compound Sample curing compound from shipping containers at the manufacturer's source of supply. Split the samples. 40-1.03I Concrete Pavement Smoothness Within 10 days after paving, measure the Profile Index Plo) of the concrete pavement surface using a zero null) blanking band under California Test 526. For the following concrete pavement areas, the Engineer does not require a profilograph and you must test and correct high points determined by a 12-foot straightedge placed parallel with and perpendicular to the centerline: 1. Horizontal curves with a centerline radius of curvature less than 1,000 feet including concrete pavement within the superelevation transitions of those curves. 2. Exit ramp termini, truck weigh stations, and weigh-in-motion areas 3. Where steep grades and superelevation rates greater than 6 percent are present on: Penetration and Air Content Action and Suspension Limits Book One- State Route 68 at San Benancio Road Intersection Improvements 196 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????3.1. Ramps 3.2. Connectors 4. Turn lanes and areas around manholes or drainage transitions 5. Acceleration and deceleration lanes for at-grade intersections 6. Shoulders and miscellaneous gore areas Use a California Profilograph or equivalent to determine the concrete pavement profile. If the profilograph uses a mechanical recorder, use an electronic scanner to reduce the profilogram. The profilograph operator must be qualified under the Department's Independent Assurance Manual. The manual is available from the Transportation Laboratory. 40-1.03J Profilograph Test Procedure Notify the Engineer at least 2 business days before performing profilograph testing. Each day before performing profilograph testing, notify the Engineer of the start location. Perform profilograph testing in the Engineer's presence. Before starting profilograph testing, remove foreign objects from the concrete pavement surface. Before starting profilograph testing, calibrate the profilograph in the Engineer's presence. If the Engineer chooses not to be present during profilograph testing, you may perform the testing with the Engineer's written approval. Note the Engineer's absence on the profilogram. Determine PIo values for the final concrete pavement surface of each 0.1-mile section of a traffic lane. Take 2 profiles within each traffic lane, 3 feet from and parallel with the edge of each lane. Each section's Plo is the average of the Plo values for the measurements within that traffic lane. A section that is less than 0.01 mile and is the result of an interruption to continuous concrete pavement surface must comply with the Plo specifications for a full section. Adjust the Plo for a partial section to reflect a full section. Use stationing to locate vertical deviations greater than 0.3 inches. The profilogram stationing must be the same as the project stationing. Note 0.1-mile segments on the profilogram. Label the profilogram with: 1. Contract number 2. County and route number 3. Stationing 4. Operator's name 5. Test date 6. Test number 7. Traffic direction 8. Traffic lane numbered from left to right in direction of travel) 9. Test wheel path left or right in direction of travel) 10. Test direction 11. Paving direction 40-1.03K Smoothness Corrective Action Correct concrete pavement not complying with the Engineer's acceptance specifications for smoothness by grinding under Section 42-2, Grinding." Do not grind before: Book One- State Route 68 at San Benancio Road Intersection Improvements 197 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????1. Ten days after concrete pavement placement 2. The concrete has developed a modulus of rupture of at least 550 psi Grind the entire lane width. When completed, the lane width must be uniform in texture and appearance. Square the corrected area's start and end normal to the paved surface's centerline. Retest sections where corrections were made. 40-1.03L Engineer's Acceptance General The Engineer accepts concrete pavement based on the Department's testing for the following concrete pavement quality characteristics. A single test represents no more than the quantity specified: Quality Characteristic Quantity Test 28-day modulus of rupture 1,000 cubic yards CT 523 Thickness 1,200 square yards for primary area measurements CT 531 Dowel bar placement 700 square yards Measurement Tie bar placement 4,000 square yards Measurement Coefficient of friction One day's paving CT 342 Air content freeze-thaw) a One day's paving CT 504 Note: a Air content tests must be performed under California Test 504 if air entrainment is specified. At the Department's option, the Engineer also accepts concrete pavement based on your or the Department's testing for smoothness. A single test represents no more than 0.1 mile. The Engineer considers other concrete pavement quality characteristics in determining final acceptance. The Engineer's acceptance of modulus of rupture, thickness, dowel bar and tie bar placement, coefficient of friction, smoothness, and air content does not constitute final concrete pavement acceptance. Modulus of Rupture The Engineer accepts concrete pavement for modulus of rupture on a lot basis. The minimum modulus of rupture for each lot is 570 psi at 28 days. For each lot of concrete for concrete pavement: 1. Quantity must not exceed 1,000 cubic yards. 2. Department determines the modulus of rupture of test beams aged 10 days and 28 days. 3. Department calculates the modulus of rupture by averaging the individual test results of 2 beams aged for 28 days. 4. Difference in the individual test results of beams aged 28 days must not exceed 12 percent when tested by Method 1, or 16 percent when tested by Method 2. The Engineer calculates the difference relative to the average of the 2 test results. The Department provides molds and machines for modulus of rupture acceptance testing. Provide material and labor the Engineer may require. Concrete Pavement Acceptance Book One- State Route 68 at San Benancio Road Intersection Improvements 198 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Concrete Pavement Smoothness If the Department tests for smoothness, the tests are performed under Section 40-1.03I, Concrete Pavement Smoothness." The Engineer accepts concrete pavement for smoothness in compliance with the following: 1. For tangents and horizontal curves having a centerline radius of curvature 2,000 feet or more, the Plo must be at most 3 inches per 0.1-mile section. 2. For horizontal curves having a centerline radius of curvature from 1,000 to 2,000 feet including concrete pavement within the superelevation transitions of those curves, the Plo must be at most 6 inches per 0.1-mile section. 3. If using a profilograph to measure smoothness, the surface must not have individual high points greater than 0.3 inch. 4. If using a straightedge to measure smoothness, the surface must be within 0.02 foot of the straightedge's lower edge. Profile index specifications apply to existing pavement within 50 feet of the transverse joint separating new concrete pavement and the existing pavement. If the Department's profilograph test results do not match yours, the Engineer may order you to recalibrate your profilograph equipment and perform a retest. If your test results are inaccurate due to operator error, the Engineer may disqualify your profilograph operator. If the Engineer determines your test results are inaccurate, the Engineer does not make adjustments to payment or contract time for recalibrating, retesting, and delays. Concrete Pavement Thickness The Engineer accepts concrete pavement for thickness based on coring in the primary area, which is the area placed in 1 day for each thickness. Concrete pavement thickness must not be deficient by more than 0.05 foot. After corrective grinding has been completed, core concrete pavement in the primary area under Section 40-3.16, Obtaining Drilled Cores," at locations determined by the Engineer and in the Engineer's presence. The core specimen diameter must be 4 inches. To identify the limits of concrete pavement deficient in thickness by more than 0.05 foot, you may divide primary areas into secondary areas. Specifications that may affect concrete pavement thickness such as allowable tolerances for subgrade construction do not change the thickness specified for concrete pavement. In each primary area, the Engineer measures concrete pavement thickness every 1,200 square yards and any remaining area. The Engineer measures cores under California Test 531 to the nearest 0.01 foot. Core at least 1 foot from existing, contiguous, and parallel concrete pavement not constructed as part of this contract. You may request the Engineer make additional thickness measurements and use them to determine the average thickness variation. The Engineer determines the locations with random sampling methods. If each thickness measurement in a primary area is less than 0.05 foot deficient, the Engineer calculates the average thickness deficiency in that primary area. The Engineer uses 0.02 foot for a thickness difference more than 0.02 foot over the specified thickness. For each thickness measurement in a primary area deficient by more than 0.05 foot, the Engineer determines a secondary area where the thickness deficiency is more than 0.05 foot. The Engineer determines this secondary area by measuring the thickness of each concrete pavement slab adjacent to the measurement found to be more than 0.05 foot deficient. The Engineer continues to measure the thickness until an area that is bound by slabs with thickness deficient by 0.05 foot or less is determined. Book One- State Route 68 at San Benancio Road Intersection Improvements 199 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Slabs without bar reinforcement are defined as the areas bound by longitudinal and transverse joints and concrete pavement edges. Slabs with bar reinforcement are defined as the areas bound by longitudinal joints and concrete pavement edges and 15-foot lengths. Secondary area thickness measurements in a slab determine that entire slab's thickness. The Engineer measures the remaining primary area thickness after removing the secondary areas from consideration for determining the average thickness deficiency. The Engineer determines the slabs to remove and replace. Required Use of Air-Entraining Admixtures If air-entraining admixtures are specified, the Engineer may choose to accept concrete pavement for air content based on your air content quality control tests. The Engineer decides to use your air content quality control tests based on a t-test that determines the difference in the means of your test and the Engineer's verification tests. The Engineer calculates the t-value of the test data as follows: t= and S2(n~-1)+Sv 1 1 1) SP r,+ri,-2 a where: n, Number of your quality control tests minimum of 2 required) n? Xe Xv Sp Sc Sv Number of verification tests minimum of 1 required) Mean of your quality control tests Mean of the verification tests Pooled standard deviation When nv 1, Sp= SJ Standard deviation of your quality control tests Standard deviation of the verification tests when nv The Engineer compares your quality control test results with the Department's verification test results at a level of significance of a 0.01. The Engineer compares the t-value to tcrlt, determined from: tern degrees of freedom rt,+n?2) tcrit for a 0.01) 1 63.657 2 9.925 3 5.841 4 4.604 5 4.032 6 3.707 7 3.499 8 3.355 9 3.250 10 3.169 Book One- State Route 68 at San Benancio Road Intersection Improvements 200 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????If the t-value calculated is less than or equal to tail, your quality control test results are verified. If the t-value calculated is greater than toil, quality control test results are not verified. If your quality control test results are not verified, core at least 3 specimens from concrete pavement under Section 40-3.16, Obtaining Drilled Cores." The Engineer selects the core locations. Your approved third party independent testing laboratory must test these specimens for air content under ASTM C 457. The Engineer compares these test results with your quality control test results using the t-test method. If your quality control test results are verified based on this comparison, the Engineer uses the quality control test results for acceptance of concrete pavement for air content. If your quality control test results are not verified based on this comparison, the Engineer uses the air content of core specimens determined under ASTM C 457 for acceptance. Dowel Bar and Tie Bar Placement The Engineer uses core specimens to evaluate and accept concrete pavement for: 1. Dowel bar placement 2. Tie bar placement 3. Concrete consolidation Obtain cores under Section 40-3.16, Obtaining Drilled Cores." The Engineer determines the core locations. Each core must have a nominal diameter of 4 inches. Core each day's paving within 2 business days in compliance with: 1. One test for every 700 square yards of doweled concrete pavement or remaining fraction of that area. Each dowel bar test consists of 2 cores, 1 on each dowel bar end to expose both ends and allow measurement. 2. One test for every 4,000 square yards of concrete pavement with tie bars or remaining fraction of that area If the tests indicate dowel or tie bars are not placed within the specified tolerances or if there are air voids around the dowel or tie bars, core additional specimens to determine the limits of unacceptable work. The Engineer determines the slabs to remove and replace. If the Engineer approves your request, slabs may remain in place with an adjustment in payment for: 1. Dowel bars with centers from 2 inches to 3 inches from the saw cut of a transverse contraction joint or with deficient concrete consolidation around the dowel bars 2. Tie bars placed outside their specified placement and position or with deficient concrete consolidation around the tie bars Bar Reinforcing Steel The Engineer accepts concrete pavement for bar reinforcing steel based on inspection before concrete placement. Curing Compound The Engineer accepts curing compound based on test results submitted with the Certificate of Compliance for moisture loss, reflectance, viscosity, nonvolatile content, and pigment content. Curing compound sampled from shipping containers from the manufacturer's supply source or Book One- State Route 68 at San Benancio Road Intersection Improvements 201 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????from the job site must match these test results within the specified tolerances listed in the precision and bias statements for the test methods. 40-2 MATERIALS 40-2.01 CONCRETE 40-2.01A General Concrete must comply with Section 90, Portland Cement Concrete." 40-2.01B Aggregate The specifications for reduction in Operating Range and Contract Compliance for cleanness value and sand equivalent specified under Section 90-2.02A, Coarse Aggregate," and Section 90-2.02B, Fine Aggregate," do not apply to concrete pavement. Combined aggregate gradings must comply with Section 90-3, Aggregate Gradings," and the difference between the percent passing the 3/8-inch sieve and the percent passing the No. 8 sieve must not be less than 16 percent of the total aggregate. 40-2.01C Cementitious Material Concrete for concrete pavement must contain from 505 pounds to 675 pounds cementitious material per cubic yard. The specifications for reducing cementitious material content in Section 90-4.05, Optional Use of Chemical Admixtures," do not apply to concrete pavement. 40-2.01D Mix Proportions Your laboratory determining mix proportions must determine the minimum cementitious materials content or the maximum water to cementitious materials ratio under California Test 559 and: 1. You must make trial mixtures no more than 24 months before field qualification. 2. Modulus of rupture used to determine the minimum cementitious materials content or maximum water to cementitious materials ratio must be 570 psi at 28 days age and 650 psi at 42 days age. 3. Your laboratory must determine an increase in the cementitious materials content or a decrease in the water to cementitious materials ratio from the trial mixtures to ensure concrete pavement complies with the specifications. If changing an aggregate supply source or the mix proportions, produce a trial batch and field-qualify the new concrete. The Engineer does not adjust contract time for performing sampling, testing, and qualifying new mix proportions or changing an aggregate supply source. 40-2.01E Field Qualification Proposed mix proportions must be field qualified before you place concrete pavement. Use an American Concrete Institute ACI) certified Concrete Laboratory Technician, Grade I" to perform field qualification tests and calculations. The Engineer accepts field qualification if five beams made and tested under California Test 523 comply with the following: 1. At a minimum, beams are tested at 10, 21, and 28 days of age 2. At your choice of age not later than 28 days, no single beam's modulus of rupture is less than 550 psi and the average modulus of rupture is at least 570 psi Book One- State Route 68 at San Benancio Road Intersection Improvements 202 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????40-2.02 TIE BARS Unless specified as smooth, tie bars must be deformed. Deformed tie bars must be: 1. Deformed steel reinforcing bars under any of the following: 1.1. ASTM A 615/A 615M, Grade 40 or 60 1.2. ASTM A 996/A 996M 1.3. ASTM A 706/A 706M 2. Epoxy-coated under Section 52-1.02B, Epoxy-coated Reinforcement," and the following: 2.1. Epoxy-coated tie bars must comply with either ASTM A 775/ A 775M or ASTM A 934/ A 934 M. 2.2. Epoxy coating under ASTM A 934/ A 934M must be purple or gray. Smooth tie bars must be: 1. Plain, round, and smooth steel under ASTM A 615/A 615M, Grade 40 or 60 2. Epoxy-coated under Section 52-1.02B, Epoxy-coated Reinforcement," and the following: 2.1. Epoxy-coated smooth tie bars must comply with ASTM A 884/A 884M, Class A, Type 1 or Type 2. 2.2. Epoxy coating under ASTM A 884/A 884 M, Class A, Type 2 must be purple or gray. 2.3. Bend test does not apply. Fabricate, sample, and handle epoxy-coated smooth and deformed tie bars at the job site under ASTM D 3963/D 3963M and Section 52-1.02B, Epoxy-coated Reinforcement." Do not bend epoxy-coated tie bars. 40-2.03 DOWEL BARS 40-2.03A General Dowel bars must be: 1. Plain, round, and smooth steel under ASTM A 615/A 615M, Grade 40 or 60 2. Epoxy-coated under Section 52-1.02B, Epoxy-coated Reinforcement," and the following: 2.1 Epoxy-coated dowel bars must comply with ASTM A 884/A 884M, Class A, Type 1 or Type 2. 2.2. Epoxy coating under ASTM A 884/ A 884M, Class A, Type 2 must be purple or gray. 2.3. Specifications for bend test do not apply. Book One- State Route 68 at San Benancio Road Intersection Improvements 203 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Fabricate, sample, and handle epoxy-coated dowel bars at the job site under ASTM D 3963/D 3963M and Section 52-1.02B, Epoxy-coated Reinforcement," except each sample must be 18 inches long. Sample each load delivered to the job site. 40-2.03B Dowel Bar Lubricant Dowel bar lubricant must be petroleum paraffin-based or curing compound. Paraffin-based lubricant must be Dayton Superior DSC BB-Coat or Valvoline Tectyl 506 or an approved equal and must be factory-applied. Curing compound must be curing compound 3) under Section 90- 7.01B, Curing Compound Method," of the Standard Specifications. 40-2.04 CURING COMPOUND Curing compound must be curing compound 1) or 2) with white pigment under Section 90- 7.01B, Curing Compound Method." Reflectance must be at least 60 percent when tested under ASTM E 1347. 40-2.05 CHEMICAL ADHESIVE DRILL AND BOND) Chemical adhesive for drilling and bonding dowels and tie bars must be prequalified. A list of prequalified chemical adhesives is available on the Department's Materials Engineering and Testing Services website. The prequalified list indicates the appropriate chemical adhesive system for the concrete temperature and installation conditions. Each chemical adhesive system must clearly and permanently show the manufacturer's name, model number of the system, manufacturing date, lot number, shelf life or expiration date, and current International Conference of Building Officials ICBO) Evaluation Report number. Each chemical adhesive carton must include the manufacturer's recommended installation procedures and warning or precautions required by State or Federal laws and regulations. 40-2.06 DOWEL AND TIE BAR BASKETS Dowel and tie bar baskets must be: 1. Minimum W10 wire size number under ASTM A 82/A 82M 2. Either U-frame or A-frame shape 3. Welded under Section 7.4 of ASTM A 185/A 185M You may epoxy-coat dowel and tie bar baskets under Section 52-1.02B, Epoxy-coated Reinforcement," and the following: 1. Epoxy-coated dowel and tie bar baskets must comply with ASTM A 884/A 884M, Class A, Type 1 or Type 2. 2. Epoxy-coating under ASTM A 884/ A 884M, Class A, Type 2 must be purple or gray. Handle epoxy-coated dowel and tie-bar baskets at the manufacturing plant and job site under ASTM D 3963/D 3963M and Section 52-1.02B, Epoxy-coated Reinforcement." Fasteners must be driven fasteners under ASTM F 1667. Fasteners on lean concrete base or asphalt concrete must have a minimum shank diameter of 3/16 inch and a minimum shank length of 2 1/2 inches. For asphalt treated permeable base or cement treated permeable base, the shank diameter must be at least 3/16 inch and the shank length must be at least 5 inches. Fasteners, clips, and washers must have a minimum 0.2-mil thick zinc coating applied either by electroplating or galvanizing. Book One- State Route 68 at San Benancio Road Intersection Improvements 204 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????40-2.07 BACKER RODS Backer rods must be Type 1 under ASTM D 5249. Backer rod diameter must be at least 25 percent greater than the sawcut joint width. Backer rod material must be expanded, crosslinked, closed-cell polyethylene foam. No bond or adverse reaction may occur between the backer rod and sealant. 40-2.08 JOINT FILLER MATERIAL Joint filler for isolation joints must be preformed expansion joint filler for concrete bituminous type) under ASTM D 994. 40-2.09 HYDRAULIC CEMENT GROUT NON-SHRINK) Hydraulic cement grout non-shrink) must comply with ASTM C 1107/ C 1107M. Use clean, uniform, rounded aggregate filler to extend the grout. Aggregate filler must not exceed 60 percent of the grout mass or the maximum recommended by the manufacturer, whichever is less. Aggregate filler moisture content must not exceed 0.5 percent. Aggregate filler must comply with: Sieve Size Percentage Passin 1/2-inch 100 3/8-inch 85 100 No. 4 10 30 No. 8 0-1 0 No. 16 0 5 40-2.10 BAR REINFORCEMENT Bar reinforcement must comply with Section 52, Reinforcement." 40-2.11 JOINT SEALANT 40-2.11A General Do not use hot-pour sealant that will melt the backer rod. 40-2.11B Silicone Joint Sealant Silicone joint sealant must be low modulus furnished in a one-part silicone formulation. Do not use acid cure sealant. Silicone joint sealant must be compatible with the surface it is applied to and comply with: Aggregate Filler Gradin Book One- State Route 68 at San Benancio Road Intersection Improvements 205 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Silicone Joint Sealant Property Test Method Specification Tensile stress, 150% elongation, 7-day cure at 77 OF + 2 OF and 45% to 55% R.H. e ASTM D 412 Die C) 45 psi max. Flow at 77 OF f OF ASTM C 639 a Must not flow from channel Extrusion Rate at 77 OF 2 OF ASTM C 603 b 3 to 9 oz/min. Specific Gravity ASTM D 792 Method A 1.01 to 1.51 Durometer Hardness, at 0 OF, Shore A, cured 7 days at 77 OF 2 OF ASTM C 661 10 to 25 Ozone and Ultraviolet Resistance, after 5,000 hours ASTM C 793 No chalking, cracking or bond loss Tack-free at 77 OF 2 OF and 45% to 55% R.H.e ASTM C 679 Less than 75 minutes Elongation, 7 day cure at 77 OF 2 OF and 45% to 55% R.H. e ASTM D 412 Die C) 500 percent min. Set to Touch, at 77 OF f2 OF and 45% to 55% R.H. e ASTM D 1640 Less than 75 minutes Shelf Life, from date of shipment 6 months min. Bond, to concrete mortar-concrete briquettes, air cured 7 days at 77 OF 2 OF AASHTO T 132 50 psi min. Movement Capability and Adhesion, 100% extension at in after, air cured 7 days at 77 F 2 F and followed by 7 water at 77 OF 2 OF TM C 719d No adhesive or cohesive failure after 5 cycles Notes: a ASTM C 639 Modified 15 percent slope channel A). bASTM C 603, through 0.12-inch opening at 50 psi. Mold briquettes under AASHTO T 132, saw in half and bond with a 0.60-inch maximum thickness of sealant and test under AASHTO T 132. Briquettes must be dried to constant mass at 212 OF 10 OF. d Prepare 12" x 1" x 3" concrete blocks under ASTM C 719. Use a sawed face for bond surface. Seal2 inches of block leaving 0.50 inch on each end of specimen unsealed. The depth of sealant must be 0.40 inch and the width 0.50 inch. e R.H. equals relative humidity. After application, silicone joint sealant must not flow on grades up to 15 percent. 40-2.11C Asphalt Rubber Joint Sealant Asphalt rubber joint sealant must: 1. Be a mixture of paving asphalt and ground rubber containing not less than 22 percent ground rubber by weight. One hundred percent of ground rubber must pass a No. 8 sieve. Ground rubber must be vulcanized or a combination of vulcanized and devulcanized materials. 2. Comply with ASTM D 6690, Type II except: 2.1. The cone penetration requirement must not exceed 120 at 77 F, 5 ounces, 5 seconds. 2.2. The resilience requirement must be a minimum 50 percent recovery when tested at 77 F. 3. Have a Ring and Ball softening point of 135 OF minimum when tested under AASHTO T 53. 4. Be capable of being melted and applied to cracks and joints at temperatures below 400 OF. 5. Not be applied when the concrete pavement surface temperature is below 50 OF. Book One- State Route 68 at San Benancio Road Intersection Improvements 206 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????40-2.11D Preformed Compression Joint Seals Preformed compression joint seals must comply with ASTM D 2628. Lubricant adhesive used with the seals must comply with ASTM D 2835. Preformed compression joint seals must have 5 or 6 cells, except seals for Type A2 and Type B joints may have 4 cells. Install preformed compression joint seals in compliance with the manufacturer's recommendations. Show evidence that the seals are compressed from 40 to 50 percent for the joint width and depth. 40-2.12 WATER Water for core drilling must be from a local domestic water supply. Water must not contain: 1. More than 1,000 parts per million of chlorides as CL 2. More than 1,300 parts per million of sulfates as SO4 3. Impurities in a quantity to cause concrete discoloration or surface etching 40-3 CONSTRUCTION 40-3.01 WATER SUPPLY Before placing concrete pavement, develop enough water supply for the work. 40-3.02 SUBGRADE PREPARATION Immediately before placing concrete, the subgrade to receive concrete pavement must be: 1. In compliance with the specified compaction and elevation tolerances 2. Free of loose and extraneous material 3. Uniformly moist, but free of standing or flowing water 4. Excavated for thickened parts of concrete pavement end anchors with no disturbed compaction outside the end anchor dimensions If cement treated permeable base is specified, cover the base surface with asphaltic emulsion before placing concrete pavement. Apply the asphaltic emulsion uniformly at a rate of 0.1 gallons per square yard. Asphaltic emulsion must comply with anionic slow-setting type, SS1h grade in Section 94, Asphaltic Emulsions." Repair damaged asphaltic emulsion before placing concrete pavement. 40-3.03 PROPORTIONING Proportion aggregate and bulk cementitious materials under Section 90-5, Proportioning." 40-3.04 PLACING CONCRETE 40-3.04A General Place concrete pavement with stationary side forms or slip-form paving equipment. Place consecutive concrete loads within 30 minutes of each other. Construct a transverse construction joint when concrete placement is interrupted by more than 30 minutes. The transverse construction joint must coincide with the next contraction joint location, or you must remove fresh concrete pavement to the preceding transverse joint location. Place concrete pavement in full slab widths separated by construction joints or monolithically in multiples of full lane widths with a longitudinal contraction joint at each traffic lane line. Do not retemper concrete. If the concrete pavement surface width is constructed as specified, you may construct concrete pavement sides on a batter not flatter than 6:1 vertical:horizontal). Book One- State Route 68 at San Benancio Road Intersection Improvements 207 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????40-3.04B Concrete Pavement Widening If concrete pavement is placed adjacent to existing pavement not constructed as part of the contract, grind the existing concrete pavement lane or shoulder adjacent to the new concrete pavement. Perform the grinding before new concrete pavement is placed. The new concrete pavement must match the elevation of the existing concrete pavement after grinding. Grind existing concrete pavement under Section 42-2, Grinding," except profile index must comply with the pavement smoothness specifications in Section 40-1.03, Quality Control and Assurance." Use paving equipment with padded crawler tracks or rubber-tired wheels on the existing concrete pavement with enough offset to avoid breaking or cracking the existing concrete pavement's edge. 40-3.04C Concrete Pavement Transition Panel For concrete pavement placed in a transition panel, texture the surface with a drag strip of burlap, a broom, or a spring steel tine device that produces scoring in the finished surface. The scoring must be either parallel with or transverse to the centerline. For the method you choose, texture at the time that produces the coarsest texture. 40-3.04D Stationary Side Form Construction Stationary side forms must be straight and without defects including warps, bends, and indentations. Side forms must be metal except at end closures and transverse construction joints where other materials may be used. You may build up side forms by attaching a section to the top or bottom. If attached to the top of metal forms, the attached section must be metal. The side form's base width must be at least 80 percent of the specified concrete pavement thickness. Side forms including interlocking connections with adjoining forms must be rigid enough to prevent springing from subgrading and paving equipment and concrete pressure. Construct subgrade to final grade before placing side forms. Side forms must bear fully on the foundation throughout their length and base width. Place side forms to the specified grade and alignment of the finished concrete pavement's edge. Support side forms during concrete placing, compacting, and finishing. After subgrade work is complete and immediately before placing concrete, true side forms and set to line and grade for a distance that avoids delays due to form adjustment. Clean and oil side forms before each use. Side forms must remain in place for at least 1 day after placing concrete and until the concrete pavement edge no longer requires protection from the forms. Spread, screed, shape, and consolidate concrete with 1 or more machines. The machine must uniformly distribute and consolidate the concrete. The machines must operate to place the concrete pavement to the specified cross section with minimal hand work. Consolidate the concrete without segregation. If vibrators are used: 1. The vibration rate must be at least 3,500 cycles per minute for surface vibrators and 5,000 cycles per minute for internal vibrators 2. Amplitude of vibration must cause perceptible concrete surface movement at least 1 foot from the vibrating element 3. Use a calibrated tachometer for measuring frequency of vibration 4. Vibrators must not rest on side forms or new concrete pavement 5. Power to vibrators must automatically cease when forward or backward motion of the paving machine is stopped Book One- State Route 68 at San Benancio Road Intersection Improvements 208 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Use high-frequency internal vibrators within 15 minutes of depositing concrete on the subgrade to uniformly consolidate the concrete across the paving width including adjacent to forms. Do not use vibrators to shift the mass of concrete. 40-3.04E Slip-Form Construction If slip-form construction is used, spread, screed, shape, and consolidate concrete to the specified cross section with slip-form machines and minimal hand work. Slip-form paving machines must be equipped with traveling side forms and must not segregate the concrete. Do not deviate from the specified concrete pavement alignment by more than 0.1 foot. Slip-form paving machines must use high frequency internal vibrators to consolidate concrete. You may mount vibrators with their axes parallel or normal to the concrete pavement alignment. If mounted with axes parallel to the concrete pavement alignment, space vibrators no more than 2.5 feet measured center to center. If mounted with axes normal to the concrete pavement alignment, space the vibrators with a maximum 0.5-foot lateral clearance between individual vibrators. Each vibrator must have a vibration rate from 5,000 cycles per minute to 8,000 cycles per minute. The amplitude of vibration must cause perceptible concrete surface movement at least 1 foot from the vibrating element. Use a calibrated tachometer to measure frequency of vibration. 40-3.05 TIE BAR PLACEMENT Place tie bars: 1. Perpendicular to the longitudinal concrete pavement joint 2. Parallel with the concrete pavement surface at mid-slab depth 3. Not less than 1/2-inch below the saw cut depth of joints 4. With not less than 2 inches clearance from the concrete pavement's surface and bottom 5. With embedment length tolerance of 2 inches 6. For smooth tie bars, with horizontal and vertical skew not more than 1/2 inch per foot of bar length Install tie bars at longitudinal joints by 1 of the following methods: 1. Drill concrete and bond tie bars with chemical adhesive in compliance with the manufacturer's instructions. Clean and dry drilled holes before placing chemical adhesive and tie bars. After inserting tie bars into chemical adhesive, support the bars to prevent movement during curing. If the Engineer rejects a tie bar installation, cut the tie bar flush with the joint face and coat the exposed end of the tie bar with chemical adhesive under Section 40-2, Materials." Offset new holes 3 inches horizontally from the rejected hole's center. 2. Insert tie bars into plastic slip-formed concrete before finishing. Inserted tie bars must have full contact between the bar and the concrete. If tie bars are inserted through the plastic concrete surface, eliminate evidence of the insertion by reworking the concrete over the tie bars. 3. Use threaded tie bar splice couplers fabricated from deformed bar reinforcement free of external welding or machining. 4. Use tie bar baskets. Anchor baskets at least 200 feet in advance of the concrete placement activity. If you request a waiver, describe the construction limitations or restricted access preventing the advanced anchoring. After the baskets are anchored and before the concrete is placed, cut and remove temporary spacer wires and demonstrate the Book One- State Route 68 at San Benancio Road Intersection Improvements 209 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????tie bars do not move from their specified depth and alignment during concrete placement. Use fasteners to anchor tie bar baskets. If tie bars are not placed correctly, stop paving activities until you demonstrate to the Engineer correction of the cause. 40-3.06 DOWEL BAR PLACEMENT Center dowel bars within 2 inches in the longitudinal direction on transverse contraction joints or construction joints. If using curing compound as lubricant, apply the curing compound to dowels in 2 separate applications. Lubricate each dowel bar entirely with bond breaker before placement. The last application must be applied not more than 8 hours before placing the dowel bars. Apply each curing compound application at a rate of 1 gallon per 150 square feet. If dowel bars are placed by mechanical insertion, eliminate evidence of the insertion by reworking the concrete over the dowel bars. If drilling and bonding dowel bars at construction joints, use a grout retention ring. If using dowel bar baskets, anchor them with fasteners. Use at least 10 fasteners for basket sections greater than 12 feet and less than or equal to 16 feet. Baskets must be anchored at least 200 feet in advance of the concrete placement activity unless the Engineer approves your waiver request. If requesting a waiver, describe the construction limitations or restricted access preventing the advanced anchoring. After the baskets are anchored and before the concrete is placed, cut and remove temporary spacer wires and demonstrate the dowel bars do not move from their specified depth and alignment during concrete placement. Place dowel bars in compliance with: Dowel Bar Tolerances Dimension Tolerance Horizontal offset 1 inch Longitudinal translation +2 inches Horizontal skew 3/8 inch, max Vertical skew 3/8 inch, max Vertical depth The minimum distance below the concrete pavement surface must be: DB d/3 + 1 /2 inch where: DB vertical distance in inches, measured from concrete pavement surface to any point along the top of dowel bar d concrete pavement thickness in inches The maximum distance below the depth shown on the plans must be 0.05 foot. If dowel bars are not placed correctly, stop paving activities until you demonstrate to the Engineer correction of the cause. Remove and replace the concrete pavement 3 feet on either side of a joint with a rejected dowel bar. Book One- State Route 68 at San Benancio Road Intersection Improvements 210 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????40-3.07 BAR REINFORCEMENT Place bar reinforcement under Section 52, Reinforcement." Bar reinforcement must be more than 1/2 inch below the saw cut depth at concrete pavement joints. 40-3.08 JOINTS 40-3.08A General Concrete pavement joints consist of: 1. Longitudinal and transverse construction joints 2. Longitudinal and transverse contraction joints 3. Isolation joints Construction joints must be normal to the concrete pavement surface. Until contract acceptance and except for joint filler material, keep joints free of foreign material including soil, gravel, concrete, or asphalt mix. Volunteer cracks are cracks not coincident with constructed joints. Repair concrete pavement damaged during joint construction under Section 40-3.17B, Repair of Spalls, Raveling, and Tearing." Do not bend tie bars or reinforcement in existing concrete pavement joints. 40-3.08B Construction Joints Construction joints form where fresh concrete is placed against hardened concrete, existing pavements, or structures. Before placing concrete at construction joints, apply a curing compound under Section 90- 7.0113, Curing Compound Method," to the vertical surface of existing or hardened concrete and allow it to dry. Use a metal or wooden bulkhead to form transverse construction joints. If dowel bars are specified, the bulkhead must allow dowel bar installation. 40-3.08C Contraction Joints In multilane monolithic concrete pavement, use the sawing method to construct longitudinal contraction joints. Construct transverse contraction joints by the sawing method. Construct transverse contraction joints within 1 foot of their specified spacing. If a slab length of less than 5 feet would be formed, adjust the transverse contraction joint spacing. Construct transverse contraction joints across the full concrete pavement width regardless of the number or types of longitudinal joints crossed. In areas of converging and diverging pavements, space transverse contraction joints so their alignment is continuous across the full width where converging and diverging pavements are contiguous. Longitudinal contraction joints must be parallel with the concrete pavement centerline. Transverse and longitudinal contraction joints must not deviate by more than 0.1 foot from either side of a 12-foot straight line, except for longitudinal joints parallel to a curving centerline. 40-3.08D Isolation Joints Construct isolation joints by saw cutting a minimum 1/8-inch width to full concrete pavement depth at the existing concrete pavement's edge and removing the concrete to expose a flat vertical surface. Before placing concrete, secure joint filler material that prevents new concrete from adhering to the existing concrete face. Book One- State Route 68 at San Benancio Road Intersection Improvements 211 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Dispose of concrete saw cutting residue under Section 7-1.13, Disposal of Materials Outside the Highway Right of Way." 40-3.08E Sawing Method The sawing method is cutting a groove in the concrete pavement with a power driven concrete saw. Grooves for longitudinal and transverse contraction joints must be the minimum width possible for the type of saw used. If necessary, the top of the joint must be sawn wider to provide space for joint sealant. Immediately wash slurry from the joint with water under 100 psi maximum pressure. Saw longitudinal and transverse contraction joints before volunteer cracking occurs and after the concrete is hard enough to saw without spalling, raveling, or tearing. To keep foreign material out of grooves before joint sealant or compression seal installation, you may use joint filler in sawed contraction joints. Joint filler must not react adversely with the concrete or cause concrete pavement damage. After sawing and washing a joint, install joint filler material that keeps moisture in the adjacent concrete during the 72 hours after paving. If you install joint filler material, the specifications for spraying the sawed joint with additional curing compound under Section 40-3.13, Curing," do not apply. If using absorptive filler material, moisten the filler immediately before or after installation. 40-3.09 JOINT SEALANT AND COMPRESSION SEAL INSTALLATION 40-3.09A General At least 7 days after concrete pavement placement and not more than 4 hours before installing joint sealant or compression seal materials, use dry sand blasting and other methods to clean the joint walls of objectionable material such as soil, asphalt, curing compound, paint, and rust. The maximum sand blasting nozzle diameter must be 1/4 inch. The minimum pressure must be 90 psi. Sand blast each side of the joint at least once, in at least 2 separate passes. Hold the nozzle at an angle to the joint from 1 to 2 inches from the concrete pavement. Using a vacuum, collect sand, dust, and loose material at least 2 inches on each side of the joint. Remove surface moisture and dampness at the joints with compressed air that may be moderately hot. Before you install joint sealant or compression seal, the joint wall must be free of moisture, residue, or film. If grinding or grooving over or adjacent to sealed joints, remove joint sealant or compression seal materials and dispose of them under Section 7-1.13, Disposal of Material Outside the Highway Right of Way." After grinding or grooving, replace the joint sealant or compression seal materials. 40-3.09B Liquid Sealant Do not install liquid sealant in construction joints. Install backer rods when the concrete pavement temperature is above the air dew point and when the air temperature is at least 40 F. Install liquid sealant immediately after installing the backer rod. Install sealant using a mechanical device with a nozzle shaped to introduce the sealant from inside the joint. Extrude sealant evenly and with continuous contact with the joint walls. Recess the sealant surface after placement. Remove excess sealant from the concrete pavement surface. Do not allow traffic over sealed joints until the sealant is set. 40-3.09C Preformed Compression Seal Do not install preformed compression seal in construction or isolation joints. Book One- State Route 68 at San Benancio Road Intersection Improvements 212 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Install longitudinal seals before transverse seals. Longitudinal seals must be continuous except at intersections with transverse seals. Install transverse seals in 1 continuous piece for the entire transverse length of concrete pavement. With a sharp instrument, cut across the longitudinal seal at the intersection with transverse construction joints. If the longitudinal seal does not relax enough to properly install the transverse seal, trim the longitudinal seal to form a tight seal between the 2 joints. Use a machine specifically designed for preformed compression seal installation. The machine must install the seal: 1. To the specified depth 2. To make continuous contact with the joint walls 3. Without cutting, nicking, or twisting the seal 4. With less than 4 percent stretch Lay a length of preformed compression seal material cut to the exact length of the pavement joint to be sealed. The Engineer measures this length. After you install the length of preformed compression joint sealant, the Engineer measures the excess amount of material at the joint end. The Engineer divides the excess amount length by the original measured length to determine the percentage of stretch. 40-3.10 SHOULDER RUMBLE STRIP If specified, construct shoulder rumble strips by rolling or grinding indentations in new concrete pavement. Select the method and equipment for constructing ground-in indentations. Do not construct shoulder rumble strips on structures or approach slabs. Construct rumble strips within 2 inches of the specified alignment. Roller or grinding equipment must be equipped with a sighting device enabling the operator to maintain the rumble strip alignment. Indentations must not vary from the specified dimensions by more than 1/16 inch in depth or more than 10 percent in length and width. The Engineer orders grinding or removal and replacement of noncompliant rumble strips to bring them within specified tolerances. Ground surface areas must be neat and uniform in appearance. The grinding equipment must be equipped with a vacuum attachment to remove residue. Dispose of removed material under Section 7-1.13, Disposal of Material Outside the Highway Right of Way." 40-3.11 PRELIMINARY FINISHING 40-3.11A General Preliminary finishing must produce a smooth and true-to-grade finish. After preliminary finishing, mark each day's concrete pavement with a stamp. The stamp must be approved by the Engineer before paving starts. The stamp must be approximately 1' x 2' in size. The stamp must form a uniform mark from 1/8 to 1/4 inch deep. Locate the mark 20 feet 5 feet from the transverse construction joint formed at each day's start of paving and 1 foot 0.25 foot from the concrete pavement's outside edge. The stamp mark must show the month, day, and year of placement and the station of the transverse construction joint. Orient the stamp mark so it can be read from the concrete pavement's outside edge. Do not apply more water to the concrete pavement surface than can evaporate before float finishing and texturing are completed. Book One- State Route 68 at San Benancio Road Intersection Improvements 213 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Allow enough time to complete finishing activities during daylight. Work may continue after daylight if the Engineer approves lighting you provide. 40-3.11B Stationary Side Form Finishing If stationary side form construction is used, give the concrete a preliminary finish by the machine float method or the hand method. If using the machine float method: 1. Use self-propelled machine floats. 2. Determine the number of machine floats required to perform the work at a rate equal to the concrete delivery rate. When the time from concrete placement to machine float finishing exceeds 30 minutes, stop concrete delivery. When machine floats are in proper position, you may resume concrete delivery and paving. 3. Machine floats must run on side forms or adjacent concrete pavement lanes. If running on adjacent concrete pavement, protect the adjacent concrete pavement surface under Section 40-3.15, Protecting Concrete Pavement." 4. Floats must be hardwood, steel, or steel-shod wood. Floats must be equipped with devices that adjust the under side to a true flat surface. If using the hand method, finish concrete smooth and true to grade with manually operated floats or powered finishing machines. 40-3.11C Slip-Form Finishing If slip-form construction is used, the slip-form paver must give the concrete pavement a preliminary finish. You may supplement the slip-form paver with machine floats. Before the concrete hardens, correct concrete pavement edge slump in excess of 0.02 foot exclusive of edge rounding. 40-3.12 FINAL FINISHING After completing preliminary finishing, round the edges of the initial paving widths to a 0.04- foot radius. Round transverse and longitudinal construction joints to a 0.02-foot radius. Before curing, texture the pavement. Perform initial texturing with a burlap drag or broom device that produces striations parallel to the centerline. Perform final texturing with a steel- tined device that produces grooves parallel with the centerline. Construct longitudinal grooves with a self-propelled machine designed specifically for grooving and texturing concrete pavement. The machine must have tracks to maintain constant speed, provide traction, and maintain accurate tracking along the pavement surface. The machine must have a single row of rectangular spring steel tines. The tines must be from 3/32 to 1/8 inch wide, on 3/4-inch centers, and must have enough length, thickness, and resilience to form grooves approximately 3/16 inch wide. The machine must have horizontal and vertical controls. The machine must apply constant down pressure on the pavement surface during texturing. The machines must not cause ravels. Construct grooves over the entire pavement width in a single pass except do not construct grooves 3 inches from the concrete pavement edges and longitudinal joints. Final texture must be uniform and smooth. Use a guide to properly align the grooves. Grooves must be parallel and aligned to the pavement edge across the pavement width. Grooves must be from 1/8 to 3/16 inch deep and 3/16 inch wide after concrete has hardened. For irregular areas and areas inaccessible to the grooving machine, you may hand-construct grooves in compliance with the hand method under Section 40-3.11B, Stationary Side Form Book One- State Route 68 at San Benancio Road Intersection Improvements 214 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Finishing." Hand-constructed grooves must comply with the specifications for machine- constructed grooves. Initial and final texturing must produce a coefficient of friction of at least 0.30 when tested under California Test 342. Notify the Engineer when the concrete pavement is scheduled to be opened to traffic. Allow at least 25 days for the Department to test for coefficient of friction from the later of: 1. Seven days after concrete placement 2. When the concrete pavement has attained a modulus of rupture of 550 psi Do not open the concrete pavement to traffic unless the coefficient of friction is at least 0.30. Correct concrete pavement not complying with the Engineer's acceptance criteria for coefficient of friction by grooving or grinding under Section 42, Groove and Grind Pavement." Do not grind before: 1. Ten days after concrete pavement placement 2. Concrete has developed a modulus of rupture of at least 550 psi Before opening to traffic, allow at least 25 days for the Department to retest sections for coefficient of friction after corrections are made. 40-3.13 CURING Cure the concrete pavement's exposed area with waterproof membrane or curing compound 1) or 2) under Section 90-7.01, Methods of Curing." When side forms are removed within 72 hours of the start of curing, also cure the concrete pavement edges. If curing compound is used, apply it with mechanical sprayers. Reapply curing compound to sawcuts and disturbed areas. 40-3.14 EARLY USE OF CONCRETE PAVEMENT If requesting early use of concrete pavement: 1. Furnish molds and machines for modulus of rupture testing 2. Sample concrete 3. Fabricate beam specimens 4. Test for modulus of rupture under California Test 523 When you request early use, concrete pavement must have a modulus of rupture of at least 350 psi. Protect concrete pavement under Section 40-3.15, Protecting Concrete Pavement." 40-3.15 PROTECTING CONCRETE PAVEMENT Protect concrete pavement under Section 90-8, Protecting Concrete." Maintain the concrete pavement temperature at not less than 40 F for the initial 72 hours. Protect the concrete pavement surface from activities that cause damage and reduce texture and coefficient of friction. Do not allow soil, gravel, petroleum products, concrete, or asphalt mixes on the concrete pavement surface. Construct crossings for traffic convenience. If the Engineer approves your request, you may use Type III portland cement in the concrete for crossings. Do not open crossings until the Department determines by California Test 523 the concrete pavement's modulus of rupture is at least 550 psi. Book One- State Route 68 at San Benancio Road Intersection Improvements 215 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Do not open concrete pavement to traffic or use equipment on the concrete pavement for 10 days after paving or before the concrete has attained a modulus of rupture of 550 psi except: 1. If the equipment is for sawing contraction joints 2. If the Engineer approves your request, one side of paving equipment's tracks may be on the concrete pavement after a modulus of rupture of 350 psi has been attained, provided: 2.1. Unit pressure exerted on the concrete pavement by the paver does not exceed 20 psi 2.2. You change the paving equipment tracks to prevent damage or the paving equipment tracks travel on protective material such as planks 2.3. No part of the track is closer than 1 foot from the concrete pavement's edge If concrete pavement damage including visible cracking occurs, stop operating paving equipment on the concrete pavement and repair the damage. 40-3.16 OBTAINING DRILLED CORES Drill concrete pavement cores under ASTM C 42/ C 42M. Core drilling equipment must use diamond impregnated bits. Clean, dry, and fill core holes with hydraulic cement grout non-shrink) or pavement concrete. Coat the core hole walls with epoxy under the specifications for epoxy adhesive for bonding new concrete to old concrete in Section 95, Epoxy." The backfill must match the adjacent concrete pavement surface elevation and texture. Do not allow residue from core drilling to fall on traffic, flow across shoulders or lanes occupied by traffic, or flow into drainage facilities including gutters. 40-3.17 REPAIR, REMOVAL, AND REPLACEMENT 40-3.17A General Working cracks are full-depth cracks essentially parallel to a planned contraction joint beneath which a contraction crack has not formed. If the Engineer orders, take 4-inch nominal diameter cores on designated cracks under Section 40-3.16, Obtaining Drilled Cores." 40-3.17B Repair of Spalls, Raveling, and Tearing Before concrete pavement is open to traffic, repair spalls, raveling, and tearing in sawed joints.Make repairs in compliance with the following: 1. Saw a rectangular area with a diamond-impregnated blade at least 2 inches deep. 2. Remove unsound and damaged concrete between the saw cut and the joint and to the saw cut's depth. Do not use a pneumatic hammer heavier than 15 pounds. Do not damage concrete pavement to remain in place. 3. Dispose of removed concrete pavement under Section 7-1.13, Disposal of Materials Outside the Highway Right of Way." 4. Clean the repair area's exposed surfaces with high pressure abrasive water blasting. Further clean and dry the exposed surfaces with compressed air free of moisture and oil. 5. Apply epoxy as specified for epoxy resin adhesive for bonding new concrete to old concrete under Section 95, Epoxy." Apply the epoxy with a stiff bristle brush. 6. Apply a portland cement concrete or mortar patch immediately following the epoxy application. Install an insert to prevent bonding of the sides of planned joints. Repair spalls if they are: Book One- State Route 68 at San Benancio Road Intersection Improvements 216 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???1. Deeper than 0.05 foot 2. Wider than 0.04 foot 3. Longer than 0.3 foot 40-3.17C Route and Seal Working Cracks Treat working cracks within 0.5 foot of either side of a planned contraction joint in compliance with the following: 1. Route and seal the crack with epoxy resin in compliance with the following: 1.1. Use a powered rotary router mounted on wheels, with a vertical shaft and a routing spindle that casters as it moves along the crack 1.2. Form a reservoir 3/4 inch deep by 3/8 inch wide in the crack 1.3. Use equipment that does not cause raveling or spalling 1.4. Place liquid sealant 2. Treat the contraction joint adjacent to the working crack in compliance with the following: 2.1. Use epoxy resin under ASTM C 881/C 881M, Type IV, Grade 2 for Type B joints and secondary saw cuts for Type Al and Type A2 joints 2.2. Pressure inject epoxy resin under ASTM C 881/C881M, Type IV, Grade 1 for narrow saw cuts including initial saw cuts for Type Al and Type A2 joints If a working crack intersects a contraction joint, route and seal the working crack and seal the contraction joint as specified for installing liquid sealant under Section 40-3.09, Joint Seal and Joint Sealant Installation." 40-3.17D Removal and Replacement of Slabs As specified, remove and replace slabs or partial slabs for: 1. Insufficient thickness 2. Dowel bar misalignment 3. Working cracks more than 0.5 foot from a planned contraction joint 40-4 MEASUREMENT AND PAYMENT 40-4.01 MEASUREMENT The contract item for concrete pavement as designated in the Verified Bid Item List is measured by the cubic yard. The Engineer calculates the pay quantity volume based on the plan dimensions. The Engineer does not measure concrete pavement placed outside those dimensions unless it was ordered by the Engineer. The contract items for sealing joints as designated in the Verified Bid Item List are measured by the linear foot. The contract item for shoulder rumble strips is measured by the station along each shoulder on which the rumble strips are constructed without deductions for gaps between indentations. 40-4.02 PAYMENT The contract price paid per cubic yard for concrete pavement as designated in the Verified Bid Item List includes full compensation for furnishing all labor, materials, tools, equipment, and Book One- State Route 68 at San Benancio Road Intersection Improvements 217 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???incidentals, and for doing all the work involved in constructing the concrete pavement, complete in place including bar reinforcement, tie bars, dowel bars, anchors, and fasteners, as shown on the plans and as specified in these specifications and the special provisions, and as directed by the Engineer. The Engineer adjusts payment for each primary area deficient in average thickness in compliance with the following: Average Thickness Deficiency foot) Deficiency Adjustment $/yd2) 0.01 0.90 0.02 2.30 0.03 4.10 0.04 6.40 0.05 9.11 Pay Adjustments for Deficient Thickness If the average thickness deficiency is less than 0.01 foot, the Engineer does not adjust payment for thickness deficiency. If the average thickness deficiency is more than 0.01 foot, the Engineer rounds to the nearest 0.01 foot and uses the adjustment table. Full compensation for core drilling and backfilling the cores ordered by the Engineer for measuring concrete pavement thickness and determining full-depth cracks is included in the contract price paid per cubic yard for concrete pavement as designated in the Engineer's Estimate and no additional compensation will be allowed therefor. The Department does not pay for additional concrete pavement thickness measurements requested by the Contractor. The Department does not pay for the portion of concrete that penetrates treated permeable base. Full compensation for the quality control plan is included in the contract price paid per cubic yard for concrete pavement as designated in the Verified Bid Item List and no separate payment will be made therefor. Full compensation for furnishing and applying asphaltic emulsion on cement treated permeable base is included in the contract price paid per cubic yard for concrete pavement as designated in the Engineer's Estimate and no separate payment will be made therefor. Full compensation for repairing joints is included in the contract price paid per cubic yard for concrete pavement as designated in the Verified Bid Item List and no separate payment will be made therefor. Full compensation for furnishing, calibrating, and operating profilograph equipment for Profile Index, for submitting profilograms, and for performing corrective work is included in the contract price paid per cubic yard for concrete pavement as designated in the Verified Bid Item List and no separate payment will be made therefor. Full compensation for grooving and grinding for final finishing is included in the contract price paid per cubic yard for concrete pavement as designated in the Verified Bid Item List and no separate payment will be made therefor. Full compensation for removing and replacing joint material for grooving and grinding is included in the contract price per cubic yard for concrete pavement as designated in the Verified Bid Item List and no separate payment will be made therefor. Full compensation for removing and replacing slabs is included in the contract price paid per cubic yard for concrete pavement as designated in the Verified Bid Item List and no separate payment will be made therefor. Full compensation for drilling holes and bonding tie bars with chemical adhesive is included in the contract price paid per cubic yard for concrete pavement as designated in the Verified Bid Item List and no additional compensation will be allowed therefor. Book One- State Route 68 at San Benancio Road Intersection Improvements 218 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Full compensation for repairing damage caused by operating paving equipment on new concrete pavement is included in the contract price paid per cubic yard for concrete pavement as designated in the Verified Bid Item List and no separate payment will be made therefor. The material and work necessary for the construction of crossings for public convenience, and their subsequent removal and disposal, will be paid for at the contract prices for the items of work involved and if there are no contract items for the work involved, payment for concrete pavement crossings will be made by extra work as specified in Section 4-1.03D, Extra Work." The Department will reduce payments to the Contractor by $56.12 per square yard for concrete pavement slabs allowed to remain in place represented by cores indicating dowel bars placed with their centers from 2 inches to 3 inches from the saw cut of a transverse contraction joint The Engineer will calculate the reduced payment using the slab dimensions adjacent to and inclusive of the joints with misplaced dowel bars. This reduced payment is in addition to other specified payment reductions. The Department will reduce payments to the Contractor by $59.56 per square yard for concrete pavement allowed to remain in place represented by cores indicating either of the following: 1. Tie bars placed outside their specified placement and position tolerances 2. Bar reinforcement placed outside their specified placement and position tolerances The Engineer will calculate the reduced payment using the slab dimensions adjacent to and inclusive of the joints with misplaced tie bars. This reduced payment is in addition to other specified payment reductions. Full compensation for core drilling for checking dowel or tie bar alignment and backfilling the cores is included in the contract price paid per cubic yard for concrete pavement as designated in the Engineer's Estimate and no additional compensation will be allowed therefor. If the initial cores show that dowel bars or tie bars are out of tolerance for alignment and the Engineer orders additional dowel or tie bar coring, full compensation for drilling the additional cores is included in the contract price paid per cubic yard for concrete pavement as designated in the Verified Bid Item List and no additional compensation will be allowed therefor. If the initial cores show that dowel bars or tie bars are within alignment tolerances and the Engineer orders more dowel or tie bar coring, the additional cores will be paid for as extra work as specified in Section 4-1.03D, Extra Work." The Department will not pay for additional coring to check dowel or tie bar alignment you request. Full compensation for performing profilograph tests, furnishing the profilograms and electronic files to the Engineer, and for performing corrective work is included in the contract price paid per cubic yard for the type of concrete pavement as designated in the Verified Bid Item List and no additional compensation will be allowed therefor. The contract prices paid per linear foot for seal pavement joint, seal isolation joint, and seal longitudinal isolation joint include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in sealing pavement joints and sealing isolation joints, complete in place, as shown on the plans, and as specified in these specifications and the Special Provisions, and as directed by the Engineer. The contract price paid per station for shoulder rumble strip includes full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in constructing the rumble strip complete in place, as shown on the plans, as specified in these Standard Specifications and as directed by the Engineer. Book One- State Route 68 at San Benancio Road Intersection Improvements 219 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 41 PAVEMENT SUBSEALING AND JACKING Issued 01-05-07) In Section 41-1.02 replace the 2nd and 3rd paragraphs with: Cement for grout shall be Type II portland cement conforming to the provisions in Section 90-2.01A, Cement." Fly ash shall conform to the requirements in AASHTO Designation: M 295 for either Class C or for Class F. The brand of fly ash used in the work shall conform to the provisions for approval of admixture brands in Section 90-4.03, Admixture Approval." In Section 41-1.02 replace the 5th paragraph with: Chemical admixtures and calcium chloride may be used. Chemical admixtures in the grout mix shall conform to the provisions in Section 90-4, Admixtures." Calcium chloride shall conform to ASTM Designation: D 98. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 42 GROOVE AND GRIND PAVEMENT Issued 05-15-09) In Section 42-2.02 replace the 3rd paragraph with: Existing portland cement concrete pavement not constructed as part of the project shall be ground as follows: Grinding shall be performed so that the pavement surface on both sides of all transverse joints and cracks has essentially the same depth of texture and does not vary from a true plane enough to permit a 0.006-foot thick shim 0.25-foot wide to pass under a 3-foot straightedge adjacent to either side of the joint or crack when the straightedge is laid on the pavement parallel to centerline with its midpoint at the joint or crack. After grinding has been completed, the pavement shall conform to the straightedge and profile requirements specified in Section 40-1.03, Quality Control and Assurance." Abnormally depressed areas due to subsidence or other localized causes will be excluded from testing with the profilograph and 12-foot straightedge specified in Section 40-1.03. The accumulated total of the excluded areas shall not exceed 5 percent of the total area to be ground. Profilograph testing shall end 25 feet prior to excluded areas and shall resume 25 feet following the excluded areas. In Section 42-2.03 replace the 2nd paragraph with: Replacement concrete paving shall conform to the provisions in Section 40, Concrete Pavement." Replacement pavement may be spread and shaped by any suitable powered finishing machines, supplemented by handwork as necessary. Consolidation of the concrete Book One- State Route 68 at San Benancio Road Intersection Improvements 220 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???shall be by means of high-frequency internal vibrators within 15 minutes after the concrete is deposited on the subgrade. Vibrating shall be done with care and in such manner to assure adequate consolidation adjacent to forms and uniformly across the full paving width. Use of vibrators for extensive shifting of the mass of concrete will not be permitted. Methods of spreading, shaping and compacting that result in segregation, voids or rock pockets shall be discontinued, and the Contractor shall adopt methods which will produce dense homogeneous pavement conforming to the required cross section. Finishing may be performed by hand method, as specified in Section 40-3.11B, Stationary Side Form Finishing." AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 49 PILING Issued 12-19-08) In Section 49-1.03 replace the 4th paragraph with: Modification to the specified installation methods and specified pile tip elevation will not be considered at locations where settlement, tension demands, or lateral load demands control design pile tip elevations or when the plans state that specified pile tip elevation shall not be revised. In Section 49-1.03 in the 6th paragraph, replace the 1st sentence with: Indicator compression pile load testing shall conform to the requirements in ASTM Designation: D 1143-81. In Section 49-1.03 in the 7th paragraph, replace the 1st sentence with: Indicator tension pile load testing shall conform to the requirements in ASTM Designation: D 3689-90. In Section 49-1.03 replace the 9th paragraph with: The Contractor shall furnish piling of sufficient length to obtain the specified tip elevation shown on the plans or specified in the Special Provisions. In Section 49-1.04 replace the 6th paragraph with: The Contractor may use additional cementitious material in the concrete for the load test and anchor piles. In Section 49-6.01 replace the 1st paragraph with: The length of timber, steel, and precast prestressed concrete piles, and of cast-in-place concrete piles consisting of driven shells filled with concrete, shall be measured along the longest side, from the tip elevation shown on the plans to the plane of pile cut-off. Book One- State Route 68 at San Benancio Road Intersection Improvements 221 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???In Section 49-6.02 add: When pile tips are revised by the Engineer for timber, steel, and precast prestressed concrete piles, and for cast-in-place concrete piles consisting of driven shells filled with concrete, the additional length required, including all materials, equipment, and labor for furnishing, splicing, and installing the piling, will be paid for as extra work as provided in Section 4-1.03D, Extra Work." AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 50 PRESTRESSING CONCRETE Issued 06-05-09) In Section 50-1.05 replace the 1st paragraph with: Prestressing steel shall be high-tensile wire conforming to the requirements in ASTM Designation: A 421, including Supplement I; high-tensile seven-wire strand conforming to the requirements in ASTM Designation: A 416; or uncoated deformed Type II) high-strength steel bars conforming to the requirements in ASTM Designation: A 722, including all supplementary requirements. The maximum weight requirement of ASTM Designation: A 722 will not apply. In Section 50-1.05 in the 3rd paragraph, delete item A. In Section 50-1.07 replace the 2nd paragraph with: Ducts shall be fabricated with either welded or interlocked seams. Galvanizing of the welded seam will not be required. Ducts shall have sufficient strength to maintain their correct alignment during placing of concrete. Joints between sections of duct shall be positive metallic connections which do not result in angle changes at the joints. Waterproof tape shall be used at the connections. Ducts shall be bent without crimping or flattening. Transition couplings connecting the ducts to anchoring devices shall be either ferrous metal or polyolefin. Ferrous metal transition couplings need not be galvanized. In Section 50-1.07 replace the 7th paragraph with: All ducts with a total length of 400 feet or more shall be vented. Vents shall be placed at intervals of not more than 400 feet and shall be located within 6 feet of every high point in the duct profile. Vents shall be 1/2 inch minimum diameter standard pipe or suitable plastic pipe. Connections to ducts shall be made with metallic or plastic structural fasteners. Plastic components, if selected, shall not react with the concrete or enhance corrosion of the prestressing steel and shall be free of water soluble chlorides. The vents shall be mortar tight, taped as necessary, and shall provide means for injection of grout through the vents and for sealing the vents. Ends of vents shall be removed one inch below the roadway surface after grouting has been completed. Book One- State Route 68 at San Benancio Road Intersection Improvements 222 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???In Section 50-1.08 in the 11th paragraph, replace item B with: B. When the concrete is designated by class or cementitious material content, either the concrete compressive strength shall have reached the strength shown on the plans at the time of stressing or at least 28 days shall have elapsed since the last concrete to be prestressed has been placed, whichever occurs first. In Section 50-1.09 replace the 2nd and 3rd paragraphs with: Grout shall consist of cement and water and may contain an admixture if approved by the Engineer. Cement shall conform to the provisions in Section 90-2.01A, Cement." In Section 50-1.11 replace the 1st paragraph with: No separate payment will be made for pretensioning precast concrete members. Payment for pretensioning precast concrete members shall be considered as included in the contract price paid for furnish precast members as provided for in Section 51, Concrete Structures." AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 51 CONCRETE STRUCTURES Issued 06-05-09) In Section 51-1.05 in the 11th paragraph, replace the 1st sentence with: Form panels for exposed surfaces shall be furnished and placed in uniform widths of not less than 3 feet and in uniform lengths of not less than 6 feet, except at the end of continuously formed surfaces where the final panel length required is less than 6 feet. In Section 51-1.06C in the 11th paragraph, replace the 1st sentence with: Falsework for box culverts and other structures with decks lower than the roadway pavement and with span lengths of 14 feet or less shall not be released until the last placed concrete has attained a compressive strength of 1,600 psi, provided that curing of the concrete is not interrupted. In Section 51-1.11 replace the 6th paragraph with: Construction methods and equipment employed by the Contractor shall conform to the provisions in Section 7-1.02, Load Limitations." In Section 51-1.12D replace the 4th paragraph with: Expanded polystyrene shall be a commercially available polystyrene board. Expanded polystyrene shall have a minimum flexural strength of 35 psi determined in conformance with the requirements in ASTM Designation: C 203 and a compressive yield strength of between 16 and 40 psi at 5 percent compression. Surfaces of expanded polystyrene against which concrete is Book One- State Route 68 at San Benancio Road Intersection Improvements 223 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???placed shall be faced with hardboard. Hardboard shall be 1/8 inch minimum thickness, conforming to ANSI A135.4, any class. Other facing materials may be used provided they furnish equivalent protection. Boards shall be held in place by nails, waterproof adhesive, or other means approved by the Engineer. In Section 51-1.12F replace the 3rd paragraph with: Type A and AL joint seals shall consist of a groove in the concrete that is filled with field- mixed silicone sealant. In Section 51-1.12F in the 6th paragraph, replace the table with: Movement Rating MR) Seal Type MR 1 inch Type A or Type B 1 inch MR 2 inches Type B 2 inches MR 4 inches Joint Seal Assembly Strip Seal) MR 4 inches Joint Seal Assembly Modular Unit) or Seismic Joint In Section 51-1.12F(3)(a) replace the 1st and 2nd paragraphs with: The sealant must consist of a 2-component silicone sealant that will withstand up to 50 percent movement. Silicone sealants must be tested under California Test 435 and must comply with the following: Specification Requirement Modulus at 150 percent elongation 8-75 psi Recovery 21/32 inch max. Notch Test Notched or loss of bond 1/4 inch, max. Water Resistance Notched or loss of bond 1/4 inch, max. Ultraviolet Exposure No more than slight checking or ASTM Designation: G 154, Table cracking. X2.1,Cycle 2. Cone Penetration 4.5-12.0 mm In Section 51-1.12F(3)(a) delete the 3rd and 8th paragraphs. In Section 51-1.12F(3)(a) replace the 10th paragraph with: A Certificate of Compliance accompanied by a certified test report must be furnished for each batch of silicone sealant in conformance with the provisions in Section 6-1.07, Certificates of Compliance." In Section 51-1.12F(3)(b) replace the 2nd paragraph with: The preformed elastomeric joint seal must conform to the requirements in ASTM D 2628 and the following: Book One- State Route 68 at San Benancio Road Intersection Improvements 224 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???1. The seal must consist of a multichannel, nonporous, homogeneous material furnished in a finished extruded form. 2. The minimum depth of the seal measured at the contact surface must be at least 95 percent of the minimum uncompressed width of the seal as designated by the manufacturer. 3. When tested in conformance with the requirements in California Test 673 for Type B seals, joint seals must provide a movement rating MR) of not less than that shown on the plans. 4. The top and bottom edges of the joint seal must maintain continuous contact with the sides of the groove over the entire range of joint movement. 5. The seal must be furnished full length for each joint with no more than 1 shop splice in any 60-foot length of seal. 6. The Contractor must demonstrate the adequacy of the procedures to be used in the work before installing seals in the joints. 7. One field splice per joint may be made at locations and by methods approved by the Engineer. The seals are to be manufactured full length for the intended joint, then cut at the approved splice section and rematched before splicing. The Contractor must submit splicing details prepared by the joint seal manufacturer for approval before beginning splicing work. 8. Shop splices and field splices must have no visible offset of exterior surfaces and must show no evidence of bond failure. 9. At all open ends of the seal that would admit water or debris, each cell must be filled to a depth of 3 inches with commercial quality open cell polyurethane foam or closed by other means subject to approval by the Engineer. In Section 51-1.12F(3)(b) replace the 7th paragraph with: The joint seal must be installed full length for each joint with equipment that does not twist or distort the seal, elongate the seal longitudinally, or otherwise cause damage to the seal or to the concrete forming the groove. In Section 51-1.12F(3)(b) in the 11th paragraph, replace the 1st sentence with: Samples of the prefabricated joint seals, not less than 3 feet in length, will be taken by the Engineer from each lot of material. In Section 51-1.12H(1) in the 6th paragraph, replace the 4th and 5th sentences with: Each ply of fabric shall have a breaking strength of not less than 800 pounds per inch of width in each thread direction when 3" x 36" samples are tested on split drum grips. The bond between double plies shall have a minimum peel strength of 20 pounds per inch. In Section 51-1.12H(1) in the 8th paragraph in the table, replace the hardness Type A) requirements with: Hardness Type A) D 2240 with 2kg mass. 55 f5 Book One- State Route 68 at San Benancio Road Intersection Improvements 225 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???In Section 51-1.12H(2) in the 1st paragraph in item A, replace the 1st and 2nd sentences with: The bearings shall consist of alternating steel laminates and internal elastomer laminates with top and bottom elastomer covers. Steel laminates shall have a nominal thickness of 0.075 inch 14 gage). In Section 51-1.135 replace the 1st paragraph with: Mortar shall be composed of cementitious material, sand, and water proportioned and mixed as specified in this Section 51-1.135. In Section 51-1.135 replace the 3rd paragraph with: The proportion of cementitious material to sand, measured by volume, shall be 1 to 2 unless otherwise specified. In Section 51-1.17 in 4th paragraph, replace the 3rd sentence with: The surfaces shall have a profile trace showing no high points in excess of 0.25 inch, and the portions of the surfaces within the traveled way shall have a profile count of 5 or less in any 100 foot section. Add: 51-1.17A Deck Crack Treatment The Contractor shall use all means necessary to minimize the development of shrinkage cracks. The Contractor shall remove all equipment and materials from the deck and clean the surface as necessary for the Engineer to measure the surface crack intensity. Surface crack intensity will be determined by the Engineer after completion of concrete cure, before prestressing, and before the release of falsework. In any 500 square foot portion of deck within the limits of the new concrete deck, should the intensity of cracking be such that there are more than 50 feet of cracks whose width at any location exceeds 0.02 inch, the deck shall be treated with a high molecular weight methacrylate HMWM) resin system. The area of deck to be treated shall have a width that extends for the entire width of new deck inside the concrete barriers and a length that extends at least 5 feet beyond the furthest single continuous crack outside the 500 square foot portion, measured from where that crack exceeds 0.02 inch in width, as determined by the Engineer. Deck crack treatment shall include furnishing, testing, and applying the HMWM resin system, with sand and absorbent material. If grinding is required, deck crack treatment shall take place before grinding. 51-1.17A(1) Submittals Submit a HMWM resin system placement plan. When HMWM resin is to be applied within 100 feet of a residence, business, or public space including sidewalks under a structure, also submit a public safety plan. Submit plans under Section 5-1.02, Plans and Working Drawings," of the Standard Specifications. The review time is 15 days. The HMWM resin system placement plan must include: 1. Schedule of work and testing for each bridge Book One- State Route 68 at San Benancio Road Intersection Improvements 226 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???2. Description of equipment for applying HMWM resin 3. Range of gel time and final cure time for HMWM resin 4. Absorbent material to be used 5. Description of equipment for applying and removing excess sand and absorbent material 6. Procedure for removing HMWM resin from the deck, including equipment 7. Storage and handling of HMWM resin components and absorbent material 8. Disposal of excess HMWM resin and containers The public safety plan must include: 1. A public notification letter with a list of delivery and posting addresses. The letter must state HMWM resin work locations, dates, times, and what to expect. Deliver the letter to residences and businesses within 100 feet of HMWM resin work locations and to local fire and police officials at least 7 days before starting work. Post the letter at the job site. 2. An airborne emissions monitoring plan prepared and executed by a certified industrial hygienist CIH) certified in comprehensive practice by the American Board of Industrial Hygiene. The plan must have at least 4 monitoring points including the mixing point, application point, and point of nearest public contact. Monitor airborne emissions during HMWM resin work and submit emissions monitoring results after completing the work. 3. An action plan for protection of the public when airborne emissions levels exceed permissible levels. 4. A copy of the CIH's certification. If the measures proposed in the safety plan are inadequate to provide for public safety associated with the use of HMWM resin, the Engineer will reject the plan and direct the Contractor to revise the plan. Directions for revisions will be in writing and include detailed comments. The Engineer will notify the Contractor of the approval or rejection of a submitted or revised plan within 15 days of receipt of that plan. 51-1.17A(2) Quality Control and Assurance Submit samples of HMWM resin components 15 days before use under Section 6-3, Testing," of the Standard Specifications. Notify the Engineer 15 days before delivery of HMWM resin components in containers over 55 gallons to the job site. Complete a test area before starting work. Results from airborne emissions monitoring of the test area must be submitted to the Engineer before starting production work. The test area must: 1. Be approximately 500 square feet 2. Be placed within the project limits outside the traveled way at an approved location 3. Be constructed using the same equipment as the production work 4. Replicate field conditions for the production work 5. Demonstrate proposed means and methods meet the acceptance criteria 6. Demonstrate production work will be completed within the time allowed 7. Demonstrate suitability of the airborne emissions monitoring plan The test area will be acceptable if: 1. The treated deck surface is tack free and non-oily 2. The sand cover adheres and resists brushing by hand 3. Excess sand and absorbent material has been removed Book One- State Route 68 at San Benancio Road Intersection Improvements 227 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???4. The coefficient of friction is at least 0.35 when tested under California Test 342 51-1.17A(3) Materials HMWM resin system consists of a resin, promoter, and initiator. HMWM resin must be low odor and comply with the following: HMWM Resin Property Requirement Test Method Volatile Content 30 percent, maximum ASTM D 2369 Viscosity 25 cP, maximum, ASTM D 2196 Brookfield RVT with UL adaptor, 50 RPM at 77?F) Specific Gravity* 0.90 minimum, at 77?F ASTM D 1475 Flash Point 180?F, minimum ASTM D 3278 Vapor Pressure 1.0 mm Hg, maximum, ASTM D 323 at 77?F Tack-free Time 400 minutes, Specimens prepared maximum, at 25?C per California Test 551 PCC Saturated 3.5 MPa, minimum at California Test 551 Surface-Dry Bond 24 hours and 21 + 1 C Strength Test must be performed before adding initiator. Sand for abrasive sand finish must: 1. Be commercial quality dry blast sand 2. Have at least 95 percent pass the No. 8 sieve and at least 95 percent retained on the No. 20 sieve when tested under California Test 205 Absorbent material must be diatomaceous earth, abrasive blast dust, or substitute recommended by the HMWM resin supplier and approved by the Engineer. 51-1.17A(4) Construction HMWM resin system applied by machine must be: 1. Combined in volumetric streams of promoted resin to initiated resin by static in-line mixers 2. Applied without atomization HMWM resin system may be applied manually. Limit the quantity of resin mixed for manual application to 5 gallons at a time. Prepare the area to be treated by abrasive blasting. Curing compound, surface contaminants, and foreign material must be removed from the bridge deck surface. Sweep the deck surface clean after abrasive blasting and blow loose material from cracks using high-pressure air. The deck surface must be dry when abrasive blast cleaning is performed. When abrasive blast cleaning within 10 feet of public traffic, remove dust and residue from abrasive blast cleaning using a vacuum attachment operating concurrently with blasting equipment If the deck surface becomes contaminated before placing HMWM, abrasive blast clean the contaminated area and sweep the deck clean. Book One- State Route 68 at San Benancio Road Intersection Improvements 228 CONTRACT NO. 10- 1] 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The deck must be dry before applying HMWM resin. The concrete surface must be at least 50 degrees F and at most 100 degrees F. Relative humidity must be expected to be at most 85 percent during the work shift. Thoroughly mix all components of the HMWM resin system. Apply HMWM resin to the deck surface within 5 minutes of mixing at approximately 90 sq ft per gallon. The Engineer determines the exact application rate. The resin gel time must be between 40 and 90 minutes. HMWM resin that thickens during application is rejected. Spread the HMWM resin system uniformly. Completely cover surfaces to be treated and fill all cracks. Redistribute excess resin using squeegees or brooms within 10 minutes of application. For textured or grooved deck surfaces, excess resin must be removed from the texture indentations. Apply the abrasive sand finish of at least 2 pounds per square yard or until saturation as determined by the Engineer no sooner than 20 minutes after applying resin. Apply absorbent material before opening lane to traffic. Remove excess sand and absorbent material by vacuuming or power sweeping. Traffic or equipment will be allowed on the overlay after the Engineer has determined: 1. The treated deck surface is tack free and non-oily 2. The sand cover adheres and resists brushing by hand 3. Excess sand and absorbent material has been removed 4. No material will be tracked beyond limits of treatment by traffic In Section 51-1.18C replace the 2nd paragraph with: When Class 2 surface finish gun finish) is specified, ordinary surface finish shall first be completed. The concrete surfaces shall then be abrasive blasted to a rough texture and thoroughly washed down with water. While the washed surfaces are damp, but not wet, a finish coating of machine applied mortar, approximately 1/4 inch thick, shall be applied in not less than 2 passes. The coating shall be pneumatically applied and shall consist of either 1) sand, cementitious material, and water mechanically mixed prior to its introduction to the nozzle, or 2) premixed sand and cementitious material to which water is added prior to its expulsion from the nozzle. The use of admixtures shall be subject to the approval of the Engineer as provided in Section 90, Portland Cement Concrete." Unless otherwise specified, supplementary cementitious materials will not be required. The proportion of cementitious material to sand shall be not less than one to 4, unless otherwise directed by the Engineer. Sand shall be of a grading suitable for the purpose intended. The machines shall be operated and the coating shall be applied in conformance with standard practice. The coating shall be firmly bonded to the concrete surfaces on which it is applied. In Section 51-1.18C replace the 5th paragraph with: When surfaces to be finished are in pedestrian undercrossings, the sand shall be silica sand and the cementitious material shall be standard white portland cement. In Section 51-1.23, add: Full compensation for deck crack treatment, including the public safety plan, shall be considered as included in the contract price paid per cubic yard for structural concrete, bridge, and no additional compensation will be allowed therefor. Book One- State Route 68 at San Benancio Road Intersection Improvements 229 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 52 REINFORCEMENT Issued 06-05-09) In Section 52-1.02(B) between the 3rd and 4th paragraphs, add: The epoxy powder coating shall be selected from the Department's Pre-Qualified Products List. In Section 52-1.02(B) replace the 14th paragraph with: Except for lap splices, splices for epoxy-coated reinforcement shall be coated with a corrosion protection covering that is selected from the Department's Pre-Qualified Products List. The covering shall be installed in accordance with the manufacturer's recommendations. In Section 52-1.07 in the 11th paragraph, replace the table with: Height Zone H) Feet above ground) Wind Pressure Value psf) H__<30 20 30 H<_ 50 25 50 H<_ 100 30 H> 100 35 In Section 52-1.08B(1) replace the 1st paragraph with: Mechanical splices to be used in the work shall be selected from the Department's Pre- Qualified Products List. In Section 52-1.08B(1) in the 2nd paragraph, replace the table with: Reinforcing Bar Number Total Sli 4 0.020-inch 5 0.020-inch 6 0.020-inch 7 0.028-inch 8 0.028-inch 9 0.028-inch 10 0.036-inch 11 0.036-inch 14 0.048-inch 18 0.060-inch In Section 52-1.08B(1), in the 6th paragraph, delete item C. In Section 52-1.08B(2) in the 6th paragraph, replace the subparagraph with: The minimum preheat and interpass temperatures shall be 400? F for Grade 40 bars and 600? F for Grade 60 bars. Immediately after completing the welding, at least 6 inches of the bar on each side of the splice shall be covered by an insulated wrapping to control the rate of cooling. The insulated wrapping shall remain in place until the bar has cooled below 200? F. Book One- State Route 68 at San Benancio Road Intersection Improvements 230 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Replace Section 52-1.08B(3) with: 52-1.08B(3) Resistance Butt Welds Shop produced resistance butt welds shall be produced by a fabricator who is selected from the Department's Pre-Qualified Products List. A Certificate of Compliance conforming to the provisions in Section 6-1.07, Certificates of Compliance," shall be furnished for each shipment of splice material. The Certificate of Compliance shall include heat number, lot number and mill certificates. In Section 52-1.08C replace the 3rd paragraph with: Testing on prequalification and production sample splices shall be performed at an approved independent testing laboratory. The laboratory shall not be employed or compensated by any subcontractor, or by other persons or entities hired by subcontractors who will provide other services or materials for the project. The independent testing laboratory shall be selected from the Department's Pre-Qualified Products List. In Section 52-1.08C replace the 5th paragraph with: Prequalification and production sample splices and testing shall conform to California Test 670 and these specifications. In Section 52-1.08C delete the 6th paragraph. In Section 52-1.08C replace the 8th paragraph with: Each sample splice, as defined herein, shall be identified as representing either a prequalification or production test sample splice. In Section 52-1.08C in the 10th paragraph, delete the last sentence. Replace Section 52-1.08C(1) with: 52-1.08C(1) Splice Prequalification Report Before using any service splices or ultimate butt splices in the work, the Contractor shall submit a Splice Prequalification Report. The report shall include the following: A. A copy of the manufacturer's product literature giving complete data on the splice material and installation procedures. B. Names of the operators who will be performing the splicing. C. Descriptions of the positions, locations, equipment, and procedures that will be used in the work. D. Certifications from the fabricator for prequalification of operators and procedures based on sample tests performed no more than 2 years before submitting the report. Each operator shall be certified by performing 2 sample splices for each bar size of each splice type that the operator will be performing in the work. For deformation-dependent types of splice devices, each operator shall be certified by performing 2 additional samples for each bar size and deformation pattern that will be used in the work. Prequalification sample splices shall be tested by an approved independent testing laboratory and shall conform to the appropriate production test criteria and slip requirements specified herein. When epoxy-coated reinforcement is required, resistance butt welded sample splices Book One- State Route 68 at San Benancio Road Intersection Improvements 231 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???shall have the weld flash removed by the same procedure as will be used in the work, before coating and testing. The Splice Prequalification Report shall include the certified test results for all prequalification sample splices. The QCM shall review and approve the Splice Prequalification Report before submitting it to the Engineer for approval. The Contractor shall allow 2 weeks for the review and approval of a complete report before performing any service splicing or ultimate butt splicing in the work. In Section 52-1.08C(2)(a) replace the 1st, 2nd, 3rd, 4th, and 5th paragraphs with: Production tests shall be performed by an approved independent testing laboratory for all service splices used in the work. A production test shall consist of testing 4 sample splices prepared for each lot of completed splices. The samples shall be prepared by the Contractor using the same splice material, position, operators, location, and equipment, and following the same procedure as used in the work. At least one week before testing, the Contractor shall notify the Engineer in writing of the date and location where the testing of the samples will be performed. The 4 samples from each production test shall be securely bundled together and identified with a completed sample identification card before shipment to the approved independent testing laboratory. The card will be furnished by the Engineer. Bundles of samples containing fewer than 4 samples of splices shall not be tested. Before performing any tensile tests on production test sample splices, one of the 4 samples shall be tested for, and shall conform to, the requirements for total slip in Section 52-1.08B(1), Mechanical Splices." Should this sample not meet the total slip requirements, one retest, in which the 3 remaining samples are tested for total slip, will be allowed. Should any of the 3 remaining samples not conform to the total slip requirements, all splices in the lot represented by this production test will be rejected. If 3 or more sample splices from a production test conform to the provisions in this Section 52-1.08C(2), Service Splice Test Criteria," all splices in the lot represented by this production test will be considered acceptable. Replace Section 52-1.08C(2)(b) with: 52-1.08C(2)(b) Quality Assurance Test Requirements for Service Splices In addition to the required production tests, the Contractor shall concurrently prepare 4 service quality assurance sample splices for: A. The first production test performed. B. One of every 5 subsequent production tests, or fraction thereof, randomly selected by the Engineer. These service quality assurance sample splices shall be prepared in the same manner as specified herein for service production sample splices. The service quality assurance sample splices shall be shipped to the Transportation Laboratory for quality assurance testing. Each set of 4 sample splices shall be securely bundled together and identified by location and contract number with weatherproof markings before shipment. Bundles containing fewer than 4 samples of splices will not be tested. Sample splices not accompanied by the supporting documentation required in Section 52-1.08B(1), Mechanical Splices," for mechanical splices, or in Section 52-1.08B(3), Resistance Butt Welds," for resistance butt welds, will not be tested. Quality assurance testing will be performed in conformance with the requirements for service production sample splices in Section 52-1.08C(2)(a), Production Test Requirements for Service Splices." Book One- State Route 68 at San Benancio Road Intersection Improvements 232 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Replace Section 52-1.08C(3) with: 52-1.08C(3) Ultimate Butt Splice Test Criteria Ultimate production and quality assurance sample splices shall be tensile tested in conformance with the requirements described in ASTM Designation: A 370 and California Test 670. Each sample splice shall be identified as representing a prequalification, production, or quality assurance sample splice. The portion of hoop reinforcing bar, removed to obtain a sample splice, shall be replaced using a prequalified ultimate mechanical butt splice, or the hoop shall be replaced in kind. Reinforcing bars, other than hoops, from which sample splices are removed, shall be repaired using ultimate mechanical butt splices conforming to the provisions in Section 52-1.08C(1), Splice Prequalification Report," or the bars shall be replaced in kind. These bars shall be repaired or replaced such that no splices are located in any No Splice Zone" shown on the plans. Ultimate production and quality assurance sample splices shall rupture either: 1) in the reinforcing bar but outside of the affected zone, provided that the sample splice has visible necking or 2) anywhere, provided that the sample splice has achieved the strain requirement for necking. When tested in conformance with the requirements in California Test 670, Necking Option I)," the visible necking shall be such that there is a visible decrease in the sample's cross- sectional area at the point of rupture. When tested in conformance with the requirements in California Test 670, Necking Option II)," the strain requirement for necking shall be such that the largest measured strain is not less than 6 percent for No. 11 and larger bars, or not less than 9 percent for No. 10 and smaller bars. The affected zone is the portion of the reinforcing bar where any properties of the bar, including the physical, metallurgical, or material characteristics, have been altered by fabrication or installation of the splice. The weld and one inch adjacent to the weld will be considered part of the affected zone. In Section 52-1.08C(3)(a) replace the 1st paragraph with: Production tests shall be performed for all ultimate butt splices used in the work. A production test shall consist of testing 4 sample splices removed from each lot of completed splices. In Section 52-1.08C(3)(a) replace the 3rd paragraph with: After notification has been received, the Engineer will randomly select the 4 sample splices to be removed from the lot and place tamper-proof markings or seals on them. These ultimate production sample splices shall be removed by the Contractor, and tested by an approved independent testing laboratory. In Section 52-1.08(C)(3)(a) replace the 5th, 6th, and 7th paragraphs with: A sample splice will be rejected if a tamper-proof marking or seal is disturbed before testing. The 4 sample splices from each production test shall be securely bundled together and identified with a completed sample identification card before shipment to the approved independent testing laboratory. The card will be furnished by the Engineer. Bundles of samples containing fewer than 4 sample splices shall not be tested. Before performing any tensile tests on production test sample splices, one of the 4 sample splices shall be tested for, and shall conform to, the requirements for total slip in Section 52- 1.08B(1), Mechanical Splices." Should this sample splice not meet these requirements, one Book One- State Route 68 at San Benancio Road Intersection Improvements 233 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???retest, in which the 3 remaining sample splices are tested for total slip, will be allowed. Should any of the 3 remaining sample splices not conform to these requirements, all splices in the lot represented by this production test will be rejected. Replace Section 52-1.08C(3)(b) with: 52-1.08C(3)(b) Quality Assurance Test Requirements for Ultimate Butt Splices In addition to the required production tests, the Contractor shall concurrently prepare 4 ultimate quality assurance sample splices for: A. The first production test performed. B. One of every 5 subsequent production tests, or fraction thereof, randomly selected by the Engineer. These ultimate quality assurance sample splices shall be prepared in the same manner as specified herein for ultimate production sample splices. The ultimate quality assurance sample splices shall be shipped to the Transportation Laboratory for quality assurance testing. Each set of 4 sample splices shall be securely bundled together and identified by location and contract number with weatherproof markings before shipment. Bundles containing fewer than 4 samples of splices will not be tested. Sample splices not accompanied by the supporting documentation required in Section 52-1.08B(1), Mechanical Splices," for mechanical splices, or in Section 52-1.08B(3), Resistance Butt Welds," for resistance butt welds, will not be tested. Quality assurance testing will be performed in conformance with the requirements for ultimate production sample splices in Section 52-1.08C(3)(a), Production Test Requirements for Ultimate Butt Splices." Replace Section 52-1.08D with: A Production Test Report for all testing performed on each lot shall be prepared by the approved independent testing laboratory performing the testing and submitted to the QCM for review and approval. The report shall be signed by an engineer who represents the laboratory and is registered as a Civil Engineer in the State of California. The report shall include, as a minimum, the following information for each test: contract number, bridge number, lot number and location, bar size, type of splice, length of mechanical splice, length of test specimen, physical condition of test sample splice, any notable defects, total measured slip, and ultimate tensile strength of each splice. In addition, the report shall include location of visible necking area and largest measured strain for ultimate butt splices. The QCM must review, approve, and forward each Production Test Report to the Engineer for review before the splices represented by the report are encased in concrete. The Engineer will have 3 working days to review each Production Test Report and respond in writing after a complete report has been received. Should the Contractor elect to encase any splices before receiving notification from the Engineer, it is expressly understood that the Contractor will not be relieved of the responsibility for incorporating material in the work that conforms to the requirements of the plans and specifications. Material not conforming to these requirements will be subject to rejection. Quality assurance test results for each bundle of 4 samples of splices will be reported in writing to the Contractor within 3 working days after receipt of the bundle by the Transportation Laboratory. In the event that more than one bundle is received on the same day, 2 additional working days shall be allowed for providing test results for each additional bundle received. A test report will be made for each bundle received. Should the Contractor elect to encase splices before receiving notification from the Engineer, it is expressly understood that the Contractor Book One- State Route 68 at San Benancio Road Intersection Improvements 234 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Will not be relieved of the responsibility for incorporating material in the work that conforms to the requirements of the plans and specifications. Material not conforming to these requirements will be subject to rejection. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 53 SHOTCRETE Issued 11-02-07) In Section 53-1.01 replace the 3rd paragraph with: The dry-mix process shall consist of delivering dry mixed aggregate and cementitious material pneumatically or mechanically to the nozzle body and adding water and mixing the materials in the nozzle body. The wet-mix process shall consist of delivering mixed aggregate, cement, and water pneumatically to the nozzle and adding any admixture at the nozzle. In Section 53-1.02 replace the 1st through 4th paragraphs with: Cementitious material, fine aggregate, and mixing water shall conform to the provisions in Section 90, Portland Cement Concrete." Shotcrete to be mixed and applied by the dry-mix process shall consist of one part cementitious material to not more than 4.5 parts fine aggregate, thoroughly mixed in a dry state before being charged into the machine. Measurement may be either by volume or by weight. The fine aggregate shall contain not more than 6 percent moisture by weight. Shotcrete to be mixed and applied by the wet-mix process shall consist of cementitious material, fine aggregate, and water and shall contain not less than 632 pounds of cementitious material per cubic yard. A maximum of 30 percent pea gravel may be substituted for fine aggregate. The maximum size of pea gravel shall be such that 100 percent passes the 1/2 inch screen and at least 90 percent passes the 3/8 inch screen. Admixtures may be added to shotcrete and shall conform to the provisions in Section 90-4, Admixtures." In Section 53-1.04 in the 3rd paragraph, replace item C with: C. Aggregate and cementitious material that have been mixed for more than 45 minutes shall not be used unless otherwise permitted by the Engineer. Replace Section 53-1.07 with: 53-1.07 MEASUREMENT Quantities of shotcrete will be measured by the cubic yard computed from measurements, along the slope, of actual areas placed and the theoretical thickness shown on the plans. The Department does not pay for shotcrete placed outside the dimensions shown on the plans or to fill low foundation. Book One- State Route 68 at San Benancio Road Intersection Improvements 235 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Replace Section 53-1.08 with: 53-1.08 PAYMENT The contract price paid per cubic yard for shotcrete shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in placing shotcrete, including preparing the foundation, wire reinforcement, structure backfill, joint filling material, and if required by the plans, drains with sacked pervious backfill material, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 55 STEEL STRUCTURES Issued 05-02-08 In Section 55-1.05 replace the 3rd paragraph with: Construction methods and equipment employed by the Contractor shall conform to the provisions in Section 7-1.02, Load Limitations." In Section 55-2.01 in the 5th paragraph in the table, replace the CVN impact value for Grade HPS 50W with: Grade HPS 50W* 4 inches and under in thickness) 20 at 10 OF In Section 55-3.05 replace the 1st paragraph with: Surfaces of bearing and base plates and other metal surfaces that are to come in contact with each other or with ground concrete surfaces or with asbestos sheet packing shall be flat to within 1/32-inch tolerance in 12 inches and to within 1/16-inch tolerance overall. Surfaces of bearing and base plates and other metal bearing surfaces that are to come in contact with preformed fabric pads, elastomeric bearing pads, or mortar shall be flat to within 1/8-inch tolerance in 12 inches and to within 3/16-inch tolerance overall. In Section 55-3.10 in the 1st paragraph, replace item B with: B. Internal threads shall conform to the requirements in ASTM Designation: A 563. In Section 55-3.19 replace the 3rd paragraph with: Immediately before setting bearing assemblies or masonry plates directly on ground concrete surfaces, the Contractor shall thoroughly clean the surfaces of the concrete and the metal to be in contact and shall apply a coating of nonsag polysulfide or polyurethane caulking conforming to the requirements in ASTM Designation: C 920 to contact areas to provide full bedding. Book One- State Route 68 at San Benancio Road Intersection Improvements 236 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????In Section 55-3.19 replace the 5th paragraph with: Mortar to be placed below masonry plates or bearing plates of the bearing assemblies and in anchor bolt sleeves or canisters shall conform to the provisions in Section 51-1.135, Mortar," except that the proportion of cementitious material to sand shall be 1:3. In Section 55-4.01 in the 1st paragraph, replace item D with: D. To determine the pay quantities of galvanized metal, the weight to be added to the calculated weight of the base metal for the galvanizing will be determined from the table of weights of zinc coatings specified in ASTM Designation: A 153/A 153M. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 56 SIGNS Issued 03-16-07) In Section 56-1.03 replace the 5th paragraph with: Clips, eyes, or removable brackets shall be affixed to all signs and all posts and shall be used to secure the sign during shipping and for lifting and moving during erection as necessary to prevent damage to the finished galvanized or painted surfaces. Brackets on tubular sign structures shall be removed after erection. Details of the devices shall be shown on the working drawings. In Section 56-1.10 replace the 4th paragraph with: The contract price paid per pound for install sign structure of the type or types designated in the Engineer's Estimate shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in installing sign structures, complete in place, including installing anchor bolt assemblies, removable sign panel frames, and sign panels and performing any welding, painting or galvanizing required during installation, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. In Section 56-2.03 replace the 4th paragraph with: Backfill material for metal posts shall consist of minor concrete conforming to the provisions in Section 90-10, Minor Concrete," and shall contain not less than 463 pounds of cementitious material per cubic yard. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 59 PAINTING Issued 06-05-09) Book One- State Route 68 at San Benancio Road Intersection Improvements 237 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????In Section 59-1.03 replace the 3rd paragraph with: Painting shall be done in a neat and workmanlike manner. Unless otherwise specified, paint shall be applied by brush, or spray, or roller, or any combination of these methods. Gun extensions shall not be used. In Section 59-2.01 replace the 2nd paragraph with: Unless otherwise specified, no painting Contractors or subcontractors will be permitted to perform work without having the following current SSPC: The Society for Protective Coatings" formerly the Steel Structures Painting Council) certifications in good standing throughout the duration of the contract: A. For cleaning and painting structural steel in the field, certification in conformance with the requirements in Qualification Procedure No. 1, Standard Procedure For Evaluating Painting Contractors Field Application to Complex Industrial Structures)" SSPC-QP 1). B. For removing paint from structural steel, certification in conformance with the requirements in Qualification Procedure No. 2, Standard Procedure for the Qualification of Painting Contractors Field Removal of Hazardous Coatings from Complex Structures)" SSPC-QP 2, Category A). C. For cleaning and painting structural steel in a permanent painting facility, certification in conformance with the requirements in Qualification Procedure No. 3, Standard Procedure For Evaluating Qualifications of Shop Painting Applicators" SSPC-QP 3, Enclosed Shop Facility). The AISC's Sophisticated Paint Endorsement SPE) quality program, Certification P-1 Enclosed, will be considered equivalent to SSPC-QP 3, Enclosed Shop Facility. In Section 59-2.12 replace the 3rd and 4th paragraphs with: Contact surfaces of stiffeners, railings, built up members or open seam exceeding 6 mils in width that would retain moisture, shall be caulked with polysulfide or polyurethane sealing compound conforming to the requirements in ASTM Designation: C 920, Type S, Grade NS, Class 25, Use 0, or other approved material. The dry film thickness of the paint will be measured in place with a calibrated Type 2 magnetic film thickness gage in conformance with the requirements in SSPC-PA 2, Measurement of Dry Coating Thickness with Magnetic Gages," of the SSPC: The Society for Protective Coatings," except that there shall be no limit to the number or location of spot measurements to verify compliance with specified thickness requirements. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 64 PLASTIC PIPE Issued 06-05-09) In Section 64-1.02 replace the 5th paragraph with: HDPE compounds used in the manufacture of corrugated polyethylene pipe and fittings shall comply with AASHTO M 294 except that the mix shall contain not less than 2 nor greater than 4 percent well dispersed carbon black. HDPE compounds used in the manufacture of ribbed Book One- State Route 68 at San Benancio Road Intersection Improvements 238 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????profile wall polyethylene pipe shall comply with ASTM F 894 except that Type E ultraviolet stabilizers shall not be allowed and carbon black shall be well dispersed in an amount not less than 2 percent nor greater than 4 percent. Manufacturers of corrugated polyethylene pipe shall: 1. Participate in the National Transportation Product Evaluation Control Program NTPEP) for each plant supplying corrugated polyethylene pipe and fittings for the project. 2. Conduct and maintain a quality control program under NTPEP. 3. Submit a copy to the Engineer of manufacturing plant audits and NTPEP test results from the current cycle of NTPEP testing for all pipe diameters supplied. Type D corrugated polyethylene pipe is not allowed. Corrugated polyethylene pipe greater than 60 inches in nominal diameter is not allowed. In Section 64-1.05 replace the 1st paragraph with: Excavation, backfill, and shaped bedding shall comply with Section 19-3, Structure Excavation and Backfill," except the following: 1. At locations where pipe is to be backfilled with concrete, the backfill shall comply with Section 64-1.06, Concrete Backfill." 2. Corrugated polyethylene pipe that is greater than 48 inches in nominal diameter but not exceeding 60 inches in nominal diameter shall be backfilled with either controlled low strength material under the special provisions or slurry cement backfill under Section 19- 3.062, Slurry Cement Backfill." 3. Where cementitious or flowable backfill is used for structure backfill, the backfill shall be placed to a level not less than 12 inches above the crown of the pipe. In Section 64-1.06 replace the 1st paragraph with: At locations where pipe is to be backfilled with concrete as shown on the plans, the concrete backfill shall be constructed of minor concrete or Class 4 concrete conforming to the provisions in Section 90, Portland Cement Concrete." Minor concrete shall contain not less than 380 pounds of cementitious material per cubic yard. The concrete to be used will be designated in the contract item or shown on the plans. In Section 64-1.06 replace the 3rd paragraph with: The surface of the concrete backfill shall be broomed with a heavy broom to produce a uniform rough surface if hot mix asphalt is to be placed directly thereon. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 65 REINFORCED CONCRETE PIPE Issued 07-31-07) Book One- State Route 68 at San Benancio Road Intersection Improvements 239 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????In Section 65-1.02 replace the 1st paragraph with: Cementitious material and aggregate shall conform to the provisions in Section 90-2, Materials" except that mortar strengths relative to Ottawa sand and grading requirements shall not apply to the aggregate. Use of supplemental cementitious material shall conform to AASHTO Designation: M 170. In Section 65-1.02A(1) in the 11th paragraph, replace item c with: c. Cementitious material and aggregate for non-reinforced concrete pipe shall conform to the provisions in Section 65-1.02, Materials." In Section 65-1.035 replace the 1st paragraph with: At locations where pipe is to be backfilled with concrete as shown on the plans, the concrete backfill shall be constructed of minor concrete or Class 4 concrete in conformance with the provisions in Section 90, Portland Cement Concrete." Minor concrete shall contain not less than 380 pounds of cementitious material per cubic yard. The concrete to be used will be designated in the contract item. In Section 65-1.035 replace the 3rd paragraph with: The surface of the concrete backfill shall be broomed with a heavy broom to produce a uniform rough surface if hot mix asphalt is to be placed directly thereon. In Section 65-1.06 in the 2nd paragraph, replace the 1st subparagraph with: Cement Mortar. Mortar shall be composed of one part cementitious material and 2 parts sand by volume. Supplementary cementitious material will not be required. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 66 CORRUGATED METAL PIPE Issued 07-31-07) In Section 66-1.045 replace the 1st paragraph with: At locations where pipe is to be backfilled with concrete as shown on the plans, the concrete backfill shall be constructed of minor concrete or Class 4 concrete conforming to the provisions in Section 90, Portland Cement Concrete." Minor concrete shall contain not less than 380 pounds of cementitious material per cubic yard. The concrete to be used will be designated in the contract item or shown on the plans. In Section 66-1.045 replace the 3rd paragraph with: The surface of the concrete backfill shall be broomed with a heavy broom to produce a uniform rough surface if hot mix asphalt is to be placed directly thereon. Book One- State Route 68 at San Benancio Road Intersection Improvements 240 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 68 SUBSURFACE DRAINS Issued 07-31-07) In Section 68-3.02D replace the 1st and 2nd paragraphs with: Concrete for splash pads shall be produced from minor concrete conforming to the provisions in Section 90-10, Minor Concrete." Minor concrete shall contain not less than 470 pounds of cementitious material per cubic yard. Mortar placed where edge drain outlets and vents connect to drainage pipe and existing drainage inlets shall conform to the provisions in Section 51-1.135, Mortar." In Section 68-3.03 replace the 13th paragraph with: Cement treated permeable material, which is not covered with hot mix asphalt within 12 hours after compaction of the permeable material, shall be cured by either sprinkling the material with a fine spray of water every 4 hours during daylight hours or covering the material with a white polyethylene sheet, not less than 6 mils thick. The above curing requirements shall begin at 7:00 a.m. on the morning following compaction of the cement treated permeable material and continue for the next 72 hours or until the material is covered with hot mix asphalt, whichever is less. The cement treated permeable material shall not be sprayed with water during the first 12 hours after compacting, but may be covered with the polyethylene sheet during the first 12 hours or prior to the beginning of the cure period. In Section 68-3.03 replace the 17th and 18th paragraphs with: Hot mix asphalt for backfilling trenches in existing paved areas shall be produced from commercial quality aggregates and asphalt and mixed at a central mixing plant. The aggregate shall conform to the 3/4 inch grading, or the 1/2 inch grading for Type A and Type B hot mix asphalt specified in Section 39-1.02E, Aggregate." The amount of asphalt binder to be mixed with the aggregate shall be between 4 percent and 7 percent by weight of the dry aggregate, as determined by the Engineer. Hot mix asphalt backfill shall be spread and compacted in approximately 2 equal layers by methods that will produce a hot mix asphalt surfacing of uniform smoothness, texture and density. Each layer shall be compacted before the temperature of the mixture drops below 250 F. Prior to placing the hot mix asphalt backfill, a tack coat of asphaltic emulsion conforming to the provisions in Section 94, Asphaltic Emulsions," shall be applied to the vertical edges of existing pavement at an approximate rate of 0.05 gallon per square yard. In Section 68-3.03 replace the 20th paragraph with: Type A pavement markers conforming to the details shown on the plans and the provisions in Section 85, Pavement Markers," shall be placed on paved shoulders or dikes at outlet, vent and cleanout locations as directed by the Engineer. The waiting period for placing pavement markers on new hot mix asphalt surfacing will not apply. Book One- State Route 68 at San Benancio Road Intersection Improvements 241 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Replace Section 68-3.05 with: 68-3.05 PAYMENT The contract price paid per linear foot for plastic pipe edge drain) of the size or sizes shown in the Engineer's Estimate shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in installing edge drains complete in place, including excavation and removal of any concrete deposits that may occur along the lower edge of the concrete pavement in Type 1 installations) and hot mix asphalt backfill for Type 1 edge drain installation, tack coat, filter fabric, and treated permeable material, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. The contract price paid per linear foot for plastic pipe edge drain outlet) of the size or sizes shown in the Engineer's Estimate shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in installing edge drain outlets, vents and cleanouts complete in place, including outlet and vent covers, expansion plugs, pavement markers, concrete splash pads, connecting outlets and vents to drainage facilities, and excavation and backfill aggregate base, hot mix asphalt, tack coat, and native material] for outlets, vents, and cleanouts to be installed in embankments and existing shoulders, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 69 OVERSIDE DRAINS Issued 07-31-07) In Section 69-1.01 replace the 1st paragraph with: This work shall consist of furnishing and installing entrance tapers, pipe downdrains, tapered inlets, flume downdrains, anchor assemblies, reducers, slip joints and hot mix asphalt overside drains to collect and carry surface drainage down the roadway slopes as shown on the plans or as directed by the Engineer and as specified in these specifications and the special provisions. Replace Section 69-1.02D with: 69-1.02D Hot Mix Asphalt Hot mix asphalt for overside drains shall conform to the provisions in Section 39-1.13, Miscellaneous Areas." Replace Section 69-1.04 with: 69-1.04 HOT MIX ASPHALT OVERSIDE DRAINS Hot mix asphalt overside drains shall be constructed as shown on the plans or as directed by the Engineer. The hot mix asphalt shall be placed in conformance with the provisions in Section 39-1.13, Miscellaneous Areas." Book One- State Route 68 at San Benancio Road Intersection Improvements 242 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????In Section 69-1.06 replace the 2nd paragraph with: Quantities of hot mix asphalt placed for overside drains will be paid for as provided in Section 39-5, Measurement and Payment," for hot mix asphalt placed in miscellaneous areas. ANNAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 70 MISCELLANEOUS FACILITIES Issued 07-18-08) In Section 70-1.02C replace the 2nd paragraph with: Precast concrete flared end sections shall conform to the requirements for Class III Reinforced Concrete Pipe in AASHTO Designation: M 170M. Cementitious materials and aggregate shall conform to the provisions in Section 90-2, Materials," except that mortar strengths relative to Ottawa sand and grading requirements shall not apply to the aggregate. Use of supplementary cementitious material shall conform to the requirements in AASHTO Designation: M 170. The area of steel reinforcement per linear foot of flared end section shall be at least equal to the minimum steel requirements for circular reinforcement in circular pipe for the internal diameter of the circular portion of the flared end section. The basis of acceptance of the precast concrete flared end section shall conform to the requirements of Section 5.1.2 of AASHTO Designation: M 170. In Section 70-1.02H replace the 1st paragraph with: Precast concrete pipe risers and pipe reducers, and precast concrete pipe sections, adjustment rings and tapered sections for pipe energy dissipators, pipe inlets and pipe manholes shall conform to the requirements in AASHTO Designation: M 199M/M 199, except that the cementitious material and aggregate shall conform to the provisions in Section 90-2, Materials," except that mortar strengths relative to Ottawa sand and grading requirements shall not apply to the aggregate. Use of supplementary cementitious material shall conform to the requirements in AASHTO Designation: M 170. In Section 70-1.03 replace the 2nd paragraph with: Cutoff walls for precast concrete flared end sections shall be constructed of minor concrete conforming to the provisions in Section 90-10, Minor Concrete." Minor concrete shall contain not less than 470 pounds of cementitious material per cubic yard. I AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 72 SLOPE PROTECTION Issued 03-13-09) Book One- State Route 68 at San Benancio Road Intersection Improvements 243 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????In Section 72-4.04 replace the 6th paragraph with: Pervious backfill material, if required by the plans, shall be placed as shown. A securely tied sack containing one cubic foot of pervious backfill material shall be placed at each weep hole and drain hole. The sack material shall conform to the requirements for filter fabric in Section 88- 1.02, Filtration." AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 73 CONCRETE CURBS AND SIDEWALKS Issued 06-05-09) In Section 73-1.01 in the 2nd paragraph, replace item 2 with: 2. Minor concrete shall contain not less than 463 pounds of cementitious material per cubic yard except that when extruded or slip-formed curbs are constructed using 3/8- inch maximum size aggregate, minor concrete shall contain not less than 505 pounds of cementitious material per cubic yard. In Section 73-1.06 replace the 15th paragraph with: Where hot mix asphalt or portland cement concrete pavements are to be placed around or adjacent to manholes, pipe inlets or other miscellaneous structures in sidewalk, gutter depression, island paving, curb ramps or driveway areas, the structures shall not be constructed to final grade until after the pavements have been constructed for a reasonable distance on each side of the structures. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 74 PUMPING PLANT EQUIPMENT Issued 07-01-08) In Section 74-1.02 delete the 2nd paragraph. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 75 MISCELLANEOUS METAL Issued 06-05-09) In Section 75-1.03 replace the 13th paragraph with: Concrete anchorage devices shall be mechanical expansion or resin capsule types installed in drilled holes or cast-in-place insert types. The anchorage devices shall be selected from the Book One- State Route 68 at San Benancio Road Intersection Improvements 244 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Department's Pre-Qualified Products List. The qualification requirements for concrete anchorage devices may be obtained from the Pre-Qualified Products List Web site. The anchorage devices shall be a complete system, including threaded studs, hex nuts, and cut washers. Thread dimensions for externally threaded concrete anchorage devices prior to zinc coating shall conform to the requirements in ASME Standard: B1.1 having Class 2A tolerances or ASME Standard: B1.13M having Grade 6g tolerances. Thread dimensions for internally threaded concrete anchorage devices shall conform to the requirements in ASTM A 563. In Section 75-1.03 replace the 18th paragraph with: Mechanical expansion anchors shall, when installed in accordance with the manufacturer's instructions and these specifications and tested in conformance with the requirements in California Test 681, withstand the application of a sustained tension test load of at least the following values for at least 48 hours with a movement not greater than 0.035 inch: Stud Diameter inches) Sustained Tension Test Load pounds) *3/4 5,000 5/8 4,100 1/2 3,200 3/8 2,100 1 /4 1,000 * Maximum stud diameter permitted for mechanical expansion anchors. Resin capsule anchors shall, when installed in accordance with the manufacturer's instructions and these specifications and tested in conformance with the requirements in California Test 681, withstand the application of a sustained tension test load of at least the following values for at least 48 hours with a movement not greater than 0.010 inch: Stud Diameter inches) Sustained Tension Test Load pounds) 1-1/4 31,000 1 17,900 7/8 14,400 3/4 5,000 5/8 4,100 1/2 3,200 3/8 2,100 1 /4 1,000 At least 25 days before use, the Contractor shall submit one sample of each resin capsule anchor per lot to the Transportation Laboratory for testing. A lot of resin capsule anchors is 100 units, or fraction thereof, of the same brand and product name. In Section 75-1.03 replace the 20th paragraph with: A Certificate of Compliance for concrete anchorage devices shall be furnished to the Engineer in conformance with the provisions in Section 6-1.07, Certificates of Compliance." Book One- State Route 68 at San Benancio Road Intersection Improvements 245 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????In Section 75-1.03 replace the 24th paragraph with: Sealing compound, for caulking and adhesive sealing, shall be a polysulfide or polyurethane material conforming to the requirements in ASTM Designation: C 920, Type S, Grade NS, Class 25, Use O. In Section 75-1.035 in the 3rd paragraph, replace the 1st sentence with: Cables shall be 3/4 inch preformed, 6 x 19, wire strand core or independent wire rope core IWRC), galvanized in conformance with the requirements in Federal Specification RR-W-410, right regular lay, manufactured of improved plow steel with a minimum breaking strength of 23 tons. In Section 75-1.035 in the 4th paragraph, replace item C with: C. Nuts shall conform to the requirements in ASTM Designation: A 563 including Appendix Xl, except lubrication is not required. In Section 75-1.035 replace the 12th paragraph with: Concrete for filling cable drum units shall conform to the provisions in Section 90-10, Minor Concrete," or at the option of the Contractor, may be a mix with 3/8-inch maximum size aggregate and not less than 675 pounds of cementitious material per cubic yard. In Section 75-1.05 replace the 6th paragraph with: Galvanizing of iron and steel hardware and nuts and bolts, when specified or shown on the plans, shall conform to the requirements in ASTM Designation: A 153/A 153M, except whenever threaded studs, bolts, nuts, and washers are specified to conform to the requirements in ASTM Designation: A 307, A 325, A 449, A 563, or F 436 and zinc coating is required, they shall be hot-dip zinc coated or mechanically zinc coated in conformance with the requirements in the ASTM Designations. Unless otherwise specified, galvanizing shall be performed after fabrication. In Section 75-1.05 replace the 8th paragraph with: Tapping of nuts or other internally threaded parts to be used with zinc coated bolts, anchor bars or studs shall be done after galvanizing and shall conform to the requirements for thread dimensions and overtapping allowances in ASTM Designation: A 563. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 80 FENCES Issued 01-05-07) In Section 80-3.01F replace the 4th paragraph with: Portland cement concrete for metal post and brace footings and for deadmen shall be minor concrete conforming to the provisions in Section 90-10, Minor Concrete." Minor concrete shall contain not less than 470 pounds of cementitious material per cubic yard. Book One- State Route 68 at San Benancio Road Intersection Improvements 246 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????In Section 80-4.01C replace the 4th paragraph with: Portland cement concrete for metal post and for deadmen shall be produced from minor concrete conforming to the provisions in Section 90-10, Minor Concrete." Minor concrete shall contain not less than 470 pounds of cementitious material per cubic yard. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 83 RAILINGS AND BARRIERS Issued 04-03-09) In Section 83-1.02 replace the 7th paragraph with: Mortar shall conform to the provisions in Section 51-1.135, Mortar," and shall consist of one part by volume of cementitious material and 3 parts of clean sand. In Section 83-1.02B in the 24th paragraph in the 8th subparagraph, replace the 1st sentence with: Anchor cable shall be 3/4 inch preformed, 6 x 19, wire strand core or independent wire rope core IWRC), galvanized in conformance with the requirements in Federal Specification RR-W- 410, right regular lay, manufactured of improved plow steel with a minimum breaking strength of 23 tons. In Section 83-1.02E in the 6th paragraph, replace the 2nd sentence with: Cable shall be galvanized in conformance with the requirements in Federal Specification RR- W-410. In Section 83-1.02I replace the 5th paragraph with: Where shown on the plans, cables used in the frame shall be 5/16 inch in diameter, wire rope, with a minimum breaking strength of 5,000 pounds and shall be galvanized in conformance with the requirements in Federal Specification RR-W-410. In Section 83-1.02I replace the 14th paragraph with: Chain link fabric shall be 11-gage conforming to one of the following: 1. AASHTO Designation: M181, Type I, Class C 2. AASHTO Designation: M181, Type IV, Class A 3. ASTM F 1345, Class 2 In Section 83-2.02D(1) replace the 5th paragraph with: When concrete barriers are to be constructed on existing structures, the dowels shall be bonded in holes drilled in the existing concrete. Drilling of holes and bonding of dowels shall conform to the following: Book One- State Route 68 at San Benancio Road Intersection Improvements 247 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????1. The bonding materials shall be either magnesium phosphate concrete, modified high alumina based concrete or portland cement based concrete. Magnesium phosphate concrete shall be either single component water activated) or dual component with a prepackaged liquid activator). Modified high alumina based concrete and portland cement based concrete shall be water activated. Bonding materials shall conform to the following requirements: Property Test Method Requirements Compressive Strength at 3 hours, MPa California Test 551 21 min. at 24 hours, MPa California Test 551 35 min. Flexure Strength at 24 hours, MPa California Test 551 3.5 min. Bond Strength: at 24 hours SSD Concrete. MPa California Test 551 2.1 min. Dry Concrete, MPa California Test 551 2.8 min. Water Absorption, % California Test 551 10 max. Abrasion Resistance at 24 hours, grams California Test 550 25 max. Drying Shrinkage at 4 days, % ASTM Designation: C 596 0.13 max. Soluble Chlorides by weight, % California Test 422 0.05 max. Water Soluble Sulfates by weight, % California Test 417 0.25 max. 2. Magnesium phosphate concrete shall be formulated for minimum initial set time of 15 minutes and minimum final set time of 25 minutes at 70? F. The materials, prior to use, shall be stored in a cool, dry environment. 3. Mix water used with water activated material shall conform to the provisions in Section 90-2.03, Water." 4. The quantity of water for single component type or liquid activator for dual component type) to be blended with the dry component, shall be within the limits recommended by the manufacturer and shall be the least amount required to produce a pourable batter. 5. Addition of retarders, when required and approved by the Engineer, shall be in conformance with the manufacturer's recommendations. 6. Before using concrete material that has not been previously approved, a minimum of 45 pounds shall be submitted to the Engineer for testing. The Contractor shall allow 45 days for the testing. Each shipment of concrete material that has been previously approved shall be accompanied by a Certificate of Compliance as provided in Section 6-1.07, Certificates of Compliance." 7. Magnesium phosphate concrete shall not be mixed in containers or worked with tools containing zinc, cadmium, aluminum or copper metals. Modified high alumina based concrete shall not be mixed in containers or worked with tools containing aluminum. 8. The surface of any dowel coated with zinc or cadmium shall be coated with a colored lacquer before installation of the dowel. The lacquer shall be allowed to dry thoroughly before embedment of the dowels. 9. The holes shall be drilled by methods that will not shatter or damage the concrete adjacent to the hole. The diameter of the drilled hole shall be 1/2 inch larger than the nominal diameter of the dowels. 10. The drilled holes shall be clean and dry at the time of placing the bonding material and the steel dowels. Bonding material and dowel shall completely fill the drilled hole. The surface temperature shall be 40? F or above when the bonding material is placed. Book One- State Route 68 at San Benancio Road Intersection Improvements 248 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????11. After bonding, dowels shall remain undisturbed for a minimum of 3 hours or until the bonding material has reached a strength sufficient to support the dowels. Dowels that are improperly bonded, as determined by the Engineer, shall be removed. The holes shall be cleaned or new holes shall be drilled and the dowels replaced and securely bonded to the concrete. Removing, redrilling and replacing improperly bonded dowels shall be performed at the Contractor's expense. Modified high alumina based concrete and portland cement based concrete shall be cured in conformance with the provisions in Section 90-7.0113, Curing Compound Method," of the Standard Specifications. Magnesium phosphate concrete shall not be cured. In Section 83-2.02D(2) in the 1st paragraph, replace item b with: b. If the 3/8-inch maximum size aggregate grading is used to construct extruded or slip- formed concrete barriers, the cementitious material content of the minor concrete shall be not less than 675 pounds per cubic yard. In Section 83-2.02D(2) replace the 3rd paragraph with: The concrete paving between the tops of the 2 walls of concrete barrier Types 50E, 60E, 60GE, and 60SE) and the optional concrete slab at the base between the 2 walls of concrete barrier Types 50E, 60E, 60GE, and 60SE) shall be constructed of minor concrete conforming to the provisions of Section 90-10, Minor Concrete," except that the minor concrete shall contain not less than 505 pounds of cementitious material per cubic yard. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 85 PAVEMENT MARKERS Issued 07-31-07) In Section 85-1.06 replace the 6th paragraph with: Pavement markers shall not be placed on new hot mix asphalt surfacing or seal coat until the surfacing or seal coat has been opened to public traffic for a period of not less than 7 days when hot melt bituminous adhesive is used, and not less than 14 days when epoxy adhesive is used. In Section 85-1.06 in the 14th paragraph, replace the 2nd sentence with: Cleaning shall be done by blast cleaning on all surfaces regardless of age or type, except that blast cleaning of clean, new hot mix asphalt and clean, new seal coat surfaces will not be required when hot melt bituminous adhesive is used. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 86 SIGNALS, LIGHTING AND ELECTRICAL SYSTEMS Issued 06-05-09) Book One- State Route 68 at San Benancio Road Intersection Improvements 249 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Replace Section 86 with: SECTION 86 ELECTRICAL SYSTEMS 86-1 GENERAL 86-1.01 DESCRIPTION Section 86 includes specifications for installing, modifying, and removing: 1. Traffic signal 2. Interconnect system 3. Ramp metering system 4. Flashing beacon system 5. Lighting system 6. Sign illumination system 7. Traffic monitoring station 8. Communication system 9. Electrical equipment in structure 10. Falsework lighting Comply with Part 4 of the California MUTCD. Nothing in this Section 86 is to be construed as to reduce the minimum standards in this manual. The locations of electrical system elements are approximate; the Engineer will approve final location. 86-1.015 DEFINITIONS Definitions pertain only to Section 86, Electrical Systems." actuation: The action of a vehicle or pedestrian causing a detector to create a call in that phase or movement to request right of way. channel: Discrete information path. controller assembly: Controller unit and auxiliary equipment housed in a rainproof cabinet to control a system's operations. controller unit: Part of the controller assembly performing the basic timing and logic functions. detector: Device indicating passage or presence of vehicles or pedestrians. electrolier: Complete assembly of lighting standard and luminaire. flasher: Device to open and close signal circuits at a repetitive rate. flashing beacon control assembly: Switches, circuit breakers, terminal blocks, flasher, wiring, and necessary electrical components all housed in a single enclosure to properly operate a beacon. inductive loop detector: Detector capable of being actuated by inductance change caused by vehicle passing or standing over the loop. lighting standard: Pole and mast arm supporting the luminaire. luminaire: Consists of housing, reflector, refractor or lens, lamp socket, integral ballast, terminal strip, and lamp. magnetic detector: Detector capable of being actuated by induced voltage caused by vehicle passing through the earth's magnetic field. powder coating: A coating applied electrostatically using UV-stable polyester triglycidyl isocyanurate exterior grade powder pre-timed controller assembly: Operates traffic signals under a predetermined cycle length. signal face: As defined in the California MUTCD. Book One- State Route 68 at San Benancio Road Intersection Improvements 250 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????signal head: As defined in the California MUTCD. signal indication: As defined in the California MUTCD. signal section: As defined in the California MUTCD. signal standard: Pole and mast arm supporting one or more signal faces with or without a luminaire mast arm. traffic-actuated controller assembly: Operates traffic signals under the varying demands of traffic as registered by detector actuation. traffic phase: Signal phase as defined in the California MUTCD. vehicle: As defined in the California Vehicle Code. 86-1.02 REGULATIONS AND CODEElectrical equipment must comply with one or more of the following: 1. EIA 2. ETL 3. NEMA 4. NETA 5. UL Materials and workmanship must comply with: 1. ANSI 2. ASTM 3. 8 CA Code of Regs 2299 et seq. 4. FCC 5. ITE 6. NEC 7. Public Utilities Commission, General Order No. 95, Rules for Overhead Electrical Line Construction" 8. Public Utilities Commission, General Order No. 128, Rules for Construction of Underground Electric Supply and Communication Systems" 86-1.03 COST BREAK-DOWN Determine quantities required to complete work. Submit the quantities as part of the cost breakdown. The sum of the amounts for the units of work listed in the cost breakdown must equal the contract lump sum price bid for the work. Include overhead and profit for each unit of work listed in the cost breakdown. If mobilization is a bid item, include bond premium, temporary construction facilities, and material plants into the mobilization bid item, otherwise, include in each unit of work listed in the cost breakdown. Do not include costs for traffic control system in the cost breakdown. The cost breakdown may be used to determine partial payment and to calculate payment adjustments for additional costs incurred due to a change order. If a change order increases or decreases the quantities, payment adjustment may be determined under Section 4-1.03B, Increased or Decreased Quantities." The cost breakdown must include type, size, and installation method for: 1. Foundations 2. Standards and poles 3. Conduit Book One- State Route 68 at San Benancio Road Intersection Improvements 251 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????4. Pull boxes 5. Conductors 6. Service equipment enclosures 7. Telephone demarcation cabinet 8. Signal heads and hardware 9. Pedestrian signal heads and hardware 10. Pedestrian push buttons 11. Loop detectors 12. Luminaires and lighting fixtures 86-1.04 EQUIPMENT LIST AND DRAWINGS Within 15 days of contract approval, submit for review a list of equipment and materials that you propose to install. Comply with Section 5-1.02, Plans and Working Drawings." The list must include: 1. Name of manufacturer 2. Dimension 3. Item identification number 4. List of components The list must be supplemented by other data as required, including: 1. Schematic wiring diagrams 2. Scale drawings of cabinets showing location and spacing of shelves, terminal blocks, and equipment, including dimensioning 3. Operation manual Submit 2 copies of the above data. The Engineer will review within 15 days. Electrical equipment that is manufactured as detailed on the plans will not require detailed drawings and diagrams. Furnish 3 sets of computer-generated cabinet schematic wiring diagrams. The cabinet schematic wiring diagram must be placed in a heavy duty plastic envelope and attached to the inside of the door of each cabinet. Prepare diagrams, plans, and drawings using graphic symbols in IEEE 315, Graphic Symbols for Electrical and Electronic Diagrams." 86-1.05 CERTIFICATE OF COMPLIANCE Submit a Certificate of Compliance for all electrical material and equipment to the Engineer under Section 6-1.07, Certificates of Compliance." 86-1.06 MAINTAINING EXISTING AND TEMPORARY ELECTRICAL SYSTEMS Keep existing electrical system or approved temporary replacement in working order during the progress of the work. Shutdown is allowed for alteration or removal of the system. Traffic signal shutdown must be limited to normal working hours. Lighting system shutdown must not interfere with the regular lighting schedule. Notify the Engineer before performing work on the existing system. Notify the local traffic enforcement agency before traffic signal shutdown. If existing or temporary system must be modified, work not shown on the plans or specified in the special provisions, but required to keep the system in working order will be paid for as extra work as specified in Section 4-1.03D, Extra Work." Book One- State Route 68 at San Benancio Road Intersection Improvements 252 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????The State or local agency will: 1. Continue the operation and maintenance of existing electrical facilities 2. Continue to provide electrical energy to operate existing electrical facilities 3. Repair or replace existing facilities damaged by public traffic 4. Pay for electrical energy to operate existing or new facilities undergoing the functional tests described in Section 86-2.14C, Functional Testing" Verify location and depth of existing detectors, conduits, pull boxes, and other electrical facilities before using tools or equipment that may damage those facilities or interfere with an electrical system. Notify the Engineer immediately if existing facility is damaged by your activities. Repair or replace damaged facility promptly. If you fail to complete the repair or replacement, promptly, the State will repair or replace and deduct the costs. Damaged detectors must be replaced within 24 hours at your expense. If you fail to complete the repair within 24 hours, the State will repair and deduct the repair costs. If roadway remains open to traffic while an existing lighting system is modified: 1. Keep existing system in working order 2. Make final connection so the modified circuit is in operation by nightfall Keep temporary electrical installations in working order until no longer required. Remove temporary installations as specified in Section 86-7, Removing, Reinstalling or Salvaging Electrical Equipment." These provisions do not void your responsibilities as specified in Section 7-1.12, Indemnification and Insurance," and Section 7-1.16, Contractor's Responsibility for the Work and Materials." During traffic signal system shutdown, place W3-la, STOP AHEAD," and R1-1, STOP," signs in each direction to direct traffic through the intersection. For 2-lane approaches, place 2 R1-1 signs. W3-la and R1-1 signs must comply with Section 12-3.06, Construction Area Signs." Use a minimum size of 30 inches for the R1-1 sign. Cover signal faces when the system is shut down overnight. Cover temporary W3-la and Rl-1 signs when the system is turned on. 86-1.07 SCHEDULING OF WORK Except service installation and service equipment enclosure, do not work above ground until all materials are on hand to complete electrical work at each location. Schedule work to allow each system to be completed and ready for operation before opening the corresponding section of the roadway to traffic. If street lighting exists or is installed in conjunction with traffic signals, do not turn on the signals until the street lighting is energized. Traffic signals will not be placed in operation until the roadways to be controlled are open to public traffic. Lighting and traffic signals, including flashing operation, will not be placed in operation before starting the functional test period specified in Section 86-2.14, Testing." Do not pull conductors into conduit until: 1. Pull boxes are set to grade 2. Metallic conduit is bonded Book One- State Route 68 at San Benancio Road intersection Improvements 253 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????In vehicular undercrossings, soffit lights must be in operation as soon as practicable after falsework has been removed from the structure. Lighting for pedestrian structures must be in operation before opening the structure to pedestrian traffic. If the Engineer orders soffit lights or lighting for pedestrian structures to be activated before permanent power service is available, the cost of installing and removing temporary power service will be paid for as extra work as specified in Section 4-1.03D, Extra Work." The initial traffic signal turn-on must be made between 9:00 a.m. and 2:00 p.m. Before the initial turn-on, all equipment, including pedestrian signals, pedestrian push buttons, vehicle detectors, lighting, signs, and pavement delineation must be installed and in working order. Direct louvers, visors, and signal faces to maximize visibility. Start functional tests on any working day except Friday or the day before a legal holiday. You must notify the Engineer 48 hours before the start of functional test. 86-1.08 BLANK) 86-2 MATERIALS AND INSTALLATION 86-2.01 EXCAVATING AND BACKFILLING Dispose of surplus excavated material under Section 7-1.13, Disposal of Materials Outside the Highway Right of Way." Backfill as specified in Section 19-3, Structure Excavation and Backfill." Compact backfill in conduit trenches outside the hinge point of slopes and not under pavement to a minimum relative compaction of 90 percent. Compact backfill within hinge points and in areas where pavement is to be constructed to a minimum relative compaction of 95 percent. Backfill trenches and restore sidewalk, pavement, and landscaping at one intersection before starting excavation at another intersection. If excavating on a street or highway, restrict closure to I lane at a time. 86-2.02 REMOVING AND REPLACING IMPROVEMENTS Replace or reconstruct sidewalk, curb, gutter, concrete pavement, asphalt concrete pavement, underlying material, lawn, plant, and other facilities damaged by your activities. Replacement material must be of equal or better quality than the material replaced. Work must be in a serviceable condition. If a part of a square or slab of concrete sidewalk, curb, gutter, or driveway is broken or damaged, the entire square or slab must be removed and reconstructed. Cut outline of PCC sidewalk or driveway to be removed: 1. Using a power-driven saw 2. On a neat line 3. To a 0.17-foot minimum depth 86-2.03 FOUNDATIONS Except for concrete for cast-in-drilled-hole concrete pile foundation, PCC must comply with Section 90-10, Minor Concrete." Construct concrete foundation on firm ground. After each post, standard, and pedestal is properly positioned, place mortar under the base plate. Finish exposed portion to present a neat appearance. Mortar must comply with Section 51-1.135, Mortar," except mortar must have: Book One- State Route 68 at San Benancio Road Intersection Improvements 254 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????1. 1 part by volume of cementitious material 2. 3 parts by volume of clean sand Reinforced cast-in-drilled-hole concrete pile foundation must comply with Section 49, Piling," except: 1. Material resulting from drilling holes must be disposed of as specified in Section 86-2.01, Excavating and Backfilling" 2. Concrete for cast-in-drilled-hole concrete pile will not be considered as designated by compressive strength Form exposed portion of the foundation to present a neat appearance and true to line and grade. The top of a foundation for post and standard must be finished to curb or sidewalk grade. Forms must be rigid and securely braced in place. Conduit ends and anchor bolts must be placed at proper height and position. Anchor bolts must be installed a maximum of 1:40 from vertical and held in place by rigid top and bottom templates. Use a steel bottom template at least 1/2 inch thick that provides proper spacing and alignment of anchor bolts near the embedded bottom end. Install bottom template before placing footing concrete. Provide new foundation and anchor bolts of the proper type and size for relocated standards. Steel parts must be galvanized as specified in Section 75-1.05, Galvanizing." Provide 2 nuts and washers for the upper threaded part of each anchor bolt. Provide 3 nuts and washers for each anchor bar or stud. Do not weld high-strength steel used for anchor bolt, anchor bar, or stud. Before placing concrete, moisten forms and ground. Keep forms in place until the concrete sets for at least 24 hours and is strong enough to prevent damage to surface. Except if located on a structure, construct foundation for post, standard, and pedestal monolithically. Apply ordinary surface finish as specified in Section 51-1.18A, Ordinary Surface Finish." If a foundation must be extended for additional depth, the extension work will be paid for as extra work as specified in Section 4-1.03D, Extra Work." Do not erect post, pole, standard, pedestal, or cabinet until the foundation is set for a minimum of 7 days. The Engineer will choose the plumbing or raking technique for posts, standards, and pedestals. Plumb or rake by adjusting the leveling nuts before tightening nuts. Do not use shims or similar devices. After final adjustments of both top nuts and leveling nuts on anchorage assemblies have been made, and each post, standard, and pedestal on structure is properly positioned, tighten nuts as follows: 1. Tighten leveling nuts and top nuts, following a crisscross pattern, until bearing surfaces of all nuts, washers, and base plates are in firm contact. 2. Use an indelible marker to mark the top nuts and base plate with lines showing relative alignment of the nut to the base plate. 3. Tighten top nuts, following a crisscross pattern, an additional 1/6th of a turn. In unpaved areas, construct a raised PCC pad in front of each controller cabinet. Completely remove foundations not to be reused or abandoned. If abandoning a foundation, remove the top of foundation, anchor bolts, and conduits to a minimum depth of 0.5 foot below sidewalk surface or original ground. Backfill the resulting hole with material equivalent to the surrounding material. Book One- State Route 68 at San Benancio Road Intersection Improvements 255 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????86-2.04 STANDARDS, STEEL PEDESTALS AND POSTS Bolts, including anchor bolts, nuts, and washers for signal and lighting support structures must comply with Section 55-2, Materials." Except for bearing-type connection or slip-base, high-strength bolted connection must comply with Section 55-3.14, Bolted Connections." Welding, nondestructive testing of welds, and acceptance and repair criteria for steel member nondestructive testing must comply with American Welding Society AWS) D1.1. Using stainless steel rivets, attach rectangular corrosion-resistant metal identification tag on all standards and poles, except Type 1: 1. Above the hand hole, near the base of standards and poles 2. On the underside of mast arms near the arm plate The lettering on each identification tag must be depressed or raised, 1/4 inch tall, legible, and include the following information: 1. Name of the manufacturer 2. Date of manufacture 3. Identification number 4. Contract number 5. Unique identification code that is: 5.1. Assigned by the manufacturer 5.2. Traceable to a particular contract and the welds on that component 5.3. Readable after the support structure is coated and installed Type 1 standard and steel pedestal for controller cabinet must be manufactured of one of the following: 1. 0.12-inch or thicker galvanized steel 2. 4-inch standard weight galvanized steel pipe as specified in ASTM A 53 3. 4-inch Type 1 conduit with the top designed for post-top slip-fitter Ferrous metal parts of a standard that has a shaft length of 15 feet or longer must comply with the provisions in Section 55-2, Materials," and the following: 1. Standard must be manufactured from sheet steel of weldable grade having a minimum yield strength of 40,000 psi after manufacturing. 2. Certified test report verifying compliance with minimum yield strength requirements must be submitted. Test report may be the mill test report for the as-received steel or if the as-received steel has a lower yield strength than required you must provide test data assuring that your method of cold forming will consistently increase the tensile properties of the steel to meet the specified minimum yield strength. Test data must include tensile properties of the steel after cold forming for specific heats and thicknesses. 3. If a single-ply 5/16-inch thick pole is specified, a 2-ply pole with equivalent section modulus may be substituted. 4. Standard may be manufactured of full-length sheets or shorter sections. Each section must be manufactured from 1 or 2 pieces of sheet steel. If 2 pieces are used, the longitudinal welded seams must be directly opposite from one another. If the sections are butt-welded together, the longitudinal welded seams of adjacent sections must be placed to form continuous straight seams from base to top of standard. Book One- State Route 68 at San Benancio Road Intersection Improvements 256 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??5. Butt-welded circumferential joints of tubular sections requiring CJP groove welds must be made using a metal sleeve backing ring inside each joint. The sleeve must be 1/8 inch nominal thickness, or thicker, and manufactured from steel having the same chemical composition as the steel in the tubular sections to be joined. If the sections to be joined have different specified minimum yield strengths, the steel in the sleeve must have the same chemical composition as the tubular section having the higher minimum yield strength. The width of the metal sleeve must be consistent with the type of nondestructive testing selected and must be a minimum width of 1 inch. At fitting time, the sleeve must be centered at the joint and in contact with the tubular section at the point of the weld. 6. Welds must be continuous. 7. Weld metal at the transverse joint must extend to the sleeve, making the sleeve an integral part of the joint. 8. During manufacturing, longitudinal seams on vertical tubular members of cantilevered support structures must be centered on and along the side of the pole that the pole plate is located. Longitudinal seams on horizontal tubular members, including signal and luminaire arms, must be within 45 degrees of the bottom of the arm. 9. Longitudinal seam weld in steel tubular section may be made by the electric resistance welding process. 10. Longitudinal seam weld must have 60 percent minimum penetration, except: 10.1. Within 6 inches of circumferential weld, longitudinal seam weld must be CJP groove weld. 10.2. Longitudinal seam weld on lighting support structure having telescopic pole segment splice must be CJP groove weld on the female end for a length on each end equal to the designated slip-fit splice length plus 6 inches. 11. Exposed circumferential weld, except fillet and fatigue-resistant weld, must be ground flush with the base metal before galvanizing or painting. Ground flush is specified as 0, +0.08-inch. 12. Circumferential weld and base plate-to-pole weld may be repaired only one time. 13. Exposed edges of the plates that make up the base assembly must be finished smooth and exposed corners of the plates must be broken. Provide shafts with slip-fitter shaft caps. 14. Surface flatness requirements of ASTM A 6 apply to plates: 14.1. In contact with concrete, grout, or washers and leveling nuts 14.2. In high-strength bolted connections 14.3. In joints, where cap screws are used to secure luminaire and signal arms 14.4. Used for breakaway slip-base assemblies 15. Standard must be straight with a maximum variation of- 15. 1. 1 inch measured at the midpoint of a 30-foot to 35-foot standard 15.2. 3/4 inch measured at the midpoint of a 17-foot to 20-foot standard 15.3. 1 inch measured 15 feet above the base plate for Type 35 and Type 36 standards 16. Zinc-coated nuts used on fastener assemblies having a specified preload obtained by specifying a prescribed tension, torque value, or degree of turn must be provided with a colored lubricant, clean and dry to the touch. The lubricant color must contrast the zinc coating color on the nut so the presence of the lubricant is visually obvious. Lubricant Book One- State Route 68 at San Benancio Road Intersection Improvements 257 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??must be insoluble in water or the fastener components must be shipped to the job site in a sealed container. 17. Do not make additional holes in structural members. 18. Standard with an outside diameter of 12 inches or less must be round. Standard with an outside diameter greater than 12 inches must be round or multisided. Multisided standard must be convex with a minimum of 12 sides and have a minimum bend radius of 4 inches. 19. Manufacture mast arm from material specified for standard. 20. Manufacture cast steel option for slip base from material of Grade 70-40, as specified in ASTM A 27/A 27M. Other comparable material may be used if approved by the Engineer. The casting tolerances must comply with the Steel Founders' Society of America's recommendations for green sand molding. 21. One casting from each lot of a maximum of 50 castings must be radiographed as specified in ASTM E 94. Casting must comply with the acceptance criteria for severity level 3 or better for the types and categories of discontinuities in ASTM E 186 and E 446. If the casting fails the inspection, 2 additional castings must be radiographed. If the 2 additional castings fail the inspection, the entire lot will be rejected. 22. Material certification, consisting of physical and chemical properties, and radiographic film of the casting must be filed at the manufacturer's office. Certification and film must be available for inspection. 23. High-strength bolts, nuts, and flat washers used to connect slip-base plate must comply with ASTM A 325 or A 325M and be galvanized as specified in Section 75-1.05, Galvanizing." 24. Plate washers must be manufactured by saw cutting and drilling steel plate. Steel plate must comply with AISI 1018 and be galvanized as specified in Section 75-1.05, Galvanizing." Before galvanizing, remove burrs and sharp edges and chamfer both sides of holes to allow the bolt head to make full contact with the washer without tension. 25. High-strength cap screws for attaching arms to standards must comply with ASTM A 325, A 325M, or A 449, and the mechanical requirements in ASTM A 325 or A 325M after galvanizing. Cap screws must be galvanized as specified in Section 75-1.05, Galvanizing." Coat threads of cap screws with a colored lubricant, clean and dry to the touch. Lubricant color must contrast the zinc-coating color on the cap screw so the presence of the lubricant is visually obvious. Lubricant must be insoluble in water or the fastener components must be shipped to the job site in a sealed container. 26. Bolted connection attaching signal or luminaire arm to pole must be considered slip critical. Galvanized faying surfaces of plates on luminaire, signal arm, and pole must be roughened by hand using a wire brush before assembly and must comply with requirements for Class C surface conditions for slip-critical connections in Specification for Structural Joints Using ASTM A 325 or A 490 Bolts," a specification approved by the Research Council on Structural Connections RCSC). Paint for faying surfaces must be as specified in the RCSC specification for Class B coating. 27. The Engineer will randomly take samples of fastener components from each production lot and submit to the Transportation Laboratory with test reports as specified in ASTM fastener specifications for QA testing and evaluation. The Engineer will determine sample sizes for each fastener component. Change in mast arm configuration is allowed as long as the mounting height and stability are maintained. Book One- State Route 68 at San Benancio Road Intersection Improvements 258 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??Before manufacturing, details must be adjusted to ensure that cap screw heads can be turned using conventional installation tools. During manufacturing process, to avoid interference with the cap screw heads, the position of the luminaire arm on the arm plate must be properly located. Configure mast arm as a smooth curving arm. Push button post, pedestrian barricade, and guard post must comply with ASTM A 53. Assemble and tighten slip base when pole is on the ground. Threads of heavy hex nuts for each slip-base bolt must be coated with additional lubricant that is clean and dry to the touch. Tighten high strength slip-base bolts to within 10 foot-pounds of the following: Standard Type Torque foot:pounds) 15-SB 150 30 150 31 200 36-20A 165 Hole in shaft of existing standard, due to removal of equipment or mast arms, must be sealed by fastening a galvanized steel disk to cover the hole. Fasten using a single central galvanized steel fastener. Seal edges of disk and hole with polysulfide or polyurethane sealing compound of Type S, Grade NS, Class 25, and Use 0, as specified in ASTM C 920. If existing standard is ordered to be relocated or reused, remove large dents, straighten shafts, and replace parts that are in poor condition. You must furnish anchor bolts or bars and nuts required for relocating or reusing standard. Repair and replacement work will be paid for as extra work as specified in Section 4-1.03D, Extra Work." New nuts, bolts, cap screws, and washers must be provided if: 1. Standard or mast arm is relocated 2. Used standard or mast arm is State furnished If the standard has a slip base, a new keeper plate must be provided. 86-2.05 CONDUIT Run conductors in conduit except for overhead and where conductors are run inside poles. You may use a larger size conduit than specified as long as you use it for the entire length between outlets. Do not use reducing coupling. New conduit must not pass through existing foundations for standards. 86-2.05A Material Conduit and conduit fitting must be UL or ETL listed and comply with the following: Slip-Base Bolt-Tightening Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 259 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Type 1 Hot-dip galvanized rigid steel conduit and conduit couplings must comply with UL 6 and ANSI C80.1. Zinc coating testing must comply with copper sulfate test requirements in UL 6. Conduit couplings for rigid steel conduit must be electrogalvanized. Type 2 Hot-dip galvanized rigid steel conduit must comply with requirements for Type lconduit and be coated with polyvinyl chloride PVC) or polyethylene. Exterior thermoplastic coating must have a minimum thickness of 35 mils. Internal coating must have a minimum thickness of 2 mils. Coated conduit must comply with UL 6; NEMA RN 1; or ETL PVC-001. Type 3 Rigid non-metallic conduit must comply with UL 651, UL 651A or UL 651B. Install at underground locations only. Type 4 Waterproof flexible metal conduit must consist of conduit with a waterproof non- metallic sunlight-resistant jacket over an inner flexible metal core. Type4 conduit must be UL listed for use as the grounding conductor. Type 5 Intermediate steel conduit and conduit couplings must comply with UL 1242 and ANSI C80.6. Zinc coating testing must comply with copper sulfate test requirements in UL 1242. Conduit couplings for intermediate rigid steel conduit must be electrogalvanized. Type 5 conduit must only be used if specified. Bonding bushings to be installed on metal conduit must be insulated and either galvanized or zinc alloy type. Fittings for steel conduit and for watertight flexible metal conduit must be UL listed at UL 514B. 86-2.05B Use Install Type 1 conduit on all exposed surfaces and at the following locations: 1. In concrete structures 2. Between a structure and nearest pull box Exposed conduit installed on painted structure must be painted the same color as the structure. Change or extend existing conduit runs using the same material. Install pull box if an underground conduit changes from the metallic type to Type 3. Minimum trade size of conduit must be: 1. 1-1/2 inches from electrolier to adjacent pull box 2. 1 inch from pedestrian push button post to adjacent pull box 3. 2 inches from signal standard to adjacent pull box 4. 3 inches from controller cabinet to adjacent pull box 5. 2 inches from overhead sign to adjacent pull box 6. 1-1/2 inches if unspecified Two conduits must be installed between controller cabinet and adjacent pull box. 86-2.05C Installation Whether shop or field cut, ream ends of conduit to remove burrs and rough edges. Make cuts square and true. Slip joints and running threads are not allowed for coupling conduit. If a standard coupling cannot be used for coupling metal type conduit, use a threaded union coupling that is UL or ETL listed. Tighten couplings for metal conduit to maintain a good electrical connection through conduit run. Conduit and Conduit Fitting Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 260 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??Cut Type 3 conduit with tools that will not deform the conduit. Use solvent weld for connections. Cut Type 2 conduit with pipe cutters; do not use hacksaws. Coated conduit must be threaded with standard conduit-threading dies. Tighten conduit into couplings or fittings using strap wrenches or approved groove joint pliers. Protect shop-cut threads from corrosion as follows: Steel conduit and ANSI C80.1 conduit couplings Intermediate metal ANSI C80.6 conduit and conduit couplings Paint conduits as specified in Section 91, Paint." Apply 2 coats of approved unthinned zinc- rich primer of organic vehicle type. Do not use aerosol cans. Paint the following parts of conduits: 1. All exposed threads 2. Field-cut threads before installing conduit couplings to steel conduit 3. Damaged surfaces on metal conduit Do not remove shop-installed conduit couplings. Damaged Type 2 conduit or conduit coupling must be wrapped with at least 1 layer of 2 inch wide, 20 mil minimum thickness PVC tape, as specified in ASTM D 1000, with a minimum tape overlap of 1/2 inch. Before applying the tape, conduit or fitting must be cleaned and painted with 1 coat of rubber-resin based adhesive as recommended by the tape manufacturer. You may repair damaged spots in the thermoplastic coating by painting over with a brushing type compound supplied by the conduit manufacturer instead of the tape wrap. The ends of Types 1, 2, or 5 conduit must be threaded and capped with standard pipe caps until wiring is started. The ends of Types 3 and 4 conduit must be capped until wiring is started. If caps are removed, replace with conduit bushings. Fit insulated bonding bushings on the end of metal conduit ending in pull box or foundation. Bell or end bushings for Type 3 conduit must be non-metallic type. Conduit bends, except factory bends, must have a radius of not less than 6 times the inside diameter of the conduit. If factory bends are not used, bend the conduit without crimping or flattening using the longest radius practicable. Bend conduits as follows: Type 1 By methods recommended by the conduit manufacturer and with equipment approved for the purpose. Type 2 Use standard bending tool designed for use on thermoplastic coated conduit. Conduit must be free of burrs and pits. Type 3 By methods recommended by the conduit manufacturer and with equipment approved for the purpose. Do not expose conduit to direct flame. Type 4 Type 5 By methods recommended by the conduit manufacturer and with equipment approved for the purpose. Install pull tape in conduit that is to receive future conductors. The pull tape must be a flat woven lubricated soft-fiber polyester tape with a minimum tensile strength of 1,800 pounds and have printed sequential measurement markings every 3 feet. At least 2 feet of pull tape must be doubled back into the conduit at each end. Shop-Cut Thread Protection Conduit-Bending Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 261 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Existing underground conduit to be incorporated into a new system must be cleaned with a mandrel or cylindrical wire brush and blown out with compressed air. Install conduit to a depth of not less than 30 inches below finished grade, except in sidewalk and curbed paved median areas, where it must be at least 18 inches below grade. You may lay conduit on existing pavement within new curbed median. Conduit coupling must be a minimum of 6 inches from face of foundation. Place a minimum of 2 inches of sand bedding in the trench before installing Type 2 or Type 3 conduit. Place a minimum of 4 inches of same material over conduit before placing additional backfill material. Obtain approval from the Engineer before disturbing pavement. If obstruction is encountered, obtain approval from Engineer to cut small holes in the pavement to locate or remove obstruction If jacking or drilling method is used, keep jacking or drilling pit 2 feet away from edge of pavement. Pavement must not be weakened or subgrade softened from excess water use. Conduit used for drilling or jacking must be removed; install new conduit for completed work. If a hole larger than the conduit is pre-drilled and you install conduit by hand or by method recommended by the conduit manufacturer with equipment approved for purpose, you may install Type 2 or Type 3 conduit under pavement. If trenching in pavement method is specified, conduit installation under pavement that is not a freeway lane or freeway to freeway connector ramp, must comply with the following: 1. Use Type 3 conduit. Place conduit under pavement in a trench approximately 2 inches wider than the outside diameter of conduit, but not exceeding 6 inches in width. Trench depth must not exceed the greater of 12 inches or conduit trade size plus 10 inches, except that at pull boxes the trench may be hand dug to required depth. The top of the installed conduit must be a minimum of 9 inches below finished grade. 2. Trenching installation must be completed before placing final pavement layer. 3. Cut pavement to be removed with a rock cutting excavator. Minimize shatter outside the removal area. 4. Place conduit in bottom of trench and backfill with minor concrete as specified in Section 90-10, Minor Concrete.". Minor concrete must contain a minimum of 590 pounds of cementitious material per cubic yard. If the trench is in asphalt concrete pavement and pavement overlay is not placed, backfill the top 1-3/4-inch of trench with minor HMA. 5. Before spreading HMA, apply tack coat as specified in Section 39, Hot Mix Apshalt." 6. Backfill trenches, except for the top 0.10 foot, by the end of each day. The top 0.10 foot must be filled within 3 days after trenching. Conduit installed beneath railroad tracks must be: 1. Type l or 2 2. 1-1/2-inch minimum diameter 3. Placed a minimum depth of 3 feet below bottom of tie If jacking or drilling method is used, construct jacking pit to a minimum of 13 feet from the centerline of track at the near side of jacking pit. Cover jacking pit with substantial planking if left overnight. Conduit ending in standard or pedestal must not extend more than 3 inches vertically above the foundation and must be sloped toward the handhole opening. Conduit entering through the side of non-metallic pull box must end inside the box within 2 inches of the wall and 2 inches above the bottom and be sloped toward the top of box to facilitate pulling of conductors. Book One- State Route 68 at San Benancio Road Intersection Improvements 262 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Conduit entering through the bottom of a pull box must end 2 inches above the bottom and be located near the end walls to leave the major portion of the box clear. At outlet, conduit must enter from the direction of the run. Underground conduit runs, including under sidewalks, that are adjacent to gasoline service stations or other underground gasoline or diesel storage, piping, or pumps and that lead to a controller cabinet, circuit breaker panel, service, or enclosure where an arc may occur during normal operations must be sealed if the conduit is within the limits specified in the NEC for Class 1, Division 1. Use Type 1 or Type 2 conduit for these runs. Conduit for future use in structures must be threaded and capped. Conduit leading to soffit, wall, or other lights or fixtures below pull box grade must be sealed and made watertight, except where conduit ends in a No. 9 or No. 9A pull box. Support for conduit in or on wall or bridge superstructure must comply with the following: 1. Steel hangers, steel brackets, and other fittings must comply with Section 75-1.03, Miscellaneous Bridge Metal." 2. Construct precast concrete conduit cradles using minor concrete and commercial quality welded wire fabric. Minor concrete must comply with Section 90-10, Minor Concrete," and contain a minimum of 590 pounds of cementitious material per cubic yard The cradles must be moist cured for a minimum of 3 days. Bond precast concrete cradles to structure with epoxy adhesives specified in one of the following: 2.1. Section 95-2.03, Epoxy Resin Adhesive for Bonding New Concrete to Old Concrete" 2.2. Section 95-2.04, Rapid Set Epoxy Adhesive for Pavement Markers" 2.3. Section 95-2.05, Standard Set Epoxy Adhesive for Pavement Markers" 3. Use pipe sleeve or form opening for conduit through bridge superstructure concrete. Sleeve or opening through either prestressed member or conventionally reinforced precast member must be: 3.1. Transverse to the member 3.2. Through the web 3.3. Not more than 3 inches maximum gross opening in concrete 4. Where conduits pass through the abutment concrete, wrap conduit with 2 layers of asphalt-felt building paper securely taped or wired in place. Fill space around conduit that runs through bridge abutment wall with mortar as specified in Section 51-1.135, Mortar," except the proportion of cementitious material to sand must be I to 3. Fill the space around conduits that run through abutments after prestressing is completed. 5. Run surface-mounted conduit straight and true, horizontal or vertical on the wall, and parallel to wall on ceiling or other similar surfaces. Support conduit at a maximum of 5- foot intervals or closer where necessary to prevent vibration or unsightly deflection. The supports must include galvanized malleable iron conduit clamps and clamp backs secured with expansion anchorage devices as specified for concrete anchorage devices in Section 75-1.03, Miscellaneous Bridge Metal." Threaded studs must be galvanized and be of the largest diameter that will pass through the mounting hole in conduit clamp. 6. Where pull boxes are placed in conduit runs, conduit must be fitted with threaded bushings and bonded. 7. Mark location of conduit end in structure, curb, or wall with a Y" that is a minimum of 3 inches tall, directly above conduit. Book One- State Route 68 at San Benancio Road Intersection Improvements 263 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????86-2.05D Expansion Fittings Install expansion fitting where the conduit crosses an expansion joint in structure. Each expansion fitting for metal conduit must include a copper bonding jumper having the ampacity specified in NEC. Each expansion-deflection fitting for expansion joints of 1-1/2-inch movement rating must be watertight and include a molded neoprene sleeve, a bonding jumper, and 2 silicon bronze or zinc-plated iron hubs. Each fitting must allow a minimum of 3/4-inch expansion, contraction, and lateral deflection. 86-2.06 PULL BOXES You may use a larger standard size pull box than that shown on the plans or specified. Pull box, cover, and extensions must be of the same material. 86-2.06A Materials Pull box, cover, and extension for installation in ground or sidewalk area must be precast reinforced PCC or non-PCC material. Non-PCC material must: 1. Be fire resistant with a burn rate no greater than 0.3-inch per minute per 0.1 inch of thickness when tested as specified in ASTM D 635 2. Show no significant change in physical properties with exposure to weather 3. Be dense, free of voids or porosity, and gray or brown in color Non-PCC pull box must comply with the following: 1. Top dimensions must not exceed the bottom dimensions by more than 1 inch. 2. Extension must be attached to pull box to maintain the minimum combined depths. 3. Cover must not fail and must not deflect more than 1/4 inch when a vertical force of 1,500 pounds is applied through a 1/2" x 3" x 6" steel plate to a non-PCC cover on a pull box. Center the steel plate on cover with its longitudinal axis coinciding with longitudinal axis of cover. Non-PCC pull boxes must be of sufficient rigidity that when a designated concentrated force is applied perpendicularly to the midpoint of one of the long sides at the top while the opposite long side is supported by a rigid surface, it must be possible to remove the cover without the use of tools. The designated concentrated force must be 150 pounds for a No. 3-1/2 pull box and must be 100 pounds for a No. 5 or No. 6 pull box. If a transformer or other device must be placed in a non-metallic pull box, include recesses for hanger. Secure cover, except ceiling pull box cover, with 3/8-inch hold down bolts, cap screws, or studs, washers, and brass stainless steel or other non-corroding-metal nut. Stainless steel hardware must have an 18 percent or greater chromium content and an 8 percent or greater nickel content. Galvanize ferrous metal parts as specified in Section 75-1.05, Galvanizing." Traffic pull box must be provided with steel cover and special concrete footing. Steel cover must have a embossed non-skid pattern. Traffic pull box and cover must have a vertical proof-load strength of 25,000 pounds. Comply with Federal Specification RR-F-621 and distribute the 25,000 pound load through a 9" x 9" x 2" steel plate. You must be able to place the load anywhere on box and cover for 1 minute without causing cracks or permanent deformations. Book One- State Route 68 at San Benancio Road Intersection Improvements 264 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????No. 3-1/2(T) and No. 5(T) traffic pull box must be reinforced with a galvanized Z bar welded frame and cover similar to that shown on the plans for No. 6(T) pull box. Frame must be anchored to box with 1/4" x 2-1/4" concrete anchors. Four concrete anchors must be included for No. 3-1/2(T) pull box; one placed in each corner. Six concrete anchors for must be included for No. 5(T) and No. 6(T) pull boxes; one placed in each corner and one near the middle of each of the longer sides. Hold down screws must be 3/8 inch hex flange cap screws of Type 316 stainless steel. Nut must be zinc plated carbon steel, vibration resistant, and have a wedge ramp at the root of the thread. Nut must be spot welded to the underside or manufactured with galvanized Z bar pull box frame. Steel cover must be countersunk approximately 1 /4 inch to accommodate bolt head. When tightened, bolt head must not exceed more than 1 /8 inch above the top of cover. A 1 /4 inch tapped hole and brass bonding screw must be included. Concrete placed around and under traffic pull box must be minor concrete as specified in Section 90-10, Minor Concrete." 86-2.06B Cover Marking Marking must be clearly defined, uniform in depth, and parallel to either the long or short sides of cover. Marking letters must be between 1 inch to 3 inch high. Before galvanizing steel or cast iron cover, apply marking by one of the following methods: 1. Use cast iron strip at least 1/4-inch thick with letters raised a minimum of 1/16 inch. Fasten strip to cover with 1/4 inch flathead stainless steel machine bolts and nuts. Peen bolts after tightening. 2. Use sheet steel strip at least 0.027-inch thick with letters raised a minimum of 1/16 inch. Fasten strip to cover by spot welding, tack welding, or brazing, with 1/4 inch stainless steel rivets or 1/4 inch roundhead stainless steel machine bolts and nuts. Peen bolts after tightening. 3. Bead weld the letters on cover so that letters are raised a minimum of 3/32 inch. 86-2.06C Installation and Use Space pull boxes no more than 200 feet apart. You may install additional pull boxes to facilitate the work. Pull box in ground or sidewalk area must be installed as follows: 1. Embed bottom of pull box in crushed rock. 2. Place a layer of roofing paper on crushed rock. 3. Place mortar over layer of roofing paper. Mortar must be 0.50 inch to 1 inch thick and be sloped toward the drain hole. 4. Make a 1-inch drain hole in center of pull box through mortar and roofing paper. 5. Place mortar between pull box and pull box extension, and around conduits. Reconstruct sump of existing pull box if disturbed by your operations. Remove old grout and replace with new if the sump was grouted. After installation of traffic pull box, install steel cover and keep bolted down when your activities are not in progress at the pull box. When steel cover is placed for final time, cover and Z bar frame must be cleaned of debris and securely tightened. Book One- State Route 68 at San Benancio Road Intersection Improvements 265 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????86-2.07 BLANK) 86-2.08 CONDUCTORS AND CABLES Conductor must be copper wire that complies with ASTM B 3 and B 8. Wire size must comply with the following: Conductor usage Requirement In loop detector lead-in cable ASTM B 286 Everywhere except in loop detector lead-in cable American Wire Gage AWG)a aExcept conductor diameter must not be less than 98 percent of specified AWG diameter. Single conductor and cable, except detector lead-in cable, must have clear, distinctive, and permanent markings on the outer surface throughout its length. The markings must include the manufacturer's name or trademark, insulation type letter designation, conductor size, voltage, and temperature rating, and for cables, it must also include number of conductors. 86-2.08A Conductor Identification Conductor insulation must be a solid color with a permanent stripe as specified below. The solid color must be homogeneous through the full depth of insulation. Identification stripe must be continuous throughout the length of conductor. For conductor sizes No. 2 and larger, the insulation may be black and the ends of the conductors must be taped for a minimum length of 20 inches with electrical insulating tape of the required color. Wire Size Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 266 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Conductor Identification Identification Insulation Color' Circuit Signal Phase or Function Base Stripea Band Symbolsf Size 2,6 Red, Yel, Brn Blk 2,6 14 4,8 Red, Yel, Brn Ora 4,8 14 Vehicle 1,5 Red, Yel, Brn None 1,5 14 Signalsa.b.d 3,7 Red, Yel, Brn Pur 3,7 14 Ramp Meter 1 Red, Yel, Bm None NBR 14 Ramp Meter 2 Red, Yel, Brn Blk NBR 14 2 6 Red, Brn Blk 2 6 14 Pedestrian 4 8 Red, Brn Ora 4p,8p 14 Signalsd 1 5 Red, Brn None lp,5p 14 3 7 Red, Bm Pur 3p,7p 14 2 6 Blu Blk P-2,P-6 14 Pedestrian Push 4 8 Blu Ora P-4,P-8 14 Buttonsd 1 5 Blu None P-1,P-5 14 3 7 Blu Pur P-3,P-7 14 Traffic Signal C ll Ungrounded Circuit Conductor Blk None CON-1 |1013| ontro er Cabinet Grounded Circuit Conductor Wht None CON-2 |1013| Highway Ungrounded-Line 1 Blk None NBR 14 Lighting Pull Ungrounded-Line 2 Red None NBR 14 Box to Luminaire Grounded Wht None NBR 14 Multiple Ungrounded-Line I Blk None ML1 10 Highway Lighting Ungrounded-Line 2 Red None ML2 10 Li h i Ungrounded to PEU Blk None Cl 14 g ng t Control Switching leg from PEU unit or SM transformer Red None C2 14 Multiple Ungrounded-Line 1 Signals) Blk None NBRe |1013| Service Ungrounded-Line 2 Lighting) Red' None NBRe |1013| Si Li h i h Ungrounded-Line 1 Blk None SL-1 10 gn g ng t Ungrounded-Line 2 Red None SL-2 10 Flashing Beacons' Ungrounded between Flasher and Beacons Red or Yel None F-Loc.' 14 Pedestrian Push Buttons Wht Blk NBR 14 Signals and Multiple Lighting Wht None NBR 10 Grounded and Common Flashing Beacons and Sign Lighting Wht None NBR 12 Lighting Control Wht None C-3 14 Multiple Service Wht None NBR 14 Railroad Preemption Bik None R 14 Spares Blk None NBR 14 Book One- State Route 68 at San Benancio Road Intersection Improvements 267 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????NBR No Band Required PEU=Photoelectric unit On overlaps, insulation is striped for 1st phase in designation. e.g., phase 2+3) conductor is striped as for phase 2. Band for overlap and special phases as required. Flashing beacons having separate service do not require banding. dThese requirements do not apply to signal cable. ejS" if circuit is switched on line side of service equipment by utility. Band conductors in each pull box and near ends of termination points. On signal light circuits, a single band may be placed around 2 or 3 ungrounded conductors comprising a phase. 6Ungrounded conductors between service switch and flasher mechanism must be black and banded. hConductors between ballasts and sign lighting lamps must be No. 16 and color must correspond to the ballast leads. Black acceptable for size No. 2 and larger. Tape ends for 20 inches with indicated color. Color Code: Yel-Yellow, Brn-Brown, Blu-Blue, Blk-Black, Wht-White, Ora-Orange, Pur-Purple. 86-2.08B Multiple Circuit Conductors Conductor for multiple circuit must be UL or ETL listed and rated for 600 V(ac) operation. Insulation for No. 14 to No. 4 conductors must be one of the following: 1. Type TW PVC as specified in ASTM D 2219 2. Type THW PVC 3. Type USE, RHH, or RHW cross-linked polyethylene Minimum insulation thickness must comply with the following: Insulation Thickness Insulation Type Conductor Size T Insulation Thickness mils) RHW USE RHH No. 14 to No. 10 39 or No. 8 to No. 2 51 No. 14 to No. 10 27 THW or TW No. 8 40 No. 6 to No. 2 54 Insulation for No. 2 and larger conductor must be one of the types listed above or Type THWN. Conductor for wiring wall and soffit luminaire must be stranded copper with insulation rated for use at temperatures up to 125 C. 86-2.08C Signal Cable Signal cable, except for the 28-conductor type, must: 1. Not be spliced 2. Be marked in each pull box with the signal standard information it is connecting to Signal cable must comply with the following: 1. Cable jacket must be: 1.1. Black polyethylene with an inner polyester binder sheath 1.2. Rated for 600 V(ac) and 75 C 2. Filler material, if used, must be polyethylene material. Book One- State Route 68 at San Benancio Road Intersection Improvements 268 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????3. Conductor must be solid copper with Type THWN insulation as specified in Section 86- 2.08, Conductors and Cables," and ASTM B 286. The minimum thickness of Type THWN insulation must be 12 mils for conductor sizes No. 14 to No. 12 and 16 mils for conductor size No. 10. The minimum thickness of nylon jacket must be 4 mils. Cable Jacket Maximum Thickness Nominal Conductor mils) Outside Cable Quantity and Average Minimum Diameter Type a Type inch) Conductor Color Code Remarks blue/black, blue/orange, Use for pedestrian push 3CSC 3 No. 14 44 36 0.40 white/black stripe buttons and spare red, yellow, brown, 5CSC 5 No. 14 44 36 0.50 black, white No. 12 white No. 14 red, yellow, brown, black, and red/black, yellow/black, 8 No. 14 brown/black, 9CSC 1 No. 12 60 48 0.65 white/black stripe No. 12 white No. 14 see" 12CSC Use for vehicle signals, Color Code and pedestrian signals, 11 No. 14 Functional Connection" spares, and signal 12CSC 1 No. 12 60 48 0.80 table common Keep signal commons in each cable separate except at the signal controller. Label each No. 10 white cable as Cl" or C2" in No. 14 see 28CSC pull box. Use Cl" for Color Code and signal phases 1, 2, 3, 27 No. 14 Functional Connection" and 4. Use C2" for 28CSC 1 No. 10 80 64 0.90 table phases 5, 6, 7, and 8. Conductor signal cable description starts with the number of conductors, followed by CSC". e.g., a signal cable with 3 conductors is labeled 3CSC.") 12CSC Color Code and Functional Connection Color Code Termination Phase Red Vehicle signal red 2, 4, 6, or 8 Yellow Vehicle signal yellow 2, 4, 6, or 8 Brown Vehicle signal green 2, 4, 6, or 8 Red/black stripe Vehicle signal red 1, 3, 5, or 7 Yellow/black stripe Vehicle signal yellow 1, 3, 5, or 7 Brown/black stripe Vehicle signal green 1, 3, 5, or 7 Black/red stripe Spare, or use as required for red or DONT WALK Black/white stripe Spare, or use as required for yellow Black Spare, or use as required for green or WALK Red/white stripe Ped signal DONT WALK Brown/white stripe Ped signal WALK Conductor Signal Cable Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 269 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????28CSC Color Code and Functional Connection Color Code Termination Phase Red/black stripe Vehicle signal red 2 or 6 Yellow/black stripe Vehicle signal yellow 2 or 6 Browniblack stripe Vehicle signal green 2 or 6 Red/orange stripe Vehicle signal red 4 or 8 Yellow/orange stripe Vehicle signal yellow 4 or 8 Brown/orange stripe Vehicle signal green 4 or 8 Red/silver stripe Vehicle signal red 1 or 5 Yellow/silver stripe Vehicle signal yellow 1 or 5 Brown/silver stripe Vehicle signal green 1 or 5 Red/ le stripe Vehicle signal red 3 or 7 Yellow/purple stripe Vehicle signal yellow 3 or 7 Brown/purple stripe Vehicle signal green 3 or 7 Red/2 black stripes Ped signal DONT WALK 2 or 6 Brown/2 black stripes Ped signal WALK 2 or 6 Red/2 orange stripes Ped signal DONT WALK 4 or 8 Brown/2 orange stripes Ped signal WALK 4 or 8 Red/2 silver stripes Overlap A, C red OLA, OLC Brown/2 silver stripes Overlap A, C green OLA, OLC Red/2 purple stripes Overlap B, D red OLB, OLD Brown/2 purple stripes Overlap B, D green OLB, OLD Blue/black stripe Ped push button 2 or 6 Blue/orange stripe Ped push button 4 or 8 Blue/silver stripe Overlap A, C yellow OLA(y), OLC(y) Blue/purple stripe Overlap B, D yellow OLB(y), OLD( y) White/black stripe Ped push button common Black/red stripe Railroad preemption Black Spare 86-2.08D Signal Interconnect Cable SIC) Signal interconnect cable must be a 3-pair or 6-pair type with stranded tinned copper No. 20 conductors. Each conductor insulation must be 13 mils minimum nominal thickness, color- coded, polypropylene material. Conductors must be in twisted pairs. Color coding distinguishes each pair. Each pair must be wrapped with an aluminum polyester shield and must have a No. 22 or larger stranded tinned copper drain wire inside the shielded pair. Cable jacket must be black, high density polyethylene, rated for a minimum of 300 V(ac) and 60 C, and must have a minimum nominal wall thickness of 40 mils. Cable jacket or moisture- resistant tape directly under the outer jacket must be marked as specified in Section 86-2.08. You must have a minimum of 6 feet of slack at each controller cabinet. Splicing is allowed only if shown on the plans. Insulate conductor splice with heat-shrink tubing and overlap at least 0.6 inch. Cover overall cable splice with heat-shrink tubing and overlap the cable jacket at least 1-1/2 inch. 86-2.09 WIRING Run conductors in conduit, except for overhead and temporary installations and where conductors are run inside poles. Solder by hot iron, pouring, or dipping method, connectors and terminal lugs for conductor sizes No. 8 and smaller. Do not perform open-flame soldering. 86-2.09A Circuitry Do not run traffic signal indication conductors to a terminal block on a standard unless connected to a mounted signal head. Book One- State Route 68 at San Benancio Road Intersection Improvements 270 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Use only 1 conductor to connect to each terminal of a pedestrian push button. The common for pedestrian push button circuit must be separate from traffic signal circuit grounded conductor. 86-2.09B Installation Use a UL- or ETL-listed inert lubricant for placing conductors in conduit. Pull conductors into conduit by hand using pull tape specified in Section 86-2.05C, Installation." Do not use winches or other power-actuated pulling equipment. If adding new conductors or removing existing conductors, remove all conductors, clean conduit as specified in Section 86-2.05C, Installation," and pull all conductors in conduit as 1 unit. If traffic signal conductors are run in lighting standard containing street lighting conductors from a different service point, you must encase the traffic signal conductors or the lighting conductors with a flexible or rigid metal conduit for a length until the 2 types of conductors are no longer in the same raceway. If less than 10 feet above grade, enclose temporary conductors in flexible or rigid metal conduit. Leave slack for each conductor as follows: Location Slack feet) Signal standard 1 Lighting standard 1 Signal and lighting standard 1 Pull box 3 Splice 3 Standards with slip base 0 After conductors are installed, seal ends of conduits with an approved sealing compound. To form a watertight seal, tape ends of spare conductors and conductors ending in pull boxes. Conductors and cables inside fixture or cabinet must be neatly arranged and tied together by function with self-clinching nylon cable ties or enclosed in plastic tubing or raceway. Identify conductors for: 1. Signal overlap phase as specified for vehicle signals in the table titled Conductor Identification." 2. Metered and unmetered conductors occupying the same pull box. Identify unmetered circuit conductors with UNMETERED-STREET LTG," or UNMETERED-COUNT STATION." Permanently identify conductors by function. Place identification on each conductor, or each group of conductors forming a signal phase, at each pull box and near the end of conductors. Label, tag, or band conductors by mechanical methods. Identification must not move along the conductors. 86-2.09C Connectors and Terminals Connectors and terminals must be UL- or ETL-listed crimp type. Use manufacturer- recommended tool for connectors and terminals to join conductors. Comply with MIL-T-7928. Terminate stranded conductors smaller than No. 14 in crimp style terminal lugs. Conductor Slack Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 271 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????86-2.09D Splicing and Terminations Splices are allowed for: 1. Grounded conductors in pull box. 2. Pedestrian push button conductors in pull box. 3. Conductors in pull box adjacent to each electrolier or luminaire. 4. Ungrounded traffic signal conductors in pull box, if traffic signals are modified. 5. Ungrounded traffic signal conductors to a terminal compartment or signal head on a standard with conductors of the same phase in the pull box adjacent to the standard. 6. Ungrounded lighting circuit conductors in pull box, if lighting circuits are modified. 86-2.09E Splice Insulation Splice must function under continuous submersion in water. Multi-conductor cable must be spliced and insulated to form a watertight joint and to prevent moisture absorption by the cable. Low-voltage tape must be: 1. UL or ETL listed 2. Self-fusing, oil and flame-resistant, synthetic rubber 3. PVC, pressure-sensitive adhesive of 6 mils minimum thickness Insulating pad must be a combination of an 80-mils thick electrical grade PVC laminate and a 120-mils thick butyl splicing compound with removable liner. Heat-shrink tubing must comply with the following: 1. Be medium or heavy wall thickness, irradiated polyolefin tubing with an adhesive mastic inner wall. 2. Before contraction, minimum wall thickness must be 40 mils. 3. Heating must be as recommended by the manufacturer. Do not perform open-flame heating. 4. When heated, the inner wall must melt and fill crevices and interstices of the covered object and the outer wall must shrink to form a waterproof insulation. 5. After contraction, each end of the heat-shrink tubing or the open end of end cap of heat- shrink tubing must overlap the conductor insulation at least 1-1/2 inches. Coat ends and seams with electrical insulation coating. 6. Comply with requirements for extruded insulated tubing at 600 V(ac) in UL Standard 468D and ANSI C119.1, and the following requirements: Shrinkage Ratio 33 percent, maximum, of supplied diameter when heated to 125 C and allowed to cool to 25 C Dielectric Strength 350 kV per inch, minimum Resistivity 25's S per inch, minimum Tensile Strength 2,000 psi, minimum Operating Temperature 40 C to 90 C 135 C in emergency) Water Absorption 0.5 percent, maximum 7. If 3 or more conductors are to be enclosed in 1 splice, place mastic around each conductor before placing inside tubing. Use mastic type recommended by heat-shrink tubing manufacturer. Heat-Shrink Tubing Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 272 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????You may use Method B" as an alternative method for splice insulation. Use at least 2 thicknesses of electrical insulating pad. Apply pad to splice as recommended by manufacturer. 86-2.095 FUSED SPLICE CONNECTORS Install a fused disconnect splice connector in each ungrounded conductor, between the line and the ballast, in the pull box adjacent to each luminaire. Connector must be accessible in the pull box. For 240 and 480 V(ac) circuits, each connector must simultaneously disconnect both ungrounded conductors. Connector must not have exposed metal parts, except for the head of stainless steel assembly screw. Recess head of stainless steel assembly screw a minimum of 1/32 inch below top of plastic boss that surrounds the head. Splice connector must protect fuse from water or weather damage. Contact between fuse and fuseholder must be spring loaded. Splice connector terminals must be: 1. Rigidly crimped, using a tool recommended by manufacturer of fused splice connector, onto ungrounded conductors 2. Insulated 3. Watertight Fuses must be standard midget ferrule type, with Non-Time-Delay" feature, and 13/32" x 1- 1/2". 86-2.10 BONDING AND GROUNDING Secure all metallic components, mechanically and electrically, to form a continuous system that is effectively grounded. Bonding jumper must be copper wire or copper braid of the same cross sectional area as a No. 8 or larger to match the load. Equipment grounding conductors must be color coded as specified in NEC or be bare. Attach bonding jumper to standard as follows: Standard type Requirements Standard with handhole Use UL-listed lug and 3/16-inch diameter or larger brass or and traffic pull box lid bronze bolt. Run jumper to conduit or bonding wire in cover adjacent pull box. Grounding jumper must be visible after the standard is installed and mortar pad is placed on foundation. Standard without Use UL-listed ground clamp on each anchor bolt. handhole Slip-base standard Use UL-listed ground clamp on each anchor bolt or attach UL- listed lug to bottom slip-base plate with 3/16-inch diameter or larger brass or bronze bolt. Ground one side of secondary circuit of step-down transformer. Ground metal conduit, service equipment, and grounded conductor at service point as specified by NEC and service utility, except grounding electrode conductor must be No. 6 or larger. Equipment bonding and grounding conductors are required in conduit. Run a No. 8 minimum bare copper wire continuously in conduit system. The bonding wire must be sized as specified in the NEC. Ground electrode must be: 1. 1 piece Bonding Jumper Attachment Book One- State Route 68 at San Benancio Road Intersection Improvements 273 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????2. 10-foot minimum length of one of the following: 2.1. Galvanized steel rod or pipe not less than 3/4 inch in diameter 2.2. Copper clad steel rod not less than 5/8 inch in diameter 3. Installed as specified in NEC 4. Bonded to service equipment using one of the following: 4.1. Ground clamp 4.2. Exothermic weld 4.3. No. 6 or larger copper conductor On wood pole, metallic equipment mounted less than 8 feet above ground surface must be grounded. Bond metallic conduit in non-metallic pull box using bonding bushing or bonding jumper. Bond metallic conduit in metal pull box using bonding bushings and bonding jumpers connected to bonding wire running in the conduit system. 86-2.11 SERVICE Electrical service installation and materials must comply with service utility requirements. If service equipment is to be installed on utility-owned pole, you must furnish and install conduit, conductors, and other necessary material to complete service installation. Service utility will decide riser and equipment position. Install service equipment early on to allow service utility to schedule its work before project completion. Furnish each service with a circuit breaker that simultaneously disconnects all ungrounded service entrance conductors. Circuit breakers must: 1. Be quick-break on either automatic or manual operation. 2. Have operating mechanism that is enclosed and trip-free from operating handle on overload. 3. Be trip indicating. 4. Have frame size plainly marked. 5. Have trip rating clearly marked on operating handle. 6. Have overload tripping of breakers not influenced by ambient temperature range of 18 C to 50 C. 7. Be internal trip type. 8. Be UL or ETL listed and comply with UL 489 or equal. 9. Have minimum interrupting capacity of 10,000 A, rms, if used as service disconnect. Service equipment enclosure must be a NEMA 3R enclosure with dead-front panel and a hasp with a 7/16-inch hole for a padlock. Enclosure must be field marked as specified in the NEC to warn qualified persons of potential electric arc flash hazards. Service equipment enclosure, except Types II and III, must be galvanized or have a factory- applied rust-resistant prime coat and finish coat. Types II and III service equipment enclosures must be manufactured from one of the following: 1. Galvanized sheet steel Book One- State Route 68 at San Benancio Road Intersection Improvements 274 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????2. Sheet steel plated with zinc or cadmium after manufacturing 3. Aluminum Manufacture service equipment enclosure as specified in Section 86-3.04A, Cabinet Construction." Overlapping exterior seams and doors must comply with requirements for NEMA 3R enclosures in the NEMA Enclosure Standards. If an alternative design is proposed for Type II or III service equipment enclosure, submit plans and shop drawings to the Engineer for approval before manufacturing. Except for falsework lighting and power for your activities, when you submit a written request, the Engineer will arrange: 1. With the service utility to complete service connections for permanent installations and the Department will pay all costs and fees required by the service utility. Submit request at least 15 days before service connections are required. 2. For furnishing electrical energy. Energy used before contract completion will be charged to you, except cost of energy used for public benefit as ordered by the Engineer will be paid by the Department or local authorities. Full compensation for furnishing and installing State-owned or permanent service poles, service equipment, conduit, conductors, and pull boxes, including equipment, conduit, and conductors placed on utility-owned poles, is included in the contract item of electrical work involved and no additional compensation will be allowed therefor. If the service point is indeterminate and is shown on the plans as approximate location" or service point not yet established," the labor and materials required for making the connection between the service point, when established, and the nearest pull box shown on the plans will be paid for as extra work as specified in Section 4-1.03D, Extra Work." 86-2.12 WOOD POLES Wood poles must comply with the following: 1. Class 5 or larger as specified in ANSI 0 5.1 2. Less than 180-degree twist in grain over the full length 3. 4-inch or less sweep 4. Beveled top 5. Placed in ground at least 6 feet 6. Length must be: 6.1. 25 feet for service pole 6.2. 35 feet for other After each pole is set in ground, backfill space around pole with selected earth or sand, free of rocks and other deleterious material, placed in 4-inch thick layers. Moisten each layer and thoroughly compact. Manufacture mast arm from standard pipe, free from burrs. Each mast arm must have an insulated wire inlet and wood pole mounting brackets for mast arm and tie-rod cross arm. Manufacture tie rod from structural steel and pipe. Mount mast arm for luminaire to provide a 34-foot mounting height for a 200 W high pressure sodium luminaire and 40-foot mounting height for 310 W high pressure sodium luminaire. Traffic signals and flashing beacons on mast arm must provide a minimum vertical clearance of 17 feet from bottom of equipment to pavement. Book One- State Route 68 at San Benancio Road Intersection Improvements 275 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????After manufacturing, pressure-treat pole as specified in Section 58, Preservative Treatment of Lumber, Timber and Piling," and AWPA Use Category System: UC4B, Commodity Specification D. If specified, treat pole with waterborne wood preservative. 86-2.13 LIGHTING AND SIGN ILLUMINATION CONTROL Enclosure for the circuit breaker for lighting and sign illumination control must: 1. Be NEMA 3R 2. Be galvanized, cadmium plated, or powder-coated 3. Include dead front panel and a hasp with a 7/16 inch diameter hole for padlock 86-2.14 TESTING 86-2.14A Materials Testing Deliver material and equipment to be tested to either the Transportation Laboratory or a testing location ordered by the Engineer. Allow 30 days for acceptance testing from the time material or equipment is delivered to test site. You must pay for all shipping, handling, and related transportation costs associated with testing. If equipment is rejected, you must allow 30 days for retesting. Retesting period starts when corrected equipment is delivered to test site. You must pay for all retesting costs. Delays resulting from submittal of non-compliant materials do not relieve you from executing the contract within the allotted time. If equipment submitted for testing does not comply with specifications, remove the equipment within 5 business days after notification that the equipment is rejected. If equipment is not removed within that period, it may be shipped to you at your expense. When testing is complete, you will be notified. You must pick up the equipment at the test site and deliver it to the job site. Testing and quality control procedures for all other traffic signal controller assemblies must comply with NEMA TS Standards for Traffic Control Systems. 86-2.14B Field Testing Before starting functional testing, perform the following tests in the presence of the Engineer: 86-2.14B(1) Continuity Test each circuit for continuity. 86-2.14B(2) Ground Test each circuit for grounds. 86-2.14B(3) Insulation Resistance Perform insulation resistance test at 500 V(dc) on each circuit between the circuit and a ground. Insulation resistance must be 10 MS2 minimum on all circuits, except for inductive loop detector circuits that must have an insulation resistance value at least 100 MS2. 86-2.14C Functional Testing Test periods must comply with Section 86-1.07, Scheduling of Work." Acceptance of new or modified traffic signal will be made only after all traffic signal circuits have been thoroughly tested. Book One- State Route 68 at San Benancio Road Intersection Improvements 276 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Perform functional test to show that each part of the system functions as specified. Functional test for each new or modified system must include at least 5 business days of continuous, satisfactory operation. If unsatisfactory performance of the system occurs, the condition must be corrected and the system retested until the 5 business days of continuous, satisfactory operation is obtained. Except for new or modified parts of existing lighting circuit and sign illumination system, the State or local agency will maintain the system during test period and pay the electrical energy cost. Except for electrical energy, you must pay the cost of necessary maintenance performed by the State or local agency on new circuits or on the portions of existing circuits modified under the contract. Shutdown of electrical system caused by traffic from a power interruption or from unsatisfactory performance of State-furnished materials does not constitute discontinuity of the functional test. 86-2.15 GALVANIZING Galvanize as specified in Section 75-1.05, Galvanizing." Cabinet material may be galvanized before manufacturing as specified in ASTM A 653/653M, Coating Designation G 90. Steel pipe standard and pipe mast arm must be hot-dip galvanized after manufacturing and must comply with Section 75-1.05, Galvanizing." Remove spikes from galvanized surfaces. A minimum of 10 inches of upper end of anchor bolts, anchor bars or studs, and nuts and washers must be galvanized as specified in Section 75-1.05, Galvanizing." After galvanizing, bolt threads must accept galvanized standard nuts without requiring tools or causing removal of protective coatings. Galvanizing existing materials in an electrical installation will not be required. 86-2.16 PAINTING Paint electrical equipment and material as specified in Section 59, Painting," and the following: 1. Use paint material specified in Section 91, Paint." 2. Factory or shop cleaning methods for metals are acceptable if equal to the methods specified. 3. Instead of temperature and seasonal restrictions for painting as specified in Section 59, Painting," paint may be applied to equipment and materials for electrical installations if ordered by the Engineer. 4. Ungalvanized ferrous surface to be painted must be cleaned before applying prime coat. Blast cleaning is not required. 5. If an approved prime coat is applied by manufacturer, and in good condition, the 1st primer application is not required. 6. Existing equipment to be painted in the field, including State-furnished equipment, must be washed with a stiff bristle brush using a solution of water containing 2 tablespoons of heavy duty detergent powder per gallon. After rinsing, surface must be wire-brushed with a coarse, cup-shaped, power-driven brush to remove badly bonded paint, rust, scale, corrosion, grease, or dirt. Dust or residue remaining after wire brushing must be removed before priming. 7. Do not paint galvanized metal guard post, galvanized equipment, State-furnished controller cabinet, and wood poles for traffic signal or flashing beacon. 8. New galvanized metal surface to be painted in the field must be cleaned as specified for existing equipment before applying the prime coat. Do not wire brush new galvanized surface. Book One- State Route 68 at San Benancio Road Intersection Improvements 277 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????9. After erection, examine exterior surface for damaged primer, clean, and spot coat with primer. 10. Paint Types II and III steel service equipment enclosures with a polymeric or an enamel coating system matching Color No. 14672, light green, of Federal Standard 595B. Coating must be commercially smooth and free of flow lines, paint washout, streaks, blisters, and other defects that would impair serviceability or detract from general appearance. Coating must comply with the following: 10.1. Coating hardness Finish must have pencil lead hardness of HB, minimum, using an Eagle Turquoise pencil. 10.2. Salt spray resistance Undercutting coating system's film must not exceed 1/8-inch average, from lines scored diagonally and deep enough to expose the base metal, after 336 hours of exposure in a salt spray cabinet complying with ASTM B 117. 10.3. Adherence Must not have coating loss when tested as specified in California Test 645. Perform testing by applying coating to 4" x 8" x 0.024" test specimens of the same material as the cabinet, using the same application method. 11. Finish interior of metal signal visor, louver, and front face of back plates with 2 applications of lusterless black exterior grade latex paint formulated for application to properly prepared metal surface. Good condition factory finish will be acceptable. 12. Finish metal signal section, signal head mounting, brackets and fittings, outside of visor, pedestrian push button housing, pedestrian signal section and visor, and back face of back plate with 2 applications of lusterless black or dark olive green exterior grade latex paint formulated for application to properly prepared metal surface. Match dark olive green color to Color Chip No. 68 filed at the Transportation Laboratory. 13. Prepare and finish conduit and conduit fitting above ground the same as adjacent standard or post. 14. Relocated, reset or modified equipment previously finished as specified in this section, except for previously-finished galvanized standard with traffic signal yellow enamel, must be given a spot finishing application on newly primed areas and 1 finishing application over the entire surface. If signal face or mounting brackets are required to be painted under this section, all signal faces and mounting brackets on the same mounting must be repainted. 15. Small rusted or repaired areas of relocated or reset galvanized equipment must be cleaned and painted as specified in Section 75-1.05, Galvanizing," for repairing damaged galvanized surfaces. 16. Stencil equipment number neatly on the standard or adjacent structure. Obtain number from the Engineer. 17. Perform painting neatly. The Engineer reserves the right to require use of brushes if the work performed by paint spraying machine is unsatisfactory. 86-3 CONTROLLER ASSEMBLIES 86-3.01 CONTROLLER ASSEMBLIES A controller assembly houses a complete mechanism for controlling the operation of traffic signals or other systems. Model 170 and Model 2070, specified as a Model 170/2070 controller assembly, includes a Model 170, 170E or 2070 controller unit, a wired cabinet, and all auxiliary equipment required to control the system. Book One- State Route 68 at San Benancio Road Intersection Improvements 278 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????86-3.02 BLANK) 86-3.03 BLANK) 86-3.04 CONTROLLER CABINETS Controller cabinets for controller assemblies other than Model 170/2070 must comply with the following: 86-3.04A Cabinet Construction Cabinet must be rainproof and the top crowned 1/2 inch or slanted toward the back to prevent standing water. Cabinet and door must be manufactured from one of the following: 1. 0.073-inch minimum thickness cold-rolled steel with continuously-welded exterior seams 2. 0.073-inch minimum thickness stainless steel with overlapping exterior seams complying with Type 4 enclosures of the NEMA Enclosure Standards 3. 0.125-inch minimum thickness aluminum with continuously-welded exterior seams Exterior welds must be ground smooth and edges filed to a radius of at least 0.03 inch. Cabinet manufactured from cold-rolled steel must comply with Section 86-2.16, Painting," and the following: 1. Cabinet manufactured from cold-rolled steel must be finished with a polymeric or an enamel coating system conforming to Color No. 14672 of Federal Standard 595B. 2. Cabinet must not have coating loss when 2 test specimens, 4" x 8", of the same material and coating as the cabinet are tested. Two 9-inch-diagonal scratches exposing bare metal will be made on a specimen. Soak specimen in demineralized water for 192 hours. Tightly affix a 1-inch wide strip of masking tape to the surface and remove with one quick motion. Specimen showing evidence of blistering, softening, or peeling of paint or coating from the base metal will be rejected. Testing must comply with California Test 645, except passing 180 Degree Bend Test is not required. 3. Metal must be prepared by the 3-step, iron phosphate conversion coating bonderizing technique. 4. Inside walls, doors, and ceiling of the housing must be the same as the outside finish. Cabinet manufactured from stainless steel must comply with the following: 1. Use annealed or quarter-hard stainless steel that complies with ASTM A 666 for Type 304, Grades A or B. 2. Use gas tungsten arc welding GTAW) process with bare stainless steel welding electrodes. Electrodes must comply with AWS A5.9 for ER308 chromium-nickel bare arc welding electrodes. 3. Procedures, welder, and welding operator must comply with requirements and practices recommended in AWS C5.5. 4. Ground or brush exposed, exterior surfaces of stainless steel cabinet to a 25 to 50- microinch finish using iron-free abrasives or stainless steel brushes. 5. After grinding or brushing, cabinet must not show rust discoloration when: 5.1. Exposed for 48 hours in a salt spray cabinet as specified in ASTM B 117 Book One- State Route 68 at San Benancio Road Intersection Improvements 279 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??5.2. Exposed 24 hours in a tap water spray cabinet with the water temperature between 38 C and 45 C 6. After the test, cabinet showing rust discoloration anywhere on its surface will be rejected. Rejected cabinets may be cleaned, passivated, and resubmitted for testing. Cabinet manufactured from aluminum sheet must comply with ASTM B 209 or B 209M for 5052-H32 aluminum sheet, and the following: 1. Use gas metal arc welding GMAW) process with bare aluminum welding electrodes. Electrodes must comply with AWS A5.10 for ER5356 aluminum alloy bare welding electrodes. 2. Procedures, welder, and welding operator for welding must comply with requirements in AWS B3.0, Welding Procedure and Performance Qualification," and to practices recommended in AWS C5.6. 3. Surface finish of each aluminum cabinet must comply with MIL-A-8625 for a Type II, Class I coating, except anodic coating must have a minimum thickness of 0.0007 inch and a minimum coating weight of 0.001 ounce per square inch. The anodic coating must be sealed in a 5 percent aqueous solution of nickel acetate, pH 5.0 to 6.5, for 15 minutes at 97 C. Before applying anodic coating, clean and etch cabinets using the steps below: 3.1. Clean by immersing into inhibited alkaline cleaner, Oakite 61A, Diversey 909, or equal, 6 to 8 ounces per gallon at 71 C for 5 minutes. 3.2. Rinse in cold water. 3.3. Etch in solution of 1-1/2 ounce of sodium fluoride and 4 to 6 ounces of sodium hydroxide per gallon of distilled water at 60 C to 65 C for 5 minutes. 3.4. Rinse in cold water. 3.5. Immerse in 50 percent by volume nitric acid solution at room temperature for 2 minutes. 3.6. Rinse in cold water. Cabinet must have: 1. Single front door with: 1.1. 44-inch maximum door width. 1.2. Lock, when closed and latched, that is locked. 1.3. Police panel mounted on door, equipped with a keyed lock and 2 police keys. Each police key must have a shaft at least 1-3/4 inch in length. 2. Dust-tight gasketing on all door openings, permanently bonded to the metal. Mating 3. surface of the gasketing must be covered with silicone lubricant to prevent sticking. Handle that: 3.1. Allows padlocking in closed position 3.2. Has a minimum length of 7 inches 3.3. Has a 5/8-inch, minimum, steel shank 3.4. Is manufactured of cast aluminum, or zinc-plated or cadmium-plated steel 4. Cabinet door frame with: Book One- State Route 68 at San Benancio Road Intersection Improvements 280 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??!??4.1. Latching mechanism that: 4.1.1. Holds tension on and forms a firm seal between door gasketing and frame. 4.1.2. Is a 3-point cabinet latch with nylon rollers that have a minimum diameter of 3/4 inch and equipped with ball bearings. 4.1.3. Has a center catch and a pushrod made of zinc-plated or cadmium-plated steel. Pushrod must be at least 1/4" x 3/4" and turned edgewise at outer supports. Cadmium plating must comply with MIL-QQ-416. Zinc plating must comply with MIL-QQ-325. 4.2. Hinging that: 4.2.1. Has 3-bolt butt hinges, each having a stainless steel fixed pin. Hinges must be stainless steel or may be aluminum for aluminum cabinet. 4.2.2. Is bolted or welded to the cabinet. Hinge pins and bolts must not be accessible when door is closed. 4.2.3. Has a catch to hold the door open at 90 degrees and 180 degrees, 10 degrees, if a door is larger than 22 inches in width or 6 square feet in area. Catch must be at least 3/8-inch diameter, stainless steel plated rod capable of holding door open at 90 degrees in a 60 mph wind at an angle perpendicular to the plane of the door. 5. Lock that: 5.1. Is solid brass, 6-pin tumbler, rim type 5.2. Has rectangular, spring-loaded bolts 5.3. Is left hand and rigidly mounted with stainless steel machine screws approximately 2 inches apart 5.4. Extends 1/8 to 3/8 inch beyond the outside surface of door 6. 2 keys that are removable in the locked and unlocked positions. Submit alternative design details for review and approval before manufacturing cabinet. Use metal shelves or brackets that will support controller unit and auxiliary equipment. Machine screws and bolts must not protrude outside the cabinet wall. 86-3.04B Cabinet Ventilation Each controller cabinet must have: 1. 8 screened, 1/2-inch diameter or larger, raintight vent holes, in lower side or bottom of cabinet. You may use louvered vents with a permanent metal mesh or 4-ply woven polypropylene air filter held firmly in place, instead. 2. Electric fan with ball or roller bearings and capacity of at least 100 cubic feet per minute. Fan must be thermostatically controlled and manually adjustable to turn on between 32 C and 65 C with a differential of not more than 6 C between automatic turn on and turn off. Fan circuit must be fused at 125 percent of ampacity of installed fan motor. Fan and cabinet vent holes must be positioned to direct bulk of airflow over controller unit or through ventilating holes of controller unit. Book One- State Route 68 at San Benancio Road Intersection Improvements 281 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??"??86-3.04C Cabinet Wiring Conductors used in controller cabinet wiring must: 1. Be neatly arranged and laced, or enclosed in plastic tubing or raceway. 2. End with properly sized captive or spring-spade terminal or be soldered to a through- panel solder lug on the back side of the terminal block. Apply crimp-style connector with proper tool to prevent opening of handle until crimp is completed. Controller cabinet must have an equipment grounding conductor bus that is grounded to the cabinet and connected to metal conduit system or other approved ground with a No. 8, or larger, grounding conductor. With all cabinet equipment in place and connected, resistance between grounded conductor terminal bus and equipment grounding conductor bus must be 50 Mu, minimum, when measured with an applied voltage of 150 V(dc). If direct current is to be grounded, connect to equipment ground only. Use two or more terminal blocks for field connection. Install field terminal within 22 inches from front of cabinet and orient for screwdriver operation. Terminal must be a minimum of 5 inches above foundation. No more than 3 conductors per terminal are allowed. Two flat metal jumpers, straight or U shaped, may be placed under terminal screw. At least 2 full threads of terminal screws must be fully engaged when screw is tightened. Live parts must not extend beyond the barrier. 86-3.05 CABINET ACCESSORIES 86-3.05A Labels Include permanently printed, engraved, or silk-screened label for equipment and removable items of equipment. Labeling must match cabinet wiring diagram. Label for shelf-mounted equipment must be on shelf face below item. Label for wall-mounted equipment must be below item. 86-3.05B Convenience Receptacle Mount convenience receptacle in a readily accessible location inside the cabinet. Convenience receptacle must be a duplex, 3-prong, NEMA 5-15R grounding type outlet that complies with UL Standard 943. 86-3.05C Surge Arrestor Surge arrestor must reduce effects of power line voltage transients and have ratings as follows: Recurrent peak voltage 184 V(ac) Energy rating, maximum 20 J Power dissipation, average 0.85 W Peak current for pulses less than 7 is 1,250 A Standby current must be 1 mA or less for 120 V(ac), 60 Hz sinusoidal input. 86-3.05D Terminal Blocks Terminal block must be rated 600 V(ac), minimum, and have nickel-, silver-, or cadmium- plated brass binder head screw terminal. Surge Arrestor Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 282 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??#??Heavy duty terminal block must be rated at 20 A and have 12 position with No. 10 x 5/16- inch nickel-plated brass binder head screws and nickel-plated brass inserts. Each position must have 2 screw-type terminals. Terminal block must be barrier type with shorting bars in each of the 12 positions, and must have integral type marking strips. Light duty terminal block must be rated at 5 A and have 12 positions with No. 6 x 1/8 inch binder head screws. Each position must have 1 screw-type terminal. 86-3.06 COMPONENTS 86-3.06A Toggle Switches Toggle switch must 1. Have poles as required 2. Be rated at 200 percent of circuit current for circuits of 10 A or less and 125 percent of circuit current for circuits over 10 A 86-3.06B Cartridge Fuses Install cartridge fuse in panel-mounted fuseholder. Fuse type and rating must be as recommended by the fuse manufacturer for protecting the load. 86-3.06C Circuit Breakers Circuit breaker must comply with Section 86-2.11, Service," except breaker must have a minimum interrupting capacity of 5,000 A, rms. 86-3.06D Connectors Use connector designed to interconnect various parts of circuit together and constructed for the application involved. Design connector for positive connection of circuit and easy insertion and removal of mating contacts. Connector must be permanently keyed to prevent improper connection of circuit. Connector, or device plugging into connector, must have positive connection to prevent a circuit from breaking due to vibration, a pull on connecting cable, or similar disruptive force. 86-3.07 ACCESSORIES Accessories must comply with the following: 86-3.07A Telephone Bridge Telephone bridge must comply with the following: 86-3.07A(1) General Description Dual 5-way active data bridge must include: 1. 4-wire transmission interconnection between a dedicated common port and 4 multiple ports. Ports must be characterized by a balanced 600 SZ terminating impedance. The module's active circuit must allow unused multiple ports to be left unterminated without affecting the transmission response of ports in use. 2. Splitter channel and combiner channel. Connect multiple inputs to a common output in combiner channel. Connect common input to multiple outputs in splitter channel. Splitter and combiner must be separate and independent, allowing operation in full- duplex data transmission applications. Input, output, and line monitor jacks on front Book One- State Route 68 at San Benancio Road Intersection Improvements 283 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??$??panel of bridge must allow isolated-module, isolated-facility, and cross-bridge measurement of transmission parameters in both, splitter and combiner channels. 3. Front-panel-accessible potentiometers with continuous adjustment of cross-bridge loss or gain within 30 to 10 dB and 10 to +10 dB ranges. Select either range for each channel. Adjusted level must be same for all cross-bridge port combinations so if the splitter- channel potentiometer is set for +3 dB gain, all common-to-multiple-port paths in the splitter channel must receive a +3 dB level increase. 4. Input voltage of 22 to 56 V(dc) at a maximum current of 60 mA. Individually package each dual 5-way active bridge unit in housing. Circuitry must be solid state, constructed on removable industry standard circuit boards with plug in edge connectors. Test jack, edge connector, and external plug connector must be made of material suitable for use in above stated environment without deterioration of electrical connection for useful life of equipment. Physical size of case must not exceed 225 cubic inches and must be suitable for mounting to frame of field cabinet. Use mounting holes to attach unit to one side of frame of relay rack. Include input and output ports for 5 full duplex telephone circuits with input and output ports labeled as to function. Level control, or switches and level adjustment potentiometers, and input and output level test jacks must provide external adjustments without removal of the housing. 86-3.07A(2) Application Use dual 5-way active data bridge to interconnect 4-wire data modems to a common data channel or link. At the distant end, terminate common data link into a computer that may time sequentially poll outlying or remote data terminals. Use bridge for central transmission arrangement, or hubbing" network, to extend data transmission to outlying terminals. To expand number of multiple ports of a 4-wire data hubbing network in a tandem bridge arrangement, directly connect 1 multiple port in each channel of 1st bridge to common port of the same channel of 2nd bridge to get a 4-wire data bridge with 1 common and 7 multiple ports. 86-3.07A(3) Circuit Description Combiner channel of dual 5-way active data bridge must have a variable-gain-integrated- circuit operational amplifier with an input summing circuit. Summing circuit must add transmission energy from all multiple input ports at low-impedance summing point for input port isolation. Connect amplifier output to transformer for balanced connection to facility. Splitter channel must include a transformer-input, variable-gain, integrated-circuit operational amplifier and power amplifier. Power transformer output must be very low impedance and drive eight 300 S2 resistors to derive proper impedance at multiple output circuits and provide isolation between output circuits. Multiple ports in bridge splitter and combiner channels must be isolated, and balanced by output transformer and matched precision resistors in each channel. 86-3.07A(4) Electrical Requirements Comply with following electrical requirements: Book One- State Route 68 at San Benancio Road Intersection Improvements 284 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??%??Specification Requirement Slitter channel loss or gain 30 to +10 dB usable range Combiner channel loss or gain 30 to +10 dB usable range Maximum output level overload Splitter: +5 dBm point) Combiner: +12 dBm Level change with loading 1 dB max, 1 port to all ports loaded Input port impedance Splitter multiple ports): 600 0 balanced Combiner common port): 600 0 balanced Output port impedance Splitter multiple ports): 600 S2 balanced Combiner common port): 600 S2 balanced Harmonic distortion Splitter: less than lpercent at +3 dBm Combiner: less than 1 percent at +8 dBm Noise 20 dBm max Frequency response 1 dB re 1,000 Hz level, 300 to 5,000 Hz Delay distortion Less than 75 s, 400 to 3,000 Hz Cross port coupling loss crosstalk) Greater than 55 dB Input power 22 to 56 V(dc), 60 mA max Operating environment 7 C to 54 C, humidity to 95% no condensation) Mounting 1 position 86-3.07A(5) Testing and Troubleshooting You must have complete testing and troubleshooting instructions, circuit diagrams and pictorial component location, and identification guides for each unit. 86-4 TRAFFIC SIGNAL FACES AND FITTINGS 86-4.01 VEHICLE SIGNAL FACES Each vehicle signal face must: 1. Be adjustable and allow for 360-degree rotation about vertical axis 2. Comply with ITE publication ST-017B, Vehicle Traffic Control Signal Heads" 3. Comply with California Test 604, except for arrow and X" faces 4. Have 3 sections arranged vertically: red at top, yellow at center, and green at bottom 5. Be of the same manufacturer and material, if more than 1 is installed at an intersection, except for programmed visibility type 6. Be sealed with neoprene gasket at top opening 7. Be LED modules 86-4.01A Signal Sections Each signal section must comply with the following: 1. Maximum height must be 10-1/4 inches for an 8-inch section and 14-3/4 inches for a 12- inch section. 2. Housing must: Electrical Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 285 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??&??2.1. Be either die-cast or permanent mold-cast aluminum, or if specified, be structural plastic. 2.2. Comply with ITE publication ST-017B if die-cast or permanent mold-cast aluminum is used. 2.3. Have a 1-piece, hinged, square-shaped door designed to allow access for relamping without the use of tools. Door must be secured to hold the door closed during loading tests. Module or lens must be watertight and mounted in the door. 3. Hinge pins, door latching devices, and other exposed hardware must be Type 304 or 305 stainless steel. Interior screws and fittings must be stainless steel, or steel with a corrosion resistant plating or coating. 4. Opening must be placed on top and bottom to receive 1-1/2-inch pipe. The 8-inch and 12-inch sections of an individual manufacturer must be capable of joining to form a signal face in any combination. This interchangeability is not required between metal and plastic sections. 5. Gaskets must be made of a material that is not affected if installed in a section with metal or plastic housing that is continuously operated for 336 hours. Structural failure is described as follows: Signal Section T e Requirements Description of Structural Failure Metal California Test 666 Fracture within housing assembly or deflection of more than half the lens diameter of signal section during wind load test Plastic California Test 605 Fracture within housing assembly or deflection of more than 10 degrees in either the vertical or horizontal plane after wind load has been removed from front of signal face, or deflection of more than 6 degrees in either the vertical or horizontal plane after wind load has been removed from back of signal face 86-4.01A(1) Metal Signal Sections Each metal signal section must have a metal visor. Metal signal faces requiring backplates must have metal backplates. 86-4.01A(2) Plastic Signal Sections Housing must be molded in 1 piece, or fabricated from 2 or more pieces and joined into a single piece. Plastic must have ultraviolet stability, be unaffected by lamp heat, and be self- extinguishing. Housing and door must be colored throughout and be black, matching Color No. 17038, 27038, or 37038 of Federal Standard 595B. Each face section must be joined to adjacent section by one of the following: 1. Minimum of 3 machine screws for 8-inch sections and 4 machine screws for 12-inch sections, installed through holes near front and back of housing. Each screw must be a No. 10 and have a nut, flat washer, and lock washer. 2. Two machine screws, each with a nut, flat washer, and lock washer, installed through holes near the front of the housing, and a fastening through the 1-1/2-inch pipe opening. Fastening must have 2 large flat washers to distribute the load around the pipe opening and 3 carriage bolts, each with a nut and lock washer. Minimum screw size must be No. 10. Minimum carriage bolt size must be 1/4 inch. Signal Section Structural Failure Book One- State Route 68 at San Benancio Road Intersection Improvements 286 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??'??Supporting section of each signal face supported only at top or bottom must have reinforcement. Reinforcement plate must be either sheet aluminum, galvanized steel, or cast aluminum. Each plate must be a minimum of 0.11-inch thick and have a hole concentric with 1-I /2-inch pipe-mounting hole in the housing. Place reinforcement plate as follows: Reinforcement Plate Placement Type of Reinforcement Plate Placement Sheet aluminum Inside and outside of housing Galvanized steel Inside of housing Cast aluminum Outside of housing Reinforcement plates placed outside of the housing must be finished to match signal housing color and be designed to allow proper serrated coupling between signal face and mounting hardware. Minimum of 3 No. 10 machine screws must be installed through holes in each plate and matching holes in the housing. Each screw must have a round or binder head, a nut, and lock washer. If signal face is supported by a Type MAS side attachment slip-fitter inserted between 2 sections, place spacers between the 2 sections. Vertical dimension of spacers must allow proper seating of serrations between the slip-fitter and the 2 sections. In addition to the fastening through the large openings in housing, the 2 sections must join with at least 2 machine screws through holes near the front of housing and the spacers, and through matching holes in a reinforcing plate installed in housing. Machine screws must be No. 10 minimum size. Spacers must be made of same material as signal housing. If reinforcing webs are used to connect back of housing to top, bottom, and sides, reinforcing plates are not required. Holes for machine screws must be either cast or drilled during signal section manufacturing. Surround each hole with a 1/8-inch minimum width boss to allow contact between signal sections about axis of hole. Each plastic signal section must have a plastic or metal visor. Plastic signal faces requiring backplates must have plastic backplates. Serrated nylon washer must be inserted between each plastic signal section and metal mounting assembly. Each washer must be between 3/16- and 1/4-inch thick. Serrations must match those on signal section and mounting assembly. 86-4.01B Visors Include removable visor with each signal section. Comply with ITE publication ST-017B. Visors are classified by lens enclosure as full circle, tunnel or cap. Bottom opens for tunnel type and both, bottom and lower sides open for cap type. Visors must be tunnel type. Visor must have a downward tilt between 3 and 7 degrees with a length of: 1. 9-1/2-inch minimum for nominal 12-inch round lenses 2. 7 inch for nominal 8-inch round lenses Metal visor must be formed from 0.050-inch, minimum thickness, aluminum alloy sheet. Plastic visor must be either formed from sheet plastic or assembled from one or more injection, rotational, or blow-molded plastic sections. Material must be of a black homogeneous color with lusterless finish. Sections must be joined using thermal, chemical, or ultrasonic bonding, or with aluminum rivets and washers permanently colored to match visor. Book One- State Route 68 at San Benancio Road Intersection Improvements 287 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??(??Secure each visor to its door and prevent removal or permanent deformation when wind load specified in California Test 605 for plastic visors or 666 for metal visors is applied to its side for 24 hours. If directional louvers are used, fit louvers snuggly into full-circular signal visors. Outside cylinder must be constructed of 0.030-inch nominal thickness, or thicker, sheet steel and vanes must be constructed of 0.016-inch nominal thickness, or thicker, sheet steel, or the cylinder and vanes must be constructed of 5052-H32 aluminum alloy of equal thickness. 86-4.02 BLANK) 86-4.03 BLANK) 86-4.04 BACKPLATES Background light must not be visible between backplate and signal face or between sections. Plastic backplates must be either formed from sheet plastic or assembled from extruded, molded, or cast sections. Sections must be factory joined using one of the following: 1. Appropriate solvent cement 2. Aluminum rivets and washers painted or permanently colored to match backplate 3. No. 10 machine screws with washers, lock washers, and nuts, painted to match backplate Backplate material must be of black homogeneous color with a lusterless finish. Secure each plastic backplate to the plastic signal face in a manner that prevents its removal or permanent deformation when the wind-load test is applied to either the front or back of signal face. Permanent deformation of any portion of backplate must not exceed 5 degrees forward or backward after wind loading is applied for 24 hours. If plastic backplate requires field assembly, join with at least 4 No. 10 machine screws at each field-assembled joint. Each machine screw must have an integral or captive flat washer, a hexagonal head slotted for a standard screwdriver, and either a locking nut or a nut and lockwasher. Machine screws, nuts, and washers must be stainless steel or steel with a zinc or black-oxide finish. If a metal backplate has 2 or more sections, fasten sections with rivets or aluminum bolts peened after assembly to avoid loosening. Instead of the screws shown on the plans, you may use self-threading No. 10 steel screws to fasten plastic backplates to plastic signal face. Each screw must have an integral or captive flat washer, a hexagonal head slotted for a standard screwdriver, and is stainless steel or steel with a zinc or black-oxide finish. 86-4.05 PROGRAMMED VISIBILITY VEHICLE SIGNAL FACES Programmed visibility signal face and its installation must comply with Section 86-4.01, Vehicle Signal Faces," Section 86-4.04, Backplates," and Section 86-4.08, Signal Mounting Assemblies." Each programmed visibility signal section must: 1. Have a nominal 12-inch diameter circular or arrow indication 2. Comply with ITE publication ST-017B for color and arrow configuration 3. Have a cap visor 4. Have an adjustable connection that provides incremental tilting from 0 to 10 degrees above or below horizontal while maintaining a common vertical axis through couplers and mountings Book One- State Route 68 at San Benancio Road Intersection Improvements 288 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??)??Terminal connection must allow external adjustment about the mounting axis in 5-degree increments. Signal must be mountable with ordinary tools and capable of servicing without tools. Preset adjustment at 4 degrees below horizontal. Visibility of each programmed visibility signal face must be capable of adjustment or programming, within the face. When programmed, each signal face's indication must be visible only in those areas or lanes to be controlled, except that during dusk and darkness a faint glow to each side is allowed. You must program the head as recommended by the manufacturer. 86-4.06 PEDESTRIAN SIGNAL FACES Message symbols for pedestrian signal faces must be white WALKING PERSON" and Portland orange UPRAISED HAND." Comply with ITE Standards: Pedestrian Traffic Control Signal Indications" and California MUTCD. Each symbol's height must be at least 10 inches and width must be at least 6-1/2 inches. Luminance of UPRAISED HAND" symbol must be 1,100 foot-lamberts, minimum, and luminance of WALKING PERSON" symbol must be 1,550 foot-lamberts, minimum, when tested as specified in California Test 606. Uniformity ratio of an illuminated symbol must not exceed 4 to 1 between the highest luminance area and the lowest luminance area. Luminance difference between a nonilluminated symbol and the background around the symbol must be less than 30 percent when viewed with the visor and front screen in place and at a low sun angle. Each housing, including front screen, must have maximum overall dimensions of 18-1/2-inch width, 19-inch height, and 11-1/2-inch depth. All new pedestrian signal faces installed at an intersection must be the same make and type. 86-4.06A Type A Each Type A pedestrian signal face must include a housing, 1 LED pedestrian signal combo module and a front screen. 86-4.06B Front Screen Front screen installation for each Type A signal must comply with one of the following: 1. Install, tilting downward, at an angle of 15?2 degrees out from the top, an aluminum honeycomb screen with 0.2-inch cells, 3/8-inch thick, or a plastic screen of 3/8-inch squares, 1/2-inch thick with wall thickness of 1/16-inch. Completely cover message plate. Include a clear front cover of 1/8-inch minimum thickness acrylic plastic sheet or 1/16-inch minimum thickness polycarbonate plastic. Hold screen and cover firmly in place with stainless steel or aluminum clips or stainless steel metal screws. 2. Install a 1-1/2-inch deep eggcrate or Z crate type screen of 1/32-inch nominal thickness polycarbonate. Mount screening in a frame constructed of 0.040-inch minimum thickness aluminum alloy or polycarbonate. Install screen parallel to face of message plate and hold in place with stainless steel screws. Visor as specified in Section 86- 4.06D, Visors," is not required. The Department will test screens in a horizontal position with its edges supported. When a 3-inch diameter, 4-pound steel ball is dropped on the screen from a height of 4 feet above, the front screen must not fracture, separate at the welds, or compress more than 1/8-inch. When Book One- State Route 68 at San Benancio Road Intersection Improvements 289 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??*??pedestrian housing is used to support front screen during test, remove message plate from pedestrian signal housing, so there is no back support for the screen. Screen and frame must be one of the following: 1. Manufactured from aluminum anodized flat black 2. Finished with lusterless black exterior grade latex paint formulated for application to properly prepared metal surfaces 3. Manufactured from flat black plastic 86-4.06C Housing Pedestrian signal housing must comply with Section 86-4.01A, Signal Sections." 86-4.06D Visors Use material similar to housing. Extend top of visor a minimum length of 6 inches at top and 5 inches at bottom when measured from front surface of line. Front must be normal to top. 86-4.06E Finish Paint exterior of each housing and visor, and interior of visor as specified in Section 86-2.16, Painting." 86-4.06F Control Pedestrian signals must be controllable by solid-state switching devices specified for traffic signal controller assemblies. 86-4.06G Terminal Blocks Include light duty terminal block, as specified in Section 86-4.01B, Electrical Components," with each pedestrian signal face. 86-4.07 BLANK) 86-4.08 SIGNAL MOUNTING ASSEMBLIES Signal mounting assembly must include: 1. 1-1/2-inch standard steel pipe or galvanized conduit 2. Pipe fitting made of ductile iron, galvanized steel, aluminum alloy Type AC-84B No. 380, or bronze 3. Mast arm and post top slip-fitters, and terminal compartments made of cast bronze or hot- dip galvanized ductile iron After installation, clean and paint exposed threads of galvanized conduit brackets and bracket areas damaged by wrench or vise jaws. Use wire brush to clean and apply 2 coats of approved unthinned zinc-rich primer, organic vehicle type, as specified in Section 91, Paint." Do not use aerosol can. Fit each terminal compartment with a terminal block having a minimum of 12 positions, each with 2 screw-type terminals. Each terminal must accommodate at least five No. 14 conductors. Include a cover on compartment for ready access to terminal block. Terminal compartment used to bracket mount signals must be bolted securely to pole or standard. Horizontal dimension of mounting assembly members between vertical centerline of terminal compartment or slip-fitter, and the vertical centerline of each signal face must not exceed 11 Book One- State Route 68 at San Benancio Road Intersection Improvements 290 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??+??inches, except where required for proper signal face alignment or to allow programming of programmed visibility signal faces. Mounting assembly members must be plumb or level, symmetrically arranged, and securely assembled. Mounting assembly must be watertight, and free of sharp edges or protrusions that might damage conductor insulation. Include positive locking serrated fittings that, if mated with similar fittings on signal faces, will prevent faces from rotating. Orient each mounting assembly to allow maximum horizontal clearance to adjacent roadway. Use slip-fitter for post-top mounting of signals. Fit slip-fitter over a 4-1/2-inch outside diameter pipe or tapered standard end. Include cadmium-plated steel set screws. Include an integral terminal compartment for each slip-fitter used to post-top mount signals with brackets. Do not install signal faces at an intersection until all other signal equipment, including complete controller assembly, is in place and ready for operation. You may mount signal faces if covered or not directed toward traffic. 86-4.09 FLASHING BEACONS Flashing beacon must include: 1. Single section traffic signal face with yellow or red LED module indications 2. Backplate 3. Tunnel visor 4. Flashing beacon control assembly Beacon flasher unit must be independent of intersection flasher unit. 86-4.09A Flashing Beacon Control Assembly 86-4.09A(1) Enclosure Enclosure must be: 1. NEMA 3R with a dead front panel and a hasp with a 7/16-inch hole for a padlock 2. Powder coated, hot-dip galvanized, or factory-applied rust resistant prime coat and finish coat 86-4.09A(2) Circuit Breakers and Switches Circuit breakers must comply with Section 86-2.11, Service." Switch for manually operating sign lighting circuit must be a single-hole-mounting toggle type with a single pole and throw and rated at 12 A, 120 V(ac). Furnish switch with an indicating nameplate reading Auto-Test." 86-4.09A(3) Flasher Comply with Section 8, Solid-State Flashers," of NEMA Standards publication No. TS 1. Flasher must be a solid-state device with no contact points or moving parts. Include 2 output circuits to allow alternate flashing of signal faces. Flasher must be able to carry a minimum of 10 A per circuit at 120 V(ac). 86-4.09A(4) Wiring Conductors and wiring in the enclosure must comply with Section 86-2.09B(1), Cabinet and Enclosure Installation." Book One- State Route 68 at San Benancio Road Intersection Improvements 291 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??,??86-4.09A(5) Terminal Blocks Terminal blocks must be: 1. Rated 25 A, 600 V(ac) 2. Molded phenolic or nylon material 3. Barrier type with plated brass screw terminals and integral marking strips 86-5 DETECTORS 86-5.01 VEHICLE DETECTORS Sensor unit and isolator must comply with TEES. 86-5.01A Inductive Loop Detectors 86-5.01A(1) General Inductive loop detector includes a completely installed loop or group of loops, in the roadway, lead-in cable, and a sensor unit, with power supply installed in a controller cabinet. 86-5.01A(2) Sensor Unit Construction Card type sensor unit must comply with TEES, issued by the Department. Shelf-mounted sensor unit must comply with Section 11 of the NEMA Standards Publication No. TS 1. 86-5.O1A(3) Construction Materials Conductor for each inductive loop detector must be continuous, unspliced, and one of the following: Option Specifications Type 1 loop wire Type RHW-USE neoprene jacketed or Type USE cross-linked polyethylene insulated, No. 12, stranded copper wire with a 40 mils minimum thickness at anoint. Type 2 loop wire Type THWN or Type XHHW, No. 14, stranded copper wire in a plastic tubing. Plastic tubing must be polyethylene or vinyl, rated for use at 105 C, and resistant to oil and gasoline. Outside diameter of tubing must be 0.27 inch maximum with a wall thickness of 0.028 inch minimum. Conductor for loop detector lead-in cable must be two No. 16, 19 x 29, stranded, tinned copper wires, comply with the calculated cross sectional area of ASTM B 286, Table 1, and be one of the following: Option Specifications Type B lead-in cable Insulated with 20 mils of high-density polyethylene. Conductors must be twisted together with at least 2 turns per foot and the twisted pair must be protected with a copper or aluminum polyester shield. A No. 20, minimum, copper drain wire must be connected to equipment ground within cabinet. Cable must have a high-density polyethylene or high-density polypropylene outer jacket with a nominal thickness of 32 mils. Include an amorphous interior moisture penetration barrier of nonh drosco is polyethylene or polypropylene fillers. Type C lead-in cable Comply with International Municipal Signal Association IMSA) Specification No. 50-2. A No. 20, minimum, copper drain wire must be connected to equipment ground within cabinet. Conductor Options for Inductive Loop Detector Conductor Options for Loop Detector Lead-In Cable Book One- State Route 68 at San Benancio Road Intersection Improvements 292 CONTRACT NO. 10-1 11065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??-??86-5.01A(4) Installation Details Install loop conductors without splices and end in nearest pull box. Seal open end of cable jacket or tubing similar to splicing requirements to prevent water from entering. Do not make final splices between loops and lead-in cable until loop operations under actual traffic conditions is approved. Splice all loop conductors for each direction of travel for same phase of a traffic signal system, in same pull box, to a detector lead-in cable that runs from pull box adjacent to loop detector to a sensor unit mounted in controller cabinet. End all loop conductors in a pull box or terminal strip in the cabinet. Identify and band conductors for inductive loop installations. Band, in pairs, by lane, in the pull box adjacent to the loops and near the end of conductors in the cabinet. Bands must comply with Section 86-2.09, Wiring." If HMA surfacing is to be placed, install loop conductors before placing uppermost layer of HMA. Install conductors in compacted layer of HMA immediately below the uppermost layer. Install conductors as shown on the plans, except fill slot with sealant flush to the surface. When cutting loops: 1. Residue from slot cutting activities must not be allowed to flow across shoulders or lanes occupied by public traffic and must be removed from the pavement surface before residue flows off. Dispose of residue from slot cutting activities under Section 7-1.13, Disposal of Materials Outside the Highway Right of Way." 2. Surplus sealant must be removed from adjacent road surface without using solvents before setting. Sealant for filling slots must comply with one of the following: Elastomeric Sealant Polyurethane material that will, within stated shelf life, cure only in the presence of moisture. Sealant must be suitable for use in both HMA and PCC. The cured sealant must have the following performance characteristics: Performance Characteristics of Cured Sealant Specification ASTM Requirement Hardness indentation) at 25 C and 50% relative D 2240 65-85 humidity. Type A, Model 1700 only) Rex. Tensile Strength: D 412 3.45 MPa, min. Pulled at 508 mm per minute Die C Elongation: D 412 400%, min. Pulled at 508 mm per minute Die C Flex at 40 C: No cracks 0.6-mm free film bend 180?) over 13-mm mandrel Weathering Resistance: Weatherometer 350 h, cured 7 days at 25 C 50% D 822 Slight chalking relative humidity Salt Spray Resistance: 3.45 MPa, min. tensile 400%, 28 days at 38 C with 5% NaCl, Die C & pulled at 508 B 117 min. elongation mm. per minute Dielectric Constant over a temperature range of 30 C D 150 Less than 25% change to 50 C Book One- State Route 68 at San Benancio Road Intersection Improvements 293 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??.??Asphaltic Emulsion Sealant Comply with State Specification 8040-41A-15. Use for filling slots in HMA pavement that are a maximum of 5/8 inch in width. Do not use where the slope causes the material to run from the slot. Material must not be thinned beyond manufacturer's recommendations. Place material when air temperature is at least 7 C. Hot-Melt Rubberized Asphalt Sealant Hot-melt rubberized asphalt must be: 1. In solid form at room temperature and fluid at application temperature of 190 C to 205 C. Fumes must be non-toxic. 2. Suitable for use in both HMA and PCC. 3. Melted in a jacketed, double-boiler type melting unit. Temperature of heat transfer medium must not exceed 245 C. 4. Applied with a pressure feed applicator or pour pot, when the pavement surface temperature is greater than 4 C. 5. Packaged in containers clearly marked Detector Loop Sealant" and specifying manufacturer's batch and lot number. The cured sealant must have the following performance characteristics: Performance Characteristics of Cured Sealant Specification ASTM Requirement Cone Penetration, 25 C, 150 g, 5 s D 5329, Sec. 6 3.5 mm, max Flow, 60 C D 5329, Sec. 8 5 mm, max Resilience, 25 C D 5329, Sec. 12 25%, min Softening Point D 36 82 C, min Ductility, 25 C, 50 mm/min D 113 300 mm, min Flash Point, COC, C D 92 288 C, min Viscosity, Brookfield Thermosel, No. 27 Spindle, 20 rpm, 190 C D 150 Less than 25% change 86-5.01B Magnetic Detectors Cable from pull box, adjacent to magnetic detector sensing element, to the field terminals in the controller cabinet must be the type specified for inductive loop detectors. 86-5.02 PEDESTRIAN PUSH BUTTON ASSEMBLIES Housing must be either die-cast or permanent mold-cast aluminum, or ultraviolet stabilized, self-extinguishing structural plastic, if specified. Plastic housing must be black matching Color No. 17038, 27038 or 37038 of Federal Standard 595B, and colored throughout. Assembly must be rainproof and shockproof in any weather condition. Switch must be a single-pole, double-throw, switching unit, with screw type terminals, rated 15 A at 125 V(ac), and must have: 1. Plunger actuator and a U frame to allow recessed mounting in push button housing 2. Operating force of 3.5 pounds 3. 1/64-inch maximum pretravel 4. 7/32-inch minimum overtravel 5. 0.0004- to 0.002-inch differential travel 6. 2-inch minimum diameter actuator Book One- State Route 68 at San Benancio Road Intersection Improvements 294 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??/??Where pedestrian push button is attached to a pole, shape housing to fit the pole curvature and secure. Include saddles to make a neat fit if needed. Where a pedestrian push button is mounted on top of a 2-1/2-inch diameter post, fit housing with a slip-fitter and use screws for securing rigidly to post. Pedestrian push button signs must be porcelain enameled metal or structural plastic. Install push button and sign on crosswalk side of pole. Point arrows on push button signs in the same direction as the corresponding crosswalk. Attach sign on Type B push button assembly. For Type C pedestrian push button assembly, mount instruction sign on the same standard as the push button assembly, using 2 straps and saddle brackets. Straps and saddle brackets must be corrosion-resisting chromium nickel steel and comply with ASTM A 167, Type 302B. Theft- proof bolts must be stainless steel with a chromium content of at least 17 percent and a nickel content of at least 8 percent. 86-6 LIGHTING 86-6.01 HIGH PRESSURE SODIUM LUMINAIRES High pressure sodium luminaires must be the enclosed cutoff type. Housing must be manufactured from aluminum. Painted or powder-coated housing must withstand a 1,000-hour salt spray test as specified in ASTM B 117. Other metal parts must be corrosion resistant. Each housing must include a slip-fitter that can be mounted on a 2-inch pipe tenon and can be adjusted 5 degrees from the axis of the tenon. Clamping brackets of slip-fitter must not bottom out on housing bosses when adjusted within the 5 degree range. The slip-fitter mounting bracket must not permanently set in excess of 0.020-inch when the 3/8-inch diameter cap screw used for mounting is tightened to 10 foot-pounds. Luminaire to be mounted horizontally on mast arm, when tested as specified in California Test 611, must be capable of withstanding cyclic loading for a minimum of 2 million cycles without failure of any luminaire parts as follows: Plane Internal Ballast Minimum Peak Acceleration Levels Vertical Removed 3.0 G peak-to-peak sinusoidal loading same as 1.5 G peak) Horizontal Installed 1.5 G peak-to-peak sinusoidal loading same as 0.75 G peak) Vertical Installed 1.0 G peak-to-peak sinusoidal loading same as 0.5 G peak) aG Acceleration of gravity Perpendicular to direction of mast arm If a photoelectric unit receptacle is included, a raintight shorting cap must be installed. If luminaire housing has a hole for the receptacle, hole must be permanently closed, covered, and sealed with weatherproof material. Optical system must be in a sealed chamber and include: 1. Reflector shaped so that a minimum of light is reflected through the arc tube of the lamp. Reflector surface must be specular and protected by either an anodized finish or a silicate film on it's specular surface. 2. Refractor or lens mounted in a door frame that is hinged to the housing and secured with a spring-loaded latch. Refractor must be made of glass or polycarbonate plastic. Lens must be made of heat- and impact-resistant glass. 3. Lamp socket that is a porcelain enclosed mogul-multiple type. Shell must include integral lamp grips to assure electrical contact under conditions of normal vibration. Cyclic Loadin Book One- State Route 68 at San Benancio Road Intersection Improvements 295 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??0??Socket must be mounted in the luminaire to allow presetting a variety of specified light distribution patterns. Socket must be rated for 1,500 W and 600 V(ac), and a 4 kV pulse. 4. Lamp. Sealing must be provided by a gasket between the reflector and: 1. Refractor or lens 2. Lamp socket Chamber must allow for filtered flow of air in and out of the chamber from lamp heat. Filtering must be accomplished by either a separate filter or a filtering gasket. If components are mounted on a down-opening door, door must be hinged and secured to luminaire housing separately from refractor or flat lens frame. Door must be easily removable and replaceable, and secured to housing to prevent accidental opening when refractor or flat lens frame is opened. Field wires connected to luminaire must terminate on a barrier-type terminal block secured to the housing. Terminal screws must be captive and equipped with wire grips for conductors up to No. 6. Each terminal positions must be clearly identified. Minimum light distribution for each luminaire must meet the isolux diagrams. Maximum brightness of each cutoff luminaire, with the lamp indicated, must be as follows: Lamp ANSI Code No. Lamp Wattage Maximum Brightness foot-lamberts S55 150 40 S66 200 40 S50 250 50 S67 310 60 S51 400 75 Brightness readings will be taken using a brightness meter with an acceptance angle of 1.5 degrees. When measured on the 90-degree and 270-degree lateral angle line, maximum brightness must not exceed above specified brightness when meter is located at a horizontal distance of 120 feet and a vertical distance of 7.5 feet between luminaire and meter, or at an angle of 3 degrees 35 minutes from the horizontal to the line between luminaire and meter. Measurements must be made from 90-degree line and 270-degree line, and averaged. Lamp used for each test must operate at wattage necessary to produce the following light output: Lamp Wattage Lumens 150 16,000 200 22,000 250 27,000 310 37,000 400 50,000 86-6.01A High Pressure Sodium Lamp Ballasts Each ballast must: 1. Operate the lamp for its rated characteristics and wattage 2. Continuously operate at ambient air temperatures from 20 C to 25 C without reduction in ballast life Cutoff Type Light Out ut Book One- State Route 68 at San Benancio Road Intersection Improvements 296 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??1??3. Operate for at least 180 cycles of 12 hours on and 12 hours off, with the lamp circuit in an open or short-circuited condition and without measurable reduction in operating requirements 4. Have a design life of not less than 60,000 hours 5. Provide proper starting and operating waveforms, voltage, and current 6. Provide reliable lamp starting and operation at ambient temperature down to 20 C for the rated life of lamp Ballast must be tested as specified in ANSI C82.6-1980, Methods of Measurement of High- Intensity-Discharge Lamp Ballasts." Starting aids for ballast of a given lamp wattage must be interchangeable between ballasts of same wattage and manufacturer, without adjustment. Each integral ballast must consist of separate components that can be easily replaced. An encapsulated starting aid will be counted as a single component. Each component must include screw terminals, NEMA tab connectors, or a single multi-circuit connector. Conductors and terminals must be identified. Mount heat-generating component so as to use the portion of the luminaire it is mounted to as a heat sink. Place capacitor a maximum practicable distance from heat-generating components or thermally shield to limit the case temperature to 75 C. Transformer and inductor must be resin-impregnated for protection against moisture. Capacitors, except those in starting aids, must be metal cased and hermetically sealed. The Department will test high-pressure sodium lamp ballast. High-pressure sodium lamp ballast must have a characteristic curve that will intersect both of the lamp-voltage limit lines between the wattage limit lines and remain between the wattage limit lines throughout the full range of lamp voltage. This requirement must be met at the rated input voltage of the ballast and at the lowest and highest rated input voltage of the ballast. Throughout the lifetime of the lamp, ballast curve must fall within the specified limits of the lamp voltage and wattage. Ballast for luminaires must be located in the luminaire housing. 86-6.01A(1) Regulator Type Ballasts Regulator type ballast must comply with the following: 1. For nominal input voltage and lamp voltage, ballast design center must not vary more than 7.5 percent from rated lamp wattage. 2. Ballast must be designed for a capacitance variance of 6 percent that will not cause more than 8 percent variation in lamp wattage regulation during rated lamp life. 3. Lamp current crest factor must not exceed 1.8 for input voltage variation of 10 percent at any lamp voltage during lamp life. Regulator-type ballast must be one of the following: Book One- State Route 68 at San Benancio Road Intersection Improvements 297 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??2??Ballast Type Power Factor Lamp Regulation Lag-type a Not less than 90 percent Lamp wattage regulation spread does not vary by throughout the life of lamp when more than 18 percent for 10 percent input ballast is operated at nominal voltage variation from nominal through life line voltage with a nominally- rated reference lamp Lead-type Not less than 90 percent Lamp wattage regulation spread does not vary by throughout the life of lamp when more than 30 percent for 10 percent input ballast is operated at nominal voltage variation from nominal through life line voltage with a nominally- rated reference lamp aPrimary and secondary windings must be electrically isolated bConstant wattage autoregulator CWA) 86-6.01A(2) Nonregulator Type Ballasts Each nonregulator type ballast must comply with the following: 1. For nominal input voltage and lamp voltage, ballast design center must not vary more than 7.5 percent from rated lamp wattage. 2. Lamp current crest factor must not exceed 1.8 for input voltage variation of 5 percent at any lamp voltage during lamp life. Ballast Type Power Factor Lamp Regulation Autotransformer Not less than 90 percent Lamp wattage regulation spread does not vary by or High- throughout the life of lamp when more than 25 percent for 5 percent input voltage Reactance ballast is operated at nominal variation from nominal through life line voltage with a nominally- rated reference lamp 86-6.01B High Pressure Sodium Lamps High pressure sodium lamps must comply with ANSI C 78.42, High Pressure Sodium Lamps," when tested as specified in ANSI C 78.389, American National Standard for Electric Lamps High Intensity Discharge-Methods of Measuring Characteristics." High pressure sodium lamps must have a minimum average rated life of 24,000 hours. 86-6.02 LOW PRESSURE SODIUM LUMINAIRES Each low pressure sodium luminaire must be completely assembled with a lamp and ballast, and must: 1. Be the enclosed type, either semi-cutoff or cutoff type. 2. Include housing, reflector, refractor or lens, lamp socket, integral ballast, removable ballast tray, lamp support, terminal strip, capacitor, and slip fitter. Reflector may be an integral part of the housing. Luminaire housing must be minimum 1/16-inch thick, corrosion resistant die cast aluminum sheet and plate with concealed continuous welds, or minimum nominal wall thickness of 3/32- thick acrylonitrile-butadiene-styrene sheet material, on a cast aluminum frame that provides mounting for all electrical components and slip fitter. Housing must be divided into optical and power compartments that are individually accessible for service and maintenance. Position and clamp luminaire to pipe tenon by tightening mounting bolts. Regulator- T a Ballast Nonre ulator-T a Ballast Book One- State Route 68 at San Benancio Road Intersection Improvements 298 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??3??Painted exterior surface of luminaire must be finished with a fused coating of electrostatically applied polyester powder paint or other ultraviolet inhibiting film. Color must be aluminum gray. High temperature neoprene, or equal, sealing ring must be installed in pipe tenon opening to prevent entry of water and insects into power and optical compartments. Access to power unit assembly must be through a weathertight hinged cover, secured with spring type latches or captive screws, to luminaire housing. Hardware must be stainless steel or cadmium plated. Use machine screws or bolts to secure removable components. Do not use sheet metal screws. Semi-cutoff luminaires and molded refractor style cutoff luminaires must include a refractor. Other cutoff luminaires must include a flat lens. Refractor must be 1-piece injection molded polycarbonate of 3/32 inch minimum thickness, or 1-piece injection molded acrylic of 1/8 inch minimum thickness. Flat lens must be 1-piece polycarbonate of 3/32 inch minimum thickness, mounted to metal frame. Refractor assembly and flat lens assembly must be constructed to rigidly maintain its shape, and hinged and secured with spring type latches to luminaire housing. Alternate methods of manufacturing refractor may be approved provided minimum specified thicknesses are maintained. Lamp socket must be high temperature, flame retardant thermoset material with self-wiping contacts or equivalent. Socket must be rated for 660 W and 1,000 V(ac). Position of socket and support must maintain the lamp in correct relationship with reflector and refractor for designed distribution pattern. Isofootcandle distribution must be ANSI Type III, short or Type IV, medium distribution, for cutoff or semi-cutoff luminaires. With a 40-foot mounting height, each type of luminaire must maintain a minimum of 0.2 footcandle at least 60 feet each side, along the longitudinal roadway line below the luminaire, and a minimum of 0.35 footcandle at a transverse roadway distance from luminaire location equal to 1.5 times the luminaire mounting height. Certified luminaire performance data must be provided. This data must include complete photometric test data in isofootcandle charts at a scale of 1 inch equals 20 feet, for the luminaire and lamp sizes shown on the plans. Alternate data may be in horizontal footcandle values recorded on a 15' x 15' area extending 90 feet longitudinally each side of the light source, and 15 feet behind and 90 feet in front of the light source, for luminaire and lamp sizes, and mounting height shown on the plans. Horizontal footcandle levels in data submitted must equal or exceed levels specified. Failure to meet referenced values will be justification for rejection of the luminaires. Photometric testing must be performed and certified by an independent and recognized testing laboratory. Low pressure sodium lamps must: 1. Be 180 W, single-ended, bayonet base, tubular gas discharge lamp 2. Maintain a minimum of 93 percent of initial lumens during rated life and must comply with the following minimum performance requirements: Lamp Designation ANSI L74-RF-180 Initial Lumens 33,000 lumens Rated Ave. Life 10 hrs/Start) 18,000 hours Operating Position Horizontal 20 degrees 3. Reach 80 percent of light output within 10 minutes and must restrike within 1 minute after an outage due to power interruption or voltage drop at the lamp socket Performance Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 299 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??4??4. Identify the month and year of installation. 5. Have an autotransformer or high-reactance type ballast. The ballast must comply with the following: 5.1. Lamp current crest factor must not exceed 1.8 at nominal line voltage 5.2. Ballast loss must not exceed 24 percent for 180 W ballast at nominal line voltage Ballast T e Power Factor Lamp Operation Autotransformer Not less than 90 percent when Lamp wattage regulation spread does not vary by or High- ballast is operated at nominal more than 6 percent for 10 percent input Reactance line voltage with a nominally- voltage variation from nominal through life rated reference lamp A multi-circuit connector must be included for quick disconnection of ballast tray. 86-6.03 SOFFIT AND WALL LUMINAIRES Soffit and wall luminaire must be weatherproof and corrosion resistant. Each flush-mounted soffit luminaire must consist of: 1. Metal body with two 1-inch minimum conduit hubs and provisions for anchoring into concrete 2. Prismatic refractor made of heat-resistant polycarbonate mounted in a door frame and clearly identified as to street side 3. Specular anodized aluminum reflector 4. Ballast located either within housing or in a ceiling pull box as shown on the plans 5. Lamp socket The door frame assembly must be hinged, gasketed, and secured to body by at least 3 machine screws. Each pendant soffit luminaire must be enclosed and gasketed, have an aluminum finish, and include: 1. Reflector with a specular anodized aluminum finish 2. Refractor made of heat-resistant polycarbonate 3. Optical assembly hinged and latched for lamp access and a device to prevent dropping 4. Ballast designed for operation in a raintight enclosure 5. Galvanized metal box with a gasketed cover, 2 captive screws, and 2 chains to prevent dropping and for luminaire mounting Each wall-mounted luminaire must consist of: 1. Cast metal body 2. Prismatic refractor, made of glass, mounted in a door frame 3. Aluminum reflector with a specular anodized finish 4. Integral ballast 5. Lamp socket 6. Gasket between refractor and body 7. At least two 5/16-inch minimum diameter mounting bolts Autotransformer or High-Reactance Type Ballast Book One- State Route 68 at San Benancio Road Intersection Improvements 300 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??5??Cast-aluminum bodies to be cast into or mounted against concrete must have a thick application of alkali-resistant bituminous paint on all surfaces to be in contact with concrete. Each soffit luminaire and wall luminaire must include a 70 W high-pressure sodium lamp with a minimum average rated life of 24,000 hours. Each lamp socket must be positioned to locate the light center of the lamp within 1/2 inch of light center location of the luminaire design. Ballast must comply with Section 86-6.01A, High Pressure Sodium Lamp Ballasts." Wall luminaire ballast must be located in luminaire housing or, if shown on the plans, in a pull box adjacent to luminaire. 86-6.04 PEDESTRIAN CROSSING FIXTURES Before starting fixture manufacturing, submit fixture design for approval. If requested, submit 1 complete prototype fixture for approval at least 30 days before manufacturing the fixtures. The prototype fixture will be returned to you, and if permitted, the fixture may be installed in the work. Lens unit in door section must be formed of 1-1/2-inch methyl methacrylate rod cut and fire- glazed for a clear finish or a cast unit with equivalent tolerances and finish. Lens must be secured to door section with an extruded lens retainer of 6063-T5 aluminum alloy that fits the lens shape. Lens retainer must fit the full length of lens on both sides. Continuous lens retainer for the full length of 3 lenses is allowed. Z bars of 5052-H32 or 5005- H 14 aluminum alloy, 1/16 inch minimum thickness may be substituted for extruded lens retainer. A captive positive-keyed screw-type latching device requiring a special socket wrench must be installed at upper edge to secure door in the closed position as shown on the plans. Furnish 2 special wrenches to the Engineer. Each fixture must include a F48T12/CW rapid start fluorescent lamp with recessed, double contact base installed on back side of door directly behind lens. Each lampholder must be UL listed for outdoor use without an enclosure and with 1,500 mA rapid start fluorescent lamp. Lampholder must be spring-loaded type. For each lamp, the distance from face of lampholder to the lamp must be designed to provide a compression of at least 0.10-inch on the spring-type lampholder when lamp is in place. Lamp must have positive mechanical and electrical contact when lamp is in place. Socket on spring- type lampholder must have enough travel to allow lamp installation. Spring must not be a part of current-carrying circuit. Ballast must be high-power-factor type with weatherproof leads for operation of one 48-inch rapid-start lamp. Ballast must be UL listed for outdoor operation on 110 to 125 V(ac) 60 Hz circuit and rated at 1,500 mA. Conductors from ballast leads to lampholder must be minimum size of No. 16, stranded, and UL-listed copper AWM. Splicing of lampholder conductors to ballast leads must be performed by using mechanically secure connectors. Conductors in fixture except ballast leads and entrance line conductors, must be UL-listed AWM. Provide sufficient slack in the conductors to allow the fixture door to fully open. Circuit conductors entering the fixture must be terminated on molded phenolic barrier-type terminal blocks rated at 15 A and 600 V(ac) and must have integral-type white waterproof- marking strips. Current-carrying parts of terminal blocks must be insulated from fixture with integral plugs or strips to provide protection from line-to-ground flashover voltage. Terminal blocks must be attached to wireway cover in top section. If you use sectionalized terminal blocks, each section must include an integral barrier on each side and be capable of rigid mounting and alignment. Exposed surfaces of fixture must be uniform in appearance and free from significant defects, including improper fit, dents, deep scratches and abrasions, burrs, roughness, off-square ends, Book One- State Route 68 at San Benancio Road Intersection Improvements 301 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??6??holes off-center or jagged, and surface irregularities. Screws for attaching components to fixture door, including Z bars, ballasts, and terminal block, must be tapped into door from the inside only. Screwheads, nuts, or other fasteners must not be removable from the outside. 86-6.04A Pedestrian Undercrossing Fixtures Fixture shell must be cast aluminum alloy, industrial type or Federal Class 18 aluminum of 1 /4 inch minimum thickness. Door must be 1 piece of 6061-T6 aluminum alloy of 1/8 inch minimum thickness. Continuous piano hinge must be Type 1100 aluminum alloy. The piano hinge must be welded or riveted to door section with 1/8 inch aluminum rivets. Matching holes must be drilled in the hinge and lower edge of fixture. After shell is in place, door assembly must be attached by minimum 3/8-inch No. 8 stainless steel self-tapping screws. A neoprene gasket must be attached to frame to provide a cushion between the shell and the door. Chain or other device must be included to prevent the door, when fully opened, from coming in contact with the undercrossing wall. Fixture must be held in place by three 3/8" x 8" anchor bolts with 2 nuts each. Fixture surfaces in contact with concrete, and with anchor bolts and nuts must be painted with a thick application of alkali-resistant bituminous paint. Paint must comply with MIL-P- 6883. Circuit conductor entering the fixture must be terminated on 2-position terminal blocks. Both ends of fixture must have holes for 1-inch conduit. Unused holes must be plugged with pressed metal closures. 86-6.04B Pedestrian Overcrossing Fixtures Fixture shell must consist of: 1. Top section and a door section of extruded 6063-T5 aluminum alloy, each with a nominal 1 /8 inch wall thickness 2. 2 cast-end sections of 319 aluminum alloy 3. Internal wireway cover of 505-H32 aluminum alloy Top section and door section must be joined together on one side by a continuous hinge formed as part of the 2 extrusions and must overlay to allow locking on the other side. Hinge must be treated with a silicone grease that will prevent the entrance of water by capillary action. Wrreway cover with 3/16 inch hemmed ends up and terminal blocks and circuit conductors must be inserted before welding end sections and must provide clearance at both ends for conductors. Cover must be fastened by at least two 1/4 inch No. 4 self-threading sheet metal screws with binding head and blunt point. You may substitute blind rivets of equivalent strength. One or more bronze sash chains or other device must be included to prevent door from opening to an extent that will damage the hinge. Lampholder must include heat-resistant circular cross section neoprene sealing gasket, silver- coated contacts, and waterproofed lead entrance for use with a 1,500 mA rapid start fluorescent lamp. Ballast must be at most 13-1/4 inches long. Circuit conductors entering the fixture must be terminated on 3-position terminal blocks. Electrical system of pedestrian overcrossing must be grounded by a No. 8 copper wire installed in conduit from fixture to fixture, from end fixture to conduit fitting on end post and from conduit fitting on end post to grounding bushing in nearest pull box. Book One- State Route 68 at San Benancio Road Intersection Improvements 302 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??7??Ground wire must be secured to inside of telescoping sleeve end casting where conductors are carried and to the inside of Type LB conduit fitting on end post by a connecting lug and a No. 8 self-threading pan screw. Lamp, lampholder, ballast, and fixture wire, must be attached to door section. Terminal blocks must be attached to top section or wireway cover. Three No. 10, solid copper circuit conductors must be installed between terminal blocks as part of each completed fixture. Before shipment to job site, fixture must be completely manufactured and assembled in the shop. 86-6.05 INDUCTION SIGN LIGHTING FIXTURES Each induction sign lighting fixture must include housing with door, reflector, refractor or lens, lamp, power coupler, high frequency generator, socket assembly, fuse block, and fuses. Each induction sign lighting fixture must: 1. Be designed for mounting near the bottom of sign panel on an overhead sign structure. 2. Be an enclosed design and be raintight and corrosion resistant. 3. Have a minimum average rating of 60,000 hours. 4. Be for a wattage of 87 W, 120/240 V(ac). 5. Have a power factor greater than 90 percent and total harmonic distortion less than 10 percent. 6. Be UL approved for wet locations and be FCC Class A-listed. 7. Not exceed 44 pounds in weight. 8. Include the manufacturer's brand name, trademark, model number, serial number, and date of manufacture on packaged assembly. Same information must be permanently marked on the outside and inside of housing. 9. Comply with minimum horizontal footcandle requirement shown on the plans. 10. Be a maximum height of 12 inches above the top of the mounting rails. If fixture is located so that the light center of the lamp is 55 inches in front of, 1 foot below, and centered on a 10-foot high by 20-foot wide sign panel, the ratio of maximum to minimum illuminance level on the panel must not exceed 12 to 1 in 95 percent of the points measured. Illuminance gradient must not exceed 2 to 1 and is defined as the ratio of minimum illuminance on a 1-foot square of panel to that on an adjacent 1-foot square of panel. Each fixture must have a mounting assembly that will allow fixture to be mounted on continuous slot channels. Mounting assembly must be either cast aluminum, hot-dip galvanized steel plate, or steel plate that has been galvanized and finished with a polymeric coating system or same finish that is used for housing. Housing must have a door designed to hold a refractor or lens, and to open without the use of special tools. Housing and door must be manufactured of sheet or cast aluminum, and have a powder coat or polyester paint finish of a gray color resembling unfinished manufacturing. Sheet aluminum must comply with ASTM B 209 or B 209M for 5052-H32 aluminum sheet. External bolts, screws, hinges, hinge pins, and door closure devices must be corrosion resistant. Housing must include weep holes. Door must be hinged to housing on side of fixture away from the sign panel and include 2 captive latch bolts or other latching device. Door must be designed to lock in the open position, 50 degrees minimum from the plane of the door opening, with an 85-mph 3-second-wind-gust load striking the door from either side. Door and housing must be gasketed to be raintight and dusttight. Thickness of gasket must be 1 /4 inch, minimum. Book One- State Route 68 at San Benancio Road Intersection Improvements 303 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??8??Fixture height must be less than 12 inches above the top of mounting rails. Reflector must be 1 piece, made from specularly finished aluminum protected with an electrochemically applied anodized finish or a chemically applied silicate film, and designed so deposited water due to condensation will drain away. Reflector must be secured to housing with a minimum of 2 screws and removable without removing any fixture parts. Do not attach reflectors to outside of housing. Refractor or lens must have a smooth exterior and must be manufactured from the material as follows: Component Manufactured From Flat lens Heat-resistant glass Convex lens Heat resistant, high-impact resistant tempered glass Refractor Borosilicate heat resistant glass Refractor and convex lens must be designed or shielded so no fixture luminance is visible if fixture is approached directly from the rear and viewing level is the bottom of the fixture. If a shield is used, it must be an integral part of the door casting. Each fixture must include an 85 W induction lamp with an interior wall that is fluorescent phosphor-coated. Light output must be at least 70 percent at 60,000 hours. Lamp must have a minimum color-rendering index of 80, be rated at a color temperature of 4,000K and be removable without the use of tools. Lamp socket must be a porcelain enclosed mogul type with a shell that contains integral lamp grips to assure electrical contact under normal vibration conditions. Center contact must be spring-loaded. Shell and center contact must be nickel-plated brass. Socket must be rated for 1,500 W and 600 V(ac). Power coupler must include a construction base with antenna, heat sink, and electrical connection cable, and be designed so it can be removed with common hand tools. High frequency generator must: 1. Start and operate lamps at an ambient temperature of 25 C or greater for the rated life of the lamp 2. Operate continuously at ambient air temperatures from 25 C to 25 C without reduction in generator life 3. Have a design life of at least 100,000 hours at 55 C 4. Have an output frequency of 2.65 MHz 10 percent 5. Have radio frequency interference that complies with FCC Title 47, Part 18, regulations regarding harmful interference 6. Be replaceable with common hand tools 7. Mounted so the fixture can be used as a heat sink Conductor terminal must be identified by the component terminal the conductor connects to. Submit a copy of the high frequency generator test methods and results from the manufacturer with each lot of fixtures. Each fixture must include a barrier-type fuse block for terminating field connections. Fuse block must: 1. Be secured to housing and be accessible without removal of any fixture parts 2. Be mounted to leave a minimum of 1/2 inch air space from sidewalls of housing Refractor and Lens Material Requirements Book One- State Route 68 at San Benancio Road Intersection Improvements 304 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??9??3. Be designed for easy removal of fuses with a fuse puller, be rated at 600 V(ac), and have box terminals. Fuses must be 13/32-inch diameter, 1-1/2 inch long ferrule type and UL or ETL listed. For 120 V(ac) input fixture, only the ungrounded conductor must be fused and there must be a solid link between the neutral and the high frequency generator. If shown on the plans, include a wire guard to prevent damage to the refractor or lens. Guard must be constructed of 1/4-inch minimum diameter galvanized steel wire, and either hot-dip galvanized or electroplated-zinc coated as specified in ASTM B 633, Service Condition SC4 with a clear chromate dip treatment. Guard elements must be spaced to prevent rocks larger than 1-1/2-inch diameter from passing through. 86-6.06 SIGN LIGHTING FIXTURES FOR FLASHING BEACON Sign lighting fixture must: 1. Be UL or ETL listed for outdoor installation 2. Include a hood with side outlet tapped for conduit, a symmetrical 10-inch steel reflector with a white porcelain-enamel finish, and a medium base socket 3. Be rated at 150 W minimum 86-6.07 INTERNALLY ILLUMINATED STREET NAME SIGNS Sign fixture must be: 1. Designed and constructed to prevent deformation or failure when subjected to an 85 mph 3-second-wind-gust load as specified in AASHTO publication, Standard Specifications for Structural Supports of Highway Signs, Luminaires and Traffic Signals," and its interim revisions 2. Manufactured from all new material and all ferrous parts must be galvanized or cadmium-plated 3. Type A or B signs Top and bottom must be formed or extruded aluminum and must be attached to formed or cast aluminum end fittings. Housing must be designed for continuous sealing between top and bottom assemblies, and end fittings, and be constructed to resist torsional twist and warp. Opening or removing 1 panel must allow access to the interior of the sign for lamp, ballast, and fuse replacement. Photoelectric unit sockets are not allowed. For Type A sign, both sides must be hinged at the top to allow installation or removal of sign panel, and to allow access to interior of sign. For Type B sign, sign panel must be slide-mounted into housing. Reflectors may be used to obtain required sign brightness. Reflectors must be formed aluminum with acrylic baked white enamel surface having a minimum reflectance of 0.85. Sign panel must be slide-mounted or rigid-mounted in a frame, with white legend, symbols, arrows, and border on each face. Background must be green. Sign panels surface must be evenly illuminated. Average of brightness readings for letters must be 150 foot-lamberts, minimum. Light transmission factor of sign panel must provide a letter to background brightness ratio between 10 to 1 and 20 to 1. Background luminance must not vary by more than 40 percent from the average background brightness reading. Luminance of letters, symbols, and arrows must not vary by more than 20 percent from their average brightness readings. Book One- State Route 68 at San Benancio Road Intersection Improvements 305 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??:??Sign panels must be translucent, high impact, resistant plastic panels of one of the following: 1. Glass fiber reinforced acrylated resin 2. Polycarbonate resin 3. Cellulose acetate butyrate plastic Paint on the outside of plastic must be protected by a plastic film that seals the front surface of panel and filters out ultraviolet radiation. Paint must be acrylic plastic type. Surface must be free of blemishes in the plastic or coating that may impair the serviceability or detract from the general appearance and color matching of sign. White or green color must not fade or darken when sign is exposed to an accelerated test of ultraviolet light equivalent to 2 years of outdoor exposure. Green color of sign, when not illuminated, must match Color No. 14109 of Federal Standard 595B. Sign panel must not crack or shatter when a 1-inch diameter, steel ball with a weight of 2.4 ounces is dropped from a height of 8.5 feet above the sign panel to any point of sign panel. For this test, sign panel must be lying in a horizontal position and supported within its frame. For Type A sign, gasket must be installed between sign panel frame and fixture housing to prevent water entry between frame and fixture housing. Gasket must be uniform and even- textured, and be the closed-cell, sponge-neoprene type, designed for use at temperatures between 20 C and +74 C. Gasket must be neatly applied to thoroughly degreased, clean surface with a suitable heat- resistant adhesive that will not allow the gasket to slip at temperatures between 20 C and +74 C. Ballast must be high power factor type and capable of starting the lamp at 20 C and above. Ballast for Type A sign must be rated at 200 mA. Ballasts for Type B sign must be rated at 430 mA. Ballast must be UL or ETL listed for operation on 110 to 125 V(ac), 60 Hz circuits, and comply with ANSI C 82.1 and ANSI C 82.2. Lampholder must be UL or ETL listed for outdoor use and of the spring-loaded type. Lampholder must have silver-coated contacts and waterproofed entrance leads for use with a rapid-start fluorescent lamp. Removal of lamp from socket must de-energize the primary of ballast. Each lampholder must include heat-resistant, circular cross section, partially-recessed neoprene ring to seal against lamp ends and protect electrical contacts from moisture, dirt or other injurious elements. Distance between face of lampholders must be designed to provide compression of at least 0.10 inch on the spring-type lampholder when lamp is in place. Lamp must have positive mechanical and electrical contact when lamp is in place. Socket on spring-type lampholder must have sufficient travel to allow lamp installation. Spring must not be a part of current carrying circuit. Lampholder must match lamp requirements and must not increase cathode filament circuit resistance by more than 0.10 Q. Lamp must comply with ANSI C 78. Wiring connections in fixture must be terminated on molded, phenolic, barrier-type, terminal blocks rated at 15 A, 1,000 V(ac), and must have integral-type white waterproof-marking strips. Current carrying parts of terminal blocks must be insulated from fixture with integral plugs or strips to provide protection from line-to-ground flashover voltage. If you choose to use sectionalized terminal blocks, each section must include an integral barrier on each side and be capable of rigid mounting and alignment. Terminal screws must be No. 10, minimum. Fuses must be Type 3AG, miniature, slow-blowing type with appropriate current and voltage ratings. Fuseholder must be a panel-mounting type with threaded or bayonet-type knob that grips the fuse tightly for extraction. Use a separate fuse for each ballast. Book One- State Route 68 at San Benancio Road Intersection Improvements 306 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??;??Screened weep holes must be constructed at strategic locations in members subject to moisture collection. Fasteners, screws, and hardware must be passive stainless steel, Type 302 or 304, or aluminum Type 6060-T6. Top of fixture housing must have 2 free-swinging mounting brackets. Each bracket must be adjustable vertically for leveling the sign to either a straight or curved mast arm. Bracket assembly must allow fixture to swing perpendicular to the sign panel. Hinge pins for the free-swinging brackets must have a minimum diameter of 1/4 inch. Message, as shown on the plans, must be displayed on both sign panels. If not shown on the plans, the message and the size of symbols or arrows will be given by the Engineer at your request. Letters must be 8-inch upper case and 6-inch lower case, Series E. Fixture conductors must be UL- or ETL-listed AWM stranded copper wire with 28 mils, minimum, thermoplastic insulation, rated at 1,000 V(ac) and rated for use at 90 C. Conductors must be No. 16 minimum and must match color coding of ballast leads. Conductors within the fixture must be secured with easily removable spring cross straps, not clamped, in the chassis or fixture. Straps must be installed 12 inches apart or less. Stranded copper conductors connected to screw-type terminals must terminate in approved crimp-type ring connectors. Splices are not allowed within fixture. Submit shop drawings showing the message for each sign, including size of letters, symbols or arrows, as shown on the plans. If requested, you must supply, without cost to the State, sufficient samples of materials to be used in the manufacturing of the sign or a complete sign assembly, to allow adequate testing and evaluation of compliance to specified requirements. 86-6.08 PHOTOELECTRIC CONTROLS Photoelectric controls must be capable of directly switching multiple lighting systems. 86-6.08A Types Photoelectric control type must comply with the following: Type I Includes a remote photoelectric unit and a test switch housed in an enclosure. Type II Includes a remote photoelectric unit, a separate contactor located in a service equipment enclosure, and a test switch located in service equipment enclosure. Type III Includes a remote photoelectric unit, a separate contactor, and a test switch housed in an enclosure. Type IV Includes a photoelectric unit that plugs into an EEI-NEMA twist-lock receptacle integral with the luminaire. Type V Includes a photoelectric unit, contactor, and test switch located in service equipment enclosure. A switch to allow manual operation of lighting circuit must be included for each Type I, Type II, Type III, and Type V photoelectric control. Switches must be single-hole mounting toggle type, single-pole, single-throw, rated at 12 A with a voltage rating that matches the circuit. Switches must have an indicating nameplate reading Auto-Test" and be connected in parallel with the load contacts of the photoelectric unit. Test switches must not have an OFF" position. Photoelectric unit for Types I, II, and III photoelectric controls, must be pole-top mounted. 86-6.08B Equipment Details 86-6.08B(1) Photoelectric Unit Photoelectric unit must: Photoelectric Control Types Book One- State Route 68 at San Benancio Road Intersection Improvements 307 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Lighting for pedestrian walkway illumination must be installed at all pedestrian openings through or under falsework. Before starting falsework opening construction, you must submit a plan of proposed lighting installations for review and obtain approval. Approval will be made as specified in Section 5- 1.02, Plans and Working Drawings." You must design falsework lighting so that required maintenance can be performed with a minimum of inconvenience to public traffic. Closing of traffic lanes for routine maintenance will not be permitted on roadways with posted speed limits greater than 25 mph. Pavement under falsework with portals less than 150 feet apart and falsework portals must be illuminated only during the hours of darkness as defined in Division 1, Section 280, of the California Vehicle Code. Photoelectric switches must be used to control falsework lighting systems. Pavement under falsework with portals 150 feet or more apart and all pedestrian openings through falsework must be illuminated 24 hours per day. Lighting fixtures must be aimed to avoid glare to oncoming motorists. Type NMC cable with No. 12 minimum conductors, with ground wire, must be used. Fasten cable to supporting structure at sufficient intervals to adequately support cable and within 12 inches from every box or fitting. Conductors within 8 feet of ground must be enclosed in a 1 /2 inch or larger metal conduit. Each illumination system must be on a minimum of 1 separate branch circuit at each bridge location. Each branch circuit must be fused, not to exceed 20 A. For falsework lighting, you must arrange with the serving utility to complete service connections. You must pay for energy, line extension, service, and service hookup costs. At completion of project or when ordered by the Engineer, falsework lighting equipment will become your property and you must remove it from the job site. You may propose a lighting plan that fulfills light intensity requirements to the systems specified herein. You must supply sufficient data to allow evaluation of alternative methods. 86-6.11B Pavement Illumination Illumination of pavement at vehicular openings through falsework must comply with the following: 1. Fixture must include R/FL commercial type floodlamp holder with protective covers. 2. Fixture must be fully adjustable with brackets and locking screws, and allow mounting directly to a standard metal junction box. 3. Lamp must be medium-base 120 V(ac), 120 W, minimum, PAR-38 quartz-halogen floodlamp. 4. A continuous row of fixture types required must be installed at locations and spacing specified. Fixtures must be installed beneath falsework structure, with the end fixtures not further than 10 feet inside portal faces. Fixtures must be installed and energized immediately after the members supporting them have been erected. 5. Fixtures along the sides of the opening must be placed not more than 4 feet behind or 2 feet in front of the roadway face of the temporary railing. Mounting heights of fixtures must be between 12 and 16 feet above the roadway surface and must present an unobstructed light pattern on the pavement. 86-6.11C Portal Illumination Illumination of falsework portals must comply with the following: 1. On each side of each entrance portal, plywood sheet clearance guides, 4 feet wide by 8 feet high, must be fastened vertically, facing traffic, with the bottom of the panel 3 feet to Book One- State Route 68 at San Benancio Road Intersection Improvements 310 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????4 feet above the roadway. The center of the panel must be located approximately 3 feet horizontally behind the roadway face of the railing. Panels must be freshly painted for each installation with not less than 2 applications of flat white paint. Paint testing will not be required. 2. If ordered by the Engineer, in order to improve the general appearance of the painted surfaces, you must repaint designated areas and that painting will be paid for as extra work as specified in Section 4-1.03D, Extra Work." 3. Falsework portals must be illuminated on the side facing traffic with 150 W, minimum, PAR reflector floodlamps mounted on the structure directly over each vertical support adjacent to the traveled way, as needed to uniformly illuminate the exterior falsework beam, the clearance guides, and the overhead clearance sign. Each lamp must be supported approximately 16 feet above the pavement and approximately 6 feet in front of the portal face. 4. Portal lighting and clearance guides must be installed on the day that vertical members are erected. 86-6.11D Pedestrian Walkway Illumination Illumination of pedestrian openings through or under falsework must comply with the following: 1. Fixtures must be flush-mounted in the overhead protection shield and equipped with a damage-resistant clear polycarbonate diffuser lens. Lamps must be standard incandescent 100 W, 120 V(ac). 2. Fixtures must be centered over the passageway at intervals of not more than 15 feet with the end fixtures not more than 7 feet inside the end of the pedestrian openings. 3. Pedestrian passageway light systems must be installed immediately after the overhead protection shield is erected. 86-7 REMOVING, REINSTALLING OR SALVAGING ELECTRICAL EQUIPMENT 86-7.01 REMOVING ELECTRICAL EQUIPMENT Existing electrical equipment, pull boxes, and conduits, to be removed and not reused or salvaged, become your property and you must dispose of it under Section 7-1.13, Disposal of Materials Outside the Highway Right of Way." Unused underground conduit may be abandoned in place after all conductors have been removed, except that conduit terminations from conduit to be abandoned must be removed from pull boxes to remain. Exercise care in salvaging equipment so that it will not be damaged or destroyed. Mast arms must be removed from standards. Luminaires, signal heads, and signal mounting assemblies must be removed from standards and mast arms. Holes resulting from removing pull boxes must be filled with material equivalent to the surrounding material. 86-7.02 REINSTALLING REMOVED ELECTRICAL EQUIPMENT If removed electrical equipment is to be reinstalled, you must supply all necessary materials and equipment, including signal mounting assemblies, anchor bolts, nuts, washers, and concrete as required to complete the new installation. Luminaires to be reinstalled must be cleaned and relamped. Existing materials required to be reused and found to be unsatisfactory by the Engineer must be replaced with new material and the replacement cost will be paid for as extra work as specified in Section 4-1.03D, Extra Work." Book One- State Route 68 at San Benancio Road Intersection Improvements 311 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??@??86-8 PAYMENT 86-8.01 PAYMENT The contract lump sum price or prices paid for signal, ramp metering, flashing beacon, lighting, sign illumination, traffic monitoring station, highway advisory radio systems, closed circuit television systems, or combinations thereof; for modifying or removing those systems; for temporary systems; or the lump sum or unit prices paid for various units of those systems; or the lump sum or per foot price paid for conduit of the various sizes, types, and installation methods listed in the Engineer's Estimate include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in furnishing and installing, modifying, or removing the systems, combinations or units thereof, including any necessary pull boxes except if the type required is shown as a separate contract item); excavation and backfill; concrete foundations except if shown as a separate contract item); pedestrian barricades; furnishing and installing illuminated street name signs; installing sign panels on pedestrian barricades, on flashing beacon standards, and on traffic signal mast arms; restoring sidewalk, pavement and appurtenances damaged or destroyed during construction; salvaging existing materials; and making all required tests, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer. If poles for electrical systems are manufactured from a source located more than 300 air-line miles from Sacramento and Los Angeles, the Department will deduct $5,000 for inspection costs for each inspection site. If poles for electrical systems are manufactured from a source located more than 3,000 air-line miles from Sacramento and Los Angeles, the Department will deduct $8,000 for inspection costs for each inspection site. Full compensation for all additional materials and labor, not shown on the plans or specified, that are necessary to complete the installation of the various systems, is included in the prices paid for the systems, or units thereof, except as provided in Section 86-1.06, Maintaining Existing and Temporary Electrical Systems," and no additional compensation will be allowed therefor. If shown as a contract item, the contract price paid per foot for cast-in-drilled-hole concrete pile signal foundation) includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing reinforced concrete pile foundations of the size shown on the Engineer's Estimate, including drilling holes, disposing of the material resulting from drilling holes, furnishing and placing anchor bolt assemblies and reinforcing steel, complete in place, as shown on the plans, and as specified in these specifications and the special provisions, and as directed by the Engineer. If shown as a contract item, non-reinforced PCC foundations will be measured and paid for by the cubic yard for foundation concrete in the same manner as specified for minor concrete minor structure) in Section 51, Concrete Structures." If shown as a separate contract item by the lump sum or per foot, interconnection conduit and cable includes all interconnection conductors, and conduit and pull boxes containing interconnection cable and no other conductors. The quantity of interconnection conduit and cable to be paid for by the foot is the length of that conduit. Compensation for conduit containing interconnection cable and other conductors is included in the contract price paid for the item requiring the other conductors. Full compensation for furnishing, installing, maintaining, and removing falsework lighting equipment is included in the contract prices paid for the items of work involved in the structure that requires the falsework lighting and no additional compensation will be allowed therefor. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Book One- State Route 68 at San Benancio Road Intersection Improvements 312 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??A??SECTION 88 ENGINEERING FABRICS Issued 06-05-09) Replace Section 88 with: SECTION 88 GEOSYNTHETICS 88-1.01 GENERAL 88-1.01A Summary Section 88 includes specifications for geosynthetics. Geosynthetics are used for: 1. Filtration 2. Drainage 3. Reinforcement 4. Water pollution control 5. Channel and shore protection 6. Pavement interlayer 7. Separation and stabilization 88-1.01B Submittals Submit: 1. Certificate of Compliance under Section 6-1.07, Certificates of Compliance" 2. Samples representing each lot 3. Minimum average roll values MARV) Label submittals with the manufacturer's name and product information. 88-1.01C Quality Control and Assurance Treat geosynthetics to resist degradation from exposure to sunlight. geosynthetics from moisture, sunlight, and shipping and storage damage. Using covers, protect 88-1.02 FILTRATION 88-1.02A Filter Fabric Geosynthetics used for filter fabric must be permeable and nonwoven. Filter fabric must consist of 1 of the following: 1. Polyester 2. Polypropylene 3. Combined polyester and polypropylene Filter fabric must comply with: Book One- State Route 68 at San Benancio Road Intersection Improvements 313 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??B??Filter Fabric Property ASTM Specification Class A Class B Class C Grab breaking load, 1-inch grip, lb minimum in each direction D 4632 157 Apparent elongation, percent minimum in each direction D 4632 50 Hydraulic bursting strength, psi minimum D 3786 210 Ultraviolet resistance, percent minimum retained grab breaking load, 500 hr D 4355 70 Permittivity, sec' minimum D 4491 0.5 0.2 0.1 Apparent opening size, average roll value, U.S. Standard sieve size maximum D 4751 40 60 70 88-1.03 DRAINAGE 88-1.03A Geocomposite Wall Drain Geocomposite wall drain must consist of a polymeric core with filter fabric integrally bonded to 1 or both sides of the core creating a stable drainage void. Filter fabric must comply with Section 88-1.02, Filtration." Geocomposite wall drain must comply with: Property ASTM Specification Thickness with fabric, 2 inches maximum Transmissivity, gradient D 4716 4 1.0, normal stress 5,000 psf, gal/min/ft 88-1.04 REINFORCEMENT 88-1.04A Geotechnical Subsurface Reinforcement General Geosynthetic used for geotechnical subsurface reinforcement must be either of the following: 1. Geotextile 2. Geogrid Geotextile permittivity must be at least 0.05 sec 1 determined under ASTM D 4491. Geogrid must have a regular and defined open area. The open area must be from 50 to 90 percent of the total grid area. Long Term Design Strength Long Term Design Strength LTDS) of geosynthetic reinforcement is the ultimate tensile strength in the primary strength direction divided by reduction factors. Calculate the LTDS from the guidelines in Geosynthetic Research Institute GRI) Standard Practice GG4a, GRI GG4b, or GRI GT7. The product of the appropriate reduction factors must be at least 1.30. Determine the reduction factor for creep using a 75-year design life for permanent applications and a 5-year Geocom osite Wall Drain Book One- State Route 68 at San Benancio Road Intersection Improvements 314 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??C??design life for temporary applications. Determine the installation damage reduction factor based on the characteristics of the backfill materials used. If test data is not available, use default values of reduction factors in the GRI Standard Practice to calculate LTDS. Submit the LTDS and its supporting calculations at least 15 days before placing geosynthetic reinforcement. Do not install before the Engineer's approval. The LTDS must be signed by an engineer who is registered as a civil engineer in the State. 88-1.05 WATER POLLUTION CONTROL Geosynthetics used for water pollution control must comply with: Applicatio n Silt Fence Sediment Gravel- Temporary Filter Filled Cover Bag Bags Woven Non- Property ASTM woven Grab breaking load, 1-inch grip, lb minimum in each direction D 4632 120 120 255 205 200 Apparent elongation, percent minimum, in each direction D 4632 15 50 50 Water flow rate, gallons per minute/square foot minimum and maximum average roll value D 4491 10 100 100 150 80 200 80 150 75 120 Permittivity, sec" minimum D 4491 0.1 1.1 1.0 0.2 1.0 Apparent opening size, inches maximum average roll value D 4751 0.023 0.023 0.033 0.016 0.007 Ultraviolet resistance, percent minimum retained grab breaking load, 500 hr. D 4355 70 70 70 70 70 88-1.06 CHANNEL AND SHORE PROTECTION 88-1.06A Rock Slope Protection Rock slope protection RSP) fabric must be a permeable, nonwoven, needle-punched geotextile. RSP fabric consists of 1 of the following: 1. Polyester 2. Polypropylene 3. Combined polyester and polypropylene Polymers must be either virgin compounds or clean reworked material. Do not subject virgin compounds to use or processing other than required for initial manufacture. Clean reworked material must be previously processed material from the processor's own production that has been reground, pelletized, or solvated. RSP fabric must not consist of more than 20 percent by weight of clean reworked material. Do not use recycled materials from either post-consumer or post-industrial sources. Class 8 or Class 10 RSP fabric must comply with: Water Pollution Control Geosynthetics Book One- State Route 68 at San Benancio Road Intersection Improvements 315 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??D??Property ASTM Specification Class 8 Class 10 Weight, oz/yd minimum D 5261 7.5 9.5 Grab breaking load, lb 1-inch grip, min. in each direction D 4632 200 250 Apparent elongation, percent min., in each direction D 4632 50 50 Permittivity, sec minimum D 4491 1.0 0.70 Apparent opening size, U.S. Standard sieve size minimum and maximum D 4751 70 100 70 100 Ultraviolet resistance, percent minimum retained grab breaking load, 500 hr. D4355 70 70 88-1.07 PAVEMENT INTERLAYER 88-1.07A Paving Fabric Geosynthetics used for paving fabric must be nonwoven. Paving fabric must comply with: Property ASTM Specification Mass per unit area, oz/yd2 minimum D 5261 4.1 Grab breaking load, lb 1-inch grip, minimum, in each direction D 4632 100 Apparent elongation, percent minimum in each direction D 4632 50 Hydraulic bursting strength, psi minimum D 3786 200 Melting point, F minimum D 276 325 Asphalt retention, gal/yd minimum D 6140 0.2 88-1.07B Paving Mat Geosynthetics used for paving mat must be a nonwoven fiberglass and polyester hybrid material. Paving mat must comply with: Property ASTM Specification Breaking force, lb/2 inches minimum D 5035 45 Ultimate elongation, percent maximum D 5035 5 Mass per unit area, oz/ sq yd minimum D 5261 3.7 Melting point, F minimum D 276 400 Asphalt retention, gal/yd minimum D 6140 0.10 Rock Slope Protection Fabric Geosynthetic Paving Fabric Geosynthetic Paving Mat Book One- State Route 68 at San Benancio Road Intersection Improvements 316 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??E??88-1.07C Paving Grid Geosynthetics used for paving grid must be a geopolymer material formed into a grid of integrally connected elements with openings. Paving grid must comply with: Property Test Specification Class I Class II Class III Tensile strength at ultimate, lb/in a minimum ASTM D 6637 560 x 1,120 560 280 Aperture size, inch minimum Calipered 0.5 0.5 0.5 Elongation, % maximum ASTM D 6637 12 12 12 Mass per area, oz / sqyd minimum ASTM D 5261 16 10 5.5 Melting point, F minimum ASTM D 276 325 325 325 Note: a For Class I, machine direction x cross direction. For Class II and Class III, both directions. 88-1.07D Paving Geocomposite Grid Paving geocomposite grid consists of paving grid specified under Section 88-1.07C, Paving Grid," bonded or integrated with paving fabric specified under Section 88-1.07A, Paving Fabric." Paving geocomposite grid must have a peel strength of at least 10 pounds per foot determined under ASTM D 413. 88-1.07E Geocomposite Strip Membrane Geocomposite strip membrane must consist of various widths of strips manufactured from of asphaltic rubber and geosynthetics. Geocomposite strip membrane must comply with: Property ASTM Specification Strip tensile strength, lbs/inch minimum D 882 50 Elongation at break, % minimum D 882 50 Resistance to puncture, lbs. minimum E 154 200 Permeance, perms maximum E 96/E 96M 0.10 Pliability, 1/4 inch mandrel with sample No cracks in conditioned at 25 F D 146 fabric or bitumen Melting point, F D 276 325 88-1.08 SEPARATION AND STABILIZATION 88-1.08A Subgrade Enhancement Geotextile Subgrade enhancement geotextile must consist of either of the following: 1. Polyester 2. Polypropylene Geocomposite Strip Membrane Geosynthetic Paving Grid Book One- State Route 68 at San Benancio Road Intersection Improvements 317 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??F??Subgrade enhancement geotextile must comply with: Property ASTM Specification' Class Al Class A2 Class B1 Class B2 Class B3 Elongation at break, % D 4632 50 50 50 50 50 Grab tensile strength, lb minimum D4632 250 160 320 200 Wide width tensile strength at 5% strain, lb/ft minimum D 4595 2,000 Wide width tensile strength at ultimate strength, lb/ft minimum D 4595 4,800 Tear strength, lb minimum D 4533 90 60 120 80 Puncture strength, lb minimum D 6241 500 310 620 620 430 Permittivity, sec-' minimum D 4491 0.05 0.05 0.20 0.20 0.20 Apparent opening size, inches maximum D 4751 0.012 0.012 0.024 0.012 0.012 Ultraviolet stability retained strength after 500 hrs exposure), % minimum D 4355 70 70 70 70 70 Notes: a Specifications are based on minimum average roll value in the weaker principle direction except apparent opening size is based on maximum average roll value. 88-1.09 PAYMENT The Department measures and pays for geosynthetics under the specifications requiring their use. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 90 PORTLAND CEMENT CONCRETE Issued 06-05-09) Replace Section 90 with: SECTION 90 PORTLAND CEMENT CONCRETE 90-1 GENERAL 90-1.01 DESCRIPTION Portland cement concrete shall be composed of cementitious material, fine aggregate, coarse aggregate, admixtures if used, and water, proportioned and mixed as specified in these specifications. The Contractor shall determine the mix proportions for concrete in conformance with these specifications. Sub grade Enhancement Geotextile Book One- State Route 68 at San Benancio Road Intersection Improvements 318 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??G??Minor concrete shall contain not less than 505 pounds of cementitious material per cubic yard unless otherwise specified in these specifications or the special provisions. Unless otherwise designated on the plans or specified in these specifications or the special provisions, the amount of cementitious material used per cubic yard of concrete in structures or portions of structures shall conform to the following: Use Cementitious Material Content Pounds/CY) Concrete designated by compressive strength: Deck slabs and slab spans of bridges 675 min., 800 max. Roof sections of exposed top box culverts 675 min., 800 max. Other portions of structures 590 min., 800 max. Concrete not designated by compressive strength: Deck slabs and slab spans of bridges 675 min. Roof sections of exposed top box culverts 675 min. Prestressed members 675 min. Seal courses 675 min. Other portions of structures 590 min. Concrete for precast members 590 min., 925 max. Except for when a modulus of rupture is specified, the minimum required compressive strength for concrete shall be the strength specified, or 2,500 pounds per square inch, whichever is greater. Concrete shall be proportioned such that the concrete will attain the minimum required compressive strength. If the specified 28-day compressive strength is greater than 3,600 pounds per square inch, the concrete shall be designated by compressive strength, and 42 days will be allowed to obtain the specified strength. For concrete not designated by compressive strength, the Engineer may test the concrete for compressive strength. The concrete will be accepted if the compressive strength at 28 days attains 85 percent or more of the minimum required compressive strength. Concrete shall be proportioned to conform to the following shrinkage limitations when tested in conformance with the requirements of AASHTO Designation: T 160, modified as follows: Condition Maximum Shrinkage of Laboratory Cast Specimens at 28 days Drying average of 3, %) Paving and approach slab concrete 0.050 Bridge deck concrete 0.045 Note: Shrinkage requirement is waived for concrete that is used for precast elements. Shrinkage tests shall be either: A. Performed by a laboratory accredited to perform AASHTO Designation: T 160, or B. Performed by a laboratory that maintains a current rating of 3 or better for the Cement and Concrete Reference Laboratory CCRL) concrete proficiency sample program. Laboratory cast specimens shall have a 4" x 4" cross section. Specimens shall be removed from the molds 23 1 hours after mixing the concrete and placed in lime water at 73 3 F to 7 days age. A comparator reading shall be taken at 7 days age and recorded as the initial reading. Specimens then shall be stored in a humidity controlled room maintained at 73 3 F and 50 4 percent relative humidity for the remainder of the test. Subsequent readings shall be taken at 7, 14, 21, and 28 days drying. Test data verifying conformance to the shrinkage limitations shall be submitted with the mix design. Shrinkage testing data accepted by the Engineer no more than 3 years prior to the first Book One- State Route 68 at San Benancio Road Intersection Improvements 319 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??H??working day of this contract will be acceptable for this entire contract, provided the data was for concrete with similar proportions and the same materials and material sources to be used on this contract. Concrete shall be considered to have similar proportions if, when compared to concrete to be used on this project, no more than 2 mix design elements are varied. Varied mix design elements shall fall within the tolerances in the following table: Mix Design Element Tolerance Water to cementitious material ratio 0.03 Total water content 5% Coarse aggregate weight per cubic yard) 10 % Fine aggregate weight per cubic yard) 10 % Supplementary cementitious material content 5% Admixture as originally dosed) 25 % Note: Admixtures must be of the same brand. Before using concrete or in advance of revising the mix proportions, the Contractor shall submit in writing to the Engineer a copy of the mix design. Compliance with cementitious material content requirements will be verified in conformance with procedures described in California Test 518 for cement content. For testing purposes, supplementary cementitious material SCM) shall be considered to be cement. Batch proportions shall be adjusted as necessary to produce concrete having the specified cementitious material content. If any concrete has a cementitious material, portland cement, or SCM content that is less than the minimum required, the concrete shall be removed. However, if the Engineer determines that the concrete is structurally adequate, the concrete may remain in place and the Contractor shall pay to the State $0.25 for each pound of cementitious material, portland cement, or SCM that is less than the minimum required. The Department may deduct the amount from any moneys due, or that may become due, the Contractor under the contract. The deductions will not be made unless the difference between the contents required and those actually provided exceeds the batching tolerances permitted by Section 90-5, Proportioning." No deductions will be made based on the results of California Test 518. The requirements of the preceding paragraph shall not apply to minor concrete. 90-2 MATERIALS 90-2.01 CEMENTITIOUS MATERIALS Unless otherwise specified, cementitious material shall be either a combination of Type II or Type V portland cement and SCM, or a blended cement. No cementitious material shall be used in the work unless it is on the Department's Pre-Qualified Products List at the time of mix design submittal. Information regarding cementitious material qualification and placement on the Department's approved list can be obtained at the Transportation Laboratory. Cementitious materials used in cast-in-place concrete for exposed surfaces of like elements of a structure shall be from the same sources and of the same proportions. Cementitious materials shall be protected from moisture until used. Sacked cementitious materials shall be piled to permit access for tallying, inspecting, and identifying each shipment. Facilities shall be provided to ensure that the various cementitious materials meeting this Section 90-2.01 are kept separate from each other and from other cementitious materials. A storage silo containing a cementitous material shall be emptied before using that silo for a different cementitious material. Blended cements with a percentage of SCM differing by more than 2 percentage points are considered different cementitious materials. Sampling cementitious materials shall be in conformance with California Test 125. Book One- State Route 68 at San Benancio Road Intersection Improvements 320 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??I??The Contractor shall furnish a Certificate of Compliance for cementitious materials in conformance with the provisions in Section 6-1.07, Certificates of Compliance." The Certificate of Compliance shall indicate the source by name and location including country, state, and city). If cementitious material is delivered directly to the job site, the Certificate of Compliance shall be signed by the cementitious material supplier. If the cementitious material is used in ready-mixed concrete or in precast concrete products purchased as such by the Contractor, the Certificate of Compliance shall be signed by the manufacturer of the concrete or product. If blended cement is used, the Certificate of Compliance shall include a statement signed by the blended cement supplier that indicates the actual percentage, by weight, of SCM in the blend. Weight of SCM shall be by weighing device conforming to Section 9-1.01, Measurement of Quantities," or as determined by chemical analysis. 90-2.01A Cement Portland cement shall conform to the requirements in ASTM Designation: C 150 except the C3S content of Type II cement shall not exceed 65 percent. Blended cement shall conform to the requirements for Portland Blast-Furnace Slag Cement, Type IS MS) or Portland-Pozzolan Cement, Type IP MS) in AASHTO Designation: M 240, except that the maximum limits on the pozzolan content shall not apply. Blended cement shall be comprised of Type II or Type V cement and SCM produced either by intergrinding portland cement clinker and SCM, by blending portland cement and either finely ground granulated blast furnace slag or finely divided pozzolan, or a combination of intergrinding and blending. In addition, Type II portland cement and Type V portland cement shall conform to the following requirements: A. The cement shall not contain more than 0.60-percent by mass of alkalies, calculated as the percentage of Na2O plus 0.658 times the percentage of K20, when determined by methods as required in AASHTO Designation: T 105; and B. The autoclave expansion shall not exceed 0.50-percent Type III portland cement shall be used only as specified or with the approval of the Engineer. Type III portland cement shall conform to the additional requirements listed above for Type II portland cement. The Contractor may use Type III portland cement in the manufacturing of precast concrete. 90-2.01B Supplementary Cementitious Materials Each supplementary cementitious material shall conform to one of the following: A. Fly ash conforming to the requirements in AASHTO Designation: M 295, Class F, and these specifications. The available alkali, as sodium oxide equivalent, shall not exceed 1.5 percent when determined in conformance with the requirements in ASTM Designation: C 311 or the total alkali, as sodium oxide equivalent, shall not exceed 5.0 percent when determined in conformance with the requirements in AASHTO Designation: T 105. B. Ultra fine fly ash UFFA) conforming to the requirements in AASHTO Designation: M 295, Class F, and the following chemical and physical requirements: Book One- State Route 68 at San Benancio Road Intersection Improvements 321 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??J??Chemical Requirements Percent Sulfur Trioxide SO3) 1.5 max. Loss on ignition 1.2 max. Available Alkalies as Na2 O) equivalent 1.5 max. Physical Requirements Percent Particle size distribution Less than 3.5 microns 50 Less than 9.0 microns 90 Strength Activity Index with portland cement 7 days 95 minimum % of control) 28 days 110 minimum % of control) Expansion at 16 days when testing job materials in 0.10 max. conformance with ASTM C 1567* * In the test mix, Type 11 or Type V portland cement shall be replaced with at least 12% UFFA by weight. C. Raw or calcined natural pozzolans conforming to the requirements in AASHTO Designation: M 295, Class N. and the following requirements and these specifications. The available alkali, as sodium oxide equivalent, shall not exceed 1.5 percent when determined in conformance with the requirements in ASTM Designation: C 311 or the total alkali, as sodium oxide equivalent, shall not exceed 5.0 percent when determined in conformance with the requirements in AASHTO Designation: T 105. D. Metakaolin conforming to the requirements in AASHTO Designation: M 295, Class N, and the following chemical and physical requirements: Chemical Requirements Percent Silicon Dioxide SiO2) + Aluminum Oxide A1203) 92.0 min. Calcium Oxide CaO) 1.0 max Sulfur Trioxide SO3) 1.0 max. Loss on ignition 1.2 max. Available Alkalies as Na20) equivalent 1.0 max. Physical Requirements Percent Particle size distribution 95 Less than 45 microns Strength Activity Index with portland cement 7 days 100 minimum % of control) 28 days 100 minimum % of control) E. Ground Granulated Blast Furnace Slag GGBFS) conforming to the requirements in AASHTO Designation: M 302, Grade 100 or Grade 120. F. Silica Fume conforming to the requirements of AASHTO Designation: M 307, with reduction in mortar expansion of 80 percent, minimum, using the cement from the proposed mix design. Commingling of fly ash from different sources at uncontrolled ratios is permissible only if the following criteria are satisfied: A. Sources of fly ash to be commingled shall each produce fly ash that conforms to the requirements in AASHTO Designation: M 295, Class F. B. Testing of the commingled product is the responsibility of the fly ash supplier. C. Each fly ash's running average of relative density shall not differ from any other by more than 0.25 pound per cubic inch at the time of commingling. Book One- State Route 68 at San Benancio Road Intersection Improvements 322 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??K??D. Each fly ash's running average of loss on ignition shall not differ from any other by more than one percent at the time of commingling. E. The final product of commingled fly ash shall conform to the requirements in AASHTO Designation: M 295, Class F. 90-2.01C Required Use Of Supplementary Cementitious Materials General The amount of portland cement and SCM used in portland cement concrete shall conform to the minimum cementitious material content provisions in Section 90-1.01, Description," or Section 90-4.05, Optional Use of Chemical Admixtures," and these specifications. The SCM content in portland cement concrete shall conform to one of the following: A. Any combination of portland cement and at least one SCM, satisfying Equations 1) and 2): Equation 1) 25xUF)+(12xFA)+(IOxFB)+(6xSL) X MC Where: UF Silica fume, metakaolin, or UFFA, including the amount in blended cement, pounds per cubic yard. FA Fly ash or natural pozzolan conforming to the requirements in AASHTO Designation: M 295, Class F or N with a CaO content up to 10 percent, including the amount in blended cement, pounds per cubic yard. FB Fly ash or natural pozzolan conforming to the requirements in AASHTO Designation: M 295, Class F or N with a CaO content up to 15 percent, including the amount in blended cement, pounds per cubic yard. SL GGBFS, including the amount in blended cement, pounds per cubic yard. MC Minimum amount of cementitious material specified, pounds per cubic yard. X 1.8 for innocuous aggregate, 3.0 for all other aggregate. Equation 2) MC MSCM PC 0 Where: MC Minimum amount of cementitious material specified, pounds per cubic yard. MSCM The minimum sum of SCMs that satisfies Equation 1) above, pounds per cubic yard. PC The amount of portland cement, including the amount in blended cement, pounds per cubic yard. B. 15 percent of Class F fly ash with at least 48 ounces of LiNO3 solution added per 100 pounds of portland cement. CaO content of the fly ash shall not exceed 15 percent. Book One- State Route 68 at San Benancio Road Intersection Improvements 323 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??L??Precast Concrete The SCM content in precast portland cement concrete shall conform to one of the following: A. Any combination of portland cement and SCM, satisfying the following equation: Equation 3) 25xUF)+(12xFA)+(IOxFB)+(6xSL) X TC Where: UF Silica fume, metakaolin, or UFFA, including the amount in blended cement, pounds per cubic yard. FA Fly ash or natural pozzolan conforming to the requirements in AASHTO Designation: M 295, Class F or N with a CaO content up to 10 percent, including the amount in blended cement, pounds per cubic yard. FB Fly ash or natural pozzolan conforming to the requirements in AASHTO Designation: M 295, Class F or N with a CaO content up to 15 percent, including the amount in blended cement, pounds per cubic yard. SL GGBFS, including the amount in blended cement, pounds per cubic yard. TC Total amount of cementitious material used in the mix, pounds per cubic yard. X 0.0 if precast members are constructed with portland cement concrete using aggregate that is innocuous" in conformance with the provisions in Section 90- 2.02, Aggregates." X 3.0 for all other aggregate. B. 15 percent of Class F fly ash with at least 48 ounces of LiNO3 solution added per 100 pounds of portland cement. CaO content of the fly ash shall not exceed 15 percent. C. Any combination of supplementary cementitious material and portland cement may be used if the expansion of cementitious material and aggregate does not exceed 0.10 percent when tested in conformance with the requirements in ASTM C 1567. Test data shall be submitted with each mix design. Test data accepted by the Engineer no more than 3 years prior to the first working day of this contract will be acceptable for this entire contract, provided the data was for the same concrete mix and the same materials and material sources to be used on this contract. 90-2.02 AGGREGATES To be considered innocuous, aggregate must be on the Department's approved list, Innocuous Aggregates for use in Concrete." Information regarding aggregate qualification and placement on the Department's approved list can be obtained at the Transportation Laboratory. Both coarse and fine aggregate must be on the approved list for the aggregate used in concrete to be considered innocuous. Aggregates shall be free from deleterious coatings, clay balls, roots, bark, sticks, rags, and other extraneous material. The Contractor shall provide safe and suitable facilities, including necessary splitting devices for obtaining samples of aggregates, in conformance with California Test 125. Aggregates shall be of such character that it will be possible to produce workable concrete within the limits of water content provided in Section 90-6.06, Amount of Water and Penetration." Book One- State Route 68 at San Benancio Road Intersection Improvements 324 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??M??Aggregates shall have not more than 10 percent loss when tested for soundness in conformance with the requirements in California Test 214. The soundness requirement for fine aggregate will be waived, provided that the durability index, Df, of the fine aggregate is 60 or greater when tested for durability in conformance with California Test 229. If the results of any one or more of the Cleanness Value, Sand Equivalent, or aggregate grading tests do not meet the requirements specified for Operating Range" but all meet the Contract Compliance" requirements, the placement of concrete shall be suspended at the completion of the current pour until tests or other information indicate that the next material to be used in the work will comply with the requirements specified for Operating Range." If the results of either or both the Cleanness Value and coarse aggregate grading tests do not meet the requirements specified for Contract Compliance," the concrete that is represented by the tests shall be removed. However, if the Engineer determines that the concrete is structurally adequate, the concrete may remain in place, and the Contractor shall pay to the State $3.50 per cubic yard for paving concrete and $5.50 per cubic yard for all other concrete for the concrete represented by these tests and left in place. The Department may deduct the amount from any moneys due, or that may become due, the Contractor under the contract. If the results of either or both the Sand Equivalent and fine aggregate grading tests do not meet the requirements specified for Contract Compliance," the concrete which is represented by the tests shall be removed. However, if the Engineer determines that the concrete is structurally adequate, the concrete may remain in place, and the Contractor shall pay to the State $3.50 per cubic yard for paving concrete and $5.50 per cubic yard for all other concrete for the concrete represented by these tests and left in place. The Department may deduct the amount from any moneys due, or that may become due, the Contractor under the contract. The 2 preceding paragraphs apply individually to the Contract Compliance" requirements for coarse aggregate and fine aggregate. When both coarse aggregate and fine aggregate do not conform to the Contract Compliance" requirements, both paragraphs shall apply. The payments specified in those paragraphs are in addition to any payments made in conformance with the provisions in Section 90-1.01, Description." No single Cleanness Value, Sand Equivalent, or aggregate grading test shall represent more than 300 cubic yards of concrete or one day's pour, whichever is smaller. When the source of an aggregate is changed, the Contractor shall adjust the mix proportions and submit in writing to the Engineer a copy of the mix design before using the aggregates. 90-2.02A Coarse Aggregate Coarse aggregate shall consist of gravel, crushed gravel, crushed rock, reclaimed aggregate, crushed air-cooled iron blast furnace slag or combinations thereof. Crushed air-cooled blast furnace slag shall not be used in reinforced or prestressed concrete. Reclaimed aggregate is aggregate that has been recovered from plastic concrete by washing away the cementitious material. Reclaimed aggregate shall conform to all aggregate requirements. Coarse aggregate shall conform to the following quality requirements: Tests California Test Requirements Loss in Los Angeles Rattler after 500 211 45% max. revolutions) Cleanness Value Operating Range 227 75 min. Contract Compliance 227 71 min. Book One- State Route 68 at San Benancio Road Intersection Improvements 325 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??N??In lieu of the above Cleanness Value requirements, a Cleanness Value Operating Range" limit of 71, minimum, and a Cleanness Value Contract Compliance" limit of 68, minimum, will be used to determine the acceptability of the coarse aggregate if the Contractor furnishes a Certificate of Compliance, as provided in Section 6-1.07, Certificates of Compliance," certifying that: A. Coarse aggregate sampled at the completion of processing at the aggregate production plant had a Cleanness Value of not less than 82 when tested in conformance with the requirements in California Test 227; and B. Prequalification tests performed in conformance with the requirements in California Test 549 indicated that the aggregate would develop a relative strength of not less than 95 percent and would have a relative shrinkage not greater than 105 percent, based on concrete. 90-2.02B Fine Aggregate Fine aggregate shall consist of natural sand, manufactured sand produced from larger aggregate or a combination thereof. Manufactured sand shall be well graded. Fine aggregate shall conform to the following quality requirements: California Test Test Requirements Organic Impurities 213 Satisfactorya Mortar Strengths Relative to Ottawa Sand 515 95%, min. Sand Equivalent: Operating Range 217 75, min. Contract Compliance 217 71, min. a Fine aggregate developing a color darker than the reference standard color solution may be accepted if it is determined by the Engineer, from mortar strength tests, that a darker color is acceptable. In lieu of the above Sand Equivalent requirements, a Sand Equivalent Operating Range" limit of 71, minimum, and a Sand Equivalent Contract Compliance" limit of 68, minimum, will be used to determine the acceptability of the fine aggregate if the Contractor furnishes a Certificate of Compliance, as provided in Section 6-1.07, Certificates of Compliance," certifying that: A. Fine aggregate sampled at the completion of processing at the aggregate production plant had a Sand Equivalent value of not less than 82 when tested by California Test 217; and B. Prequalification tests performed in conformance with California Test 549 indicated that the aggregate would develop a relative strength of not less than 95 percent and would have a relative shrinkage not greater than 105 percent, based on concrete. 90-2.03 WATER In conventionally reinforced concrete work, the water for curing, for washing aggregates, and for mixing shall be free from oil and shall not contain more than 1,000 parts per million of chlorides as Cl, when tested in conformance with California Test 422, nor more than 1,300 parts per million of sulfates as SO4, when tested in conformance with California Test 417. In prestressed concrete work, the water for curing, for washing aggregates, and for mixing shall be free from oil and shall not contain more than 650 parts per million of chlorides as Cl, when tested in conformance with California Test 422, nor more than 1,300 parts per million of sulfates as SO4, when tested in conformance with California Test 417. In no case shall the water contain Book One- State Route 68 at San Benancio Road Intersection Improvements 326 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??O??an amount of impurities that will cause either: 1) a change in the setting time of cement of more than 25 percent when tested in conformance with the requirements in ASTM Designation: C 191 or ASTM Designation: C 266 or 2) a reduction in the compressive strength of mortar at 14 days of more than 5 percent, when tested in conformance with the requirements in ASTM Designation: C 109, when compared to the results obtained with distilled water or deionized water, tested in conformance with the requirements in ASTM Designation: C 109. In nonreinforced concrete work, the water for curing, for washing aggregates and for mixing shall be free from oil and shall not contain more than 2,000 parts per million of chlorides as Cl, when tested in conformance with California Test 422, or more than 1,500 parts per million of sulfates as SO4, when tested in conformance with California Test 417. In addition to the above provisions, water for curing concrete shall not contain impurities in a sufficient amount to cause discoloration of the concrete or produce etching of the surface. Water reclaimed from mixer wash-out operations may be used in mixing concrete. The water shall not contain coloring agents or more than 300 parts per million of alkalis Na2O + 0.658 K20) as determined on the filtrate. The specific gravity of the water shall not exceed 1.03 and shall not vary more than +0.010 during a day's operations. 90-2.04 Admixture Materials Admixture materials shall be stored and dispersed in liquid form and conform to the following requirements: A. Chemical Admixtures-ASTM Designation: C 494. B. Air-entraining Admixtures-ASTM Designation: C 260. C. Lithium Nitrate shall be in an aqueous solution conforming to the following: 1. Lithium Nitrate LiNO3) must be 30 percent +/- 0.5 percent by weight 2. Sulfate SO4) must be less than 1000 ppm 3. Chloride Cl) must be less than 1000 ppm 4. Alkalis Na2O + 0.658 K20) must be less than 1000 ppm 90-3 AGGREGATE GRADINGS 90-3.01 GENERAL Before beginning concrete work, the Contractor shall submit in writing to the Engineer the gradation of the primary aggregate nominal sizes that the Contractor proposes to furnish. If a primary coarse aggregate or the fine aggregate is separated into 2 or more sizes, the proposed gradation shall consist of the gradation for each individual size, and the proposed proportions of each individual size, combined mathematically to indicate one proposed gradation. The proposed gradation shall meet the grading requirements shown in the table in this section, and shall show the percentage passing each of the sieve sizes used in determining the end result. The Engineer may waive, in writing, the gradation requirements in this Section 90-3.01 and in Sections 90-3.02, Coarse Aggregate Grading," 90-3.03, Fine Aggregate Grading," and 90- 3.04, Combined Aggregate Gradings," if, in the Engineer's opinion, furnishing the gradation is not necessary for the type or amount of concrete work to be constructed. Gradations proposed by the Contractor shall be within the following percentage passing limits: Book One- State Route 68 at San Benancio Road Intersection Improvements 327 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??P??Primary Aggregate Nominal Size Sieve Size Limits of Pro osed Gradation 1-1/2"x3/4" 1" 19-41 1" x No. 4 3/4" 52 85 1"xNo.4 3/8" 15-38 1/2" x No. 4 3/8" 40 78 3/8" x No. 8 3/8" 50 85 Fine Aggregate No. 16 55 75 Fine Aggregate No. 30 34 46 Fine Aggregate No. 50 16 29 Should the Contractor change the source of supply, the Contractor shall submit in writing to the Engineer the new gradations before their intended use. 90-3.02 COARSE AGGREGATE GRADING The grading requirements for coarse aggregates are shown in the following table for each size of coarse aggregate: Percentage Passing Primary Aggregate Nominal Sizes 1-1/2" x 3/4" 1" x No. 4 1/2" x No. 4 3/8" x No. 8 Sieve Sizes Operating Range Contract Compliance Operating Range Contract Compliance Operating Range Contract Compliance Operating Range Contract C2LnEliance 2" 100 100 1-1/2" 88 100 85 100 100 100 1" X?18 X 25 88 100 86 100 3/4" 0- 17 0-20 X?15 X?22 100 100 1/2" 82 100 80 100 100 100 3/8" 0-7 0-9 X?15 X?22 X?15 X?22 X?15 X?20 No.4 0-16 0-18 0-15 0-18 0-25 0-28 No.8 0-6 0-7 0-6 0-7 0-6 0-7 In the above table, the symbol X is the gradation that the Contractor proposes to furnish for the specific sieve size as provided in Section 90-3.01, General." Coarse aggregate for the 1-1/2 inch, maximum, combined aggregate grading as provided in Section 90-3.04, Combined Aggregate Gradings," shall be furnished in 2 or more primary aggregate nominal sizes. Each primary aggregate nominal size may be separated into 2 sizes and stored separately, provided that the combined material conforms to the grading requirements for that particular primary aggregate nominal size. When the one inch, maximum, combined aggregate grading as provided in Section 90-3.04, Combined Aggregate Gradings," is to be used, the coarse aggregate may be separated into 2 sizes and stored separately, provided that the combined material shall conform to the grading requirements for the 1 x No. 4 primary aggregate nominal size. 90-3.03 FINE AGGREGATE GRADING Fine aggregate shall be graded within the following limits: Book One- State Route 68 at San Benancio Road Intersection Improvements 328 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Q?? Percentage Passing Sieve Sizes Operating Range Contract Compliance 3/8" 100 100 No. 4 95 100 93 100 No. 8 65 95 61 99 No.16 Xd10 X?13 No.30 X?9 X?12 No. 50 X f6 X 9 No. 100 2-12 1 15 No. 200 0-8 0-10 In the above table, the symbol X is the gradation that the Contractor proposes to furnish for the specific sieve size as provided in Section 90-3.01, General." In addition to the above required grading analysis, the distribution of the fine aggregate sizes shall be such that the difference between the total percentage passing the No. 16 sieve and the total percentage passing the No. 30 sieve shall be between 10 and 40, and the difference between the percentage passing the No. 30 and No. 50 sieves shall be between 10 and 40. Fine aggregate may be separated into 2 or more sizes and stored separately, provided that the combined material conforms to the grading requirements specified in this Section 90-3.03. 90-3.04 COMBINED AGGREGATE GRADINGS Combined aggregate grading limits shall be used only for the design of concrete mixes. Concrete mixes shall be designed so that aggregates are combined in proportions that shall produce a mixture within the grading limits for combined aggregates as specified herein. The combined aggregate grading, except when otherwise specified in these specifications or the special provisions, shall be either the 1-1/2 inch, maximum grading, or the 1 inch, maximum grading, at the option of the Contractor. Percentage Passing Sieve Sizes 1-1/2" Max. 1" Max. 1/2" Max. 3/8" Max. 2" 100 1-1/2" 90- 100 100 1" 50-86 90-100 3/4" 45 75 55 100 100 1/2" 90 100 100 3/8" 38-55 45-75 55-86 50-100 No. 4 30 45 35 60 45 63 45 63 No. 8 23 38 27 45 35 49 35 49 No. 16 17 33 20 35 25 37 25 37 No. 30 10 22 12 25 15 25 15-25 No.50 4-10 5-15 5-15 5-15 No.100 1-6 1-8 1-8 1-8 No.200 0-3 0-4 0-4 0-4 Changes from one grading to another shall not be made during the progress of the work unless permitted by the Engineer. 90-4 ADMIXTURES 90-4.01 GENERAL Admixtures used in portland cement concrete shall conform to and be used in conformance with the provisions in this Section 90-4 and the special provisions. Admixtures shall be used Grading Limits of Combined Aggregates Book One- State Route 68 at San Benancio Road Intersection Improvements 329 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??R??when specified or ordered by the Engineer and may be used at the Contractor's option as provided herein. Chemical admixtures and air-entraining admixtures containing chlorides as Cl in excess of one percent by weight of admixture, as determined by California Test 415, shall not be used. Admixtures shall be uniform in properties throughout their use in the work. Should it be found that an admixture as furnished is not uniform in properties, its use shall be discontinued. If more than one admixture is used, the admixtures shall be compatible with each other so that the desirable effects of all admixtures used will be realized. Chemical admixtures shall be used in conformance with the manufacturer's written recommendations. The manufacturer's written recommendations shall include a statement that the admixtures are compatible with the types and amounts of SCMs used. 90-4.02 MATERIALS Admixture materials shall conform to the provisions in Section 90-2.04, Admixture Materials." 90-4.03 ADMIXTURE APPROVAL No admixture brand shall be used in the work unless it is on the Department's current list of approved brands for the type of admixture involved. Information regarding admixture qualification and placement on the Department's list can be obtained at the Transportation Laboratory. If the Contractor proposes to use an admixture of a brand and type on the current list of approved admixture brands, the Contractor shall furnish a Certificate of Compliance from the manufacturer, as provided in Section 6-1.07, Certificates of Compliance," certifying that the admixture furnished is the same as that previously approved. If a previously approved admixture is not accompanied by a Certificate of Compliance, the admixture shall not be used in the work until the Engineer has had sufficient time to make the appropriate tests and has approved the admixture for use. The Engineer may take samples for testing at any time, whether or not the admixture has been accompanied by a Certificate of Compliance. 90-4.04 REQUIRED USE OF CHEMICAL ADMIXTURES If the use of a chemical admixture is specified, the admixture shall be used at the dosage specified, except that if no dosage is specified, the admixture shall be used at the dosage normally recommended by the manufacturer of the admixture. 90-4.05 OPTIONAL USE OF CHEMICAL ADMIXTURES The Contractor may use Type A or F, water-reducing; Type B, retarding; or Type D or G, water-reducing and retarding admixtures as described in ASTM Designation: C 494 to conserve cementitious material or to facilitate any concrete construction application subject to the following conditions: A. If a water-reducing admixture or a water-reducing and retarding admixture is used, the cementitious material content specified or ordered may be reduced by a maximum of 5 percent by weight, except that the resultant cementitious material content shall be not less than 505 pounds per cubic yard; and B. When a reduction in cementitious material content is made, the dosage of admixture used shall be no less than the dosage used in determining approval of the admixture. The Contractor may use Type S admixtures conforming to the requirements in ASTM Designation: C 494. Book One- State Route 68 at San Benancio Road Intersection Improvements 330 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??S??Unless otherwise specified, a Type C accelerating chemical admixture conforming to the requirements in ASTM Designation: C 494, may be used in portland cement concrete. Inclusion in the mix design submitted for approval will not be required provided that the admixture is added to counteract changing conditions that contribute to delayed setting of the portland cement concrete, and the use or change in dosage of the admixture is approved in writing by the Engineer. 90-4.06 REQUIRED USE OF AIR-ENTRAINING ADMIXTURES When air-entrainment is specified or ordered by the Engineer, the air-entraining admixture shall be used in amounts to produce a concrete having the specified air content as determined by California Test 504. 90-4.07 OPTIONAL USE OF AIR-ENTRAINING ADMIXTURES When air-entrainment has not been specified or ordered by the Engineer, the Contractor will be permitted to use an air-entraining admixture to facilitate the use of any construction procedure or equipment provided that the average air content, as determined by California Test 504, of 3 successive tests does not exceed 4 percent, and no single test value exceeds 5.5 percent. If the Contractor elects to use an air-entraining admixture in concrete for pavement, the Contractor shall so indicate at the time the Contractor designates the source of aggregate. 90-4.08 BLANK 90-4.09 BLANK 90-4.10 PROPORTIONING AND DISPENSING LIQUID ADMIXTURES Chemical admixtures and air-entraining admixtures shall be dispensed in liquid form. Dispensers for liquid admixtures shall have sufficient capacity to measure at one time the prescribed quantity required for each batch of concrete. Each dispenser shall include a graduated measuring unit into which liquid admixtures are measured to within 5 percent of the prescribed quantity for each batch. Dispensers shall be located and maintained so that the graduations can be accurately read from the point at which proportioning operations are controlled to permit a visual check of hatching accuracy prior to discharge. Each measuring unit shall be clearly marked for the type and quantity of admixture. Each liquid admixture dispensing system shall be equipped with a sampling device consisting of a valve located in a safe and readily accessible position such that a sample of the admixture may be withdrawn slowly by the Engineer. If more than one liquid admixture is used in the concrete mix, each liquid admixture shall have a separate measuring unit and shall be dispensed by injecting equipment located in such a manner that the admixtures are not mixed at high concentrations and do not interfere with the effectiveness of each other. When air-entraining admixtures are used in conjunction with other liquid admixtures, the air-entraining admixture shall be the first to be incorporated into the mix, unless it is demonstrated that a different sequence improves performance. When automatic proportioning devices are required for concrete pavement, dispensers for liquid admixtures shall operate automatically with the batching control equipment. The dispensers shall be equipped with an automatic warning system in good operating condition that will provide a visible or audible signal at the point at which proportioning operations are controlled when the quantity of admixture measured for each batch of concrete varies from the preselected dosage by more than 5 percent, or when the entire contents of the measuring unit are not emptied from the dispenser into each batch of concrete. Book One- State Route 68 at San Benancio Road Intersection Improvements 331 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??T??Unless liquid admixtures are added to premeasured water for the batch, their discharge into the batch shall be arranged to flow into the stream of water so that the admixtures are well dispersed throughout the batch, except that air-entraining admixtures may be dispensed directly into moist sand in the batching bins provided that adequate control of the air content of the concrete can be maintained. Liquid admixtures requiring dosages greater than one-half gallon per cubic yard shall be considered to be water when determining the total amount of free water as specified in Section 90-6.06, Amount of Water and Penetration." 90-4.11 BLANK 90-5 PROPORTIONING 90-5.01 STORAGE OF AGGREGATES Aggregates shall be stored or stockpiled in such a manner that separation of coarse and fine particles of each size shall be avoided and the various sizes shall not become intermixed before proportioning. Aggregates shall be stored or stockpiled and handled in a manner that prevent contamination by foreign materials. In addition, storage of aggregates at batching or mixing facilities that are erected subsequent to the award of the contract and that furnish concrete to the project shall conform to the following: A. Intermingling of the different sizes of aggregates shall be positively prevented. The Contractor shall take the necessary measures to prevent intermingling. The preventive measures may include, but are not necessarily limited to, physical separation of stockpiles or construction of bulkheads of adequate length and height; and B. Contamination of aggregates by contact with the ground shall be positively prevented. The Contractor shall take the necessary measures to prevent contamination. The preventive measures shall include, but are not necessarily limited to, placing aggregates on wooden platforms or on hardened surfaces consisting of portland cement concrete, asphalt concrete, or cement treated material. In placing aggregates in storage or in moving the aggregates from storage to the weigh hopper of the batching plant, any method that may cause segregation, degradation, or the combining of materials of different gradings that will result in any size of aggregate at the weigh hopper failing to meet the grading requirements, shall be discontinued. Any method of handling aggregates that results in excessive breakage of particles shall be discontinued. The use of suitable devices to reduce impact of falling aggregates may be required by the Engineer. 90-5.02 PROPORTIONING DEVICES Weighing, measuring, or metering devices used for proportioning materials shall conform to the requirements in Section 9-1.01, Measurement of Quantities," and this Section 90-5.02. In addition, automatic weighing systems shall comply with the requirements for automatic proportioning devices in Section 90-5.03A, Proportioning for Pavement." Automatic devices shall be automatic to the extent that the only manual operation required for proportioning the aggregates, cement, and SCM for one batch of concrete is a single operation of a switch or starter. Proportioning devices shall be tested as frequently as the Engineer may deem necessary to ensure their accuracy. Weighing equipment shall be insulated against vibration or movement of other operating equipment in the plant. When the plant is in operation, the weight of each batch of material shall Book One- State Route 68 at San Benancio Road Intersection Improvements 332 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??U??not vary from the weight designated by the Engineer by more than the tolerances specified herein. Equipment for cumulative weighing of aggregate shall have a zero tolerance of 0.5 percent of the designated total batch weight of the aggregate. For systems with individual weigh hoppers for the various sizes of aggregate, the zero tolerance shall be 0.5 percent of the individual batch weight designated for each size of aggregate. Equipment for cumulative weighing of cement and SCM shall have a zero tolerance of 0.5 percent of the designated total batch weight of the cement and SCM. Equipment for weighing cement or SCM separately shall have a zero tolerance of 0.5 percent of their designated individual batch weights. Equipment for measuring water shall have a zero tolerance of 0.5 percent of its designated weight or volume. The weight indicated for any batch of material shall not vary from the preselected scale setting by more than the following: A. Aggregate weighed cumulatively shall be within 1.0 percent of the designated total batch weight of the aggregate. Aggregates weighed individually shall be within 1.5 percent of their respective designated batch weights; and B. Cement shall be 99 to 102 percent of its designated batch weight. When weighed individually, SCM shall be 99 to 102 percent of its designated batch weight. When SCM and cement are permitted to be weighed cumulatively, cement shall be weighed first to 99 to 102 percent of its designated batch weight, and the total for cement and SCM shall be 99 to 102 percent of the sum of their designated batch weights When a blended cement is used, the percentages of cement and SCM used for calculating batch weights shall be based on the percentage of SCM indicated in the Certificate of Compliance from the blended cement supplier; and C. Water shall be within 1.5 percent of its designated weight or volume. Each scale graduation shall be approximately 0.001 of the total capacity of the scale. The capacity of scales for weighing cement, SCM, or cement plus SCM and aggregates shall not exceed that of commercially available scales having single graduations indicating a weight not exceeding the maximum permissible weight variation above, except that no scale shall be required having a capacity of less than 1,000 pounds, with one pound graduations. 90-5.03 PROPORTIONING Proportioning shall consist of dividing the aggregates into the specified sizes, each stored in a separate bin, and combining them with cementitious material and water as provided in these specifications. Aggregates shall be proportioned by weight. At the time of batching, aggregates shall have been dried or drained sufficiently to result in a stable moisture content such that no visible separation of water from aggregate will take place during transportation from the proportioning plant to the point of mixing. In no event shall the free moisture content of the fine aggregate at the time of batching exceed 8 percent of its saturated, surface-dry weight. Should separate supplies of aggregate material of the same size group, but of different moisture content or specific gravity or surface characteristics affecting workability, be available at the proportioning plant, withdrawals shall be made from one supply exclusively and the materials therein completely exhausted before starting upon another. Bulk Type IP MS) or Type IS MS) cement shall be weighed in an individual hopper and shall be kept separate from the aggregates until the ingredients are released for discharge into the mixer. Bulk cement and SCM may be weighed in separate, individual weigh hoppers or may be weighed in the same weigh hopper and shall be kept separate from the aggregates until the Book One- State Route 68 at San Benancio Road Intersection Improvements 333 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??V??ingredients are released for discharge into the mixer. If the cement and SCM are weighed cumulatively, the cement shall be weighed first. If cement and SCM are weighed in separate weigh hoppers, the weigh systems for the proportioning of the aggregate, the cement, and the SCM shall be individual and distinct from all other weigh systems. Each weigh system shall be equipped with a hopper, a lever system, and an indicator to constitute an individual and independent material-weighing device. The cement and the SCM shall be discharged into the mixer simultaneously with the aggregate. The scales and weigh hoppers for bulk weighing cement, SCM, or cement plus SCM shall be separate and distinct from the aggregate weighing equipment. For batches of one cubic yard or more, the batching equipment shall conform to one of the following combinations: A. Separate boxes and separate scale and indicator for weighing each size of aggregate. B. Single box and scale indicator for all aggregates. C. Single box or separate boxes and automatic weighing mechanism for all aggregates. In order to check the accuracy of batch weights, the gross weight and tare weight of batch trucks, truck mixers, truck agitators, and non-agitating hauling equipment shall be determined when ordered by the Engineer. The equipment shall be weighed on scales designated by the Engineer. 90-5.03A Proportioning For Pavement Aggregates and bulk SCM for use in pavement shall be proportioned by weight by means of automatic proportioning devices of approved type conforming to these specifications. The Contractor shall install and maintain in operating condition an electronically actuated moisture meter that will indicate, on a readily visible scale, changes in the moisture content of thefine aggregate as it is batched within a sensitivity of 0.5 percent by weight of the fine aggregate. The batching of cement, SCM, or cement plus SCM and aggregate shall be interlocked so that a new batch cannot be started until all weigh hoppers are empty, the proportioning devices are within zero tolerance, and the discharge gates are closed. The interlock shall permit no part of the batch to be discharged until all aggregate hoppers and the cement and SCM hoppers or the cement plus SCM hopper are charged with weights that are within the tolerances specified in Section 90-5.02, Proportioning Devices." If interlocks are required for cement and SCM charging mechanisms and cement and SCM are weighed cumulatively, their charging mechanisms shall be interlocked to prevent the introduction of SCM until the weight of cement in the cement weigh hopper is within the tolerances specified in Section 90-5.02, Proportioning Devices." If concrete is completely mixed in stationary paving mixers, the SCMs shall be weighed in a separate weigh hopper and the SCM and cement shall be introduced simultaneously into the mixer proportionately with the aggregate. If the Contractor provides certification that the stationary mixer is capable of mixing the cement, SCM, aggregates, and water uniformly before discharge, weighing the SCM cumulatively with the cement is permitted. Certification shall contain the following: A. Test results for 2 compressive strength test cylinders of concrete taken within the first one-third and 2 compressive strength test cylinders of concrete taken within the last one- third of the concrete discharged from a single batch from the stationary paving mixer. Strength tests and cylinder preparation will be in conformance with the provisions of Section 90-9, Compressive Strength"; Book One- State Route 68 at San Benancio Road Intersection Improvements 334 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??W??B. Calculations demonstrating that the difference in the averages of 2 compressive strengths taken in the first one-third is no greater than 7.5 percent different than the averages of 2 compressive strengths taken in the last one-third of the concrete discharged from a single batch from the stationary paving mixer. Strength tests and cylinder preparation will be in conformance with the provisions of Section 90-9, Compressive Strength;" and C. The mixer rotation speed and time of mixing before discharge that are required to produce a mix that meets the requirements above. The discharge gate on the cement and SCM hoppers or the cement plus SCM hopper shall be designed to permit regulating the flow of cement, SCM, or cement plus SCM into the aggregate as directed by the Engineer. If separate weigh boxes are used for each size of aggregate, the discharge gates shall permit regulating the flow of each size of aggregate as directed by the Engineer. Material discharged from the several bins shall be controlled by gates or by mechanical conveyors. The means of withdrawal from the several bins, and of discharge from the weigh box, shall be interlocked so that not more than one bin can discharge at a time, and so that the weigh box cannot be tripped until the required quantity from each of the several bins has been deposited therein. Should a separate weigh box be used for each size of aggregate, all may be operated and discharged simultaneously. If the discharge from the several bins is controlled by gates, each gate shall be actuated automatically so that the required mass is discharged into the weigh box, after which the gate shall automatically close and lock. The automatic weighing system shall be designed so that all proportions required may be set on the weighing controller at the same time. 90-6 MIXING AND TRANSPORTING 90-6.01 GENERAL Concrete shall be mixed in mechanically operated mixers, except that when permitted by the Engineer, batches not exceeding 1/3 cubic yard may be mixed by hand methods in conformance with the provisions in Section 90-6.05, Hand-Mixing." Equipment having components made of aluminum or magnesium alloys that would have contact with plastic concrete during mixing, transporting, or pumping of portland cement concrete shall not be used. Concrete shall be homogeneous and thoroughly mixed, and there shall be no lumps or evidence of undispersed cementitious material. Uniformity of concrete mixtures will be determined by differences in penetration as determined by California Test 533, or slump as determined by ASTM Designation: C 143, and by variations in the proportion of coarse aggregate as determined by California Test 529. When the mix design specifies a penetration value, the difference in penetration, determined by comparing penetration tests on 2 samples of mixed concrete from the same batch or truck mixer load, shall not exceed 1/2 inch. When the mix design specifies a slump value, the difference in slump, determined by comparing slump tests on 2 samples of mixed concrete from the same batch or truck mixer load, shall not exceed the values given in the table below. Variation in the proportion of coarse aggregate will be determined by comparing the results of tests of 2 samples of mixed concrete from the same batch or truck mixer load and the difference between the 2 results shall not exceed 170 pounds per cubic yard of concrete. Book One- State Route 68 at San Benancio Road Intersection Improvements 335 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??X??Average Slump Maximum Permissible Difference Less than 4" 1" 4" to 6" 1-1/2" Greater than 6" to 9" 2" The Contractor shall furnish samples of the freshly mixed concrete and provide satisfactory facilities for obtaining the samples. 90-6.02 MACHINE MIXING Concrete mixers may be of the revolving drum or the revolving blade type, and the mixing drum or blades shall be operated uniformly at the mixing speed recommended by the manufacturer. Mixers and agitators that have an accumulation of hard concrete or mortar shall not be used. The temperature of mixed concrete, immediately before placing, shall be not less than 50 F or more than 90 F. Aggregates and water shall be heated or cooled as necessary to produce concrete within these temperature limits. Neither aggregates nor mixing water shall be heated to exceed 150 F. If ice is used to cool the concrete, discharge of the mixer will not be permitted until all ice is melted. The batch shall be so charged into the mixer that some water will enter in advance of cementitious materials and aggregates. All water shall be in the drum by the end of the first one- fourth of the specified mixing time. Cementitious materials shall be batched and charged into the mixer by means that will not result either in loss of cementitious materials due to the effect of wind, in accumulation of cementitious materials on surfaces of conveyors or hoppers, or in other conditions that reduce or vary the required quantity of cementitious material in the concrete mixture. Paving and stationary mixers shall be operated with an automatic timing device. The timing device and discharge mechanism shall be interlocked so that during normal operation no part of the batch will be discharged until the specified mixing time has elapsed. The total elapsed time between the intermingling of damp aggregates and all cementitious materials and the start of mixing shall not exceed 30 minutes. The size of batch shall not exceed the manufacturer's guaranteed capacity. When producing concrete for pavement or base, suitable batch counters shall be installed and maintained in good operating condition at job site batching plants and stationary mixers. The batch counters shall indicate the exact number of batches proportioned and mixed. Concrete shall be mixed and delivered to the job site by means of one of the following combinations of operations: A. Mixed completely in a stationary mixer and the mixed concrete transported to the point of delivery in truck agitators or in nonagitating hauling equipment central-mixed concrete). B. Mixed partially in a stationary mixer, and the mixing completed in a truck mixer shrink- mixed concrete). C. Mixed completely in a truck mixer transit-mixed concrete). D. Mixed completely in a paving mixer. Agitators may be truck mixers operating at agitating speed or truck agitators. Each mixer and agitator shall have attached thereto in a prominent place a metal plate or plates on which is plainly marked the various uses for which the equipment is designed, the manufacturer's guaranteed capacity of the drum or container in terms of the volume of mixed concrete and the speed of rotation of the mixing drum or blades. Book One- State Route 68 at San Benancio Road Intersection Improvements 336 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Y??Truck mixers shall be equipped with electrically or mechanically actuated revolution counters by which the number of revolutions of the drum or blades may readily be verified. When shrink-mixed concrete is furnished, concrete that has been partially mixed at a central plant shall be transferred to a truck mixer and all requirements for transit-mixed concrete shall apply. No credit in the number of revolutions at mixing speed will be allowed for partial mixing in a central plant. 90-6.03 TRANSPORTING MIXED CONCRETE Mixed concrete may be transported to the delivery point in truck agitators or truck mixers operating at the speed designated by the manufacturer of the equipment as agitating speed, or in non-agitating hauling equipment, provided the consistency and workability of the mixed concrete upon discharge at the delivery point is suitable for adequate placement and consolidation in place, and provided the mixed concrete after hauling to the delivery point conforms to the provisions in Section 90-6.01, General." Truck agitators shall be loaded not to exceed the manufacturer's guaranteed capacity and shall maintain the mixed concrete in a thoroughly mixed and uniform mass during hauling. Bodies of nonagitating hauling equipment shall be constructed so that leakage of the concrete mix, or any part thereof, will not occur at any time. Concrete hauled in open-top vehicles shall be protected during hauling against rain or against exposure to the sun for more than 20 minutes when the ambient temperature exceeds 75 F. No additional mixing water shall be incorporated into the concrete during hauling or after arrival at the delivery point. The rate of discharge of mixed concrete from truck mixer-agitators shall be controlled by the speed of rotation of the drum in the discharge direction with the discharge gate fully open. If a truck mixer or agitator is used for transporting concrete to the delivery point, discharge shall be completed within 1.5 hours or before 250 revolutions of the drum or blades, whichever occurs first, after the introduction of the cement to the aggregates. Under conditions contributing to quick stiffening of the concrete, or if the temperature of the concrete is 85 F or above, the time allowed may be less than 1.5 hours. If an admixture is used to retard the set time, the temperature of the concrete shall not exceed 85 F, the time limit shall be 2 hours, and the revolution limitation shall be 300. If nonagitating hauling equipment is used for transporting concrete to the delivery point, discharge shall be completed within one hour after the addition of the cement to the aggregates. Under conditions contributing to quick stiffening of the concrete, or when the temperature of the concrete is 85 F or above, the time between the introduction of cement to the aggregates and discharge shall not exceed 45 minutes. Each load of concrete delivered at the job site shall be accompanied by a weighmaster certificate showing the mix identification number, nonrepeating load number, date and time at which the materials were batched, the total amount of water added to the load, and for transit- mixed concrete, the reading of the revolution counter at the time the truck mixer is charged with cement. This weighmaster certificate shall also show the actual scale weights pounds) for the ingredients batched. Theoretical or target batch weights shall not be used as a substitute for actual scale weights. Weighmaster certificates shall be provided in printed form, or if approved by the Engineer, the data may be submitted in electronic media. Electronic media shall be presented in a tab- delimited format on a CD or DVD. Captured data, for the ingredients represented by each batch shall be line feed, carriage return" LFCR) and one line, separate record" with allowances for sufficient fields to satisfy the amount of data required by these specifications. The Contractor may furnish a weighmaster certificate accompanied by a separate certificate that lists the actual batch weights or measurements for a load of concrete provided that both Book One- State Route 68 at San Benancio Road Intersection Improvements 337 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Z??certificates are imprinted with the same nonrepeating load number that is unique to the contract and delivered to the jobsite with the load. Weighmaster certificates furnished by the Contractor shall conform to the provisions in Section 9-1.01, Measurement of Quantities." 90-6.04 TIME OR AMOUNT OF MIXING Mixing of concrete in paving or stationary mixers shall continue for the required mixing time after all ingredients, except water and admixture, if added with the water, are in the mixing compartment of the mixer before any part of the batch is released. Transfer time in multiple drum mixers shall not be counted as part of the required mixing time. The required mixing time, in paving or stationary mixers, of concrete used for concrete structures, except minor structures, shall be not less than 90 seconds or more than 5 minutes, except that when directed by the Engineer in writing, the requirements of the following paragraph shall apply. The required mixing time, in paving or stationary mixers, except as provided in the preceding paragraph, shall be not less than 50 seconds or more than 5 minutes. The minimum required revolutions at the mixing speed for transit-mixed concrete shall not be less than that recommended by the mixer manufacturer, but in no case shall the number of revolutions be less than that required to consistently produce concrete conforming to the provisions for uniformity in Section 90-6.01, General." When a high range water-reducing admixture is added to the concrete at the job site, the total number of revolutions shall not exceed 300. 90-6.05 HAND-MIXING Hand-mixed concrete shall be made in batches of not more than 1/3 cubic yard and shall be mixed on a watertight, level platform. The proper amount of coarse aggregate shall be measured in measuring boxes and spread on the platform and the fine aggregate shall be spread on this layer, the 2 layers being not more than one foot in total depth. On this mixture shall be spread the dry cementitious materials and the whole mass turned no fewer than 2 times dry; then sufficient clean water shall be added, evenly distributed, and the whole mass again turned no fewer than 3 times, not including placing in the carriers or forms. 90-6.06 AMOUNT OF WATER AND PENETRATION The amount of water used in concrete mixes shall be regulated so that the penetration of the concrete as determined by California Test 533 or the slump of the concrete as determined by ASTM Designation: C 143 is within the nominal values shown in the following table. When the penetration or slump of the concrete is found to exceed the nominal values listed, the mixture of subsequent batches shall be adjusted to reduce the penetration or slump to a value within the nominal range shown. Batches of concrete with a penetration or slump exceeding the maximum values listed shall not be used in the work. If Type F or Type G chemical admixtures are added to the mix, the penetration requirements shall not apply and the slump shall not exceed 9 inches after the chemical admixtures are added. Book One- State Route 68 at San Benancio Road Intersection Improvements 338 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??[??Type of Work Nominal Maximum Penetration inches) Slump inches) Penetration inches) Slump inches) Concrete Pavement 0-1 1-1/2 Non-reinforced concrete facilities 0 1-1/2 2 Reinforced concrete structures Sections over 12 inches thick Sections 12 inches thick or less 0 1-1/2 0-2 2-1/2 3 Concrete placed under water 6-8 9 Cast-in-place concrete piles 2-1/2 3-1/2 5-7 4 8 The amount of free water used in concrete shall not exceed 310 pounds per cubic yard, plus 20 pounds for each required 100 pounds of cementitious material in excess of 550 pounds per cubic yard. The term free water is defined as the total water in the mixture minus the water absorbed by the aggregates in reaching a saturated surface-dry condition. If there are adverse or difficult conditions that affect the placing of concrete, the above specified penetration and free water content limitations may be exceeded providing the Contractor is granted permission by the Engineer in writing to increase the cementitious material content per cubic yard of concrete. The increase in water and cementitious material shall be at a ratio not to exceed 30 pounds of water per added 100 pounds of cementitious material per cubic yard. Full compensation for additional cementitious material and water added under these conditions shall be considered as included in the contract price paid for the concrete work involved and no additional compensation will be allowed therefor. The equipment for supplying water to the mixer shall be constructed and arranged so that the amount of water added can be measured accurately. Any method of discharging water into the mixer for a batch shall be accurate within 1.5 percent of the quantity of water required to be added to the mix for any position of the mixer. Tanks used to measure water shall be designed so that water cannot enter while water is being discharged into the mixer and discharge into the mixer shall be made rapidly in one operation without dribbling. All equipment shall be arranged so as to permit checking the amount of water delivered by discharging into measured containers. 90-7 CURING CONCRETE 90-7.01 METHODS OF CURING Newly placed concrete shall be cured by the methods specified in this Section 90-7.01 and the special provisions. 90-7.01A Water Method The concrete shall be kept continuously wet by the application of water for a minimum curing period of 7 days after the concrete has been placed. Cotton mats, rugs, carpets, or earth or sand blankets may be used as a curing medium to retain the moisture during the curing period. If a curing medium consisting of cotton mats, rugs, carpets, polyethylene sheeting, polyethylene sheeting on burlap, or earth or sand blankets is to be used to retain the moisture, the entire surface of the concrete shall be kept damp by applying water with a nozzle that so atomizes the flow that a mist and not a spray is formed, until the surface of the concrete is covered with the curing medium. The moisture from the nozzle shall not be applied under pressure directly upon the concrete and shall not be allowed to accumulate on the concrete in a quantity sufficient to cause a flow or wash the surface. At the expiration of the curing period, the concrete surfaces shall be cleared of all curing media. Book One- State Route 68 at San Benancio Road Intersection Improvements 339 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??\??At the option of the Contractor, a curing medium consisting of white opaque polyethylene sheeting extruded onto burlap may be used to cure concrete structures. The polyethylene sheeting shall have a minimum thickness of 4-mil, and shall be extruded onto 10-ounce burlap. At the option of the Contractor, a curing medium consisting of polyethylene sheeting may be used to cure concrete columns. The polyethylene sheeting shall have a minimum thickness of 10-mil achieved in a single layer of material. If the Contractor chooses to use polyethylene sheeting or polyethylene sheeting on burlap as a curing medium, these media and any joints therein shall be secured as necessary to provide moisture retention and shall be within 3 inches of the concrete at all points along the surface being cured. When these media are used, the temperature of the concrete shall be monitored during curing. If the temperature of the concrete cannot be maintained below 140? F, use of these curing media shall be disallowed. When concrete bridge decks and flat slabs are to be cured without the use of a curing medium, the entire surface of the bridge deck or slab shall be kept damp by the application of water with an atomizing nozzle as specified above, until the concrete has set, after which the entire surface of the concrete shall be sprinkled continuously with water for a period of not less than 7 days. 90-7.01B Curing Compound Method Surfaces of the concrete that are exposed to the air shall be sprayed uniformly with a curing compound. Curing compounds to be used shall be as follows: 1. Pigmented curing compound conforming to the requirements in ASTM Designation: C 309, Type 2, Class B, except the resin type shall be poly-alpha-methylstyrene. 2. Pigmented curing compound conforming to the requirements in ASTM Designation: C 309, Type 2, Class B. 3. Pigmented curing compound conforming to the requirements in ASTM Designation: C 309, Type 2, Class A. 4. Nonpigmented curing compound conforming to the requirements in ASTM Designation: C 309, Type 1, Class B. 5. Nonpigmented curing compound conforming to the requirements in ASTM Designation: C 309, Type 1, Class A. 6. Nonpigmented curing compound with fugitive dye conforming to the requirements in ASTM Designation: C 309, Type 1-D, Class A. The infrared scan for the dried vehicle from curing compound 1) shall match the infrared scan on file at the Transportation Laboratory. The loss of water for each type of curing compound, when tested in conformance with the requirements in California Test 534, shall not be more than 0.28 pounds per square yard in 24 hours. The curing compound to be used will be specified elsewhere in these specifications or in the special provisions. If the use of curing compound is required or permitted elsewhere in these specifications or in the special provisions and no specific kind is specified, any of the curing compounds listed above may be used. Curing compound shall be applied at a nominal rate of one gallon per 150 square feet, unless otherwise specified. At any point, the application rate shall be within 50 square feet per gallon of the nominal rate specified, and the average application rate shall be within 25 square feet per gallon of the Book One- State Route 68 at San Benancio Road Intersection Improvements 340 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??]??nominal rate specified when tested in conformance with the requirements in California Test 535. Runs, sags, thin areas, skips, or holidays in the applied curing compound shall be evidence that the application is not satisfactory. Curing compounds shall be applied using power operated spray equipment. The power operated spraying equipment shall be equipped with an operational pressure gage and a means of controlling the pressure. Hand spraying of small and irregular areas that are not reasonably accessible to mechanical spraying equipment, in the opinion of the Engineer, may be permitted. The curing compound shall be applied to the concrete following the surface finishing operation, immediately before the moisture sheen disappears from the surface, but before any drying shrinkage or craze cracks begin to appear. In the event of any drying or cracking of the surface, application of water with an atomizing nozzle as specified in Section 90-7.01A, Water Method," shall be started immediately and shall be continued until application of the compound is resumed or started; however, the compound shall not be applied over any resulting freestanding water. Should the film of compound be damaged from any cause before the expiration of 7 days after the concrete is placed in the case of structures and 72 hours in the case of pavement, the damaged portion shall be repaired immediately with additional compound. At the time of use, compounds containing pigments shall be in a thoroughly mixed condition with the pigment uniformly dispersed throughout the vehicle. A paddle shall be used to loosen all settled pigment from the bottom of the container, and a power driven agitator shall be used to disperse the pigment uniformly throughout the vehicle. Agitation shall not introduce air or other foreign substance into the curing compound. The manufacturer shall include in the curing compound the necessary additives for control of sagging, pigment settling, leveling, de-emulsification, or other requisite qualities of a satisfactory working material. Pigmented curing compounds shall be manufactured so that the pigment does not settle badly, does not cake or thicken in the container, and does not become granular or curdled. Settlement of pigment shall be a thoroughly wetted, soft, mushy mass permitting the complete and easy vertical penetration of a paddle. Settled pigment shall be easily redispersed, with minimum resistance to the sideways manual motion of the paddle across the bottom of the container, to form a smooth uniform product of the proper consistency. Curing compounds shall remain sprayable at temperatures above 40 F and shall not be diluted or altered after manufacture. The curing compound shall be packaged in clean 274-gallon totes, 55-gallon barrels or 5- gallon pails shall be supplied from a suitable storage tank located at the jobsite. The containers shall comply with Title 49, Code of Federal Regulations, Hazardous Materials Regulations." The 274-gallon totes and the 55-gallon barrels shall have removable lids and airtight fasteners. The 5-gallon pails shall be round and have standard full open head and bail. Lids with bungholes will not be permitted. Settling or separation of solids in containers, except tanks, must be completely redispersed with low speed mixing prior to use, in conformance with these specifications and the manufacturer's recommendations. Mixing shall be accomplished either manually by use of a paddle or by use of a mixing blade driven by a drill motor, at low speed. Mixing blades shall be the type used for mixing paint. On-site storage tanks shall be kept clean and free of contaminants. Each tank shall have a permanent system designed to completely redisperse settled material without introducing air or other foreign substances. Steel containers and lids shall be lined with a coating that will prevent destructive action by the compound or chemical agents in the air space above the compound. The coating shall not come off the container or lid as skins. Containers shall be filled in a manner that will prevent skinning. Plastic containers shall not react with the compound. Each container shall be labeled with the manufacturer's name, kind of curing compound, batch number, volume, date of manufacture, and volatile organic compound VOC) content. The label shall also warn that the curing compound containing pigment shall be well stirred before Book One- State Route 68 at San Benancio Road Intersection Improvements 341 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??^??use. Precautions concerning the handling and the application of curing compound shall be shown on the label of the curing compound containers in conformance with the Construction Safety Orders and General Industry Safety Orders of the State. Containers of curing compound shall be labeled to indicate that the contents fully comply with the rules and regulations concerning air pollution control in the State. When the curing compound is shipped in tanks or tank trucks, a shipping invoice shall accompany each load. The invoice shall contain the same information as that required herein for container labels. Curing compound will be sampled by the Engineer at the source of supply, at the job site, or at both locations. Curing compound shall be formulated so as to maintain the specified properties for a minimum of one year. The Engineer may require additional testing before use to determine compliance with these specifications if the compound has not been used within one year or whenever the Engineer has reason to believe the compound is no longer satisfactory. Tests will be conducted in conformance with the latest ASTM test methods and methods in use by the Transportation Laboratory. 90-7.01C Waterproof Membrane Method The exposed finished surfaces of concrete shall be sprayed with water, using a nozzle that so atomizes the flow that a mist and not a spray is formed, until the concrete has set, after which the curing membrane, shall be placed. The curing membrane shall remain in place for a period of not less than 72 hours. Sheeting material for curing concrete shall conform to the requirements in AASHTO Designation: M 171 for white reflective materials. The sheeting material shall be fabricated into sheets of such width as to provide a complete cover for the entire concrete surface. Joints in the sheets shall be securely cemented together in such a manner as to provide a waterproof joint. The joint seams shall have a minimum lap of 0.33 foot. The sheets shall be securely weighted down by placing a bank of earth on the edges of the sheets or by other means satisfactory to the Engineer. Should any portion of the sheets be broken or damaged before the expiration of 72 hours after being placed, the broken or damaged portions shall be immediately repaired with new sheets properly cemented into place. Sections of membrane that have lost their waterproof qualities or have been damaged to such an extent as to render them unfit for curing the concrete shall not be used. 90-7.01D Forms-In-Place Method Formed surfaces of concrete may be cured by retaining the forms in place. The forms shall remain in place for a minimum period of 7 days after the concrete has been placed, except that for members over 20 inches in least dimension the forms shall remain in place for a minimum period of 5 days. Joints in the forms and the joints between the end of forms and concrete shall be kept moisture tight during the curing period. Cracks in the forms and cracks between the forms and the concrete shall be resealed by methods subject to the approval of the Engineer. 90-7.02 BLANK Book One- State Route 68 at San Benancio Road Intersection Improvements 342 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??_??90-7.03 CURING STRUCTURES Newly placed concrete for cast-in-place structures, other than highway bridge decks, shall be cured by the water method, the forms-in-place method, or, as permitted herein, by the curing compound method, in conformance with the provisions in Section 90-7.01, Methods of Curing." The curing compound method using a pigmented curing compound may be used on concrete surfaces of construction joints, surfaces that are to be buried underground, and surfaces where only ordinary surface finish is to be applied and on which a uniform color is not required and that will not be visible from a public traveled way. If the Contractor elects to use the curing compound method on the bottom slab of box girder spans, the curing compound shall be curing compound 1). The top surface of highway bridge decks shall be cured by both the curing compound method and the water method. The curing compound shall be curing compound 1). Concrete surfaces of minor structures, as defined in Section 51-1.02, Minor Structures," shall be cured by the water method, the forms-in-place method or the curing compound method. When deemed necessary by the Engineer during periods of hot weather, water shall be applied to concrete surfaces being cured by the curing compound method or by the forms-in- place method, until the Engineer determines that a cooling effect is no longer required. Application of water for this purpose will be paid for as extra work as provided in Section 4- 1.03D, Extra Work." 90-7.04 CURING PRECAST CONCRETE MEMBERS Precast concrete members shall be cured in conformance with any of the methods specified in Section 90-7.01, Methods of Curing." Curing shall be provided for the minimum time specified for each method or until the concrete reaches its design strength, whichever is less. Steam curing may also be used for precast members and shall conform to the following provisions: A. After placement of the concrete, members shall be held for a minimum 4-hour presteaming period. If the ambient air temperature is below 50 OF, steam shall be applied during the presteaming period to hold the air surrounding the member at a temperature between 50 OF and 90 OF. B. To prevent moisture loss on exposed surfaces during the presteaming period, members shall be covered as soon as possible after casting or the exposed surfaces shall be kept wet by fog spray or wet blankets. C. Enclosures for steam curing shall allow free circulation of steam about the member and shall be constructed to contain the live steam with a minimum moisture loss. The use of tarpaulins or similar flexible covers will be permitted, provided they are kept in good repair and secured in such a manner as to prevent the loss of steam and moisture. D. Steam at the jets shall be at low pressure and in a saturated condition. Steam jets shall not impinge directly on the concrete, test cylinders, or forms. During application of the steam, the temperature rise within the enclosure shall not exceed 40 OF per hour. The curing temperature throughout the enclosure shall not exceed 150 OF and shall be maintained at a constant level for a sufficient time necessary to develop the required transfer strength. Control cylinders shall be covered to prevent moisture loss and shall be placed in a location where temperature is representative of the average temperature of the enclosure. E. Temperature recording devices that will provide an accurate, continuous, permanent record of the curing temperature shall be provided. A minimum of one temperature recording device per 200 feet of continuous bed length will be required for checking temperature. Book One- State Route 68 at San Benancio Road Intersection Improvements 343 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??`??F. Members in pretension beds shall be detensioned immediately after the termination of steam curing while the concrete and forms are still warm, or the temperature under the enclosure shall be maintained above 60 F until the stress is transferred to the concrete. G. Curing of precast concrete will be considered completed after termination of the steam curing cycle. 90-7.05 CURING PRECAST PRESTRESSED CONCRETE PILES Newly placed concrete for precast prestressed concrete piles shall be cured in conformance with the provisions in Section 90-7.04, Curing Precast Concrete Members," except that piles in a corrosive environment shall be cured as follows: A. Piles shall be either steam cured or water cured. If water curing is used, the piles shall be kept continuously wet by the application of water in conformance with the provisions in Section 90-7.01A, Water Method." B. If steam curing is used, the steam curing provisions in Section 90-7.04, Curing Precast Concrete Members," shall apply except that the piles shall be kept continuously wet for their entire length for a period of not less than 3 days, including the holding and steam curing periods. 90-7.06 CURING SLOPE PROTECTION Concrete slope protection shall be cured in conformance with any of the methods specified in Section 90-7.01, Methods of Curing." Concreted-rock slope protection shall be cured in conformance with any of the methods specified in Section 90-7.01, Methods of Curing," with a blanket of earth kept wet for 72 hours, or by sprinkling with a fine spray of water every 2 hours during the daytime for a period of 3 days. 90-7.07 CURING MISCELLANEOUS CONCRETE WORK Exposed surfaces of curbs shall be cured by pigmented curing compounds as specified in Section 90-7.01B, Curing Compound Method." Concrete sidewalks, gutter depressions, island paving, curb ramps, driveways, and other miscellaneous concrete areas shall be cured in conformance with any of the methods specified in Section 90-7.01, Methods of Curing." Shotcrete shall be cured for at least 72 hours by spraying with water, by a moist earth blanket, or by any of the methods provided in Section 90-7.01, Methods of Curing." Mortar and grout shall be cured by keeping the surface damp for 3 days. After placing, the exposed surfaces of sign structure foundations, including pedestal portions, if constructed, shall be cured for at least 72 hours by spraying with water, by a moist earth blanket, or by any of the methods provided in Section 90-7.01, Methods of Curing." 90-8 PROTECTING CONCRETE 90-8.01 GENERAL In addition to the provisions in Section 7-1.16, Contractor's Responsibility for the Work and Materials," the Contractor shall protect concrete as provided in this Section 90-8. If required by the Engineer, the Contractor shall submit a written outline of the proposed methods for protecting the concrete. The Contractor shall protect concrete from damage from any cause, which shall include, but not be limited to: rain, heat, cold, wind, Contractor's actions, and actions of others. Concrete shall not be placed on frozen or ice-coated ground or subgrade nor on ice-coated forms, reinforcing steel, structural steel, conduits, precast members, or construction joints. Book One- State Route 68 at San Benancio Road Intersection Improvements 344 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??a??Under rainy conditions, placing of concrete shall be stopped before the quantity of surface water is sufficient to damage surface mortar or cause a flow or wash of the concrete surface, unless the Contractor provides adequate protection against damage. Concrete that has been frozen or damaged by other causes, as determined by the Engineer, shall be removed and replaced by the Contractor at the Contractor's expense. 90-8.02 PROTECTING CONCRETE STRUCTURES Structure concrete and shotcrete used as structure concrete shall be maintained at a temperature of not less than 45 F for 72 hours after placing and at not less than 40 F for an additional 4 days. 90-9 COMPRESSIVE STRENGTH 90-9.01 GENERAL Concrete compressive strength requirements consist of a minimum strength that shall be attained before various loads or stresses are applied to the concrete and, for concrete designated bycompressive strength, a minimum strength at the age of 28 days or at the age otherwise allowed in Section 90-1.01, Description." The various strengths required are specified in these specifications or the special provisions or are shown on the plans. The compressive strength of concrete will be determined from test cylinders that have been fabricated from concrete sampled in conformance with the requirements of California Test 539. Test cylinders will be molded and initially field cured in conformance with California Test 540. Test cylinders will be cured and tested after receipt at the testing laboratory in conformance with the requirements of California Test 521. A strength test shall consist of the average strength of 2 cylinders fabricated from material taken from a single load of concrete, except that, if any cylinder should show evidence of improper sampling, molding, or testing, that cylinder shall be discarded and the strength test shall consist of the strength of the remaining cylinder. When concrete compressive strength is specified as a prerequisite to applying loads or stresses to a concrete structure or member, test cylinders for other than steam cured concrete will be cured in conformance with Method 1 of California Test 540. The compressive strength of concrete determined for these purposes will be evaluated on the basis of individual tests. When concrete is designated by compressive strength rather than by cementitious material content, the concrete strength to be used as a basis for acceptance of other than steam cured concrete will be determined from cylinders cured in conformance with Method 1 of California Test 540. If the result of a single compressive strength test at the maximum age specified or allowed is below the specified strength but is 95 percent or more of the specified strength, the Contractor shall make corrective changes, subject to approval of the Engineer, in the mix proportions or in the concrete fabrication procedures, before placing additional concrete, and shall pay to the State $10 for each in-place cubic yard of concrete represented by the deficient test. If the result of a single compressive strength test at the maximum age specified or allowed is below 95 percent of the specified strength, but is 85 percent or more of the specified strength, the Contractor shall make the corrective changes specified above, and shall pay to the State $15 for each in-place cubic yard of concrete represented by the deficient test. In addition, such corrective changes shall be made when the compressive strength of concrete tested at 7 days indicates, in the judgment of the Engineer, that the concrete will not attain the required compressive strength at the maximum age specified or allowed. Concrete represented by a single test that indicates a compressive strength of less than 85 percent of the specified 28-day compressive strength will be rejected in conformance with the provisions in Section 6-1.04, Defective Materials." If the test result indicates that the compressive strength at the maximum age specified or allowed is below the specified strength, but is 85 percent or more of the specified strength, Book One- State Route 68 at San Benancio Road Intersection Improvements 345 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??b??payments to the State as required above shall be made, unless the Contractor, at the Contractor's expense, obtains and submits evidence acceptable to the Engineer that the strength of the concrete placed in the work meets or exceeds the specified 28-day compressive strength. If the test result indicates a compressive strength at the maximum age specified or allowed below 85 percent, the concrete represented by that test will be rejected, unless the Contractor, at the Contractor's expense, obtains and submits evidence acceptable to the Engineer that the strength and quality of the concrete placed in the work are acceptable. If the evidence consists of tests made on cores taken from the work, the cores shall be obtained and tested in conformance with the requirements in ASTM Designation: C 42. No single compressive strength test shall represent more than 320 cubic yards. If a precast concrete member is steam cured, the compressive strength of the concrete will be determined from test cylinders that have been handled and stored in conformance with Method 3 of California Test 540. The compressive strength of steam cured concrete will be evaluated on the basis of individual tests representing specific portions of production. If the concrete is designated by 28-day compressive strength rather than by cementitious material content, the concrete shall be considered to be acceptable whenever its compressive strength reaches the specified 28-day compressive strength provided that strength is reached in not more than the maximum number of days specified or allowed after the member is cast. When concrete is specified by compressive strength, prequalification of materials, mix proportions, mixing equipment, and procedures proposed for use will be required prior to placement of the concrete. Prequalification shall be accomplished by the submission of acceptable certified test data or trial batch reports by the Contractor. Prequalification data shall be based on the use of materials, mix proportions, mixing equipment, procedures, and size of batch proposed for use in the work. Certified test data, in order to be acceptable, shall indicate that not less than 90 percent of at least 20 consecutive tests exceed the specified strength at the maximum number of days specified or allowed, and none of those tests are less than 95 percent of specified strength. Strength tests included in the data shall be the most recent tests made on concrete of the proposed mix design and all shall have been made within one year of the proposed use of the concrete. Trial batch test reports, in order to be acceptable, shall indicate that the average compressive strength of 5 consecutive concrete cylinders, taken from a single batch, at not more than 28 days or the maximum age allowed) after molding shall be at least 580 pounds per square inch greater than the specified 28-day compressive strength, and no individual cylinder shall have a strength less than the specified strength at the maximum age specified or allowed. Data contained in the report shall be from trial batches that were produced within one year of the proposed use of specified strength concrete in the project. Whenever air-entrainment is required, the air content of trial batches shall be equal to or greater than the air content specified for the concrete without reduction due to tolerances. Tests shall be performed in conformance with either the appropriate California Test methods or the comparable ASTM test methods. Equipment employed in testing shall be in good condition and shall be properly calibrated. If the tests are performed during the life of the contract, the Engineer shall be notified sufficiently in advance of performing the tests in order to witness the test procedures. The certified test data and trial batch test reports shall include the following information: A. Date of mixing. B. Mixing equipment and procedures used. C. The size of batch in cubic yards and the weight, type, and source of all ingredients used. D. Penetration or slump if the concrete will be placed under water or placed in cast-in-place concrete piles) of the concrete. Book One- State Route 68 at San Benancio Road Intersection Improvements 346 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??c??E. The air content of the concrete if an air-entraining admixture is used. F. The age at time of testing and strength of all concrete cylinders tested. Certified test data and trial batch test reports shall be signed by an official of the firm that performed the tests. When approved by the Engineer, concrete from trial batches may be used in the work at locations where concrete of a lower quality is required and the concrete will be paid for as the type of concrete required at that location. After materials, mix proportions, mixing equipment, and procedures for concrete have been prequalified for use, additional prequalification by testing of trial batches will be required prior to making changes that, in the judgment of the Engineer, could result in a strength of concrete below that specified. The Contractor's attention is directed to the time required to test trial batches and the Contractor shall be responsible for production of trial batches at a sufficiently early date so that the progress of the work is not delayed. When precast concrete members are manufactured at the plant of an established manufacturer of precast concrete members, the mix proportions of the concrete shall be determined by the Contractor, and a trial batch and prequalification of the materials, mix proportions, mixing equipment, and procedures will not be required. 90-10 MINOR CONCRETE 90-10.01 GENERAL Concrete for minor structures, slope paving, curbs, sidewalks and other concrete work, when designated as minor concrete on the plans, in the specifications, or in the contract item, shall conform to the provisions specified herein. The Engineer, at the Engineer's discretion, will inspect and test the facilities, materials and methods for producing the concrete to ensure that minor concrete of the quality suitable for use in the work is obtained. Before using minor concrete or in advance of revising the mix proportions, the Contractor shall submit in writing to the Engineer a copy of the mix design. When required by the following table, the Contractor shall include compressive strength test results verifying the minimum specified compressive strength: SCM Test Submittal Required Fly Ash used alone When portland cement content<350 lbs/cy GGBFS used alone When portland cement content 250 lbs/cy Natural Pozzolan used alone When portland cement content 350 lbs/c More than 1 SCM Always Tests shall be performed by an ACI certified technician. 90-10.02 MATERIALS Minor concrete shall conform to the following requirements: 90-10.02A Cementitious Material Cementitious material shall conform to the provisions in Section 90-1.01, Description," and 90-2, Materials." Book One- State Route 68 at San Benancio Road Intersection Improvements 347 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??d??90-10.02B Aggregate Aggregate shall be clean and free from deleterious coatings, clay balls, roots, and other extraneous materials. Use of crushed concrete or reclaimed aggregate is acceptable only if the aggregate satisfies all aggregate requirements. The Contractor shall submit to the Engineer for approval, a grading of the combined aggregate proposed for use in the minor concrete. After acceptance of the grading, aggregate furnished for minor concrete shall conform to that grading, unless a change is authorized in writing by the Engineer. The Engineer may require the Contractor to furnish periodic test reports of the aggregate grading furnished. The maximum size of aggregate used shall be at the option of the Contractor, but in no case shall the maximum size be larger than 1-1/2-inch or smaller than 3/4 inch. The Engineer may waive, in writing, the gradation requirements in this Section 90-10.02B, if, in the Engineer's opinion, the furnishing of the gradation is not necessary for the type or amount of concrete work to be constructed. 90-10.02C Water Water used for washing, mixing, and curing shall be free from oil, salts, and other impurities that would discolor or etch the surface or have an adverse affect on the quality of the concrete. 90-10.02D Admixtures The use of admixtures shall conform to the provisions in Section 90-4, Admixtures." 90-10.03 PRODUCTION Cementitious material, water, aggregate, and admixtures shall be stored, proportioned, mixed, transported, and discharged in conformance with recognized standards of good practice that will result in concrete that is thoroughly and uniformly mixed, that is suitable for the use intended, and that conforms to requirements specified herein. Recognized standards of good practice are outlined in various industry publications such as are issued by American Concrete Institute, AASHTO, or the Department. The cementitious material content of minor concrete shall conform to the provisions in Section 90-1.01, Description." The amount of water used shall result in a consistency of concrete conforming to the provisions in Section 90-6.06, Amount of Water and Penetration." Additional mixing water shall not be incorporated into the concrete during hauling or after arrival at the delivery point, unless authorized by the Engineer. Discharge of ready-mixed concrete from the transporting vehicle shall be made while the concrete is still plastic and before stiffening occurs. An elapsed time of 1.5 hours one hour in non-agitating hauling equipment), or more than 250 revolutions of the drum or blades, after the introduction of the cementitious material to the aggregates, or a temperature of concrete of more than 90 F will be considered conditions contributing to the quick stiffening of concrete. The Contractor shall take whatever action is necessary to eliminate quick stiffening, except that the addition of water will not be permitted. The required mixing time in stationary mixers shall be not less than 50 seconds or more than 5 minutes. The minimum required revolutions at mixing speed for transit-mixed concrete shall be not less than that recommended by the mixer manufacturer, and shall be increased, if necessary, to produce thoroughly and uniformly mixed concrete. When a high range water-reducing admixture is added to the concrete at the job site, the total number of revolutions shall not exceed 300. Book One- State Route 68 at San Benancio Road Intersection Improvements 348 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??e??Each load of ready-mixed concrete shall be accompanied by a weighmaster certificate that shall be delivered to the Engineer at the discharge location of the concrete, unless otherwise directed by the Engineer. The weighmaster certificate shall be clearly marked with the date and time of day when the load left the batching plant and, if hauled in truck mixers or agitators, the time the mixing cycle started. A Certificate of Compliance conforming to the provisions in Section 6-1.07, Certificates of Compliance," shall be furnished to the Engineer, prior to placing minor concrete from a source not previously used on the contract, stating that minor concrete to be furnished meets contract requirements, including minimum cementitious material content specified. 90-10.04 CURING MINOR CONCRETE Curing minor concrete shall conform to the provisions in Section 90-7, Curing Concrete." 90-10.05 PROTECTING MINOR CONCRETE Protecting minor concrete shall conform to the provisions in Section 90-8, Protecting Concrete," except the concrete shall be maintained at a temperature of not less than 40 F for 72 hours after placing. 90-10.06 MEASUREMENT AND PAYMENT Minor concrete will be measured and paid for in conformance with the provisions specified in the various sections of these specifications covering concrete construction when minor concrete is specified in the specifications, shown on the plans, or indicated by contract item in the Engineer's Estimate. 90-11 MEASUREMENT AND PAYMENT 90-11.01 MEASUREMENT Portland cement concrete will be measured in conformance with the provisions specified in the various sections of these specifications covering construction requiring concrete. For concrete measured at the mixer, the volume in cubic feet shall be computed as the total weight of the batch in pounds divided by the density of the concrete in pounds per cubic foot. The total weight of the batch shall be calculated as the sum of all materials, including water, entering the batch. The density of the concrete will be determined in conformance with the requirements in California Test 518. 90-11.02 PAYMENT Portland cement concrete will be paid for in conformance with the provisions specified in the various sections of these specifications covering construction requiring concrete. Full compensation for furnishing and incorporating admixtures required by these specifications or the special provisions will be considered as included in the contract prices paid for the concrete involved and no additional compensation will be allowed therefor. Should the Engineer order the Contractor to incorporate any admixtures in the concrete when their use is not required by these specifications or the special provisions, furnishing the admixtures and adding them to the concrete will be paid for as extra work as provided in Section 4-1.03D, Extra Work." Should the Contractor use admixtures in conformance with the provisions in Section 90-4.05, Optional Use of Chemical Admixtures," or Section 90-4.07, Optional Use of Air-entraining Admixtures," or should the Contractor request and obtain permission to use other admixtures for Book One- State Route 68 at San Benancio Road Intersection Improvements 349 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??f??the Contractor's benefit, the Contractor shall furnish those admixtures and incorporate them into the concrete at the Contractor's expense and no additional compensation will be allowed therefor. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 91 PAINT Issued 05-1-06) Replace Section 91-3 with: 91-3 PAINTS FOR TIMBER 91-3.01 WOOD PRIMER, LATEX-BASE Classification: This specification covers a ready-mixed priming paint for use on unpainted wood or exterior woodwork. It shall conform with the requirements in the Detailed Performance Standards of the Master Painters Institute MPI) for exterior wood primers, and be listed on the Exterior Latex Wood Primer MPI List Number 6. 91-3.02 PAINT; LATEX-BASE FOR EXTERIOR WOOD, WHITE AND TINTS Classification: This specification covers a ready-mixed paint for use on wood surfaces subject to outside exposures. This paint shall conform to the requirements in the Detailed Performance Standards of the Master Painters Institute MPI) for Paint, Latex, Exterior, and shall be listed on the following MPI Approved Products List: A. Exterior Latex, Flat MPI Gloss Level 1, MPI List Number 10. B. Exterior Latex, Semi-Gloss, MPI Gloss Level 5, MPI List Number 11. C. Exterior Latex, Gloss, MPI Gloss Level 6, MPI List Number 119. Unpainted wood shall first be primed with wood primer conforming to the provisions in Section 91-3.01, Wood Primer, Latex-Base." Replace Section 91-4 with: 91-4 MISCELLANEOUS PAINTS 91-4.01 THROUGH 91-4.04 BLANK) 91-4.05 PAINT; ACRYLIC EMULSION, EXTERIOR WHITE AND LIGHT AND MEDIUM TINTS Classification: This specification covers an acrylic emulsion paint designed for use on exterior masonry. This paint shall conform to the requirements in the Detailed Performance Standards of the Master Painters Institute MPI) for Paint, Latex, Exterior, and shall be listed on the following MPI Approved Products Lists: A. Exterior Latex, Flat MPI Gloss Level 1, MPI List Number 10. B. Exterior Latex, Semi-Gloss, MPI Gloss Level 5, MPI List Number 11. C. Exterior Latex, Gloss, MPI Gloss Level 6, MPI List Number 119. This paint may be tinted by using universal" or all purpose" concentrates. Book One- State Route 68 at San Benancio Road Intersection Improvements 350 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??g??AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 92 ASPHALTS Issued 03-21-08) Replace Section 92 with: SECTION 92 ASPHALTS 92-1.01 DESCRIPTION Asphalt is refined petroleum or a mixture of refined liquid asphalt and refined solid asphalt that are prepared from crude petroleum. Asphalt is: 1. Free from residues caused by the artificial distillation of coal, coal tar, or paraffin 2. Free from water 3. Homogeneous 92-1.02 MATERIALS GENERAL Furnish asphalt under the Department's Certification Program for Suppliers of Asphalt." The Department maintains the program requirements, procedures, and a list of approved suppliers at: http://www.dot.ca.gov/hq/esc/Translab/fpm/fpmcoc.htm Transport, store, use, and dispose of asphalt safely. Prevent the formation of carbonized particles caused by overheating asphalt during manufacturing or construction. GRADES Performance graded PG) asphalt binder is: Book One- State Route 68 at San Benancio Road Intersection Improvements 351 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??h?? Specification Grade Property AASHTO Test PG PG PG PG PG Method 58-22 a 64-10 64-16 64-28 70-10 Original Binder Flash Point, Minimum C T 48 230 230 230 230 230 Solubility, Minimum % T 44 99 99 99 99 99 Viscosity at 135?C, T 316 Maximum, Pas 3.0 3.0 3.0 3.0 3.0 Dynamic Shear, T 315 Test Temp. at 10 rad/s, C 58 64 64 64 70 Minimum G*/sin(delta), kPa 1.00 1.00 1.00 1.00 1.00 RTFO Test, e T 240 Mass Loss, Maximum, % 1.00 1.00 1.00 1.00 1.00 RTFO Test Aged Binder Dynamic Shear, T 315 Test Temp. at 10 rad/s, C 58 64 64 64 70 Minimum G*/sin(delta), kPa 2.20 2.20 2.20 2.20 2.20 Ductility at 25?C T 51 Minimum, cm 75 75 75 75 75 PAV Aging, R28 Temperature, C 100 100 100 100 110 RTFO Test and PAV Aged Binder Dynamic Shear, T 315 Test Temp. at 10 rad/s, C 22 d 31 d 28 d 22 d 34 d Maximum G*sin(delta), kPa 5000 5000 5000 5000 5000 Creep Stiffness, T 313 Test Temperature, C 12 0 6 18 0 Maximum S-value, Mpa 300 300 300 300 300 Minimum M-value 0.300 0.300 0.300 0.300 0.300 Notes: a. Use as asphalt rubber base stock for high mountain and high desert area. b. The Engineer waives this specification if the supplier is a Quality Supplier as defined by the Department's Certification Program for Suppliers of Asphalt." c. The Engineer waives this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards. d. Test the sample at 3?C higher if it fails at the specified test temperature. G*sin(delta) remains 5000 kPa maximum. e. RTFO Test" means the asphaltic residue obtained using the Rolling Thin Film Oven Test, AASHTO Test Method T 240 or ASTM Designation: D 2872. The residue from mass change determination may be used for other tests. f. PAV" means Pressurized Aging Vessel. Performance graded polymer modified asphalt binder PG Polymer Modified) is: Performance Graded Asphalt Binder Book One- State Route 68 at San Benancio Road Intersection Improvements 352 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??i?? Specification Grade Property AASHTO Test Method PG PG PG 58-34 PM 64-28 PM 76-22 PM Original Binder Flash Point, Minimum C T 48 230 230 230 Solubility, Minimum % T 44` 98.5 98.5 98.5 Viscosity at 135?C, T 316 Maximum, Pas 3.0 3.0 3.0 Dynamic Shear, T 315 Test Temp. at 10 rad/s, C 58 64 76 Minimum G*/sin(delta), kPa 1.00 1.00 1.00 RTFO Test T 240 Mass Loss, Maximum, % 1.00 1.00 1.00 RTFO Test Aged Binder Dynamic Shear, T 315 Test Temp. at 10 rad/s, C 58 64 76 Minimum G*/sin(delta), kPa 2.20 2.20 2.20 Dynamic Shear, T 315 Test Temp. at 10 rad/s, C Note e Note e Note e Maximum delta), % 80 80 80 Elastic Recovery, T 301 Test Temp., C 25 25 25 Minimum recovery, % 75 75 65 PAVE Aging, R 28 Temperature, C 100 100 110 RTFO Test and PAV Aged Binder Dynamic Shear, T 315 Test Temp. at 10 rad/s, C 16 22 31 Maximum G*sin(delta), kPa 5000 5000 5000 Creep Stiffness, T 313 Test Temperature, C 24 18 12 Maximum S-value, MPa 300 300 300 Minimum M-value 0.300 0.300 0.300 Notes: a. Do not modify PG Polymer Modified using acid modification. b. The Engineer waives this specification if the supplier is a Quality Supplier as defined by the Department's Certification Program for Suppliers of Asphalt." c. The Department allows ASTM D 5546 instead of AASHTO T 44 d. The Engineer waives this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards. e. Test temperature is the temperature at which G*/sin(delta) is 2.2 kPa. A graph of log G*/sin(delta) plotted against temperature may be used to determine the test temperature when G*/sin(delta) is 2.2 kPa. A graph of delta) versus temperature may be used to determine delta at the temperature when G*/sin(delta) is 2.2 kPa. The Engineer also accepts direct measurement of delta) at the temperature when G*/sin(delta) is 2.2 kPa. f. Tests without a force ductility clamp may be performed. g. PAV" means Pressurized Aging Vessel. SAMPLING Provide a sampling device in the asphalt feed line connecting the plant storage tanks to the asphalt weighing system or spray bar. Make the sampling device accessible between 24 and 30 inches above the platform. Provide a receptacle for flushing the sampling device. Include with the sampling device a valve: 1. Between 1/2 and 3/4 inch in diameter Performance Graded Polymer Modified Asphalt Binder a Book One- State Route 68 at San Benancio Road Intersection Improvements 353 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??j??2. Manufactured in a manner that a one-quart sample may be taken slowly at any time during plant operations 3. Maintained in good condition Replace failed valves. In the Engineer's presence, take 2 one-quart samples per operating day. Provide round, friction top, one-quart containers for storing samples. 92-1.03 EXECUTION If asphalt is applied, you must comply with the heating and application specifications for liquid asphalt in Section 93, Liquid Asphalts." 92-1.04 MEASUREMENT If the contract work item for asphalt is paid by weight, the Department measures asphalt tons by complying with the specifications for weight determination of liquid asphalt in Section 93, Liquid Asphalts." The Engineer determines the asphalt weight from volumetric measurements if you: 1. Use a partial asphalt load 2. Use asphalt at a location other than a mixing plant and no scales within 20 miles are available and suitable 3. Deliver asphalt in either of the following: 3.1. A calibrated truck with each tank accompanied by its measuring stick and calibration card 3.2. A truck equipped with a calibrated thermometer that determines the asphalt temperature at the delivery time and with a vehicle tank meter complying with the specifications for weighing, measuring, and metering devices in Section 9-1.01, Measurement of Quantities" If you furnish hot mix asphalt from a mixing plant producing material for only one project, the Engineer determines the asphalt quantity by measuring the volume in the tank at the project's start and end provided the tank is calibrated and equipped with its measuring stick and calibration card. The Engineer determines pay quantities from volumetric measurements as follows: 1. Before converting the volume to weight, the Engineer reduces the measured volume to that which the asphalt would occupy at 60 F. 2. The Engineer uses 235 gallons per ton and 8.51 pounds per gallon for the average weight and volume for PG and PG Polymer Modified asphalt grades at 60 F. 3. The Engineer uses the Conversion Table in Section 93, Liquid Asphalts." AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 93 LIQUID ASPHALTS Issued 11-03-06) Book One- State Route 68 at San Benancio Road Intersection Improvements 354 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??k??In Section 93-1.04 replace the 9th paragraph with: The following Legend and Conversion Table is to be used for converting volumes of liquid asphalt products, Grades 70 to 3000, inclusive, and paving asphalt Grades PG 58-22, PG 64-10, PG 64-16, PG 64-28, and PG 70-10, and Grades PG 58-34 PM, PG 64-28 PM, and PG 76-22 PM. AAnAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA SECTION 95 EPOXY Issued 06-05-09) Replace the table in Section 95-2.11 with: Characteristics of Adhesive: California Testa Test Requirement Brookfield Viscosity, No. 3 434, Part 4 0.9 max. Spindle at 20 rpm, Poise at 77?F Gel time, minutes 434, Part 1 2 to 15 Slant Shear Strength on Dry 434, Part 5b 3,000 min. Concrete, psi, after 4 days of cure in air at 77? F 2? F Slant Shear Strength on Wet 434, Part 5b 1,700 min. Concrete, psi, after 4 days of cure in air at 77?F?2?F Tensile Strength, psi 434, Part 7, except test after 4 days 4,500 min. of cure at77?F?2?F Elongation, % 434, Part 7, except test after 4 days 10 max. of cure at 77? F 2? F a The mixing ratio used will be that recommended by the manufacturer. b For slant shear strength on concrete, delete Sections B-1 and B-5 of California Test 434, Part 5. For dry concrete, use Step 2" below only. For wet concrete, use both Steps 1" & 2": 1. Soak blocks in water for 24 hours at 77? F 2? F. Remove and wipe off excess water. 2. Mix epoxy as described in California Test 434, Part 1, and apply a coat approximately 0.010-inch thick to each diagonal surface. Place four 0.125-inch square pieces of shim stock 0.012-inch thick on one block to control final film thickness. Before pressing the coated surfaces together, leave the blocks so that the coated surfaces are horizontal until the epoxy reacts slightly to prevent excessive flow. Book One- State Route 68 at San Benancio Road Intersection Improvements 355 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??l??STANDARD PLANS LIST The Standard Plan sheets applicable to this contract include, but are not limited to those indicated below. Applicable Revised Standard Plans RSP) and New Standard Plans NSP) indicated below are included in the project plans as Standard Plan sheets. ACRONYMS, ABBREVIATIONS AND SYMBOLS A10A Acronyms and Abbreviations Sheet 1 of 2) A10B Acronyms and Abbreviations Sheet 2 of 2) A10C Symbols Sheet 1 of 2) A1OD Symbols Sheet 2 of 2) PAVEMENT MARKERS, TRAFFIC LINES, AND PAVEMENT MARKINGS A20A Pavement Markers and Traffic Lines, Typical Details A20B Pavement Markers and Traffic Lines, Typical Details A20C Pavement Markers and Traffic Lines, Typical Details A20D Pavement Markers and Traffic Lines, Typical Details A24A Pavement Markings Arrows A24B Pavement Markings Arrows RSP A24C Pavement Markings Symbols and Numerals A24D Pavement Markings Words A24E Pavement Markings Words and Crosswalks EXCAVATION AND BACKFILL A62A Excavation and Backfill Miscellaneous Details A62B Limits of Payment for Excavation and Backfill Bridge Surcharge and Wall A62C Limits of Payment for Excavation and Backfill Bridge RSP A62DA Excavation and Backfill Concrete Pipe Culverts A62F Excavation and Backfill Metal and Plastic Culverts OBJECT MARKERS, DELINEATORS, CHANNELIZERS AND BARRICADES A73C Delineators, Channelizers and Barricades CONCRETE BARRIER TYPE 60 SERIES RSP A76A Concrete Barrier Type 60 A76B Concrete Barrier Type 60 METAL BEAM GUARD RAILING STANDARD RAILING SECTIONS A77A2 Metal Beam Guard Railing Standard Railing Section Steel Post with Notched Wood or Notched Recycled Plastic Block) A77B1 Metal Beam Guard Railing Standard Hardware A77C2 Metal Beam Guard Railing Steel Post, Notched Wood Block and Notched Recycled Plastic Block Details A77C3 Metal Beam Guard Railing Typical Line Post Embedment and Hinge Point Offset Details Book One- State Route 68 at San Benancio Road Intersection Improvements 356 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??m??RSP A77C4 Metal Beam Guard Railing Typical Railing Delineation and Dike Positioning Details NSP A77C5 Metal Beam Guard Railing Typical Vegetation Control Standard Railing Section NSP A77C6 Metal Beam Guard Railing Typical Vegetation Control for Terminal System End Treatments NSP A77C8 Metal Beam Guard Railing Typical Vegetation Control at Fixed Object METAL BEAM GUARD RAILING TYPICAL LAYOUTS FOR EMBANKMENTS RSP A77E1 Metal Beam Guard Railing Typical Layouts for Embankments RSP A77E2 Metal Beam Guard Railing Typical Layouts for Embankments RSP A77E3 Metal Beam Guard Railing Typical Layouts for Embankments RSP A77E4 Metal Beam Guard Railing Typical Layouts for Embankments RSP A77E5 Metal Beam Guard Railing Typical Layouts for Embankments RSP A77E6 Metal Beam Guard Railing Typical Layouts for Embankments METAL BEAM GUARD RAILING TYPICAL LAYOUTS FOR STRUCTURES RSP A77F1 Metal Beam Guard Railing Typical Layouts for Structure Approach A77F2 Metal Beam Guard Railing Typical Layouts for Structure Approach and Between Structures RSP A77F4 Metal Beam Guard Railing Typical Layouts for Structure Departure A77H1 Metal Railing End Anchor Assembly Type SFT) A77H2 Metal Railing Rail Tensioning Assembly A77H3 Metal Railing Anchor Cable and Anchor Plate Details METAL BEAM GUARD RAILING CONNECTIONS DETAILS AND TRANSITION RAILING TO BRIDGE RAILINGS, ABUTMENTS AND WALLS RSP A77J1 Metal Beam Guard Railing Connections to Bridge Railings without Sidewalks Details No. 1 RSP A77J2 Metal Beam Guard Railing Connections to Bridge Railings without Sidewalks Details No. 2 A77J3 Metal Beam Guard Railing Connections to Abutments and Walls RSP A77J4 Metal Beam Guard Railing Transition Railing Type WB) A77L1 Metal Beam Railing Terminal System Type SRT) A77L3 Metal Beam Railing Terminal System Type ET) FENCES RSP A85 Chain Link Fence NSP A85A Chain Link Fence Details NSP A85B Chain Link Fence Details CURBS, DRIVEWAYS, DIKES, CURB RAMPS AND ACCESSIBLE PARKING RSP A87A Curbs and Driveways A87B Asphalt Concrete Dikes Book One- State Route 68 at San Benancio Road Intersection Improvements 357 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??n??DRAINAGE INLETS, PIPE INLETS AND GRATES NSP D71 Drainage Inlet Markers D72 Drainage Inlets D73 Drainage Inlets NSP D73A Drainage Inlets Precast) D74A Drainage Inlets RSP D74B Drainage Inlets D74C Drainage Inlets Details RSP D75B Concrete Pipe Inlets D75C Pipe Inlets Ladder and Trash Rack Details RSP D77A Grate Details D77B Bicycle Proof Grate Details PIPE DOWNDRAINS, ANCHORAGE SYSTEMS AND OVERSIDE DRAINS D87A Corrugated Metal Pipe Downdrain Details D87B Plastic Pipe Downdrain Details D87C Cable Anchorage System D87D Overside Drains FLARED END SECTIONS D94B Concrete Flared End Sections PIPE COUPLING AND JOINT DETAILS D97H Reinforced Concrete Pipe or Non-Reinforced Concrete Pipe Standard and Positive Joints PLANTING AND IRRIGATION RSP Hl Planting and Irrigation Abbreviations RSP H2 Planting and Irrigation Symbols H4 Planting and Irrigation Details EROSION CONTROL RNSP H51 Erosion Control Details Fiber Roll) TEMPORARY CRASH CUSHIONS, RAILING AND TRAFFIC SCREEN RSP T1A Temporary Crash Cushion, Sand Filled Unidirectional) RSP T1B Temporary Crash Cushion, Sand Filled Bidirectional) RSP T2 Temporary Crash Cushion, Sand Filled Shoulder Installations) T3 Temporary Railing Type K) RSP T7 Construction Project Funding Identification Signs TEMPORARY TRAFFIC CONTROL SYSTEMS T10 Traffic Control System for Lane Closure On Freeways and Expressways T13 Traffic Control System for Lane Closure on Two Lane Conventional Highways TEMPORARY WATER POLLUTION CONTROL T51 Temporary Water Pollution Control Details Temporary Silt Fence) T53 Temporary Water Pollution Control Details Temporary Cover) RSP T56 Temporary Water Pollution Control Details Temporary Fiber Roll) Book One- State Route 68 at San Benancio Road Intersection Improvements 358 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??o??T57 Temporary Water Pollution Control Details Temporary Check Dam) T58 Temporary Water Pollution Control Details Temporary Construction Entrance) T59 Temporary Water Pollution Control Details Temporary Concrete Washout Facility) NSP T61 Temporary Water Pollution Control Details Temporary Drainage Inlet Protection) NSP T62 Temporary Water Pollution Control Details Temporary Drainage Inlet Protection) NSP T63 Temporary Water Pollution Control Details Temporary Drainage Inlet Protection) NSP T64 Temporary Water Pollution Control Details Temporary Drainage Inlet Protection) NSP T65 Temporary Water Pollution Control Details Temporary Fence Type ESA)] BRIDGE DETAILS B0-3 Bridge Details B0-5 Bridge Details B0-13 Bridge Details PILES B2-5 Pile Details Class 90 and Class 140 RSP B2-8 Pile Details Class 200 RETAINING WALLS B3-1 Retaining Wall Type 1 H 4' through 30' B3-7 Retaining Wall Type 5 B3-8 Retaining Wall Details No. 1 B3-9 Retaining Wall Details No. 2 T-BEAM DETAILS B6-10 Utility Openings, T-Beam JOINT SEALS RSP B6-21 Joint Seals Maximum Movement Rating 2") UTILITY OPENING B7-11 Utility Details CHAIN LINK RAILING, CABLE RAILING AND TUBULAR HAND RAILING B11-7 Chain Link Railing B11-47 Cable Railing BRIDGE METAL RAIL BARRIERS ROADSIDE SIGNS RS1 Roadside Signs, Typical Installation Details No. 1 RS2 Roadside Signs Wood Post, Typical Installation Details No. 2 RS4 Roadside Signs, Typical Installation Details No. 4 OVERHEAD AND ROADSIDE SIGNS PANELS S93 Framing Details for Framed Single Sheet Aluminum Signs, Rectangular Shape Book One- State Route 68 at San Benancio Road Intersection Improvements 359 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??p??S94 Roadside Framed Single Sheet Aluminum Signs, Rectangular Shape S95 Roadside Single Sheet Aluminum Signs, Diamond Shape ELECTRICAL SYSTEMS SYMBOLS AND ABBREVIATIONS RSP ES-lA Electrical Systems Symbols and Abbreviations) RSP ES-1B Electrical Systems Symbols and Abbreviations) RSP ES-IC Electrical Systems Symbols and Abbreviations) ELECTRICAL SYSTEMS SIGNAL HEADS, SIGNAL FACES AND MOUNTINGS ES-4A Electrical Systems Signal Heads and Mountings) ES-4B Electrical Systems Signal Heads and Mountings) RSP ES-4C Electrical Systems Signal Heads and Mountings) RSP ES-4D Electrical Systems Signal Heads and Mountings) ES-4E Electrical Systems Signal Faces and Mountings) ELECTRICAL SYSTEMS DETECTORS RSP ES-5A Electrical Systems Detectors) ES-5B Electrical Systems Detectors) ES-5C Electrical Systems Detectors) ES-5D Electrical Systems Detectors) ELECTRICAL SYSTEMS SIGNAL AND LIGHTING STANDARDS RSP ES-7B Electrical Systems Signal and Lighting Standard Type 1 Standards and Equipment Numbering) RSP ES-7D Electrical Systems Signal and Lighting Standard Case 2 Arm Loading, Wind Velocity 100 mph, Arm Lengths 15' to 30') RSP ES-7F Electrical Systems Signal and Lighting Standard Case 4 Arm Loading, Wind Velocity 100 mph, Arm Lengths 25' to 45') ELECTRICAL SYSTEMS SIGNAL AND LIGHTING STANDARD DETAILS ES-7M Electrical Systems Signal and Lighting Standards Details No. 1) ES-7N Electrical Systems Signal and Lighting Standards Details No. 2) ELECTRICAL SYSTEMS INTERNALLY ILLUMINATION STREET NAME SIGN ELECTRICAL SYSTEMS PEDESTRIAN BARRICADES ES-7P Electrical Systems Pedestrian Barricades) ELECTRICAL SYSTEMS PULL BOX DETAILS ES-8 Electrical Systems Pull Box Details) ELECTRICAL SYSTEMS ISOFOOTCANDLE DIAGRAMS AND FOUNDATION DETAILS ES-10 Electrical Systems Isofootcandle Diagrams) ES-11 Electrical Systems Foundation Installations) ELECTRICAL SYSTEMS SPLICING, WIRING DETAILS AND FUSE RATINGS ES-13A Electrical Systems Splicing Details) ES-13B Electrical Systems Wiring Details and Fuse Ratings) Book One- State Route 68 at San Benancio Road Intersection Improvements 360 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??q??RESOURCE MANAGEMENT AGENCY DEPARTMENT OF PUBLIC WORKS COUNTY OF MONTEREY STATE OF CALIFORNIA SPECIAL PROVISIONS STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS CONTRACT NO. 10-111065 SECTION 1. DEFINITION AND TERMS 1-1.01 SPECIFICATIONS AND PLANS The work embraced herein shall be done in accordance with the Standard Specifications, dated May 2006, and the Standard Plans, dated May 2006, of the State of California, Department of Transportation, as amended, insofar as the same may apply and in accordance with the following Special Provisions. Additionally, a Mitigation Monitoring and Reporting Program has been adopted for this project and is attached hereto in Appendix B. In case of conflict between the Standard Specifications and these Special Provisions, the Special Provisions shall take precedence over and be used in lieu of such conflicting portions; however, the provisions of the Mitigation Monitoring and Reporting Program shall take precedence over both. The listing of certain salient sections from the Standard Specifications and these Special Provisions shall not in any way relieve the Contractor of complying with each and every section of the Standard Specifications. The Contractor shall comply with all applicable project-specific mitigation measures listed in Mitigation Monitoring Reporting Program for the State Route 68/San Benancio Intersection Improvement Project. Amendments to the Standard Specifications set forth in these Special Provisions shall be considered as part of the Standard Specifications for the purposes set forth in Section 5-1.04, Contract Documents," of the Standard Specifications. Whenever either the term Standard Specifications is amended" or the term Standard Specifications are amended" is used in the Special Provisions, the indented text or table following the term shall be considered an amendment to the Standard Specifications. In case of conflict between such amendments and the Standard Specifications, the amendments shall take precedence over and be used in lieu of the conflicting portions. 1-1.02 INTERPRETATION OF STANDARD SPECIFICATIONS For the purpose of this Contract, certain terms or pronouns in place of them used throughout the Standard Specifications shall be interpreted as follows: Attention is directed to Section 1-4, Definition," of the Standard Specifications and these Special Provisions: 1-1.03 DEFINITIONS The following terms defined in Section 1, Definitions and Terms," of the Standard Specifications shall be interpreted to have the following meaning and intent: State: County of Monterey Department: The Monterey County Department of Public Works Book One San Benancio/State Route 68 Intersection Improvements 361 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??r??Director: Chair of the Board of Supervisors Engineer: Director of Public Works of Monterey County, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them. Laboratory: Any established laboratory designated by the Engineer to test materials and work involved in the Contract. Attorney General: County Counsel of Monterey County 1-1.04 DEFINITIONS IN SPECIAL PROVISIONS Whenever in the Special Provisions and other contract documents, the following terms, or pronouns in place of them are used, the intent and meaning shall be interpreted as follows: Clerk of the Board: The Clerk of the Monterey County Board of Supervisors Public Works Director: The Director of Public Works of Monterey County. SECTION 2. PROPOSAL REQUIREMENTS AND CONDITIONS 2-1.01 GENERAL The bidder's attention is directed to the provisions in Section 2, Bidding," of the Standard Specifications and these Special Provisions for the requirements and conditions which he must observe in the preparation of the proposal form and the submission of the bid. The Bidder's Bond form mentioned in the last paragraph in Section 2-1.13, Bidder's Security," of the Standard Specifications will be found in the Bid Form, Book Two. Bidder's security in the form of cashier's check or certified check shall be made payable to the County of Monterey. In conformance with Public Contract Code 7106, a Noncollusion Affidavit is included in the Proposal. Signing the Proposal shall also constitute signature of the Noncollusion Affidavit. This Contract will require a Class A" contractor's license. 2-1.02 REQUIRED LISTING OF PROPOSED SUBCONTRACTORS Each bid shall have listed therein the name and address of each Subcontractor to whom the bidder proposes to subcontract portions of the work in an amount in excess of one-half of one percent of his total bid or $10,000, whichever is greater, in accordance with the Subletting and Subcontracting Fair Practices Act, commencing with 4100 of the Public Contract Code. The bidder's attention is directed to other provisions of said Act related to the imposition of penalties for a failure to observe its provisions by using unauthorized Subcontractors or by making unauthorized substitutions. A sheet for listing the Subcontractors, as required herein by law, is included in the Bid Form. 2-1.03 EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF WORK The bidder shall examine carefully the site of the work contemplated, the plans and specifications, and the proposal and contract forms therefor. The submission of a bid shall be Book One San Benancio/State Route 68 Intersection Improvements 362 CONTRACT NO. 10-1 1 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??s??conclusive evidence that the bidder has investigated and is satisfied as to the general and local conditions to be encountered, as to the character, quality and scope of work to be performed, the quantities of materials to be furnished and as to the requirements of the proposal, plans, specifications and the contract. The submission of a bid shall also be conclusive evidence that the bidder is satisfied as to the character, quality and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information was reasonably ascertainable from an inspection of the site as well as from the plans and specifications made a part of the contract. All bidder inquiries about the meaning or intent of the Contract Documents submitted to the Engineer shall be in writing. Replies to the inquiries will be in the form of addenda and will be mailed, faxed, or delivered to all parties recorded by the Engineer as having received the bidding documents. Issued addenda shall be considered as part of the Contract Documents. Bidder inquiries received less than ten 10) days prior to the date of bid opening will not be answered. Oral and other interpretations or clarifications will be without legal effect. The County assumes no responsibility for conclusions or interpretations made by a bidder or contractor based on the information or data made available by the County. The County does not assume responsibility for representation made by its officers or agents before the execution of the contract concerning surface or subsurface conditions, unless that representation is expressly stated in the contract. No conclusions or interpretations made by a bidder or contractor from the information and data made available by the County will relieve a bidder or contractor from properly fulfilling the terms of the contract. 2-1.04 GOOD-FAITH EFFORT TO HIRE RESIDENTS OF MONTEREY BAY AREA In accordance with 5.08.120 of the Monterey County Code, unless such requirement would conflict with a state or federal law or regulation applicable to a particular contract for a public work of improvement, all contractors and subcontractors providing work, laborers, or materialmen on the project must promise to make a good-faith effort to hire qualified individuals who are, and have been for one 1) year prior to the opening of bids residents of the Monterey Bay Area in sufficient numbers so that no less than fifty percent 50%) of the contractor's total construction work force on the project including any subcontractor work force, measured in labor work hours is comprised of Monterey Bay Area residents. A certification form relating to compliance with 5.08.120 is furnished with the bid documents. Each contractor must complete the certification form and submit the certification form with the sealed bid. The Monterey County Board of Supervisors may deem a bid non-responsive for failure to abide by the good-faith local hiring provisions of Section 5.08.120. The Monterey County Purchasing Agent has prescribed rules, regulations, and procedures relating to the application, administration, and interpretation of the provisions of 5.08.120, which include the following: Monterey Bay Area resident" means a person who resides within the boundaries of Monterey County, Santa Cruz County, or San Benito County. A good-faith effort to hire qualified individuals" means that the contractor will take the following or similar steps. Contact local recruitment sources to identify qualified individuals who are Monterey Bay Area residents. Advertise for qualified Monterey Bay Area residents in trade papers and a newspaper of Book One San Benancio/State Route 68 Intersection Improvements 363 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??t??general circulation in at least Monterey County, unless time limits imposed by the County do not permit that advertising. If portions of the work are to be performed by subcontractors, identify subcontractors whose work force includes Monterey Bay Area residents. Take residency into account as a factor when determining composition of construction work force and potential subcontractors for the project. Require the same good-faith efforts by its subcontractors. The County department administering the contract, in conjunction with the County's Equal Opportunity Officer, may periodically request evidence from each contractor that the contractor is complying with the requirements of 5.08.120. To this end, the contractor shall maintain accurate records documenting the following: contractor's good-faith efforts to hire Monterey Bay Area residents; the total number of labor hours contractor's construction work force has expended to date on the project; the number of such labor hours performed by Monterey Bay Area residents; and evidence of residency of contractor construction workforce. The contractor shall require any and all subcontractors on the project to maintain records of the same information for subcontractor's work force on the project and shall require subcontractor to provide a copy of those records to contractor upon contractor's request. The contractor shall make contractor's and subcontractors' records available to County for review and inspection within five business days of the County's request. Contractors and subcontractors are referred to the provisions of 5.08.120 of the Monterey County Code and the rules, regulations, and procedures adopted to implement 5.08.120, a copy of which are on file with the County department administering the contract, with the County's Purchasing Agent, and with the County's Equal Opportunity Officer. SECTION 3. AWARD AND EXECUTION OF CONTRACT 3-1.01 GENERAL The bidder's attention is directed to the provisions in Section 3, Contract Award and Execution," of the Standard Specifications and these Special Provisions for the requirements and conditions concerning award and execution of contract. Bidders who wish to lodge a protest as to the award of the bid must do so before 5 p.m. of the 5th business day following the notice of intent to award the contract. Failure to timely file a written protest shall constitute a waiver of right to protest. Untimely protests will not be accepted or considered. Bid protests must be submitted, in writing, to: MONTEREY COUNTY DEPARTMENT OF PUBLIC WORKS, ATTENTION OF THE PROJECT MANAGER, 168 W ALISAL STREET 2ND FLOOR, SALINAS, CA 93901-2438. Protests may be hand-delivered or sent via facsimile 831) 755-4958], certified postal mail, or E-mail to the attention of the project manager The Project Manager's E-mail address may be obtained by calling 831) 755-4800]. Bid protests must include the project name and project number, a complete statement describing the basis for the bid protest, including a detailed statement of all legal and factual grounds for the protest, any documentation supporting the protestor's grounds for the protest, and the form of relief requested and the legal basis for such relief. The party lodging the protest must also include their contact information including mailing address, telephone number, and E-mail address. If a valid protest is timely filed, the Department shall investigate the bid protest. The protested bidder shall have three 3) business days to respond to any Department of Public Works requests to provide additional information. The Department shall respond to the Book One San Benancio/State Route 68 Intersection Improvements 364 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??u??protesting party, stating its finding. The Department Director shall make a recommendation to the Board regarding the bid protest. The award of the contract, if it be awarded, will be to the lowest responsible bidder whose bid complies with all the requirements prescribed. In determining the lowest responsible" Bidder, consideration shall be given to the general competency of Bidder in regards to the work covered by the bid. The contract shall be executed by the successful bidder and shall be returned, together with the contract bonds and insurance certificates, to the MONTEREY COUNTY PUBLIC WORKS DEPARTMENT so that it is received within 10 days, not including Saturdays, Sundays and legal holidays, after the bidder has received the contract for execution. Failure to do so shall be just cause for forfeiture of the proposal guaranty. The executed contract documents shall be delivered to the following address: MONTEREY COUNTY DEPARTMENT OF PUBLIC WORKS, 168 W. ALISAL ST 2ND FL, SALINAS, CA, 93901-2438. 3-1.02 CONTRACT BONDS In lieu of the second paragraph in Section 3-1.03 of the Standard Specifications, the following shall be inserted: Except as otherwise provided in 3248 of the Civil Code and 30154 of the Streets and Highways Code, each of the two bonds shall be in a sum equal to at least 100 percent of the contract price and shall be written by an admitted corporate surety. SECTION 4. PROSECUTION AND PROGRESS 4-1.01 BEGINNING OF WORK, TIME OF COMPLETION, AND LIQUIDATED DAMAGES Attention is directed to the provisions in Section 8-1.03, Beginning of Work;" in Section 8-1.06 Time of Completion;" and in Section 8-1.07, Liquidated Damages;" of the Standard Specifications. The Contractor shall begin work within 15 calendar days of the issuance of the Notice to Proceed by the County of Monterey. This work shall be diligently prosecuted to completion before the expiration of 120 WORKING DAYS. The Contractor shall pay to the County of Monterey the sum of $4,250 per day, for each and every calendar day's delay in finishing the work in excess of the number of working days prescribed above. 4-1.02 PRE-CONSTRUCTION CONFERENCE After the issuance of the Notice to Proceed, a pre-construction conference shall be held at the office of the MONTEREY COUNTY DEPARTMENT OF PUBLIC WORKS, 855 E. LAUREL DRIVE, BUILDING D, SALINAS, CA, for the purpose of discussing with the Contractor the scope of work, contract drawings, Specifications, existing conditions, materials to be ordered, equipment to be used, and all essential matters pertaining to the prosecution of and the satisfactory completion of the project as required. The Contractor's representatives at this conference shall include all major superintendents for the work and may include major subcontractors. 4-1.03 ARCHAEOLOGICAL DISCOVERIES All articles of archaeological interest that may be uncovered by the Contractor during the progress of the work shall be reported immediately to the Engineer. The further operations of the Contractor with respect to the find shall be decided under the direction of the Engineer. Book One San Benancio/State Route 68 Intersection Improvements 365 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??v??SECTION 5. GENERAL SECTION 5-1. MISCELLANEOUS 5-1.01 LABOR NON DISCRIMINATION Attention is directed to the following Notice that is required by Chapter 5 of Division 4 of Title 2, California Code of Regulations. NOTICE OF REQUIREMENT FOR NONDISCRIMINATION PROGRAM GOV. CODE, 12990) Your attention is called to the Nondiscrimination Clause", set forth in Section 7-1.01A(4), Labor Nondiscrimination," of the Standard Specifications, which is applicable to all nonexempt state contracts and subcontracts, and to the Standard California Nondiscrimination Construction Contract Specifications" set forth therein. The Specifications are applicable to all nonexempt state construction contracts and subcontracts of $5,000 or more. 5-1.02 GENERAL PREVAILING WAGE RATES Attention is directed to Section 7-1.01A(2), Prevailing Wage," of the Standard Specifications. The general prevailing wage rates determined by the Director of Industrial Relations, for the county or counties in which the work is to be done, are available on the Internet at: http://www.dir.ca.gov/dlsr/pwd/. These wage rates are not included in the Bid Book for the project. Changes, if any, to the general prevailing wage rates will be available at the same location. The general prevailing rates of per diem, holiday, and overtime wages for each craft, classification, or type of worker needed to execute the contract are determined in accordance with 1770, et. seq., of the Labor Code; and the contractor shall comply with all applicable sections thereof. The general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work are on file in the office of the Monterey County Department of Public Works or on the Internet at: http://www.dir.ca.gov/dlsr/pwd/. The Contractor shall post the prevailing wage rates at the job site. 5-1.03 APPRENTICES Attention is directed to Section 7-1.01A 5), Apprentices," of the Standard Specifications. 5-1.04 LABOR CODE REQUIREMENT Attention is directed to Section 7-1.01A(1), Hours of Labor," of the Standard Specifications. 5-1.05 WORKERS' COMPENSATION Attention is directed to Section 7-1.12B(3), Workers' Compensation and Employer's Liability Insurance," of the Standard Specifications. Book One San Benancio/State Route 68 Intersection Improvements 366 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??w??5-1.06 PUBLIC SAFETY The Contractor shall provide for the safety of traffic and the public in conformance with the provisions in Section 7-1.09, Public Safety," of the Standard Specifications and these Special Provisions. The Contractor shall install temporary railing Type K) between a lane open to public traffic and an excavation, obstacle or storage area when the following conditions exist: A. Excavations The near edge of the excavation is 12 feet or less from the edge of the lane, except: 1. Excavations covered with sheet steel or concrete covers of adequate thickness to prevent accidental entry by traffic or the public. 2. Excavations less than 1 foot deep. 3. Trenches less than 1 foot wide for irrigation pipe or electrical conduit, or excavations less than 1.0-ft in diameter. 4. Excavations parallel to the lane for the purpose of pavement widening or reconstruction. 5. Excavations in side slopes, where the slope is steeper than 4:1 horizontal: vertical). 6. Excavations protected by existing barrier or railing. B. Temporarily Unprotected Permanent Obstacles. The work includes the installation of a fixed obstacle together with a protective system, such as a sign structure together with protective railing, and the Contractor elects to install the obstacle prior to installing the protective system; or the Contractor, for the Contractor's convenience and with permission of the Engineer, removes a portion of an existing protective railing at an obstacle and does not replace such railing complete in place during the same day. C. Storage Areas.-Material or equipment is stored within 12 feet of the lane and the storage is not otherwise prohibited by the provisions of the Standard Specifications and these Special Provisions. The approach end of temporary railing Type K), installed in conformance with the provisions in this section Public Safety" and in Section 7-1.09, Public Safety," of the Standard Specifications, shall be offset a minimum of 15 feet from the edge of the traffic lane open to public traffic. The temporary railing shall be installed on a skew toward the edge of the traffic lane of not more than 1 foot transversely to 10 feet longitudinally with respect to the edge of the traffic lane. If the 15 feet minimum offset cannot be achieved, the temporary railing shall be installed on the 10 to 1 skew to obtain the maximum available offset between the approach end of the railing and the edge of the traffic lane, and an array of temporary crash cushion modules shall be installed at the approach end of the temporary railing. Temporary railing Type K) shall conform to the provisions in Section 12-3.08, Temporary Railing Type K)," of the Standard Specifications. Temporary railing Type K), conforming to the details shown on 1999 Standard Plan T3, may be used. Temporary railing Type K) fabricated prior to January 1, 1993, and conforming to 1988 Standard Plan B11-30 may be used, provided the fabrication date is printed on the required Certificate of Compliance. Temporary crash cushion modules shall conform to the provisions in Temporary Crash Cushion Module" of these Special Provisions. Except for installing, maintaining and removing traffic control devices, whenever work is performed or equipment is operated in the following work areas, the Contractor shall close the Book One San Benancio/State Route 68 Intersection Improvements 367 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??x??adjacent traffic lane unless otherwise provided in the Standard Specifications and these Special Provisions: Approach Speed of Public Traffic Posted Limit) Miles Per Hour) Work Areas Over 45 Miles Per Hour Within 6 feet of a traffic lane but not on a traffic lane 35 to 45 Miles Per Hour Within 3 feet of a traffic lane but not on a traffic lane The lane closure provisions of this section shall not apply if the work area is protected by permanent or temporary railing or barrier. When traffic cones or delineators are used to delineate a temporary edge of a traffic lane, the line of cones or delineators shall be considered to be the edge of the traffic lane, however, the Contractor shall not reduce the width of an existing lane to less than 10 feet without written approval from the Engineer. When work is not in progress on a trench or other excavation that required closure of an adjacent lane, the traffic cones or portable delineators used for the lane closure shall be placed off of and adjacent to the edge of the traveled way. The spacing of the cones or delineators shall be not more than the spacing used for the lane closure. Suspended loads or equipment shall not be moved nor positioned over public traffic or pedestrians. Full compensation for conforming to the provisions in this section Public Safety," including furnishing and installing temporary railing Type K) and temporary crash cushion modules, shall be considered as included in the contract prices paid for the various items of work involved and no additional compensation will be allowed therefore. 5-1.07 REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCE When the presence of asbestos or hazardous substances are not shown on the plans or indicated in the specifications and the Contractor encounters materials which the Contractor reasonably believes to be asbestos or a hazardous substance as defined in 25914.1 of the Health and Safety Code, and the asbestos or hazardous substance has not been rendered harmless, the Contractor may continue work in unaffected areas reasonably believed to be safe. The Contractor shall immediately cease work in the affected area and report the condition to the Engineer in writing. In conformance with 25914.1 of the Health and Safety Code, removal of asbestos or hazardous substances including exploratory work to identify and determine the extent of the asbestos or hazardous substance will be performed by separate contract. If delay of work in the area, due to the presence of asbestos or hazardous substances, delays the current controlling operation, the delay will be considered a right of way delay and the Contractor will be compensated for the delay in conformance with the provisions in Section 8-1.09, Delays," of the Standard Specifications. The Department reserves the right to use other forces for exploratory work to identify and determine the extent of such material and for removing hazardous material from such area. 5-1.08 CONTRACTOR'S LICENSING LAWS Attention is directed to Section 7-1.01C, Contractor's Licensing Laws," of the Standard Specifications. Book One San Benancio/State Route 68 Intersection Improvements 368 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??y??5-1.09 SUBCONTRACTING No subcontract releases the Contractor from the contract or relieves the Contractor of their responsibility for a subcontractor's work. If the Contractor violates Public Contract Code 4100 et seq., the County of Monterey may exercise the remedies provided under Public Contract Code 4110. The County of Monterey may refer the violation to the Contractors State License Board as provided under Public Contract Code 111. The Contractor shall perform work equaling at least 30 percent of the value of the original total bid with the Contractor's own employees and equipment, owned or rented, with or without operators. Each subcontract must comply with the contract. Each subcontractor must have an active and valid State contractor's license with a classification appropriate for the work to be performed Business and Professions Code, 7000 et seq.). Submit copies of subcontracts upon request by the Engineer. Before subcontracted work starts, submit a Subcontracting Request form. Do not use a debarred contractor; a current list of debarred contractors is available at the Department of Industrial Relations' Web site. Upon request by the Engineer, immediately remove and not again use a subcontractor who fails to prosecute the work satisfactorily. 5-1.10 PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS Attention is directed to the provisions in 10262 and 10262.5 of the Public Contract Code and 7108.5 of the Business and Professions Code concerning prompt payment to subcontractors. A prime contractor or subcontractor shall pay any subcontractor not later than 10 days of receipt of each progress payment in accordance with the provision in 7108.5 of the California Business and Professions Code concerning prompt payment to subcontractors. The 10 days is applicable unless a longer period is agreed to in writing. Any delay or postponement of payment over 30 days may take place only for good cause and with the agency's prior written approval. Any violation of 7108.5 shall subject the violating contractor or subcontractor to the penalties, sanction and other remedies of that section. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor. 5-1.11 PARTNERING The County of Monterey will promote the formation of a Partnering" relationship with the Contractor in order to effectively complete the contract to the benefit of both parties. The purpose of this relationship will be to maintain cooperative communication and mutually resolve conflicts at the lowest possible management level. The Contractor may request the formation of such a Partnering" relationship by submitting a request in writing to the Engineer after approval of the contract. If the Contractor's request for Partnering" is approved by the Engineer, scheduling of a Partnering" workshop, selecting the Partnering" facilitator and workshop site, and other administrative details shall be as agreed to by both parties. The costs involved in providing a facilitator and a workshop site will be borne equally by the County of Monterey and the Contractor. The Contractor shall pay all compensation for the wages and expenses of the facilitator, and of the expenses for obtaining the workshop site. The State's share of such costs will be reimbursed to the Contractor in a change order written by the Book One San Benancio/State Route 68 Intersection Improvements 369 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??z??Engineer. Markups will not be added. All other costs associated with the Partnering" relationship will be borne separately by the party incurring the costs. The establishment of a Partnering" relationship will not change or modify the terms and conditions of the contract and will not relieve either party of the legal requirements of the contract. 5-1.12 PAYMENTS Attention is directed to Section 9-1.07, Progress Payments," and 9-1.08, Payment After Contract Acceptance," of the Standard Specifications and these Special Provisions. For the purpose of making partial payments pursuant to Section 9-1.07, Progress Payments," of the Standard Specifications, the amount set forth for the contract items of work hereinafter listed shall be deemed to be the maximum value of the contract item of work, which will be recognized for progress payment purposes. Clearing and Grubbing $10,000 Prepare Water Pollution Control Program $ 3,400 Lead Compliance Plan $10,000 Temporary Stream Diversion $ 1,000 After acceptance of the contract pursuant to the provisions in Section 7-1.17, Acceptance of Contract," of the Standard Specifications, the amount, if any, payable for a contract item of work in excess of the maximum value for progress payment purposes hereinabove listed for the item, will be included for payment in the first estimate made after acceptance of the contract. No partial payment will be made for any materials on hand which are furnished but not incorporated in the work. 5-1.13 MEASUREMENT AND PAYMENT Attention is directed to Section 9, Measurement and Payment," of the Caltrans Standard Specifications and these Special Provisions. Section 9-1.10, Arbitration," as defined in the Standard Specifications, is deleted from this contract. In lieu of arbitration, the following shall apply from the Public Contract Code): A. Application of article; inclusion of article in plans and specifications Public Contracts Codes 20104): I a. This article applies to all public works claims of three hundred seventy-five thousand dollars $375,000) or less which arise between a Contractor and the County of Monterey. lb. This article shall not apply to any claims resulting from a contract between the Contractor and the County of Monterey when the public agency has elected to resolve any disputes pursuant to Article 7.1 commencing with 10240) of Chapter 1 of Part 2, of the Public Contract Code). 2a. Public Works" has the same meaning as in 3 100 and 3106 of the Civil Code. 2b. Claim" means a separate demand by the Contractor for A) a time extension, B) payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the contract for a public work and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or C) an amount the payment of which is disputed by the local agency. 3. The provisions of this article or a summary thereof shall be set forth in the plans or specifications for any work, which may give, rise to a claim under this article. 4. This article applies only to contracts entered into on or after January 1, 1991. Book One San Benancio/State Route 68 Intersection Improvements 370 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??{??B. Claims; requirements Public Contracts Codes 20104.2): For any claim subject to this article, the following requirements apply: 1. The claim shall be in writing and include the documents necessary to substantiate the claim. Claims must be filed on or before the date of final payment. Nothing in this subdivision is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims. 2a. For Claims of less than fifty thousand dollars $50,000), the local agency shall respond in writing to any written claim within 45 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses or claims the local agency may have against the claimant. 2b. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. 2c. The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 15 days after receipt of the further documentation or within a period of time no greater than that taken by the claimant in producing the additional information, whichever is greater. 3a. For claims of over fifty thousand dollars $50,000) and less than or equal to three hundred seventy-five thousand dollars $375,000), the local agency shall respond in writing to all written claims within 60 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses or claims the local agency may have against the claimant. 3b. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. 3c. The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the claimant in producing the additional information or requested documentation, whichever is greater. 4. If the claimant disputes the local agency's written response, or the local agency fails to respond within the time prescribed, the claimant may so notify the local agency, in writing, either within 15 days of receipt of the local agency's response or within 15 days of the local agency's failure to respond within the time prescribed, respectively, and demand an informal conference to meet-and-confer for settlement of the issues in dispute. Upon a demand, the local agency shall schedule a meet-and-confer conference within 30 days for settlement of the dispute. 5. If following the meet-and-confer conference the claim or any portion remains in dispute, the claimant may file a claim pursuant to Chapter 1 commencing with 900) and Chapter 2 commencing with 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the claimant submits his or her written claim pursuant to subdivision a) until the time the claim is denied, including any period of time utilized by the meet and confer conference. C. Procedures for civil actions filed to resolve claims Public Contracts Codes 20104.4): The following procedures are established for all civil actions filed to resolve claims subject to this article: Book One San Benancio/State Route 68 Intersection Improvements 371 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??|??1. Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to nonbinding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court. 2a. If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 commencing with 1141.10) Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding 1141.11 of that code. The Civil Discovery Act of 1986 Article 3 commencing with 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding bought under this subdivision consistent with the rules pertaining to judicial arbitration. 2b. In addition to Chapter 2.5 commencing with 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, A) arbitrators shall, when possible, be experienced in construction law, and B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney's fees on appeal of the other party. D. Payment by local agency of undisputed portion of claim; interest on arbitration award or judgment Public Contracts Codes 20104.6): 1. The County of Monterey shall not fail to pay money as to any portion of a claim that is undisputed except as otherwise provided in the contract. 2. In any suit filed under 20104.4, Monterey County shall pay interest at the legal rate on any arbitration award or judgment. The interest shall begin to accrue the date the suit is filed in a court of law. 5-1.14 ENCROACHMENT PERMIT Prior to start of work within the State of California's right-of-way or work affecting the State of California facilities, the contractor will be required to obtain an Encroachment Permit at the following State of California Transportation office: California Department of Transportation District 5, Permits Branch, Permit Engineer 50 Higuera Street San Luis Obispo CA 93401 5-1.15 INDEMNIFICATION AND INSURANCE Attention is directed to Section 7-1.12, Indemnification and Insurance," of the Standard Specifications and these Special Provisions. In addition to all the Standard Specifications Section 7-1.12B(4)(c) and Section 7- 1.12B(4)(c) requirements, the following additional requirements shall be met. An Additional Insured Endorsement to the Contractor's Liability insurance policy naming the County of Monterey, their officers, agents, and employees as additional insureds in the form approved by the County of Monterey shall also be furnished. A copy of the approved endorsement form may be obtained from the County of Monterey at the address to obtain bid packages as shown in the Notice to Bidders. The insurance afforded to the additional insureds is primary insurance and if the additional insureds have other insurance that might be applicable to any loss, the amount of this insurance shall not be reduced or prorated due to the existence of such other insurance. The contractor's insurer agrees to waive subrogation claims against the County of Monterey, their officers, agents, and employees. Book One San Benancio/State Route 68 Intersection Improvements 372 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??}??Evidence of insurance Contractual Liability insurance and Additional Insured Endorsement) in compliance with the requirements herein shall be furnished to the County of Monterey by the Contractor with the Certificate of Insurance in the form as approved by the County of Monterey. A copy of the approved certificate form may be obtained from the County of Monterey at the address to obtain bid packages as shown in the Notice to Bidders. Certificates of insurance shall, without any qualification thereto, contain the following statement: Should any of the described policies be canceled, modified, or reduced in limits before the expiration date thereof, the issuing company will mail 30 days' advance written notice to the named certificate holders. The insurance shall be issued by a company or companies authorized to transact business in the State of California and shall have a rating of at least A- VII in accordance with the current Best's rating. Insurance coverage in the minimum amounts set forth herein shall not be construed to relieve the Contractor for liability in excess of such coverage, nor shall it preclude the State of California or County of Monterey from taking such other actions as is available to them under any other provision of this contract except retainage of money due to the Contractor) or otherwise in law. Commercial general liability insurance shall be in the minimum amounts of $2,000,000 per occurrence and $4,000,000 aggregate for bodily injury and $1,000,000 per occurrence and aggregate for property damage, naming Domain Corporation and Islandia 29, LP as additional insured. Except as otherwise provided herein, nothing in the contract is intended to create the public or any member thereof a third party beneficiary hereunder, nor is any term and condition or other provision of the contract intended to establish a standard of care owed to the public or any member thereof. Prior to the execution of this Agreement by the County, Contractor shall file certificates of insurance with the County Contracts/Purchasing Department and with the County Public Works Director, showing that the Contractor has in effect the insurance required by this Agreement. The Contractor shall file a new or amended certificate of insurance promptly after any change is made in any insurance policy that would alter the information of the certificate then on file. Acceptance or approval of insurance shall in no way modify or change the indemnification clause in this Agreement, which shall continue in full force and effect. 5-1.16 AREAS FOR CONTRACTOR'S USE Attention is directed to the requirements specified in Section 7-1.19, Rights in Land and Improvements," of the Standard Specifications and these Special Provisions. The County right-of-way shall be used only for purposes that are necessary to perform the required work. The Contractor shall not occupy the right-of-way, or allow others to occupy the right-of-way, for purposes that are not necessary to perform the required work. There are no County-owned parcels adjacent to the right-of-way for the exclusive use of the Contractor within the contract limits. The Contractor shall secure at his own expense any area required for plant sites, storage of equipment or materials, or for other purposes. Use of the Contractor's work areas and other County-owned property shall be at the Contractor's own risk, and the County shall not be held liable for any damage to or loss of materials or equipment located within such areas. The Contractor shall obtain encroachment permits prior to occupying County-owned parcels outside the contract limits. The required encroachment permits may be obtained from the MONTEREY COUNTY DEPARTMENT OF PUBLIC WORKS, 168 W ALISAL STREET 2ND FLOOR, SALINAS, CA 93901-2438. Residence trailers will not be allowed within the county right-of-way. Book One San Benancio/State Route 68 Intersection Improvements 373 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??~??The Contractor shall remove all equipment, materials, and rubbish from the work areas and other County-owned property, which he occupies and shall leave the areas in a presentable condition, in accordance with the provisions in Section 4-1.02, Final Cleaning Up," of the Standard Specifications. The Contractor shall secure at his own expense any area required for plant sites, storage of equipment or materials, or for other purposes if sufficient area is not available to him within the contract limits. 5-1.17 NOTICE OF POTENTIAL CLAIM Attention is directed to Section 5-1.146, Potential Claims & Dispute Resolution," of the Standard Specifications. 5-1.18 FINAL PAYMENT AND CLAIMS Attention is directed to Section 9-1.08D, Final Payment and Claims," of the Standard Specifications. The following terms in said section shall be interpreted to have the following meaning and intent: Department: The Monterey County Department of Public Works 5-1.19 PAYROLL RECORDS The Contractor's attention is directed to Section 7- 1.01A(3), Payroll Records," of the Standard Specifications, and to the provisions of Labor Code, 1776 Stats. 1978, Chapter 1249). The Contractor shall be responsible for the compliance with these provisions by his/her Subcontractors. The Contractor shall furnish the Engineer with certified payrolls and statement of benefits. 5-1.20 SURFACE MINING AND RECLAMATION ACT Attention is directed to the Surface Mining and Reclamation Act of 1975, commencing in Public Resources Code, Mining and Geology, 2710, which establishes regulations pertinent to surface mining operations. Material from mining operations furnished for this project shall only come from permitted sites in compliance with the Surface Mining and Reclamation Act of 1975. The requirements of this section shall apply to all materials furnished for the project, except for acquisition of materials in conformance with Section 4-1.05, Use of Materials Found on the Work," of the Standard Specifications. 5-1.21 PROJECT INFORMATION The information in this section has been compiled specifically for this project and is made available for bidders and Contractors. Other information referenced in the Standard Specifications and these Special Provisions do not appear in this section. The information is subject to the conditions and limitations set forth in Section 2-1.03, Bid Documents," Section 2- 1.11, Job Site Document Examination," and Section 6-2, Local Materials," of the Standard Specifications. Bidders and Contractors shall be responsible for knowing the procedures for obtaining information. A Storm Water Information Handout is available for this project. The Storm Water Information Handout can be obtained by contacting MONTEREY COUNTY DEPARTMENT OF PUBLIC WORKS, ATTENTION OF THE PROJECT MANAGER, 168 W ALISAL STREET 2ND FLOOR, SALINAS, CA 93901-2438. Book One San Benancio/State Route 68 Intersection Improvements 374 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Cross sections are available for this project. The cross sections can be obtained by contacting MONTEREY COUNTY DEPARTMENT OF PUBLIC WORKS, ATTENTION OF THE PROJECT MANAGER, 168 W ALISAL STREET 2ND FLOOR, SALINAS, CA 93901-2438. 5-1.22 SOUND CONTROL REQUIREMENTS Sound control shall conform to the provisions in Section 14-8.02, Noise Control," of the Standard Specifications and these Special Provisions. Each internal combustion engine, used for any purpose on the job or related to the job, shall be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine shall be operated on the project without the muffler. The noise level requirements shall apply to the equipment on the job or related to the job, including but not limited to trucks, transit mixers or transient equipment that may or may not be owned by the Contractor. The use of loud sound signals shall be avoided in favor of light warnings except those required by safety laws for the protection of personnel. Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor. 5-1.23 AIR POLLUTION CONTROL Air pollution control shall conform to the provisions in Section 14-9.01, Air Pollution Control," of the Standard Specifications and these Special Provisions. Material to be disposed of shall not be burned unless the Contractor has obtained a permit to burn combustible material resulting from clearing and grubbing operations from an air pollution control officer of the local or regional authority. A copy of the permit shall be filed with the Engineer before beginning any burning. All such burning shall be conducted in strict conformance with the provisions stipulated in said permit and at such times and in such manner as to prevent the fire from spreading to areas adjoining the right-of-way. In case the burning precedes construction operations, the piles may be placed in the center of the right-of-way; otherwise, the piles shall be placed in the most convenient location at the side of the right-of-way and beyond slope lines where they may be burned without damage to the surrounding forest cover or adjacent property. Full compensation for conforming to the provisions in this section shall be considered as included in the prices paid for the various contract items of work and no additional compensation shall be allowed therefore. 5-1.24 BIRD PROTECTION GENERAL This work includes protecting migratory and non-game birds, their occupied nests, and their eggs. Nesting or attempted nesting by migratory and nongame birds is anticipated to occur but is not limited to February 15 through September 1. QUALITY ASSURANCE Regulatory requirements The Federal Migratory Bird Treaty Act 16 USC 703-711.), 50 CFR 10, and Fish & Game Code 3503, 3513, and 3800, protect migratory and non-game birds, their occupied nests, and their eggs. Book One San Benancio/State Route 68 Intersection Improvements 375 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The Federal Endangered Species Act of 1973 16 USC 1531, 1543) and California Endangered Species Act Fish & Game Code 2050-?2115.5) prohibit the take of listed species and protect occupied and unoccupied nests of threatened and endangered bird species. The Bald Eagle Protection Act 16 USC 668) prohibits the destruction of bald and golden eagles occupied and unoccupied nests. Permits are included in the Project Information handout. CONSTRUCTION When migratory or non-game bird nests are discovered which may be adversely affected by construction activity, or when a bird is found injured or killed as a result of construction activity, immediately stop work within 100 feet of the nest or bird and notify the Engineer. Work must not resume until the Engineer provides written notification that work may resume at that location. When ordered by the Engineer, use exclusion devices, nesting prevention measures or remove and dispose of partially constructed and unoccupied nests of migratory or non-game birds on a regular basis to prevent their occupation. Nest removal activities must not result in depositing into or allowing materials to enter waters of this state. MEASUREMENT AND PAYMENT Exclusion devices, nesting prevention measures and nest removal that are ordered by the Engineer will be paid for as extra work as specified in Section 4-1.03D, Extra Work," of the Standard Specifications. A delay to the controlling operation due to migratory or non-game birds or their nests will be considered a temporary suspension of work under Section 8-1.05, Temporary Suspension of Work," of the Standard Specifications. Adjustments will be made for delays that the Engineer determines are not due to the Contractor's failure to perform the provision of the contract in the same manner as for suspensions due to unsuitable weather in Section 8-1.05. 5-1.25 RELATIONS WITH CALIFORNIA DEPARTMENT OF FISH AND GAME A portion of this project is located within the jurisdiction of the California Department of Fish and Game. An agreement regarding a stream or lake has been entered into by the County of Monterey and the Department of Fish and Game. The Contractor shall be fully informed of the requirements of this agreement as well as rules, regulations, and conditions that may govern the Contractor's operations in these areas and shall conduct the work accordingly. It is unlawful for any person to divert, obstruct or change the natural flow of the bed, channel or bank of a stream, river or lake without first notifying the Department of Fish and Game, unless the project or activity is noticed and constructed in conformance with conditions imposed under Fish and Game Code 1602. Attention is directed to Sections 7-1.01, Laws to be Observed," 7-1.01G, Water Pollution," and 7-1.12, Indemnification and Insurance," of the Standard Specifications. Modifications to the agreement between the County of Monterey and the Department of Fish and Game which are proposed by the Contractor shall be submitted in writing to the Engineer for transmittal to the Department of Fish and Game for their consideration. When the Contractor is notified by the Engineer that a modification to the agreement is under consideration, no work shall be performed which is inconsistent with the original agreement or proposed modification until the Departments take action on the proposed modifications. The provisions of this section shall be made a part of every subcontract executed pursuant to this contract. Book One San Benancio/State Route 68 Intersection Improvements 376 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Modifications to any agreement between the County and the Department of Fish and Game will be fully binding on the Contractor. The provisions of this section shall be made a part of every subcontract executed pursuant to this contract. 5-1.26 RELATIONS WITH ARMY CORPS OF ENGINEERS A portion of this project is located within the jurisdiction of the Army Corps of Engineers, also called Waters of the United States. A Nationwide Permit No. 14: Linear Transportation Projects has been granted for this project which allows for discharge of temporary fill into a total of 0.0002 acres of waters of the U.S. This permit is identified as Department of the Army, U.S. Army Corps of Engineers 404 Permit File Number 2007-400399, dated 12/18/07). The permit was revalidated on November 2, 2009. The Contractor shall be fully informed of the requirements of these permits as well as rules, regulations, and conditions that may govern the Contractor's operations in these areas and shall conduct the work accordingly. It is unlawful for any person to discharge fill material or disrupt any Corps jurisdictional waters of the U.S. without first notifying the Army Corps of Engineers and obtaining the appropriate permits with conditions imposed under Army Corps of Engineers Code. When the Contractor is notified by the Engineer that a modification to the agreement is under consideration, no work shall be performed which is inconsistent with the original agreement or proposed modification until the Army Corps of Engineers take action on the proposed modifications. Compensation for delay will be determined in conformance with the provisions in Section 8-1.09, Right of Way Delays," of the Standard Specifications. The provisions of this section shall be made a part of every subcontract executed pursuant to this contract. Modifications to any agreement between the Department of Transportation and the Army Corps of Engineers will be fully binding on the Contractor. The provisions of this section shall be made a part of every subcontract executed pursuant to this contract. Full compensation for compliance with the project permits, their associated conditions, and this special provision, is included in the various items of work and no additional compensation will be allowed therefor. 5-1.27 RELATIONS WITH CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD This project lies within the boundaries of the Central Coast Regional Water Quality Control Board RWQCB). The State Water Resources Control Board SWRCB) has issued to the Department a permit that governs storm water and non-storm water discharges from the Department's properties, facilities, and activities. The Department's permit is entitled Order No. 99 06 DWQ, NPDES No. CAS000003, National Pollutant Discharge Elimination System NPDES) Permit, Statewide Storm Water Permit and Waste Discharge Requirements WDRs) for the State of California, Department of Transportation Caltrans)." Copies of the Department's permit are available for review from the SWRCB, Division of Water Quality, 1001 I" Street, P.O. Box 100, Sacramento, California 95812-0100, Telephone fax: 916) 341-5463 and may also be obtained at: http://www.waterboards.ca.gov/water issues/programs/stormwaterlcaltrans.shtml The Department's permit references and incorporates by reference the current statewide general permit issued by the SWRCB entitled Order No. 2009-0009-DWQ, National Pollutant Discharge Elimination System NPDES) General Permit No. CAS000002, Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction and Land Disturbance Activities" that regulates discharges of storm water and non-storm water from Book One San Benancio/State Route 68 Intersection Improvements 377 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???construction activities disturbing 1 acre or more of soil in a common plan of development. Copies of the statewide permit and modifications thereto are available for review from the SWRCB, Division of Water Quality, 1001 I" Street, P.O. Box 100, Sacramento, California 95812-0100, Telephone fax: 916) 341-5463 and may also be obtained at: http://www.waterboards.ca.gov/water-issues/programs/stonnwater/ This project shall conform to the permits and modifications thereto. The Contractor shall maintain copies of the permits at the project site and shall make them available during construction. The Contractor shall know and comply with provisions of Federal, State, and local regulations and requirements that govern the Contractor's operations and storm water and non-storm water discharges from the project site and areas of disturbance outside the project limits during construction. Attention is directed to Sections 7-1.01, Laws to be Observed," 5- 1.18, Property and Facility Preservation," 7-1.12, Indemnification and Insurance," and 9- 1.07E(5), Penalty Withholds," of the Standard Specifications. The Contractor shall notify the Engineer immediately upon request from the regulatory agencies to enter, inspect, sample, monitor, or otherwise access the project site or the Contractor's records pertaining to water pollution control work. The Contractor and the Department shall provide copies of correspondence, notices of violation, enforcement actions, or proposed fines by regulatory agencies to the requesting regulatory agency. 5-1.28 DAMAGE CLAIMS Attention is directed to Section 7, Legal Relations and Responsibility," of the Standard Specifications. Provided the Contractor's operations and work comply with the plans and specifications, the Contractor's responsibility for payment of claims for physical damages caused by screenings or bituminous binder will be limited to no more than 10 percent of the total contract bid price. For each seal coat location within the project, only those claims for physical damages caused by screenings or bituminous binder that occurred within the period extending from the first day screenings were applied to the binder to 4 days following the last day screenings were applied to the binder, shall be considered for resolution. Claims reported or submitted by the public directly to the Contractor within 30 days from the last spreading of screenings on the project shall be processed and resolved by the Contractor in conformance with the following: 1. Within 3 business days after receipt of a claim from the public, the Contractor shall submit to the Department a copy of the claim together with a determination of whether or not the claim will be paid. If the claim is to be rejected, the Contractor shall explain in writing the basis for rejecting the claim. 2. If the claimant becomes dissatisfied with the Contractor's handling of their claim, the Contractor shall immediately refer the dissatisfied claimant to the local District Claims Office for assistance in resolving the claim. 3. Within 30 days from the last spreading of screenings on the project, the Contractor shall submit evidence to the Department of those claims paid by the Contractor. Claims presented by the public directly to the Department or State Board of Control, as set forth in Govt. Code 900 et seq., will be processed and resolved by the Department in conformance with the following: Book One San Benancio/State Route 68 Intersection Improvements 378 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???1. These claims will be processed as formal government claims against the State, subject to all applicable statutes, regulations, and departmental policies. The Department reserves the right to adjust and settle any formal government claim directly with the claimant, or it may refer the claim to the Contractor for investigation and disposition. 2. If the Department or State Board of Control approves settlement of a formal government claim or the Department is ordered to pay the claim pursuant to a court order, the claim will be paid by the Department from the funds withheld. 3. Within 3 business days of determination by the local District Claims Office that the Contractor is responsible for resolving the formal government claim, the local District Claims Office will either send a copy of the claim to the Contractor for handling and disposition, or notify the Contractor of the Department's decision to settle and pay the claim directly with the claimant. Funds in an amount not to exceed 5 percent of the total contract bid price will be withheld. This withhold by the Department will be for a maximum period of 60 days after the last spreading of screenings on the project to allow the Department sufficient time to settle claims that remain unresolved by the Contractor. At the end of this 60-day period, funds remaining in the withhold, that are not allocated by the Department to pay unsettled claims, will be returned to the Contractor. If no withheld funds remain or if the withhold has been returned to the Contractor, the Department may elect to pay a formal government claim from public funds. If the Department determines the Contractor is responsible for the claim, the Department will then seek reimbursement from the Contractor for any public funds used to pay the claim, subject to the 10 percent limitation. The Department may use any legal remedy available to obtain reimbursement from the Contractor including administration of an offset as provided for in Govt. Code 12419.5. Except for the limitation of responsibility for damage claims specified above, nothing in this section shall be construed as decreasing the Contractor's obligation to defend and indemnify the State from all claims in conformance with the provisions of Section 7, Legal Relations and Responsibility," of the Standard Specifications. 5-1.29 ENVIRONMENTALLY SENSITIVE AREA An ESA exists on this project. Before start of work, protect the ESA by installing temporary fence type ESA). 5-1.30 ARCHAEOLOGICAL MONITORING AREA AMA) AMAs within, near, or straddling the project limits are shown on the plans. No project personnel shall enter the archaeological site area unless accompanied by a qualified archeologist. A qualified archaeologist, hired by the County, and Native American representative if the Native American community so elects) shall be allowed to monitor all ground disturbing project construction activities adjacent to the archaeological monitoring area. In the event that cultural materials are identified during construction, all ground-disturbing activities shall stop until a qualified archaeologist can evaluate theses materials. If the deposit is intake, an excavation plan must be developed and implemented. Compensation for delay will be determined in conformance with the provisions in Section 8-1.09, Right of Way Delays," of the Standard Specifications. Book One San Benancio/State Route 68 Intersection Improvements 379 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???5-1.31 NONHIGHWAY FACILITIES INCLUDING UTILITIES) The utility owner will relocate a utility shown in the following table before the corresponding date shown: Utility Relocation and Date of the Relocation Utility Location Date Pacific Gas and Electric S' 524+45 Rt to 537+31 Rt July 30, 2010 5-1.32 RELIEF FROM MAINTENANCE AND RESPONSIBILITY The Contractor may be relieved of the duty of maintenance and protection for those items not directly connected with plant establishment work in conformance with the provisions in Section 7-1.15, Relief From Maintenance and Responsibility," of the Standard Specifications. Water pollution control, maintain existing planted areas, maintain existing irrigation facilities, transplant trees, and transplant palm trees shall not be relieved of maintenance. 5-1.33 ENVIRONMENTAL REQUIREMENTS The Contractor shall not allow or cause to be allowed any asphalt, aggregate, soil, other material or waste resulting from the Contractor's work to be discharged or deposited into the creeks, ditches or rivers shown on the plans. The Contractor shall comply with the California Tiger Salamander protection provisions as follows: 1. A qualified biologist, provided by the County, shall survey the work site for California Tiger Salamander CTS) 72 hours prior to the onset of construction activities. If any CTS are found the qualified biologist shall contact the CDFG to determine if moving the CTS is appropriate. No construction shall commence until all CTS are removed from the project site. After the preconstruction surveys are completed, exclusionary fencing shall be installed around the southern facing slope north of the creek to prevent CTS from entering the project site once construction has begun. 2. Before any construction activities begin, a qualified biologist shall conduct a training session for all construction personnel. The training shall include a description of the CTS and its habitat, the importance of the CTS and its habitat, the general measures that are being implemented to conserve the CTS as they relate to the project, and the boundaries within which the project may be accomplished. Brochures, books and briefings may be used in the training session, provided that a qualified person is on hand to answer questions. 3. After the pre-construction surveys have been completed and exclusionary fencing has been installed, a qualified biologist shall be present at the work site during construction activities on the southern facing slope north of the creek where potentially suitable habitat occurs. The qualified biologist shall have the authority to halt any action that might result in impacts that exceed the levels anticipated by the CDFG during review of the proposed action. If work is stopped, the CDFG shall be notified immediately by the qualified biologist. The Contractor shall comply with the California Red-legged Frog Standard Protection Provisions as follows: 1. Before any construction activities begin on the project, a Service-approved biologist hired by the County) will conduct a training session for all construction personnel, including all sub-contractors that will perform work within riparian habitat areas. Book One San Benancio/State Route 68 Intersection Improvements 380 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???2. During project activities, all trash that may attract predators will be properly contained, removed from the work site, and disposed of regularly. Following construction, all trash and construction debris will be removed from work areas. 3. All fueling and maintenance of vehicles and other equipment and staging areas will occur at least 66 feet from any riparian habitat or water body. The Contractor shall ensure contamination of habitat does not occur during such operations. 4. If a work site is to be temporarily dewatered by pumping, intakes will be completely screened with wire mesh not larger than 0.2 inches to prevent California red-legged frogs from entering the pump system. 5. Any temporary access roads shall be covered in 6" of mulch. Following construction, the temporary access road will be removed and the disturbed area re-graded to pre- project contours. The Contractor shall submit a temporary access road plan. 6. The Contractor shall give full cooperation to the Service-approved biologist or their representative. At the Contractor's option within 20 days after contract approval, the Contractor shall submit 3 copies of the temporary access road plan to the Engineer. The Contractor shall allow 20 days for the Engineer's review. If revisions are required, the Engineer will provide comments and specify the date that the review stopped. The Contractor shall revise and resubmit the temporary access road plan within 15 days of receipt of the Engineer's comments. The Engineer's review will resume when the complete temporary access road plan is resubmitted. When the Engineer approves the temporary access road plan, the Contractor shall submit 2 copies of the approved temporary access road plan to the Engineer. If the Engineer fails to complete the review within the time allowed and if, in the opinion of the Engineer, completion of the work is delayed or interfered with by reason of the Engineer's delay, the Contractor will be compensated for resulting losses, and an extension of time will be granted, as provided for in Section 8-1.09, Right of Way Delays," of the Standard Specifications. The Contractor shall comply with all applicable project-specific mitigation measures, where the Construction Contractor is identified as one of the implementing parties, listed in Mitigation Monitoring and Reporting Program for the State Route 68/San Benancio Intersection Improvement Project". Full compensation for conforming to the requirements in these Special Provisions shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor. 5-1.34 DAMAGE REPAIR Attention is directed to Section 7-1.16, Contractor's Responsibility for the Work and Materials," and Section 7-1.165, Damage by Storm, Flood, Tsunami or Earthquake," of the Standard Specifications and these Special Provisions. When as a result of freezing conditions as defined herein) during the plant establishment period, plants have died or, in the opinion of the Engineer, have deteriorated to a point beyond which the plants will not mature as typical examples of their species, the Engineer may direct replacement of the affected plants. The total cost of ordered plant replacement work will be paid for as extra work as provided in Section 4-1.03D, Extra Work," of the Standard Specifications. A freezing condition, for the purpose of this specification, occurs when the temperature at or near the affected area has been officially recorded below 32? F and plants have been killed or damaged to the degree described above. When, as a result of drought conditions as defined herein) during the plant establishment period, plants have died or, in the opinion of the Engineer, have deteriorated to a point beyond which the plants will not mature as typical examples of their species, the Engineer may direct replacement of the affected plants. The total cost of ordered plant replacements, after water has Book One San Benancio/State Route 68 Intersection Improvements 381 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???been restricted or stopped, will be paid for as extra work as provided in Section 4-1.03D, Extra Work," of the Standard Specifications. Restriction or shutoff of available water shall not relieve the Contractor from performing other contract work. A drought condition occurs when the Department, or its supplier, restricts or stops delivery of water to the Contractor to the degree that plants have died or deteriorated as described above. When the provisions in Section 7-1.165, Damage by Storm, Flood, Tsunami or Earthquake," of the Standard Specifications are applicable, the provisions above for payment of costs for repair of damage due to rain, freezing conditions and drought shall not apply. SECTION 6. BLANK) SECTION 7. BLANK) SECTION 8. MATERIALS SECTION 8-1. MISCELLANEOUS 8-1.01 PREQUALIFIED AND TESTED SIGNING AND DELINEATION MATERIALS The Department maintains the following list of Prequalified and Tested Signing and Delineation Materials. The Engineer shall not be precluded from sampling and testing products on the list of Prequalified and Tested Signing and Delineation Materials. The manufacturer of products on the list of Prequalified and Tested Signing and Delineation Materials shall furnish the Engineer a Certificate of Compliance in conformance with the provisions in Section 6-1.07, Certificates of Compliance," of the Standard Specifications for each type of traffic product supplied. For those categories of materials included on the list of Prequalified and Tested Signing and Delineation Materials, only those products shown within the listing may be used in the work. Other categories of products, not included on the list of Prequalified and Tested Signing and Delineation Materials, may be used in the work provided they conform to the requirements of the Standard Specifications. Materials and products may be added to the list of Prequalified and Tested Signing and Delineation Materials if the manufacturer submits a New Product Information Form to the New Product Coordinator at the Transportation Laboratory. Upon a Departmental request for samples, sufficient samples shall be submitted to permit performance of required tests. Approval of materials or products will depend upon compliance with the specifications and tests the Department may elect to perform. PAVEMENT MARKERS, PERMANENT TYPE Retroreflective with Abrasion Resistant Surface ARS) 1. Apex, Model 921AR 4" x 4") 2. Ennis Paint, Models C88 4" x 4"), 911 4" x 4") and C80FH 3. Ray-O-Lite, Models AA" ARC II 4" x 4") and ARC Round Shoulder 4" x 4") 4. 3M Series 290 3.5" x 4") 5. 3M Series 290 PSA 6. Glowlite, Inc Model 988AR 4" x 4") 1. 2. 3. 4. Retroreflective with Abrasion Resistant Surface ARS) for recessed applications only) Ennis Paint, Model 948 2.3" x 4.7") Ennis Paint, Model 944SB 2" x 4")* Ray-O-Lite, Model 2002 2" x 4.6") Ray-O-Lite, Model 2004 2" x 4")* Book One San Benancio/State Route 68 Intersection Improvements 382 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???*For use only in 4.5 inch wide older) recessed slots Non-Reflective, 4-inch Round 1. Apex Universal Ceramic) 2. Apex Universal, Models 929 ABS) and 929PP Polypropylene) 3. Glowlite, Inc. Ceramic) and PP Polypropylene) 4. Hi-Way Safety, Inc., Models P20-2000W and 2001Y ABS) 5. Interstate Sales, Diamond Back" Polypropylene) 6. Novabrite Models Cdot White) Cdot-y Yellow), Ceramic 7. Novabrite Models Pdot-w White) Pdot-y Yellow), Polypropylene 8. Three D Traffic Works TD10000 ABS), TD10500 Polypropylene) 9. Ray-O-Lite, Ray-O-Dot Polypropylene) PAVEMENT MARKERS, TEMPORARY TYPE Temporary Markers for Long Term Day/Night Use 180 days or less) 1. Vega Molded Products Temporary Road Marker" 3" x 4") 2. Pexco LLC, Halftrack model 25, 25,26 and 35 Temporary Markers for Short Term Day/Night Use 14 days or less) For seal coat or chip seal applications, clear protective covers are required) 1. Apex Universal, Model 932 2. Pexco LLC, Models T.O.M., T.R.P.M., and HH" High Heat) 3. Hi-Way Safety, Inc., Model 1280/1281 4. Glowlite, Inc., Model 932 STRIPING AND PAVEMENT MARKING MATERIAL Permanent Traffic Striping and Pavement Marking Tape 1. Advanced Traffic Marking, Series 300 and 400 2. Brite-Line, Series 1000 3. Brite-Line, DeltaLine XRP" 4. Swarco Industries, Director 35" For transverse application only) 5. Swarco Industries, Director 60" 6. 3M, Stamark" Series 380 and 270 ES 7. 3M, Stamark" Series 420 For transverse application only) Temporary Removable) Striping and Pavement Marking Tape 180 days or less) 1. Advanced Traffic Marking, Series 200 2. Brite-Line, Series 100 3. Garlock Rubber Technologies, Series 2000 4. P.B. Laminations, Aztec, Grade 102 5. Swarco Industries, Director-2" 6. Trelleborg Industries, R140 Series 7. 3M Series 620 CR", and Series 780 8. 3M Series A145, Removable Black Line Mask Black Tape: for use only on Hot mix asphalt surfaces) 9. Advanced Traffic Marking Black Hide-A-Line" Black Tape: for use only on Hot mix asphalt surfaces) 10. Brite-Line BTR" Black Removable Tape Black Tape: for use only on Hot mix asphalt surfaces) Book One San Benancio/State Route 68 Intersection Improvements 383 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???11. Trelleborg Industries, RB-140 Black Tape: for use only on Hot mix asphalt surfaces) Preformed Thermoplastic Heated in place) 1. Flint Trading Inc., Hot Tape" 2. Flint Trading Inc., Premark Plus" 3. Ennis Paint Inc., Flametape" Ceramic Surfacing Laminate, 6" x 6" 1. Highway Ceramics, Inc. CLASS 1 DELINEATORS One Piece Driveable Flexible Type, 66-inch 1. Pexco LLC, Flexi-Guide Models 400 and 566" 2. Carsonite, Curve-Flex CFRM-400 3. Carsonite, Roadmarker CRM-375 4. FlexStake, Model 654 TM 5. GreenLine Model CGD 1-66 Special Use Type, 66-inch 1. Pexco LLC, Model FG 560 with 18-inch U-Channel base) 2. Carsonite, Survivor" with 18-inch U-Channel base) 3. Carsonite, Roadmarker CRM-375 with 18-inch U-Channel base) 4. FlexStake, Model 604 5. GreenLine Model CGD with 18-inch U-Channel base) 6. Impact Recovery Model D36, with #105 Driveable Base 7. Safe-Hit with 8-inch pavement anchor SH248-GP 1) 8. Safe-Hit with 15-inch soil anchor SH248-GP2) and with 18-inch soil anchor SH248-GP3) 9. Safe-Hit RT 360 Post with Soil Mount Anchor GPS) 10. Shur-Tite Products, Shur-Flex Drivable Surface Mount Type, 48-inch 1. Bent Manufacturing Company, Masterflex Model MFEX 180-48 2. Carsonite, Channelizer" 3. FlexStake, Models 704, 754 TM, and EB4 4. Impact Recovery Model D48, with #101 Fixed Surface-Mount) Base 5. Three D Traffic Works Channelflex" ID No. 522248W 6. Flexible Marker Support, Flexistiff Model C-9484 7. Safe-Hit, SH 248 SMR CHANNELIZERS Surface Mount Type, 36-inch 1. Bent Manufacturing Company, Masterflex Models MF-360-36 Round) MF-180-36 Flat) and MFEX 180-36 2. Pexco LLC, Flexi-Guide Models FG300PE, FG300UR, and FG300EFX 3. Carsonite, Super Duck" Round SDR-336) 4. Carsonite, Model SDCF03601 MB Channelizer" 5. FlexStake, Models 703, 753 TM, and EB3 Book One San Benancio/State Route 68 Intersection Improvements 384 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???6. GreenLine, Model SMD-36 7. Hi-way Safety, Inc. Channel Guide Channelizer" Model CGC36 8. Impact Recovery Model D36, with #101 Fixed Surface-Mount) Base 9. Safe-Hit, Guide Post, Model SH236SMA and Dura-Post, Model SHL36SMA 10. Three D Traffic Works Boomerang" 5200 Series 11. Flexible Marker Support, Flexistiff Model C-9484-36 12. Shur-Tite Products, Shur-Flex Lane Separation System 1. Pexco LLC, Flexi-Guide FG) 300 Curb System" 2. Qwick Kurb, Klemmfix Guide System" 3. Dura-Curb System 4. Tuff Curb 5. FG 300 Turnpike Curb CONICAL DELINEATORS, 42-inch For 28-inch Traffic Cones, see Standard Specifications) 1. Bent Manufacturing Company T-Top" 2. Plastic Safety Systems Navigator-42" 3. TrafFix Devices Grabber" 4. Three D Traffic Works Ringtop" TD7000, ID No. 742143 5. Three D Traffic Works, TD7500 6. Work Area Protection Corp. C-42 OBJECT MARKERS Type K", 18-inch 1. Pexco LLC, Model FG318PE 2. Carsonite, Model SMD 615 3. FlexStake, Model 701 KM 4. Safe-Hit, Model SH718SMA Type Q" Object Markers, 24-inch 1. Bent Manufacturing Masterflex" Model MF-360-24 2. Pexco LLC, Model FG324PE 3. Carsonite, Channelizer" 4. FlexStake, Model 701KM 5. Safe-Hit, Models SH824SMA_WA and SH824GP3_WA 6. Three D Traffic Works ID No. 531702W and TD 5200 7. Three D Traffic Works ID No. 520896W 8. Safe-Hit, Dura-Post SHLQ-24 inch CONCRETE BARRIER MARKERS AND TEMPORARY RAILING REFLECTORS Impactable Type 1. ARTUK, FB" 2. Pexco LLC, Models PCBM-12 and PCBM-T12 3. Duraflex Corp., Flexx 2020" and Electriflexx" 4. Hi-Way Safety, Inc., Model GMKRM100 5. Plastic Safety Systems BAM" Models OM-BARR and OM-BWAR TYPE K) Book One San Benancio/State Route 68 Intersection Improvements 385 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???6. Three D Traffic Works Roadguide" Model TD 9300 Non-Impactable Type 1. ARTUK, JD Series 2. Plastic Safety Systems BAM" Models OM-BITARW and OM-BITARA 3. Vega Molded Products, Models GBM and JD 4. Plastic Vacuum Forming, Cap-It C400" METAL BEAM GUARD RAIL POST MARKERS For use to the left of traffic) 1. Pexco LLC, Mini" 3" x 10") 2. Creative Building Products, Dura-Bull, Model 11201" 3. Duraflex Corp., Railrider" 4. Plastic Vacuum Forming, Cap-It C300" CONCRETE BARRIER DELINEATORS, 16-inch For use to the right of traffic) 1. Pexco LLC, Model PCBM T-16 2. Safe-Hit, Model SH216RBM 3. Three D Traffic Works Roadguide" Model 9400 CONCRETE BARRIER-MOUNTED MINI-DRUM 10" x 14" x 22") 1. Stinson Equipment Company SaddleMarker" GUARD RAILING DELINEATOR Place top of reflective element at 48 inches above plane of roadway) Wood Post Type, 27-inch 1. Pexco LLC, FG 427 and FG 527 2. Carsonite, Model 427 3. FlexStake, Model 102 GR 4. GreenLine GRD 27 5. Safe-Hit, Model SH227GRD 6. Three D Traffic Works Guardflex" TD9100 7. New Directions Mfg, NDM27 8. Shur-Tite Products, Shur-Tite Flat Mount Steel Post Type 1. Carsonite, Model CFGR-327 RETROREFLECTIVE SHEETING Channelizers, Barrier Markers, and Delineators 1. Avery Dennison T-6500 Series For rigid substrate devices only) 2. Avery Dennison WR-7100 Series 3. Nippon Carbide Industries, Flexible Ultralite Grade ULG) II 4. Reflexite, PC-1000 Metalized Polycarbonate 5. Reflexite, AC-1000 Acrylic 6. Reflexite, AP-1000 Metalized Polyester 7. Reflexite, Conformalight, AR-1000 Abrasion Resistant Coating Book One San Benancio/State Route 68 Intersection Improvements 386 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???8. 3M, High Intensity Traffic Cones, 4-inch and 6-inch Sleeves 1. Nippon Carbide Industries, Flexible Ultralite Grade ULG) II 2. Reflexite, Vinyl, TR" Semi-transparent) or Conformalight" 3. 3M Series 3840 4. Avery Dennison S-9000C Drums 1. Avery Dennison WR-6100 2. Nippon Carbide Industries, Flexible Ultralite Grade ULG) II 3. Reflexite, Conformalight", Super High Intensity" or High Impact Drum Sheeting" 4. 3M Series 3810 Barricades: Type I, Medium-Intensity Typically Enclosed Lens, Glass-Bead Element) 1. Nippon Carbide Industries, CN8117 2. Avery Dennison, W 1100 series 3. 3M Series CW 44 Barricades: Type II, Medium-High-Intensity Typically Enclosed Lens, Glass-Bead Element) 1. Avery Dennison, W-2100 Series Vertical Clearance Signs: Structure Mounted 1. 3M Model 4061, Diamond Grade DG3, Fluorescent Yellow Signs: Type II, Medium-High-Intensity Typically Enclosed Lens, Glass-Bead Element) 1. Avery Dennison, T-2500 Series 2. Nippon Carbide Industries, Nikkalite 18000 Signs: Type III, High-Intensity Typically Encapsulated Glass-Bead Element) 1. Avery Dennison, T-5500A and T-6500 Series 2. Nippon Carbide Industries, Nikkalite Brand Ultralite Grade II 3. 3M 3870 and 3930 Series Signs: Type IV, High-Intensity Typically Unmetallized Microprismatic Element) 1. Avery Dennison, T-6500 Series 2. Nippon Carbide Industries, Crystal Grade, 94000 Series 3. Nippon Carbide Industries, Model No. 94847 Fluorescent Orange 4. 3M Series 3930 and Series 3924S Signs: Type VI, Elastomeric Roll-Up) High-Intensity, without Adhesive 1. Avery Dennison, WU-6014 2. Novabrite LLC, Econobrite" 3. Reflexite Vinyl" 4. Reflexite SuperBright" Book One San Benancio/State Route 68 Intersection Improvements 387 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???5. Reflexite Marathon" 6. 3M Series RS20 Signs: Type VII, Super-High-Intensity Typically Unmetallized Microprismatic Element) 1. 3M Series 3924S, Fluorescent Orange 2. 3M LDP Series 3970 Signs: Type VIII, Super-High-Intensity Typically Unmetallized Microprismatic Element) 1. Avery Dennison, T-7500 Series 2. Avery Dennison, T-7511 Fluorescent Yellow 3. Avery Dennison, T-7513 Fluorescent Yellow Green 4. Avery Dennison, W-7514 Fluorescent Orange 5. Nippon Carbide Industries, Nikkalite Crystal Grade Series 92800 6. Nippon Carbide Industries, Nikkalite Crystal Grade Model 92847 Fluorescent Orange Signs: Type IX, Very-High-Intensity Typically Unmetallized Microprismatic Element) 1. 3M VIP Series 3981 Diamond Grade Fluorescent Yellow 2. 3M VIP Series 3983 Diamond Grade Fluorescent Yellow/Green 3. 3M VIP Series 3990 Diamond Grade 4. Avery Dennison T-9500 Series 5. Avery Dennison, T9513, Fluorescent Yellow Green 6. Avery Dennison, W9514, Fluorescent Orange 7. Avery Dennison, T-9511 Fluorescent Yellow SPECIALTY SIGNS 1. Reflexite Endurance" Work Zone Sign with Semi-Rigid Plastic Substrate) ALTERNATIVE SIGN SUBSTRATES Fiberglass Reinforced Plastic FRP) and Expanded Foam PVC 1. Fiber-Brite FRP) 2. Sequentia, Polyplate" FRP) 3. Inteplast Group InteCel" 0.5 inch for Post-Mounted CZ Signs, 48-inch or less)(PVC) Aluminum Composite, Temporary Construction Signs and Permanent Signs up to 4 foot, 7 Inches 1. Alcan Composites Dibond Material, 80 mils" 2. Mitsubishi Chemical America, Alpolic 350 3. Bone Safety Signs, Bone Light ACM temporary construction signs only) 8-1.02 FILTER FABRIC Filter fabric for rock slope protection must be Class A as specified in Section 88-1.02, Filtration," of the Standard Specifications. Book One San Benancio/State Route 68 Intersection Improvements 388 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???SECTION 8-2. CONCRETE 8-2.01 PORTLAND CEMENT CONCRETE Portland cement concrete shall conform to the provisions in Section 90, Portland Cement Concrete," of the Standard Specifications and these Special Provisions. 8-2.02 PRECAST CONCRETE QUALITY CONTROL GENERAL Precast concrete quality control shall conform to these Special Provisions. Unless otherwise specified, precast concrete quality control shall apply when any precast concrete members are fabricated in conformance with the provisions in Section 49, Piling," or Section 51, Concrete Structures," of the Standard Specifications. Precast concrete quality control shall not apply to precast concrete members that are fabricated from minor concrete. Quality Control QC) shall be the responsibility of the Contractor. The Contractor's QC inspectors shall perform inspection and testing prior to precasting, during precasting, and after precasting, and as specified in this section and additionally as necessary to ensure that materials and workmanship conform to the details shown on the plans, and to the specifications. Quality Assurance QA) is the prerogative of the Engineer. Regardless of the acceptance for a given precast element by the Contractor, the Engineer will evaluate the precast element. The Engineer will reject any precast element that does not conform to the approved Precast Concrete Quality Control Plan PCQCP), the details shown on the plans, or to these Special Provisions. The Contractor shall designate in writing a precast Quality Control Manager QCM) for each precasting facility. The QCM shall be responsible directly to the Contractor for the quality of precasting, including materials and workmanship, performed by the Contractor and all subcontractors. The QCM shall be the sole individual responsible to the Contractor for submitting, receiving, and approving all correspondence, required submittals, and reports to and from the Engineer. The QCM shall not be employed or compensated by any subcontractor, or other persons or entities hired by subcontractors, or suppliers, who will provide other services or materials for the project. The QCM may be an employee of the Contractor. Prior to submitting the PCQCP required herein, a meeting between the Engineer, the Contractor's QCM, and a representative from each entity performing precast concrete operations for this project, shall be held to discuss the requirements for precast quality control. QC Inspectors shall either be 1) licensed as Civil Engineers in the State of California, or 2) have a current Plant Quality Personnel Certification, Level II, from the Precast/Prestressed Concrete Institute. A QC Inspector shall witness all precast concrete operations. PRECAST CONCRETE QUALIFICATION AUDIT Unless otherwise specified, no Contractors or subcontractors performing precast concrete operations for the project shall commence work without having successfully completed the Department's Precast Fabrication Qualification Audit, hereinafter referred to as the audit. Copies of the audit form, along with procedures for requesting and completing the audit, are available at: http://www.dot.ca.gov/hq/esc/Translab/OSM/smbresources.htm An audit that was previously approved by the Department no more than 3 years before the award of this contract will be acceptable for the entire period of this contract, provided the Engineer determines the audit is for the same type of work that is to be performed on this contract. Book One San Benancio/State Route 68 Intersection Improvements 389 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???A list of facilities that have successfully completed the audit and are authorized to provide material for this contract is available at: http://www.dot.ca.gov/hq/esc/Translab/OSM/smdocuments/Internet auditlisting.pdf Successful completion of an audit shall not relieve the Contractor of the responsibility for furnishing materials or producing finished work of the quality specified in these Special Provisions and as shown on the plans. PRECAST CONCRETE QUALITY CONTROL PLAN Prior to performing any precasting operations, the Contractor shall submit to the Engineer, in conformance with the provisions in Section 5-1.02, Plans and Working Drawings," of the Standard Specifications, 3 copies of a separate PCQCP for each item of work to be precast. A separate PCQCP shall be submitted for each facility. As a minimum, each PCQCP shall include the following: A. The name of the precasting firm, the concrete plants to be used, and any concrete testing firm to be used; B. A manual prepared by the precasting firm that includes equipment, testing procedures, safety plan, and the names, qualifications, and documentation of certifications for all personnel to be used; C. The name of the QCM and the names, qualifications, and documentation of certifications for all QC inspection personnel to be used; D. An organizational chart showing all QC personnel and their assigned QC responsibilities; E. The methods and frequencies for performing all required quality control procedures, including all inspections, material testing, and any required survey procedures for all components of the precast elements including prestressing systems, concrete, grout, reinforcement, steel components embedded or attached to the precast member, miscellaneous metal, and formwork; F. A system for identification and tracking of required precast element repairs, and a procedure for the reinspection of any repaired precast element. The system shall have provisions for a method of reporting nonconforming precast elements to the Engineer; and G. Forms to be used for Certificates of Compliance, daily production logs, and daily reports. The Engineer shall have 4 weeks to review the PCQCP submittal after a complete plan has been received. No precasting shall be performed until the PCQCP is approved in writing by the Engineer. A PCQCP that was previously approved by the Engineer no more than one year prior to the beginning of work on this contract will be acceptable for the entire period of this contract, provided the Engineer determines the PCQCP is for the same type of work that is to be performed on this contract. An amended PCQCP or addendum shall be submitted to, and approved in writing by the Engineer, for any proposed revisions to the approved PCQCP. An amended PCQCP or addendum will be required for any revisions to the PCQCP, including but not limited to changes in concrete plants or source materials, changes in material testing procedures and testing labs, changes in procedures and equipment, changes in QC personnel, or updated systems for tracking and identifying precast elements. The Engineer shall have 2 weeks to complete the review of the amended PCQCP or addendum, once a complete submittal has been received. Work that is affected by any of the proposed revisions shall not be performed until the amended PCQCP or addendum has been approved. Book One San Benancio/State Route 68 Intersection Improvements 390 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???After final approval of the PCQCP, amended PCQCP, or addendum, the Contractor shall submit 7 copies to the Engineer of each of these approved documents. It is expressly understood that the Engineer's approval of the Contractor's PCQCP shall not relieve the Contractor of any responsibility under the contract for the successful completion of the work in conformance with the requirements of the plans and specifications. The Engineer's approval shall neither constitute a waiver of any of the requirements of the plans and specifications nor relieve the Contractor of any obligation hereunder; and defective work, materials, and equipment may be rejected notwithstanding approval of the PCQCP. REPORTING The QC Inspector shall provide reports to the QCM on a daily basis for each day that precasting operations are performed. A daily production log for precasting shall be kept by the QCM for each day that precasting operations, including setting forms, placing reinforcement, setting prestressing steel, casting, curing, post tensioning, and form release, are performed. The log shall include the facility location, and shall include a specific description of casting or related operations, any problems or deficiencies discovered, any testing or repair work performed, and the names of all QC personnel and the specific QC inspections they performed that day. The daily report from each QC Inspector shall also be included in the log. This daily log shall be available for viewing by the Engineer, at the precasting facility. All reports regarding material tests and any required survey checks shall be signed by the person who performed the test or check, and then submitted directly to the QCM for review and signature prior to submittal to the Engineer. Corresponding names shall be clearly printed or type-written next to all signatures. The Engineer shall be notified immediately in writing when any precasting problems or deficiencies are discovered and of the proposed repair or process changes required to correct them. The Engineer shall have 4 weeks to review these procedures. No remedial work shall begin until the Engineer approves these procedures in writing. The following items shall be included in a precast report that is to be submitted to the Engineer following the completion of any precast element: A. Reports of all material tests and any required survey checks; B. Documentation that the Contractor has evaluated all tests and corrected all rejected deficiencies, and all repairs have been re-examined with the required tests and found acceptable; and C. A daily production log. At the completion of any precast element, and if the QCM determines that element is in conformance with these Special Provisions, the QCM shall sign and furnish to the Engineer, a Certificate of Compliance in conformance with the provisions in Section 6-1.07, Certificates of Compliance," of the Standard Specifications. This Certificate of Compliance shall be submitted with the precast report. The certificate shall state that all of the materials and workmanship incorporated in the work, and all required tests and inspections of this work, have been performed in conformance with the details shown on the plans and the provisions of the Standard Specifications and these Special Provisions. PAYMENT In the event the Engineer fails to complete the review of 1) a PCQCP, 2) an amended PCQCP or addendum, or 3) a proposed repair or process change, within the time allowed, and if, in the opinion of the Engineer, completion of the work is delayed or interfered with by reason of the Engineer's delay in completing the review, the Contractor will be compensated for any resulting Book One San Benancio/State Route 68 Intersection Improvements 391 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???loss, and an extension of time will be granted, in the same manner as provided for in Section 8-1.09, Right of Way Delays," of the Standard Specifications. All required repair work or process changes required to correct precasting operation deficiencies, whether discovered by the QCM, QC Inspector, or by the Engineer, and any associated delays or expenses to the Contractor caused by performing these repairs, shall be at the Contractor's expense. Full compensation for conforming to the requirements of this section shall be considered as included in the contract prices paid for the various items of work involved and no additional compensation will be allowed therefor. 8-2.03 SELF-CONSOLIDATING CONCRETE FOR PRECAST ELEMENTS GENERAL Summary This section includes specifications for self-consolidating concrete SCC). You may use SCC for precast concrete. Definitions self-consolidating concrete: Flowing concrete capable of spreading to a level state without segregation and without the use of internal or external vibrators. Submittals Submit the following for approval before placing SCC: 1. SCC mix design and placement procedures 2. Trial batch test report Quality Control and Assurance General Prepare SCC specimens for compressive strength testing under California Test 540 except fabricate test specimens as follows: 1. Place test molds on a firm, flat surface to prevent distortion of the bottom surface. When more than 1 specimen is to be made from the same batch, make all specimens simultaneously. Fill the mold in 1 lift, pouring the concrete from a larger container. Pat sides of the mold lightly by hand, or jig by rocking the mold from side to side. 2. Strike off the surface of the concrete even with the top edge of the mold. Wipe the sides of the mold free of excess concrete and press the lid on. Prequalification of SCC Mix Design Prequalify the SCC mix design with a trial batch using the same materials, mix proportions, mixing equipment, procedures, and size of batch to be used in the production of SCC. The trial batch test report for the SCC mix design must include the following tests and results: Book One San Benancio/State Route 68 Intersection Improvements 392 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Property Requirement Test Method Slump Flow At least 20 inches ASTM C 1611 Flow Rate T50 Between 2 and 7 seconds ASTM C 1611 Visual Stability Index 1.0 or less ASTM C 1611 J-Ring Flow The difference between J-Ring ASTM C 1621 flow and the slump flow must not exceed 2 inches Column Segregation Static segregation must not ASTM C 1610 exceed 15% Bleeding Bleeding capacity must not ASTM C 232 exceed 2.5% Compressive Strength The average of 5 test cylinders California Test must be at least 580 psi greater 521 than the specified strength.' Minimum Compressive The minimum for an individual California Test Strength test cylinder must not be less than 521 the specified strength.' Note: a At the maximum age specified or allowed Field Quality Control Determine the fine aggregate moisture content for each batch of SCC. Determine slump flow and visual stability index VSI) at the beginning of SCC placement and whenever a set of concrete cylinders is prepared. The slump flow must not vary by more than 3 inches from the mix design slump flow, and the minimum allowable slump flow is 20 inches. VSI must be 1.0 or less. If the Engineer rejects SCC for slump flow and VSI, make corrective changes in the SCC mix design or placement procedures before placing additional SCC. Submit revised SCC mix design or placement procedures for approval. MATERIALS SCC must comply with Section 90, Portland Cement Concrete," of the Standard Specifications except Section 90-3, Aggregate Gradings," of the Standard Specifications does not apply. PAYMENT The Department measures and pays for SCC under the specifications requiring or allowing its use. SECTION 8-3. WELDING 8-3.01 WELDING GENERAL Unless otherwise specified, Section 8-3, Welding," shall apply to any welding that is specified to conform to an AWS welding code. Requirements of the AWS welding codes shall apply unless otherwise specified in the Standard Specifications, on the plans, or in these Special Provisions. Wherever the abbreviation AWS is used, it shall be equivalent to the abbreviations ANSIIAWS or AASHTO/AWS. Wherever reference is made to the following AWS welding codes in the Standard Specifications, on the plans, or in these Special Provisions, the year of adoption for these codes shall be as listed: SCC Mix Design Requirements Book One San Benancio/State Route 68 Intersection Improvements 393 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???AWS Code Year of Adoption D1.1 2008 D1.3 2008 D IA 2005 D1.5 2008 D1.6 2007 D1.8 2009 Flux cored welding electrodes conforming to the requirements of AWS A5.20 E6XT-4 or E7XT-4 shall not be used to perform welding for this project. Unless otherwise specified, Clause 6.1.3 of AWS D1.1, paragraph 1 of Section 7.1.2 of AWS D1.4, and Clause 6.1.1.2 of AWS D1.5, are replaced with the following: The QC Inspector shall be the duly designated person who acts for and on behalf of the Contractor for inspection, testing, and quality related matters for all welding. Quality Assurance QA) is the prerogative of the Engineer. The QA Inspector is the duly designated person who acts for and on behalf of the Engineer. The QC Inspector shall be responsible for quality control acceptance or rejection of materials and workmanship. When the term Inspector" is used without further qualification, it shall refer to the QC Inspector. Inspection and approval of all joint preparations, assembly practices, joint fit-ups, welding techniques, and the performance of each welder, welding operator, and tack welder shall be documented by the QC Inspector on a daily basis for each day welding is performed. For each inspection, including fit-up, Welding Procedure Specification WPS) verification, and final weld inspection, the QC Inspector shall confirm and document compliance with the requirements of the AWS or other specified code criteria and the requirements of these Special Provisions on all welded joints before welding, during welding, and after the completion of each weld. The Engineer shall have the authority to verify the qualifications or certifications of any welder, QC Inspector, or NDT personnel to specified levels by retests or other means approved by the Engineer. When joint weld details that are not prequalified to the details of Clause 3 of AWS D1.1 or to the details of Figure 2.4 or 2.5 of AWS D1.5 are proposed for use in the work, the joint details, their intended locations, and the proposed welding parameters and essential variables, shall be approved by the Engineer. The Contractor shall allow the Engineer 15 days to complete the review of the proposed joint detail locations. In addition to the requirements of AWS D1.1, welding procedure qualifications for work welded in conformance with this code shall conform to the following: When a nonstandard weld joint is to be made using a combination of WPSs, a single test may be conducted combining the WPSs to be used in production, provided the essential variables, including weld bead placement, of each process are limited to those established in Table 4.5. Upon approval of the proposed joint detail locations and qualification of the proposed joint details, welders and welding operators using these details shall perform a qualification test plate using the WPS variables and the joint detail to be used in production. The test plate shall have the maximum thickness to be used in production and a minimum length of 18 inches. The test plate shall be mechanically and radiographically tested. Mechanical and radiographic testing and acceptance criteria shall be as specified in the applicable AWS codes. The Engineer will witness all qualification tests for WPSs that were not previously approved by the Department. Book One San Benancio/State Route 68 Intersection Improvements 394 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???In addition to the requirements specified in the applicable code, the period of effectiveness for a welder's or welding operator's qualification shall be a maximum of 3 years for the same weld process, welding position, and weld type. If welding will be performed without gas shielding, then qualification shall also be without gas shielding. Excluding welding of fracture critical members, a valid qualification at the beginning of work on a contract will be acceptable for the entire period of the contract, as long as the welder's or welding operator's work remains satisfactory. The Contractor shall notify the Engineer 7 days prior to performing any procedure qualification tests. Witnessing of qualification tests by the Engineer shall not constitute approval of the intended joint locations, welding parameters, or essential variables. The Contractor shall notify the Engineer using the Standard TL-38 Inspection Form" located at: http://www.dot.ca.gov/hq/esc/Translab/OSM/smbfonns.htm Clause 6.14.6, Personnel Qualification," of AWS D1.1, Section 7.8, Personnel Qualification," of AWS Dl.4, and Clause 6.1.3.4, Personnel Qualification," of AWS 131.5 are replaced with the following: Personnel performing nondestructive testing NDT) shall be qualified and certified in conformance with the requirements of the American Society for Nondestructive Testing ASNT) Recommended Practice No. SNT-TC-1A and the Written Practice of the NDT firm. The Written Practice of the NDT firm shall meet or exceed the guidelines of the ASNT Recommended Practice No. SNT-TC-IA. Individuals who perform NDT, review the results, and prepare the written reports shall be either: A. Certified NDT Level II technicians, or; B. Level III technicians who hold a current ASNT Level III certificate in that discipline and are authorized and certified to perform the work of Level II technicians. Clause 6.6.5, Nonspecified NDT Other than Visual," of AWS D1.1, Section 7.6.5 of AWS D1.4 and Clause 6.6.5 of AWS D1.5 shall not apply. For any welding, the Engineer may direct the Contractor to perform NDT that is in addition to the visual inspection or NDT specified in the AWS or other specified welding codes, in the Standard Specifications, or in these Special Provisions. Except as provided for in these Special Provisions, additional NDT required by the Engineer, and associated repair work, will be paid for as extra work as provided in Section 4-1.03D, Extra Work," of the Standard Specifications. Prior to release of welded material by the Engineer, if testing by NDT methods other than those originally specified discloses an attempt to defraud or reveals a gross nonconformance, all costs associated with the repair of the deficient area, including NDT of the weld and of the repair, and any delays caused by the repair, shall be at the Contractor's expense. A gross nonconformance is defined as the sum of planar type rejectable indications in more than 20 percent of the tested length. When less than 100 percent of NDT is specified for any weld, it is expected that the entire length of weld meet the specified acceptance-rejection criteria. Should any welding deficiencies be discovered by additional NDT directed or performed by the Engineer that utilizes the same NDT method as that originally specified, all costs associated with the repair of the deficient area, including NDT of the weld and of the weld repair, and any delays caused by the repair, shall be at the Contractor's expense. Repair work to correct welding deficiencies discovered by visual inspection directed or performed by the Engineer, and any associated delays or expenses caused to the Contractor by performing these repairs, shall be at the Contractor's expense. Book One San Benancio/State Route 68 Intersection Improvements 395 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???WELDING QUALITY CONTROL Welding quality control shall conform to the requirements in the AWS or other specified welding codes, the Standard Specifications, and these Special Provisions. Unless otherwise specified, welding quality control shall apply to work welded in conformance with the provisions in the following: A. Section 49, Piling," Section 52, Reinforcement," Section 55, Steel Structures," and Section 75-1.035, Bridge Joint Restrainer Units," of the Standard Specifications B. Structural Steel for Building Work" of these Special Provisions Unless otherwise specified, Clauses 6.1.4.1 and 6.1.4.3 of AWS D1.1, paragraph 2 of Section 7.1.2 of AWS D1.4, and Clauses 6.1.3.2 through 6.1.3.3 of AWS Dl.5 are replaced with the following: The QC Inspector shall be currently certified as an AWS Certified Welding Inspector CWI) in conformance with the requirements in AWS QC I, Standard for AWS Certification of Welding Inspectors." The QC Inspector may be assisted by an Assistant QC Inspector provided that this individual is currently certified as an AWS Certified Associate Welding Inspector CAWI) in conformance with the requirements in AWS QC1, Standard for AWS Certification of Welding Inspectors." The Assistant QC Inspector may perform inspection under the direct supervision of the QC Inspector provided the assistant is always within visible and audible range of the QC Inspector. The QC Inspector shall be responsible for signing all reports and for determining if welded materials conform to workmanship and acceptance criteria. The ratio of QC Assistants to QC Inspectors shall not exceed 5 to 1. The Contractor shall designate in writing a welding Quality Control Manager QCM). The QCM shall be responsible directly to the Contractor for the quality of welding, including materials and workmanship, performed by the Contractor and subcontractors. The QCM shall be the sole individual responsible to the Contractor for submitting, receiving, reviewing, and approving all correspondence, required submittals, and reports to and from the Engineer. The QCM shall be a registered professional engineer or shall be currently certified as a CWI. Unless the QCM is hired by a subcontractor providing only QC services, the QCM shall not be employed or compensated by any subcontractor, or by other persons or entities hired by subcontractors, who will provide other services or materials for the project. The QCM may be an employee of the Contractor. The QCM shall sign and furnish to the Engineer, a Certificate of Compliance in conformance with the provisions in Section 6-1.07, Certificates of Compliance," of the Standard Specifications for each item of work for which welding was performed. The certificate shall state that all of the materials and workmanship incorporated in the work, and all required tests and inspections of this work, have been performed in conformance with the details shown on the plans, the Standard Specifications, and these Special Provisions. Welding inspection personnel or NDT firms to be used in the work shall not be employed or compensated by any subcontractor, or by other persons or entities hired by subcontractors, who will provide other services or materials for the project, except for the following conditions: A. The work is welded in conformance with AWS D1.5 and is performed at a permanent fabrication or manufacturing facility that is certified under the AISC Quality Certification Program, Category CBR, Major Steel Bridges and Fracture Critical endorsement F, when applicable. B. Structural steel for building work is welded in conformance with AWS D1.1 and is performed at a permanent fabrication or manufacturing facility that is certified under the AISC Quality Certification Program, Category STD, Standard for Steel Building Structures. Book One San Benancio/State Route 68 Intersection Improvements 396 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???For welding performed at such facilities, the inspection personnel or NDT firms may be employed or compensated by the facility performing the welding provided the facility maintains a QC program that is independent from production. Unless otherwise specified, an approved independent third party will witness the qualification tests for welders or welding operators. The independent third party shall be a current CWI and shall not be an employee of the contractor performing the welding. The Contractor shall allow the Engineer 15 days to review the qualifications and copy of the current certification of the independent third party. Prior to submitting the Welding Quality Control Plan WQCP) required herein, a prewelding meeting between the Engineer, the Contractor's QCM, and a representative from each entity performing welding or inspection for this project, shall be held to discuss the requirements for the WQCP. Information regarding the contents, format, and organization of a WQCP, is available at the Transportation Laboratory and at: http://www.dot.ca.gov/hq/esc/Translab/OSM/smbresources.htm The Contractor shall submit to the Engineer, in conformance with the provisions in Section 5-1.02, Plans and Working Drawings," of the Standard Specifications, 2 copies of a separate WQCP for each subcontractor or supplier for each item of work for which welding is to be performed. The Contractor shall allow the Engineer 15 days to review the WQCP submittal after a complete plan has been received. No welding shall be performed until the WQCP is approved in writing by the Engineer. An amended WQCP or any addendum to the approved WQCP shall be submitted to, and approved in writing by the Engineer, for proposed revisions to the approved WQCP. An amended WQCP or addendum will be required for revisions to the WQCP, including but not limited to a revised WPS; additional welders; changes in NDT firms, QC, or NDT personnel or procedures; or updated systems for tracking and identifying welds. The Engineer shall have 7 days to complete the review of the amended WQCP or addendum. Work affected by the proposed revisions shall not be performed until the amended WQCP or addendum has been approved. After final approval of the WQCP, amended WQCP, or addendum, the Contractor shall submit 7 copies to the Engineer of the approved documents. A copy of the Engineer approved document shall be available at each location where welding is to be performed. All welding will require inspection by the Engineer. The Contractor shall request inspection at least 3 business days prior to the beginning of welding for locations within California and 5 business days for locations outside of California. The Contractor shall request inspection at: http://www.dot.ca.gov/hq/esc/Translab/OSM/smbforms.htm Continuous inspection shall be provided when any welding is being performed. Continuous inspection, as a minimum, shall include having a QC Inspector within such close proximity of all welders or welding operators so that inspections by the QC Inspector of each welding operation at each welding location does not lapse for a period exceeding 30 minutes. A daily production log for welding shall be kept for each day that welding is performed. The log shall clearly indicate the locations of all welding. The log shall include the welders' names, amount of welding performed, any problems or deficiencies discovered, and any testing or repair work performed, at each location. The daily report from each QC Inspector shall also be included in the log. Book One San Benancio/State Route 68 Intersection Improvements 397 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The following items shall be included in a Welding Report that is to be submitted to the Engineer within 15 days following the performance of any welding: A. A daily production log. B. Reports of all visual weld inspections and NDT. C. Radiographs and radiographic reports, and other required NDT reports. D. A summary of welding and NDT activities that occurred during the reporting period. E. Reports of each application of heat straightening. F. A summarized log listing the rejected lengths of weld by welder, position, process, joint configuration, and piece number. G. Documentation that the Contractor has evaluated all radiographs and other nondestructive tests and corrected all rejectable deficiencies, and that all repaired welds have been reexamined using the required NDT and found acceptable. The following information shall be clearly written on the outside of radiographic envelopes: name of the QCM, name of the nondestructive testing firm, name of the radiographer, date, contract number, complete part description, and all included weld numbers, report numbers, and station markers or views, as detailed in the WQCP. In addition, all interleaves shall have clearly written on them the part description and all included weld numbers and station markers or views, as detailed in the WQCP. A maximum of 2 pieces of film shall be used for each interleave. Reports of all visual inspections and NDT shall be signed by the inspector or technician and submitted daily to the QCM for review and signature prior to submittal to the Engineer. Corresponding names shall be clearly printed or typewritten next to all signatures. Reports of all NDT, whether specified, additional, or informational, performed by the Contractor shall be submitted to the Engineer. The Engineer will review the Welding Report to determine if the Contractor is in conformance with the WQCP. Except for field welded steel pipe piling, the Engineer shall be allowed 15 days to review the report and respond in writing after the complete Welding Report has been received. Prior to receiving notification from the Engineer of the Contractor's conformance with the WQCP, the Contractor may encase in concrete or cover welds for which the Welding Report has been submitted. However, should the Contractor elect to encase or cover those welds prior to receiving notification from the Engineer, it is expressly understood that the Contractor shall not be relieved of the responsibility for incorporating material in the work that conforms to the requirements of the plans and specifications. Material not conforming to these requirements will be subject to rejection. For field welded steel pipe piling, including bar reinforcement in the piling, the Contractor shall allow the Engineer 2 business days to review the Welding Report and respond in writing after the required items have been received. No field welded steel pipe piling shall be installed, and no reinforcement in the piling shall be encased in concrete until the Engineer has approved the above requirements in writing. In addition to the requirements in AWS Dl.1 and AWS D1.5, third-time excavations of welds or base metal to repair unacceptable discontinuities, regardless of NDT method, and all repairs of cracks require prior approval of the Engineer. The Engineer shall be notified immediately in writing when welding problems, deficiencies, base metal repairs, or any other type of repairs not submitted in the WQCP are discovered, and also of the proposed repair procedures to correct them. For requests to perform third-time excavations or repairs of cracks, the Contractor shall include an engineering evaluation of the proposed repair. The engineering evaluation, at a minimum, shall address the following: A. What is causing each defect? B. Why the repair will not degrade the material properties? C. What steps are being taken to prevent similar defects from happening again? Book One San Benancio/State Route 68 Intersection Improvements 398 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The Contractor shall allow the Engineer 7 days to review these procedures. No remedial work shall begin until the repair procedures are approved in writing by the Engineer. Clause 6.5.4 of AWS D1.5 is replaced with the following: The QC Inspector shall inspect and approve each joint preparation, assembly practice, welding technique, joint fit-up, and the performance of each welder, welding operator, and tack welder to make certain that the applicable requirements of this code and the approved Welding Procedure Specification WPS) are met. The QC Inspector shall examine the work to make certain that it meets the requirements of Clauses 3 and 6.26. The size and contour of all welds shall be measured using suitable gages. Visual inspection for cracks in welds and base metal, and for other discontinuities shall be aided by strong light, magnifiers, or such other devices as may be helpful. Acceptance criteria different from those specified in this code may be used when approved by the Engineer. In addition to the requirements of AWS D1.5, Clause 5.12 or 5.13, welding procedures qualification for work welded in conformance with that code shall conform to the following requirements: A. Unless considered pre-qualified, fillet welds shall be qualified in each position. The fillet weld soundness test shall be conducted using the essential variables of the WPS as established by the Procedure Qualification Record PQR). B. For qualification of joints that do not conform to Figures 2.4 and 2.5 of AWS D1.5, a minimum of 2 WPS qualification tests are required. The tests shall be conducted using both Figure 5.1 and Figure 5.3. The test conforming to Figure 5.1 shall be conducted in conformance with AWS D1.5, Clause 5.12 or 5.13. The test conforming to Figure 5.3 shall be conducted using the welding electrical parameters that were established for the test conducted conforming to Figure 5.1. The ranges of welding electrical parameters established during welding per Figure 5.1 in conformance with AWS D1.5, Clause 5.12, shall be further restricted according to the limits in Table 5.3 during welding per Figure 5.3. C. Multiple zones within a weld joint may be qualified. The travel speed, amperage, and voltage values that are used for tests conducted per AWS D1.5 Clause 5.13 shall be consistent for each pass in a weld joint, and shall in no case vary by more than 10 percent for travel speed, 10 percent for amperage, and 7 percent for voltage as measured from a predetermined target value or average within each weld pass or zone. The travel speed shall in no case vary by more than 15 percent when using submerged arc welding. D. For a WPS qualified in conformance with AWS D1.5 Clause 5.13, the values to be used for calculating ranges for current and voltage shall be based on the average of all weld passes made in the test. Heat input shall be calculated using the average of current and voltage of all weld passes made in the test for a WPS qualified in conformance with Clause 5.12 or 5.13. E. Macroetch tests are required for WPS qualification tests, and acceptance shall be per AWS D1.5 Clause 5.19.3. F. When a nonstandard weld joint is to be made using a combination of WPSs, a test conforming to Figure 5.3 may be conducted combining the WPSs to be used in production, provided the essential variables, including weld bead placement, of each process are limited to those established in Table 5.3. G. Prior to preparing mechanical test specimens, the PQR welds shall be inspected by visual and radiographic tests. Backing bar shall be 3 inches in width and shall remain in place during NDT testing. Results of the visual and radiographic tests shall comply with AWS Book One San Benancio/State Route 68 Intersection Improvements 399 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???D1.5 Clause 6.26.2, excluding Clause 6.26.2.2. Test plates that do not comply with both tests shall not be used. PAYMENT Full compensation for conforming to the requirements of Welding" shall be considered as included in the contract prices paid for the various items of work involved and no additional compensation will be allowed therefor. SECTION 9. DESCRIPTION OF WORK 9-1.00 DESCRIPTION OF BRIDGE WORK El Toro Creek Bridge Br. No. 44C0117 The El Toro Creek Bridge at San Benancio Road is to be widened 25'-4th" to the north east. The widened structure will be a Precast Prestressed I-Girder with a Cast-In-Place reinforced concrete deck superstructure. The substructure will consist of a two column Cast-In-Place reinforced concrete bent and end diaphragm type Cast-In-Place reinforced concrete abutments found on driven steel H-piling. The existing Type 115 Metal Tube Railing will be removed and replaced with California ST-20 Bridge Rail and shall comply with the visual requirements outlined in Appendix B, Mitigation Monitoring and Reporting Plan," of these Special Provisions. 9-1.01 INCREASED AND DECREASED QUANTITIES: The County reserves the right to increase, decrease or delete the quantities of items as follows: ITEM CODE. DESCRIPTION 074028 Temporary Fiber Roll 074028A Temporary Large Fiber Roll 074034 Temporary Cover 074041 Street Sweeping 074056 Rain Event Action Plan 074057 Storm Water Annual Report 120151 Temporary Traffic Stripe Paint) 120152 Temporary Pavement Marking Paint) 129000 Temporary Railing Type K) 394048 Place Hot Mix Asphalt Dike Type E) 394073 Place Hot Mix Asphalt Dike Type A) 394074 Place Hot Mix Asphalt Dike Type C) 394090 Place Hot Mix Asphalt Misc. Area) The adjustment provision in Section 4-1.03 Changes" of the Standard Specifications shall not apply to the above items. Such other items or details, not mentioned above, that are required by the Plans, Standard Specifications, or these Special Provisions, shall be performed, placed, constructed, or installed. SECTION 10. CONSTRUCTION DETAILS Book One San Benancio/State Route 68 Intersection Improvements 400 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???SECTION 10-1. GENERAL 10-1.00 CONSTRUCTION PROJECT INFORMATION SIGNS Before any major physical construction work readily visible to highway users is started on this contract, the Contractor shall furnish and erect 2 Type 1 Construction Project Information signs at the locations designated by the Engineer. The signs and overlays shall be of a type and material consistent with the estimated time of completion of the project and shall conform to the details shown on the plans. The sign letters, the border and the Department's construction logos shall conform to the colors non-reflective) and details shown on the plans, and shall be on a white background non-reflective). The colors blue and orange shall conform to PR Color Number 3 and Number 6, respectively, as specified in the Federal Highway Administration's Color Tolerance Chart. The sign message to be used for fund types shall consist of the following, in the order shown: STATE HIGHWAY FUNDS MONTEREY COUNTY TRANSPORTATION FUNDS The sign message to be used for type of work shall consist of the following: HIGHWAY IMPROVEMENT The sign message to be used for the Year of Completion of Project Construction will be furnished by the Engineer. The Contractor shall furnish and install the Year" sign overlay within 10 working days of notification of the year date to be used. The letter sizes to be used shall be as shown on the plans. The information shown on the signs shall be limited to that shown on the plans. The signs shall be kept clean and in good repair by the Contractor. Upon completion of the work, the signs shall be removed and disposed of outside the highway right of way in conformance with the provisions in Section 7-1.13 of the Standard Specifications. Full compensation for furnishing, erecting, maintaining, and removing and disposing of the construction project information signs shall be considered as included in the contract lump sum price paid for construction area signs and no additional compensation will be allowed therefor. 10-1.01 ORDER OF WORK Order of work shall conform to the provisions in Section 5-1.05, Order of Work," of the Standard Specifications and these Special Provisions. Attention is directed to Miscellaneous Concrete Construction" of these Special Provisions regarding constructing a 2' x 2' test panel prior to constructing curb ramps with detectable warning surfaces. Attention is directed to Environmentally Sensitive Area" and Temporary Fence Type ESA)" of these Special Provisions. Prior to beginning work, the boundaries of the Environmentally Sensitive Areas ESA) shall be clearly delineated in the field. The boundaries shall be delineated by the installation of temporary fence Type ESA). Attention is directed to Appendix B, Mitigation Monitoring and Reporting Program," of these Special Provisions. The processes and procedures outlined in the Mitigation Monitoring and Reporting Program shall be followed by the contractor. Book One San Benancio/State Route 68 Intersection Improvements 401 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The first order of work shall be to place the order for the electrical equipment. The Engineer shall be furnished a statement from the vendor that the order for the electrical equipment has been received and accepted by the vendor. The uppermost layer of new pavement shall not be placed until all underlying conduits and loop detectors have been installed. Prior to commencement of the traffic signal functional test at any location, all items of work related to signal control shall be completed and all roadside signs, pavement delineation, and pavement markings shall be in place at that location. Attention is directed to Maintaining Traffic" and Temporary Pavement Delineation" of these Special Provisions and to the stage construction sheets of the plans. Attention is directed to Progress Schedule Critical Path Method)" of these Special Provisions regarding the submittal of a general time-scaled logic diagram within 10 days after approval of the contract. The diagram shall be submitted prior to performing any work that may be affected by any proposed deviations to the construction staging of the project. The work shall be performed in conformance with the stages of construction shown on the plans. Non-conflicting work in subsequent stages may proceed concurrently with work in preceding stages, provided satisfactory progress is maintained in the preceding stages of construction. In each stage, after completion of the preceding stage, the first order of work shall be the removal of existing pavement delineation as directed by the Engineer. Pavement delineation removal shall be coordinated with new delineation so that lane lines are provided at all times on traveled ways open to public traffic. Before obliterating any pavement delineation traffic stripes, pavement markings, and pavement markers) that is to be replaced on the same alignment and location, as determined by the Engineer, the pavement delineation shall be referenced by the Contractor, with a sufficient number of control points to reestablish the alignment and location of the new pavement delineation. The references shall include the limits or changes in striping pattern, including one- and 2-way barrier lines, limit lines, crosswalks and other pavement markings. Full compensation for referencing existing pavement delineation shall be considered as included in the contract prices paid for new pavement delineation and no additional compensation will be allowed therefor. Prior to applying hot mix asphalt, the Contractor shall cover all manholes, valve and monument covers, grates, or other exposed facilities located within the area of application, using a plastic or oil resistant construction paper secured to the facility being covered by tape or adhesive. The covered facilities shall be referenced by the Contractor, with a sufficient number of control points to relocate the facilities after the hot mix asphalt has been placed. After completion of the hot mix asphalt operation, all covers shall be removed and disposed of in a manner satisfactory to the Engineer. Full compensation for covering manholes, valve and monument covers, grates, or other exposed facilities, referencing, and removing temporary cover shall be considered as included in the contract price paid per ton for hot mix asphalt, and no additional compensation will be allowed therefor. Construction of the new structural section adjacent to the existing traveled way shall be performed in successive and, once all operations are under way, concurrent operations of excavating, preparing subgrade, placing base materials and paving. Excavation within 8 feet of the existing traveled way shall not precede the paving operation by more than 4 working days unless: A. Approved in writing by the Engineer and; B. Material is placed and compacted against the vertical cuts within 8 feet of the existing traveled way. During excavation operations, native material may be used for this Book One San Benancio/State Route 68 Intersection Improvements 402 CONTRACT NO. 10- I1 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???purpose, however, once the placing of the structural section commences, structural material shall be used. The material shall be placed to the level of the elevation of the top of existing pavement and tapered at a slope of 4:1 horizontal:vertical) or flatter to the bottom of the excavation. Full compensation for placing the material on a 4:1 horizontal:vertical) slope, regardless of the number of times it is required, and subsequent removing or reshaping of the material to the lines and grades shown on the plans shall be considered as included in the contract price paid for the materials involved and no additional compensation will be allowed therefor. No payment will be made for material placed in excess of that required for the structural section. At the end of each working day if a difference in excess of 1 foot exists between the elevation of the existing pavement and the elevation of excavations within 8 feet of the traveled way, material shall be placed and compacted against the vertical cuts adjacent to the traveled way. During excavation operations, native material may be used for this purpose; however, once placing of the structural section commences, structural material shall be used. The material shall be placed to the level of the elevation of the top of existing pavement and tapered at a slope of 4:1 horizontal:vertical) or flatter to the bottom of the excavation. Full compensation for placing the material on a 4:1 slope, regardless of the number of times the material is required, and subsequent removing or reshaping of the material to the lines and grades shown on the plans shall be considered as included in the contract price paid for the materials involved and no additional compensation will be allowed therefor. No payment will be made for material placed in excess of that required for the structural section. At those locations exposed to public traffic where guard railings or barriers are to be constructed, reconstructed, or removed and replaced, the Contractor shall schedule operations so that at the end of each working day there shall be no post holes open nor shall there be any railing or barrier posts installed without the blocks and rail elements assembled and mounted thereon. At least 60 days before planting the plants, furnish the Engineer a statement from the vendor that the order for the plants required for this contract, including inspection plants, has been received and accepted by the vendor. The statement from the vendor must include the names, sizes, and quantities of plants ordered and the anticipated date of delivery. Place orders for replacement plants with the vendor at the appropriate time so that the roots of the replacement plants are not in a root-bound condition. At least 60 days before applying seeds, furnish the Engineer a statement from the vendor that the order for the seed required for this contract has been received and accepted by the vendor. The statement from the vendor must include the names and quantity of seed ordered and the anticipated date of delivery. 10-1.02 WATER POLLUTION CONTROL GENERAL Summary Discharges of storm water from the project must comply with NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities" Order No. 2009-009-DWQ, NPDES No. CAS000002). Manage work activities to reduce the discharge of pollutants to surface waters, groundwater, or municipal separate storm sewer systems including work items shown in the verified Bid Item List for: 1. Prepare Storm Water Pollution Prevention Plan. SWPPP preparation includes obtaining SWPPP acceptance, amending the SWPPP, preparing a CSMP and a SAP, and monitoring and inspecting WPC practices at the job site. Book One San Benancio/State Route 68 Intersection Improvements 403 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???2. Storm Water Sampling and Analysis Day. Storm Water Sampling and Analysis Day includes reporting of storm water quality per qualifying rain event. If specified for the risk level, the work includes preparation, collection, analysis, and reporting of storm water samples for turbidity, pH, and other constituents. 3. Storm Water Annual Report. Storm Water Annual Report preparation includes certifications, monitoring and inspection results, and obtaining Storm Water Annual Report acceptance. 4. Rain Event Action Plan. If specified for the project risk level, REAP preparation includes preparing and submitting REAP forms and monitoring weather forecasts. Do not start work until: 1. SWPPP is accepted 2. WDID is issued 3. SWPPP has been reviewed by the RWQCB. If the RWQCB requires time for SWPPP review, allow enough time for the RWQCB to review the SWPPP as specified under Submittals" of these Special Provisions. This job is Risk Level 2. Definitions and Abbreviations active and inactive areas: 1) Active areas have soil disturbing work activities occurring at least once within 14 days, and 2) Inactive areas are areas that have not been disturbed for at least 15 days. BMPs: Best Management Practices are water pollution control practices. construction phase: Construction phases are 1) Highway Construction including work activities for building roads and structures, 2) Plant Establishment including maintenance on vegetation installed for final stabilization, and 3) Suspension where work activities are suspended and areas are inactive. CSMP: Construction Site Monitoring Program. NAL: Numeric Action Level NEL: Numeric Effluent Limit NPDES: National Pollutant Discharge Elimination System NOI: Notice of Intent normal working hours: The hours you normally work on this project Preparation Manual: The Department's Storm Water Pollution Prevention Plan and Water Pollution Control Program Preparation Manual." QSD: Qualified SWPPP Developer QSP: Qualified SWPPP Practitioner REAP: Rain Event Action Plan. RWQCB: Regional Water Quality Control Board. SAP: Sampling and Analysis Plan SSC: Suspended Sediment Concentration SWRCB: State Water Resources Control Board SWPPP: Storm Water Pollution Prevention Plan WDID: Waste Discharge Identification Number WPC: Water Pollution Control WPC Manager: Water Pollution Control Manager. The WPC Manager implements water pollution control work described in the SWPPP and oversees revisions and amendments to the SWPPP. Book One San Benancio/State Route 68 Intersection Improvements 404 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Submittals Within 20 days after contract approval, start the following process for SWPPP acceptance: 1. Submit 3 copies of the SWPPP and allow 20 days for the Engineer's review. If revisions are required, the Engineer provides comments and specifies the date that the review stopped. 2. Change and resubmit the SWPPP within 15 days of receipt of the Engineer's comments. The Engineer's review resumes when the complete SWPPP is resubmitted. 3. When the Engineer accepts the SWPPP, submit an electronic and 4 printed copies of the accepted SWPPP. 4. If the RWQCB reviews the accepted SWPPP, the Engineer submits one copy of the accepted SWPPP to the RWQCB for their review and comment. RWQCBs requiring 30 days to review SWPPPs include: 4.1. Central Coast RWQCB 5. If the Engineer requests changes to the SWPPP based on RWQCB comments, amend the SWPPP within 10 days. Submit: 1. Storm water training records including training dates and subjects for employees and subcontractors. Include dates and subjects for ongoing training, including tailgate meetings. 2. Employee training records: 2.1. Within 5 days of SWPPP acceptance for existing employees 2.2. Within 5 days of training for new employees 2.3. At least 5 days before subcontractors start work for subcontractor's employees Prepare a Storm Water Annual Report for the reporting period from July 1st to June 30th: 1. If construction occurs from July 1st through June 30th, submit the report no later than July 15th for the prior reporting period 2. If construction ends before June 30th, submit the report within 15 days after contract acceptance Submit the Storm Water Annual Report as follows: 1. Submit 2 copies of the Storm Water Annual Report and allow 10 days for the Engineer's review. If revisions are required, the Engineer provides comments and specifies the date that the review stopped. 2. Change and resubmit the Storm Water Annual Report within 5 days of receipt of the Engineer's comments. The Engineer's review resumes when the complete Storm Water Annual Report is resubmitted. 3. When the Engineer accepts the Storm Water Annual Report, insert the WPC Manager's signed certification and the Engineer's signed certification. Submit one electronic copy and 2 printed copies of the accepted Storm Water Annual Report. Submit as required: 1. NAL Exceedance Reports 2. NEL Exceedance Reports 3. Visual Monitoring Reports 4. Inspection Reports 5. BMP Status Report At least 5 days before operating any construction support facility: Book One San Benancio/State Route 68 Intersection Improvements 405 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???1. Submit a plan showing the location and quantity of WPC practices associated with the construction support facility 2. If you will be operating a batch plant or a crushing plant under the General Industrial Permit, submit a copy of the NOI approved by the RWQCB and the SWPPP approved by the RWQCB Quality Control and Assurance Training Provide storm water training for: 1. Project managers 2. Supervisory personnel 3. Employees involved with WPC work Train all employees, including subcontractor's employees, in the following subjects: 1. WPC rules and regulations 2. Implementation and maintenance for: 2.1. Temporary Soil Stabilization 2.2. Temporary Sediment Control 2.3. Tracking Control 2.4. Wind Erosion Control 2.5. Material pollution prevention and control 2.6. Waste management 2.7. Non-storm water management 2.8. Identifying and handling hazardous substances 2.9. Potential dangers to humans and the environment from spills and leaks or exposure to toxic or hazardous substances Employees must receive initial WPC training before working on the job. Conduct weekly training meetings covering: 1. WPC BMP deficiencies and corrective actions 2. BMPs that are required for work activities during the week 3. Spill prevention and control 4. Material delivery, storage, use, and disposal 5. Waste management 6. Non-storm water management procedures Training for personnel to collect water quality samples must include: 1. SAP review 2. Health and safety review 3. Sampling simulations A Storm Water Information Handout has been prepared for this contract and is available as described in Project Information" of these Special Provisions. If you operate construction support facilities, protect storm water systems or receiving waters from the discharge of potential pollutants by using WPC practices. Construction support facilities include: 1. Staging areas 2. Storage yards for equipment and materials 3. Mobile operations 4. Batch plants for PCC and HMA Book One San Benancio/State Route 68 Intersection Improvements 406 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???5. Crushing plants for rock and aggregate 6. Other facilities installed for your convenience such as haul roads If you operate a batch plant to manufacture PCC, HMA, or other material; or a crushing plant to produce rock or aggregate; obtain coverage under the General Industrial General Permit. You must be covered under the General Industrial Permit for batch plants and crushing plants located: 1. Outside of the job site 2. Within the job site that serve one or more contracts Discharges from manufacturing facilities such as batch plants must comply with the general waste discharge requirements for Order No. 97-03-DWQ, NPDES General Permit No. CAS000001, issued by the SWRCB for Discharge of Stormwater Associated with Industrial Activities Excluding Construction Activities." The General Industrial Permit is available at: http://www.waterboards.ca.gov/ You may obtain copies of the Preparation Manual from the Publication Distribution Unit. The mailing address for the Publication Distribution Unit is: State of California Department of Transportation Publication Distribution Unit 1900 Royal Oaks Drive Sacramento, California 95815 Telephone: 916) 445-3520 For the Preparation Manual and other WPC references, go to the Department's Construction Storm Water and Water Pollution Control" Web site at: http://www.dot.ca.gov/hq/construc/stormwater/storrnwaterI.htm Water Pollution Control Manager Assign one WPC Manager to implement the SWPPP. The WPC Manager must comply with the Permit Order No. 2009-009-DWQ, NPDES No. CAS000002) qualifications for a QSP and a QSD. You may assign a different QSD to prepare the SWPPP. The QSD must have the following qualifications: 1. Department approved storm water management training described in the Department's Construction Storm Water and Water Pollution Control" web site 2. Registration or certification described in the Permit Order No. 2009-009-DWQ, NPDES No. CAS000002) The QSP must meet the qualifications of the QSD or have the following certifications: 1. Department approved storm water management training described in the Department's Construction Storm Water and Water Pollution Control" web site 2. Certification described in the Permit At the job site, the WPC Manager must: 1. Be responsible for WPC work 2. Be the primary contact for WPC work 3. Oversee the maintenance of WPC practices 4. Oversee and enforce hazardous waste management practices 5. Have the authority to mobilize crews to make immediate repairs to WPC practices Book One San Benancio/State Route 68 Intersection Improvements 407 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???6. Ensure that all employees have current water pollution control training 7. Implement the accepted SWPPP and amend the SWPPP when required WPC Manager must oversee: 1. Inspections of WPC practices identified in the SWPPP 2. Inspections and reports for visual monitoring 3. Preparation and implementation of REAPS 4. Sampling and analysis 5. NAL exceedance reports 6. NEL exceedance reports 7. SWPPP annual certification 8. Annual reports 9. BMP status reports STORM WATER POLLUTION PREVENTION PLAN This work includes preparing a SWPPP including a CSMP, obtaining SWPPP acceptance, amending the SWPPP, inspecting and reporting on WPC practices at the job site. If specified by the risk level, the work includes preparing REAPS. The SWPPP must comply with the Preparation Manual and the Permit. The SWPPP must be submitted in place of the water pollution control program under Section 7-1.01G, Water Pollution," of the Standard Specifications. You may request, or the Engineer may order, changes to the WPC work. Changes may include the addition of new WPC practices. Additional WPC work will be paid for as extra work under Section 4-1.03D, Extra Work," of the Standard Specifications. The SWPPP must include sections as specified for the project risk level as follows: 1. For risk level 1: 1.1. Schedule 1.2. CSMP 2. For risk level 2: 2.1. Schedule 2.2. CSMP 2.3. Adherence to Effluent Standards for NALs 2.4. REAP 3. For risk level 3: 3.1. Schedule 3.2. CSMP 3.3. Adherence to Effluent Standards for NALs and NELs 3.4. REAP The SWPPP must include WPC practices: 1. For storm water and non-stormwater from areas outside of the job site related to project work activities such as: 1.1. Staging areas 1.2. Storage yards 1.3. Access roads 2. For activities or mobile operations related to contractor obtained NPDES permits 3. Construction support facilities Book One San Benancio/State Route 68 Intersection Improvements 408 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The SWPPP must include a copy of permits obtained by the Department such as Fish & Game permits, US Army Corps of Engineers permits, RWQCB 401 Certifications, and RWQCB Waste Discharge Requirements for Aerially Deposited Lead Reuse. Amend the SWPPP annually and resubmit it by July 15th. Amend the SWPPP if- 1 Changes in work activities could affect the discharge of pollutants 2. WPC practices are added by change order work 3. WPC practices are added at your discretion 4. Changes in the amount of disturbed soil are substantial 5. Objectives for reducing or eliminating pollutants in storm water discharges have not been achieved 6. There is a Permit violation Whenever you amend the SWPPP, follow the same process specified for SWPPP acceptance. Retain a printed copy of the accepted SWPPP at the job site. SWPPP Schedule The SWPPP schedule must: 1. Describe when work activities will be performed that could cause the discharge of pollutants into storm water 2. Describe WPC practices associated with each construction phase 3. Identify soil stabilization and sediment control practices for disturbed soil areas Construction Site Monitoring Program CSMP) The QSD must prepare a CSMP as part of the SWPPP. The CSMP must be developed before starting work and be revised to reflect current construction activities as necessary. The CSMP must include sections for the project risk level as follows: 1. For risk level 1: 1.1. Visual Monitoring 1.2. SAP for Non-Visible Pollutants 2. For risk level 2: 2.1. Visual Monitoring 2.2. SAP for Non-Visible Pollutants 2.3. SAP for sediment and turbidity 2.4. SAP for pH 3. For risk level 3: 3.1. Visual Monitoring 3.2. SAP for Non-Visible Pollutants 3.3. SAP for sediment and turbidity 3.4. SAP for pH 3.5. Receiving Water Sampling 3.6. SAP for temporary active treatment systems Visual Monitoring The WPC Manager must oversee the performance of visual inspections for qualifying rain events. A qualified rain event is a storm that produces at least 0.5 inches of precipitation with a 48 hour or greater period between storms. For each qualifying rain event, perform visual inspections and record observations during normal working hours as follows: 1. Record the time, date, and rain gauge reading Book One San Benancio/State Route 68 Intersection Improvements 409 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???2. Observe: 2.1. Within 2 days before the storm: 2.1.1. Drainage areas for spills, leaks, or uncontrolled pollutants 2.1.2. Proper implementation of WPC practices 2.1.3. Storm water storage areas for leaks and adequate freeboard 2.2. Every 24 hours during the storm: 2.2.1. WPC practices for effective operation 2.2.2. WPC practices needing maintenance and repair 2.3. Within 2 days after the storm event: 2.3.1. Discharge locations 2.3.2. WPC practices to evaluate the design, implementation, and effectiveness 2.3.3. To identify where additional WPC practices may be needed Perform non-stormwater discharge visual inspections as follows: 1. At least once during each of the following periods: 1.1. January through March 1.2. April through June 1.3. July through September 1.4. October through December 2. Observe flowing and contained storm water for the presence of floating and suspended materials, sheen on the surface, discoloration, turbidity, odors, and sources of observed pollutants 3. Observe the job site for the presence of authorized and unauthorized non-stormwater discharges and their sources The WPC Manager must prepare visual inspection reports that include the following: 1. Name of personnel performing the inspection, inspection date, and date inspection report completed 2. Storm and weather conditions 3. Locations and observations 4. Corrective actions taken Maintain visual inspections reports at the job site as part of the SWPPP. Sampling and Analysis General Include a SAP in the CSMP to monitor the effectiveness of WPC practices. The SAP must comply with the Preparation Manual. Assign trained personnel to collect water quality samples. Document their training in the SAP. Describe the following water quality sampling procedures in the SAP: 1. Sampling equipment 2. Sample preparation 3. Collection 4. Field measurement methods 5. Analytical methods 6. Quality assurance and quality control 7. Sample preservation and labeling 8. Collection documentation 9. Sample shipping Book One San Benancio/State Route 68 Intersection Improvements 410 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???10. Chain of custody 11. Data management and reporting 12. Precautions from the construction site health and safety plan 13. Laboratory selection and certifications Whenever assigned field personnel take samples, comply with the equipment manufacturer's recommendation for collection, analysis methods, and equipment calibration. Samples taken for laboratory analysis must follow water quality sampling procedures and be analyzed by a State-certified laboratory under 40 CFR Part 136, Guidelines Establishing Test Procedures for the Analysis of Pollutants." The SAP must identify the State-certified laboratory, sample containers, preservation requirements, holding times, and analysis method. For a list of State-certified laboratories go to: http://www.cdph.ca.gov/certlic/labs/Pages/ELAP.aspx Obtain, install, and maintain a rain gauge at the job site. Observe and record daily precipitation. Document sample collection during precipitation. You are not required to physically collect samples under the following conditions: 1. During dangerous weather conditions such as flooding or electrical storms 2. Outside of normal working hours Retain water quality sampling documentation and analytical results with the SWPPP at the job site. Show pollutant sampling locations on SWPPP drawings. If discharges or sampling locations change because of changed work activities or knowledge of site conditions, amend the SAP. If the job is risk level 2 or risk level 3, collect and analyze at least 3 samples for each day of each qualifying rain event. Collect effluent samples at all locations where the storm water is discharged off-site. Analytical Results and Evaluation Submit an electronic copy in file format xls, txt, csv, dbs, or mdb) and a printed copy of water quality analytical results, and quality assurance and quality control within 48 hours of field analysis sampling, and within 30 days for laboratory analysis. Also provide an evaluation of whether the downstream samples show levels of the tested parameter that are higher than the control sample. Electronic water quality analysis results must have the following information: 1. Sample identification number 2. Contract number 3. Constituent 4. Reported value 5. Analytical method 6. Method detection limit 7. Reported limit If downstream samples show increased levels, assess WPC practices, site conditions, and surrounding influences to determine the probable cause for the increase. Book One San Benancio/State Route 68 Intersection Improvements 411 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???SAP for Non-Visible Pollutants The SAP must include a description of the sampling and analysis strategy for monitoring non-visible pollutants. The SAP must identify potential non-visible pollutants present at the job site associated with any of the following: 1. Construction materials and waste 2. Existing contamination due to historical site usage 3. Application of soil amendments, including soil stabilization materials, with the potential to change pH or contribute toxic pollutants to storm water SWPPP drawings must show the locations planned for storage and use of potential non- visible pollutants. The SAP must include sampling procedures for the following conditions when observed during a storm water visual inspection. For each of the following, collect at least one sample for each qualifying storm event: 1. Materials or waste containing potential non-visible pollutants that are not stored under watertight conditions, 2. Materials or waste containing potential non-visible pollutants that are stored under watertight conditions, but a breach, leakage, malfunction, or spill is observed; the leak or spill has not been cleaned up before precipitation; and material or waste could discharge non-visible pollutants to surface waters or drainage system, 3. Chemical applications, including fertilizer, pesticide, herbicide, methyl methacrylate concrete sealant, or non-pigmented curing compound used during precipitation or within 24 hours preceding precipitation, and could discharge pollutants to surface waters or drainage system, 4. Applied soil amendments, including soil stabilization materials that could change pH levels or contribute toxic pollutants to storm water runoff and discharge pollutants to surface waters or drainage system, unless available independent test data indicates acceptable concentrations of non-visible pollutants in the soil amendment, 5. Storm water runoff from an area contaminated by historical usage of the site that could discharge pollutants to surface waters or drainage systems. The SAP must provide sampling procedures and schedule for: 1. Sample collection during the first 2 hours of each rain event that generate runoff 2. Sample collection during normal working hours 3. Each non-visible pollutant source 4. Uncontaminated control sample. The SAP must identify locations for sampling downstream and control samples, and reasons for selecting those locations. Select control sample locations where the sample will not come in contact with materials, waste, or areas associated with potential non-visible pollutants or disturbed soil areas. SAP for Sediment and Turbidity If the job is risk level 2 or risk level 3, sample and analyze for turbidity: Parameter Test Method Detection Unit Limit Min) Turbidity Field test with calibrated I NTU portable instrument Book One San Benancio/State Route 68 Intersection Improvements 412 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???If the job is risk level 3 and the turbidity NEL has been exceeded, sample and analyze for SSC: Parameter Test Method Detection Limit Min) Unit SSC ASTM Method D3977-97 5 Mg/L SAP for pH If the job is risk level 2 or risk level 3, sample and analyze for pH: Parameter Test Method Detection Unit Limit Min) pH Field test with calibrated 0.2 pH units portable instrument Receiving Water Sampling If the job is risk level 3, obtain samples from representative and accessible locations: 1. Upstream of the discharge point 2. Downstream of the discharge point Show receiving water sampling locations on SWPPP drawings. If there are several discharge points, obtain samples from a single upstream and a single downstream location. Rain Event Action Plan REAP) The WPC Manager must submit a REAP to protect the job site at least 48 hours before a predicted rain event. Prepare a REAP when National Weather Service is predicting at least a 50 percent probability of precipitation within 72 hours. For the REAP, use approved forms and include: 1. Site location 2. Risk level 3. Contact information including 24-hour emergency phone numbers for: 3.1. WPC Manager 3.2. Erosion and sediment control providers or subcontractors 3.3. Storm water sampling providers or subcontractors 4. Storm Information 5. Construction phase information for: 5.1. Highway Construction including active and inactive areas for work activities for building roads and structures 5.2. Plant Establishment including maintenance on vegetation installed for final stabilization where areas are inactive 5.3. Suspension where work activities are suspended and areas are inactive 6. Construction phase information including: 6.1. Construction activities 6.2. Subcontractors and trades on the job site 6.3. Pre-storm activities including: 6.3.1. Responsibilities of the WPC Manager 6.3.2. Responsibilities of the crew and crew size 6.3.3. Stabilization for active and inactive disturbed soil areas Book One San Benancio/State Route 68 Intersection Improvements 413 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???6.3.4. Stockpile management 6.3.5. Corrective actions taken for deficiencies identified during pre-storm visual inspection 6.4. Activities to be performed during storm events including: 6.4.1. Responsibilities of the WPC Manager 6.4.2. Responsibilities of the crew and crew size 6.4.3. BMP maintenance and repair 6.5. Description of flood contingency measures You must have the REAP onsite at least 24 hours before a predicted rain event. A printed copy of each REAP must be at the job site as part of the SWPPP. Implement the REAP including mobilizing crews to complete activities no later than 24 hours before precipitation occurs. IMPLEMENTATION REQUIREMENTS Monitor the National Weather Service Forecast Office on a daily basis. For forecasts, go to: http://www.srh.noaa.gov/forecast Whenever you or the Engineer identifies a deficiency in the implementation of the accepted SWPPP: 1. Correct the deficiency immediately, unless the Engineer authorizes an agreed date for correction 2. Correct the deficiency before precipitation occurs If you fail to correct the deficiency by the agreed date or before the onset of precipitation, the Department may correct the deficiency and deduct the cost of correcting the deficiency from payment. Continue SWPPP implementation during any temporary suspension of work activities. Install WPC practices within 15 days or before predicted precipitation, whichever occurs first. Numeric Action Levels NALs) If the job is risk level 2 or risk level 3, then it is subject to NALs: Parameter Test Method Detection Limit Min) Unit Numeric Action Level pH Field test with calibrated 0.2 pH units Lower NAL 6.5 portable instrument Upper NAL 8.5 Turbidity Field test with calibrated 1 NTU 250 NTU portable instrument Numeric Effluent Limits NELs) If the job is risk level 3, then it is subject to NELs: Parameter Test Method Detection Limit Min) Unit Numeric Effluent Limit pH Field test with calibrated 0.2 pH units Lower NEL 6.0 portable instrument Upper NEL 9.0 Turbidity Field test with calibrated 1 NTU 500 NTU portable instrument Book One San Benancio/State Route 68 Intersection Improvements 414 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The storm event daily average for storms up to the 5-year, 24-hour storm, must not exceed the NEL for turbidity. The daily average sampling results must not exceed the NEL for pH. Inspection The WPC Manager must oversee inspections for WPC practices identified in the SWPPP: 1. Before a forecasted storm 2. After precipitation that causes site runoff 3. At 24-hour intervals during extended precipitation 4. On a predetermined schedule, a minimum of once a week The WPC Manager must oversee daily inspections of- 1 Storage areas for hazardous materials and waste 2. Hazardous waste disposal and transporting activities 3. Hazardous material delivery and storage activities 4. WPC practices specified under Construction Site Management" of these Special Provisions The WPC Manager must use the Storm Water Site Inspection Report provided in the Preparation Manual. The WPC Manager must prepare BMP status reports that include the following: 1. Location and quantity of installed WPC practices 2. Location and quantity of disturbed soil for the active or inactive areas Within 24 hours of finishing the weekly inspection, the WPC Manager must submit: 1. Copy of the completed site inspection report 2. Copy of the BMP status report REPORTING REQUIREMENTS Storm Water Annual Report The WPC Manager must prepare a Storm Water Annual Report. The report must: 1. Use an approved report format 2. Include project information including description and location 3. Include storm water monitoring information including: 3.1. Summary and evaluation of sampling and analysis results including laboratory reports 3.2. Analytical methods, reporting units, detections limits for analytical parameters 3.3. Summary of corrective actions 3.4. Identification of corrective actions or compliance activities that were not implemented 3.5. Summary of violations 3.6. Names of individuals performing storm water inspections and sampling 3.7. Logistical information for inspections and sampling including location, date, time, and precipitation 3.8. Visual observations and sample collection records 4. Include documentation on training for: 4.1. Individuals responsible for NPDES permit compliance 4.2. Individuals responsible for BMP installation, inspection, maintenance, and repair 4.3. Individuals responsible for preparing, revising, and amending the SWPPP Book One San Benancio/State Route 68 Intersection Improvements 415 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???NAL Exceedance Report If the job is risk level 2 or risk level 3 and an effluent sample exceeds a NAL, notify the Engineer and submit a NAL Exceedance Report no later than 48 hours after the conclusion of the storm event. The report must: 1. Include the following field sampling results and inspections: 1.1. Analytical methods, reporting units, and detection limits 1.2. Date, location, time of sampling, visual observation and measurements 1.3. Quantity of precipitation of the storm event 2. Description of BMPs and corrective actions taken to manage NAL exceedance NEL Violation Report If the job is risk level 3 and an NEL is exceeded, notify the Engineer and submit a NEL Violation Report within 6 hours. The report must: 1. Include the following field sampling results and inspections: 1.1. Analytical methods, reporting units, and detection limits 1.2. Date, location, time of sampling, visual observations and measurements 1.3. Quantity of precipitation of the storm event 2. Description of BMPs and corrective actions taken to manage NEL exceedance If the job is risk level 2 or risk level 3, submit all sampling results to the Engineer no later than 48 hours after the conclusion of a storm event. PAYMENT The contract lump sum price paid for prepare storm water pollution prevention plan includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in preparing, obtaining acceptance of, and amending the SWPPP and CSMP, inspecting water pollution control practices, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. For projects with 60 working days or less, payments for SWPPP are made as follows: 1. After the Engineer accepts the SWPPP, the Department includes up to 75 percent of the bid item price in the monthly progress estimate 2. After contract acceptance, the Department pays for the remaining percentage of the bid item price For projects with more than 60 working days, payments for SWPPP are made as follows: 1. After the Engineer accepts the SWPPP, the Department includes up to 50 percent of the bid item price in the monthly progress estimate 2. The Department pays 40 percent of the bid item price over the life of the contract 3. After contract acceptance, the Department pays for the remaining 10 percent of the bid item The Department pays $500 for each Rain Event Action Plan submitted. The contract unit price paid for Rain Event Action Plan includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in preparation and submittal of REAP forms, and monitoring weather forecasts as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. The Department does not adjust payment for an increase or decrease in the quantity of rain event action plans submitted. Section 4-1.03B, Increased or Decreased Quantities," of the Standard Specifications does not apply. Book One San Benancio/State Route 68 Intersection Improvements 416 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The Department pays $2,000 for each Storm Water Annual Report submitted. The contract unit price paid for Storm Water Annual Report includes full compensation for doing all the work involved in submitting the completed Storm Water Annual Report. The Department does not adjust payment for an increase or decrease in the quantity of storm water annual reports submitted. Section 4-1.03B, Increased or Decreased Quantities," of the Standard Specifications does not apply. The work to complete the final Storm Water Annual Report contract item is excluded from Section 7-1.17, Acceptance of Contract," of the Standard Specifications. The contract unit price paid for storm water sampling and analysis day includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in preparation, collection, analysis, and reporting of storm water samples per qualifying rain event as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. The Department does not adjust payment for an increase or decrease in the quantity of storm water sampling and analysis. Section 4-1.03B, Increased or Decreased Quantities," of the Standard Specifications does not apply. You may request or the Engineer may order laboratory analysis of storm water samples. Laboratory analysis of storm water samples will be paid for as extra work under Section 4- 1.03D, Extra Work," of the Standard Specifications. The Department does not pay for the preparation, collection, laboratory analysis, and reporting of storm water samples for non-visible pollutants if WPC practices are not implemented before precipitation or if a failure of a WPC practice is not corrected before precipitation. The Department does not pay for implementation of WPC practices in areas outside the highway right-of-way not specifically provided for in the drawings or in the Special Provisions. The Department does not pay for WPC practices installed at your construction support facilities. WPC practices for which there are separate bid items of work are measured and paid for as those bid items of work. For each failure to submit a completed Storm Water Annual Report, the Department withholds $10,000. This withhold is in addition to other withholds under Section 9-1.07E(3) Performance Failure Withholds," of the Standard Specifications. Each failure to comply with any part of these Special Provisions and each failure to implement water pollution control practices are considered separate performance failures. 10-1.03 CONSTRUCTION SITE MANAGEMENT GENERAL Summary This work includes controlling potential sources of water pollution before they come in contact with storm water systems or watercourses. Control material pollution and manage waste and non-stormwater at the job site by implementing effective handling, storage, use, and disposal practices. For information on documents specified in these Special Provisions, refer to the Department's Preparation Manual, Dewatering Guide, and BMP Manual. Preparation Manual, Dewatering Guide, and BMP Manual are available from the Department's Construction Storm Water and Water Pollution Control web site at: http://www.dot.ca.gov/hq/construc/stonnwater/stormwaterl.htm Book One San Benancio/State Route 68 Intersection Improvements 417 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Definitions and Abbreviations active and inactive areas: 1) Active areas have soil disturbing work activities occurring at least once within 14 days, and 2) Inactive areas are areas that have not been disturbed for at least 15 days. BMP Manual: The Department's Construction Site Best Management Practices BMP) Manual. CDPH: California Department of Public Health Dewatering Guide: The Department's Field Guide to Construction Site Dewatering. ELAP: Environmental Laboratory Accreditation Program minor spills: Small quantities of oil, gasoline, paint, or other material that are small enough to be controlled by a first responder upon discovery of the spill. MSDS: Material Safety Data Sheet Preparation Manual: The Department's Storm Water Pollution Prevention Plan SWPPP) and Water Pollution Control Program WPCP) Preparation Manual. semi-significant spills: Spills that can be controlled by a first responder with help from other personnel. significant or hazardous spills: Spills that cannot be controlled by construction personnel. WPC: Water Pollution Control WPC Manager: Water Pollution Control Manager as defined under Water Pollution Control" of these Special Provisions. Submittals Submit the following: 1. MSDS at least 5 days before material is used or stored 2. Monthly inventory records for material used or stored 3. Copy of written approval to discharge into a sanitary sewer system at least 5 days before beginning discharge activities Quality Control and Assurance Not Used MATERIALS Not Used CONSTRUCTION Spill Prevention and Control Implement spill and leak prevention procedures for chemicals and hazardous substances stored at the job site. If you spill or leak chemicals or hazardous substances at the job site, you are responsible for all associated cleanup costs and related liability. As soon as it is safe, contain and clean up spills of petroleum products, sanitary and septic waste substances listed under CFR Title 40, Parts 110, 117, and 302. Minor Spills Clean up minor spills using the following procedures: 1. Contain the spread of the spill 2. Recover the spilled material by absorption 3. Clean the contaminated area 4. Dispose of the contaminated material promptly and properly Book One San Benancio/State Route 68 Intersection Improvements 418 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Semi-significant Spills Clean up semi-significant spills immediately by the following procedures: 1. Contain the spread of the spill 2. Recover the spilled material using absorption whenever a spill occurs on a paved surface or an impermeable surface 3. Contain the spill with an earthen dike and dig up the contaminated soil for disposal whenever a spill occurs on soil 4. If the spill occurs during precipitation, cover the spill with plastic or other material to prevent contaminated runoff 5. Dispose of the contaminated material promptly and properly Significant or Hazardous Spills Immediately notify qualified personnel of significant or hazardous spills. Do not let construction personnel attempt to clean up the spill until qualified staff has arrived. Do the following: 1. Notify the Engineer and follow up with a written report 2. Obtain the services of a spills contractor or hazardous material team immediately 3. Notify the local emergency response team by dialing 911 and county officials at the emergency phone numbers kept at the job site 4. Notify the Governor's Office of Emergency Services Warning Center at 805) 852-7550 5. Notify the National Response Center at 800) 424-8802 regarding spills of Federal reportable quantities under CFR Title 40, Parts 110, 119, and 302 6. Notify other agencies as appropriate, including: 6.1. Fire Department 6.2. Public Works Department 6.3. Coast Guard 6.4. Highway Patrol 6.5. City Police or County Sheriff Department 6.6. Department of Toxic Substances 6.7. California Division of Oil and Gas 6.8. Cal OSHA 6.9. Regional Water Resources Control Board Report minor, semi-significant, and significant spills to the WPC Manager. The WPC Manager must notify the Engineer immediately. The WPC Manager must oversee and enforce proper spill prevention and control measures. Prevent spills from entering storm water runoff before and during cleanup. Do not bury spills or wash spills with water. Keep material or waste storage areas clean, well organized, and equipped with enough cleanup supplies for the material being stored. Material Management General Material must be delivered, used, and stored for this job in a way that minimizes or eliminates discharge of material into the air, storm drain systems, and watercourses. Implement the practices described under Material Management" of these Special Provisions while taking delivery of, using, or storing any of the following materials: 1. Hazardous chemicals including acids, lime, glues, adhesives, paints, solvents, and curing compounds 2. Soil stabilizers and binders Book One San Benancio/State Route 68 Intersection Improvements 419 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???3. Fertilizers 4. Detergents 5. Plaster 6. Petroleum materials including fuel, oil, and grease 7. Asphalt components and concrete components 8. Pesticides and herbicides Employees trained in emergency spill cleanup procedures must be present during the unloading of hazardous materials or chemicals. If practicable, use less hazardous materials. Material Storage Use the following material storage procedures: 1. Store liquids, petroleum materials, and substances listed in CFR Title 40, Parts 110, 117, and 302 as specified by the Department, and place them in secondary containment facilities. 2. Secondary containment facilities must be impervious to the materials stored there for a minimum contact time of 72 hours. 3. Cover secondary containment facilities during non-working days and when precipitation is predicted. Secondary containment facilities must be adequately ventilated. 4. Keep secondary containment facility free of accumulated rainwater or spills. After precipitation, or in the event of spills or leaks, collect accumulated liquid and place into drums within 24 hours. Handle these liquids as hazardous waste under Hazardous Waste" of these Special Provisions unless testing determines them to be non-hazardous. 5. Do not store incompatible materials, such as chlorine and ammonia, in the same secondary containment facility. 6. Store materials in the original containers with the original material labels maintained in legible condition. Replace damaged or illegible labels immediately. 7. Secondary containment facilities must have the capacity to contain precipitation from a 24-hour-long, 25-year storm, and 10 percent of the aggregate volume of all containers, or entire volume of the largest container within the facility, whichever is greater. 8. Store bagged or boxed material on pallets. Protect bagged or boxed material from wind and rain during non-working days and while precipitation is predicted. 9. Provide sufficient separation between stored containers to allow for spill cleanup or emergency response access. Storage areas must be kept clean, well organized, and equipped with cleanup supplies appropriate for the materials being stored. 10. Repair or replace perimeter controls, containment structures, covers, and liners as necessary. Inspect storage areas before and after precipitation, and at least weekly during other times. Stockpile Management Use the following stockpile management procedures: 1. Reduce or eliminate potential water pollution from stockpiled material including soil, paving material, and pressure treated wood. 2. Locate stockpiles: 2.1. If within the floodplain, at least 100 feet from concentrated flows of storm water, drainage courses, and inlets unless approved 2.2. If outside the floodplain, at least 50 feet from concentrated flows of storm water, drainage courses, and inlets unless approved Book One San Benancio/State Route 68 Intersection Improvements 420 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Install WPC practices within 15 days or before predicted precipitation, whichever occurs first. Active and inactive soil stockpiles must be: 1. Covered with soil stabilization measures, plastic sheeting, or geosynthetic fabric 2. Surrounded with a linear sediment barrier Portland cement concrete rubble, AC, HMA, AC and HMA rubble, aggregate base or aggregate sub-base stockpiles must be: 1. Covered with plastic sheeting, or geosynthetic fabric 2. Surrounded with a linear sediment barrier Pressure treated wood stockpiles must be: 1. Placed on pallets 2. Covered with impermeable material Cold mix asphalt concrete stockpiles must be: 1. Placed on impervious surface 2. Covered with impermeable material 3. Protected from run-on and runoff Control wind erosion year round under Section 10, Dust Control" of the Standard Specifications. Repair or replace linear sediment barriers and covers as needed to keep them functioning properly. If sediment accumulates to 1/3 of the linear sediment barrier height, remove the sediment. Waste Management Solid Waste Do not allow litter or debris to accumulate anywhere at the job site, including storm drain grates, trash racks, and ditch lines. Pick up and remove trash and debris from the job site at least once a week. The WPC Manager must monitor solid waste storage and disposal procedures at the job site. If practicable, recycle non-hazardous job site waste and excess material. If recycling is not practicable, disposal must comply with Section 7-1.13, Disposal of Material Outside the Highway Right of Way" of the Standard Specifications. Furnish enough closed-lid dumpsters of sufficient size to contain any solid waste generated by work activities. When the refuse reaches the fill line, empty the dumpsters. Dumpsters must be watertight. Do not wash out dumpsters at the job site. Furnish additional containers and pick up dumpsters more frequent during the demolition phase of construction. Solid waste includes: 1. Brick 2. Mortar 3. Timber 4. Metal scraps 5. Sawdust 6. Pipe 7. Electrical cuttings 8. Non-hazardous equipment parts 9. Styrofoam and other packaging materials 10. Vegetative material and plant containers from highway planting Book One San Benancio/State Route 68 Intersection Improvements 421 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???11. Litter and smoking material, including litter generated randomly by the public 12. Other trash and debris Furnish and use trash receptacles at the job site yard, field trailers, and locations where workers gather for lunch and breaks. Hazardous Waste Use hazardous waste management practices if waste is generated at the job site from the following substances: 1. Petroleum products 2. Asphalt products 3. Concrete curing compound 4. Pesticides 5. Acids 6. Paints 7. Stains 8. Solvents 9. Wood preservatives and treated posts 10. Roofing tar 11. Road flares 12. Lime 13. Glues and adhesives 14. Materials classified as hazardous by California Code of Regulations, Title 22, Division 4.5; or listed in CFR Title 40, Parts 110, 117, 261, or 302 The WPC Manager must oversee and enforce hazardous waste management practices. Minimize the production of hazardous materials and hazardous waste at the job site. If damaged, repair or replace perimeter controls, containment structures, and covers. If hazardous material levels are unknown, use a laboratory certified by ELAP under CDPH to sample and test waste to determine safe methods for storage and disposal. Separate potentially hazardous waste from non-hazardous waste at the job site. Hazardous waste must be handled, stored, and disposed of under California Code of Regulations, Title 22, Division 4.5, Section 66262.34; and in CFR Title 49, Parts 261, 262, and 263. Store hazardous waste in sealed containers constructed and labeled with the contents and date accumulated under California Code of Regulations, Title 22, Division 4.5; and in CFR Title 49, Parts 172, 173, 178, and 179. Keep hazardous waste containers in temporary containment facilities under Material Storage" of these Special Provisions. Furnish containers with adequate storage volume at convenient locations for hazardous waste collection. Do not overfill hazardous waste containers. Do not mix hazardous waste. Do not allow potentially hazardous waste to accumulate on the ground. Store containers of dry waste that are not watertight on pallets. Store hazardous waste away from storm drains, watercourses, moving vehicles, and equipment. Clean water based or oil based paint from brushes or equipment within a contained area and in a way that does not contaminate soil, watercourses, and storm drain systems. Handle and dispose of the following as hazardous waste: paints, thinners, solvents, residues, and sludge that cannot be recycled or reused. When thoroughly dry, dispose of the following as solid waste: dry, latex paint and paint cans, used brushes, rags, absorbent materials, and drop cloths. Dispose of hazardous waste within 90 days of being generated. Use a licensed hazardous waste transporter to take hazardous waste to a Class I Disposal Site. Submit a copy of uniform hazardous waste manifest forms within 24 hours of transporting hazardous waste. Book One San Benancio/State Route 68 Intersection Improvements 422 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The WPC Manager must inspect the following daily: 1. Storage areas for hazardous materials and waste 2. Hazardous waste disposal and transporting activities 3. Hazardous material delivery and storage activities Contaminated Soil Identify contaminated soil from spills or leaks by noticing discoloration, odors, or differences in soil properties. Soil with evidence of contamination must be sampled and tested by a laboratory certified by ELAP. If levels of contamination are found to be hazardous, handle and dispose of the soil as hazardous waste. Prevent the flow of water, including ground water, from mixing with contaminated soil by using one or a combination of the following measures: 1. Berms 2. Cofferdams 3. Grout curtains 4. Freeze walls 5. Concrete seal course If water mixes with contaminated soil and becomes contaminated, sample and test the water using a laboratory certified by ELAP. If levels of contamination are found to be hazardous, handle and dispose of the water as hazardous waste. Concrete Waste Use practices that will prevent the discharge of portland cement concrete, AC, or HMA waste into storm drain systems or watercourses. Collect and dispose of portland cement concrete, AC, or HMA waste at locations where: 1. Concrete material, including grout, is used 2. Concrete dust and debris result from demolition 3. Sawcutting, coring, grinding, grooving, or hydro-concrete demolition of portland cement concrete, AC, or HMA creates a residue or slurry 4. Concrete truck or other concrete-coated equipment is cleaned at the job site Sanitary and Septic Waste Do not bury or discharge wastewater from sanitary or septic systems within Department right-of-way. The WPC Manager must inspect sanitary or septic waste storage and monitor disposal procedures at least weekly. Sanitary facilities that discharge to the sanitary sewer system must be properly connected and free from leaks. Place sanitary facilities at least 50 feet away from storm drains, watercourses, and flow lines. Obtain written approval from the local health agency, city, county, and sewer district before discharging from a sanitary or septic system directly into a sanitary sewer system, and submit a copy to the Engineer. Comply with local health agency provisions while using an on-site disposal system. Liquid Waste Use practices that will prevent job site liquid waste from entering storm drain systems or watercourses. Liquid waste includes the following: 1. Drilling slurries or fluids 2. Grease-free or oil-free wastewater or rinse water Book One San Benancio/State Route 68 Intersection Improvements 423 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???3. Dredgings, including liquid waste from drainage system cleaning 4. Liquid waste running off a surface including wash or rinse water 5. Other non-stormwater liquids not covered by separate permits Hold liquid waste in structurally sound, leak proof containers such as: 1. Roll-off bins 2. Portable tanks Liquid waste containers must be of sufficient quantity and volume to prevent overflow, spills and leaks. Store containers: 1. At least 50 feet from moving vehicles and equipment 2. If within the floodplain, at least 100 feet from concentrated flows of storm water, drainage courses, watercourses, and storm drain inlets unless approved 3. If outside the floodplain, at least 50 feet from concentrated flows of storm water, drainage courses, watercourses, and storm drain inlets unless approved Remove and dispose of deposited solids from sediment traps under Solid Waste" of these Special Provisions unless the Engineer approves another method. Liquid waste may require testing to determine hazardous material content before disposal. Drilling fluids and residue must be disposed of outside the highway right-of-way. If an approved location is available within the job site, fluids and residue exempt under California Code of Regulations, Title 23, Section 2511(g) may be dried by evaporation in a leak proof container. Dispose of remaining solid waste under Solid Waste" of these Special Provisions. Non-Storm Water Management Water Control and Conservation Manage water used for work activities to prevent erosion or discharge of pollutants into storm drain systems or watercourses. Obtain approval before washing anything at the job site with water that could discharge into a storm drain system or watercourse. Report discharges immediately. If water is used at the job site, implement water conservation practices. Inspect irrigation areas. Adjust watering schedules to prevent erosion, excess watering, or runoff. Shut off water source to broken lines, sprinklers, or valves, and repair breaks within 24 hours. If possible, reuse water from waterline flushing for landscape irrigation. Sweep and vacuum paved areas; do not wash them with water. Direct job site water runoff, including water from water line repair, to areas where it can infiltrate into the ground and not enter storm drain systems or watercourses. Do not allow spilled water to escape water truck filling areas. If possible, direct water from off-site sources around the job site. Minimize the contact of off-site water with job site water. Illegal Connection and Discharge Detection and Reporting Inspect the job site and the site perimeter before starting work for evidence of illegal connections, discharges, or dumping. After starting work, inspect the job site and perimeter on a daily schedule. Whenever illegal connections, discharges, or dumping are discovered, notify the Engineer immediately. Take no further action unless ordered by the Engineer. Assume unlabeled or unidentifiable material is hazardous. Look for the following evidence of illegal connections, discharges, or dumping: Book One San Benancio/State Route 68 Intersection Improvements 424 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???1. Debris or trash piles 2. Staining or discoloration on pavement or soils 3. Pungent odors coming from drainage systems 4. Discoloration or oily sheen on water 5. Stains or residue in ditches, channels or drain boxes 6. Abnormal water flow during dry weather 7. Excessive sediment deposits 8. Nonstandard drainage junction structures 9. Broken concrete or other disturbances near junction structures Vehicle and Equipment Cleaning Limit vehicle and equipment cleaning or washing at the job site except what is necessary to control vehicle tracking or hazardous waste. Notify the Engineer before cleaning vehicles and equipment at the job site with soap, solvents, or steam. Contain and recycle or dispose of resulting waste under Liquid Waste" or Hazardous Waste" of these Special Provisions, whichever is applicable. Do not use diesel to clean vehicles or equipment, and minimize the use of solvents. Clean or wash vehicles and equipment in a structure equipped with disposal facilities. If using a structure is not possible, clean or wash vehicles and equipment in an outside area. The outside area must be: 1. Paved with AC, HMA, or concrete paving 2. Surrounded by a containment berm 3. Equipped with a sump to collect and dispose of wash water 4. If within the floodplain, located at least 100 feet from concentrated flows of storm water, drainage courses, watercourses, and storm drain inlets unless approved 5. If outside the floodplain, located at least 50 feet from concentrated flows of storm water, drainage courses, watercourses, and storm drain inlets unless approved When washing vehicles or equipment with water, use as little water as possible. Hoses must be equipped with a positive shutoff valve. Discharge liquid from wash racks to a recycle system or to another approved system. Remove liquids and sediment as necessary. The WPC Manager must inspect vehicle and equipment cleaning facilities: 1. Daily if vehicle and equipment cleaning occurs daily 2. Weekly if vehicle and equipment cleaning does not occur daily Vehicle and Equipment Fueling and Maintenance If practicable, perform maintenance on vehicles and equipment off the job site. If fueling or maintenance must be done at the job site, designate a site, or sites, and obtain approval before using. Minimize mobile fueling or maintenance. If vehicle and equipment fueling and maintenance must be done at the job site, areas for the following activities must be: 1. On level ground 2. Protected from storm water run-on 3. If within the floodplain, located at least 100 feet from concentrated flows of storm water, drainage courses, watercourses, and storm drain inlets unless approved 4. If outside the floodplain, located at least 50 feet from concentrated flows of storm water, drainage courses, watercourses, and storm drain inlets unless approved Book One San Benancio/State Route 68 Intersection Improvements 425 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Use containment berms or dikes around the fueling and maintenance area. Keep adequate quantities of absorbent spill cleanup material and spill kits in the fueling and maintenance area and on fueling trucks. Dispose of spill cleanup material and kits immediately after use. Use drip pans or absorbent pads during fueling or maintenance. Fueling or maintenance activities must not be left unattended. Fueling nozzles must be equipped with an automatic shutoff control. Vapor recovery fueling nozzles must be used where required by the Air Quality Management District. When not in use, nozzles must be secured upright. Do not top-off fuel tanks. Recycle or properly dispose of used batteries and tires. The WPC Manager must inspect vehicle and equipment maintenance and fueling areas: 1. Daily when vehicle and equipment maintenance and fueling occur daily 2. Weekly when vehicle and equipment maintenance and fueling do not occur daily The WPC Manager must inspect vehicles and equipment at the job site for leaks and spills on a daily schedule. Operators must inspect vehicles and equipment each day of use. If leaks cannot be repaired immediately, remove the vehicle or equipment from the job site. Material and Equipment Used Over Water Place drip pans and absorbent pads under vehicles or equipment used over water. Keep an adequate supply of spill cleanup material with the vehicle or equipment. If the vehicle or equipment will be idle for more than one hour, place drip pans or plastic sheeting under the vehicle or equipment on docks, barges, or other surfaces over water. Furnish watertight curbs or toe boards on barges, platforms, docks, or other surfaces over water to contain material, debris, and tools. Secure material to prevent spills or discharge into water due to wind. Structure Removal Over or Adjacent to Water Do not allow demolished material to enter storm water systems or watercourses. Use approved covers and platforms to collect debris. Use attachments on equipment to catch debris on small demolition activities. Empty debris catching devices daily and handle debris under Waste Management" of these Special Provisions. The WPC Manager must inspect demolition sites within 50 feet of storm water systems or watercourses daily. Paving, Sealing, Sawcutting, Grooving, and Grinding Activities Prevent the following materials from entering storm drain systems or water courses: 1. Cementitious material 2. 3. 4. 5. 6. 7. Asphaltic material Aggregate or screenings Grinding grooving, or sawcutting residue Pavement chunks Shoulder backing Methacrylate Cover drainage inlets and use linear sediment barriers to protect downhill watercourses until paving, sealing, sawcutting, grooving, or grinding activities are completed and excess material has been removed. Cover drainage inlets and manholes during the application of seal coat, tack coat, slurry seal, or fog seal. If precipitation is predicted, limit paving, sawcutting, and grinding to places where runoff can be captured. Book One San Benancio/State Route 68 Intersection Improvements 426 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Do not start seal coat, tack coat, slurry seal, or fog seal activities if precipitation is predicted during the application or curing period. Do not excavate material from existing roadways during precipitation. Use a vacuum to remove slurry immediately after slurry is produced. Do not allow slurry to run onto lanes open to traffic or off the pavement. Collect residue from portland cement concrete grinding and grooving activities with a vacuum attachment on the grinding machine. Do not leave any residue on the pavement or allow the residue to flow across the pavement. If approved, material excavated from existing roadways may be stockpiled under Stockpile Management" of these Special Provisions. Do not coat asphalt trucks and equipment with substances that contain soap, foaming agents, or toxic chemicals. When paving equipment is not in use, park over drip pans or plastic sheeting with absorbent material to catch drips. Thermoplastic Striping and Pavement Markers Thermoplastic striping and preheating equipment shutoff valves must work properly at all times. Do not preheat, transfer, or load thermoplastic within 50 feet of drainage inlets or watercourses. Do not fill a preheating container above a level that is 6 inches below the top. Truck beds must be cleaned daily of scraps or melted thermoplastic. Do not unload, transfer, or load bituminous material for pavement markers within 50 feet of drainage inlets or watercourses. Release all pressure from a melting tank before removing the lid to fill or service. Do not fill a melting tank above a level that is 6 inches below the top. Collect bituminous material from the roadway after marker removal. Pile Driving Keep spill kits and cleanup material at pile driving locations. Pile driving equipment must be parked over drip pans, absorbent pads, or plastic sheeting with absorbent material. If precipitation is predicted, protect pile driving equipment by parking on plywood and covering with plastic. Store pile driving equipment when not in use. Stored pile driving equipment must be: 1. Kept on level ground 2. Protected from storm water run-on 3. If within the floodplain, at least 100 feet from concentrated flows of storm water, drainage courses, watercourses, and storm drain inlets unless approved 4. If outside the floodplain, at least 50 feet from concentrated flows of storm water, drainage courses, watercourses, and storm drain inlets unless approved If practicable, use vegetable oil instead of hydraulic fluid. The WPC Manager must inspect the pile driving area for leaks and spills: 1. Daily when pile driving occurs daily 2. Weekly when pile driving does not occur daily Concrete Curing Do not overspray chemical curing compound. Minimize the drift by spraying as close to the concrete as possible. Cover drainage inlets before applying the curing compound. Minimize the use and discharge of water by using wet blankets or similar methods to maintain moisture while curing concrete. Book One San Benancio/State Route 68 Intersection Improvements 427 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Concrete Finishing Collect and dispose of water and solid waste from high-pressure water blasting. Cover drainage inlets within 50 feet before sandblasting. Minimize drift of dust and blast material by keeping the nozzle close to the surface of the concrete. The blast residue may contain hazardous material. Inspect concrete finishing containment structures for damage before each day of use and before predicted precipitation. Remove liquid and solid waste from containment structures after each work shift. Sweeping Sweeping must be done using hand or mechanical methods such as vacuuming. Monitor paved areas and roadways within the job site for sediment and debris generating activities such as: 1. Clearing and grubbing 2. Earthwork 3. Trenching 4. Roadway structural section work 5. Vehicles entering and leaving the job site 6. Soil disturbing work 7. Work that causes offsite tracking of material If sediment or debris is observed, perform sweeping: 1. Within: 1.1. 8 hours of predicted rain 1.2. 24 hours unless the Engineer approves a longer period 2. On paved roads at job site entrances and exit locations 3. On paved areas within the job site that flow to storm drains or receiving waters You may stockpile collected material at the job site. Remove collected material including sediment from paved shoulders, drain inlets, curbs and dikes, and other drainage areas. If stockpiled, dispose of collected material at least once per week. You may dispose of sediment within the job site that you collected during sweeping activities. Protect disposal areas against erosion. Remove and dispose of trash collected during sweeping under Section 7-1.13, Disposal of Material Outside the Highway Right of Way" of the Standard Specifications. Dewatering Dewatering consists of discharging accumulated storm water, ground water, or surface water from excavations or temporary containment facilities. If dewatering and discharging activities are specified under a work item such as Temporary Active Treatment System" or Dewatering and Discharge," perform dewatering work as specified in the section involved. If dewatering and discharging activities are not specified under a work item and you will be performing dewatering activities, you must: 1. Submit a Dewatering and Discharge Plan under Section 5-1.02, Plans and Working Drawings," of the Standard Specifications and Water Pollution Control" of these Special Provisions at least 10 days before starting dewatering activities. The Dewatering and Discharge Plan must include: 1.1. Title sheet and table of contents Book One San Benancio/State Route 68 Intersection Improvements 428 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???1.2. Description of dewatering and discharge activities detailing locations, quantity of water, equipment, and discharge points 1.3. Estimated schedule for dewatering and discharge start and end dates, intermittent or continuous) 1.4. Discharge alternatives such as dust control or percolation 1.5. Visual monitoring procedures with inspection log 2. Conduct dewatering activities under the Departments' s Field Guide for Construction Dewatering." 3. Ensure that any dewatering discharge does not cause erosion, scour, or sedimentary deposits that could impact natural bedding materials. 4. Discharge the water within the project limits. Dispose of the water in the same way as specified for material in Section 7-1.13 Disposal of Material Outside the Highway Right of Way" of the Standard Specification if it cannot be discharged within project limits due to site constraints. 5. Do not discharge storm water or non-stormwater that has an odor, discoloration other than sediment, an oily sheen, or foam on the surface. Notify the Engineer immediately upon discovering any such condition. The WPC manager must inspect dewatering activities: 1. Daily when dewatering work occurs daily 2. Weekly when dewatering work does not occur daily PAYMENT The contract lump sum price paid for construction site management includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in spill prevention and control, material management, waste management, non-stormwater management, and dewatering and identifying, sampling, testing, handling, and disposing of hazardous waste resulting from your activities, as specified in the Standard Specifications and these Special Provisions, and as ordered by the Engineer. 10-1.04 TEMPORARY STREAM DIVERSION GENERAL Summary This work includes constructing, maintaining, and removing a temporary stream diversion, Submittals Submit a stream diversion plan in compliance with all applicable regulatory permits and the WPCP: The plan must: 1. Detail proposed equipment to be used 2. Detail proposed coffer dam and pipe material and size. 3. Show original stream contours and their reestablishment upon completion of construction. Within 20 days after contract approval, the Contractor shall submit 3 copies of the str0eam diversion plan to the Engineer. The Contractor shall allow 20 days for the Engineer's review. If revisions are required, the Engineer will provide comments and specify the date that the review stopped. The Contractor shall revise and resubmit the stream diversion plan within 15 days of receipt of the Engineer's comments. The Engineer's review will resume when the complete stream diversion plan is resubmitted. When the Engineer approves the stream diversion plan, the Book One San Benancio/State Route 68 Intersection Improvements 429 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Contractor shall submit 2 copies of the approved stream diversion plan to the Engineer. If the Engineer fails to complete the review within the time allowed and if, in the opinion of the Engineer, completion of the work is delayed or interfered with by reason of the Engineer's delay, the Contractor will be compensated for resulting losses, and an extension of time will be granted, as provided for in Section 8-1.09, Right of Way Delays," of the Standard Specifications. Construction Comply with all applicable regulatory permits, the WPCP, these Special Provisions and as directed by the Engineer during construction and removal of temporary stream diversion. Construct the temporary stream diversion when directed by the Engineer and as necessary to protect bridge, retaining wall, and miscellaneous construction activities within the El Toro Creek from water flowing within the creek. PAYMENT The contract lump sum price paid for temporary stream diversion shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in temporary stream diversion, complete in place, including permit compliance, plan preparation and grading, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.05 TEMPORARY FENCE TYPE ESA) GENERAL Summary This work includes constructing, maintaining, and removing temporary fence Type ESA). Temporary fence Type ESA) provides a visible boundary adjacent to protected areas such as an environmentally sensitive area. Signs are not required for temporary fence Type ESA). Submittals Submit a Certificate of Compliance as specified in Section 6-1.07, Certificates of Compliance" of the Standard Specifications for: 1. High visibility fabric 2. Safety cap for metal posts MATERIALS High Visibility Fabric High visibility fabric for temporary fence Type ESA) must consist of one of the following: 1. Polyethylene 2. Polypropylene 3. Combined polyethylene and polypropylene Sample under ASTM D 4354, Procedure C. Test under ASTM D 4759. All properties must be based on Minimum Average Roll Value. Identify, store, and handle under ASTM D 4873. High visibility fabric must: 1. Contain ultraviolet inhibitors 2. Comply with the following: Book One San Benancio/State Route 68 Intersection Improvements 430 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Property Specifications Requirements Width, inches, Min Measured 48 Opening size inches Measured 1" x 1" Min) 2" x 2" Max) Color Observed Orange Grab breaking load ASTM D4632 260 1-inch grip, lb, Min. in each direction Apparent elongation ASTM D4632 5 percent, Min., in each direction Ultraviolet Degradation ASTM D4355 70 percent of original unexposed grab breaking load 500 hr, minimum Posts Posts must be wood or steel. Wood posts must be: 1. Untreated fir, redwood, cedar, or pine and cut from sound timber 2. Straight and free of loose or unsound knots and other defects that would render the stakes unfit for use 3. Pointed on the end to be driven into the ground 4. At least 2" x 2" in size and 6 feet long Steel posts must: 1. Have a U," T," L," or other cross sectional shape that can resist failure from lateral loads. 2. Be pointed on the end to be driven into the ground. 3. Weigh at least 0.75-pound per foot. 4. Be at least 6 feet long. 5. Have a safety cap attached to the exposed end. The safety cap must be yellow, orange or red plastic and fit snugly to the metal post. Signs If specified, signs must be: 1. Weatherproof and fade-proof and may include plastic laminated printed paper affixed to an inflexible weatherproof backer board 2. Attached to the high visibility fabric with tie wire or locking plastic fasteners CONSTRUCTION General Install temporary fence Type ESA): 1. With high visibility fabric, posts, and fasteners as follows: 1.1. If wood posts are used, fasteners must be staples or nails 1.2. If steel posts are used, fasteners must be tie wires or locking plastic fasteners 1.3. Spacing of the fasteners must be no more than 8 inches apart 2. Before clearing and grubbing activities 3. From outside of the protected area 4. With posts spaced 8 feet apart and embedded at least 16 inches in the soil Book One San Benancio/State Route 68 Intersection Improvements 431 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???If specified, signs must be: 1. Attached with the top of the sign panel flush with the top of the high visibility fabric 2. Placed 100 feet apart along the length and at each end of the fence If trees and other plants need protection, install fence to: 1. Enclose the foliage canopy drip line) of protected plants 2. Protect visible roots from encroachment Maintenance Maintain temporary fence Type ESA) by: 1. Keeping posts in a vertical position 2. Reattaching fabric to posts 3. Replacing damaged sections of fabric 4. Replacing and securing signs Removal When the Engineer determines that temporary fence Type ESA) is no longer required, remove and dispose of it under Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Backfill and repair ground disturbance caused by the installation and removal of temporary fence Type ESA), including holes and depressions, under Section 15-1.02, Preservation of Property," of the Standard Specifications. MEASUREMENT AND PAYMENT Temporary fence Type ESA) is measured and paid for by the linear foot in the same manner specified for fence Type BW or WM) in Section 80, Fences," of the Standard Specifications. The contract price paid per linear foot for temporary fence Type ESA) includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing the temporary fence Type ESA), complete in place, including maintenance, removal of materials, and backfilling and repairing holes, depressions and other ground disturbance, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as ordered by the Engineer. 10-1.06 TEMPORARY FIBER ROLL GENERAL Summary This work includes constructing, maintaining, and removing temporary fiber roll and temporary large fiber roll. The SWPPP must describe and include the use of temporary fiber roll as a water pollution control practice for sediment control. Submittals Submit a Certificate of Compliance as specified in Section 6-1.07, Certificates of Compliance" of the Standard Specifications for fiber roll. MATERIALS Fiber Roll Fiber roll must: Book One San Benancio/State Route 68 Intersection Improvements 432 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???1. Last for at least one year after installation 2. Be Type 1 or Type 2 If specified, Type 1 fiber roll must be: 1. Made from an erosion control blanket: 1.1. Classified by the Erosion Control Technology Council ECTC) as ECTC 2D 1.2. With a Universal Soil Loss Equation USLE) C-Factor of not more than 0.20 at a 2:1 horizontal:vertical) slope 1.3. Capable to withstand a maximum shear stress of 1.75 pounds per square foot under ASTM D 6460 1.4. With a minimum tensile strength of 75 pounds per foot under ASTM D 5035 1.5. With top and bottom surfaces covered with lightweight non-synthetic netting 1.6. That complies with one of the following: 1.6.1. Double net straw and coconut blanket with 70 percent straw and 30 percent coconut fiber 1.6.2. Double net excelsior blanket with 80 percent of the wood excelsior fibers being 6 inches or longer 2. Rolled along the width 3. Secured with natural fiber twine every 6 feet and 6 inches from each end 4. Finished to be either: 4.1. From 8 to 10 inches in diameter, from 10 to 20 feet long, and at least 0.5 pounds per linear foot 4.2. From 10 to 12 inches in diameter, at least 10 feet long, and at least 2 pounds per linear foot 4.3. 20" inches in diameter for large fiber rolls, at least 10 feet long, and at least 8 pounds per linear foot If specified, Type 2 fiber roll must: 1. Be filled with rice or wheat straw, wood excelsior, or coconut fiber 2. Be covered with a biodegradable jute, sisal, or coir fiber netting 3. Have the netting secured tightly at each end 4. Be finished to be either: 4.1. From 8 to 10 inches in diameter, from 10 to 20 feet long, and at least 1.1 pounds per linear foot 4.2. From 10 to 12 inches in diameter, at least 10 feet long, and at least 3 pounds per linear foot 4.3. 20" inches in diameter for large fiber rolls, at least 10 feet long, and at least 10 pounds per linear foot Wood Stakes Wood stakes must be: 1. Untreated fir, redwood, cedar, or pine and cut from sound timber 2. Straight and free of loose or unsound knots and other defects which would render the stakes unfit for use 3. Pointed on the end to be driven into the ground For fiber roll, wood stakes must be at least: 1. 1" x 1" x 24" in size for Type 1 installation 2. 1" x 2" x 24" in size for Type 2 installation Book One San Benancio/State Route 68 Intersection Improvements 433 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Rope For Type 2 installation, rope must: 1. Be biodegradable, such as sisal or manila 2. Have a minimum diameter of 1/4 inch CONSTRUCTION Before placing fiber roll, remove obstructions including rocks, clods, and debris greater than one inch in diameter from the ground. If fiber roll is to be placed in the same area as erosion control blanket, install the blanket before placing the fiber roll. For other soil stabilization practices such as hydraulic mulch or compost, place the fiber roll and then apply the soil stabilization practice. Place fiber roll on slopes at the following spacing unless the plans show a different spacing: 1. 10 feet apart for slopes steeper than 2:1 horizontal: vertical) 2. 15 feet apart for slopes from 2:1 to 4:1 horizontal:vertical) 3. 20 feet apart for slopes from 4:1 to 10:1 horizontal: vertical) 4. 50 feet apart for slopes flatter than 10:1 horizontal:vertical) Place fiber roll approximately parallel to the slope contour. For any 20 foot section of fiber roll, do not allow the fiber roll to vary more then 5 percent from level. Type 1 and Type 2 fiber roll may be installed using installation method Type 1, Type 2, or a combination: For installation method Type 1, install fiber roll by: 1. Placing in a furrow that is from 2 to 4 inches deep 2. Securing with wood stakes every 4 feet along the length of the fiber roll 3. Securing the ends of the fiber roll by placing a stake 6 inches from the end of the roll 4. Driving the stakes into the soil so that the top of the stake is less then 2 inches above the top of the fiber roll For installation method Type 2, install fiber roll by: 1. Securing with rope and notched wood stakes. 2. Driving stakes into the soil until the notch is even with the top of the fiber roll. 3. Lacing the rope between stakes and over the fiber roll. Knot the rope at each stake. 4. Tightening the fiber roll to the surface of the slope by driving the stakes further into the soil. MAINTENANCE Maintain temporary fiber roll to provide sediment holding capacity and to reduce runoff velocities. Remove sediment deposits, trash, and debris from temporary fiber roll as needed or when directed by the Engineer. If removed sediment is deposited within project limits, it must be stabilized and not subject to erosion by wind or water. Trash and debris must be removed and disposed of as specified in Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Maintain temporary fiber roll by: 1. Removing sediment from behind the fiber roll when sediment is 1/3 the height of the fiber roll above ground 2. Repairing or adjusting the fiber roll when rills and other evidence of concentrated runoff occur beneath the fiber roll. 3. Repairing or replacing the fiber roll when they become split, torn, or unraveled 4. Adding stakes when the fiber roll slump or sag 5. Replacing broken or split wood stakes Book One San Benancio/State Route 68 Intersection Improvements 434 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Repair temporary fiber roll within 24 hours of discovering damage unless the Engineer approves a longer period. If your vehicles, equipment, or activities disturb or displace temporary fiber roll, repair temporary fiber roll at your expense. The Department does not pay maintenance costs for cleanup, repair, removal, disposal, or replacement due to improper installation or your negligence. REMOVAL When the Engineer determines that temporary fiber roll is not required, they must be removed and disposed of under Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Ground disturbance, including holes and depressions, caused by the installation and removal of the temporary fiber roll must be backfilled and repaired under Section 15-1.02, Preservation of Property," of the Standard Specifications. Do not remove temporary large fiber roll. MEASUREMENT AND PAYMENT Temporary fiber roll and temporary large fiber roll is measured by the linear foot along the centerline of the installed roll. Where temporary fiber roll is joined and overlapped, the overlap is measured as a single installed roll. The contract price paid per linear foot for temporary fiber roll includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing the temporary fiber roll, complete in place, including removal of materials, cleanup and disposal of retained sediment and debris, and backfilling and repairing holes, depressions and other ground disturbance, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. The contract price paid per linear foot for temporary large fiber roll includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing the temporary large fiber roll, complete in place, including removal of materials, cleanup and disposal of retained sediment and debris, and backfilling and repairing holes, depressions and other ground disturbance, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. The State and you share the cost of maintaining the temporary fiber roll. The State determines the maintenance cost under Section 9-1.03, Force Account Payment," of the Standard Specifications and pays you one-half of that cost. 10-1.07 TEMPORARY CONCRETE WASHOUT PORTABLE) GENERAL Summary This work includes removal and disposal of concrete waste by furnishing, maintaining, and removing portable temporary concrete washouts. SWPPP must describe and include the use of a portable temporary concrete washout as a water pollution control practice for waste management and materials pollution control. Submittals At least 5 business days before concrete activities start, submit: 1. Name and location of off-site concrete waste disposal facility to receive concrete waste 2. Copy of permit issued by RWQCB for off-site commercial disposal facility 3. Copy of license for off-site commercial disposal facility Book One San Benancio/State Route 68 Intersection Improvements 435 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???4. Copy of permit issued by state or local agency having jurisdiction over disposal facility if disposal site is located outside of the State of California Quality Control and Assurance Retain and submit records of disposed concrete waste including: 1. Weight tickets 2. Delivery and removal of temporary concrete washouts MATERIALS Portable Temporary Concrete Washout Portable temporary concrete washout must: 1. Be a commercially available watertight container. 2. Have sufficient capacity to contain all liquid and concrete waste generated by washout activities without seepage or spills. 3. Have at least 55-gallon capacity. 4. Be labeled for the exclusive use as a concrete waste and washout facility. Stencil Concrete Waste material" in 3-inch high letters on white background. Top of stenciling must be 12 inches from the top of the container. Concrete Washout Sign Concrete washout sign must comply with the provisions in Section 12-3.06B, Portable Signs" of the Standard Specifications and: 1. Be approved by the Engineer 2. Consist of base, framework, and sign panel 3. Be made of plywood 4. Be minimum 2' x 4' in size 5. Read Concrete Washout" with 3 inches high black letters on white background CONSTRUCTION Placement Place portable temporary concrete washouts at job site: 1. Before concrete placement activities start 2. In the immediate area of concrete work as approved by the Engineer 3. No closer than 50 feet from storm drain inlets, open drainage facilities, ESAs, or watercourses 4. Away from construction traffic or public access areas Install a concrete washout sign adjacent to each portable temporary concrete washout location. Operation Use portable temporary concrete washouts for: 1. Washout from concrete delivery trucks 2. Slurries containing portland cement concrete or hot mix asphalt from sawcutting, coring, grinding, grooving, and hydro-concrete demolition 3. Concrete waste from mortar mixing stations Relocate portable temporary concrete washouts as needed for concrete construction work. Book One San Benancio/State Route 68 Intersection Improvements 436 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Replace portable temporary concrete washouts when filled to capacity. Do not fill higher than 6 inches below rim. Your WPC manager must inspect portable temporary concrete washouts: 1. Daily if concrete work occurs daily 2. Weekly if concrete work does not occur daily Maintenance When relocating or transporting a portable temporary concrete washout within the job site, secure it to prevent spilling of concrete waste material. If any spilled material is observed, remove spilled material and place it into portable temporary concrete washout. Removal Dispose of concrete waste material at a facility specifically licensed to receive solid concrete waste, liquid concrete waste, or both. When portable temporary concrete washout is full, remove and dispose of concrete waste within 2 days. PAYMENT The contract lump sum price paid for temporary concrete washout portable) includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in furnishing, maintaining, and removing the portable temporary concrete washout, including removal and disposal of concrete waste, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.08 TEMPORARY CONSTRUCTION ENTRANCE GENERAL Summary This work includes constructing, maintaining, and removing temporary construction entrance to provide temporary access. The SWPPP must describe and include the use of temporary construction entrance as a water pollution control practice for tracking control. Temporary construction entrance must be Type 1, Type 2, or a combination. Submittals Submit a Certificate of Compliance under Section 6-1.07, Certificates of Compliance," of the Standard Specifications for: 1. Temporary entrance fabric 2. Rock Submit details for alternatives at least 5 business days before installation. You may propose alternatives for the following items: 1. Alternative sump 2. Alternative corrugated steel panels If the Engineer approves, you may eliminate the sump. Book One San Benancio/State Route 68 Intersection Improvements 437 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???MATERIALS Temporary Entrance Fabric Temporary entrance fabric must comply with Section 88-1.04, Rock Slope Protection Fabric," of the Standard Specifications and be woven Type B or non-woven Type B. Rock Rock must be Type A or Type B. Rock Type A) must comply with: 1. Requirements under Section 72-2.02, Materials," of the Standard Specifications 2. Following sizes: Square Screen Size inch) Percentage Passing Percentage Retained 6 100 0 3 0 100 Rock Type B) must be Railway Ballast Number 25. Do not use blast furnace slag. Railway Ballast Number 25 must comply with: 1. Description in AREMA Manual for Railway Engineering. 2. Following sizes: Nominal Percentage Passmi Size Square Opening 3" 2-1/2" 2" 1-1/2" 1" 3/4" 1/2" 3/8" No. 4 2-1/2"-3/8" 100 80-100 60-85 50-70 25-50 5-20 0-10 0-3 3. Following properties: Specification Requirements Percent material passing No. 200 sieve, max. 1.0 ASTM: C 117 Bulk specific gravity, min. 2.60 ASTM: C 127 Absorption, percent min. 1.0 ASTM: C 127 Clay lumps and friable particles, percent max. 0.5 ASTM: C 142 Degradation, percent max. 30 ASTM: C 535 Soundness Sodium Sulfate), percent max. 5.0 ASTM: C 88 Flat, elongated particles, or both, percent max. 5.0 ASTM: D 4791 Corrugated Steel Panels Corrugated steel panels must: 1. Be made of steel. 2. Be pressed or shop welded 3. Have a slot or hook for connecting panels together Book One San Benancio/State Route 68 Intersection Improvements 438 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???CONSTRUCTION Prepare location for temporary construction entrance by: 1. Removing vegetation to ground level and clear away debris 2. Grading ground to uniform plane 3. Grading ground surface to drain 4. Removing sharp objects that may damage fabric 5. Compacting the top 1.5 feet of soil to at least 90 percent relative compaction If temporary entrance Type 1) is specified, use rock Type A). If temporary construction entrance Type 2) is specified, use Rock Type B) under corrugated steel panels. Use at least 6 corrugated steel panels for each entrance. Couple panels together. Install temporary construction entrance by: 1. Positioning fabric along the length of the entrance 2. Overlapping sides and ends of fabric by at least 12 inches 3. Spreading rock over fabric in the direction of traffic 4. Covering fabric with rock within 24 hours 5. Keeping a 6 inch layer of rock over fabric to prevent damage to fabric by spreading equipment Do not drive on fabric until rock is spread. Unless the Engineer eliminates the sump, install a sump within 20 feet of each temporary construction entrance. Repair fabric damaged during rock spreading by placing a new fabric over the damaged area. New fabric must be large enough to cover damaged area and provide at least 18-inch overlap on all edges. Maintenance Maintain temporary construction entrance to minimize generation of dust and tracking of soil and sediment onto public roads. If dust or sediment tracking increases, place additional rock unless the Engineer approves another method. Repair temporary construction entrance if: 1. Fabric is exposed 2. Depressions in the entrance surface develop 3. Rock is displaced Repair temporary construction entrance within 24 hours of discovering damage unless the Engineer approves a longer period. During use of temporary construction entrance, do not allow soil, sediment, or other debris tracked onto pavement to enter storm drains, open drainage facilities, or watercourses. When material is tracked onto pavement, remove it within 24 hours unless the Engineer approves a longer period. If your vehicles, equipment, or activities disturb or displace the temporary construction entrance, repair it at your expense. The Department does not pay maintenance costs for cleanup, repair, removal, disposal, or replacement due to improper installation or your negligence. Book One San Benancio/State Route 68 Intersection Improvements 439 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Removal When the Engineer determines that temporary construction entrance is not required, remove and dispose of it under Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Backfill and repair ground disturbance, including holes and depressions, caused by installation and removal of temporary construction entrance under Section 15-1.02, Preservation of Property," of the Standard Specifications. MEASUREMENT AND PAYMENT Temporary construction entrance is determined from actual count in place. Temporary construction entrance is measured one time only and no additional measurement will be recognized. The contract price paid for temporary construction entrance includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing temporary construction entrance, complete in place, including removal of temporary construction entrance, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. No additional compensation will be made if the temporary construction entrance is relocated during the course of construction. The State and you share the cost of maintaining temporary construction entrance. The State determines the maintenance cost under Section 9-1.03, Force Account Payment," of the Standard Specifications and pays you one-half of that cost. 10-1.09 TEMPORARY COVER GENERAL Summary This work includes constructing, maintaining, and removing temporary cover. The SWPPP must describe and include the use of temporary cover as a water pollution control practice for soil stabilization and stockpile management. Submittals Submit a Certificate of Compliance as specified Compliance" of the Standard Specifications for: 1. Gravel-filled bag fabric 2. Temporary cover fabric in Section 6-1.07, Certificates If you substitute a material in the following list, submit a for approval at least 5 business days before installation: 1. Alternative restrainer 2. Alternative linear sediment barrier MATERIALS Geosynthetic Fabrics Geosynthetic fabrics must consist of one of the following: 1. Polyester 2. Polypropylene 3. Combined polyester and polypropylene Sample under ASTM D 4354, Procedure C. of sample of the alternative material Book One San Benancio/State Route 68 Intersection Improvements 440 CONTRACT NO. 10- 111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Test under ASTM D 4759. All properties are based on Minimum Average Roll Value MARV). Identify, store, and handle under ASTM D 4873. Protect geosynthetics from moisture, sunlight and damage during shipping and storage. Label each unit with the manufacturer's name, identifying information and product identification. Gravel-filled bag fabric must comply with: Specification ents Grab breaking load 205 1-inch grip, lb, min. in each direction Apparent elongation 50 percent, min., in each direction Water Flow Rate 80-150 max. average roll value, gallons per minute/square foot Permittivity 1.2 1/sec., min Apparent opening size 40-80 max. average roll value, U.S. Standard sieve size Ultraviolet Degradation 70 percent of original unexposed grab breaking load 500 hr, minimum The temporary cover fabric must be geosynthetic cover fabric, plastic sheeting, or a combination of both. Temporary cover fabric must be either: 1. Plastic sheeting consisting of a single-ply geomembrane material, 10 mils thick, that complies with ASTM D 5199 2. Geosynthetic cover fabric that complies with the following properties: Specification Requirements Grab breaking load 200 1-inch grip, lb, min. in each direction Apparent elongation 50 percent, min., in each direction Water Flow Rate 75-120 max. average roll value, gallons per minute/square foot Permittivity 0.08 1/sec., min Apparent opening size 100 max. average roll value, U.S. Standard sieve size Ultraviolet Degradation 70 percent of original unexposed grab breaking load 500 hr, minimum Gravel Gravel for gravel-filled bags must be: 1. From 3/8 to 3/4 inch in diameter 2. Clean and free from clay balls, organic matter, and other deleterious materials Gravel-filled Bags Gravel-filled bags must: 1. Be made from gravel-filled bag fabric. 2. Have inside dimensions from 24 to 32 inches in length, and from 16 to 20 inches in width. 3. Have the opening bound to retain the gravel. The opening must be sewn with yarn, bound with wire, or secured with a closure device. Book One San Benancio/State Route 68 Intersection Improvements 441 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???4. Weigh from 30 to 50 pounds when filled with gravel. Restrainers Restrainers must be used to secure the cover fabric or plastic sheeting to the surface of the slope or stockpile. Restrainers must be one of the following: 1. Made of gravel-filled bags that are roped together and spaced no more than a 6 feet apart 2. Made of wooden lath and anchor restrainers as shown on the plans and the following: 2.1 Wooden lath must be 2" x 4" x 8', made from fir or pine, and comply with Section 88-2.12, Lumber," of the Standard Specifications 2.2 Anchor restrainers must be made from steel reinforcing bars and spaced no more than 4 feet apart along the wooden lath 3. An approved alternate method Rope Rope must be at least 3/8 inch in diameter. Rope must be one of the following: 1. Biodegradable, such as sisal or manila 2. Nondegradable, such as polypropelene or nylon Linear Sediment Barrier Linear sediment barriers consist of one or more of the following: 1. Gravel bag berm 2. Earthen berm 3. Approved alternate method CONSTRUCTION Temporary Cover Fabric Install temporary cover fabric by: 1. Placing the temporary cover fabric loosely on the slope or stockpile with the longitudinal edges perpendicular to the slope contours 2. Placing the temporary cover fabric on the upper portion of the slope to overlap cover fabric on the lower portion of the slope 3. Placing the temporary cover fabric on the side of the prevailing wind to overlap the cover fabric on the downwind side of the slope 4. Anchoring the perimeter edge of the temporary cover fabric in key trenches 5. Overlapping edges of the temporary cover fabric by at least 2 feet 6. Placing restrainers at the overlap area and along the toe of the slope. Between overlaps, the restrainers must be spaced a maximum of 8 feet on center. 7. Ensuring that, if anchor restraints are used, the leg of the steel reinforcing bar pierces the temporary cover fabric and holds the wooden lath firmly against the surface of the slope or stockpile. Linear Sediment Barrier Protect excavation and embankment slopes with linear sediment barrier by: 1. Preventing run-on and concentrated flows from damaging the slopes 2. Placing the barrier approximately parallel to the slope contour at the toe of the slope 4. Angling the last 6 feet of the barrier up-slope Book One San Benancio/State Route 68 Intersection Improvements 442 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Ð?Protect stockpiles with linear sediment barrier by: 1. Preventing run-on and concentrated flows from touching the stockpiled material 2. Surrounding the stockpile with a linear sediment barrier 3. Adding more linear sediment barrier within 24 hours of adding more material to the stockpile If earthen berms are used as a linear sediment barrier, they must be: 1. At least 8 inches high and 36 inches wide 2. Compacted by hand or mechanical method If gravel bag berms are used as a linear sediment barrier: 1. Place gravel bags as a single layer 2. Place gravel bags end-to-end to eliminate gaps If you need to increase the height of the gravel bag berm: 1. Increase height by adding rows of gravel-filled bags 2. Stack bags in a way that the bags in the top row overlap the joints in the lower row 3. Stabilize berm by adding rows at the bottom If you remove the temporary cover to do other work, replace and secure temporary cover within one hour. MAINTENANCE Maintain temporary cover to minimize exposure of the slopes or stockpile and prevent movement of the material beyond the linear sediment barrier. Maintain temporary cover by: 1. Relocating and securring restrainers to keep the erosion control blankets in place. Temporary cover fabric that breaks free must be immediately secured. 2. Repairing or replacing the temporary cover fabric when the area covered by temporary cover becomes exposed or exhibits visible erosion. 3. Repairing or replacing the linear sediment barrier when washouts occur between joints or beneath the linear sediment barrier. 4. Repairing or replacing the temporary cover fabric when it becomes detached, torn, or unraveled. Repair temporary cover within 24 hours of discovering damage unless the Engineer approves a longer period. If your vehicles, equipment, or activities disturb or displace temporary cover, repair temporary cover at your expense. REMOVAL When the Engineer determines that temporary cover is not required, it must be removed and disposed of under Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Ground disturbance, including holes and depressions, caused by the installation and removal of the temporary cover must be backfilled and repaired under Section 15-1.02, Preservation of Property," of the Standard Specifications. Book One San Benancio/State Route 68 Intersection Improvements 443 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Ð?MEASUREMENT AND PAYMENT Temporary cover is measured by the square foot of the actual area covered excluding overlaps. The contract price paid per square yard for temporary cover includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in installing temporary cover, complete in place, including restrainers and removal of temporary cover, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.10 TEMPORARY DRAINAGE INLET PROTECTION GENERAL Summary This work includes constructing, maintaining, and removing temporary drainage inlet protection. Drainage inlet protection settles and filters sediment before stormwater runoff discharges into storm drainage systems. The SWPPP must describe and include the use of temporary drainage inlet protection as a water pollution control practice for sediment control. Provide temporary drainage inlet protection to meet the changing conditions around the drainage inlet. Temporary drainage inlet protection must be: 2. Type 3 Submittals Submit a Certificate of Compliance as specified in Section 6-1.07, Certificates of Compliance" of the Standard Specifications for: 1. Erosion control blanket 2. Fiber rolls 3. Safety cap for metal posts 4. Silt fence fabric 5. Sediment filter bag 6. Foam barrier 7. Rigid plastic barrier 8. Gravel-filled bag fabric If you substitute the steel wire staple with an alternative attachment device, submit a sample of the device for approval at least 5 business days before installation. MATERIALS Geosynthetic Fabrics Geosynthetic fabrics for temporary drainage inlet protection must consist of one of the following: 1. Polyester 2. Polypropylene 3. Combined polyester and polypropylene Book One San Benancio/State Route 68 Intersection Improvements 444 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??O?Geosynthetic fabrics for temporary drainage inlet must comply with the specifications for water pollution control in Section 88-1.05, Water Pollution Control," of the Standard Specifications. Foam barrier must comply with: Foam Barrier Property ASTM Specification Designation Grab breaking load D 4632 1-inch grip, Ib, min. in each direction 200 Apparent elongation D 4632 percent, min., in each direction 15 Water Flow Rate D 4491 max. average roll value, gallons per minute/square foot 100-150 Permittivity D 4491 1/sec., min. 0.05 Apparent opening size D 4751 max. average roll value, U.S. Standard sieve size 40 Ultraviolet Degradation D 4595 percent of original unexposed grab breaking load 500 hr, minimum 70 Sample under ASTM D 4354, Procedure C. Test under ASTM D 4759. All properties are based on Minimum Average Roll Value MARV). Identify, store, and handle under ASTM D 4873. Erosion Control Blanket Erosion control blanket must be: 1. Described as a rolled erosion control product RECP) 2. Classified as temporary and degradable or long-term and non-degradable 3. Machine-made mats 4. Provided in rolled strips 5. Classified by the Erosion Control Technology Council ECTC) Erosion control blanket classified as temporary and degradable must be one of the following: 1. Double net excelsior blanket: 1.1. Classified as ECTC Type 2D 1.2. Classified as an erosion control blanket 1.3. Designed to last for at least one year after installation 1.4. With a Universal Soil Loss Equation USLE) C-Factor of not more than 0.20 at a 2:1 horizontal: vertical) slope 1.5. With 80 percent of the wood excelsior fibers being 6 inches or longer 1.6. Capable to withstand a maximum shear stress of 1.75 pounds per square foot under ASTM D 6460 1.7. With a minimum tensile strength of 75 pounds per foot under ASTM D 5035 1.8. With top and bottom surfaces covered with lightweight non-synthetic netting Book One San Benancio/State Route 68 Intersection Improvements 445 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????2. Double net straw and coconut blanket: 2.1. Classified as ECTC Type 2D 2.2. Classified as an erosion control blanket 2.3. Designed to last for at least one year after installation 2.4. With a USLE C-Factor of not more than 0.20 at a 2:1 horizontal:vertical) slope 2.5. Comprised of 70 percent straw and 30 percent coconut fiber 2.6. Capable to withstand a maximum shear stress of 1.75 pounds per square foot under ASTM D 6460 2.7. With a minimum tensile strength of 75 pounds per foot under ASTM D 5035 2.8. With top and bottom surfaces covered with lightweight non-synthetic netting 3. Jute netting: 3.1. Classified as ECTC Type 3B 3.2. Classified as an open weave textile and have from 14 to 20 strands per foot in each direction 3.3. Designed to last for at least one year after installation 3.4. With a USLE C-Factor of not more than 0.25 at a 1.5:1 horizontal:vertical) slope 3.5. Comprised of 100 percent unbleached and undyed spun yarn made of jute fiber 3.6. With an average open area from 63 to 70 percent 3.7. From 48 to 72 inches in width 3.8. Capable to withstand a maximum shear stress of 2.0 pounds per square foot under ASTM D 6460 3.9. With a minimum tensile strength of 100 pounds per foot under ASTM D 5035 3.10. From 0.90 to 1.20 pounds per square yard in weight 4. Coir netting: 4.1. Classified as ECTC Type 4 4.2. Classified as an open weave textile and from 13 to 18 strands per foot in each direction 4.3. Designed to last for at least three years after installation 4.4. With a USLE C-Factor of not more than 0.25 at a 1:1 horizontal:vertical) slope 4.5. Comprised of 100 percent unbleached and undyed spun coir yarn made of coconut fiber 4.6. With an average open area from 63 to 70 percent 4.7. From 72 to 158 inches in width 4.8. Capable to withstand a maximum shear stress of 2.25 pounds per square foot under ASTM D6460 4.9. With a minimum tensile strength of 125 pounds per foot under ASTM D 5035 4.10. From 1.20 to 1.67 pounds per square yard in weight Erosion control blanket classified as long-term and non-degradable must: 1. Be a geosynthetic fabric 2. Comply with the specifications for rock slope protection fabric Class 8) in Section 88- 1.06, Channel and Shore Protection," of the Standard Specifications Staples You may use an alternative attachment device such as a geosynthetic pins or plastic pegs to install erosion control blanket. Rock Rock must comply with: 1. Requirements under Section 72-2.02, Materials," of the Standard Specifications Book One San Benancio/State Route 68 Intersection Improvements 446 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??i?2. Following sizes: Square Screen Size inch) Percentage Passing Percentage Retained 6 100 0 3 0 100 Rope Rope for fiber rolls must be: 1. Biodegradable, such as sisal or manila 2. At least 1/4 inch in diameter Fiber Rolls Fiber rolls must: 1. Last for at least one year after installation 2. Be Type 1 or Type 2 For Type 1, fiber rolls must be: 1. Made from an erosion control blanket classified as temporary and degradable 2. Rolled along the width 3. Secured with natural fiber twine every 6'-6" from each end 4. Finished to be either: 4.1. From 8 to 10 inches in diameter, from 10 to 20 feet long, and at least 0.5 pounds per linear foot 4.2. From 10 to 12 inches in diameter, at least 10 feet long, and at least 2 pounds per linear foot For Type 2, fiber rolls must: 1. Be filled with rice or wheat straw, wood excelsior, or coconut fiber 2. Be covered with biodegradable jute, sisal, or coir fiber netting 3. Have netting secured tightly at each end 4. Be finished to be either: 4.1. From 8 to 10 inches in diameter, from 10 to 20 feet long, and at least 1.1 pounds per linear foot 4.2. From 10 to 12 inches in diameter, at least 10 feet long, and at least 3 pounds per linear foot Wood Stakes Wood stakes must be: 1. Untreated fir, redwood, cedar, or pine and cut from sound timber 2. Straight and free of loose or unsound knots and other defects which would render the stakes unfit for use 3. Pointed on the end to be driven into the ground For fiber rolls, wood stakes must be at least: 1. 1" x 1" x 24" in size for Type 1 installation 2. 1" x 2" x 24" in size for Type 2 installation Posts Posts must be wood or metal. Book One San Benancio/State Route 68 Intersection Improvements 447 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Wood posts must be: 1. Untreated fir, redwood, cedar, or pine and cut from sound timber 2. Straight and free of loose or unsound knots and other defects that would render the stakes unfit for use 3. Pointed on the end to be driven into the ground 4. At least 2" x 2" in size, and 4 feet long Metal posts must: 1. Be made of steel. 2. Have a U," T," L," or other cross sectional shape that can resist failure from lateral loads. 3. Be pointed on the end to be driven into the ground. 4. Weigh at least 0.75-pound per foot. 5. Be at least 4 feet long. 6. Have a safety cap attached to the exposed end. The safety cap must be orange or red plastic and fit snugly to the metal post. Silt Fence Silt fence must be: 1. Constructed with silt fence fabric, posts, and fasteners 2. Prefabricated or assembled at the job site Silt fence fabric must be attached to posts using these methods: 1. If prefabricated silt fence is used, posts must be inserted into sewn pockets 2. If assembled on the job site: 2.1. If wood posts are used, fasteners must be staples or nails 2.2. If steel posts are used, fasteners must be tie wires or locking plastic fasteners 2.3. Spacing of the fasteners must be at least 8 inches Gravel-filled Bags Gravel-filled bags must: 1. Be made from fabric. 2. Have inside dimensions from 24 to 32 inches in length, and from 16 to 20 inches in width. 3. Have the opening bound to retain the gravel. The opening must be sewn with yam, bound with wire, or secured with a closure device. 4. Weigh from 30 to 50 pounds when filled with gravel. Gravel for gravel-filled bags must be: 1. From 3/8 to 3/4 inch in diameter 2. Clean and free from clay balls, organic matter, and other deleterious materials Sediment Filter Bag Sediment filter bag must: 1. Be made of fabric 2. Be sized to fit the catch basin or drainage inlet 3. Include a high-flow bypass Book One San Benancio/State Route 68 Intersection Improvements 448 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Sediment filter bag may include a metal frame. Sediment filter bags that do not have a metal frame and are deeper than 18 inches must: 1. Include lifting loops and dump straps 2. Include a restraint cord to keep the sides of the bag away from the walls of the catch basin Foam Barriers Foam barriers must: 1. Be filled with a urethane foam core 2. Have a geosynthetic fabric cover and flap 3. Have a triangular, circular, or square shaped cross section 4. Have a vertical height of at least 5 inches after installation 5. Have a horizontal flap of at least 8 inches in width 6. Have a length of at least 4 feet per unit 7. Have the ability to interlock separate units into a longer barrier so that water does not flow between the units 8. Be secured to: 8.1. Pavement with 1-inch concrete nails with 1-inch washers and solvent-free adhesive 8.2. Soil with 6-inch nails with 1-inch washers Rigid Plastic Barriers Rigid plastic barriers must: 1. Have an integrated filter 2. Have a formed outer jacket of perforated high density polyethylene HDPE) or polyethylene terephthalate PET) 3. Have a flattened tubular shaped cross section 4. Be made from virgin or recycled materials 5. Be free from biodegradable filler materials that degrade the physical or chemical characteristics of the finished filter core or outer jacket 6. Have a length of at least 4 feet per unit 7. Have the ability to interlock separate units into a longer barrier so that water does not flow between the units 8. Be secured to: 8.1 Pavement with 1-inch concrete nails with 1-inch washers and solvent-free adhesive, with gravel-filled bags, or a combination 8.2 Soil with 6-inch nails with 1-inch washers and wood stakes 9. Comply with the following properties: Book One San Benancio/State Route 68 Intersection Improvements 449 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Specification Requirements Grab tensile strength of outer jacket material, pounds/square inch, min. in each 4000 direction ASTM D 4632* Break strength of outer jacket, pounds/square inch 1300 ASTM D 4632* Permittivity of filter core, 1/sec., min. 0.38 ASTM D 4491 Flow rate of filter core, gallons per minute per square foot, 100 min. ASTM D 4491 200 max. Filter core aperture size, max., Average Opening Size AOS), microns 425 Ultraviolet stability outer jacket & filter core), percent tensile strength retained 90 after 500 hours, min. ASTM D 4355 xenon-arc lamp and water spray weathering method) * or appropriate test method for specific polymer If used at a curb inlet without a grate, rigid plastic barriers must: 1. Have a horizontal flap of at least 6 inches with an under-seal gasket to prevent underflows 2. Include a high-flow bypass 3. Have a vertical height of at least 7 inches after installation 4. Be sized to fit the catch basin or drainage inlet If used at a grated catch basin without a curb inlet, rigid plastic barriers must: 1. Cover the grate by at least 2 inches on each side and have an under-seal gasket to prevent underflows 2. Include a high-flow bypass 3. Have a vertical height of at least 1.5 inches after installation 4. Be sized to fit the catch basin or drainage inlet If used at a curb inlet with a grate, rigid plastic barriers must: 1. Have a horizontal flap that covers the grate by at least 2 inches on the 3 sides away from the curb opening and have an under-seal gasket to prevent underflows 2. Include a high-flow bypass 3. Have a vertical section that covers the curb opening by at least 5 inches after installation 4. Be sized to fit the catch basin or drainage inlet If used as a linear sediment barrier, rigid plastic barriers: 1. Must have an installed height of at least 6 inches 2. May have a horizontal flap of at least 4 inches Linear Sediment Barrier Linear sediment barriers must consist of one or more of the following: 1. 2. 3. 4. 5. Silt fence Gravel-filled bags Fiber roll Rigid plastic barrier Foam barrier Flexible Sediment Barrier Flexible sediment barriers consist of one or more of the following: 1. Rigid plastic barrier Book One San Benancio/State Route 68 Intersection Improvements 450 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????2. Foam barrier CONSTRUCTION For drainage inlet protection at drainage inlets in paved and unpaved areas: 1. Prevent ponded runoff from encroaching on the traveled way or overtopping the curb or dike. Use linear sediment barriers to redirect runoff and control ponding. 2. Clear the area around each drainage inlet of obstructions including rocks, clods, and debris greater than one inch in diameter before installing the drainage inlet protection. 3. Install a linear sediment barrier up-slope of the existing drainage inlet and parallel with the curb, dike, or flow line to prevent sediment from entering the drainage inlet. Erosion Control Blanket To install erosion control blanket and geosynthetic fabric: 1. Secure blanket or fabric to the surface of the excavated sediment trap with staples and embed in a trench adjacent to the drainage inlet 2. Anchor the perimeter edge of the erosion control blanket in a trench Silt Fence If silt fence is used as a linear sediment barrier: 1. Place fence along the perimeter of the erosion control blanket, with the posts facing the drainage inlet 2. Install fence with the bottom edge of the silt fence fabric in a trench. Backfill the trench with soil and compact manually Gravel Bag Berm If gravel bag berm is used as a linear sediment barrier: 1. Place gravel-filled bags end-to-end to eliminate gaps 2. Stack bags in a way that the bags in the top row overlap the joints in the lower row If gravel bag berms are used for Type 3A and Type 3B: 1. Place gravel-filled bags end-to-end to eliminate gaps 2. Stack bags in a way that the bags in the top row overlap the joints in the lower row 3. Arrange bags to create a spillway by removing one or more gravel-filled bags from the upper layer If used within shoulder area, place gravel-filled bags behind temporary railing Type K). Fiber Rolls If fiber rolls are used as a linear sediment barrier: 1. Place fiber rolls in a furrow. 2. Secure fiber rolls with stakes installed along the length of the fiber rolls. Stakes must be installed from 6 to 12 inches from the end of the rolls. If fiber rolls are used as a linear sediment barrier for Type 4A, place them over the erosion control blanket. Foam Barriers If foam barriers are used as a linear sediment barrier: Book One San Benancio/State Route 68 Intersection Improvements 451 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????1. Install barriers with the horizontal flap in a 3 inch deep trench and secured with nails and washers placed no more than 4 feet apart 2. Secure barriers with 2 nails at the connection points where separate units overlap 3. Place barriers without nails or stakes piercing the core Flexible Sediment Barriers If flexible sediment barriers are used: 1. Secure barriers to the pavement with nails and adhesive, gravel-filled bags, or a combination 2. Install barriers flush against the sides of concrete, asphalt concrete, or hot mix asphalt curbs or dikes 3. Place barriers to provide a tight joint with the curb or dike and anchored in a way that runoff cannot flow behind the barrier If flexible sediment barriers are used for Type 4B: 1. Secure barriers to the pavement according to the angle and spacing shown on the plans 2. Place barriers to provide a tight joint with the curb or dike. Cut the cover fabric or jacket to ensure a tight fit Rigid Sediment Barriers If rigid sediment barriers are used at a grated catch basin without a curb inlet: 1. Place barriers using the gasket to prevent runoff from flowing under the barrier 2. Secure barriers to the pavement with nails and adhesive, gravel-filled bags, or a combination If rigid sediment barriers are used for linear sediment barriers: 1. Install barriers in a trench. Backfill the trench with soil and compact manually 2. Place barrier with separate units overlapping at least 4 inches 3. Reinforce barriers with a wood stake at each overlap 4. Fasten barriers to the wood stakes with steel screws, 16 gauge galvanized steel wire, or with UV stabilized cable ties that are from 5 to 7 inches in length Sediment Filter Bags Install sediment filter bags for Type 5 by: 1. Removing the drainage inlet grate 2. Placing the sediment bag in the opening 3. Replacing the grate to secure the sediment filter bag in place MAINTENANCE Maintain temporary drainage inlet protection to provide sediment holding capacity and to reduce runoff velocities. Remove sediment deposits, trash, and debris from temporary drainage inlet protection as needed or when directed by the Engineer. If removed sediment is deposited within project limits, it must be stabilized and not subject to erosion by wind or water. Trash and debris must be removed and disposed of as specified in Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Maintain temporary drainage inlet protection by removing sediment from: 1. Behind flexible sediment barriers when sediment exceeds 1 inch in depth 2. Surface of the erosion control blanket when sediment exceeds 1 inch in depth 3. Sediment trap for Type 2 when the volume has been reduced by approximately one-half Book One San Benancio/State Route 68 Intersection Improvements 452 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????4. Behind silt fence when the sediment is 1 /3 the height of the silt fence fabric above ground 5. Sediment filter bags when filled or when the restraint cords are no longer visible If rills and other evidence of concentrated runoff occur beneath the linear sediment barrier, repair or adjust the barrier. If silt fence fabric becomes split, torn, or unraveled, repair or replace silt fence. If geosynthetic fabric becomes split, torn, or unraveled, repair or replace foam barriers. Repair or replace sagging or slumping linear sediment barriers with additional stakes. Replace broken or split wood stakes. Reattach foam barriers and rigid plastic barriers that become detached or dislodged from the pavement. Repair split or torn rigid plastic barriers with 16 gauge galvanized steel wire or UV stabilized cable ties that are from 5 to 7 inches in length. For sediment filter bags without metal frames, empty by placing one inch steel reinforcing bars through the lifting loops and then lift the filled bag from the drainage inlet. For sediment filter bags with metal frames, empty by lifting the metal frame from the drainage inlet. Rinse before replacing in the drainage inlet. When rinsing the sediment filter bags, do not allow the rinse water to enter a drain inlet or waterway. Repair temporary drainage inlet protection within 24 hours of discovering damage unless the Engineer approves a longer period. If your vehicles, equipment, or activities disturb or displace temporary drainage inlet protection, repair temporary drainage inlet protection at your expense. The Department does not pay maintenance costs for cleanup, repair, removal, disposal, or replacement due to improper installation or your negligence. REMOVAL When the Engineer determines that the temporary drainage inlet protection is not required, it must be removed and disposed of under Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Ground disturbance, including holes and depressions, caused by the installation and removal of the temporary drainage inlet protection must be backfilled and repaired under Section 15-1.02, Preservation of Property," of the Standard Specifications. MEASUREMENT AND PAYMENT Quantities of temporary drainage inlet protection will be determined from actual count in place. The protection will be measured one time only and no additional measurement will be recognized. The contract unit price paid for temporary drainage inlet protection includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing the temporary drainage inlet protection, complete in place, including removal of materials, cleanup and disposal of retained sediment and debris, and backfilling and repairing holes, depressions and other ground disturbance, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. No additional compensation will be made if the temporary drainage inlet protection is relocated during the course of construction. The State and you share the cost of maintaining the temporary drainage inlet protection. The State determines the maintenance cost under Section 9-1.03, Force Account Payment," of the Standard Specifications and pays you one-half of that cost. Book One San Benancio/State Route 68 Intersection Improvements 453 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????10-1.11 STREET SWEEPING GENERAL Summary This work includes street sweeping. The SWPPP must describe and include the use of street sweeping as a water pollution control practice for sediment control and tracking control. Submittals At least 5 business days before starting clearing and grubbing, earthwork, or other activities with the potential for tracking sediment or debris, submit: 1. Number of sweepers described in the SWPPP 2. Type of sweeper technology Quality Control and Assurance Retain and submit records of street sweeping including: 1. Quantity of sweeping waste disposal 2. Sweeping times and locations CONSTRUCTION Street Sweepers Sweepers must use one of these technologies: 1. Mechanical sweeper followed by a vacuum-assisted sweeper 2. Vacuum-assisted dry waterless) sweeper 3. Regenerative-air sweeper Operation Street sweeping must be done at: 1. Paved roads at job site entrance and exit locations 2. Paved areas within the job site that flow to storm drains or water bodies Street sweeping must be done: 1. During clearing and grubbing activities 2. During earthwork activities 3. During trenching activities 4. During roadway structural section activites 5. When vehicles are entering and leaving the job site 6. After soil disturbing activities 7. After observing offsite tracking of material Monitor paved areas and roadway within the jobsite. Street sweeping must be done: 1. Within 1 hour, if sediment or debris is observed during activities that require sweeping 2. Within 24 hours, if sediment or debris is observed during activities that do not require sweeping At least 1 sweeper must be on the job site at all times when sweeping work is required. The sweeper must be in good working order. Perform street sweeping to minimize dust. If dust generation is excessive or sediment pickup is ineffective, use water or a vacuum. Book One San Benancio/State Route 68 Intersection Improvements 454 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????You may stockpile collected material on the jobsite according to the approved SWPPP. Dispose of collected material at least once per week. Material collected during street sweeping must be removed and disposed of under Section 7- 1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Your WPCM must inspect paved roads at job site access points: 1. Daily if earthwork and other sediment or debris generating activities occur daily 2. Weekly if earthwork and other sediment or debris generating activities do not occur daily 3. When the National Weather Service predicts precipitation with a probability of at least 30 percent MEASUREMENT AND PAYMENT The contract lump sum price paid for street sweeping includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in street sweeping, including disposal of collected material, as shown on the plans, as specified in the Standard Specifications, these Special Provisions, and as directed by the Engineer. 10-1.12 PROGRESS SCHEDULE CRITICAL PATH METHOD) GENERAL Summary Comply with Section 8-1.04, Progress Schedule," of the Standard Specifications, except you must: 1. Use a computer software to prepare the schedule 2. Furnish compatible software for the Engineer's exclusive possession and use You are responsible for assuring that all activity sequences are logical and that each schedule shows a coordinated plan for complete performance of the work. Definitions contract completion date: The current extended date for completion of the contract shown on the weekly statement of working days furnished by the Engineer as specified in Section 8-1.06, Time of Completion," of the Standard Specifications. data date: The day after the date through which a schedule is current. Everything occurring earlier than the data date is as-built" and everything on or after the data date is planned." float: The difference between the earliest and latest allowable start or finish times for an activity. milestone: An event activity that has zero duration and is typically used to represent the beginning or end of a certain stage of the project. near critical path: A chain of activities with total float exceeding that of the critical path but having no more than 10 working days of total float. time-scaled network diagram: A graphic depiction of a CPM schedule comprised of activity bars with relationships for each activity represented by arrows. The tail of each arrow connects to the activity bar for the predecessor and points to the successor. total float: The amount of time that an activity or chain of activities can be delayed before extending the scheduled completion date. Book One San Benancio/State Route 68 Intersection Improvements 455 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Submittals General Requirements Submit to the Engineer baseline, monthly updated, and final updated schedules, each consistent in all respects with the time and order of work requirements of the contract. Perform work in the sequence indicated on the current accepted schedule. Each schedule must show: 1. Calculations using critical path method to determine controlling activities. 2. Duration activities less than 20 working days. 3. Each required constraint. Constraints other than those required by the Special Provisions may be included only if authorized. The Engineer's review and acceptance of schedules does not waive any contract requirements and does not relieve you of any obligation or responsibility for submitting complete and accurate information. Correct rejected schedules and resubmit them within 7 days of notification by the Engineer, at which time a new review period of 7 days will begin. Errors or omissions on schedules do not relieve you from finishing all work within the time limit specified for completion of the contract. If, after a schedule has been accepted by the Engineer, either you or the Engineer discover that any aspect of the schedule has an error or omission, you must correct it on the next updated schedule. Computer Software Submit to the Engineer for review a description of proposed schedule software to be used. After the Engineer accepts the proposed software, furnish schedule software and all original software instruction manuals. All software must be compatible with the current version of the Windows operating system in use by the Engineer. The schedule software must include: 1. Latest version of Primavera SureTrak Project Manager for Windows, or equivalent 2. Latest version of schedule-comparing HST SureChange, or equivalent If a schedule software equivalent to SureTrak is proposed, it must be capable of generating files that can be imported into SureTrak. The schedule-comparing software must be compatible with schedule software submitted and must be able to compare two schedules and provide reports of changes in activity ID, activity description, constraints, calendar assignments, durations, and logic ties. The schedule software and schedule-comparing software will be returned to you before the final estimate. The Department will compensate you as specified in Section 4-1.03, Extra Work," of the Standard Specifications for replacement of software or manuals damaged, lost, or stolen after delivery to the Engineer. Instruct the Engineer in the use of the software and provide software support until the contract is accepted. Within 15 days of contract approval, provide a commercial 8-hour training session for 2 Department employees in the use of the software at a location acceptable to the Engineer. It is recommended that you also send at least 2 employees to the same training session to facilitate development of similar knowledge and skills in the use of the software. If schedule software other than SureTrak is submitted, then the training session must be a total of 16-hours for each Department employee. Network Diagrams, Reports, and Data Include the following with each schedule submittal: 1. Two sets of originally plotted, time-scaled network diagrams 2. One read-only compact disk or floppy diskette containing the schedule data The time-scaled network diagrams must conform to the following: 1. Show a continuous flow of information from left to right Book One San Benancio/State Route 68 Intersection Improvements 456 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????2. Be based on early start and early finish dates of activities 3. Clearly show the critical path using graphical presentation 4. Be prepared on 11 x 17" or larger size 5. Include a title block and a timeline on each page Baseline Schedule Submit to the Engineer a baseline schedule within 20 days of approval of the contract. Allow 20 days for the Engineer's review after the baseline schedule and all support data are submitted. Beginning the week the baseline schedule is first submitted, meet with the Engineer weekly to discuss and resolve schedule issues until the baseline schedule is accepted. The baseline schedule must include the entire scope of work and must show how you plan to complete all work contemplated. Multiple critical paths and near-critical paths must be kept to a minimum. A total of not more than 50 percent of the baseline schedule activities must be critical or near critical, unless otherwise authorized by the Engineer. The baseline schedule must not extend beyond the number of working days originally provided in these Special Provisions. Updated Schedule Submit an updated schedule and meet with the Engineer to review contract progress on or before the 1st day of each month, beginning one month after the baseline schedule is accepted. Allow 15 days for the Engineer's review after the updated schedule and all support data are submitted, except that the review period will not start until any previous month's required schedule is accepted. Updated schedules that are not accepted or rejected within the review period are considered accepted by the Engineer. The updated schedule must show: 1. Data date of the 21st day of the month or other date established by the Engineer 2. Changes from approved revised schedules Final Updated Schedule Submit a final updated schedule with actual start and finish dates for the activities within 30 days after completion of contract work. Provide a written certificate with this submittal signed by your project manager or an officer of the company stating, To my knowledge and belief, the enclosed final updated schedule reflects the actual start and finish dates of the actual activities for the project contained herein." An officer of the company may delegate in writing the authority to sign the certificate to a responsible manager. PAYMENT Full compensation for furnishing software is considered as included in the contract prices paid for the various items of work involved and no additional compensation will be allowed. 10-1.13 CONSTRUCTION AREA TRAFFIC CONTROL DEVICES Flagging, signs, and temporary traffic control devices furnished, installed, maintained, and removed when no longer required shall conform to the provisions in Section 12, Construction Area Traffic Control Devices," of the Standard Specifications and these Special Provisions. Category 1 temporary traffic control devices are defined as small and lightweight less than 100 pounds) devices. These devices shall be certified as crashworthy by crash testing, crash testing of similar devices, or years of demonstrable safe performance. Category 1 temporary traffic control devices include traffic cones, plastic drums, portable delineators, and channelizers. Book One San Benancio/State Route 68 Intersection Improvements 457 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????If requested by the Engineer, the Contractor shall provide written self-certification for crashworthiness of Category 1 temporary traffic control devices at least 5 business days before beginning any work using the devices or within 2 business days after the request if the devices are already in use. Self-certification shall be provided by the manufacturer or Contractor and shall include the following: A. Date, B. Federal Aid number if applicable), C. Contract number, district, county, route and post mile of project limits, D. Company name of certifying vendor, street address, city, state and zip code, E. Printed name, signature and title of certifying person; and F. Category 1 temporary traffic control devices that will be used on the project. The Contractor may obtain a standard form for self-certification from the Engineer. Category 2 temporary traffic control devices are defined as small and lightweight less than 100 pounds) devices that are not expected to produce significant vehicular velocity change, but may cause potential harm to impacting vehicles. Category 2 temporary traffic control devices include barricades and portable sign supports. Category 2 temporary traffic control devices shall be on the Federal Highway Administration's FHWA) list of Acceptable Crashworthy Category 2 Hardware for Work Zones. This list is maintained by FHWA and can be located at: http://safety.fhwa.dot.gov/roadway dept/policy_guide/road_hardware/listing.cftn?code=wor kzone The Department also maintains this list at: http://www.dot.ca.gov/hq/traffops/signtech/signdel/pdf/Category2.pdf Category 2 temporary traffic control devices that have not received FHWA acceptance shall not be used. Category 2 temporary traffic control devices in use that have received FHWA acceptance shall be labeled with the FHWA acceptance letter number and the name of the manufacturer. The label shall be readable and permanently affixed by the manufacturer. Category 2 temporary traffic control devices without a label shall not be used. If requested by the Engineer, the Contractor shall provide a written list of Category 2 temporary traffic control devices to be used on the project at least 5 business days before beginning any work using the devices or within 2 business days after the request if the devices are already in use. Category 3 temporary traffic control devices consist of temporary traffic-handling equipment and devices that weigh 100 pounds or more and are expected to produce significant vehicular velocity change to impacting vehicles. Temporary traffic-handling equipment and devices include crash cushions, truck-mounted attenuators, temporary railing, temporary barrier, and end treatments for temporary railing and barrier. Type III barricades may be used as sign supports if the barricades have been successfully crash tested, meeting the NCHRP Report 350 criteria, as one unit with a construction area sign attached. Category 3 temporary traffic control devices shall be shown on the plans or on the Department's Highway Safety Features list. This list is maintained by the Division of Engineering Services and can be found at: http://www.dot.ca.gov/hq/esc/approved_products list/ Category 3 temporary traffic control devices that are not shown on the plans or not listed on the Department's Highway Safety Features list shall not be used. Book One San Benancio/State Route 68 Intersection Improvements 458 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Full compensation for providing self-certification for crashworthiness of Category 1 temporary traffic control devices and for providing a list of Category 2 temporary traffic control devices used on the project shall be considered as included in the prices paid for the various items of work requiring the use of the Category 1 or Category 2 temporary traffic control devices and no additional compensation will be allowed therefor. 10-1.14 CONSTRUCTION AREA SIGNS Construction area signs for temporary traffic control shall be furnished, installed, maintained, and removed when no longer required in conformance with the provisions in Section 12, Construction Area Traffic Control Devices," of the Standard Specifications and these Special Provisions. Attention is directed to Furnish Sign" of these Special Provisions. Attention is directed to the provisions in Prequalified and Tested Signing and Delineation Materials" of these Special Provisions. Type II retroreflective sheeting shall not be used on construction area sign panels. Type III, IV, VII, VIII, or IX retroreflective sheeting shall be used for stationary mounted construction area sign panels. Attention is directed to Construction Project Information Signs" of these Special Provisions regarding the number and type of construction project information signs to be furnished, erected, maintained, and removed and disposed of. Unless otherwise shown on the plans or specified in these Special Provisions, the color of construction area warning and guide signs shall have black legend and border on orange background, except W10-1 or W47(CA) Highway-Rail Grade Crossing Advance Warning) sign shall have black legend and border on yellow background. Orange background on construction area signs shall be fluorescent orange. Repair to construction area sign panels will not be allowed, except when approved by the Engineer. At nighttime under vehicular headlight illumination, sign panels that exhibit irregular luminance, shadowing or dark blotches shall be immediately replaced at the Contractor's expense. The Contractor shall notify the appropriate regional notification center for operators of subsurface installations at least 2 business days, but not more than 14 days, prior to commencing excavation for construction area sign posts. The regional notification centers include, but are not limited to, the following: Notification Center Underground Service Alert Telephone Number 811 Excavations required to install construction area signs shall be performed by hand methods without the use of power equipment, except that power equipment may be used if it is determined there are no utility facilities in the area of the proposed post holes. The post hole diameter, if backfilled with portland cement concrete, shall be at least 4 inches greater than the longer dimension of the post cross section. Construction area signs placed within 15 feet from the edge of the travel way shall be mounted on stationary mounted sign supports as specified in Construction Area Traffic Control Devices" of these Special Provisions. The Contractor shall maintain accurate information on construction area signs. Signs that are no longer required shall be immediately covered or removed. Signs that convey inaccurate information shall be immediately replaced or the information shall be corrected. Covers shall be replaced when they no longer cover the signs properly. The Contractor shall immediately restore to the original position and location any sign that is displaced or overturned, from any cause, during the progress of work. Book One San Benancio/State Route 68 Intersection Improvements 459 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????10-1.15 MAINTAINING TRAFFIC Maintaining traffic shall conform to the provisions in Sections 7-1.08, Public Convenience," Section 7-1.09, Public Safety," and Section 12, Construction Area Traffic Control Devices," of the Standard Specifications and these Special Provisions. Closure is defined as the closure of a traffic lane or lanes, including shoulder, ramp or connector lanes, within a single traffic control system. Closures shall conform to the provisions in Traffic Control System for Lane Closure" of these Special Provisions. Work that interferes with public traffic shall be limited to the hours when lane closures are allowed, except for work required under Sections 7-1.08, Public Convenience," and Section 7- 1.09, Public Safety." Designated legal holidays are as follows: January 1, the third Monday in February, the last Monday in May, July 4, the first Monday in September, November 11, Thanksgiving Day, and December 25. When a designated legal holiday falls on a Sunday, the following Monday shall be a designated legal holiday. When November 11 falls on a Saturday, the preceding Friday shall be a designated legal holiday. Special days are as follows: February 7-13, 2011, June 13-20, 2011, August 12-15, 2011, and as directed by the Engineer. The following community events actual event dates not available) may impact traffic: Carmel Valley Art & Wine Festival June 2011, MotoGP Championship Race July 2011, Concorso Italiano Car Show August 2011, Carmel Valley Fiesta Parade August 2011, California International Airshow August 2011. Under one-way reversing traffic control operations, public traffic may be stopped in one direction for periods not to exceed 5 minutes. After each stoppage, all accumulated traffic for that direction shall pass through the work zone before another stoppage is made. The maximum length of a single stationary lane closure shall be 0.25 miles. Local authorities shall be notified at least 5 business days before work begins. The Contractor shall cooperate with local authorities to handle traffic through the work area and shall make arrangements to keep the work area clear of parked vehicles. C43(CA) FRESH CONCRETE) sign shall be used at the beginning of the approach slab work area. The sign shall be in place during the entire curing period. During erection of signal poles and mast arms, the road may be closed and public traffic stopped for periods not to exceed 10 minutes. After one closure is made, accumulated traffic shall pass through the work before another closure is allowed. Personal vehicles of the Contractor's employees shall not be parked on the traveled way or shoulders including sections closed to public traffic. When work vehicles or equipment are parked within 6 feet of a traffic lane to perform active construction, the shoulder area shall be closed as shown on the plans. If minor deviations from the lane requirement charts are required, a written request shall be submitted to the Engineer at least 15 days before the proposed date of the closure. The Engineer may approve the deviations if there is no significant increase in the cost to the State and if the work can be expedited and better serve the public traffic. Full compensation for furnishing, erecting, maintaining, and removing and disposing of the C43(CA) signs shall be considered as included in the contract lump sum price paid for construction area signs and no additional compensation will be allowed therefor. Book One San Benancio/State Route 68 Intersection Improvements 460 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Lane Closure Restriction for Desi nated Legal Holidays and Special Days Thu Fri Sat Sun Mon Tues Wed Thu Fri Sat Sun x H xx xx xx SD xx x xx H xx xx SD xx x xx H xx xx SD xx x xx xx H xx xxx x xx xx SD xx xxx x H xx x SD xx x H xx SD xx x H xx xx xx xx SD xx Legends: Refer to lane closure charts x The full width of the traveled way shall be open for use by public traffic after xx The full width of the traveled way shall be open for use by public traffic. xxx The full width of the traveled way shall be open for use by public traffic until H Designated Legal Holiday SD Special Day Pedestrian access facilities shall be provided through construction areas within the right of way as shown on the plans and as specified herein. Pedestrian walkways shall be surfaced with hot mix asphalt, portland cement concrete or timber. The surface shall be skid resistant and free of irregularities. Hand railings shall be provided on each side of pedestrian walkways as necessary to protect pedestrian traffic from hazards due to construction operations or adjacent vehicular traffic. Protective overhead covering shall be provided as necessary to insure protection from falling objects and drip from overhead structures. In addition to the required openings through falsework, pedestrian facilities shall be provided during pile driving, footing, wall, and other bridge construction operations. At least one walkway shall be available at all times. If the Contractor's operations require the closure of one walkway, then another walkway shall be provided nearby, off the traveled roadway. Railings shall be constructed of wood, S4S, and shall be painted white. Railings and walkways shall be maintained in good condition. Walkways shall be kept clear of obstructions. Full compensation for providing pedestrian facilities shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor. Book One San Benancio/State Route 68 Intersection Improvements 461 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Chart No. 1 Conventional Highway Lane Requirements County: Monterey Route/Direction: 68/ WB & EB PM: 13.1/13.6 Closure Limits: At the intersection of Route 68 and San Benancio Road FROM HOUR TO HOUR 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Mondays through Thursdays R R R R R 1 1 1 1 1 1 R R R R Fridays R R R R R Saturdays Sundays R R Legend: R Provide at least one through traffic lane, not less than 10 feet in width, for use by both directions of travel Reversing Control) 1 One lane open in each direction of travel. Separate left turn lanes must be provided. Work permitted within project right of way where shoulder or lane closure is not required. REMARKS: EA: OH8220 Date: 2/23/10 Chart valid for one year prior to advertisement. 10-1.16 CLOSURE REQUIREMENTS AND CONDITIONS Closures shall conform to the provisions in Maintaining Traffic" of these Special Provisions and these Special Provisions. CLOSURE SCHEDULE A written schedule of planned closures for the next week period, defined as Sunday noon through the following Sunday noon, shall be submitted by noon each Monday. A written schedule shall be submitted not less than 25 days and not more than 125 days before the anticipated start of any operation that will: 1. Reduce horizontal clearances, traveled way, including shoulders, to two lanes or less due to such operations as temporary barrier placement and paving 2. Reduce the vertical clearances available to the public due to such operations as pavement overlay, overhead sign installation, or falsework or girder erection The Closure Schedule shall show the locations and times of the proposed closures. The Closure Schedule request forms furnished by the Engineer shall be used. Closure Schedules submitted to the Engineer with incomplete or inaccurate information will be rejected and returned for correction and resubmittal. The Contractor will be notified of disapproved closures or closures that require coordination with other parties as a condition of approval. Closure Schedule amendments, including adding additional closures, shall be submitted by noon to the Engineer, in writing, at least 3 business days in advance of a planned closure. Approval of Closure Schedule amendments will be at the discretion of the Engineer. The Engineer shall be notified of cancelled closures 2 business days before the date of closure. Book One San Benancio/State Route 68 Intersection Improvements 462 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Closures that are cancelled due to unsuitable weather may be rescheduled at the discretion of the Engineer. CONTINGENCY PLAN A detailed contingency plan shall be prepared for reopening closures to public traffic. If required by Beginning of Work, Time of Completion and Liquidated Damages" of these Special Provisions, the contingency plan shall be submitted to the Engineer before work at the job site begins. Otherwise, the contingency plan shall be submitted to the Engineer within one business day of the Engineer's request. LATE REOPENING OF CLOSURES If a closure is not reopened to public traffic by the specified time, work shall be suspended in conformance with the provisions in Section 8-1.05, Temporary Suspension of Work," of the Standard Specifications. No further closures are to be made until the Engineer has accepted a work plan, submitted by the Contractor, which will insure that future closures will be reopened to public traffic at the specified time. The Engineer will have 2 business days to accept or reject the Contractor's proposed work plan. The Contractor will not be entitled to compensation for the suspension of work resulting from the late reopening of closures. COMPENSATION The Engineer shall be notified of delays in the Contractor's operations due to the following conditions, and if, in the opinion of the Engineer, the Contractor's controlling operation is delayed or interfered with by reason of those conditions, and the Contractor's loss due to that delay could not have been avoided by rescheduling the affected closure or by judicious handling of forces, equipment and plant, the delay will be considered a right of way delay and will be compensated in conformance with the provisions in Section 8-1.09, Right of Way Delays," of the Standard Specifications: 1. The Contractor's proposed Closure Schedule is denied and his planned closures are within the time frame allowed for closures in Maintaining Traffic" of these Special Provisions, except that the Contractor will not be entitled to compensation for amendments to the Closure Schedule that are not approved. 2. The Contractor is denied a confirmed closure. Should the Engineer direct the Contractor to remove a closure before the time designated in the approved Closure Schedule, delay to the Contractor's schedule due to removal of the closure will be considered a right of way delay and compensation for the delay will be determined in conformance with the provisions in Section 8-1.09, Right of Way Delays," of the Standard Specifications. 10-1.17 TRAFFIC CONTROL SYSTEM FOR LANE CLOSURE A traffic control system shall consist of closing traffic lanes in conformance with the details shown on the plans, the provisions in Section 12, Construction Area Traffic Control Devices," of the Standard Specifications, the provisions under Maintaining Traffic" and Construction Area Signs" of these Special Provisions, and these Special Provisions. The provisions in this section will not relieve the Contractor from the responsibility to provide additional devices or take measures as may be necessary to comply with the provisions in Section 7-1.09, Public Safety," of the Standard Specifications. During traffic stripe operations and pavement marker placement operations using bituminous adhesive, traffic shall be controlled, at the option of the Contractor, with either stationary or moving lane closures. During other operations, traffic shall be controlled with stationary lane Book One San Benancio/State Route 68 Intersection Improvements 463 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????closures. Attention is directed to the provisions in Section 84-1.04, Protection From Damage," and Section 85-1.06, Placement," of the Standard Specifications. If components in the traffic control system are displaced or cease to operate or function as specified, from any cause, during the progress of the work, the Contractor shall immediately repair the components to the original condition or replace the components and shall restore the components to the original location. STATIONARY LANE CLOSURE When lane closures are made for work periods only, at the end of each work period, all components of the traffic control system, except portable delineators placed along open trenches or excavation adjacent to the traveled way, shall be removed from the traveled way and shoulder. If the Contractor so elects, the components may be stored at selected central locations designated by the Engineer within the limits of the highway right of way. One-way traffic shall be controlled through the project in conformance with the plan entitled Traffic Control System for Lane Closure on Two Lane Conventional Highways" and these Special Provisions. Additional advance flaggers will be required. When traffic is under one-way control on unpaved areas, the cones shown along the centerline on the plan need not be placed. Utilizing a pilot car will be at the option of the Contractor. If the Contractor elects to use a pilot car, the cones shown along the centerline on the plan need not be placed. The pilot car shall have radio contact with personnel in the work area. The maximum speed of the pilot car through the traffic control zone shall be 25 miles per hour. MOVING LANE CLOSURE Flashing arrow signs used in moving lane closures shall be truck-mounted. Flashing arrow signs shall be in the caution display mode when used on 2-lane highways. Changeable message signs used in moving lane closure operations shall conform to the provisions in Section 12-3.12, Portable Changeable Message Signs," of the Standard Specifications, except the signs shall be truck-mounted. The full operation height of the bottom of the sign may be less than 7 feet above the ground, but should be as high as practicable. Truck-mounted attenuators TMA) for use in moving lane closures shall be any of the following approved models, or equal: 1. Hexfoam TMA Series 3000, Alpha 1000 TMA Series 1000, and Alpha 2001 TMA Series 2001, manufactured by Energy Absorption Systems, Inc., 35 East Wacker Drive, Suite 1100, Chicago, IL 60601: I.I. Northern California: Traffic Control Service, Inc., 8585 Thys Court, Sacramento, CA 95828, telephone 800) 884-8274, FAX 916) 387-9734. 1.2. Southern California: Traffic Control Service, Inc., 1818 E. Orangethorpe, Fullerton, CA 92831-5324, telephone 800) 222-8274, FAX 714) 526-9501. 2. Cal T-001 Model 2 or Model 3, manufacturer and distributor: Hexcel Corporation, 11711 Dublin Boulevard, P.O. Box 2312, Dublin, CA 94568, telephone 925) 551-4900. 3. Renco Rengard Model Nos. CAM 8-815 and RAM 8-815, manufacturer and distributor: Renco Inc., 1582 Pflugerville Loop Road, P.O. Box 730, Pflugerville, TX 78660-0730, telephone 800) 654-8182. Each TMA shall be individually identified with the manufacturer's name, address, TMA model number, and a specific serial number. The names and numbers shall each be a minimum 1/2 inch high and located on the left street) side at the lower front corner. The TMA shall have a message next to the name and model number in 1/2 inch high letters which states, The bottom Book One San Benancio/State Route 68 Intersection Improvements 464 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????of this TMA shall be inches inch above the ground at all points for proper impact performance." The blanks shall be filled in per manufacturer's specifications. A TMA which is damaged or appears to be in poor condition shall not be used unless recertified by the manufacturer. The Engineer shall be the sole judge whether used TMAs supplied under this contract need recertification. Each unit shall be certified by the manufacturer to meet the requirements for TMAs in conformance with the standards established by the Transportation Laboratory. Approvals for new TMA designs proposed as equal to the above approved models shall be in conformance with the procedures including crash testing) established by the Transportation Laboratory. For information regarding submittal of new designs for evaluation contact: Transportation Laboratory, 5900 Folsom Boulevard, Sacramento, CA 95819. New TMAS proposed as equal to approved WAS or approved TMAs determined by the Engineer to need recertification shall not be used until approved or recertified by the Transportation Laboratory. PAYMENT The contract lump sum price paid for traffic control system shall include full compensation for furnishing all labor including flagging) materials including signs), tools, equipment, and incidentals, and for doing all the work involved in placing, removing, storing, maintaining, moving to new locations, replacing, and disposing of the components of the traffic control system and for furnishing and operating the pilot car, including driver, radios, other equipment, and labor required), as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. The adjustment provisions in Section 4-1.03, Changes," of the Standard Specifications shall not apply to the item of traffic control system. Adjustments in compensation for traffic control system will be made only for increased or decreased traffic control system required by changes ordered by the Engineer and will be made on the basis of the cost of the increased or decreased traffic control necessary. The adjustment will be made on a force account basis as provided in Section 9-1.03, Force Account Payment," of the Standard Specifications for increased work, and estimated on the same basis in the case of decreased work. Traffic control system required by work which is classed as extra work, as provided in Section 4-1.03D of the Standard Specifications, will be paid for as a part of the extra work. 10-1.18 TEMPORARY PAVEMENT DELINEATION Temporary pavement delineation shall be furnished, placed, maintained, and removed in conformance with the provisions in Section 12-3.01, General," of the Standard Specifications and these Special Provisions. Nothing in these Special Provisions shall be construed as reducing the minimum standards specified in the California MUTCD or as relieving the Contractor from the responsibilities specified in Section 7-1.09, Public Safety," of the Standard Specifications. GENERAL When the work causes obliteration of pavement delineation, temporary or permanent pavement delineation shall be in place before opening the traveled way to public traffic. Laneline or centerline pavement delineation shall be provided for traveled ways open to public traffic. The Contractor shall perform the work necessary to establish the alignment of temporary pavement delineation, including required lines or markers. Surfaces to receive application of paint or removable traffic tape temporary pavement delineation shall be dry and free of dirt and loose material. Temporary pavement delineation shall not be applied over existing pavement delineation or other temporary pavement delineation. Temporary pavement delineation shall be Book One San Benancio/State Route 68 Intersection Improvements 465 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????maintained until superseded or replaced with a new pattern of temporary pavement delineation or permanent pavement delineation, or as determined by the Engineer. Temporary pavement markers, including underlying adhesive, and removable traffic tape that are applied to the final layer of surfacing or existing pavement to remain in place or that conflicts with a subsequent or new traffic pattern for the area shall be removed when no longer required for the direction of public traffic, as determined by the Engineer. TEMPORARY LANELINE AND CENTERLINE DELINEATION When lanelines or centerlines are obliterated and temporary pavement delineation to replace the lines is not shown on the plans, the minimum laneline and centerline delineation to be provided for that area shall be temporary pavement markers placed at longitudinal intervals of not more than 24 feet. The temporary pavement markers shall be the same color as the laneline or centerline the pavement markers replace. Temporary pavement markers shall be, at the option of the Contractor, one of the temporary pavement markers listed for short term day/night use 14 days or less) or long term day/night use 180 days or less) in Prequalified and Tested Signing and Delineation Materials" of these Special Provisions. The temporary pavement markers shall be placed in conformance with the manufacturer's instructions. Temporary pavement markers for long term day/night use 180 days or less) shall be cemented to the surfacing with the adhesive recommended by the manufacturer, except epoxy adhesive shall not be used to place the temporary pavement markers in areas where removal of the temporary pavement markers will be required. Temporary laneline or centerline delineation consisting entirely of temporary pavement markers listed for short term day/night use 14 days or less), shall be placed on longitudinal intervals of not more than 24 feet and shall be used for a maximum of 14 days on lanes opened to public traffic. Before the end of the 14 days the permanent pavement delineation shall be placed. If the permanent pavement delineation is not placed within the 14 days, the Contractor shall replace the temporary pavement markers and provide additional temporary pavement delineation and shall bear the cost thereof. The additional temporary pavement delineation to be provided shall be equivalent to the pattern specified for the permanent pavement delineation for the area, as determined by the Engineer. TEMPORARY EDGELINE DELINEATION On multilane roadways freeways and expressways), when edgelines are obliterated and temporary pavement delineation to replace those edgelines is not shown on the plans, the edgeline delineation to be provided for those areas adjacent to lanes open to public traffic shall be as follows: 1. Temporary pavement delineation for right edgelines shall, at the option of the Contractor, consist of either a solid 4-inch wide traffic stripe tape of the same color as the stripe it replaces, traffic cones, portable delineators or channelizers placed at longitudinal intervals not to exceed 100 feet. 2. Temporary pavement delineation for left edgelines shall, at the option of the Contractor, consist of either solid 4-inch wide traffic stripe tape of the same color as the stripe it replaces, traffic cones, portable delineators or channelizers placed at longitudinal intervals not to exceed 100 feet or temporary pavement markers placed at longitudinal intervals of not more than 6 feet. Where removal of the 4-inch wide traffic stripe will not be required, painted traffic stripe conforming to the provisions of Temporary Traffic Stripe Paint)" of these Special Provisions may be used. Book One San Benancio/State Route 68 Intersection Improvements 466 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????The lateral offset for traffic cones, portable delineators or channelizers used for temporary edgeline delineation shall be as determined by the Engineer. If traffic cones or portable delineators are used as temporary pavement delineation for edgelines, the Contractor shall provide personnel to remain at the project site to maintain the cones or delineators during the hours of the day that the portable delineators are in use. Channelizers used for temporary edgeline delineation shall be the surface mounted type and shall be orange in color. Channelizer bases shall be cemented to the pavement in the same manner provided for cementing pavement markers to pavement in Pavement Markers" of these Special Provisions, except epoxy adhesive shall not be used to place channelizers on the top layer of pavement. Channelizers shall be, at the Contractor's option, one of the surface mount types 36 inch) listed in Prequalified and Tested Signing and Delineation Materials" of these Special Provisions. Temporary edgeline delineation shall be removed when no longer required for the direction of public traffic as determined by the Engineer. TEMPORARY TRAFFIC STRIPE PAINT) The painted temporary traffic stripe shall be complete in place at the location shown before opening the traveled way to public traffic. Removal of painted temporary traffic stripe will not be required. Temporary painted traffic stripe shall conform to the provisions in Section 84-3, Painted Traffic Stripes and Pavement Markings," of the Standard Specifications, except for payment. At the option of the Contractor, either one or 2 coats shall be applied regardless of whether on new or existing pavement. TEMPORARY PAVEMENT MARKING PAINT) Temporary pavement marking consisting of painted pavement marking shall be applied and maintained at the locations shown on the plans. The painted temporary pavement marking shall be complete in place at the location shown before opening the traveled way to public traffic. Removal of painted temporary pavement marking will not be required. Temporary painted pavement marking shall conform to the provisions in Paint Traffic Stripe and Pavement Marking" of these Special Provisions, except for payment. At the option of the Contractor, either one or 2 coats shall be applied regardless whether on new or existing pavement. At the Contractor's option, temporary removable pavement marking tape or permanent pavement marking tape listed in Prequalified and Tested Signing and Delineation Materials" of these Special Provisions may be used instead of painted temporary pavement markings. When pavement marking tape is used, regardless of which type of tape is placed, the tape will be measured and paid for by the square foot as temporary pavement marking paint). TEMPORARY PAVEMENT MARKERS Temporary pavement markers shall be applied complete in place before opening the traveled way to public traffic. Temporary pavement markers shall be, at the option of the Contractor, one of the temporary pavement markers for long term day/night use 180 days or less) listed in Prequalified and Tested Signing and Delineation Materials" of these Special Provisions. Temporary pavement markers shall be placed in conformance with the manufacturer's instructions and shall be cemented to the surfacing with the adhesive recommended by the manufacturer, except epoxy adhesive shall not be used in areas where removal of the pavement markers will be required. Book One San Benancio/State Route 68 Intersection Improvements 467 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Retroreflective pavement markers conforming to the provisions in Pavement Markers" of these Special Provisions may be used in place of temporary pavement markers for long term day/night use 180 days or less) except to simulate patterns of broken traffic stripe. Placement of the retroreflective pavement markers used for temporary pavement markers shall conform to the provisions in Pavement Markers" of these Special Provisions except the waiting period provisions before placing the pavement markers on new hot mix asphalt surfacing as specified in Section 85-1.06, Placement," of the Standard Specifications shall not apply and epoxy adhesive shall not be used to place pavement markers in areas where removal of the pavement markers will be required. MEASUREMENT AND PAYMENT Temporary traffic stripe and temporary pavement marking shown on the plans will be measured and paid for in the same manner specified for paint traffic stripe and paint pavement marking in Section 84-3.06, Measurement," and Section 84-3.07, Payment," of the Standard Specifications. Temporary pavement markers shown on the plans will be measured and paid for by the unit in the same manner specified for retroreflective pavement markers in Section 85-1.08, Measurement," and Section 85-1.09, Payment," of the Standard Specifications. Full compensation for furnishing, placing, maintaining, and removing the temporary pavement markers including underlying adhesive, layout dribble) lines to establish alignment of temporary pavement markers or used for temporary laneline and centerline delineation and signing specified for no passing" zones) for those areas where temporary laneline and centerline delineation is not shown on the plans and for providing equivalent patterns of permanent traffic lines for those areas when required, shall be considered as included in the contract prices paid for the items of work that obliterated the laneline and centerline pavement delineation and no separate payment will be made therefor. Full compensation for furnishing, placing, maintaining, and removing temporary edgeline delineation not shown on the plans shall be considered as included in the contract prices paid for the items of work that obliterated the edgeline pavement delineation and no separate payment will be made therefor. The quantity of channelizers used as temporary edgeline delineation will not be included in the quantity of channelizer surface mounted) to be paid for. 10-1.19 PORTABLE CHANGEABLE MESSAGE SIGNS GENERAL Summary Work includes furnishing, placing, operating, maintaining, and removing portable changeable message signs. Comply with Section 12-3.12 Portable Changeable Message Signs," of the Standard Specifications. Definitions useable shoulder area: Paved or unpaved contiguous surface adjacent to the traveled way with: 1. Sufficient weight bearing capacity to support portable changeable message sign 2. Slope not greater than 6:1 horizontal:vertical) Submittals Upon request, submit a Certificate of Compliance for each portable changeable message sign under Section 6-1.07, Certificates of Compliance," of the Standard Specifications. Book One San Benancio/State Route 68 Intersection Improvements 468 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Quality Control and Assurance Comply with the manufacturer's operating instructions for portable changeable message sign. Approaching drivers must be able to read the entire message for all phases at least twice at the posted speed limit before passing portable changeable message sign. You may use more than 1 portable changeable message sign to meet this requirement. Only display the message shown on the plans or ordered by the Engineer or specified in these Special Provisions. MATERIALS The text of the message displayed on portable changeable message sign must not scroll, or travel horizontally or vertically across the face of the message panel. CONSTRUCTION Continuously repeat the entire message in no more than 2 phases of at least 3 seconds per phase. If useable shoulder area is at least 15 feet wide, the displayed message on portable changeable message sign must be minimum 18-inch character height. If useable shoulder area is less than 15 feet wide, you may use a smaller message panel with minimum 12-inch character height to prevent encroachment in the traveled way. You or your representative must be available by cell phone for operations that require portable changeable message signs. Give the Engineer your cell phone number. When the Engineer contacts you, immediately comply with the Engineer's request to modify the displayed message. Start displaying the message on portable changeable message sign 30 minutes before closing the lane. Place portable changeable message sign in advance of the first warning sign for: 1. Each stationary lane closure Place portable changeable message sign as far from the traveled way as practicable where it is legible to traffic and does not encroach on the traveled way. Place portable changeable sign before or at the crest of vertical roadway curvature where it is visible to approaching traffic. Avoid placing portable changeable message sign within or immediately after horizontal roadway curvature. Where possible, place portable changeable message sign behind guardrail or temporary railing Type K). Except where placed behind guardrail or temporary railing Type K) use traffic control for shoulder closure to delineate portable changeable message sign. Remove portable changeable message sign when not in use. MEASUREMENT AND PAYMENT 10-1.20 TEMPORARY RAILING TYPE K) Temporary railing type K) shall conform to the provisions in Section 12, Construction Area Traffic Control Devices," of the Standard Specifications. 10-1.21 TEMPORARY ALTERNATIVE CRASH CUSHION SYSTEM This work shall consist of furnishing, installing, and maintaining sand filled temporary crash cushion modules in groupings or arrays, or other system, such as a crash cushion Type ADIEM), crash cushion Type CAT), ABSORB 350 crash cushion or approved equal at each Book One San Benancio/State Route 68 Intersection Improvements 469 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????location shown on the plans, as specified in these Special Provisions or where designated by the Engineer. The grouping or array of sand filled modules shall form a complete sand filled temporary crash cushion in conformance with the details shown on the plans and these Special Provisions. Temporary crash cushions shall be secured in place prior to commencing work for which the temporary crash cushions are required. Temporary crash cushion systems shall be rated for approach speeds of 60 MPH. Whenever the work or the Contractor's operations establishes a fixed obstacle, the exposed fixed obstacle shall be protected with a sand filled temporary crash cushion. The sand filled temporary crash cushion shall be in place prior to opening the lanes adjacent to the fixed obstacle to public traffic. Temporary crash cushions shall be maintained in place at each location, including times when work is not actively in progress. Sand filled temporary crash cushions may be removed during a work period for access to the work provided that the exposed fixed obstacle is 15 feet or more from a lane carrying public traffic and the temporary crash cushion is reset to protect the obstacle prior to the end of the work period in which the fixed obstacle was exposed. When no longer required, as determined by the Engineer, sand filled temporary crash cushions shall be removed from the site of the work. Sand filled temporary crash cushion modules shall be one of the following, or equal, and be manufactured after March 31, 1997: 1. Energite III and Fitch Inertial Modules, manufactured by Energy Absorption Systems, Inc., 35 East Wacker Drive, Suite 1100, Chicago, IL 60601: I.I. Northern California: Traffic Control Service, Inc., 8585 Thys Court, Sacramento, CA 95828, telephone 800) 884-8274, FAX 916) 387-9734 1.2. Southern California: Traffic Control Service, Inc., 1818 E. Orangethorpe, Fullerton, CA 92831-5324, telephone 800) 222-8274, FAX 714) 526-9501 2. TrafFix Sand Barrels, manufactured by TrafFix Devices, Inc., 220 Calle Pintoresco, San Clemente, CA 92672, telephone 949) 361-5663, FAX 949) 361-9205 2.1. Northern California: United Rentals, Inc., 1533 Berger Drive, San Jose, CA 95112, telephone 408) 287-4303, FAX 408) 287-1929 2.2. Southern California: Statewide Safety & Sign, Inc., P.O. Box 1440, Pismo Beach, CA 93448, telephone 800) 559-7080, FAX 805) 929-5786 3. CrashGard Model CC-48 Sand Barrels, manufactured by Plastic Safety Systems, Inc., 2444 Baldwin Road, Cleveland, OH 44104: 3.1. Northern California: 3.1.1. Capitol Barricade Safety & Sign, 6329 Elvas Ave, Sacramento, CA 95819, telephone 888) 868-5021, FAX 916) 451-5388 3.1.2. Sierra Safety, Inc., 9093 Old State Highway, New Castle, CA 95658, telephone 916) 663-2026, FAX 916) 663-1858 3.2. Southern California: Hi Way Safety Inc., 13310 5th Street, Chino, CA 91710, telephone 909) 591-1781, FAX 909) 627-0999 Modules contained in each temporary crash cushion shall be of the same type at each location. The color of the modules shall be the standard yellow color, as furnished by the vendor, with black lids. The modules shall exhibit good workmanship free from structural flaws and objectionable surface defects. The modules need not be new. Good used undamaged Book One San Benancio/State Route 68 Intersection Improvements 470 CONTRACT NO. 10- 111 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????modules conforming to color and quality of the types specified herein may be utilized. If used Fitch modules requiring a seal are furnished, the top edge of the seal shall be securely fastened to the wall of the module by a continuous strip of heavy duty tape. Modules shall be filled with sand in conformance with the manufacturer's directions, and to the sand capacity in pounds for each module shown on the plans. Sand for filling the modules shall be clean washed concrete sand of commercial quality. At the time of placing in the modules, the sand shall contain not more than 7 percent water as determined by California Test 226. Modules damaged due to the Contractor's operations shall be repaired immediately by the Contractor at the Contractor's expense. Modules damaged beyond repair, as determined by the Engineer, due to the Contractor's operations shall be removed and replaced by the Contractor at the Contractor's expense. Temporary crash cushion modules may be placed on movable pallets or frames. Comply with dimensions shown on the plans. The pallets or frames shall provide a full bearing base beneath the modules. The modules and supporting pallets or frames shall not be moved by sliding or skidding along the pavement or bridge deck. A Type R or P marker panel shall be attached to the front of the crash cushion as shown on the plans, when the closest point of the crash cushion array is within 12 feet of the traveled way. The marker panel, when required, shall be firmly fastened to the crash cushion with commercial quality hardware or by other methods determined by the Engineer. At the completion of the project, temporary crash cushion modules, sand filling, pallets or frames, and marker panels shall become the property of the Contractor and shall be removed from the site of the work. Temporary crash cushion modules shall not be installed in the permanent work. Temporary crash cushion modules will be measured by the array or unit as determined from the actual count of arrays or units used in the work or ordered by the Engineer at each location. Temporary crash cushion modules placed in conformance with Section 7-1.09, Public Safety," of the Standard Specifications and modules placed in excess of the number specified or shown will not be measured nor paid for. Repairing modules damaged by public traffic will be paid for as extra work as provided in Section 4-1.03D of the Standard Specifications. Modules damaged beyond repair by public traffic, when ordered by the Engineer, shall be removed and replaced immediately by the Contractor. Modules replaced due to damage by public traffic will be measured and paid for as temporary alternative crash cushion system. If the Engineer orders a lateral move of the temporary alternative crash cushion system and the repositioning is not shown on the plans, moving the temporary alternative crash cushion system will be paid for as extra work as provided in Section 4-1.03D of the Standard Specifications and these temporary crash cushion modules will not be counted for payment in the new position. The contract unit price paid for temporary alternative crash cushion system shall include full compensation for furnishing all labor, materials including sand, pallets or frames and marker panels), tools, equipment, and incidentals, and for doing all the work involved in furnishing, installing, maintaining, moving, and resetting during a work period for access to the work, and removing from the site of the work when no longer required including those damaged by public traffic) temporary alternative crash cushion system, complete in place, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. Book One San Benancio/State Route 68 Intersection Improvements 471 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????10-1.22 TREATED WOOD WASTE GENERAL Summary This work includes handling, storing, transporting, and disposing of treated wood waste. Wood removed from metal beam guard railing is treated with one or more of the following: 1. Creosote 2. Pentachlorophenol 3. Copper azole 4. Copper boron azole 5. Chromated copper arsenate 6. Ammoniacal copper zinc arsenate 7. Copper naphthenate 8. Alkaline copper quaternary 34. Manage treated wood waste under Title 22 CA Code of Regulations, Division 4.5, Chapter Submittals For disposal of treated wood waste submit a copy of each completed shipping record and weight receipt to the Engineer within 5 business days of disposal. CONSTRUCTION Provide training to personnel who handle treated wood waste or may come in contact with treated wood waste that includes: 1. All applicable requirements of Title 8 CA Code of Regulations 2. Procedures for identifying and segregating treated wood waste 3. Safe handling practices 4. Requirements of Title 22 CA Code of Regulations, Division 4.5, Chapter 34 5. Proper disposal methods Store treated wood waste before disposal using any of the following methods: 1. Elevate on blocks above a reasonably foreseeable run-on elevation and protect from precipitation 2. Place in water-resistant containers designed for shipping or solid waste collection 3. Place on a containment surface protected from run-on and precipitation Prevent unauthorized access to treated wood waste using a secured enclosure such as a locked chain link fenced area or a lockable shipping container located within the project limits. Resize and segregate treated wood waste at a location where debris from the operation including sawdust and chips can be contained. Collect and manage the debris as treated wood waste. Provide water-resistant labels, that comply with Title 22 CA Code of Regulations, Division 4.5, Chapter 34, 67386.5,. to clearly mark and identify treated wood waste and accumulation areas. Labels must include: 1. Caltrans, District number, Construction, contract number 2. District office address 3. Engineer's name, address, and telephone number 4. Contractor's contact name and telephone number Book One San Benancio/State Route 68 Intersection Improvements 472 CONTRACT NO. 10-1 It 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Before transporting treated wood waste, obtain agreement from the receiving facility that the treated wood waste will be accepted. Protect shipments of treated wood waste from loss and exposure to precipitation. Each shipment must be accompanied by a shipping record such as a manifest or bill of lading that includes: 1. Caltrans with district number 2. Construction contract number 3. District office address 4. Engineer name, address, and telephone number 5. Contractor contact name and telephone number 6. Receiving facility name and address 7. Waste description: Treated wood waste preservative type if known or unknown/mixture) 8. Project location 9. Estimated quantity of shipment by weight or volume 10. Date of transport 11. Date of receipt by the receiving treated wood waste facility 12. Weight of shipment as measured by the receiving treated wood waste facility The shipping record must be at least a 4-part carbon or carbonless 8-1/2" x 11" form to allow retention of copies by the Engineer, transporter, and disposal facility. Dispose of treated wood waste in an approved treated wood waste facility. A list of currently approved treated wood waste facilities may be viewed at: http: //www. dtsc. ca. gov/Hazardous W aste/upload/TW W_Confirmed_Landfill_Li st.pdf Dispose of treated wood waste within: 1. 90 days of generation if stored on blocks 2. 90 days of filling a container if containerized 3. 180 days of generation if stored on a containment surface MEASUREMENT AND PAYMENT Full compensation for handling, storing, transporting, and disposing treated wood waste, including personnel training, is included in the contract price paid per linear foot for remove metal beam guard railing and no additional compensation will be allowed therefor. 10-1.23 EXISTING HIGHWAY FACILITIES The work performed in connection with various existing highway facilities shall conform to the provisions in Section 15, Existing Highway Facilities," of the Standard Specifications and these Special Provisions. Except as otherwise provided for damaged materials in Section 15-2.04, Salvage," of the Standard Specifications, the materials to be salvaged shall remain the property of the State, and shall be cleaned, packaged, bundled, tagged, and hauled to the County Construction Yard and stockpiled. Existing footing concrete that is below ground and outside of the footing limits shown on the contract plans or original contract plans shall be removed as directed by the Engineer and will be paid in conformance with Section 4-1.03D, Extra Work," of the Standard Specifications. Additional exploratory work of bridge members for unforeseen damage shall be done when directed by the Engineer and will be paid in conformance with Section 4-1.03D, Extra Work," of the Standard Specifications. When removing and replacing restrainers, not more than 50 percent of the existing restrainers shall be removed at any time nor at any joint and the replacement of an equal proportion of new Book One San Benancio/State Route 68 intersection Improvements 473 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???restrainers shall complete in place before starting on the next 50 percent. All removal and replacement shall be done symmetrically about the centerline of the existing bridge. SALVAGE METAL BEAM GUARD RAILING Existing metal beam guard railing, where shown on the plans to be salvaged, shall be removed and salvaged. Salvaged metal beam guard railing materials shall be hauled to 855 East Laurel Drive and stockpiled. Existing concrete anchors or steel foundation tubes shall be completely removed and disposed of. Full compensation for removing and disposing of concrete anchors or steel foundation tubes shall be considered as included in the contract price paid per linear foot for salvage metal beam guard railing and no separate payment will be made therefor. Full compensation for removing cable anchor assemblies, terminal anchor assemblies or steel foundation tubes shall be considered as included in the contract price paid per linear foot for salvage metal beam guard railing and no separate payment will be made therefor. REMOVE TRAFFIC STRIPE AND PAVEMENT MARKING This work includes removing existing traffic stripe and pavement marking at the locations shown on the plans. Submit a lead compliance plan under Section 7-1.07, Lead Compliance Plan," of the Standard Specifications. Waste residue from removal of thermoplastic and painted traffic stripe and pavement marking is a non-hazardous waste residue and contains lead in average concentrations less than 1000 mg/kg total lead and 5 mg/L soluble lead. This waste residue does not contain heavy metals in concentrations that exceed thresholds established by the Health and Safety Code and 22 CA Code of Regs and is not regulated under the Federal Resource Conservation and Recovery Act RCRA), 42 USC 6901 et seq. REMOVE PAVEMENT MARKER Existing pavement markers, including underlying adhesive, when no longer required for traffic lane delineation as determined by the Engineer, shall be removed and disposed of. REMOVE DRAINAGE FACILITY Existing box culverts, inlets, corrugated metal pipes, headwalls and endwalls, where any portion of these structures is within 3 feet of the grading plane in excavation areas, or within one foot of original ground in embankment areas, or where shown on the plans to be removed, shall be completely removed and disposed of Frames and grates shall be removed and salvaged as shown on the plans. Full compensation for salvaging existing frames and grates shall be considered as included in the contract lump sum price paid for remove drainage facility and no additional compensation will be allowed therefor. REMOVE ROADSIDE SIGN Existing roadside signs, at those locations shown on the plans to be removed, shall be removed and disposed of. Sign panels shown on the plans shall be salvaged. Existing roadside signs shall not be removed until replacement signs have been installed or until the existing signs are no longer required for the direction of public traffic, unless otherwise directed by the Engineer. Book One San Benancio/State Route 68 Intersection Improvements 474 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Full compensation for salvaging sign panels shall be considered as included in the contract unit price paid for remove roadside sign and no separate payment will be made therefor. RESET FENCE Existing fences, of the types and locations shown on the plans, shall be removed and reset in conformance with the details shown on the plans. During construction operations, the fences shall be moved as necessary to clear the way for the Contractor's operations.When construction is complete, fences shall be installed in the final position on new redwood posts. Redwood posts shall conform to the provisions for sign posts in Section 56-2.02B, Wood Posts," of the Standard Specifications. The space around the posts shall be backfilled with earthy material. The backfill material shall be placed in layers approximately 4 inches thick and each layer shall be moistened and thoroughly compacted. Existing posts, mounts, and hardware shall be disposed of in conformance with the provisions in Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Full compensation for disposing of existing posts, mounts, and hardware; moving and maintaining the various types of fences regardless of the number of moves required); and for furnishing new posts, planks, and hardware shall be considered as included in the contract unit price paid for reset fence and no additional compensation will be allowed therefor. RELOCATE BUS STOP BENCH Existing bus stop benches, where shown on the plans, shall be relocated in conformance with the details shown on the plans. All mounting hardware shall be new and shall conform to the provisions in Section 75, Miscellaneous Metal," of the Standard Specifications. Damage incurred to the bus stop bench during relocation shall be repaired at the contractors own expense. Existing hardware shall be disposed of in conformance with the provisions in Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. The contract unit price paid for relocate bus stop bench shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in relocating bus stop bench, complete in place, including disposing of existing hardware, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. RELOCATE ROADSIDE SIGN Existing roadside signs shall be removed and relocated to the new locations shown on the plans. Each roadside sign shall be installed at the new location on the same day that the sign is removed from its original location. Two holes shall be drilled in each existing post as required to provide the breakaway feature shown on the plans. CLEAN BRIDGE DECK This work includes abrasive blast cleaning the portland cement concrete bridge deck. Book One San Benancio/State Route 68 Intersection Improvements 475 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???General Traffic stripes, pavement markings, and pavement markers must be removed under 10-1.22 of these Special Provisions before cleaning the deck surface. Construction Abrasive blast clean the deck surface. Sweep the deck surface clean. Blow loose material from cracks using high-pressure air. The deck surface must be dry when abrasive blast cleaning is performed. Laitance, surface contaminants, and foreign material must be removed from the bridge deck surface. Remove dust and residue from abrasive blast cleaning using a vacuum attachment operating concurrently with blasting equipment when abrasive blast cleaning within 10 feet of public traffic. If the deck surface becomes contaminated before placing methacrylate resin, abrasive blast clean the contaminated area and sweep the deck clean Dispose of removed materials under Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Measurement and Payment Clean bridge deck will be measured and paid for by the square foot of deck surface cleaned. The contract price paid per square foot for clean bridge deck includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all work involved in cleaning the bridge deck, including removing contrast treatment except slurry or chip seal contrast treatment, complete in place, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. Removal of slurry or chip seal contrast treatment will be paid for as extra work as specified in Section 4-1.03D, Extra Work," of the Standard Specifications. BRIDGE REMOVAL PORTION Removing bridges or portions of bridges shall conform to the provisions in Section 15-4, Bridge Removal," of the Standard Specifications and these Special Provisions. Remove existing barriers and portions of overhang, abutment stem and wingwalls as shown on plans. Removed materials that are not to be salvaged or used in the reconstruction shall become the property of the Contractor and shall be disposed of in conformance with the provisions in Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. 10-1.24 CLEARING AND GRUBBING Comply with Section 16, Clearing and Grubbing," of the Standard Specifications and with Duff' of these Special Provisions regarding duff collection. Vegetation shall be cleared and grubbed only within the excavation and embankment slope lines. Riparian vegetation in El Toro Creek shall be cleared for equipment access by cutting vegetation at the stump and leaving the cut vegetation scattered in the disturbed area. Vegetation shall not be grubbed in El Toro Creek. Before salvaging duff in an area where salvaging duff is feasible) and again before starting any planting or seeding operations kill all exotic plants/weeds and remove from all areas to be revegetated. Employ mechanical control methods when feasible. Do not use heavy equipment e.g., bulldozers, backhoes) to eradicate exotic plants and weeds. In circumstances where Book One San Benancio/State Route 68 Intersection Improvements 476 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???mechanical control is not effective, use systemic herbicides that have been approved by the United States Environmental Protection Agency for use in aquatic situations e.g., Rodeo by Monsanto). Existing vegetation to be removed shall be chipped including leaves, twigs, branches and trunks. Placement of the chipped material shall conform to Chipped Material" of these Special Provisions. Trees designated on the by the Engineer shall be removed and disposed of in accordance with this Section. Trees to be removed may be designated by the Engineer at any time during the performance of the contract, and maybe subject to the conditions specified under Hand Clearing. Full compensation for collecting duff shall be considered as included in the contract price paid per square yard for duff and no additional compensation will be allowed therefor. Full compensation for eradicating exotic plants and weeds shall be considered as included in the contract lump sum price paid for clearing and grubbing and no separate payment will be made therefor. 10-1.25 EARTHWORK Earthwork shall conform to the provisions in Section 19, Earthwork," of the Standard Specifications and these Special Provisions. When tree roots greater than 2 inch are encountered during earthwork operations, where trees are to be saved, excavation shall be done by hand within the dripline of the trees. Root damage such as root splitting, bruising and cracking is not allowed. Roots that are 2 inch or larger shall be pruned clean with appropriate cutting tools. Roots shall be pruned in conformance with the provisions in Section 20-4.055, Pruning," of the Standard Specifications. Where a portion of the existing surfacing is to be removed, the outline of the area to be removed shall be cut on a neat line with a power-driven saw to a minimum depth of 0.17-foot before removing the surfacing. Full compensation for cutting the existing surfacing shall be considered as included in the contract price paid per cubic yard for roadway excavation and no additional compensation will be allowed therefor. The portion of imported borrow placed within 4 feet of the finished grade shall have a Resistance R-Value) of not less than 25. Reinforcement or metal attached to reinforced concrete rubble placed in embankments shall not protrude above the grading plane. Prior to placement within 2 feet below the grading plane of embankments, reinforcement or metal shall be trimmed to no greater than 3/ inch from the face of reinforced concrete rubble. Full compensation for trimming reinforcement or metal shall be considered as included in the contract prices paid per cubic yard for the types of excavation shown in the Engineer's estimate, or the contract prices paid for furnishing and placing imported borrow or embankment material, as the case may be, and no additional compensation will be allowed therefor. A. The quantities of roadway excavation, structure excavation and ditch excavation, which have been used in the embankment, will be adjusted by multiplying by a specified grading factor of 1.0. No further adjustment will be made in the event that the specified grading factor does not equal the actual grading factor. B. The quantity of imported borrow to be paid for will be that quantity remaining after deducting the adjusted quantities of excavation from the total embankment quantity and then adding a quantity of cubic yards for the anticipated effect of subsidence. No adjustment will be made in the event that the anticipated subsidence does not equal the actual subsidence. C. The Contractor may propose a plan whereby the Contractor would be paid on the basis of measured settlement in lieu of the allowance specified above. The proposal shall include complete details of the subsidence-measuring devices and a detailed plan of each Book One San Benancio/State Route 68 Intersection Improvements 477 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???installation. If the proposed plan is approved by the Engineer, the Contractor, at the Contractor's expense, shall provide, install and maintain the subsidence-measuring devices. The Engineer will take necessary readings to determine the progress of subsidence, if any, and the Contractor shall provide necessary assistance to make the readings. D. Installed devices which are determined by the Engineer to have been damaged will not be used for the determination of subsidence for the area the devices represent in the pattern of approved installations. The subsidence of the area represented by that installation shall be considered zero, regardless of the subsidence measured at other installations. E. The volumes required as a result of subsidence will be computed by the average-end-area method from the original measurements and the final measurements, including zero subsidence at all points and for all areas as provided herein. It shall be understood and agreed that the subsidence at the point of intersection of the side slopes and end slopes at structures) with the ground line as established by the original cross sections shall be considered as zero. Unless otherwise agreed to by the Engineer, the subsidence shall be considered as zero at the points on the cross sections 50 feet beyond the beginning and ending of the instrumented area. The computed volumes for such subsidence will be added to the quantities of embankment measured as specified herein. F. Detachable elements of the subsidence-measuring devices which can be salvaged without damage to the work shall remain the property of the Contractor and shall be removed from the highway right of way after final measurements are made. Roughen embankment slopes to receive erosion control materials by either trackwalking or rolling with a sheepsfoot roller. Trackwalk slopes by running track mounted equipment perpendicular to slope contours. Roughen excavation slopes and flat surfaces to receive erosion control materials by scarifying to a depth of 1 to 2 inches running parallel to the slope contours. Full compensation for roughening is included in the contract price paid per cubic yard for roadway excavation and no additional compensation will be allowed. If the Contractor elects to use the Weep Hole and Geocomposite Drain" alternative where permitted on the plans, the geocomposite drain shall conform to the details shown on the plans and the following: A. Geocomposite wall drain shall consist of a manufactured core not less than 0.25 inch thick nor more than 2 inches thick with one or both sides covered with a layer of filter fabric that will provide a drainage void. The drain shall produce a flow rate through the drainage void of at least 2.0 gallons per minute per foot of width at a hydraulic gradient of 1.0 and a minimum externally applied pressure of 3,500 psf. B. A Certificate of Compliance conforming to the provisions in Section 6-1.07, Certificates of Compliance," of the Standard Specifications shall be furnished for the geocomposite drain certifying that the drain produces the required flow rate and complies with these Special Provisions. The Certificate of Compliance shall be accompanied by a flow capability graph for the geocomposite drain showing flow rates for externally applied pressures and hydraulic gradients. The flow capability graph shall be stamped with the verification of an independent testing laboratory. C. Filter fabric for geocomposite wall drain shall conform to the provisions in Section 88- 1.02, Filtration," of the Standard Specifications. Filter fabric shall be Class A. D. The manufactured core shall be either a preformed grid of embossed plastic, a mat of random shapes of plastic fibers, a drainage net consisting of a uniform pattern of polymeric strands forming 2 sets of continuous flow channels, or a system of plastic pillars and interconnections forming a semirigid mat. Book One San Benancio/State Route 68 Intersection Improvements 478 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???E. The core material and filter fabric shall be capable of maintaining the drainage void for the entire height of geocomposite drain. Filter fabric shall be integrally bonded to the side of the core material with the drainage void. Core material manufactured from impermeable plastic sheeting having nonconnecting corrugations shall be placed with the corrugations approximately perpendicular to the drainage collection system. F. The geocomposite drain shall be installed with the drainage void and the filter fabric facing the embankment. The fabric facing the embankment side shall overlap a minimum of 3 inches at all joints and wrap around the exterior edges a minimum of 3 inches beyond the exterior edge. If additional fabric is needed to provide overlap at joints and wrap-around at edges, the added fabric shall overlap the fabric on the geocomposite drain at least 6 inches and be attached thereto. G. Should the fabric on the geocomposite drain be torn or punctured, the damaged section shall be replaced completely or repaired by placing a piece of fabric that is large enough to cover the damaged area and provide a minimum 6-inch overlap. H. Plastic pipe shall conform to the provisions for edge drain pipe and edge drain outlets in Section 68-3, Edge Drains," of the Standard Specifications. 1. Treated permeable base to be placed around the slotted plastic pipe at the bottom of the geocomposite drain shall be cement treated permeable base conforming to the provisions for cement treated permeable base in Section 29, Treated Permeable Bases," of the Standard Specifications and these Special Provisions. J. The treated permeable base shall be enclosed with a high density polyethylene sheet or PVC geomembrane, not less than 10 mils thick, that is bonded with a suitable adhesive to the concrete and geocomposite drain. Surfaces to receive the polyethylene sheet shall be cleaned before applying the adhesive. The treated permeable base shall be compacted with a vibrating shoe type compactor. Pervious backfill material placed within the limits of payment for bridges will be measured and paid for as structure backfill bridge). Pervious backfill material placed within the limits of payment for retaining walls will be measured and paid for as structure backfill retaining wall). If structure excavation or structure backfill for bridges is not otherwise designated by type and payment for the structure excavation or structure backfill has not otherwise been provided for in the Standard Specifications or these Special Provisions, the structure excavation or structure backfill will be measured and paid for as structure excavation bridge) or structure backfill bridge), respectively. Structure excavation designated as Type D, for footings at the locations shown on the plans, will be measured and paid for as structure excavation Type D). Ground water or surface water is expected to be encountered at these locations, but seal course concrete is not shown or specified. Structure excavation for footings at locations not designated on the plans as structure excavation Type D), and where ground or surface water is encountered, will be measured and paid for as structure excavation bridge). Structure excavation designated as Type D, for footings at the locations shown on the plans, will be measured and paid for as structure excavation Type D). Ground water or surface water is expected to be encountered at these locations, but seal course concrete is not shown or specified. Structure excavation for footings at locations not designated on the plans as structure excavation Type D), and where ground or surface water is encountered, except locations where seal course concrete is shown or specified, will be measured and paid for as structure excavation bridge). Book One San Benancio/State Route 68 Intersection Improvements 479 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???PAYMENT Full compensation for Contractor Designed Temporary Shoring is included in the contract unit price paid per cubic yard for structure excavation, and no additional compensation will be allowed therefor. 10-1.26 EROSION CONTROL SEQUENCING) Place erosion control treatments in the following sequence: Duff Chipped Material Rolled Erosion Control Product Jute Mesh) Fiber Rolls Erosion Control Hydroseed) 10-1.27 CHIPPED MATERIAL GENERAL Summary This work includes collecting, processing, stockpiling, and placing chipped material. Section 16-1.04, Removal and Disposal of Material," of the Standard Specifications does not apply to chipped material collection areas shown on the plans. MATERIAL Chipped material consists of shrubs and trees. Trees equal to or greater than 4" diameter breast height must be cut no higher than 12" from existing grade. Leaves, branches and trunk shall be chipped. CONSTRUCTION Collect chipped material from areas shown on the plans and identified as Chipped Material Collect)". Process chipped material to a maximum dimension of 6". Stockpile chipped material until work in the area to receive the chipped material is complete. Chipped material stockpiles shall not exceed 6 foot in height. Upon completion of the earthwork in an area, spread chipped material to a uniform thickness. Spread chipped material to the edge of retaining walls, dikes, paving and to within 4 feet from the flow line of paved and unpaved drainage ditches. Roadway and adjacent areas should be left in a neat and finished appearance PAYMENT Chipped material will be measured by the square foot applied in place. No payment will be made for chipped material placed outside the limits shown on the plans. The contract price paid per square meter for chipped material shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in collecting, stockpiling, and spreading chipped material, complete in place, as shown on the plans, as specified in the these Special Provisions, and as directed by the Engineer. 10-1.28 DUFF GENERAL Summary This work includes collecting, processing, stockpiling, and placing duff. Book One San Benancio/State Route 68 Intersection Improvements 480 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Section 16-1.04, Removal and Disposal of Material," of the Standard Specifications does not apply to duff collection areas shown on the plans. MATERIAL Duff consists of excavating the top 6 inches of soil, organic material and vegetation including trees, shrubs, ground cover, grasses, bark, leaves, and roots including attached soil. Duff must not include invasive species, as determined by a Qualified Biologist. CONSTRUCTION Collect duff from duff collection areas shown on the plans. Process duff to a maximum dimension of 6 inches. Stockpile duff material until work in the area to receive the duff is complete. Duff stockpiles shall not exceed 6 feet in height. Upon completion of the earthwork in an area, spread duff to a uniform thickness. Spread duff no closer than 10 feet from the pavement edge. Roadway and adjacent areas should be left in a neat and finished appearance. Trackwalk duff with tracked equipment run perpendicular to slope contours. Water may be used to assist this process but must not cause erosion. PAYMENT Duff will be measured by the square yard applied in place. No payment will be made for duff placed outside the limits shown on the plans. The contract price paid per square yard for duff shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in duff, complete in place, including collection, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.29 MOVE-IN/MOVE-OUT EROSION CONTROL) Move-in/move-out Erosion Control) shall include moving onto the project when an area is ready to receive erosion control as determined by the Engineer, setting up all required personnel and equipment for the application of erosion control materials and moving out all personnel and equipment when erosion control in that area is completed. When areas are ready to receive applications of erosion control as determined by the Engineer, the Contractor shall begin erosion control work in that area within 5 working days of the Engineer's notification to perform the erosion control work. Quantities of move-in/move-out Erosion Control) will be determined as units from actual count as determined by the Engineer. For measurement purposes, a move-in followed by a move-out will be considered as one unit. The contract unit price paid for move-in/move-out Erosion Control) shall include full compensation for furnishing all labor, materials excluding erosion control materials), tools, equipment, and incidentals and for doing all the work involved in moving in and removing from the project all personnel and equipment necessary for application of erosion control as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. No adjustment of compensation will be made for any increase or decrease in the quantities of move-in/move-out Erosion Control) required, regardless of the reason for the increase or decrease. The provisions in Section 4-1.03B, Increased or Decreased Quantities," of the Standard Specifications shall not apply to the item of move-in/move-out Erosion Control). Book One San Benancio/State Route 68 Intersection Improvements 481 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???10-1.30 ROLLED EROSION CONTROL PRODUCT JUTE MESH) GENERAL Summary This work includes installing rolled erosion control product jute mesh). Definitions Rolled erosion control product RECP): A degradable material manufactured or fabricated into rolls designed to reduce soil erosion and assist in the growth, establishment and protection of vegetation. Open weave textile OWT): A degradable RECP composed of processed natural or polymer yams woven into a matrix, used to provide erosion control and vegetation establishment. Submittals Submit a Certificate of Compliance under Section 6-1.07, Certificates of Compliance" of the Standard Specifications for: 1. Jute Mesh 2. Fastener MATERIALS Jute Mesh Jute Mesh must comply with the following: 1. Jute mesh must be a OWT RECP. 1. Machine-made mats in rolled strips. 2. Minimum width: 48 inches. 3. Average open area: 60 to 70 percent. 4. Minimum strands per foot in each direction: 14 to 20. 5. Minimum weight per square yard: 0.90 to 1.20 pounds. 6. Physical requirements in Table A: Table A Number Net Matrix Maximum Minimum Functional Minimum Of Type C" Sheer Longevity Tensile Nets Factor' Stress 2 months) Stren th 3 1 Organic Unbleached 0.25 1.5 12 50 and Undyed Woven Jute otes: Universal Soil Loss Equation USLE) C-Factor for a 1.5:1 H:V) unvegetated slope. 2lb/ft2 under ASTM D 6460. 3 lb/ft under ASTM D 5035. Fasteners Fasteners must be 11 gauge, 6-inch U-shaped staples with 6-inch legs, and 1-inch crown. MEASUREMENT AND PAYMENT The quantity of rolled erosion control product jute mesh) will be measured by the square foot as determined from actual slope measurements of the areas covered by rolled erosion control product jute mesh) excluding overlaps. Book One San Benancio/State Route 68 Intersection Improvements 482 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???The contract price paid per square foot for rolled erosion control product jute mesh) includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in rolled erosion control product jute mesh), complete in place, including fasteners, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.31 EROSION CONTROL HYDROSEED) GENERAL Summary This work includes removing and disposing of weeds, applying erosion control materials, seed, fiber, and tackifier to erosion control Hydroseed) areas shown on the plans. Comply with Section 20-3, Erosion Control," of the Standard Specifications. Apply erosion control Hydroseed) when an area is ready to receive erosion control as determined by the Engineer and under Move-In/Move-Out Erosion Control)" of these Special Provisions. The Engineer will designate the ground location of all erosion control Hydroseed) areas in increments of one acre or smaller by directing the placing of stakes or other suitable markers. Furnish all tools, labor, materials, and transportation required to adequately indicate the various erosion control Hydroseed) locations. MATERIALS Seed Seed not required to be labeled under the California Food and Agricultural Code must be tested for purity and germination by a seed laboratory certified by the Association of Official Seed Analysts or by a seed technologist certified by the Society of Commercial Seed Technologists. Measure and mix individual seed species in the presence of the Engineer. Seed must contain at most 1.0 percent total weed seed by weight. Deliver seed to the job site in unopened separate containers with the seed tag attached. Containers without a seed tag attached are not accepted. The Engineer takes a sample of approximately one ounce or 0.25 cup of seed for each seed lot greater than 2 pounds. Seed must comply with the following: Book One San Benancio/State Route 68 Intersection Improvements 483 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Botanical Name Percent Germination Pounds Pure Live Seed Per Acre Common Name) Minimum) Slope Measurement) Achillea millefolium 40 0.5 White Yarrow) Artemisia californica 25 0.1 California Sagebrush) Bromus carinatus' 40 12.0 California Brome) Eriogonum fasiculatum 35 1.0 California Buckwheat) Eschscholzia californica 38 1.5 California Poppy) Hordeum branchyantherum 35 15.0 Meadow Barley) Koeleria macrantha' 38 3.0 Junegrass) Lupins succulentus 42 3.0 Arroyo Lupine) Trifolium wildenovii 35 3.0 Tomcat Clover) Vulpia microstachys 40 8.0 Small Fescue) Total 47.1 Applicable when numbers below are shown after a Botanical Name/(Common Name) above: I Seed produced in California only. Botanical Name Percent Germination Pounds Pure Live Seed Per Acre Common Name) Minimum) Slope Measurement) Agrositis pallens' 35 5.0 Thin Grass) Deschampsia cespitosa 40 3.0 Tufted Hair grass) Hordeum depressum 35 4.0 Low Barley) Leymus triticoides Rio" 40 6.0 Creeping Wild Rye) Scipus acutus 30 3.0 Hard Stem Bulrush) Trifolium obtusiflorum 40 3.0 Clammy Clover) Vulpia microstachys 40 8.0 Small Fescue Total 32.0 Applicable when numbers below are shown after a Botanical Name/(Common Name) above: 1 Seed produced in California only. Seed Sampling Supplies At the time of seed sampling, provide the Engineer a glassine lined bag and custody seal tag for each seed lot sample. Organic Fertilizer Seed Type 1) Seed Type 2) Book One San Benancio/State Route 68 Intersection Improvements 484 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Tackifier Tackifier must be: 1. Guar Plant Based) 2. Psyllium Plant Based) 3. Starch Plant Based) Tackifier must comply with the following: 1. Nonflammable 2. Nontoxic to aquatic organisms 3. Free from growth or germination inhibiting factors 4. lant-based product Tackifier classified as a plant based product must comply with the following: 1. A natural high molecular weight polysaccharide 2. A high viscosity hydrocolloid that is miscible in water 3. Functional for at least 180 days 4. Labeled as either guar, psyllium, or starch Guar: 1. A guar gum based product derived from the ground endosperm of the guar plant, cyanmopsis tetragonolobus 2. Treated with dispersant agents for easy mixing 3. Able to be diluted at the rate of 1 to 5 pounds per 100 gallons of water Psyllium: 1. Made of the finely ground muciloid coating of plantago ovata or plantago ispaghula seeds 2. Able to dry and form a firm but rewettable membrane Starch: 1. A non-ionic, water-soluble granular material derived from corn, potato, or other plant-based source. Fiber Fiber must be: 1. Wood 2. Cellulose Fiber must comply with the following: 1. Free from lead paint, printing ink, varnish, petroleum products, seed germination inhibitors, or chlorine bleach 2. Free from synthetic or plastic materials 3. At most 7 percent ash Wood Fiber must comply with the following: 1. Long strand, whole wood fibers, thermo-mechanically processed from clean, whole wood chips 2. Not made from sawdust, cardboard, paper, or paper byproducts 3. At least 25 percent of fibers 3/8 inch long 4. At least 40 percent held on a No. 25 sieve Book One San Benancio/State Route 68 Intersection Improvements 485 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Coloring Agent Use a biodegradable, nontoxic coloring agent free from copper, mercury, and arsenic. CONSTRUCTION Site Preparation Immediately prior to applying seed to erosion control Hydroseed) areas, trash and debris and weeds must be removed. Removed weeds must be disposed of in conformance with the provisions in Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. Application Apply erosion control Hydroseed) materials in separate applications in the following sequence: 1. Apply the following mixture with hydroseeding equipment at the rates indicated within 60 minutes after the seed has been added to the mixture: Material Pounds Per Acre Slope Measurement) Seed Rate Per Seed Type Fiber 500 3. Apply the following mixture with hydro-seeding equipment at the corresponding rates: Material Pounds Per Acre Slope Measurement) Fiber 1200 Tackifier 125 The ratio of total water to total tackifier in the mixture must be as recommended by the manufacturer. Seed may be dry applied at the total rate specified in the preceding table for small areas not accessible by the hydro-seeding equipment, when approved in writing by the Engineer. Dry applied seed must be incorporated into the soil a maximum depth of 1/4 inch by raking or dragging. Once straw work is started in an area, complete tackifier applications in that area on the same working day. The Engineer may change the rates of erosion control Hydroseed) materials to meet field conditions. For any area where erosion control Hydroseed) materials are to be applied, the application of all erosion control Hydroseed) materials to be applied to that area must be completed within 72 hours from when the first materials were applied. MEASUREMENT AND PAYMENT Erosion control Hydroseed) will be measured by the square foot or by the acre, whichever is designated in the Engineer's Estimate. The area will be calculated on the basis of actual or computed slope measurements. The contract price paid per square foot or acre for erosion control Hydroseed) includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in erosion control Hydroseed) complete in place, as shown on the plans, as Book One San Benancio/State Route 68 Intersection Improvements 486 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.32 FIBER ROLLS GENERAL Summary This work includes installing fiber rolls. At the option of the Contractor, fiber rolls shall be Type 1 or Type 2. MATERIALS Fiber Roll Fiber roll shall be either: 1. Constructed with a premanufactured blanket consisting of wood excelsior, rice or wheat straw, or coconut fibers or a combination of these materials. The blanket shall be between 6 feet and 8 feet in width and between 65 feet and 95 feet in length. Wood excelsior shall be individual fibers, of which 80 percent shall be 6 inches or longer in length. The blanket shall have a photodegradable plastic netting or biodegradable jute, sisal, or coir fiber netting on at least one side. The blanket shall be rolled along the width and secured with jute twine spaced 6 feet apart along the full length of the roll and placed 6 inches from the ends of each roll. The finished roll shall be between 8 inches and 10 inches in diameter, a minimum of 20 feet in length, and shall weigh a minimum of 0.5 pound per linear foot. More than one blanket may be required to achieve the finished roll diameter. When more than one blanket is required, blankets shall be jointed longitudinally with an overlap of 6 inches along the length of the blanket. 2. A premanufactured roll of rice or wheat straw, wood excelsior, or coconut fiber encapsulated within a photodegradable plastic or biodegradable jute, sisal, or coir fiber netting. The netting shall have a minimum durability of one year after installation. The netting shall be secured tightly at each end of the roll. Rolls shall be between 8 inches and 12 inches in diameter. Rolls between 8 inches and 10 inches in diameter shall have a minimum weight of 1 pound per linear foot and a minimum length of 20 feet. Rolls between 10 inches and 12 inches in diameter shall have a minimum weight of 3 pounds per linear foot and a minimum length of 10 feet. Stakes Wood stakes shall be a minimum of 1" x 1" x 24" in size for Type 1 installation, or a minimum of 1" x 2" x 24" in size for Type 2 installation. Wood stakes shall be untreated fir, redwood, cedar, or pine and cut from sound timber. They shall be straight and free of loose or unsound knots and other defects which would render them unfit for the purpose intended. Metal stakes shall not be used. Rope Rope shall be biodegradable, such as sisal or manila, with a minimum diameter of 1/ inch. CONSTRUCTION Installation Fiber rolls shall be installed as follows: 1. Fiber rolls Type 1): Furrows shall be constructed to a depth between 2 inches and 4 inches, and to a sufficient width to hold the fiber roll. Stakes shall be installed Book One San Benancio/State Route 68 Intersection Improvements 487 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???24 inches apart along the length of the fiber rolls and stopped at 12 inches from each end of the rolls. Stakes shall be driven to a maximum of 2 inches above, or flush with the top of the roll. 2. Fiber rolls Type 2): Rope and notched stakes shall be used to restrain the fiber rolls against the slope. Stakes shall be driven into the slope until the notch is even with the top of the fiber roll. Rope shall be knotted at each stake and laced between stakes. After installation of the rope, stakes shall be driven into the slope such that the rope will hold the fiber roll tightly to the slope. Furrows will not be required. 3. Fiber rolls shall be placed 10 feet apart along the slope for slope inclination horizontal: vertical) of 2:1 and steeper, 15 feet apart along the slope for slope inclination between 2:1 and 4:1, 20 feet apart along the slope for slope inclination between 4:1 and 10:1, and a maximum of 50 feet apart along the slope for slope inclination of 10:1 and flatter. 4. The bedding area for the fiber rolls shall be cleared of obstructions including rocks, clods, and debris greater than one inch in diameter before installation. 5. Fiber rolls shall be installed approximately parallel to the slope contour. If the intended function of the fiber rolls to disperse concentrated water runoff and to reduce runoff velocities is impaired, the Contractor shall take action to repair or replace the fiber rolls. Split, torn, or unraveling rolls shall be repaired or replaced. Broken or split stakes shall be replaced. Sagging or slumping fiber rolls shall be repaired with additional stakes or replaced. Locations where rills and other evidence of concentrated runoff have occurred beneath the rolls shall be corrected. Fiber rolls shall be repaired or replaced within 24 hours of identifying the deficiency. MEASUREMENT AND PAYMENT Quantities of fiber rolls to be paid for will be determined by the linear foot measured along the centerline of the installed roll. Where fiber rolls are joined and overlapped, the overlap will be measured as a single installed roll. The contract price paid per linear foot for fiber roll shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in installing fiber rolls, complete in place, including furrow excavation and backfill, repairing or replacing fiber rolls as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.33 WILLOW CUTTINGS PLANT GROUP WC) GENERAL Summary Willow cutting work shall consist of obtaining, storing, transporting and planting willow cuttings in conformance with the provisions in Section 20-4, Highway Planting," of the Standard Specifications and these Special Provisions. If willow planting cannot be performed prior to the start of plant establishment and within the above specified time, then the work shall be performed during the plant establishment period when directed by the Engineer. The Contractor shall notify the Engineer, in writing, at least 5 working days prior to installing willow cuttings. MATERIAL Harvest Willow cutting removal shall not be between February 15th and September 1st. Book One San Benancio/State Route 68 Intersection Improvements 488 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Willow cuttings shall be taken from dormant willows in late fall after leaf drop and before bud burst in the early spring. Willow cuttings may be procured from commercial nurseries as un-rooted or rooted branches, or they can be obtained from native stands. When taken from native stands, the Contractor shall notify the Engineer, in writing, at least 10 working days prior to gathering willow cuttings. The cuttings shall be taken only from the areas shown on the plans or other adjacent areas designated by the Engineer. Willow cuttings shall be taken at random from healthy, vigorous plants with smooth bark that is not deeply furrowed, free from splits, scale, disease and defects such as knots, sunscald, injuries, serious abrasions of the bark, bark stripping or major disfigurement. No more than 20% of the willow cuttings can be young stock with supple suckers and shoots. Cuttings from willow suckers shall not be used. No more than 50 percent of the plants in a designated area shall be cut. No more than 60 percent of each individual plant shall be cut. Cuts shall be made with sharp, clean tools. Harvesting activity shall occur throughout the stand and crown area rather than from the perimeter. Willow cuttings taken from native stands shall be soaked for at least 2 days but not more than 30 days in oxygenated water to allow buds to swell prior to planting. Cuttings shall be soaked in a manner such that at least 50 percent of the cutting is submerged. Cuttings shall be soaked in a location that is shaded at all times. Willow cuttings shall not be allowed to dry out. Cuttings shall be planted immediately after soaking, should not be exposed to sun and air for more than three hours prior to planting, and should be covered with plastic or moist burlap while waiting to be planted. Willow cuttings may be stored in large coolers between 34 to 39 degrees Fahrenheit with 60 to 70 percent humidity until just before planting. No water or burlap should be added to stored cuttings. Cuttings should be monitored regularly to detect drying, sprouting or mold. Willow cuttings can be stored for up to 6 months. Pruned branches and trimmings shall be spread in the designated willow cutting areas so that no areas are left unsightly. During transportation, the willow cuttings shall be placed on the transport vehicles in an orderly fashion to prevent damage and to facilitate handling. Willow cuttings shall be wrapped in light-colored, opaque plastic with small amounts of water added to prevent desiccation. Willow cuttings shall be kept out of direct sunlight or in other locations that are likely to heat up. Willow Cuttings Willow cuttings shall be reasonably straight and at least 30 inchin length and %2 inch to 1 1/2 inch in diameter from tip to toe. The top of each willow cutting shall be cut square above a leaf bud, and the base of each willow cutting shall be cut below a leaf bud at an angle of approximately 45 degrees. Willow cuttings shall have leaves and branches trimmed off flush with the stem. The terminal end of the willow pole cutting shall be sealed by dipping the top 2 inches to 3 inches of each cutting into a 50:50 mix of white latex paint and water or paraffin wax to prevent moisture loss. Commercial Fertilizer Commercial fertilizer packet) shall be slow or controlled release and shall be in a biodegradable packet form. The packet shall gradually release nutrients over a 12-month period. Each packet shall have a weight of 10 g 1 g and shall have the following guaranteed chemical analysis: Book One San Benancio/State Route 68 Intersection Improvements 489 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Ingredient Percentage Nitrogen 20 Phosphoric Acid 10 Water Soluble Potash 5 INSTALLATION Prior to planting, an area 2 feet in diameter shall be cleared of weed growth at each proposed plant willow cutting) location. Pesticides shall not be used for weed control within the 2 foot diameter area. Planting holes shall be made perpendicular to the ground line and shall be formed with a water jet stinger or auger. Plant holes shall be large enough to receive the willow cuttings in order that the willow cuttings may be planted to the proper depths without damage to the bark. Where rock or other hard material prohibits holes from being excavated as specified, new holes shall be excavated and the abandoned holes backfilled. If the soil in and around the plant hole is not wet prior to planting, the soil shall be watered and maintained in a wet state until the willow cuttings are planted. Willow pole cuttings shall be re-cut using a grafting or cutting knife at an angle prior to insertion in the soil. The base of willow pole cuttings shall be planted approximately two-thirds of the willow cutting's length and shall have from 3 to 5 bud scars exposed above the plant hole. Pole cuttings with more than 5 bud scars exposed shall have excess scars removed by pruning. After planting, the plant holes shall be backfilled with water and excavated material to make a mud slurry. The excavated material shall be distributed evenly within the hole without clods, lumps or air pockets and compacted without damage to the willow cutting's bark. Compaction shall be adequate to prevent the willow cutting from being easily removed from the soil. One commercial fertilizer packet shall be placed in the backfill of each plant to within 6 to 8 inches of the soil surface and approximately 1 inch from the cutting. Willow cuttings not used shall be disposed of outside the highway right of way in conformance with the provisions in Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. MAINTENANCE Cuttings shall be watered and maintained in a healthy condition from the time the cuttings are planted until acceptance of the contract. Cuttings that die shall be replaced at the Contractor's expense. The method of planting replacement cuttings shall be as specified in this section for willow cuttings. MEASUREMENT AND PAYMENT The quantity of willow cuttings will be measured as units determined from actual count in place, excluding additional willow cuttings required for replacement. The contract unit price paid for Willow Cuttings Plant Group WC) includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in willow cuttings, complete in place, including obtaining, storing and transporting willow cuttings, preparing planting holes, furnishing and placing commercial fertilizer packet), and for watering and maintaining willow cuttings, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.34 AGGREGATE BASE Aggregate base must comply with Section 26, Aggregate Bases," of the Standard Specifications and these Special Provisions. Book One San Benancio/State Route 68 Intersection Improvements 490 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Aggregate base must be Class 2. Do not store reclaimed asphalt concrete or aggregate base with reclaimed asphalt concrete within 100 feet measured horizontally of any culvert, watercourse, or bridge. 10-1.35 HOT MIX ASPHALT GENERAL Summary This work includes producing and placing hot mix asphalt HMA) Type A using the standard process. Comply with Section 39, Hot Mix Asphalt," of the Standard Specifications. MATERIALS Asphalt Binder The grade of asphalt binder mixed with aggregate for HMA Type A must be PG 64-10. Aggregate The aggregate for HMA Type A must comply with the 1/2-inch grading. CONSTRUCTION Rumble Strips Construct rumble strips in the top layer of new HMA surfacing. Before opening the lane to public traffic, pave shoulders and median borders adjacent to a lane being paved. Do not leave a vertical joint more than 0.15 foot high between adjacent lanes open to public traffic. Place HMA on adjacent traveled way lanes so that at the end of each work shift, the distance between the ends of HMA layers on adjacent lanes is between 5 feet and 10 feet. Place additional HMA along the transverse edge at each lane's end and along the exposed longitudinal edges between adjacent lanes. Hand rake and compact the additional HMA to form temporary conforms. You may place Kraft paper or another approved bond breaker under the conform tapers to facilitate the taper removal when paving operations resume. Widening If widening existing pavement, construct new structural section on both sides of the existing pavement to match the elevation of the existing pavement's edge at each location before placing HMA over the existing pavement. Conform Tapers Place shoulder conform tapers concurrently with the adjacent lane's paving. Place additional HMA along the pavement's edge to conform to road connections and private drives. Hand rake, if necessary, and compact the additional HMA to form a smooth conform taper. 10-1.36 HOT MIX ASPHALT MISCELLANEOUS AREAS) GENERAL Summary This work includes producing hot mix asphalt HMA) and placing it on miscellaneous areas. Book One San Benancio/State Route 68 Intersection Improvements 491 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Comply with Section 39, Hot Mix Asphalt," of the Standard Specifications. MEASUREMENT AND PAYMENT If there is a contract item for place hot mix asphalt miscellaneous area) paid for by the square yard, this item is limited to the areas listed on the plans and is in addition to the contract items for the materials involved. Full compensation for tack coat for miscellaneous areas is considered as included in the contract price paid per ton for the hot mix asphalt used in miscellaneous areas and no separate payment will be made therefor. 10-1.37 PILING GENERAL Piling shall conform to the provisions in Section 49, Piling," of the Standard Specifications, and these Special Provisions. Unless otherwise specified, welding of any work performed in conformance with the provisions in Section 49, Piling," of the Standard Specifications, shall be in conformance with the requirements in AWS D1.1. Difficult pile installation is anticipated due to the presence of high ground water, cobbles and boulders, low overhead clearance, underground utilities, and overhead utilities When a calculated nominal driving resistance is shown on the plans for piling, that value shall be utilized in lieu of nominal resistance in Section 49, Piling," of the Standard Specifications, and these Special Provisions. MEASUREMENT AND PAYMENT PILING) Measurement and payment for the various types and classes of piles shall conform to the provisions in Sections 49-6.01, Measurement," and 49-6.02, Payment," of the Standard Specifications and these Special Provisions. 10-1.38 CONCRETE STRUCTURES Portland cement concrete structures shall conform to the provisions in Section 51, Concrete Structures," of the Standard Specifications and these Special Provisions. GENERAL Attention is directed to Precast Concrete Quality Control" of these Special Provisions. Shotcrete shall not be used as an alternative construction method for reinforced concrete members unless otherwise specified. Concrete, for retaining wall structures, shall have an integral earthtone color conforming to Federal Standard 595B Color No. 33522. Plastic pipe located at vertical drains used behind retaining walls, including horizontal or sloping drains down slopes and across sidewalk areas, shall be polyvinyl chloride PVC) plastic pipe, Schedule 80, conforming to the provisions for pipe for edge drains and edge drain outlets in Section 68-3.02, Materials," of the Standard Specifications. The vertical drain pipe shall be rigidly supported in place during backfilling operations. PAYMENT Full compensation for Facing Rock Slope Protection is included in the contract unit price paid per cubic yard for Minor Concrete Gutter), and no additional compensation will be allowed therefor. Book One San Benancio/State Route 68 Intersection Improvements 492 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Full compensation for application of integral earthtone color is included in the contract unit pice paid per cubic yard for Structure Concrete Retaining Wall), and no additional compensation will be allowed therefor. AGGREGATE GRADINGS The aggregate grading of concrete for San Benancio Bridge shall be the 1-inch maximum combined aggregate grading and shall conform to the requirements in Section 90-3, Aggregate Gradings," of the Standard Specifications. FALSEWORK Falsework shall conform to the provisions in Section 51, Concrete Structures," of the Standard Specifications and these Special Provisions. Temporary crash cushion modules, as shown on the plans and conforming to the provisions in Temporary Crash Cushion Module" of these Special Provisions, shall be installed at the approach end of temporary railings which are located less than 15 feet from the edge of a traffic lane. For 2-way traffic openings, temporary crash cushion modules shall be installed at the departing end of temporary railings which are located less than 6 feet from the edge of a traffic lane. The Contractor's engineer who signs the falsework drawings shall also certify in writing that the falsework is constructed in conformance with the approved drawings and the contract specifications prior to placing concrete. This certification shall include performing any testing necessary to verify the ability of the falsework members to sustain the stresses required by the falsework design. The engineer who signs the drawings may designate a representative to perform this certification. Where falsework contains openings for railroads, vehicular traffic, or pedestrians, the designated representative shall be qualified to perform this work, shall have at least 3 years of combined experience in falsework design or supervising falsework construction, and shall be registered as a Civil Engineer in the State of California. For other falsework, the designated representative shall be qualified to perform this work and shall have at least 3 years of combined experience in falsework design or supervising falsework construction. The Contractor shall certify the experience of the designated representative in writing and provide supporting documentation demonstrating the required experience if requested by the Engineer. Welding and Nondestructive Testing Welding of steel members, except for previously welded splices and except for when fillet welds are used where load demands are less than or equal to 1,000 pounds per inch for each 1/8 inch of fillet weld, shall conform to AWS D1.1 or other recognized welding standard. The welding standard to be utilized shall be specified by the Contractor on the working drawings. Previously welded splices for falsework members are defined as splices made prior to the member being shipped to the project site. Splices made by field welding of steel beams at the project site shall undergo nondestructive testing NDT). At the option of the Contractor, either ultrasonic testing UT) or radiographic testing RT) shall be used as the method of NDT for each field weld and any repair made to a previously welded splice in a steel beam. Testing shall be performed at locations selected by the Contractor. The length of a splice weld where NDT is to be performed, shall be a cumulative weld length equal to 25 percent of the original splice weld length. The cover pass shall be ground smooth at the locations to be tested. The acceptance criteria shall conform to the requirements of AWS D1.1, Section 6, for cyclically loaded nontubular connections subject to tensile stress. If repairs are required in a portion of the weld, additional NDT shall be performed on the repaired sections. The NDT method chosen shall be used for an entire splice evaluation including any required repairs. Book One San Benancio/State Route 68 Intersection Improvements 493 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????For all field welded splices, the Contractor shall furnish to the Engineer a letter of certification which certifies that all welding and NDT, including visual inspection, are in conformance with the specifications and the welding standard shown on the approved working drawings. This letter of certification shall be signed by an engineer who is registered as a Civil Engineer in the State of California and shall be provided prior to placing any concrete for which the falsework is being erected to support. For previously welded splices, the Contractor shall determine and perform all necessary testing and inspection required to certify the ability of the falsework members to sustain the stresses required by the falsework design. This welding certification shall 1) itemize the testing and inspection methods used, 2) include the tracking and identifying documents for previously welded members, 3) be signed by an engineer who is registered as a Civil Engineer in the State of California, 4) and shall be provided prior to erecting the members. DECK CLOSURE POURS Where a deck closure pour is shown on the plans, reinforcement protruding into the closure space and forms for the closure pour shall conform to the following: A. During the time of placement of concrete in the deck, other than for the closure pour itself, reinforcing steel which protrudes into the closure space shall be completely free from any connection to the reinforcing steel, concrete, or other attachments of the adjacent structure, including forms. The reinforcing steel shall remain free of any connection for a period of not less than 24 hours following completion of the pour. B. Forms for the closure pour shall be supported from the superstructure on both sides of the closure space. ELASTOMERIC BEARING PADS Elastomeric bearing pads shall conform to the provisions in Section 51-1.12H, Elastomeric Bearing Pads," of the Standard Specifications. PRECAST CONCRETE GIRDERS Precast reinforced concrete girders shall conform to the provisions in Section 51, Concrete Structures," of the Standard Specifications. PRECAST PRESTRESSED CONCRETE BRIDGE MEMBERS The anticipated deflection and method of accommodation of deflection of precast prestressed concrete girders, prior to the time the deck concrete is placed, shall be shown on the working drawings in conformance with the provisions in Section 5-1.02, Plans and Working Drawings," of the Standard Specifications. The deflection shall include the following: A. Anticipated upward deflection caused by the prestressing forces. B. Downward deflection caused by the dead load of the girder. C. Deflection caused by the creep and shrinkage of the concrete for the time interval between the stressing of the girders and the planned placement of the deck. The deflection shall be substantiated by calculations that consider the ages of the girder concrete at the time of stressing and the Contractor's planned placement of the deck. Deflection calculations shall be based on the concrete producer's estimate of the modulus of elasticity at the applicable concrete age. Adjustments to accommodate girder deflections that occur prior to the time the deck concrete is placed may include revisions in bearing seat elevations, but the adjustments shall be limited by the following conditions: A. The minimum permanent vertical clearance under the structure as shown on the plans shall not be reduced. Book One San Benancio/State Route 68 Intersection Improvements 494 CONTRACT NO. 10-1 11065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????B. The profile grade and cross slope of the deck shall not be changed. C. A minimum of one inch of deck slab concrete between the top of the precast girders and the deck slab reinforcement shall be maintained. Girders with unanticipated girder deflection that do not comply with conditions A, B, and C will be rejected in conformance with the provisions in Section 6-1.04, Defective Materials," of the Standard Specifications. Adjustments to accommodate girder deflections will not be considered a change in dimensions. Full compensation for increases in the cost of construction, including increases in the quantity of deck or bearing seat concrete, resulting from adjustments to accommodate girder deflections shall be considered as included in the contract prices paid for the various items of work involved, and no additional compensation will be allowed therefor. The Contractor shall submit a girder erection plan to the Engineer for approval in conformance with the provisions in Section 5-1.02, Plans and Working Drawings," of the Standard Specifications. The girder erection plan shall include procedures, details, and sequences for unloading, lifting, erecting, and installing temporary bracing, and shall be signed by an engineer who is registered as a Civil Engineer in the State of California. The Contractor shall allow 20 days for the review of the girder erection plan. MEASUREMENT AND PAYMENT Measurement and payment for concrete in structures shall conform to the provisions in Section 51-1.22, Measurement," and Section 51-1.23, Payment," of the Standard Specifications and these Special Provisions. Full compensation for furnishing and installing plastic pipe located at vertical drains used behind retaining walls including horizontal or sloping drains down slopes and across sidewalk areas, including excavation and backfill involved in placing the plastic pipe, shall be considered as included in the contract price paid per cubic yard for the various items of concrete work involved and no separate payment will be made therefor. Full compensation for public notification and airborne monitoring for deck crack treatment shall be considered as included in the contract price paid per cubic yard for structural concrete, bridge, and no additional compensation will be allowed therefor. 10-1.39 ARCHITECTURAL SURFACE TEXTURED CONCRETE) Architectural texture for concrete surfaces shall conform to the details shown on the plans, the provisions in Section 51, Concrete Structures," of the Standard Specifications, and these Special Provisions. Architectural textures listed below are required at concrete surfaces shown on the plans: TEST PANEL A test panel at least 4' x 4' in size shall be successfully completed at a location approved by the Engineer before beginning work on architectural textures. The test panel shall be constructed and finished with the materials, tools, equipment, and methods to be used in constructing the architectural texture. If ordered by the Engineer, additional test panels shall be constructed and finished until the specified finish, texture, and color are obtained, as determined by the Engineer. The test panel approved by the Engineer shall be used as the standard of comparison in determining acceptability of architectural texture for concrete-surfaces. FORM LINERS Form liners shall be used for textured concrete surfaces and shall be installed in conformance with the manufacturer's recommendations, unless other methods of forming textured concrete Book One San Benancio/State Route 68 Intersection Improvements 495 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????surfaces are approved by the Engineer. Form liners shall be manufactured from an elastomeric material or a semi-elastomeric polyurethane material by a manufacturer of commercially available concrete form liners. No substitution of other types of formliner material will be allowed. Form liners shall leave crisp, sharp definition of the architectural surface. Recurring textural configurations exhibited by repeating, recognizable shadow patterns shall be prevented by proper casting of form liner patterns. Textured concrete surfaces with such recurring textural configurations shall be reworked to remove such patterns as approved by the Engineer or the concrete shall be replaced. Form liners shall have the following properties: Description ASTM Designation: Ran e Elastomeric material Shore A D 2240 20 to 65 hardness Tensile strength psi) D 412 130 to 900 Semi-elastomeric polyurethane Shore D D 2240 55 to 65 hardness Tensile strength psi) D 2370 2600 minimum Cuts and tears in form liners shall be sealed and repaired in conformance with the manufacturer's recommendations. Form liners that are delaminated from the form shall not be used. Form liners with deformations to the manufactured surface caused by improper storage practices or any other reason shall not be used. Form liners shall extend the full length of texturing with transverse joints at 8 foot minimum spacing. Small pieces of form liners shall not be used. Grooves shall be aligned straight and true. Grooves shall match at joints between form liners. Joints in the direction of grooves in grooved patterns shall be located only in the depressed portion of the textured concrete. Adjoining liners shall be butted together without distortion, open cracks, or offsets at the joints. Joints between liners shall be cleaned before each use to remove any mortar in the joint. Adhesives shall be compatible with the form liner material and with concrete. Adhesives shall be approved by the liner manufacturer. Adhesives shall not cause swelling of the liner material. RELEASING FORM LINERS Products and application procedures for form release agents shall be approved by the form liner manufacturer. Release agents shall not cause swelling of the liner material or delamination from the forms. Release agents shall not stain the concrete or react with the liner material. For reliefs simulating fractured concrete or wood grain surfaces the application method shall include the scrubbing method using a natural bristle scrub brush in the direction of grooves or grain The release agent shall coat the liner with a thin film. Following application of form release agent, the liner surfaces shall be cleaned of excess amounts of agent using compressed air. Buildup of form release agent caused by the reuse of a liner shall be removed at least every 5 uses. Form liners shall release without leaving particles or pieces of liner material on the concrete and without pulling or breaking concrete from the textured surface. The concrete surfaces exposed by removing forms shall be protected from damage. Book One San Benancio/State Route 68 Intersection Improvements 496 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????CURING Concrete surfaces with architectural texture shall be cured only by the forms-in-place or water methods. Seals and curing compounds shall not be used. MEASUREMENT AND PAYMENT Architectural texture will be measured and paid for by the square foot. The contract price paid per square foot for architectural texture of the types listed in the Engineer's Estimate shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in architectural texture, complete in place, including test panels, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.40 STRUCTURE APPROACH SLABS TYPE N) GENERAL Summary This work includes constructing reinforced concrete approach slabs, structure approach drainage systems, and treated permeable base. Reinforced concrete approach slabs must comply with Section 51, Concrete Structures," of the Standard Specifications. Submittals Furnish a Certificate of Compliance under Section 6-1.07, Certificates of Compliance," of the Standard Specifications for the geocomposite drain certifying that the drain complies with these Special Provisions. The Certificate of Compliance must be accompanied by a flow capability graph for the geocomposite drain showing flow rates and the externally applied pressures and hydraulic gradients. The flow capability graph must be stamped with the verification of an independent testing laboratory. Notify the Engineer of the type of treated permeable base to be furnished at least 30 days before the start of placement. Once you have notified the Engineer of the selection, the type to be furnished must not be changed without a prior written request to do so and approval thereof by the Engineer. Notify the Engineer of the source of woven tape fabric at least 45 days before use. MATERIALS Concrete Concrete for structure approach slabs must contain not less than 675 pounds of cementitious material per cubic yard and must either: 1. Cure for not less than 5 days before opening to public traffic, or 2. Comply with Rapid Strength Concrete for Structures" of these Special Provisions. Drainage Pads Concrete for use in drainage pads must be minor concrete, except the concrete must contain not less than 505 pounds of cementitious material per cubic yard. Geocomposite Drain Geocomposite drain must consist of a manufactured core not less than 0.25 inch thick nor more than 2 inches thick with one or both sides covered with a layer of filter fabric that will Book One San Benancio/State Route 68 Intersection Improvements 497 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????provide a drainage void. The drain must produce a flow rate through the drainage void of at least 2 gallons per minute per foot of width at a hydraulic gradient of 1.0 and a minimum externally applied pressure of 3,500 psf. The manufactured core must be one of the following: 1. Preformed grid of embossed plastic 2. Mat of random shapes of plastic fibers 3. Drainage net consisting of a uniform pattern of polymeric strands forming 2 sets of continuous flow channels 4. System of plastic pillars and interconnections forming a semirigid mat The core material and filter fabric must be capable of maintaining the drainage void for the entire height of geocomposite drain. Filter fabric must be integrally bonded to the side of the core material with the drainage void. Filter Fabric Filter fabric must comply with the specifications for Class A filter fabric in Section 88-1.02, Filtration," of the Standard Specifications. Treated Permeable Base Treated permeable base under structure approach slabs must be an asphalt treated permeable base or a cement treated permeable base as specified in Section 29, Treated Permeable Bases," of the Standard Specifications. Miscellaneous Materials Steel components of abutment ties, including plates, nuts, washers, and rods, must comply with Section 75-1.03, Miscellaneous Bridge Metal," of the Standard Specifications. Steel angles, plates, and bars at the concrete barrier joints must comply with Section 75-1.03, Miscellaneous Bridge Metal," of the Standard Specifications. Hardboard and expanded polystyrene must comply with Section 51-1.12D, Sheet Packing, Preformed Pads, and Board Fillers," of the Standard Specifications. Building paper must be commercial quality 30-pound asphalt felt. PVC conduit used to encase the abutment tie rod must be commercial quality. CONSTRUCTION Geocomposite Drain Install the geocomposite drain with the drainage void and the filter fabric facing the embankment. The fabric facing the embankment side must overlap a minimum of 3 inches at all joints and wrap around the exterior edges a minimum of 3 inches beyond the exterior edge. If additional fabric is needed to provide overlap at joints and wraparound at edges, the added fabric must overlap at least 6 inches and be attached to the fabric on the geocomposite drain. Place core material manufactured from impermeable plastic sheeting having non-connecting corrugations with the corrugations approximately perpendicular to the drainage collection system. If the fabric on the geocomposite drain is torn or punctured, replace the damaged section completely or repair it by placing a piece of fabric that is large enough to cover the damaged area and provide a 6-inch overlap. If asphalt treated permeable base is placed around the slotted plastic pipe at the bottom of the geocomposite drain, it must be placed at a temperature of not less than 180 OF nor more than 230 OF. Book One San Benancio/State Route 68 Intersection Improvements 498 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Filter Fabric Place filter fabric immediately after grading and compacting the subgrade to receive the filter fabric. Align, handle, and place filter fabric in a wrinkle-free manner under the manufacturer's recommendations. Adjacent borders of the filter fabric must be overlapped from 12 inches to 18 inches or stitched. The preceding roll must overlap the following roll in the direction the material is being spread or must be stitched. When the fabric is joined by stitching, it must be stitched with yarn of a contrasting color. The size and composition of the yarn must be as recommended by the fabric manufacturer. The number of stitches per 1 inch of seam must be 5 to 7. Equipment or vehicles must not be operated or driven directly on the filter fabric. Woven Tape Fabric Woven tape fabric to be placed between the treated permeable base and the approach slab must be a fabric made of woven strips or tapes and shall conform to the following: Property Designation Requirement Weight, ounces per square yard, min. D 3776 3 Grab Tensile Strength, pounds, min. D 4632 50 Elongation, percent, max. D 4632 35 Toughness, pounds, min. Percent elongation times grab tensile strength) 1,200 Woven tape fabric must be treated to provide a minimum of 70 percent breaking strength retention after 500 hours exposure when tested under ASTM D 4355. Treated Permeable Base Construct treated permeable base under Section 29, Treated Permeable Bases," of the Standard Specifications and these Special Provisions. Place asphalt treated permeable base at a temperature of not less than 200 F nor more than 250 F. Do not use material stored in excess of 2 hours in the work. Asphalt treated permeable base may be spread in 1 layer. Compact with a vibrating shoe type compactor or a roller weighing at least 1.5 tons but not more than 5 tons. Begin compacting base as soon as the mixture has cooled sufficiently to support the weight of the equipment without undue displacement. Cement treated permeable base may be spread in 1 layer. Compact base with a vibrating shoe type compactor or with a steel-drum roller weighing at least 1.5 tons but not more than 5 tons. Compaction must begin within one-half hour of spreading and must consist of 2 complete coverages of the cement treated permeable base. Finishing Approach Slabs Finish and treat the top surface of approach slabs under Section 51-1.17, Finishing Bridge Decks," of the Standard Specifications. Edges of slabs must be edger finished. Cure approach slabs with pigmented curing compound 1) under the specifications for curing structures in Section 90-7.01B, Curing Compound Method," of the Standard Specifications. Book One San Benancio/State Route 68 Intersection Improvements 499 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Sealing Joints Type AL joint seals must comply with Section 51-1.12F, Sealed Joints," of the Standard Specifications. The sealant may be mixed by hand-held power-driven agitators and placed by hand methods. The pourable seal between the steel angle and concrete barrier must comply with the requirements for Type A and AL seals in Section 51-1.12F(3), Materials and Installation," of the Standard Specifications. The sealant may be mixed by hand-held power-driven agitators and placed by hand methods. Immediately before placing the seal, thoroughly clean the joint, including abraisive blast cleaning of the concrete surfaces, so that all foreign material and concrete spillage are removed from all joint surfaces. Joint surfaces must be dry at the time the seal is placed. MEASUREMENT AND PAYMENT Structural concrete, approach slab Type N) will be measured and paid for in conformance with the provisions in Section 51-1.22, Measurement," and Section 51-1.23" Payment," of the Standard Specifications and these Special Provisions. Full compensation forthe structure approach drainage system including geocomposite drain, plastic pipe, and drainage pads, treated permeable base, filter fabric, woven tape fabric, miscellaneous metal, pourable seals, epoxy-coated bar reinforcement transverse joint seals at sleeper slabs, waterstops, and sliding joints shall be considered as included in the contract price paid per cubic yard for structural concrete, approach slab of the type shown in the Engineer's Estimate, and no additional compensation will be allowed therefor. 10-1.41 STRUCTURE APPROACH SLABS TYPE R) GENERAL Summary This work includes removing portions of existing structures, existing pavement and base including reinforced concrete approach slabs, asphalt concrete surfacing, portland cement concrete pavement, subsealing material, and cement treated base, and constructing new reinforced concrete approach slabs at structure approaches. Reinforced concrete approach slabs must comply with Section 51, Concrete Structures," of the Standard Specifications. Quality Control and Assurance Trial Slab Before beginning work on approach slabs constructed using RSC, you must successfully complete one or more trial slabs for each concrete mix design to be used in constructing the approach slabs. Trial slabs must be constructed, finished, cured, and tested with the materials, tools, equipment, personnel, and methods to be used in completing the approach slab. Trial slabs must demonstrate that you are capable of producing approach slabs in conformance with the provisions in this section, within anticipated time periods including delivery, placement, finishing, and curing times, and under similar atmospheric and temperature conditions expected during construction operations. Multiple trial slabs for each approach slab concrete mix design may be required to envelop variable atmospheric conditions. The minimum trial slab dimensions must be 10' x 20' x 9". Place trial slabs"near the job site at a location acceptable to the Engineer except slabs must not be placed on the roadway or within the project limits. Book One San Benancio/State Route 68 Intersection Improvements 500 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????Perform compressive strength testing under Section 90-9, Compressive Strength"" of the Standard Specifications. Trial slab concrete must develop compressive strengths of at least 1200 psi at the age of break used for prequalification of the concrete, and at least 2500 psi at 3 days. MATERIALS Concrete Concrete for structure approach slabs must contain not less than 675 pounds of cementitious material per cubic yard and must either: 1. Cure for not less than 5 days before opening to public traffic, or 2. Comply with Rapid Strength Concrete for Structures" of these Special Provisions. Temporary Structural Section HMA must consist of commercial quality aggregate and asphalt binder. The grading of the aggregate must comply with the 3/4-inch HMA Types A 3/ B grading specified in Section 39- 1.02E, Aggregate," of the Standard Specifications. The asphalt binder must comply with the requirements for liquid asphalt SC-800 in Section 93, Liquid Asphalts," of the Standard Specifications. The amount of asphalt binder to be mixed with the aggregate must be approximately 0.3 percent less than the optimum bitumen content as determined by California Test 367. Aggregate Base Approach Slab) Aggregate base approach slab) for filling voids below the reinforced structure approach slab concrete must be produced from commercial quality aggregates consisting of broken stone, crushed gravel or natural rough-surfaced gravel, and sand, or any combination thereof. The grading of the aggregate base must comply with the 3/4-inch maximum grading specified in Section 26-1.02A, Class 2 Aggregate Base," of the Standard Specifications. Miscellaneous Materials Steel components of abutment ties, including plates, nuts, washers, and rods, must comply with Section 75-1.03, Miscellaneous Bridge Metal," of the Standard Specifications. Steel angles, plates, and bars at the concrete barrier joints must comply with Section 75-1.03, Miscellaneous Bridge Metal," of the Standard Specifications. Hardboard and expanded polystyrene must comply with Section 51-1.12D, Sheet Packing, Preformed Pads, and Board Fillers," of the Standard Specifications. Building paper must be commercial quality 30-pound asphalt felt. PVC conduit used to encase the abutment tie rod must be commercial quality. CONSTRUCTION General The thickness shown on the plans for structure approach slabs is the minimum thickness. The thickness may vary depending on the thickness of the pavement and base materials removed. Dispose of all materials no longer required in the work under Section 7-1.13, Disposal of Material"Outside the Highway Right of Way," of the Standard Specifications. Removing Existing Pavement And Base Materials Sawcut full depth the outline of portland cement concrete to be removed with a power-driven concrete saw. Cut the outlines of excavations in asphalt concrete on a neat line to a minimum depth of 0.25 foot with a power-driven concrete saw or wheel-type rock cutting excavator before any asphalt Book One San Benancio/State Route 68 Intersection Improvements 501 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????concrete material is removed. These excavations must be permanently or temporarily backfilled to conform to the grade of the adjacent pavement before opening the lane to public traffic. Surplus excavated material may be used as temporary backfill material. Regardless of the type of equipment used to remove concrete within the sawed outline, do not use power impact tools within 1.5 feet of the pavement that is required to remain in place. Uniformally grade and compact the existing base material remaining in place after removing the existing pavement and base materials to the required depth. The finished surface of the base material at any point must not extend above the grade approved by the Engineer. Fill areas of base material that are low as a result of over excavation with structure approach slab concrete in the same operation that the new concrete is placed. Where pavement subsealing has been performed under existing approach slabs, remove the full depth of subsealing material. Where removal of cement treated base is required to construct the approach slab, remove the full depth of the cement treated base. Fill voids between the new structure approach slab and the base material remaining in place that are caused by removal of subsealing material or cement treated base with either aggregate base approach slab) or structure approach slab concrete. If you choose to fill these voids with structure approach slab concrete, fill the voids in the same operation that the new concrete is placed. Establish a grade line for the new approach slab that will provide a smooth profile grade. The profile grade will be subject to approval by the Engineer. Aggregate Base Approach Slab) Spread and compact aggregate base approach slab) for filling voids below the reinforced structure approach slab concrete by methods that will produce a well-compacted, uniform base, free from pockets of coarse or fine material to the grade approved by the Engineer. Where the required thickness of aggregate base is 8 inches or less, the base may be spread and compacted in one layer. Where the required thickness of aggregate base is more than 8 inches, the base must be spread and compacted in 2 or more layers of approximately equal thickness. The maximum compacted thickness of any one layer shall not exceed 8 inches. The finished surface of the base material at any point must not extend above the grade approved by the Engineer. Fill areas of base material that are lower than the grade approved by the Engineer with structure approach slab concrete in the same operation that the new concrete is placed. Bonding Bar Reinforcement Bond bar reinforcement or abutment tie rods in drilled holes under the provisions for drilling and bonding dowels in Section 83-2.02D(1), General," of the Sta"dard Specifications. If reinforcement is encountered during drilling before the specified depth is attained, notify the Engineer. Unless the Engineer approves coring through the reinforcement, the hole will be rejected and a new hole must be drilled adjacent to the rejected hole to the depth shown on the plans. Finishing Approach Slabs Finish the top surface of the approach slab under the provisions for decks in Section 51-1.17, Finishing Bridge Dec"s," of the Standard Specifications. The finished top surface must not vary more than 0.02 foot from the lower edge of a 12-foot straightedge placed parallel with the centerline. Edges of slabs must be edger finished. The provisions for deck crack treatment do not apply to Type R approach slabs. Book One San Benancio/State Route 68 Intersection Improvements 502 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????The surface of the approach slab will not be profiled, and the Profile Index requirements do not apply. Approach slab concrete shall be cured before the time the lane is to be opened to public traffic as specified in Maintaining Traffic" of these Special Provisions. Sealing Joints Type AL joint seals must comply with Section 51-1.12F, Sealed Joints," of the Standard Specifications. The sealant may be mixed by hand-held power-driven agitators and placed by hand methods. MEASUREMENT AND PAYMENT Structural concrete, approach slab Type R) will be measured and paid for in conformance with the provisions in Section 51-1.22, Measurement," and Section 51-1.23" Payment," of the Standard Specifications and these Special Provisions. Full compensation for removing and disposing of portions of existing structures and pavement materials shall be considered as included in the contract price paid per cubic yard for structural concrete, approach slab Type R), and no separate payment will be made therefor. The quantity of aggregate base approach slab) to be paid for shall include the actual volume of aggregate base approach slab) used to fill voids below the reinforced structure approach slab concrete, except for the volume of areas low as a result of over excavation. The volume to be paid for will be calculated on the basis of the constructed length, width, and thickness of the filled voids. Structure approach slab concrete used to fill voids lower than the approved grade of the base, except for the areas low as a result of over excavation, will be measured and paid for by the cubic yard as aggregate base approach slab). The contract price paid per cubic yard for aggregate base approach slab) shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing aggregate base approach slab), complete in place, including excavation and removing and disposing of base and subsealing materials, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. Full compensation for furnishing, stockpiling, and disposing of standby material for construction of temporary structural sections; and for constructing, maintaining, removing, and disposing of temporary structural sections shall be considered as included in the contract price paid per cubic yard for structural concrete, approach slab Type R), and no separate payment will be made therefor. Full compensation for drilling and bonding of bar reinforcement or abutment tie rods shall be considered as included in the contract price paid per cubic yard for structural concrete, approach slab Type R), and no separate payment will be made therefor. Full compensation for constructing, testing, and removing trial slabs shall be considered as included in the contract price paid per cubic yard for structural concrete, approach slab Type R), and no separate payment will be made therefor. 10-1.42 PAVING NOTCH EXTENSION This work shall consist of extending existing paving notches in conformance with the details shown on the plans and these Special Provisions. Concrete for the paving notch extensions shall conform to the provisions for structure approach slab concrete of these Special Provisions. At least 12 hours shall elapse between the time of placing concrete for the paving notch extension and placing concrete for the structure approach slab. Book One San Benancio/State Route 68 Intersection Improvements 503 CONTRACT NO. 10-1 1 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????The construction joint between the paving notch extension and the existing abutment shall conform to the provisions for horizontal construction joints in Section 51-1.13, Bonding," of the Standard Specifications. Concrete shall be placed in the spalled portions of the existing paving notch concurrently with the concrete for the paving notch extension. Attention is directed to Reinforcement" of these Special Provisions. Structure excavation and backfill shall conform to the provisions in Section 19-3, Structure Excavation and Backfill," of the Standard Specifications, except for payment. Drilling of holes and bonding of reinforcing steel dowels shall conform to the provisions for drilling and bonding dowels in Section 83-2.02D(1), General," of the Standard Specifications. If reinforcement is encountered during drilling before the specified depth is attained, the Engineer shall be notified. Unless the Engineer approves coring through the reinforcement, the hole will be rejected and a new hole, in which reinforcement is not encountered, shall be drilled adjacent to the rejected hole to the depth shown on the plans. The quantity of concrete for paving notch extension will be measured by the cubic foot. The contract price paid per cubic foot for paving notch extension shall include full compensation for furnishing all labor, materials including concrete for the paving notch spalled areas), tools, equipment, and incidentals, and for doing all the work involved in constructing the paving notch extension, complete in place, including structure excavation and backfill, reinforcement, and drilling and bonding dowels, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.43 DRILL AND BOND DOWELS Drilling and bonding dowels shall conform to the details shown on the plans, the provisions in Section 83-2.02D(1), General," of the Sta"dard Specifications, and these Special Provisions. Dowels shall conform to the provisions for bar reinforcement in Reinforcement" of these Special Provisions. If reinforcement is encountered during drilling before the specified depth is attained, the Engineer shall be notified. Unless the Engineer approves coring through the reinforcement, the hole will be rejected and a new hole, in which reinforcement is not encountered, shall be drilled adjacent to the rejected hole to the depth shown on the plans. Unless otherwise provided, dowels to be bonded into drilled holes will be paid for as bar reinforcing steel bridge). Unless otherwise provided, drilling and bonding dowels will be measured and paid for by the linear foot determined by the number and the required depth of holes as shown on the plans or as ordered by the Engineer. The contract price paid per linear foot for drill and bond dowel shall include full compensation for furnishing all labor, materials except reinforcing steel dowels), tools, equipment, and incidentals, and for doing all the work involved in drilling the holes, including coring through reinforcement when approved by the Engineer, and bonding the dowels, complete in place, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.44 CORE AND PRESSURE GROUT HIGH STRENGTH RODS Coring and pressure grouting high strength rods shall include coring holes through reinforced concrete, placing high strength rods, and filling the holes with pressurized grout, as shown on the plans and in conformance with these Special Provisions. High strength rods to be placed in the cored holes shall conform to the provisions for miscellaneous metal restrainer rod type) of these Special Provisions. High strength rods to be pressure grouted in cored holes will be paid for as miscellaneous metal restrainer rod type). Book One San Benancio/State Route 68 Intersection Improvements 504 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Holes shall be cored by methods that will not shatter or damage the concrete adjacent to the holes. Water for coring shall be from the local domestic water supply or shall not contain more than 1,000 parts per million of chlorides as Cl, nor more than 1,300 parts per million of sulfates as SO4, nor shall it contain any impurities in a sufficient amount to cause discoloration of the concrete or produce etching of the surface. Concrete areas and steel surfaces to be in contact with the grout shall be cleaned of all loose or foreign material that would in any way prevent bonding, and concrete holes shall be flushed with water and allowed to dry to a surface dry condition immediately before grouting. Grout shall conform to the requirements of either ASTM Designation: C 1107 or ASTM Designation: C 845, Type K, and shall provide a minimum compressive strength of 5000 psi at 28 days when tested by California Test 551. The grout shall be mixed in accordance with the manufacturer's recommendations. Water shall conform to the provisions for water for prestressed concrete work in Section 90-2.03, Water," of the Standard Specifications. Admixtures shall not contain more than 500 parts per million of chlorides as Cl, when tested by California Test 422, and shall not contain more than 2500 parts per million of sulfates as SO4, when tested by California Test 417. After high strength rod placement, the ends of the cored hole containing the high strength rod shall be sealed. A vent tube shall be placed at one end and one injection feed tube at the other end. The vent tube and injection feed tube shall be placed in the same end for cored holes that have only one end. The tubes shall be placed in the hole so that the air vents and the hole to be completely filled with grout. Sufficient pressure shall be used so that the hole is free of voids. Grout shall be pumped into the holes and continually wasted until air and water are ejected and there are no visible slugs. Grout or water shall not flow into any waterway, on to public traffic, across shoulders or lanes occupied by public traffic, or into gutters or other drainage facilities. Full compensation for coring and pressure grouting high strength rods is included in the contract unit price paid per pound for miscellaneous metal restrainer rod type), and no additional compensation will be allowed. 10-1.45 SEALING JOINTS Joints in concrete bridge decks and joints between concrete structures and concrete approach slabs must be sealed in conformance with the details shown on the plans, the provisions in Section 51, Concrete Structures," of the Standard Specifications, and these Special Provisions. When ordered by the Engineer, a joint seal larger than called for by the Movement Rating shown on the plans must be furnished and installed. Payment to the Contractor for furnishing the larger seal and for saw cutting the increment of additional depth of groove required will be determined as provided in Section 4-1.03, Changes," of the Standard Specifications. 10-1.46 REINFORCEMENT Reinforcement shall conform to the provisions in Section 52, Reinforcement," of the Standard Specifications and these Special Provisions. The provisions in Welding Quality Control" of these Special Provisions do not apply to resistance butt welding. Reinforcement shown on the plans to be galvanized shall be galvanized in conformance with the requirements in ASTM Designation: A 767/A 767M, Class 1, except that chromating will not be required. Within areas where galvanized reinforcement is required, tie wire and bar chairs or other metallic devices used to secure or support the reinforcement shall be galvanized, plastic coated, or epoxy coated to prevent corrosion of the devices or damage to the galvanized reinforcement. Book One San Benancio/State Route 68 Intersection Improvements 505 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Galvanized surfaces that are abraded or damaged caused by shipping, handling, or installation shall be repaired as specified in Section 75-1.05, Galvanizing," of the Standard Specifications. MEASUREMENT AND PAYMENT Measurement and payment for reinforcement in structures shall conform to the provisions in Section 52-1.10, Measurement," and Section 52-1.11" Payment," of the Standard Specifications and these Special Provisions. Full compensation for galvanizing steel reinforcement shall be considered as included in the prices paid for the various items of work involved and no additional compensation will be allowed therefor. 10-1.47 BRIDGE DECK METHACRYLATE RESIN TREATMENT GENERAL Summary This work includes applying a high molecular weight methacrylate HMWM) resin system with sand and absorbent material to bridge decks. Submittals Submit a HMWM resin system placement plan and a public safety plan under Section 5-1.02, Plans and Working Drawings," of the Standard Specifications. The plan review time is 15 days. The HMWM resin system placement plan must include: 1. Schedule of work and testing for each bridge 2. Description of equipment for applying HMWM resin 3. Range of gel time and final cure time for HMWM resin 4. Absorbent material to be used 5. Description of equipment for applying and removing excess sand and absorbent material 6. Procedure for removing HMWM resin from the deck, including equipment 7. Storage and handling of HMWM resin components and absorbent material 8. Disposal of excess HMWM resin and containers The public safety plan must include: 1. A public notification letter with a list of delivery and posting addresses. The letter must state HMWM resin work locations, dates, times, and what to expect. Deliver the letter to residences and businesses within 100 feet of HMWM resin work locations and to local fire and police officials at least 7 days before starting work. Post the letter at the job site. 2. An airborne emissions monitoring plan prepared and executed by a certified industrial hygienist CIH) certified in comprehensive practice by the American Board of Industrial Hygiene. The plan must have at least 4 monitoring points including the mixing point, application point, and point of nearest public contact. Monitor airborne emissions during HMWM resin work and submit emissions monitoring results after completing the work. 3. An action plan for protection of the public when airborne emissions levels exceed permissible levels. 4. A copy of the CIH's certification. Submit a material safety data sheet for each HMWM resin system component and diatomaceous earth shipment before use. Book One San Benancio/State Route 68 Intersection Improvements 506 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Quality Control and Assurance Submit samples of HMWM resin components 15 days before use under Section 6-3, Testing," of the Standard Specifications. Notify the Engineer 15 days before delivery of HMWM resin components in containers over 55 gallons to the job site. Complete a test area before starting work. Results from airborne emissions monitoring of the test area must be submitted to the Engineer before starting production work. The test area must: 1. Be approximately 500 sq ft 2. Be placed within the project limits outside the traveled way at an approved location 3. Be constructed using the same equipment as the production work 4. Replicate field conditions for the production work 5. Demonstrate proposed means and methods meet the acceptance criteria 6. Demonstrate production work will be completed within the time allowed 7. Demonstrate suitability of the airborne emissions monitoring plan The test area will be acceptable if. 1. The treated deck surface is tack free and non-oily 2. The sand cover adheres and resists brushing by hand 3. Excess sand and absorbent material has been removed 4. The coefficient of friction is at least 0.35 when tested under California Test 342 MATERIALS HMWM resin system consists of a resin, promoter, and initiator. HMWM resin must be low odor and comply with the following: HMWM Resin Property Requirement Test Method Volatile Content 30 percent, maximum ASTM D 2369 Viscosity 25 cP, maximum, ASTM D 2196 BrookfiELd RVT with UL adaptor, 50 RPM at 77?F) Specific Gravity 0.90 minimum, at 77?F ASTM D 1475 Flash Point 180?F, minimum ASTM D 3278 Vapor Pressure 1.0 mm Hg, maximum, ASTM D 323 at 77?F Tack-free Time 400 minutes, Specimens prepared maximum, at 25?C per California Test 551 PCC Saturated 3.5 MPa, minimum at California Test 551 Surface-Dry Bond 24 hours and 21 t 1 C Strength Test must be performed before adding initiator. Sand for abrasive sand finish must: 1. Be commercial quality dry blast sand 2. Have at least 95 percent pass the No. 8 sieve and at least 95 percent retained on the No. 20 sieve when tested under California Test 205 Absorbent material must be diatomaceous earth, abrasive blast dust, or substitute recommended by the HMWM resin supplier and approved by the Engineer. Book One San Benancio/State Route 68 Intersection Improvements 507 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????CONSTRUCTION HMWM resin system applied by machine must be: 1. Combined in volumetric streams of promoted resin to initiated resin by static in-line mixers 2. Applied without atomization HMWM resin system may be applied manually. Limit the quantity of resin mixed for manual application to 5 gallons at a time. The deck must be dry before applying HMWM resin. The concrete surface must be at least 50 degrees F and at most 100 degrees F. Relative humidity must be expected to be at most 85 percent during the work shift. Spread the HMWM resin uniformly. Completely cover surfaces to be treated and fill all cracks. Redistribute excess resin using squeegees or brooms within 10 minutes of application. For textured or grooved deck surfaces, excess resin must be removed from the texture indentations. Apply the abrasive sand finish of at least 2 lbs per sq yd or until saturation as determined by the Engineer no sooner than 20 minutes after applying resin. Apply absorbent material before opening lane to traffic. Remove excess sand and absorbent material by vacuuming or power sweeping. Traffic or equipment will be allowed on the overlay after the Engineer has determined: 1. The treated deck surface is tack free and non-oily 2. The sand cover adheres and resists brushing by hand 3. Excess sand and absorbent material has been removed 4. No material will be tracked beyond limits of treatmen by traffic Remove the HMWM resin from the deck surface if the Engineer determines 1) the above listed conditions have not been met and 2) the allowable lane closure time will be exceeded. The Engineer performs California Test 342 on treated deck surfaces. The Engineer provides at least a 15-day notice for the Contractor to provide traffic control for each bridge location. The coefficient of friction of the treated deck must be at least 0.35. MEASUREMENT AND PAYMENT Bridge deck methacrylate resin treatment will be measured by the square foot based on the dimensions shown on the plans and will be paid for as treat bridge deck. Furnish bridge deck treatment material will be measured by the gallon of mixed HMWM resin actually placed and will be paid for as furnish bridge deck treatment material. No payment will be made for materials wasted or not incorporated in the work. The contract price paid per square foot for treat bridge deck shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in preparing and applying bridge deck HMWM resin treatment, including sand and absorbent material, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. The contract price paid per gallon for furnish bridge deck treatment material shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals necessary to furnish the bridge deck treatment material to the site of the work ready for application, as specified in the Standard Specifications and these Special Provisions and as directed by the Engineer. Public safety plan will be paid for on the basis of a lump sum price. The contract lump sum price paid for public safety plan shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, including the public action plan and airborne emissions monitoring work performed by the CIH, notification of the public, and Book One San Benancio/State Route 68 Intersection Improvements 508 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????reporting test results, complete in place, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. Full compensation for providing traffic control for the Engineer to perform inspections and testing shall be considered as included in the contract prices paid for the items of work involving bridge deck methacrylate resin treatment and no additional compensation will be allowed therefor. 10-1.48 ROADSIDE SIGNS Roadside signs shall be furnished and installed at the locations shown on the plans or where designated by the Engineer and in conformance with the provisions in Section 56-2, Roadside Signs," of the Standard Specifications and these Special Provisions. The Contractor shall furnish roadside sign panels in conformance with the provisions in Furnish Sign" of the"e Special Provisions. Wood posts shall be pressure treated after fabrication in conformance with the provisions in Section 58, Preservative Treatme"t of Lumber, Timber and Piling," of the Standard Specifications and AWPA Use Category System: UC4A, Commodity Specification A or B.Type N CA), Type P CA), and Type R CA) marker panels mounted on a post with a roadside sign shall be considered to be sign panels and will not be paid for as markers. 10-1.49 FURNISH SIGN Signs shall be fabricated and furnished in accordance with details shown on the plans, the Traffic Sign Specifications, and these Special Provisions. Traffic Sign Specifications for California sign codes are available for review at: http://www.dot.ca.gov/hq/traffops/signtech/signdel/specs.htm Traffic Sign Specifications for signs referenced with Federal MUTCD sign codes can be found in Standard Highway Signs Book, administered by the Federal Highway Administration, which is available for review at: http://mutcd.fhwa.dot.gov/ser-shs mil l ennium. htm Information on cross-referencing California sign codes with the Federal MUTCD sign codes is available at: http://www.dot.ca.gov/hq/traffops/signtech/signdel/specs.htm Temporary or permanent signs shall be free from blemishes that may affect the serviceability and detract from the general sign color and appearance when viewing during daytime and nighttime from a distance of 25 feet. The face of each finished sign shall be uniform, flat, smooth, and free of defects, scratches, wrinkles, gel, hard spots, streaks, extrusion marks, and air bubbles. The front, back, and edges of the sign panels shall be free of router chatter marks, burns, sharp edges, loose rivets, delaminated skins, excessive adhesive over spray and aluminum marks. QUALITY CONTROL FOR SIGNS The requirements of Quality Control for signs" in this section shall not apply to construction area signs. No later than 14 days before sign fabrication, the Contractor shall submit a written copy of the quality control plan for signs to the Engineer for review. The Engineer will have 10 days to review the quality control plan. Sign fabrication shall not begin until the Engineer approves the Contractor's quality control pl'n in writing. The Contractor shall submit to the Engineer at least 3 copies of the approved quality control plan. The quality control plan shall include, but not be limited to the following requirements: A. Identification of the party responsible for quality control of signs, B. Basis of acceptance for incoming raw materials at the fabrication facility, Book One San Benancio/State Route 68 Intersection Improvements 509 CONTRACT NO. 10- 11 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????C. Type, method and frequency of quality control testing at the fabrication facility, D. List by manufacturer and product name) of process colors, protective overlay film, retroreflective sheeting and black non-reflective film, E. Recommended cleaning procedure for each product, and F. Method of packaging, transport and storage for signs. No legend shall be installed at the project site. Legend shall include letters, numerals, tildes, bars, arrows, route shields, symbols, logos, borders, artwork, and miscellaneous characters. The style, font, size, and spacing of the legend shall conform to the Standard Alphabets published in the FHWA Standard Highway Signs Book. The legend shall be oriented in the same direction in accordance with the manufacturer's orientation marks ound on the retroreflective sheeting. On multiple panel signs, legend shall be placed across joints without affecting the size, shape, spacing, and appearance of the legend. Background and legend shall be wrapped around interior edges of formed panel signs as shown on plans to prevent delamination. The following notation shall be placed on the lower right side of the back of each sign where the notation will not be blocked by the sign post or frame: A. PROPERTY OF STATE OF CALIFORNIA, B. Name of the sign manufacturer, C. Month and year of fabrication, D. Type of retroreflective sheeting, and E. Manufacturer's identification and lot number of retroreflective sheeting. The above notation shall be applied directly to the aluminum sign panels in 1/4-inch upper case letters and numerals by die-stamp and applied by similar method to the fiberglass reinforced plastic signs. Painting, screening, or engraving the notation will not be allowed. The notation shall be applied without damaging the finish of the sign. Signs with a protective overlay film shall be marked with a dot of 3/8 inch in diameter. The dot placed on white border shall be black, while the dot placed on black border shall be white. The dot shall be placed on the lower border of the sign before application of the protective overlay film and shall not be placed over the legend and bolt holes. The application method and exact location of the dot shall be determined by the manufacturer of the signs. For sign panels that have a minor dimension of 48 inches or less, no splice will be allowed in the retroreflective sheet except for the splice produced during the manufacturing of the retroreflective sheeting. For sign panels that have a minor dimension greater than 48 inches, only one horizontal splice will be allowed in the retroreflective sheeting. Unless specified by the manufacturer of the retroreflective sheeting, splices in retroreflective sheeting shall overlap by a minimum of one inch. Splices shall not be placed within 2 inches from edges of the panels. Except at the horizontal borders, the splices shall overlap in the direction from top to bottom of the sign to prevent moisture penetration. The retroreflective sheeting at the overlap shall not exhibit a color difference under the incident and reflected light. Signs exhibiting a significant color difference between daytime and nighttime shall be replaced immediately. Repairing sign panels will not be allowed except when approved by the Engineer. The Department will inspect signs at the Contractor's facility and delivery location, and in accordance with Section 6, Control of Materials" of the Standard Specifications. The Engineer will inspect signs for damage and defects before and after installation. Regardless of kind, size, type, or whether delivered by the Contractor or by a common carrier, signs shall be protected by thorough wrapping, tarping, or other methods to ensure that signs are not damaged by weather conditions and during transit. Signs shall be dry during transit and shipped on palettes, in crates, or tier racks. Padding and protective materials shall be placed between signs as appropriate. Finished sign panels shall be transported and stored by method Book One San Benancio/State Route 68 Intersection Improvements 510 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????that protects the face of signs from damage. The Contractor shall replace wet, damaged, and defective signs. Signs shall be stored in dry environment at all times. Signs shall not rest directly on the ground or become wet during storage. Signs, whether stored indoor or outdoor, shall be free standing. In areas of high heat and humidity signs shall be stored in enclosed climate-controlled trailers or containers. Signs shall be stored indoor if duration of the storage will exceed 30 days. Screen processed signs shall be protected, transported and stored as recommended by the manufacturer of the retroreflective sheeting. When requested, the Contractor shall provide the Engineer test samples of signs and materials used at various stages of production. Sign samples shall be 12" x 12" in size with applied background, letter or numeral, and border strip. The Contractor shall assume the costs and responsibilities resulting from the use of patented materials, equipment, devices, and processes for the Contractor's work. SHEET ALUMINUM Alloy and temper designations for sheet aluminum shall be in accordance with ASTM Designation: B 209. The Contractor shall furnish the Engineer a Certificate of Compliance in conformance with Section 6-1.07, Certificates of Compliance," of the Standard Specifications for the sheet aluminum. Sheet aluminum shall be pretreated in accordance to ASTM Designation: B 449. Surface of the sheet aluminum shall be cleaned, deoxidized, and coated with a light and tightly adherent chromate conversion coating free of powdery residue. The conversion coating shall be Class 2 with a weight between 10 milligrams per square foot and 35 milligrams per square foot, and an average weight of 25 milligrams per square foot. Following the cleaning and coating process, the sheet aluminum shall be protected from exposure to grease, oils, dust, and contaminants. Sheet aluminum shall be free of buckles, warps, dents, cockles, burrs, and defects resulting from fabrication. Base plate for standard route marker shall be die cut. RETROREFLECTIVE SHEETING The Contractor shall furnish retroreflective sheeting for sign background and legend in conformance with ASTM Designation: D 4956 and Prequalified and Tested Signing and Delineation Materials" of these Special Provisions. Retroreflective sheeting shall be applied to sign panels as recommended by the retroreflective sheeting manufacturer without stretching, tearing, and damage. Class 1, 3, or 4 adhesive backing shall be used for Type II, III, IV, VII, VIII, and IX retroreflective sheeting. Class 2 adhesive backing may also be used for Type II retroreflective sheeting. The adhesive backing shall be pressure sensitive and fungus resistant. When the color of the retroreflective sheeting determined from instrumental testing is in dispute, the Engineer's visual test will govern. PROCESS COLOR AND FILM The Contractor shall furnish and apply screened process color, non-reflective opaque black film, and protective overlay film of the type, kind, and product that are approved by the manufacturer of the retroreflective sheeting. The Contractor shall furnish the Engineer a Certificate of Compliance in accordance to Section 6-1.07, Certificates of Compliance," of the Standard Specifications for the screened process color, non-reflective opaque black film, and protective overlay film. Book One San Benancio/State Route 68 Intersection Improvements 511 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????The surface of the screened process color shall be flat and smooth. When the screened process colors determined from the instrumental testing in accordance to ASTM Designation: D 4956 are in dispute, the Engineer's visual test will g'vern. The Contractor shall provide patterns, layouts, and set-ups necessary for the screened process. The Contractor may use green, red, blue, and brown reverse-screened process colors for background and non-reflective opaque black film or black screened process color for legend. The coefficient of retroreflection for reverse-screened process colors on white retroreflective sheeting shall not be less than 70 percent of the coefficient of retroreflection specified in ASTM Designation: D 4956. The screened process colors and non-reflective opaque black film shall have the same outdoor weatherability as that of the retroreflective sheeting. After curing, screened process colors shall withstand removal when tested by applying 3M Company Scotch Brand Cellophane Tape No. 600 or equivalent tape over the color and removing with one quick motion at 90? angle. SINGLE SHEET ALUMINUM SIGN Single sheet aluminum signs shall be fabricated and furnished with or without frame. The Contractor shall furnish the sheet aluminum in accordance to Sheet Aluminum" of these Special Provisions. Single sheet aluminum signs shall be fabricated from sheet aluminum alloy 6061-T6 or 5052-H38. Single Sheet aluminum signs shall not have a vertical splice in the sheet aluminum. For signs with depth greater than 48 inches, one horizontal splice will be allowed in the sheet aluminum. Framing for single sheet aluminum signs shall consist of aluminum channel or rectangular aluminum tubing. The framing shall have a length tolerance of 1/8 inch. The face sheet shall be affixed to the frame with rivets of 3/16-inch diameter. Rivets shall be placed within the web of channels and shall not be placed less than 1/2 inch from edges of/zhe sign panels. Rivets shall be made of aluminum alloy 5052 and shall be anodized or treated with conversion coating to prevent corrosion. The exposed portion of rivets on the face of signs shall be the same color as the background or legend where the rivets are placed. Finished signs shall be flat within a tolerance of 1/32 inch per linear foot when measured across the plane of the sign in all directions. The finished signs shall have an overall tolerance within 1/8 inch of the detailed dimensions. Aluminum channels or rectangular aluminum tubings shall be welded together with the inert gas shielded-arc welding process using E4043 aluminum electrode filler wires as shown on the plans. Width of the filler shall be equal to wall thickness of smallest welded channel or tubing. MEASUREMENT AND PAYMENT Furnishing signs except for construction area signs) will be measured by the square foot and the quantity to be paid for will be the total area, in square feet, of the sign panel types installed in place. The contract price paid per square foot for furnish sign of the types specified in the Engineer's estimate shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in fabricating and furnishing the signs, including removable sign panel frame and fastening hardware, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. Book One San Benancio/State Route 68 Intersection Improvements 512 CONTRACT NO. 10- H 1065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??10-1.50 REINFORCED CONCRETE PIPE Reinforced concrete pipe shall conform to the provisions in Section 65, Reinforced Concrete Pipe," of the Standard Specifications and these Special Provisions. GENERAL Where embankment will not be placed over the top of the pipe, a relative compaction of not less than 85 percent shall be required below the pipe spring line for pipe installed using Method 1 backfill in trench, as shown on Standard Plan A62D. Where the pipe is to be placed under the traveled way, a relative compaction of not less than 90 percent shall be required unless the minimum distance between the top of the pipe and the pavement surface is the greater of 4 feet or one half of the outside diameter of the pipe. Except as otherwise designated by classification on the plans or in the specifications, joints for culvert and drainage pipes shall conform to the plans or specifications for standard joints. MATERIALS The concrete for reinforced concrete pipe shall contain not less than 470 pounds of cementitious material per cubic yard and have a water-cementitious material ratio that does not exceed 0.40 by weight. Supplementary cementitious material is optional. Reinforcement shall have a minimum cover of 1 inch. 10-1.51 CORRUGATED METAL PIPE Corrugated metal culverts shall conform to the provisions in Section 66, Corrugated Metal Pipe," of the Standard Specifications and these Special Provisions. Corrugated steel pipe shall be fabricated from zinc-coated steel sheet. 10-1.52 OVERSIDE DRAIN Hot mix asphalt overside drains shall conform to the provisions in Section 69, Overside Drains," of the Standard Specifications. 10-1.53 SLOPE PROTECTION Slope protection shall be placed or constructed in conformance with the provisions in Section 72, Slope Protection," o" the Standard Specifications. 10-1.54 MISCELLANEOUS CONCRETE CONSTRUCTION Minor concrete curb ramp) and curb) shall conform to the provisions in Section 73, Concrete Curbs and Sidewalks," of the Standard Specifications and these Special Provisions. Curb ramp detectable warning surface shall consist of raised truncated domes constructed or installed on curb ramps in conformance with the details shown on the plans and these Special Provisions. At the option of the Contractor, the detectable warning surface shall be prefabricated, cast-in-place, or stamped into the surface of the curb ramp. The color of the detectable warning surface shall be yellow conforming to Federal Standard 595B, Color No. 33538. Prefabricated detectable warning surface shall be in conformance with the requirements established by the Department of General Services, Division of State Architect and be attached in conformance with the manufacturer's recommendations. Cast-in-place and stamped detectable warning surfaces shall be painted in conformance with the provisions in Section 59-6, Painting Concrete," of the Standard Specifications. The finished surfaces of the detectable warning surface shall be free from blemishes. Book One San Benancio/State Route 68 Intersection Improvements 513 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??Prior to constructing the cast-in-place or stamping the detectable warning surface, the Contractor shall demonstrate the ability to produce a detectable warning surface conforming to the details shown on the plans and these Special Provisions by constructing a 24" x 24" test panel. The manufacturer shall provide a written 5-year warranty for prefabricated detectable warning surfaces, guaranteeing replacement when there is defect in the dome shape, color fastness, sound-on-cane acoustic quality, resilience, or attachment. The warranty period shall begin upon acceptance of the contract. Full compensation for constructing or furnishing and installing curb ramp detectable warning surfaces shall be considered as included in the contract price paid per cubic yard for minor concrete curb ramp) and no separate payment will be made therefor. 10-1.55 MISCELLANEOUS IRON AND STEEL Miscellaneous iron and steel shall conform to the provisions in Section 75, Miscellaneous Metal," of the Standard Specifications and these Special Provisions. Construction and installation of guide rail is measured and paid for as miscellaneous iron and steel. 10-1.56 MISCELLANEOUS METAL RESTRAINER ROD TYPE) Tie rod assemblies consisting of high strength rods, bearing plates, couplers, anchorage devices, and incidentals shall conform to the details shown on the plans and the provisions in Sections 15, Existing Highway Facilities" of the Standard Specifications and these Special Provisions. Tie rod assemblies shall conform to the materials and sampling provisions for prestressing steel in Section 50, Prestressing Concrete," of the Standard Specifications and the following: A. The high strength rods shall conform to the requirements of ASTM Designation: A 722/A 722M, including all supplementary requirements. B. All exposed steel parts, other than high strength rods, shall be galvanized. Galvanizing shall conform to the provisions in Section 75-1.05 Galvanizing," of the Standard Specifications. C. After installation, the exposed portion of threads on the high strength rods shall be cleaned by wire brushing and painted with 2 applications of unthinned commercial quality zinc-rich primer organic vehicle type). Spray cans shall not be used. D. Anchorage devices and couplers, conforming to the requirements specified herein, shall be of a type selected by the Contractor and shall include locking devices to prevent turning or loosening. E. The anchorage device and coupler shall develop not less than 90 percent of the specified ultimate tensile strength of the steel rod. F. The Contractor shall be responsible for determining the required lengths of the rod assemblies. G. The rod assemblies shall be shipped as a complete unit including anchorage device and coupler. Bearing plates shall conform to the requirements of ASTM Designation: A 36/A 36M. Tie rod assemblies will be measured by the pound and will be paid for as miscellaneous metal restrainer rod type). The contract price paid per pound for miscellaneous metal restrainer rod type) shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in installing grouted tie rod assemblies including bearing plates, couplers, and anchorage devices, complete in place, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. Book One San Benancio/State Route 68 Intersection Improvements 514 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??10-1.57 CHAIN LINK FENCE Chain link fence shall be Type CL-4, Vinyl-Clad and shall conform to the provisions in Section 80, Fences," of the Standard Specifications. Chain link fence Type CL-4, Vinyl-Clad) shall be black. 10-1.58 METAL BEAM GUARD RAILING Metal beam guard railing shall be constructed in conformance with the provisions in Section 83-1, Railings," of the Standard Specifications and these Special Provisions. Attention is directed to Order of Work" of these Special Provisions. Line posts shall be steel. Blocks shall be plastic. Prior to shipping from the supplier, galvanized steel posts for metal beam guardrailing, alternative terminal systems, and transition railings shall be acid washed in a 10 percent 10%) sulfuric acid solution for 40 seconds and then rinsed with water. Full compensation for etching shall be considered as included in the contract price paid per foot for metal beam guard railing and no additional compensation will be allowed therefor. ALTERNATIVE FLARED TERMINAL SYSTEM Alternative flared terminal system shall be furnished and installed as shown on the plans and in conformance with these Special Provisions. The allowable alternatives for a flared terminal system shall consist of one of the following or a Department approved equal. A. TERMINAL SYSTEM TYPE FLEAT) Terminal system Ty-e FLEAT) shall be a Flared Energy Absorbing Terminal 350 manufactured by Road Systems, Inc., located in Big Spring, Texas, and shall include items detailed for terminal system Type FLEAT) shown on the plans. The Flared Energy Absorbing Terminal 350 can be obtained from the distributor, Universal Industrial Sales, P.O. Box 699, Pleasant Grove, UT 84062, telephone 801) 785-0505 or from the distributor, Gregory Highway Products, 4100 13th Street, S.W., Canton, OH 44708, telephone 330) 477-4800. B. TERMINAL SYSTEM TYPE SRT) Terminal system Type SRT) shall be an SRT-350 Slotted Rail Terminal 8-post system) as manufactured by Trinity Industries, Inc., and shall include items detailed for terminal system Type SRT) shown on the plans. The SRT-350 Slotted Rail Terminal 8-post system) can be obtained from the manufacturer, Trinity Industries, Inc., P.O. Box 99, 950 West 400S, Centerville, UT 84014, telephone 800) 772-7976. The Contractor shall provide the Engineer with a Certificate of Compliance from the manufacturer in conformance with the provisions in Section 6-1.07, Certificates of Compliance," of the Standard Specifications. The Certificate of Compliance shall certify that the terminal systems furnished conform to the contract plans and specifications, conform to the prequalified design and material requirements, and were manufactured in conformance with the approved quality control program. Terminal systems shall be installed in conformance with the manufacturer's installation instructions and these requirements. Each terminal system installed shall be identified by painting the type of terminal system in neat black letters and figures 2 inches high on the backside of the rail element between system posts numbers 4 and 5. For terminal system Type SRT), the steel foundation tubes with soil plates attached shall be, at the Contractor's option, either driven, with or without pilot holes, or placed in drilled holes. Book One San Benancio/State Route 68 Intersection Improvements 515 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Space around the steel foundation tubes shall be backfilled with selected earth, free of rock, placed in layers approximately 4 inches thick and each layer shall be moistened and thoroughly compacted. The wood terminal posts shall be inserted into the steel foundation tubes by hand and shall not be driven. Before the wood terminal posts are inserted, the inside surfaces of the steel foundation tubes to receive the wood posts shall be coated with a grease which will not melt or run at a temperature of 149? F or less. The edges of the wood terminal posts may be slightly rounded to facilitate insertion of the post into the steel foundation tubes. For terminal system Type FLEAT), the soil tubes shall be, at the Contractor's option, driven with or without pilot holes, or placed in drilled holes. Space around the steel foundation tubes shall be backfilled with selected earth, free of rock, placed in layers approximately 4 inches thick and each layer shall be moistened and thoroughly compacted. Wood posts shall be inserted into the steel foundation tubes by hand. Before the wood terminal posts are inserted, the inside surfaces of the steel foundation tubes to receive the wood posts shall be coated with a grease which will not melt or run at a temperature of 149? F or less. The edges of the wood posts may be slightly rounded to facilitate insertion of the post into the steel foundation tubes. Surplus excavated material remaining after the terminal system has been installed shall be disposed of in a uniform manner along the adjacent roadway where designated by the Engineer. The contract unit price paid for alternative flared terminal system shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in furnishing and installing alternative flared terminal system, complete in place, including excavation, backfill and disposal of surplus material, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. ALTERNATIVE IN-LINE TERMINAL SYSTEM Alternative in-line terminal system shall be furnished and installed as shown on the plans and in conformance with these Special Provisions. The allowable alternatives for an in-line terminal system shall consist of one of the following or a Department approved equal. A. TERMINAL SYSTEM TYPE SKT) Terminal system Ty-e SKT) shall be a SKT 350 Sequential Kinking Terminal manufactured by Road Systems, Inc., located in Big Spring, Texas, and shall include items detailed for terminal system Type SKT) shown on the plans. The SKT 350 Sequential Kinking Terminal can be obtained from the distributor, Universal Industrial Sales, P.O. Box 699, Pleasant Grove, UT 84062, telephone 801) 785-0505 or from the distributor, Gregory Highway Products, 4100 13th Street, S.W., Canton, OH 44708, telephone 330) 477-4800. B. TERMINAL SYSTEM TYPE ET) Terminal system Type ET) shall be an ET-2000 PLUS 4-tube system) extruder terminal as manufactured by Trinity Industries, Inc., and shall include items detailed for terminal system Type ET) shown on the plans. The ET-2000 PLUS 4-tube system) extruder terminal can be obtained from the manufacturer, Trinity Industries, Inc., P.O. Box 99, 950 West 400S, Centerville, UT 84014, telephone 800) 772-7976. The Contractor shall provide the Engineer with a Certificate of Compliance from the manufacturer in conformance with the provisions in Section 6-1.07, Certificates of Compliance," of the Standard Specifications. The Certificate of Compliance shall certify that the terminal systems furnished conform to the contract plans and specifications, conform to the Book One San Benancio/State Route 68 Intersection Improvements 516 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??prequalified design and material requirements, and were manufactured in conformance with the approved quality control program. Terminal systems shall be installed in conformance with the manufacturer's installation instr'ctions and these requirements. Each terminal system installed shall be identified by painting the type of terminal system in neat black letters and figures 2 inches high on the backside of the rail element between system posts numbers 4 and 5. For terminal system Type ET) the steel foundation tubes with soil plates attached shall be, at the Contractor's option, either dri'en, with or without pilot holes, or placed in drilled holes. Space around the steel foundation tubes shall be backfilled with selected earth, free of rock, placed in layers approximately 4 inches thick and each layer shall be moistened and thoroughly compacted. The wood terminal posts shall be inserted into the steel foundation tubes by hand and shall not be driven. Before the wood terminal posts are inserted, the inside surfaces of the steel foundation tubes to receive the wood posts shall be coated with a grease which will not melt or run at a temperature of 149? F or less. The edges of the wood terminal posts may be slightly rounded to facilitate insertion of the post into the steel foundation tubes. For terminal system Type SKT) the soil tubes shall be, at the Contractor's option, driven with or without pilot holes, or placed in drilled holes. Space around the steel foundation tubes shall be backfilled with selected earth, free of rock, placed in layers approximately 4 inches thick and each layer shall be moistened and thoroughly compacted. Wood posts shall be inserted into the steel foundation tubes by hand. Before the wood terminal posts are inserted, the inside surfaces of the steel foundation tubes to receive the wood posts shall be coated with a grease which will not melt or run at a temperature of 149? F or less. The edges of the wood posts may be slightly rounded to facilitate insertion of the post into the steel foundation tubes. Surplus excavated material remaining after the terminal system has been installed shall be disposed of in a uniform manner along the adjacent roadway where designated by the Engineer. The contract unit price paid for alternative in-line terminal system shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in furnishing and installing alternative in-line terminal system, complete in place, including excavation, backfill and disposal of surplus material, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.59 VEGETATION CONTROL MINOR CONCRETE) This work shall consist of furnishing and constructing vegetation control as specified in these Special Provisions, as shown on the plans and as directed by the Engineer. MATERIALS Minor Concrete Concrete for vegetation control shall consist of a mixture of portland cement concrete, and concrete reinforcing fibers. Concrete shall conform to the provisions for minor concrete in Section 90, Portland Cement Concrete," of the Standard Specifications and these Special Provisions. Components of the concrete for vegetation control shall be incorporated homogeneously at the concrete plant before delivery to the work site. Reinforcing fibers for minor concrete shall consist of polypropylene fibers with an engineered sinusoidal contoured profile, manufactured specifically for use as concrete reinforcement. Reinforcing fiber shall consist of a blended ratio of 4 parts of coarse monofilament fibers with maximum individual fiber lengths of 2-inch + 1/2-inch and 1 part of fine fibrillated polypropylene fibers of various lengths and thickness. Reinforcing fibers shall be of a commercial source, combined with the concrete in proportions as recommended by the manufacturer. Book One San Benancio/State Route 68 Intersection Improvements 517 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????The color of the concrete shall be earthtone tan. If a coloring agent is added and the Contractor elects to use the curing compound method for curing concrete, the curing compound shall be curing compound 6) specified in Section 90-7, Curing Concrete," of the Standard Specifications. Grout Grout for vegetation control shall conform to the provisions in Section 19-3.062, Slurry Cement Backfill," of the Standard Specifications and these Special Provisions. Not more than 188 pounds of cement shall be used for each cubic yard of material produced. Aggregate for grout shall be commercial quality concrete sand. Color of grout shall match the color of the minor concrete used to construct the vegetation control. Landscape Fabric Landscape fabric shall be manufactured from thermally spun bonded polypropylene fabric and shall conform to the following: Specification Minimum Requirement Grab Tensile Strength 135 lbs Grab Elongation 70% UV Resistance 70% 150 hours Weight 3 ounces per square yard Staples for landscape fabric shall be 2 inches in width, 6 inches in length and 11-gauge wire. A copy of the manufacturer's product sheet, together with instructions for installation, shall be furnished to the Engineer 5 business days before installation. A Certificate of Compliance for the landscape fabric shall be furnished to the Engineer in conformance with the provisions in Section 6-1.07, Certificates of Compliance," of the Standard Specifications. SITE PREPARATION Clearing Areas to receive vegetation control shall be cleared of trash and debris in conformance with Section 16, Clearing and Grubbing," of the Standard Specifications and these Special Provisions. Vegetation shall be removed to the ground. Cleared trash, debris and removed vegetation shall be disposed of outside the highway right of way in conformance with Section 7-1.13, Disposal of Material Outside the Highway Right of Way," of the Standard Specifications. PLACEMENT Landscape fabric shall be stapled to prevent shifting during concrete placement. Fabric shall lie flat, smooth, without bulges or wrinkles, and maintain uniform contact with the soil surface. Grout shall be spread to completely fill voids as shown on the plans. Minor concrete shall be struck off and compacted until a layer of mortar has been brought to the surface. Minor concrete shall receive a broom finish. Two weakened plane joints shall be constructed in the minor concrete at each post location, perpendicular to the rail and in line with the edge of the grout. The joints shall be constructed to a minimum depth of one inch by scoring with a tool that will leave the corners rounded and ensure free movement of concrete at the joint. Book One San Benancio/State Route 68 Intersection Improvements 518 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????The finished grade of vegetation control shall be uniform; maintaining planned flow lines, slope gradient and contours of the project site. MEASUREMENT AND PAYMENT Quantities of vegetation control minor concrete) will be measured by the square yard computed from measurements of actual areas placed. Vegetation control minor concrete) placed outside the dimensions shown on the plans will not be paid for. The contract price paid per square yard for vegetation control minor concrete) shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing vegetation control minor concrete), including clearing trash, debris and vegetation and excavation, complete in place, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.60 CABLE RAILING Cable railing shall conform to the provisions in Section 83-1, Railings," of the Standard Specifications. 10-1.61 CALIFORNIA ST-20 BRIDGE RAIL California ST-20 bridge rail shall consist of metal railing mounted on a reinforced concrete parapet as shown on the plans and as specified in these Special Provisions. Metal railing shall conform to the provisions in Section 83-1.02D, Steel Bridge Railing" of the Standard Specifications. Stud bolts shall conform to the provisions for stud connectors in Section 55-2, Materials," of the Standard Specifications. Reinforced concrete shall conform to the provisions in Section 51, Concrete Structures," and Section 52, Reinforcement," of the Standard Specifications. Ferrous metal parts shall be galvanized. Galvanizing shall conform to the provisions in Section 75-1.05, Galvanizing," of the Standard Specifications. Exposed galvanized surfaces shall be prepared and painted in conformance with the provisions in Section 59-3, Painting Galvanized Surfaces," of the Standard Specifications and these Special Provisions. Exposed areas of galvanized surfaces shall receive a minimum of 2 finish coats of paint conforming to either the requirements for White Tintable Finish Paint-Waterborne, Formula PWB-164B, or an exterior grade latex paint meeting the requirements for SSPC-Paint 24, Latex Semi-Gloss Exterior Topcoat," of the SSPC: The Society for Protective Coatings," and conforming to the following: A. No visible color change in the finish coats shall occur when tested in conformance with the requirements in ASTM Designation: G 53 using FS 40 UV-B bulbs for a minimum of 38 cycles. The cycle shall be 4 hours of ultraviolet UV) exposure at 140? F and 4 hours of condensate exposure at 104? F. B. The vehicle shall be an acrylic or modified acrylic copolymer with a minimum of necessary additives. The total dry film thickness of all applications of the first finish coat shall be not less than 2 mils. Except as approved by the Engineer, a minimum drying time of 12 hours shall be allowed between finish coats. The second finish coat color shall match Federal Standard 595C, No. 30140. The total dry film thickness of all applications of the second finish coat shall be not less than 2 mils. Book One San Benancio/State Route 68 Intersection Improvements 519 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????The 2 finish coats shall be applied in 2 or more applications to a total dry film thickness of not less than 4 mils nor more than 8 mils. There shall be no chemical treatment of galvanized surfaces prior to cleaning and painting. Nuts, bolts, and washers shall be galvanized after fabrication and shall not be painted. The Contractor shall submit working drawings for the California ST-20 bridge railing in conformance with the provisions in Section 5-1.02, Plans and Working Drawings," of the Standard Specifications. The working drawings shall include the following: A. Details for venting and pick-up holes in rails and sleeves. B. Railing layout. C. Complete details for the construction of the work including methods of construction, sequence of shop and field assembly, and installation procedures. Working drawings shall be 11 x 17" minimum in size and shall be printed on 20-lb minimum) bond paper. Each drawing shall include the name of the structure as shown on the plans, the District-County-Route-Post Mile, bridge number, and contract number. The working drawings shall be clearly legible, and text shall be a 12-point minimum font size. The Contractor shall submit 9 copies of each set of drawings to the Engineer for review and approval. The Contractor shall allow 25 days after complete drawings are submitted for the review. Upon approval, the Engineer will stamp or mark the drawings approved and return 2 sets of these drawings to the Contractor for use during construction. In the event the Engineer fails to complete the review within the time allowed, and if, in the opinion of the Engineer, the Contractor's controlling operation is delayed or interfered with by reason of the Engineer's delay in completing the review, the Contractor will be compensated for any resulting loss in the same manner as provided for in Section 8-1.09, Right of Way Delays," of the Standard Specifications. California ST-20 bridge railing will be measured by the linear foot from end to end along the face of the railing, including reinforced concrete end blocks and intermediate posts. The contract price paid per linear foot for California ST-20 bridge rail shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing the railing, complete in place, including the reinforced concrete parapet, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.62 TRANSITION RAILING TYPE WB) Transition railing Type WB) shall be furnished and installed in conformance with details shown on the plans, the provisions in Section 83-2, Barriers," of the Standard Specifications and these Special Provisions. The 10-gage rail elements shall conform to the requirements of Class B, Type 1 thrie beam guard railing as shown in AASHTO Designation: M 180. End caps shall conform to the requirements of Class A, Type 1 thrie beam guard railing as shown in AASHTO Designation: M 180. Surplus excavated material remaining after the transitional railing Type WB) has been constructed shall be disposed of in a uniform manner along the adjacent roadway where designated by the Engineer. The contract unit price paid for transition railing Type WB) shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in furnishing and installing transition railing Type WB), complete in place, including drilling holes for wood posts, driving posts, backfill, and disposal of surplus material, as shown Book One San Benancio/State Route 68 Intersection Improvements 520 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. 10-1.63 CONCRETE BARRIER Concrete barriers shall conform to the provisions in Section 83-2, Barriers," of the Standard Specifications and these Special Provisions. The provisions of the third paragraph in Section 83-2.02D(4), Finishing," of the Standard Specifications shall not apply. At those locations shown on the plans, concrete barrier markers shall be cemented to the barrier in conformance with the manufacturer's recommendations. 10-1.64 PAINT TRAFFIC STRIPE AND PAVEMENT MARKING Painted traffic stripes traffic lines) and pavement markings shall be applied in conformance with the provisions in Section 84, Traffic Stripes and Pavement Markings," of the Standard Specifications and these Special Provisions. Traffic stripe and pavement marking paint shall conform to the requirements in State Specification No. PTWB-01. The color of the painted traffic stripes and pavement markings shall conform to the requirements in ASTM Designation: D 6628-01. Retroreflectivity of the paint traffic stripes and pavement markings shall conform to the requirements in ASTM Designation: D 6359-99. White painted traffic stripes and pavement markings shall have a minimum initial retroreflectivity of 250 mcd m-2 lx-1. Yellow painted traffic stripes and pavement markings shall have a minimum initial retroreflectivity of 150 mcd m2 lx-1. At the option of the Contractor, permanent traffic striping and pavement marking tape conforming to the provisions in Prequalified and Tested Signing and Delineation Materials" of these Special Provisions may be placed instead of painted traffic stripes and pavement markings. Permanent tape, if used, shall be placed in conformance with the manufacturer's specifications. If permanent tape is placed instead of painted traffic stripes and pavement markings, the tape will be measured and paid for by the linear foot as paint traffic stripe and by the square foot as paint pavement marking of the number of coats designated in the Engineer's Estimate. 10-1.65 THERMOPLASTIC TRAFFIC STRIPE AND PAVEMENT MARKING Thermoplastic traffic stripes traffic lines) and pavement markings shall be applied in conformance with the provisions in Section 84, Traffic Stripes and Pavement Markings," of the Standard Specifications and these Special Provisions. Thermoplastic material shall be free of lead and chromium, and shall conform to the requirements in State Specification PTH-02ALKYD. Retroreflectivity of the thermoplastic traffic stripes and pavement markings shall conform to the requirements in ASTM Designation: D 6359-99. White thermoplastic traffic stripes and pavement markings shall have a minimum initial retroreflectivity of 250 mcd m2 lx-1. Yellow thermoplastic traffic stripes and pavement markings shall have a minimum initial retroreflectivity of 150 mcd m-2 1x-1. Where striping joins existing striping, as shown on the plans, the Contractor shall begin and end the transition from the existing striping pattern into or from the new striping pattern a sufficient distance to ensure continuity of the striping pattern. Thermoplastic material for traffic stripes shall be applied at a minimum rate of 0.20-lb/ft. The minimum application rate is based on a solid stripe of 4 inches in width. Book One San Benancio/State Route 68 Intersection Improvements 521 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Thermoplastic traffic stripes shall be applied at the minimum thickness and application rate as specified below. The minimum application rate is based on a solid stripe of 4 inches in width. Minimum Minimum Stripe Thickness Application Rate inch) lb/ft) 0.079 0.27 0.098 0.34 Thermoplastic traffic stripes and pavement markings shall be free of runs, bubbles, craters, drag marks, stretch marks, and debris. At the option of the Contractor, permanent traffic striping and pavement marking tape conforming to the provisions in Prequalified and Tested Signing and Delineation Materials" of these Special Provisions may be placed instead of the thermoplastic traffic stripes and pavement markings specified herein. Permanent tape, if used, shall be installed in conformance with the manufacturer's specifications. If permanent tape is placed instead of thermoplastic traffic stripes and pavement markings, the tape will be measured and paid for by the linear foot as thermoplastic traffic stripe and by the square foot as thermoplastic pavement marking. 10-1.66 PAVEMENT MARKERS Pavement markers shall be placed in conformance with the provisions in Section 85, Pavement Markers," of the Standard Specifications and these Special Provisions. Attention is directed to Traffic Control System For Lane Closure" of these Special Provisions regarding the use of moving lane closures during placement of pavement markers with bituminous adhesive. The Contractor shall furnish the Engineer certificates of compliance for the pavement markers in conformance with the provisions in Section 6-1.07, Certificates of Compliance," of the Standard Specifications. Retroreflective pavement markers shall be marked as abrasion resistant on the body of the markers. SECTION 10-2. HIGHWAY PLANTING AND IRRIGATION SYSTEMS 10-2.01 GENERAL The work performed in connection with highway planting and irrigation systems shall conform to the provisions in Section 20, Erosion Control and Highway Planting," of the Standard Specifications and these Special Provisions. PROGRESS INSPECTIONS Progress inspections will be performed by the Engineer for completed highway planting and irrigation system work at designated stages during the life of the contract. Progress inspections will not relieve the Contractor of responsibility for installation in conformance with the Special Provisions, plans and Standard Specifications. Work within an area shall not progress beyond each stage until the inspection has been completed, corrective work has been performed, and the work is approved, unless otherwise permitted by the Engineer. The requirements for progress inspections will not preclude additional inspections of work by the Engineer at other times during the life of the contract. Book One San Benancio/State Route 68 Intersection Improvements 522 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????The Contractor shall notify the Engineer, in writing, at least 4 working days prior to completion of the work for each stage of an area and shall allow a minimum of 3 working days for the inspection. Progress inspections will be performed at the following stages of work: A. Before planting begins and after completion of the work specified for planting in Section 20-4.03, Preparing Planting Areas," of the Standard Specifications. B. Before plant establishment work begins and after completion of the work specified for planting in Section 20-4.05, Planting," of the Standard Specifications. C. At intervals of one month during the plant establishment period. COST BREAK-DOWN The Contractor shall furnish the Engineer a cost break-down for the contract lump sum items of highway planting and irrigation system. Cost break-down tables shall be submitted to the Engineer for approval within 15 working days after the contract has been approved. Cost break-down tables will be approved, in writing, by the Engineer before any partial payment will be made for the applicable items of highway planting and irrigation system involved. Cost break-downs shall be completed and furnished in the format shown in the samples of the cost break-downs included in this section. Line item descriptions of work shown in the samples are the minimum to be submitted. Additional line item descriptions of work may be designated by the Contractor. If the Contractor elects to designate additional line item descriptions of work, the quantity, value and amount for those line items shall be completed in the same manner as for the unit descriptions shown in the samples. The line items and quantities given in the samples are to show the manner of preparing the cost break-downs to be furnished by the Contractor. The Contractor shall determine the quantities required to complete the work shown on the plans. The quantities and their values shall be included in the cost break-downs submitted to the Engineer for approval. The Contractor shall be responsible for the accuracy of the quantities and values used in the cost break-downs submitted for approval. The sum of the amounts for the line items of work listed in each cost break-down table for highway planting and for irrigation system work shall be equal to the contract lump sum price bid for Highway Planting and Irrigation System, respectively. Overhead and profit shall be included in each individual line item of work listed in a cost break-down table. No adjustment in compensation will be made in the contract lump sum prices paid for highway planting and irrigation system due to differences between the quantities shown in the cost break-downs furnished by the Contractor and the quantities required to complete the work as shown on the plans and as specified in these Special Provisions. Individual line item values in the approved cost break-down tables will be used to determine partial payments during the progress of the work and as the basis for calculating an adjustment in compensation for the contract lump sum items of highway planting and irrigation system due to changes in line items of work ordered by the Engineer. When the total of ordered changes to line items of work increases or decreases the lump sum price bid for either Highway Planting or Irrigation System by more than 25 percent, the adjustment in compensation for the applicable lump sum item will be determined in the same manner specified for increases and decreases in the total pay quantity of an item of work in Section 4-1.03B, Increased or Decreased Quantities," of the Standard Specifications. Book One San Benancio/State Route 68 Intersection Improvements 523 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????HIGHWAY PLANTING COST BREAK-DOWN Contract No. 10-111065 UNIT DESCRIPTION UNIT APPROXIMATE QUANTITY VALUE AMOUNT PLANT GROUP A) EA 372 COMMERCIAL FERTILIZER PACKET) EA 394 ROOT PROTECTORS EA 112 FOLIAGE PROTECTORS EA 112 MULCH CY ROADSIDE CLEARING Ls 1 TOTAL IRRIGATION SYSTEM COST BREAK-DOWN Contract No. 10-111065 UNIT DESCRIPTION UNIT APPROXIMATE QUANTITY VALUE AMOUNT 1 /" PLASTIC PIPE SCH 40) FT 190 1" PLASTIC PIPE SCH-4") FT 540 3/" PLASTIC PIPE SCH-4") FT 950 SPRINKLERS TYPE D-1) EA 788 1" FILTER ASSEMBLY UNI" EA 4 2" CAM COUPLER ASSEMBL" EA 4 TOTAL 10-2.02 BLANK) 10-2.03 BLANK) 10-2.04 HIGHWAY PLANTING The work performed in connection with highway planting shall conform to the provisions in Section 20-4, Highway Planting," o" the Standard Specifications and these Special Provisions. HIGHWAY PLANTING MATERIALS Mulch Mulch must consist of either wood chips or tree bark or a combination of both. Wood chips produced from tree trimmings may contain leaves and small twigs. Commercial Fertilizer Slow Release) Commercial fertilizer slow release) shall be a pelleted or granular form, shall be slow or controlled release with a nutrient release over an 8-month to 12-month period, and shall fall within the following guaranteed chemical analysis range: Book One San Benancio/State Route 68 Intersection Improvements 524 CONTRACT NO. 10- 111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Ingredient Percentage Nitrogen 16-21 Phosphoric Acid 6-8 Water Soluble Potash 4-10 Commercial Fertilizer Packets) Commercial fertilizer packet) shall be slow or controlled release and shall be in a biodegradable packet form. The packet shall gradually release nutrients over a 12-month period. Each packet shall have a weight of 10 g 1 g and shall have the following guaranteed chemical analysis: Ingredient Percentage Nitrogen 20 Phosphoric Acid 10 Water Soluble Potash 5 ROADSIDE CLEARING Before preparing planting areas trash and debris shall be removed from these areas as required under Construction Site Management of these Special Provisions. The project area shall be cleared as specified herein: A. Weeds shall be killed and removed within an area 6 feet in diameter centered at each plant location. B. Weeds shall be mowed within the limits of mowing, except for areas where weeds are to be killed. C. Disposal of weeds killed during the initial roadside clearing will be required. After the initial roadside clearing is complete, additional roadside clearing work shall be performed as necessary to maintain the areas, as specified above, in a neat appearance until the start of the plant establishment period. This work shall include the following: A. Trash and debris shall be removed. B. Rodents shall be controlled. C. Weed growth shall be killed before the weeds reach the seed stage of growth or exceed 6 inches in length, whichever occurs first. D. Weeds in plant basins, including basin walls, shall be removed by hand pulling, after the plants have been planted. E. Areas outside the areas specified to be cleared of weeds shall be mowed. Weed Control Weed control shall also conform to the following: A. Stolon type weeds shall be killed with glyphosate. B. Areas to be mowed shall be mowed when weed height exceeds 12 inches. Weeds shall be mowed to a height of 2 inches to 6 inches. C. Disposal of mowed material and killed weeds after initial roadside clearing will not be required, unless otherwise directed by the Engineer. When directed by the Engineer, mowed material and killed weeds shall be disposed of and the disposal will be paid for as extra work as provided in Section 4-1.03D of the Standard Specifications. Roadside clearing work shall not include work required to be performed as clearing and grubbing as specified in Section 16, Clearing and Grubbing," of the Standard Specifications. Book One San Benancio/State Route 68 Intersection Improvements 525 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????PESTICIDES Pesticides used to control weeds shall conform to the provisions in in the section, Clearing and Grubbing," elsewhere in these Special Provisions. PLANTING Place commercial fertilizer packets in the backfill of each plant at the time of planting and at the rate shown on the Plant List to within 6 inches to 8 inches of the soil surface and approximately one inch from the roots. When more than one fertilizer packet is required per plant, the packets must be distributed evenly around the root ball. Root protectors must conform to the provisions in Root Protectors" of here Special Provisions. Planting and seeding operations must take place following completion of final grading and ground preparation between October 15 and February 1. A qualified Biologist/Revegetation Specialist, hired by the County, will monitor the revegetation during construction and the plant establishment period. Allow the biologist to access the project site at all times. FOLIAGE PROTECTOR Foliage protectors shall be installed in conformance with the details shown on the plans, the provisions in Section 20-2.13A, Foliage Protector," and Section 20-4, Highway Planting," of the Standard Specifications and these Special Provisions. Each foliage protector shall be held in place with two round stakes at least 2 inch nominal diameter or square stakes at least 2 inch x 2 inch in cross sectional dimensions. Stakes shall be made of wood and at least 5 feet in length. Support stakes shall be installed vertically, embedded in the soil, and fastened to the wire cylinder at 6 inch maximum centers. Wire cylinder shall be snug against stakes yet loose enough to be raised for application of pesticides or to perform weeding within the plant basin. Steel stakes shall not be used. ROOT PROTECTOR Root protectors shall be installed in conformance with the details shown on the plans, the provisions in Section 20-2.13B, Root Protector," and"Section 20-4, Highway Planting," of the Standard Specifications and these Special Provisions. PLANT ESTABLISHMENT WORK The plant establishment period shall be Type 2 and shall not be less than 750 working days. Attention is directed to Relief From Maintenance and Responsibility" in these Special Provisions regarding relief from maintenance and protection. Commercial fertilizer slow release) shall be applied to trees, shrubs, vines and ground cover during the first week of March and November of each year. Commercial fertilizer shall be applied at the rates shown on the plans and shall be spread with a mechanical spreader wherever possible. The Contractor shall submit a watering schedule to the Engineer for use during the plant establishment period. The schedule shall be submitted not less than 15 days prior to the start of plant establishment. Weeds within plant basins, including basin walls, shall be controlled by hand pulling. Weeds within mulched areas and outside of plant basins shall be controlled by killing. Book One San Benancio/State Route 68 Intersection Improvements 526 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Weeds shall be mowed within the limits of mowing except for areas where weeds are to be killed. Except as specified in these Special Provisions, disposal of mowed material will not be required unless ordered by the Engineer. Disposal of mowed material, as directed by the Engineer, will be paid for as extra work as provided in Section 4-1.03D,"Extra Work," of the Standard Specifications. Replacement plants shall be the same size as originally specified. During the plant establishment period, if plants become restricted by foliage protectors, the tops of foliage protectors shall be removed. Foliage protectors shall be completely removed, including the support stakes, within 15 working days prior to completion of the plant establishment period. The final inspection shall be performed in conformance with the provisions in Section 5-1.13, Final Inspection," of the Standard Specifications and shall be completed a minimum of 20 working days before the estimated completion of the contract. 10-2.05 IRRIGATION SYSTEMS Irrigation systems shall be furnished and installed in conformance with the provisions in Section 20-5, Irrigation Systems," of the Standard Specifications, except materials containing asbestos fibers shall not be used. Contractor is responsible to remove all irrigation components prior to completion of the contract. VALVE BOXES Valve boxes shall conform to the provisions in Section 20-2.24, Valve Boxes," of the Standard Specifications, except as otherwise provided herein. PIPE Plastic Pipe Plastic pipe supply lines must be polyvinyl chloride PVC) 1120 or 1220 pressure rated pipe with the minimum pressure rating PR) shown on the plans. Plastic pipe supply lines less than 3 inches in diameter must have solvent cemented type joints. Primers must be used on the solvent cemented type joints. Plastic pipe supply lines must include pipe anchors and be installed on grade. Plastic pipe irrigation lines) must include staples and be installed on grade. Staples must be made of 11-gauge minimum steel wire and must be U-shaped with 6 inch legs and a 1 inch crown. Staples must be installed a maximum of 6 feet on center. Fittings for plastic pipe supply lines with a pressure rating PR) of 315 must be Schedule 80. Full compensation for pipe anchors is included in the contract price paid per linear foot for the various sizes of Plastic Pipe Supply Line) and no additional compensation will be allowed therfor. SPRINKLERS SPRINKLER TYPE D) Type D sprinklers shall be plastic, nonadjustable, pressure compensating emitters with automatic flushing action. Emitter shall be regulated by dual silicone diaphragms. Emitters shall have the flow rate and operating pressure range shown on the plans. Emitters shall be installed as shown on the plans and in conformance with the manufacturer's written instructio's. Two copies of the written instructions shall be furnished to the Engineer prior to installation. Book One San Benancio/State Route 68 Intersection Improvements 527 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Emitters shall be equipped with a single barb which shall be inserted into Plastic Pipe Irrigation Line). FILTER ASSEMBLY UNIT A filter assembly unit shall consist of a filter housing, a reusable filter cartridge, fittings, and pipe as shown on the plans. Filter assembly units shall include pipe anchors and be installed on grade. Filter assembly units shall withstand a cold water working pressure of 150 psi. Pressure loss through the filter assembly units shall not exceed the following: FILTER ELEMENT SIZE inches) MAX FLOW RATE GPM) PRESSURE LOSS AT MAX FLOW psi) 1 18 4 Filter housings shall be manufactured of reinforced polypropylene plastic. Filter cartridges shall be threaded plastic rings attached to one another to produce a reusable cylindrical form filter. Filters shall be capable of 140-mesh size mesh filtration. CAM COUPLER ASSEMBLY Cam coupler assemblies shall be fabricated as shown on the plans and in conformance with these Special Provisions. Cam coupler assemblies shall consist of the following: A. Cam coupler, B. Dust cap, C. Check valve, D. Pipes, E. Fittings, F. Portland cement concrete support, and G. Valve box with woven wire cloth and gravel. Cam couplers shall be manufactured of brass or bronze. Cam coupler assemblies shall withstand a cold water working pressure of 150 psi. SECTION 10-3. ELECTRICAL SYSTEMS 10-3.01 DESCRIPTION Traffic signals and lighting shall conform to the provisions in Section 86, Electrical Systems," of the Standard Specifications and these Special Provisions. 10-3.02 COST BREAK-DOWN Cost break-downs shall conform to the provisions in Section 86-1.03, Cost Break-Down," of the Standard Specifications and these Special Provisions. The Engineer shall be furnished a cost break-down for each contract lump sum item of work described in this Section 10-3. The cost break-down shall be submitted to the Engineer for approval within 15 days after the contract has been approved. The cost break-down shall be approved, in writing, by the Engineer before any partial payment for the items of electrical work will be made. Book One San Benancio/State Route 68 Intersection Improvements 528 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????10-3.03 MAINTAINING EXISTING AND TEMPORARY ELECTRICAL SYSTEMS Traffic signal system shutdowns shall be limited to periods allowed for lane closures listed or specified in Maintaining Traffic" of these Special Provisions. 10-3.04 CAST-IN-DRILLED-HOLE CONCRETE PILE FOUNDATIONS GENERAL Summary This work includes constructing cast-in-drilled-hole concrete pile foundations for traffic signal and lighting standards. Comply with Section 86-2.03, Foundations," of the Standard Specifications. MATERIALS Concrete must contain not less than 590 pounds of cementitious material per cubic yard. CONSTRUCTION For standards located in sidewalk areas, the pile foundation must be: 1. Placed to final sidewalk grade before the sidewalk is placed 2. Square for the top 4 inches PAYMENT Payment for cast-in-drilled-hole concrete pile foundations shall conform to the provisions in Section 86-8, Payment," of the Standard Specifications. 10-3.05 STANDARDS, STEEL PEDESTALS, AND POSTS Standards, steel pedestals, and posts for traffic signal and lighting standards shall conform to the provisions in Section 86-2.04, Standards, Steel Pedistals and Posts," of the Standard Specifications, Steel Structures" of these Special Provisions, and the following requirements. Steel bolts not designated on the plans as high-strength HS) or stainless steel shall be for general applications and shall conform to the requirements in ASTM Designation: A 307. Anchor bolts shall conform to the requirements in ASTM Designation: F 1554, Grade 36. High-strength HS) anchor bolts shall conform to the requirements in ASTM Designation: F 1554, Grade 105. The sign mounting hardware shall be installed at the locations shown on the plans. Non-illuminated street name signs shall be installed on signal mast arms using a minimum 3/4" x 0.020" round edge stainless steel strap and saddle bracket. The strap shall be wrapped at least twice around the mast arm, tightened, and secured with a 3/4" stainless strap seal. The sign panel shall be leveled and hardware securely tightened. Handhole reinforcement rings for standards, steel pedestals, and posts shall be continuous around the handholes. Type 1 standards shall be assembled and set with the handhole on the downstream side of the pole in relation to traffic or as shown on the plans. 10-3.06 CONDUIT Conduit to be installed underground shall be Type 3 unless otherwise specified. The conduit in a foundation and between a foundation and the nearest pull box shall be Type 3. When Type 3 conduit is placed in a trench not in pavement or under portland cement concrete sidewalk), after the bedding material is placed and the conduit is installed, the trench Book One San Benancio/State Route 68 Intersection Improvements 529 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????shall be backfilled to not less than 4 inches above the conduit with minor concrete conforming to the provisions in Section 90-10, Minor Concrete," of The Standard Specifications, except the concrete shall contain not less than 421 pounds of cementitious material per cubic yard. The remaining trench shall be backfilled to finished grade with backfill material. After conductors have been installed, the ends of conduits terminating in pull boxes, service equipment enclosures, and controller cabinets shall be sealed with an approved type of sealing compound. At locations where conduit is required to be installed under pavement and if a delay to vehicles will not exceed 5 minutes, conduit shall be installed by the Trenching in Pavemen Method." 10-3.07 CONDUCTORS, CABLES, AND WIRING Splices shall be insulated with heat-shrink tubing of the appropriate size after thoroughly painting the spliced conductors with electrical insulating coating. Conductors shall be wrapped around projecting end of conduit in pull boxes, as shown on the plans. Cables shall be secured to the projecting end of conduit in pull boxes to prevent pulling of cables without removing the securing device. Signal Interconnect Cable SIC) shall be the 6-pair type. 10-3.09 LIGHT EMITTING DIODE SIGNAL MODULE GENERAL Summary This work includes installing LED signal module. Comply with Section 86, Electrical Systems," of the Standard Specifications. Use LED signal module as the light source for the following traffic signal faces: 1. 12-inch section 2. 12-inch arrow section Submittals Before shipping LED signal modules to job site, submit the following to the Transportation Laboratory: 1. Delivery form including district number, EA, and contact information 2. List containing all LED signal module serial numbers anticipated for use 3. LED signal modules Quality Control and Assurance Module must be one listed on the Pre-Qualified Products List for LED traffic signals at: http://www.dot.ca.gov/hq/esc/approved_products-list The State will test LED signal module shipments as specified in ANSUASQ Z1.4 Testing will be completed within 30 days of delivery to the Transportation Laboratory. LED signal modules tested or submitted for testing must be representative of typical production units. LED and circular LED signal modules will be tested as specified in California Test 604. Arrow, U- turn, and bicycle LED signal modules will be tested as specified in California Test 3001. All parameters of the specification may be tested on the modules. LEDs must be spread evenly across the module. LED arrow indication must provide the minimum initial luminous intensity listed. Measurements will be performed at the rated operating voltage of 120 V(ac). Delays resulting from submittal of non-compliant materials do not relieve you from executing the contract within the allotted time. Non-compliant materials will be rejected. You Book One San Benancio/State Route 68 Intersection Improvements 530 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????must resubmit new LED for retesting and pick up the failed units within 7 days of notification. You must provide new LED signal modules and allow a minimum of 30 days for the retest. You must pay for all shipping and handling costs related to testing and retesting. Delays resulting from resubmittal and retesting are your responsibility and no extra time will be allowed. After testing, you must pick up the tested LED signal modules from the Transportation Laboratory and deliver to the job site. Warranty The manufacturer must provide a written warranty against defects in materials and workmanship for LED signal modules for a minimum period of 48 months after installation of LED signal modules. Replacement LED signal modules must be provided within 15 days after receipt of failed LED modules at your expense. The State pays for shipping the failed modules to you. All warranty documentation must be submitted to the Engineer before installation. Replacement LED signal modules must be delivered to State Maintenance Electrical Shop at 50 Higuera Street, San Luis Obispo, CA 93401. MATERIALS Minimum power consumption for LED signal module must be 5 W. LED signal module must have an operational lifecycle rating of 48 months. During the operational lifecycle, LED signal module must meet all parameters of this specification. LED signal module must be designed for installation in the door frame of standard traffic signal housing. LED signal module must: 1. 2. 3. 4. 5. Be 4 pounds maximum weight Be manufactured for 12-inch circular and arrow section Be from the same manufacturer Be the same model for each size Be sealed units with: 5.1. 2 color-coded conductors for power connection, except for lane control LED signal modules use 3 color-coded conductors. 5.2. Printed circuit board and power supply contained inside and complying with Chapter 1, Section 6 of TEES published by the Department. 5.3. Lens that is: 5.3.1. Integral to the units 5.3.2. Convex or flat with a smooth outer surface 5.3.3. Made of UV stabilized plastic or glass, and withstands UV exposure from direct sunlight for 48 months without exhibiting evidence of deterioration 5.4. 1-piece EPDM gasket 6. Include 3-foot long conductors with quick disconnect terminals attached 7. Be sealed in door frames 8. Fit into existing traffic signal section housing and comply with ITE publication, Equipment and Material Standards, Chapter 2, Vehicle Traffic Control Signal Heads" Individual LEDs must be wired so catastrophic loss or failure of 1 LED will not result in loss of more than 5 percent of the signal module light output. Failure of an individual LED in a string must not result in loss of entire string or other indication. No special tools for installation are allowed. Book One San Benancio/State Route 68 Intersection Improvements 531 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????12-inch Arrow Comply with Section 9.01 of ITE publication, Equipment and Material Standards, Chapter 2, Vehicle Traffic Control Signal Heads" for arrow indicatiors. LED signal module must: 1. Be weather tight and connect directly to electrical wiring. 2. Be capable of optical unit replacement. 3. Be a single, self-contained device, ready for installation into traffic signal housing. 4. Have manufacturer's name, trademark, model number, serial number, lot number, month and year of manufacture, and required operating characteristics, including rated voltage, power consumption, and volt-ampere, permanently marked on the back of the module. 5. Have a symbol of module type and color. Symbol must be an inch in diameter. Color must be written out in 0.50 inch high letters next to the symbol. 6. Be AIInGaP technology for red and yellow indications and gallium nitride technology for green indications. 7. Be ultra bright type rated for 100,000 hours of continuous operation from 40 C to +74 C. 8. Have a maximum power consumption as follows: LED Signal Module Power Consumption Watts) Type Red Yellow Green 25 C 74 C 25 C 74 C 25 C 74 C 12-inch circular 11 17 22 25 15 15 8-inch circular 8 13 13 16 12 12 12-inch arrow 9 12 10 12 11 11 12-inch U-turn 9 12 10 12 11 11 Bicycle 11 17 22 25 15 15 Programmed Visibility 11 17 22 25 15 15 Lane Control X) 9 12 Lane Control Arrow) 11 11 Lens may be tinted, or may use transparent film or materials with similar characteristics to enhance ON/OFF" contrasts. Tinting or other materials to enhance ON/OFF" contrast must not affect chromaticity and must be uniform across the face of the lens. If polymeric lens is used, surface coating or chemical surface treatment must be applied for front surface abrasion resistance. Power supply must be integral to the module. Internal components must be adequately supported to withstand mechanical shock and vibration from high winds and other sources. Lens and LED signal module material must comply with the ASTM specifications for that material. Enclosures containing either the power supply or electronic components of LED signal module, except lenses, must be made of UL94VO flame-retardant material. If a specific mounting orientation is required, the LED signal module must have prominent and permanent vertical markings for accurate indexing and orientation within the signal housing. Markings must include an up arrow, or the word UP" or TOP." LED signal module must meet or exceed the following values when operating at 25 C: Power Consumption Requirements Book One San Benancio/State Route 68 Intersection Improvements 532 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Minimum Initial Intensities for Circular Indications cd) 12-inch Angle v,h) Red Yellow Green 2.5, 2.5 399 798 798 2.5, 7.5 295 589 589 2.5, 12.5 166 333 333 2.5, 17.5 90 181 181 7.5, 2.5 266 532 532 7.5, 7.5 238 475 475 7.5, 12.5 171 342 342 7.5, 17.5 105 209 209 7.5, 22.5 45 90 90 7.5, 27.5 19 38 38 12.5, 2.5 59 119 119 12.5, 7.5 57 114 114 12.5, 12.5 52 105 105 12.5,?17.5 40 81 81 12.5, 22.5 26 52 52 12.5, 27.5 19 38 38 17.5, 2.5 26 52 52 17.5, 7.5 26 52 52 17.5,?12.5 26 52 52 17.5, 17.5 26 52 52 17.5, 22.5 24 48 48 17.5,?27.5 19 38 38 Minimum Luminance for Arrows, U-turn, Bicycle, Lane Control, and PV Indications FL) Arrow Indication Red 1,605 Yellow 3,210 Green 3,210 LED signal module must meet or exceed the following illumination values for 48 months when operating over a temperature range of 40 C to + 74 C. Yellow LED signal module must meet or exceed the following illumination values for 48 months, when operating at 25 C: Book One San Benancio/State Route 68 Intersection Improvements 533 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Minimum Maintained Intensities for Circular Indications cd) 12-inch Angle v,h) Red Yellow Green 2.5, +2.5 339 678 678 2.5,?7.5 251 501 501 2.5, +12.5 141 283 283 2.5, +17.5 77 154 154 7.5, +2.5 226 452 452 7.5, +7.5 202 404 404 7.5, +12.5 145 291 291 7.5, +17.5 89 178 178 7.5, 22.5 38 77 77 7.5, 27.5 16 32 32 12.5, +2.5 50 101 101 12.5, +7.5 48 97 97 12.5, +12.5 44 89 89 12.5, +17.5 34 69 69 12.5, +22.5 22 44 44 12.5, +27.5 16 32 32 17.5, +2.5 22 44 44 17.5, +7.5 22 44 44 17.5, +12.5 22 44 44 17.5, +17.5 22 44 44 17.5, +22.5 20 41 41 17.5, +27.5 16 32 32 Minimum Maintained Luminance for Arrow, U-turn, Bicycle, Lane Control, and PV Arrow Indication Indications FL) Red 1,610 Yellow 3,210 Green 3,210 LED signal module must comply with the following chromaticity requirements for 48 months when operating over a temperature range of 40 C to +74 C. Red Y: not greater than 0.308, or less than 0.998 x Y: not les- than 0.411, nor less than 0.995 x, Yellow nor greater than-0.452 Y: not less than 0.506 0.519x, nor less th-n Green 0.150 + 1.068x, nor more than 0.730 x LED signal m-dule must operate: 1. At a frequency of 60 Hz 3 Hz, over a voltage range from 95 V(ac) to 135 V(ac), without perceptible flicker to the unaided eye. Fluctuations of line voltage must have no visible effect on luminous intensity of the indications. Rated voltage for measurements must be 120 V(ac). 2. Compatible with currently used controller assemblies, including solid state load switches, flashers, and conflict monitors. Comply with TEES Chapters 3 and 6. If a 20 mA alternating current or less is applied to the unit, the voltage read across the 2 leads must be 15 V(ac) or less. Wiring and terminal block must comply with Section 13.02 of ITE publication, Equipment and Material Standards, Chapter 2, Vehicle Traffic Control Signal Heads." Electrical connect Chromaticity Standards CIE Chart) Book One San Benancio/State Route 68 Intersection Improvements 534 CONTRACT NO. 10- 111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????on for each Type 1 LED signal module must be 2 secured, color-coded, 3-foot long, 600 V(ac), 20 AWG minimum stranded jacketed copper wires. Wires must comply with NEC, rated for service at +105 C. LED signal module on-board circuitry must: 1. Include voltage surge protection to withstand high-repetition noise transients. The voltage surge protection must comply with NEMA Standard TS2, Section 2.1.6. 2. Comply with FCC, Title 47, SubPart B, Section 15 regulations for Class A emission limits for electronic noise. LED signal module must provide a power factor of 0.90 or greater. Total harmonic distortion from current and voltage induced into an alternating current power line by LED signal module must not exceed 20 percent at an operating temperature of 25 C. When power is applied to LED signal module, light emission must occur within 90 ms. 10-3.10 LIGHT EMITTING DIODE PEDESTRIAN SIGNAL FACE MODULES GENERAL Summary This work includes installing LED pedestrian signal face PSF) module into standard Type A pedestrian signal housing. Comply with Section 86, Electrical Systems," of the Standard Specifications. Submittals Before shipping LED PSF modules to job site, submit the following to the Transportation Laboratory: 1. Delivery form including district number, EA, and contact information 2. List containing all LED PSF module serial numbers anticipated for use 3. LED PSF modules Quality Control and Assurance Module must be one listed on the Pre-Qualified Products List for LED traffic signals at: http://www.dot.ca.gov/hq/esc/approved_products-list The State will test LED PSF module shipments as specified in ANSI/ASQ Z1.4 Testing will be completed within 30 days of delivery to the Transportation Laboratory. LED PSF modules tested or submitted for testing must be representative of typical production units. LED PSF modules will be tested as specified in California Test 606. All parameters of the specification may be tested on the modules. Delays resulting from submittal of non-compliant materials do not relieve you from executing the contract within the allotted time. Non-compliant materials will be rejected. You must resubmit new LED for retesting and pick up the failed units within 7 days of notification. You must provide new LED PSF modules and allow a minimum of 30 days for the retest. You must pay for all shipping and handling costs related to testing and retesting. Delays resulting from resubmittal and retesting are your responsibility and no extra time will be allowed. After successful testing, you must pick up the tested LED PSF modules from the Transportation Laboratory and deliver to the job site. Warranty The manufacturer must provide a written warranty against defects in materials and workmanship for LED PSF modules for a minimum period of 48 months after installation of Book One San Benancio/State Route 68 Intersection Improvements 535 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?? ??LED PSF modules. Replacement LED PSF modules must be provided within 15 days after receipt of failed LED PSF modules at your expense. The State pays for shipping the failed modules to you. All warranty documentation must be submitted to the Engineer before installation. Replacement LED PSF modules must be delivered to State Maintenance Electrical Shop at 50 Higuera Street, San Luis Obispo, CA 93401. MATERIALS LED PSF module must: 1. Be from the same manufacturer. 2. Be installed in standard Type A pedestrian signal housing, UPRAISED HAND" and WALKING PERSON"" Do not include reflectors. 3. Use LED as the light source. 4. Be designed to mount behind or replace face plates of standard Type A housing as specified in ITE publication, Equipment and Material Standards, Chapter 3, Pedestrian Traffic Control Signal Indications" and the California MUTCD." 5" Have a minimum power consumption of 10 W. 6. Use required color and be ultra bright type rated for 100,000 hours of continuous operation from 40 C to +74 C. 7. Be able to replace signal lamp optical units and pedestrian signal faces with both LED and incandescent light sources. 8. Fit into pedestrian signal section housings without modifications to the housing. The housing must comply with ITE publication, Equipment and Materials Standards, Chapter 3, Pedestrian Traffic Control Signal Heads." 9. Be a single, self-contained device, not requiring on-site assembly for installation into standard Type A housing. 10. Have the following information permanently marked on the back of module: 10.1. Manufacturer's name 10.2. Trademark 10.3. Model number 10.4. Serial number 10.5. Lot number 10.6. Month and year of manufacture 10.7. Required operating characteristics, as follows: 10.7.1. Rated voltage 10.7.2. Power consumption 10.7.3. Volt-ampere VA) 10.7.4. Power factor 11. Have prominent and permanent vertical markings for accurate indexing and orientation within the signal housing if a specific mounting orientation is required. Markings must include an up arrow, or the word UP" or TOP." Marking must be a minimum of 1-inch diameter. Circuit board and power supply must be contained inside the LED PSF modules. Circuit board must comply with Chapter 1, Section 6 of TEES published by the Department. Individual LEDs must be wired so catastrophic loss or failure of 1 LED will not result in loss of more than 5 percent of the PSF module light output. Failure of an individual LED in a string must not result in the loss of entire string or other indication. LEDs must be evenly distributed in each indication. Do not use outline forms. No special tools for installation are allowed. Book One San Benancio/State Route 68 Intersection Improvements 536 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??!??Installation of the LED PSF module into pedestrian signal face must require only removal of lenses, reflectors, lamps, and existing LED modules. Power supply for LED PSF module must be integral to the module. Power supply for each symbol must be isolated to avoid turn-on conflict. Assembly and manufacturing processes for LED PSF module must assure that all internal components are adequately supported to withstand mechanical shock and vibration from high winds and other sources. Material used for LED PSF module must comply with ASTM D 3935. Enclosures containing either the power supply or electronic components of LED PSF module, except lenses, must be made of UL94VO flame-retardant material. Color of UPRAISED HAND" symbol must be portland orange. Color of WALKING PERSON" symbol must be lunar white. Each symbol must not be less than 10 inches high and 6.5 inches wide. Uniformity ratio of illuminated symbols must not exceed 4 to 1 between highest and lowest luminance areas. Symbols must comply with ITE publication, Equipment and Material Standards, Chapter 3, Pedestrian Traffic Control Signal Indications," and the California MUTCD." LED PSF module m"st maintain an average luminance value over 48 months of continuous use in signal operation for a temperature range of 40 C to +74 C. In addition, LED PSF modules must meet or exceed the following luminance values upon initial testing at 25 C. Luminance Values PSF module Luminance UPRAISED HAND 1,094 FL WALKING PERSON 1,547 FL Color output of LED PSF module must comply with chromaticity requirements in Section 5.3 of ITE publication, Equipment and Material Standards, Chapter 3, Pedestrian Traffic Control Signal Indications." Measured chromaticity coordinates of LED PSF module must comply with the following chromaticity requirements for 48 months when operating over a temperature range of 40 C to +74 C. UPRAISED HAND Not greater then 0.390, nor less than 0.33 1, nor Cortland orange) less than 0.997-X X: not less than 0.280, nor greater than 0.320 WALKING PERSON Y: not less than 1.055*X 0.0128, nor greater- lunar white) than 1.055*X + 0.0072 LED PSF module maximum power consumption must not exceed the following values: PSF module Power Consumption 24?C Power Consumption 74?C UPRAISED HAND 10.0 W 12.0 W WALKING PERSON 9.0 W 12.0 W Wiring and terminal block must comply with Section 13.02 of ITE publication, Equipment and Material Standards, Chapter 2, Vehicle Traffic Control Signal Heads." The LED PSF module"must be supplied with spade lugs and 3 secured, color-coded, 3-foot long, 600 V(ac), 20 AWG minimum stranded jacketed copper wires. Wires must comply with NEC, rated for service at +105 C. Chromaticity Standards CIE Chart) Power Consumption Requirements Book One San Benancio/State Route 68 Intersection Improvements 537 CONTRACT NO. 10- 11 1 065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??"??LED PSF module must operate: 1. At a frequency of 60 Hz 3 Hz over a voltage range from 95 V(ac) to 135 V(ac) without perceptible flicker to the unaided eye. Fluctuations of line voltage must have no visible effect on luminous intensity of the indications. Rated voltage for measurements must be 120 V(ac). 2. Compatible with currently used State controller assemblies including solid state load switches, flashers, and conflict monitors. Comply with TEES Chapters 3 and 6. If a 20 ma alternating current or less is applied to the unit, the voltage read across the 2 leads must be 15 V(ac) or less. LED PSF module on-board circuitry must: 1. Include voltage surge protection to withstand high-repetition noise transients. The voltage surge protection must comply with NEMA Standard TS2, Section 2.1.6. 2. Comply with FCC, Title 47, SubPart B, Section 15 regulations for Class A emission limits for electronic noise. LED PSF module must provide a power factor of 0.90 or greater. Total harmonic distortion from current and voltage induced into an alternating current power line by LED PSF module must not exceed 20 percent at an operating temperature of 25 C. The LED PSF module circuitry must prevent perceptible light emission to the unaided eye when a voltage, 50 V(ac) or less is applied to the unit. When power is applied to LED PSF module, light emission must occur within 90 ms. The UPRAISED HAND" and WALKING PERSON" symbol indications must be electrically isolated from each other. Sharing a power supply or interconnect circuitry between the 2 indications is not allowed. 10-3.11 DETECTORS Loop detector sensor units will be State-furnished in conformance with the provisions in Materials" of these Special Provisions. Loop wire shall be Type 2. Loop detector lead-in cable shall be Type. Slots shall be filled with hot-melt rubberized asphalt sealant. At the Contractor's option, where a Type A or a Type B loop is designated on the plans, a Type E loop may be substituted. For Type E detector loops, sides of the slot shall be vertical and the minimum radius of the slot entering and leaving the circular part of the loop shall be 1-1/2 inches. Slot width shall be a maximum of 5/8 inch. Loop wire for circular loops shall be Type 2. Slots of circular loops shall be filled with elastomeric sealant or hot melt rubberized asphalt sealant. 10-3.12 LUMINAIRES Ballasts shall be the lag or lead regulator type. 10-3.13 PHOTOELECTRIC CONTROLS Contactors shall be the mechanical armature type. SECTION 11 BLANK) SECTION 12 BLANK) SECTION 13 BLANK) SECTION 14 BLANK) Book One San Benancio/State Route 68 Intersection Improvements 538 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??#??SECTION 15. SAMPLE CONTRACT SAMPLE CONTRACT CONTRACT FOR PUBLIC WORK COUNTY OF MONTEREY STATE OF CALIFORNIA CONTRACT NO. 10-111065 THIS AGREEMENT, made in triplicate by and between the COUNTY OF MONTEREY, a political subdivision of the State of California, hereinafter called the County," and hereinafter called the Contractor," WITNESSETH: 1) THE WORK The Contractor shall do all the work and furnish all the materials, except such as are mentioned in any of the contract documents to be furnished by the County, necessary to construct and complete in a good, workmanlike and substantial manner and to the satisfaction of the County, the following public work: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS CONTRACT NO. 10-111065 in accordance with this agreement and with all of the following additional contract documents which are incorporated into and made a part of this agreement: a) The Standard Specifications, dated May 2006, and the Standard Plans, dated May 2006 of the State of California, Department of Transportation, including any amendments thereto. b) A set of plans and cross sections when applicable) entitled: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS CONTRACT NO. 10-111065 c) The Special Provisions for the work. d) The Notice to Contractors calling for bids. e) The Payment and Performance bonds required. f) Certificate of Insurance. g) Mitigation Monitoring and Reporting Program as adopted by the Monterey County Board of Supervisors. Book One San Benancio/State Route 68 Intersection Improvements 539 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??$??h) The accepted bid/proposal including the following: 1) List of Subcontractors 2) Equal Employment Opportunity Certification 3) Public Contract Code Section 10285.1 Statement 4) Public Contract Code Section 10162 Questionnaire 5) Public Contract Section 10232 Statement 6) Non-Collusion Affidavit 7) Debarment and Suspension Certification 8) Statement Concerning Employment of Undocumented Aliens 9) Contractor's Certificate as to Workers' Compensation 10) Contractor's Certification of Good-Faith Effort to Hire Monterey Bay Area Residents 11) List of Satisfied Public Agencies 12) Bidder's Bond 13) Bidder's List All contract documents are intended to cooperate, so that any work called for in one and not mentioned in another is to be executed the same as if mentioned in all. However, should there be any conflict between the terms of this instrument and the Contractor's bid or proposal, then this instrument shall control. 2) WORKERS' COMPENSATION In accordance with the provisions of Section 3700 of the Labor Code, the Contractor and every Subcontractor will be required to secure the payment of compensation to his employees. Book One San Benancio/State Route 68 Intersection Improvements 540 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??%??3. CONTRACT PRICE The County shall pay the Contractor the following prices for the performance of this contract: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS CONTRACT NO. 10-111065 ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 1 066070 MAINTAIN TRAFFIC LS 1 $ $ 2 071325 TEMPORARY FENCE TYPE ESA LF 3125 $ $ 3 073000A P TEMPORARY STREAM DIVERSION LS 1 $ $ 4 074016 CONSTRUCTION SITE MANAGEMENT LS 1 $ $ 5 074019 PREPARE STORM WATER POLLUT O LS 1 $ $ I N PREVENTION PLAN 6 074028 TEMPORARY FIBER ROLL LF 1743 $ $ 7 074028A TEMPORARY LARGE FIBER ROLL LF 1144 $ $ 8 074033 TEMPORARY CONSTRUCTION EA 3 $ $ ENTRANCE 9 074034 TEMPORARY COVER SF 11300 $ $ 10 074038 TEMPORARY DRAINAGE INLET P T EA 3 $ $ RO ECTION TYPE 3) 11 074041 STREET SWEEPING LS 1 $ $ 12 074042 TEMPORARY CONCRETE W SHOUT P EA 4 $ $ A ORTABLE) 13 074056 RAIN EVENT ACTION PLAN LS 1 $ $ 14 074057 STORM WATER ANNUAL REPORT LS 1 $ $ 15 074058 STORM WATER SAMPLING AND ANALYSIS DAY LS 1 $ $ 16 120090 CONSTRUCTION AREA SIGNS LS 1 $ $ 17 120100 TRAFFIC CONTROL SYSTEM LS 1 $ $ 18 120151 TEMPORARY TRAFFIC STRIPE LF 21200 $ $ 19 120152 TEMPORARY PAVEMENT SF 500 $ $ MARKING PAINT) 20 128650 PORTABLE CHANGEABLE EA 2 $ $ MESSEAGE SIGN 21 129000 TEMPORARY RAILING TYPE K) LF 2320 $ $ Book One San Benancio/State Route 68 Intersection Improvements 541 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??&??ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 22 129100 TEMPORARY ALTERNATIVE EA 7 $ $ CRASH CUSHION SYSTEM 23 150714 REMOVE THERMOPLASTIC LF 20814 $ $ TRAFFIC STRIPE 24 150715 REMOVE THERMOPLASTIC SF 665 $ $ PAVEMENT MARKING 25 150722 REMOVE PAVEMENT MARKER EA 266 $ $ 26 150771 REMOVE ASPHALT CONCRETE LF 195 $ $ DIKE 27 150806A REMOVE 18" CORRUGATED LF 113 $ $ STEEL PIPE 28 150820 REMOVE INLET EA 1 $ $ 29 152370A RELOCATE BUS STOP BENCH EA 2 $ $ 30 152386 RELOCATE ROADSIDE SIGN EA 5 $ $ ONE POST 31 152387 RELOCATE ROADSIDE SIGN EA 2 $ $ TWO POST 32 158210A RESET FENCE LF 111 $ $ 33 160101 CLEARING AND GRUBBING LS 1 $ $ 34 190101 ROADWAY EXCAVATION CY 775 $ $ 35 192037 STRUCTURE EXCAVATION CY 985 $ $ F) RETAINING WALL) 36 193013 STRUCTURE BACKFILL CY 472 $ $ F) RETAINING WALL) 37 200001 HIGHWAY PLANTING LS 1 $ $ 38 202007 DUFF Sy 1714 $ $ 39 202007 CHIPPED MATERIAL SF 9840 $ $ 40 203021 FIBER ROLL LF 1750 $ $ 41 203032 EROSION CONTROL AC 1 $ $ HYDROSEED) 42 203038 ROLLED EROSION CONTROL SF 9659 $ $ PRODUCT JUTE MESH) 43 204017 PLANT GROUP W) WILLOW EA 22 $ $ CUTTING) 44 204099 PLANT ESTABLISHMENT WORK LS 1 $ $ 45 208000 IRRIGATION SYSTEM LS 1 $ $ 46 260201 CLASS 2 AGGREGATE BASE CY 3224 $ $ 47 390132 HOT MIX ASPHALT TYPE A) TON 2256 $ $ Book One San Benancio/State Route 68 Intersection Improvements 542 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??'??ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 48 394048 PLACE HOT MIX ASPHALT LF 351 $ $ CONCRETE DIKE TYPE E) 49 394073 PLACE HOT MIX ASPHALT LF 89 $ $ CONCRETE DIKE TYPE A) 50 394074 PLACE HOT MIX ASPHALT LF 685 $ $ CONCRETE DIKE TYPE C) 51 394090 PLACE HOT MIX ASPHALT SF 246 $ $ MISCELLANEOUS AREA) 52 510060 STRUCTURAL CONCRETE, CY 339 $ $ F) RETAINING WALL 53 510502 MINOR CONCRETE MINOR CY 1.61 $ $ F) STRUCTURE) 54 511035A ARCHITECTURAL TREATMENT SF 3132 $ $ F) TEXTURED CONCRETE) 55 520103 BAR REINFORCING STEEL LB 28400 $ $ F, P) RETAINING WALL) 56 566011 ROADSIDE SIGN ONE POST EA 3 $ $ 57 650014 18" REINFORCED CONCRETE LF 106 $ $ PIPE 58 650018 24" REINFORCED CONCRETE LF 186 $ $ PIPE 59 690110 12" CORRUGATED STEEL PIPE LF 29 $ $ DOWNDRAIN 60 705206 24" CONCRETE FLARED END EA 1 $ $ SECTION 61 707417 36" REINFORCED CONCRETE LF 15 $ $ PIPE RISER 62 721009 ROCK SLOPE PROTECTION CY 4 $ $ FACING, METHOD B) 63 1 17 73 5 MINOR CONCRETE GUTTER) CY 22 $ $ F 64 731623 MINOR CONCRETE CURB Cy 3 $ $ F) RAMP) 65 750500 MISCELLANEOUS IRON AND LB 1729 $ $ F, P) STEEL 66 800321 CHAIN LINK FENCE TYPE CL-6, LF 72 $ $ VINYL CLAD) 67 832002 METAL BEAM GUARD RAIL LF 624 $ $ STEEL POST) 68 832070 VEGETATION SY 271 $ $ CONTROL(MINOR CONCRETE) 69 839521 CABLE RAILING LF 394 $ $ 70 839541 TRANSITION RAILING TYPE EA 6 $ $ 71 839559 TERMINAL SYSTEM TYPE ET) EA 1 $ $ 72 839565 TERMINAL SYSTEM TYPE SRT) EA 3 $ $ 73 839701A CO CRETE BARRIER TYPE 60) LF 195 $ $ Book One San Benancio/State Route 68 Intersection Improvements 543 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??(??ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 74 840504 4" THERMOPLASTIC TRAFFIC LF 9620 $ $ STRIPE 75 840506 8" THERMOPLASTIC TRAFFIC LF 1780 $ $ STRIPE 76 840515 MAC OPLASTIC PAVEMENT SF 552 $ $ 77 850111 PAVEMENT MARKER EA 260 $ $ P) RETROREFLECTIVE) 78 861501 MODIFY SIGNAL AND LS 1 $ $ LIGHTING 79 192003 STRUCTURE EXCAVATION CY 91 $ $ F) BRIDGE) 80 192037 STRUCTURE EXCAVATION CY 283 $ $ F) RETAINING WALL) 81 193003 STRUCTURE BACKFILL CY 96 $ $ F) BRIDGE) 82 193013 STRUCTURE BACKFILL CY 312 $ $ F) RETAINING WALL) 83 490519 DRIVE STEEL PILE HP 12 X 74) EA 18 $ $ 84 490566A FURNISH STEEL PILE HP 12 X LF 838 $ $ P) 74) 85 490539 DRIVE STEEL PILE HP 14 X 117) EA 8 $ $ 86 490538 FURNISH STEEL PILE HP 14 X LF 372 $ $ P) 117) 87 490514 DRIVE STEEL PILE HP 12 X 53) EA 30 $ $ 88 490566B FURNISH STEEL PILE HP 12 X LF 1,341 $ $ P) 53) 89 510051 STRUCTURAL CONCRETE, CY 5.4 $ $ F) BRIDGE FOOTING 90 510053 STRUCTURAL CONCRETE, CY 206.6 $ $ F) BRIDGE 91 510060 STRUCTURAL CONCRETE, CY 250 $ $ F) RETAINING WALL 92 510086 STRUCTURAL CONCRETE, CY 59 $ $ F) APPROACH SLAB TYPE N) 93 510087 STRUCTURAL CONCRETE, CY 86 $ $ F) APPROACH SLAB TYPE R) 94 519088 JOINT SEAL MR 1") LF 132 $ $ 95 520102 BAR RIENFORCING STEEL LB 58,300 $ $ F, P) BRIDGE) 96 520103 BAR REINFORCING STEEL LB 14,100 $ $ F, P) RETAINING WALL) 97 512203 FURNISH PRECAST PRESTRESSED CONCRETE EA 8 $ $ P) GIRDER 40'-50') 98 512500 ERECT PRECAST PRESTRESSED EA 8 $ $ CONCRETE GIRDER Book One San Benancio/State Route 68 Intersection Improvements 544 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??)??ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 99 750501 F P) MISCELLANEOUS METAL BRIDGE LB 60 $ $ 100 839740 F P) CALIFORNIA ST-20 BRIDGE RAIL LF 360 $ $ 101 510800 PAVING NOTCH EXTENSION CF 48 $ $ 102 721009 ROCK SLOPE PROTECTION FACING METHOD B CY 0.20 $ $ 103 511106 DRILL AND BOND DOWEL LF 140 $ $ 104 192020 F STRUCTURE EXCAVATION TYPE D CY 52 $ $ 105 153235 CLEAN BRIDGE DECK SQFT 3840 $ $ 106 153225A BRIDGE DECK METHACRYLATE RESIN SQFT 3840 $ $ TREATMENT 107 540108 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 52 $ $ 108 99990 MOBILIZATION 10% LS 1 $ $ $ GRAND TOTAL Book One San Benancio/State Route 68 Intersection Improvements 545 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??*??IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the dates appearing below their respective signatures. CONTRACTOR: Name of Company) By: Name: Title: Date: COUNTY OF MONTEREY: By: Name: Yazdan T. Emrani, P.E. Title: Director of Public Works Date: APPROVE AS TO FORM APPROVE AS TO FORM By: By: Name: Cynthia L. Hasson Name: Steven F. Mauck Title: Deputy County Counsel Title: Risk Manager Date: Date: Book One San Benancio/State Route 68 Intersection Improvements 546 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??+??COUNTY OF MONTEREY PAYMENT BOND Civil Code Section 3249) WHEREAS, the County of Monterey has awarded to Principal, as Contractor, a contract for the following project: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS CONTRACT NO. 10-111065 AND WHEREAS, Principal, as Contractor, is required to furnish a bond in connection with said contract, to secure the payment of claims of laborers, mechanics, materialmen, and other persons furnishing labor and materials on the project, as provided by law. NOW, THEREFORE, we Principal, and as as Surety, are held and firmly bound unto the County of Monterey, a political subdivision of the State of California hereinafter called County"), and to the persons named in California Civil Code section 3181 in the penal sum of for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT: If the Principal, or any of Principal's heirs, executors, administrators, successors, assigns, or Subcontractors, 1) fails to pay in full all of the persons named in Civil Code Section 3181 with respect to any labor or materials furnished by said persons on the project described above, or 2) fails to pay in full all amounts due under the California Unemployment Insurance Code with respect to work or labor performed on the project described above, or 3) fails to pay for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Principal and Subcontractors pursuant to Unemployment Insurance Code section 13020 with respect to such work and labor, then the Surety shall pay for the same. Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract on the call for bids, or to the work to be performed there under, or the specifications accompanying the same, shall in any way affect its obligation under this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of said contract or the call for bids, or to the work, or to the specifications. If suit is brought upon this bond by the County and judgment is recovered, the Surety shall pay all litigation expenses incurred by the County in such suit, including attorney's fees, court costs, expert witness fees and investigation expenses. This bond inures to the benefit of any of the persons named in Civil Code section 3181, and such persons or their assigns shall have a right of action in any suit brought upon this bond, Book One San Benancio/State Route 68 Intersection Improvements 547 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??,??subject to any limitations set forth in Civil Code sections 3247 et seq. Civil Code, Division 3, Part 4, Title 15, Chapter 7: Payment Bond for Public Works). IN WITNESS WHERE OF the above-bounden parties have executed this instrument under their several seals this day of 20 the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. Corporate Seal) Corporate Seal) Principal By Title Surety By Title Attach notary acknowledgment for all signatures and attorney-in-fact certificate for signature by surety's representative) Book One San Benancio/State Route 68 Intersection Improvements 548 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??-??COUNTY OF MONTEREY PERFORMANCE BOND WHEREAS, the County of Monterey has awarded to Principal, as Contractor, a contract for the following project: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS CONTRACT NO. 10-111065 WHEREAS, Principal, as Contractor, is required to furnish a bond in connection with said contract, to secure the faithful performance of said contract. and NOW, THEREFORE, we as Principal, as Surety, are held and firmly bound unto the County of Monterey, a political subdivision of the State of California hereinafter called County"), in the penal sum of for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT: If the Principal, as Contractor, or Principal's heirs, executors, administrators, successors, or assigns, 1) shall in all things stand to and abide by and well and truly keep and perform the covenants, conditions, and agreements in said contract and any alteration thereof made as therein provided, on Principal's part to be kept and performed, at the time and in the manner therein specified and in all respects according to their true intent and meaning, and 2) shall defend, indemnify and save harmless the County, the members of its board of supervisors, and its officers, agents and employees as therein stipulated, then this obligation shall become null and void; otherwise, it shall be and remain in full force and virtue. Surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the contract or the call for bids, or to the work to be performed thereunder, or the specifications accompanying the same, shall in any way affect its obligation under this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of said contract or the call for bids, or to the work, or to the specifications. Whenever the Principal, as Contractor, is in default, and is declared in default, under the contract by the County of Monterey, the County of Monterey having performed its obligation under the contract, Surety may promptly remedy the default, or shall promptly: 1) Complete the contract in accordance with its terms or conditions, or 2) Obtain a bid or bids for submission to County of Monterey for completing the contract in accordance with its terms or conditions, and upon determination by County of Monterey and Surety of the lowest responsible and responsive bidder, arrange for a contract between such bidder and County of Monterey, and make available as work progresses even though there should be a default or a succession of defaults under the contract or contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the Book One- San Benancio/State Route 68 Intersection Improvements 549 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??.??balance of contract price. If suit is brought upon this bond by the County and judgment is recovered, the Surety shall pay all litigation expenses incurred by the County in such suit, including attorney's fees, court costs, expert witness fees and investigation expenses. IN WITNESS WHEREOF, the above-bounden parties have executed this instrument under their several seals this day of 20 the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. Corporate Seal) Corporate Seal) Principal By Title Surety By Title Attach notary acknowledgment for all signatures and attorney-in-fact certificate for signature by surety's representative) Book One San Benancio/State Route 68 Intersection Improvements 550 CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??/??APPENDIX A REGULATORY PERMITS Book One- San Benancio/State Route 68 Intersection Improvements A CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??0?? NOTEXTPAGE BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??1??n AGREEMENT RESOURCES AGE-NCY CALIFORNIA IM. DEPARTMENT ffl,'R FISH&GAME California Fish and Game Code Section 1602 Stream Alteration Agreement No. 2009-0161-R4 El Toro Creek Monterey County Parties: California Department of Fish and Game Central Region 1234 East Shaw Avenue Fresno, California 93710 Mr. Enrique Saavedra County of Monterey 168 West Alisal Street Salinas, California 93901. |1013||1013||1013| WHEREAS: 1. Mr. Enrique Saavedra, hereinafter referred to as the Operator"), on September 30, 2009, notified Notification" No. 2009-0161-R4) the Department of Fish and Game Department") of their intent to divert or obstruct the natural flow of, or change the bed or banks of, or use materials from El Toro Creek in Monterey County, waters over which the Department asserts jurisdiction pursuant to Division 2, Chapter 6 of the California Fish and Game Code. 2. The Operator may not commence any activity that is subject to Fish and Game Code Sections 1600 et seq., until the Department has found that such Project shall not substantially adversely affect an existing fish or wildlife resource or until the Department's proposals, or the decisions of a panel of arbitrators, have been incorporated into such projects. 3. Fish and Game Code Sections 1600 et seq., make provisions for the negotiation of agreements regarding the delineation and definition of appropriate activities, Project modifications and/or specific measures necessary to protect fish and wildlife resources. 4. The Department has determined that without the mitigative features identified in this Agreement, the activities proposed in the Notification could substantially adversely affect fish and wildlife. |1013| Page 1 of 16 APPENDIX A REGULATORY PERMITS, Page 1 of 76 Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??2??7 NOW THEREFORE, IT IS AGREED THAT: 1. The receipt of this document Agreement"), by the Operator, satisfies the Department's requirement to notify the Operator of the existence of an existing fish and wildlife resource that may be substantially adversely affected by the Project that is described in the Notification. 2. The contents of this Agreement constitute the Department's proposals as to measures necessary to protect fish and wildlife resources, and satisfy the Department's requirement to submit these proposals to the Operator. 3. The signature of the Operator's representative on this Agreement constitutes the Operator's commitment to incorporate the Department's proposals into the Project described in the Notification. C 4. This Agreement does not exempt the Operator from complying with all other applicable local, State and Federal law, or other legal obligations. 5. This Agreement, alone, does not constitute or imply the approval or endorsement of a Project, or of specific Project features, by the Department of Fish and Game, beyond the Department's limited scope of responsibility, established by Code Sections 1600 et seq. This Agreement does not therefore assure concurrence, by the Department, with the issuance of permits from this or any other agency. Independent review and recommendations shall be provided by the Department as appropriate on those projects where local, State or Federal permits or environmental reports are required. 6. This Agreement does not authorize the take" defined in Fish and Game Code Section 86 as hunt, pursue, catch, capture, or kill; or attempt to hunt, pursue, catch, capture, or kill) of State-listed threatened or endangered species. If the Operator, in the performance of the agreed work, discovers the presence of a listed species in the Project work area, work shall stop immediately. The Operator shall not resume activities authorized by this Agreement until such time as valid take" permits are obtained from the Department pursuant to Fish and Game Code Sections 2081(a) and 2081(b), as appropriate. C 7. To the extent that Provisions of this Agreement provide for the diversion of water, they are agreed to with the understanding that Operator possesses the legal right to so divert such water. 8. To the extent that the Provisions of this Agreement provide for activities that require the Operator to trespass on another owner's property, they are agreed to with the understanding that the Operator possesses the legal right to so trespass. 9. To the extent that the Provisions of this Agreement provide for activities that are subject to the authority of other public agencies, said activities are agreed to with the understanding that all appropriate permits and authorizations shall be obtained prior to commencing agreed activities. Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 2 of 16 |1013| APPENDIX A REGULATORY PERMITS, Page 2 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??3??10. All Provisions of this Agreement remain in force throughout the term of the Agreement. Any Provision of the Agreement may be amended at any time, provided such amendment is agreed to in writing by both parties. Mutually approved amendments become part of the original Agreement and are subject to all previously negotiated Provisions. The Agreement may be terminated by either party, subject to 30 days written notification. 11. The Operator shall provide a copy of the Agreement to the Project supervisors and all contractors and subcontractors. Copies of the Agreement shall be available at work sites during all periods of active work and shall be presented to Department personnel upon demand. 12. The Operator agrees to provide the Department access to the Project site at any time to ensure compliance with the terms, conditions, and Provisions of this Agreement. 13. The Operator and any contractor or subcontractor, working on activities covered by this Agreement, are jointly and separately liable for compliance with the Provisions of this Agreement. Any violation of the Provisions of this Agreement is cause to stop all work immediately until the problem is reconciled. Failure to comply with the Provisions and requirements of this Agreement may result in prosecution. 14. The Operator assumes responsibility for the restoration of any fish and wildlife habitat which may be impaired or damaged either directly or, incidental to the Project, as a result of failure to properly implement or complete the mitigative features of this Agreement, or from activities which were not included in the Operator's Notification. 15. It is understood that the Department enters into this Agreement for purposes of establishing protective features for fish and wildlife, in the event that a Project is implemented. The decision to proceed with the Project is the sole responsibility of the Operator, and is not required by this Agreement. It is agreed that all liability and/or incurred costs, related to or arising out of the Operator's Project and the fish and wildlife protective conditions of this Agreement, remain the sole responsibility of the Operator. The Operator agrees to hold harmless and defend the Department of Fish and Game against any related claim made by any party or parties for personal injury or other damage. 16. The terms, conditions, and Provisions contained herein constitute the limit of activities agreed to and resolved by this Agreement. The signing of this Agreement does not imply that the Operator is precluded from doing other activities at the site. However, activities not specifically agreed to and resolved by this Agreement are subject to separate notification pursuant to Fish and Game Code Sections 1600 et seq. California Environmental Quality Act CEQA) Compliance: In approving this Agreement, the Department is independently required to assess the applicability of CEQA. The features of this Agreement shall be considered as part of the overall Project description. Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 3 of 16 APPENDIX A REGULATORY PERMITS, Page 3 of 76 |1013| BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??4??C The Operator's concurrence signature on this Agreement serves as confirmation to the Department that the activities that shall be conducted under the terms of this Agreement are consistent with the Project described in the CEQA Mitigated Negative Declaration and Notice of Determination titled State Route 68/San Benancio Road Intersection Improvement Project" State Clearinghouse Number 2008121039) that was filed with the State Clearinghouse on December 9, 2008, by the California Department of Transportation as the Lead Agency. A copy of this document was provided with the Section 1602 Notification. The Department, as a CEQA Responsible Agency, shall make findings and submit a Notice of Determination to the State Clearinghouse upon signing this Agreement. This Agreement contains a Monitoring and Reporting Program MRP), to incorporate monitoring and reporting requirements for the activities authorized in this Agreement. C Project Location: The work authorized by this Agreement will occur within or adjacent to Toro Creek in San Luis Obispo County, California. More specifically, work will occur at the intersection of State Route 68 and San Benancio Road, approximately 10 miles west of the City of Salinas Township 15S, Range 2E, Section 11, MDB&M, APNs 161-011-078, 161-061-003, State Route 68 right-of-way, and San Benancio Road right-of-way) Figure 1). Unless changes are submitted and approved by the Department, the Project shall be built in the location indicated on the maps/drawings that were submitted with the Notification. Project Description: The Operator's Notification includes Fish and Game Notification Form FG2023, maps and other submitted information. The Notification comprises the Operator's Project description, and it is used as the basis for establishing the protective Provisions that are included in this Agreement. Any changes or additions to the Project as described in the Notification shall require additional consultation and protective Provisions. The Department's CEQA Determination is based upon the Operator's commitment to full implementation of the Provisions of this Agreement. The proposed Project would widen the bridge over El Toro Creek by approximately 24 feet to include two 2) new lanes. To accommodate the widened bridge, one 1) concrete abutment would be built on each side of the stream channel next to the existing abutments. Rock slope protection RSP) would be installed to protect the abutments during high flows. On State Route 68, the highway would be widened on both sides to provide for a second-west to southbound left turn lane. Retaining walls would be built along both sides of State Route 68 to allow for the new lanes. Concrete or rock-lined swales would be built to convey runoff water from the roads, and one 1) culvert may be extended with an energy dissipation pad built at the outlet. Approximately 0.50 acre and 0.15 acre of riparian habitat would be temporarily and permanently impacted, respectively, including removal of arroyo willow, coast live oak, western sycamore, and elderberry. Upon completion, of construction, the site would be stabilized using generally accepted erosion and sediment control practices and revegetated to mitigate for the loss of trees and other vegetation. Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 4 of 16 APPENDIX A REGULATORY PERMITS, Page 4 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??5??Figure 1 Department of Fish and Game Conservation Planning GIS Central Region USGS Quad BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??6?? The following bulleted activities are authorized by this Agreement: Install one 1) concrete bridge abutment and rock slope protection on each side of El Toro Creek, adjacent to existing abutments, to support the widened bridge. Construct retaining walls along the south side of Highway 68 and both sides of San Benancio Road near the El Toro Creek bridge to accommodate new traffic lanes. Construct concrete or rock and vegetation lined swales and extend one 1) culvert on the south side of State Route 68 to carry storm water from the roads to the stream channel. Temporarily impact approximately 0.50 acres of wetland habitat and revegetating the area upon completion of construction. Use equipment such as backhoes, excavators, graders, concrete trucks, and similar equipment during construction activities at the site. Implement erosion and sediment prevention measures and revegetate the site after completion of excavation. Plant and Animal Species of Concern: This Agreement is intended to avoid, minimize, and mitigate adverse impacts to the fish and wildlife resources that occupy the area of El Toro Creek, and the immediate adjacent riparian habitat. The protective measures described in this Agreement must be implemented in order to avoid impacts, within the area covered by this Agreement, to the following species: the Federal threatened California red-legged frog Rana aurora draytonii), State species of concern Western pond turtle Clemmys marmorata), bat species, CNPS species Congdon's tarplant Centromadia parryi ssp. congdonii), and CNPS species Carmel Valley bush-mallow Malacothamnuspalmeri var. involucratus), as well as the other birds, mammals, fish, reptiles, amphibians, invertebrates and plants that comprise the local riparian ecosystem. Departmental files contain lists of species that could be subject to potential generated impacts from this Project. GENERAL MEASURES FOR PROTECTION OF BIOLOGICAL RESOURCES 1. Agreed activities within the streams may commence after protective features are implemented. This Agreement shall take effect on the date it is signed by the Department and shall remain in effect until December 31, 2014. If the Project is not completed prior to the expiration date defined above, the Operator shall contact the Department to negotiate a new expiration date and any new requirements. 2. When known, the Operator shall provide a construction/work schedule to the Department. The construction schedule shall either be mailed to the Central Region office at 1234 East Shaw Avenue, Fresno, California 93710, Attention: Stream Alteration Program, or faxed to 559) 243-4594. Refer to Notification 2009-0161-R4 when notifying the Department. The Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 6 of 16 APPENDIX A REGULATORY PERMITS, Page 6 of 76 |1013| BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??7??1 |1013| names, phone numbers, cellular phone numbers, pager numbers of key personnel shall be included in this notification. 3. Prior to starting any activity within the stream, all workers shall have received training from the Operator on the contents of this Agreement, the resources at stake, and the legal consequences of non-compliance. 4. The stream bed and any disturbed banks shall be fully restored upon completion of construction. Vegetation in the vicinity of the site shall not be disturbed during construction activities. 5. This Agreement does not allow for the take," or incidental take," of any State- or Federal- listed threatened or endangered species. 6. The Operator affirms that no take" of listed species will occur as a result of this Project and will take prudent measures to ensure that all take" is avoided. The Operator acknowledges that they fully understand that they do not have State incidental take" authority. If any State- or Federal-listed threatened or endangered species occur within the proposed work area or could be impacted by the work proposed, and thus taken" as a result of Project activities,: the Operator is responsible for obtaining and complying with required State and Federal threatened and endangered species permits or other written authorization before proceeding with this Project. 7. Liability for any take," or incidental take," of such listed species remains the separate responsibility of the Operator for the duration of the Project. 8. The Operator shall immediately notify the Department of the discovery of any such rare, threatened, or endangered species prior to and/or during construction. 9. If construction is scheduled to occur during the nesting season of February 15 to August 1, preconstruction surveys shall be conducted by a qualified biologist to determine the presence of nesting birds in the riparian zone. If active raptor nests are found to be present, construction within 100 yards of the active nests shall be delayed until the qualified biologist determines that the young have fledged. If active nests of non-raptor species are found to be present, construction within 25 yards of the active non-raptor nests shall be delayed until the qualified biologist determines that the young have fledged. 10. All litter, construction debris, and waste shall be picked up daily and properly disposed of at an appropriate site. During all activities at Project work sites, all trash that may attract predators shall be properly contained, removed from the work site, and disposed of regularly. Following construction, all trash and construction debris shall be removed from work areas. 11. No pets shall be allowed at the Project site. Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 7 of 16 APPENDIX A REGULATORY PERMITS, Page 7 of 76 31 32 33 34 |1013| BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??8??12. Building materials and/or construction equipment shall not be stockpiled or stored where they could be washed into the water or where they will cover aquatic or riparian vegetation. |1013||1013||1013||10 13| 10 11 12 13 14 15 16 17 18 19 13. The number of access routes, number and size of staging areas, and the total area of the work site activity shall be limited to the minimum necessary to complete the restoration action. Any equipment entering the active stream e.g., in the process of installing a coffer dam) shall be preceded by an individual on foot to displace wildlife and prevent them from being crushed. To avoid any potential for negative impacts to listed species, the following measures shall be implemented: California Red-Lemed Frog Rana aurora draytonii) 14. Construction shall occur between April 15 and October 31. After October 31, construction activities may be extended on a day-to-day basis by contacting Mr. Mike Hill at 805) 471-7222 or the Central Region office at 559) 243-4014, extension 240. No construction activities shall occur following the first significant rainfall after October 31. For purposes of this Agreement, significant rainfall" is defined as rainfall totaling one-quarter of one inch 1/4 inch) of rain in any 24-hour period. 20 15. Prior to the start of construction, the Project limits shall be clearly marked using flagging, 21 temporary construction fencing,- or other suitable and visible means. Construction personnel and 22 equipment shall not enter areas outside the Project limits. 23 24 16. An Emergency Response Plan shall be prepared prior to the start of construction and kept 25 on-site during all phases of construction. The Plan shall identify the actions that shall be taken in 26 the event of a spill of petroleum products, contaminated soil, or other material harmful to fish, 27 plants, or aquatic life. Emergency response materials shall be kept at the site and readily 28 available to allow rapid containment and cleanup of any spilled material. Within 24 hours of any 29 hazardous material spill, including but not limited to petroleum products, the Operator shall 30 contact Mr. Mike Hill by calling 805) 471-7222 and the Department's Central Region by calling 31 559) 243-4014, extension 240. 32 33 17. The Project site has been identified as an area that is potentially inhabited by the California 34 red-legged frog. The Operator is required to comply with all applicable State and Federal laws, 35 including the California and Federal Endangered Species Acts. This Agreement does not 36 authorize the take" of any State- or Federal- listed species. Liability for any take" or 37 incidental take" of such listed species remains the responsibility of the Operator for the duration 38 of the Project. Any unauthorized take" of such listed species may result in prosecution and 39 nullification of the Agreement. 40 41 18. Prior to construction, a qualified biologist shall conduct training sessions to familiarize all 42 construction, personnel with identification of southern steelhead and California red-legged frogs, Agreement No. 2009-0161-R4 W. Enrique Saavedra El Toro Creek Monterey County Page 8 of 16 APPENDIX A REGULATORY PERMITS, Page 8 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??9??their habitat, general Provisions and protections afforded by the Endangered Species Act, measures implemented to protect southern steelhead and California red-legged frogs, and a review of the Project boundaries. During construction, a qualified biologist shall monitor construction activities including, but not limited to, excavation of the sites, installation and removal of diversion structures, and sediment/erosion control devices. 19. To minimize the possibility of injuring California red-legged frogs and other wildlife, herbaceous and small shrubby vegetation within the Project boundaries that would be disturbed by subsequent Project activities shall be removed by hand prior to the use of heavy equipment or machinery. Bullfrogs and exotic crayfish that are observed during the Project shall be captured and permanently removed from the wild. All trash shall be removed from the site daily to avoid attracting potential predators to the site. No pets shall be permitted to be at the site during construction. 20. Within 48 hours prior to construction, the Project site shall be surveyed for California red- legged frogs by a qualified biologist. If any California red-legged frogs are found, work shall not start until the U.S. Fish and Wildlife Service has been contacted and has given approval for work to continue. If any California red-legged frogs are found, the Department of Fish and Game shall be contacted within. 24 hours at 805) 471-7222. 21. Any disturbed banks shall be fully restored upon completion of construction. Revegetation shall be done using locally obtained native species. Planting techniques can include seed casting, hydroseeding, or live planting methods using the techniques in Part XI of the California Salmonid Stream Habitat Restoration Manual. The most current version of the manual is available at: http://www.dfg.ca.gov/habitats. Congdon's Tarplant Centromadia parrpi ssp. conbdonia') and Cannel Valley Bush-Mallow Malacothamnus Palmeri var. involucratus) 22. Prior to construction, surveys shall be conducted by a qualified biologist or botanist to determine the presence of sensitive plants, including but not limited to Congdon's tarplant and Carmel Valley bush-mallow. If any CNPS-listed or other sensitive plant species are observed, the location shall be clearly marked to avoid potential impact to the plants. If impact cannot be avoided, the plants shall be salvaged and stored until they can be replanted in or adjacent to the Project location. RIPARIAN VEGETATION 23. The Operator shall retain riparian vegetation, including trees and brush, to the maximum extent feasible, emphasizing shade production and bank stabilization at the site. Prior to construction, all trees to be removed shall be clearly marked using flagging or other highly visible methods. Only trees marked for removal shall be removed. To the maximum extent Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 9 of 16 APPENDIX A REGULATORY PERMITS, Page 9 of 76 I BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??:??possible, trees to be removed shall be cut at or within 6-inches of ground level and the roots left intact to stabilize the soil. 41 42 43 44 45 24. The Operator shall use Project designs and access points that minimize riparian disturbance without affecting less stable areas, which may increase the risk of channel instability. 25. All coast live oak trees that are removed shall be replaced in-kind at a minimum ratio of not less than 6:1 using locally obtained stock. Arroyo willows greater than 6-inches diameter at breast height DBH) and all other trees greater than 4-inches DBH shall be replaced in-kind at a minimum ratio of 3:1 using locally obtained stock. Upon completion of construction, all disturbed areas shall be revegetated to mitigate for loss of riparian and upland habitat. 26. Disturbance or removal of vegetation shall not exceed the minimum necessary to complete operations. The Project boundaries shall be clearly marked using flagging or other appropriate means. After completion of construction all flagging or other boundary markings shall be removed from the site. 27. All invasive exotic plant species shall be removed from the Project site. Any Vinca, Cape or German ivy, Castor bean, Arundo, or other exotic plant species shall be bagged and appropriately disposed of in a landfill. Exotic species shall not be used in composting or left otherwise exposed in or around the Project site. Heavy equipment and other machinery shall be inspected for the presence of undesirable species prior to on-site use and cleaned to reduce the risk of introducing exotic plant species into the Project site. HAZARDS AND HAZARDOUS MATERIALS 28. All contaminated soil and water shall be contained and disposed of at an appropriate facility licensed to accommodate such contaminants. In no case shall contaminated soil be used for backfill or other purposes, and in no case shall contaminated soil or water be placed where it may enter Waters of the State". 29. All heavy equipment used at the Project site shall be maintained be in proper working condition and shall be free of drips and leaks of coolant and petroleum products. No equipment shall be used on the site unless such equipment is free of leaks and drips. 30. Staging/storage areas for equipment, materials, fuels, lubricants and solvents, shall be located outside of the stream's high water channel and associated riparian area. Stationary equipment such as motors, pumps, generators, compressors, and welders, located within the dry portion of the stream channel or adjacent to the stream shall be positioned over drip-pans. Vehicles and equipment shall be moved out of the normal high water area of the stream prior to refueling and lubricating. 31. All fueling and maintenance of vehicles, other equipment, and staging/storage areas shall be located at least 50 feet from any riparian habitat or water body. The Operator shall ensure contamination of habitat does not occur during such operations. Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 10 of 16 APPENDIX A REGULATORY PERMITS, Page L of 76 I BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??;??132. All equipment operators shall be trained in the procedures to be taken should an accident occur. Prior to the commencement of work, the Operator shall provide the Department with a Plan allowing for prompt and effective response to any accidental spills. All workers shall be informed of the importance of preventing spills and of the appropriate measures to take should a spill occur. 33. All activities performed in or near a stream shall have absorbent materials designed for spill containment and cleanup at the activity site for use in case of an accidental spill. Any equipment or vehicles driven and/or operated within or adjacent to the stream shall be checked and maintained daily, to prevent leaks or materials that if introduced to water could be deleterious to aquatic life. 34. Debris, soil, silt, bark, rubbish, creosote-treated wood, raw cement/concrete or washings thereof, asphalt, paint or other coating material, oil or other petroleum products, or any other substances which could be hazardous to aquatic life, resulting from Project-related activities, shall be prevented from contaminating the soil and/or entering the Waters of the State". Any of these materials, placed within or where they may enter a stream or lake, by Operator or any party working under contract, or with the permission of the Operator, shall be removed immediately. WATER QUALITY 35. Work shall be conducted during the period of lowest flow in the stream channel. 36. If the Project site must be dewatered during construction activities, any muddy or otherwise contaminated water shall be pumped to an upland area located outside the stream channel where the water can clear prior to re-entering the stream. 37. If any power or utility poles are replaced or relocated, they shall be replaced using steel posts. Any removed posts containing creosote, arsenic, or other toxic materials shall be removed from the Project site and disposed of at a facility specifically licensed to accept such materials. 38. Effective erosion and sediment control measures shall be in place at all times during construction. Project activities shall not begin until all temporary erosion and sediment controls are installed throughout the Project site. Erosion and sediment control measures shall be inspected not less than once weekly and shall be maintained in proper functioning condition throughout construction. If erosion and sediment control measures are found to be in need of repair or not in proper working order for any reason, construction shall immediately cease until the measures are repaired. 39. Concrete or rock and vegetation-lined swales maybe built to convey runoff from the road surface to the stream channel. It is recommended that tock and vegetation swales be used instead of concrete. If rock and vegetation swales are used, vegetation shall consist of native vegetation appropriate for the site, such as but not limited to California blackberry Rubus ursinus), creeping wild rye Leymus triticoides), or other suitable species. If concrete is used, all concrete shall be Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 11 of16 APPENDIX A REGULATORY PERMITS, Page of 76 |1013| BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????OBLIGATIONS OF THE OPERATOR The Operator shall have primary responsibility for monitoring compliance with all protective measures included as Provisions" in this Agreement. Protective measures must be implemented within the time periods indicated in the Agreement and the program described below. The Operator shall submit the following Reports to the Department: A construction schedule Provision 2). An Emergency Response Plan Provision 16). If necessary, a Pre-Construction biological survey and report if sensitive species are found Provision 20). Revegetation Plan Provision 45). A Final. Project Report to be submitted within 30 days after the Project-construction is completed. The final report shall summarize the Project-construction, including any problems relating to the protective measures of this Agreement. Before and after" photo documentation of the Project site shall be required. An Annual Report with respect to revegetatioii shall be submitted within 30 days of the end of each calendar year for three 3) years Provision 47). Photo documentation shall be part of the Annual Report. A Project Report submitted within 30 days of each anniversary date of the Department representative's signature on this Agreement. The report to include an assessment of the effectiveness of the mitigation features that were implemented and recommendations, if any, for improving the effectiveness of mitigation measures. The Operator's monitoring of the revegetation effort shall commence immediately following the first planting. Monitoring of revegetation shall continue for two 2) years after seeding and planting the site. Before and after" photo documentation of the Project site shall be required. In addition to the above monitoring and reporting requirements, the Department requires as part of the MRP that the Operator: Immediately notify the Department in writing if monitoring reveals that any of the protective measures were not implemented during the period indicated in this program, or if it anticipates that measures shall not be implemented within the time period specified. Immediately notify the Department if any of the protective measures are not providing the level of protection that is appropriate for the impact that is occurring, and recommendations, if any, for alternative mitigation measures. Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 14 of 16 APPENDIX A REGULATORY PERMITS, Page 1 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11?????VERIFICATION OF COMPLIANCE: 51. The Department shall verify compliance with management compliance measures to ensure the accuracy of the Operator's monitoring and reporting efforts. The Department may, at its sole discretion, review relevant Project documents maintained by the Operator, interview the Operator's employees and agents, inspect the Project area, and take other actions to assess compliance with or effectiveness of management compliance measures for the Project. Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 15 of 16 APPENDIX A REGULATORY PERMITS, Page 15' of 76 I BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??@??CONCURRENCE: APPROVED BY THE CALIFORNIA DEPARTMENT OF FISH AND GAME on 2010. Jeffrey\R. Pingle, Ph.D. Regional Manager Central Region ACKNOWLEDGMENT The undersigned acknowledges receipt of this Agreement and, by signing, accepts and agrees to comply with all terms and conditions contained herein. The undersigned also acknowledges that adequate funding shall be made available to implement the measures required by this Agreement. Date: 2` 2, Agreement No. 2009-0161-R4 Mr. Enrique Saavedra El Toro Creek Monterey County Page 16 of 16 APPENDIX A REGULATORY PERMITS, Page 1(p of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??A??Regulatory Division NOV022009 SUBJECT: File Number 2007-400399S Mr. Enrique Saavedra County of Monterey c/o Namat Hosseinion, Dokken Engineering 2365 Iron Point Road, Suite 200 Folsom, California 95630 Dear Mr. Saavedra: RECEIVED NOV 0 5 2009 This letter is written in response to the September 28, 2009 submittal by Dokken Engineering, on your behalf, concerning Department of the Army re-authorization to construct a new bridge pier in El Toro Creek in conjunction with the project to widen the bridge and improve the intersection of State Route SR) 68 and San Benancio Road, halfway between the Cities of Salinas and Monterey, Monterey County, California. This action would result in the permanent fill of approximately 0.0002 acres of waters of the U.S. The original authorization for this project, issued December 18, 2007, will expire on December 18, 2009. The project has not changed since the original authorization. Based on a review of the information you submitted, your project qualifies for authorization under Department of the Army Nationwide Permit 14 Linear Transportation Projects 72 Fed. Reg. 11092, March 12, 2007), pursuant to Section 404 of the Clean Water Act 33 U.S.C. Section 1344). See Enclosure 1. All work shall be completed in accordance with the plans and drawings titled SR-68/San Benancio Road Intersection Improvement Project Features" included in Figures 2A and 2B of the original application package submitted in 2007. The project must be in compliance with the General Conditions cited in Enclosure 2 for.this Nationwide Permit authorization to remain valid. Non-compliance with any condition could result in the suspension, modification or revocation of the authorization for your project, thereby requiring you to obtain an Individual Permit from the Corps. This Nationwide Permit authorization does not obviate the need to obtain other State or local approvals required by law. This authorization will remain valid for two years from the date of this letter, unless the Nationwide Permit is suspended, modified or revoked. If you have commenced work or are under contract to commence work prior to the suspension, or revocation of the Nationwide Pen-nit and the project would not comply with the resulting Nationwide Permit authorization, you have twelve 12) months from that date to complete the project under the present terms and conditions of the Nationwide Permit. Upon completion of the project and all associated mitigation requirements, you shall sign and return the Certification of Compliance, Enclosure 3, verifying that you have complied with the terms and conditions of the permit. DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94105-2197 APPENDIX A REGULATORY PERMITS, Page J of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??B??2- This authorization will not be effective until you have obtained a Section 401 water quality certification from the Central Coast Regional Water Quality Control Board RWQCB). If the RWQCB fails to act on a valid request for certification within two 2) months after receipt of a complete application, the Corps will presume a waiver of water quality certification has been obtained. You shall submit a copy of the certification to the Corps prior to the commencement of work. To ensure compliance with this Nationwide Permit authorization, the following special conditions shall be implemented: 1. This Corps permit does not authorize you to take an endangered species. In order to legally take a listed species, you must have a separate authorization under the Endangered Species Act ESA) e.g., an ESA Section 10 permit or a Biological Opinion BO) under ESA Section 7 with incidental take" provisions with which you must comply). The enclosed U.S. Fish and Wildlife Service FWS) BO's dated January 26, 1999 and November 26, 2007 contain mandatory terms and conditions to implement the reasonable and prudent measures that are associated with incidental take" that is also specified in the BO's. Your authorization under this Corps permit is conditional upon your compliance with all of the mandatory terms and conditions associated with incidental take authorized by the attached BO's, whose terms and conditions are incorporated by reference in this permit. Failure to comply with the terms and conditions associated with incidental take of the BO's, where a take of the listed species occurs, would constitute an unauthorized take and it would also constitute non-compliance with this Corps permit. The FWS is the appropriate authority to determine compliance with the terms and conditions of its BO's and with the ESA. 2. To avoid impacting the identified archeological site CA-MNT-4/267, all work associated with this project along the northeast side of San Benancio Road, including the temporary access road used to stage the pile driver and construct the bridge falsework, must occur within the existing right-of-way, as outlined in the Environmentally Sensitive Area ESA) Action Plan and Figure 5C Revised Project Design Plans") contained in the Cultural Resources Summary Report dated March 2007. APPENDIX A REGULATORY PERMITS, Page 18 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??C??3- Should you have any questions regarding this matter, please call Greg Brown of our Regulatory Division at 415-503-6791 or by email at gregory.g.brown(&usace.army.mil, Please address all correspondence to the Regulatory Division and refer to the File Number at the head of this letter. If you would like to provide comments on our permit review process, please complete the Customer Survey Form available through the Forms and Contacts Block on our website: www.spn.usace.army mil/regulatory. Sincerely, Jaannc M. flicks Chief, Regulatory Division Ln!clo arcs Copies furnished w/o enclosures): US FWS, Ventura, CA CA RWQCB, San Luis Obispo, CA APPENDIX A REGULATORY PERMITS, Page 19 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??D??APPENDIX A REGULATORY PERMITS, Page 2 O of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??E??Regulatory Division NOV 0 2 2009 SUBJECT: File Number 2007-400399S Mr. Enrique Saavedra County of Monterey c/o Namat Hosseinion, Dokken Engineering 2365 Iron Point Road, Suite 200 Folsom, California 95630 Dear Mr. Saavedra: RECEIVED NOV 0 5 2299 This letter is written in response to the September 28, 2009 submittal by Dokken Engineering, on your behalf, concerning Department of the Army re-authorization to construct a new bridge pier in El Toro Creek in conjunction with the project to widen the bridge and improve the intersection of State Route SR) 68 and San Benancio Road, halfway between the Cities of Salinas and Monterey, Monterey County, California. This action would result in the permanent fill of approximately 0.0002 acres of waters of the U.S. The original authorization for this project, issued December 18, 2007, will expire on December 18, 2009. The project has not changed since the original authorization. Based on a review of the information you submitted, your project qualifies for authorization under Department of the Army Nationwide Permit 14 Linear Transportation Projects 72 Fed. Reg. 11092, March 12, 2007), pursuant to Section 404 of the Clean Water Act 33 U.S.C. Section 1344). See Enclosure 1. All work shall be completed in accordance with the plans and drawings titled SR-68/San Benancio Road Intersection Improvement Project Features" included in Figures 2A and 2B of the original application package submitted in 2007. The project must be in compliance with the General Conditions cited in Enclosure 2 for this Nationwide Permit authorization to remain valid. Non-compliance with any condition could result in the suspension, modification or revocation of the authorization for your project, thereby requiring you to obtain an Individual Permit from the Corps. This Nationwide Permit authorization does not obviate the need to obtain other State or local approvals required by law. This authorization will remain valid for two years from the date of this letter, unless the Nationwide Permit is suspended, modified or revoked. If you have commenced work or are under contract to commence work prior to the suspension, or revocation of the Nationwide Permit and the project would not comply with the resulting Nationwide Permit authorization, you have twelve 12) months from that date to complete the project under the present terms and conditions of the Nationwide Permit. Upon completion of the project and all associated mitigation requirements, you shall sign and return the Certification of Compliance, Enclosure 3, verifying that you have complied with the terms and conditions of the permit. DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94105-2197 APPENDIX A REGULATORY PERMITS, Page 2 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??F??2- This authorization will not be effective until you have obtained a Section 401 water quality certification from the Central Coast Regional Water Quality Control Board RWQCB). If the RWQCB fails to act on a valid request for certification within two 2) months after receipt of a complete application, the Corps will presume a waiver of water quality certification has been obtained. You shall submit a copy of the certification to the Corps prior to the commencement of work. To ensure compliance with this Nationwide Permit authorization, the following special conditions shall be implemented: 1. This Corps permit does not authorize you to take an endangered species. In order to legally take a listed species, you must have a separate authorization under the Endangered Species Act ESA) e.g., an ESA Section 10 permit or a Biological Opinion BO) under ESA Section 7 with incidental take" provisions with which you must comply). The enclosed U.S. Fish and Wildlife Service FWS) BO's dated January 26, 1999 and November 26, 2007 contain mandatory terms and conditions to implement the reasonable and prudent measures that are associated with incidental take" that is also specified in the BO's. Your authorization under this Corps permit is conditional upon your compliance with all of the mandatory terms and conditions associated with incidental take authorized by the attached BO's, whose terms and conditions are incorporated by reference in this permit. Failure to comply with the terms and conditions associated with incidental take of the BO's, where a take of the listed species occurs, would constitute an unauthorized take and it would also constitute non-compliance with this Corps permit. The FWS is the appropriate authority to determine compliance with the terms and conditions of its BO's and with the ESA. 2. To avoid impacting the identified archeological site CA-MNT-4/267, all work associated with this project along the northeast side of San Benancio Road, including the temporary access road used to stage the pile driver and construct the bridge falsework, must occur within the existing right-of-way, as outlined in the Environmentally Sensitive Area ESA) Action Plan and Figure 5C Revised Project Design Plans") contained in the Cultural Resources Summary Report dated March 2007. APPENDIX A REGULATORY PERMITS, Page 2 2 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??G??3- Should you have any questions regarding this matter, please call Greg Brown of our Regulatory Division at 415-503-6791 or by email at g e ory._ brown usace.army.mil. Please address all correspondence to the Regulatory Division and refer to the File Number at the head of this letter, If you would like to provide comments on our permit review process, please complete the Customer Survey Form available through the Forms and Contacts Block on our website: www.spn.usace.army.mil/reuulatory. Sincerely, Jane \/J. I licks Chic Regulatory Division Enclosure.:; Copies furnished w/o enclosures): UUS FWS, Ventura, CA CA RWQCB, San Luis Obispo, CA APPENDIX A REGULATORY PERMITS, Page 23 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??H??APPENDIX A REGULATORY PERMITS, Page of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??I??DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94105-2197 Regulatory Branch SUBJECT: File Number 400399S Jeff Bray, LSA Associates 4200 Rocklin Rd, Suite 11B Rocklin, California 95677 Dear Mr. Bray: DEC 18 2007 This letter is written in response to your submittal of March 30, 2007 concerning Department of the Army authorization to construct a new pier in El Toro Creek in conjunction with the project to improve the intersection of State Route SR) 68 and San Benancio Road, halfway between the Cities of Salinas and Monterey, Monterey County, California. This action would result in the permanent fill of approximately 0.0002 acres of waters of the U.S. Based on a review of the information you submitted, your project qualifies for authorization under Department of the Army Nationwide Permit 14 Linear Transportation Projects 67 Fed. Reg. 2020, January 15, 2002), pursuant to Section 404 of the Clean Water Act 33 U.S.C. Section 1344). See Enclosure 1. All work shall be completed in accordance with the plans and drawings titled SR-68/San Benancio Road Intersection Improvement Project Features" included in Figures 2A and 2B of your application package. The project must be in compliance with the General Conditions cited in Enclosure 2 for this Nationwide Permit authorization to remain valid. Non-compliance with any condition could result in the suspension, modification or revocation of the authorization for your project, thereby requiring you to obtain an Individual Permit from the Corps. This Nationwide Permit authorization does not obviate the need to obtain other State or local approvals required by law. This authorization will remain valid for two years from the date of this letter, unless the Nationwide Permit is suspended, modified or revoked. If you have commenced work or are under contract to commence work prior to the suspension, or revocation of the Nationwide Permit and the project would not comply with the resulting Nationwide Permit authorization, you have twelve 12) months from that date to complete the project under the present terms and conditions of the Nationwide Permit. Upon completion of the project and all associated mitigation requirements, you shall sign and return the Certification of Compliance, Enclosure 3, verifying that you have complied with the terms and conditions of the permit. APPENDIX A REGULATORY PERMITS, Page L5- of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??J??2- This authorization will not be effective until you have obtained a Section 401 water quality certification from the Regional Water Quality Control Board RWQCB). If the RWQCB fails to act on a valid request for certification within two 2) months after receipt of a complete application, the Corps will presume a waiver of water quality certification has been obtained. You shall submit a copy of the certification to the Corps prior to the commencement of work. To ensure compliance with this Nationwide Permit authorization, the following special conditions shall be implemented: 1. This Corps permit does not authorize you to take an endangered species. In order to legally take a listed species, you must have a separate authorization under the Endangered Species Act ESA) e.g., an ESA Section 10 permit or a Biological Opinion BO) under ESA Section 7 with incidental take" provisions with which you must comply). The enclosed U.S. Fish and Wildlife Service FWS) BO dated November 26, 2007 contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with incidental take" that is also specified in the BO. Your authorization under this Corps permit is conditional upon your compliance with all of the mandatory terms and conditions associated with incidental take authorized by the attached BO, whose terms and conditions are incorporated by reference in this permit. Failure to comply with the terms and conditions associated with incidental take of the BO, where a take of the listed species occurs, would constitute an unauthorized take and it would also constitute non- compliance with this Corps permit. The FWS is the appropriate authority to determine compliance with the terms and conditions of its BO and with the ESA. 2. To avoid impacting the identified archeological site CA-MNT-4/267, all work associated with this project along the northeast side of San Benancio Road, including the temporary access road used to stage the pile driver and construct the bridge falsework, must occur within the existing right-of-way, as outlined in the Environmentally Sensitive Area ESA) Action Plan and Figure 5C Revised Project Design Plans") contained in the Cultural Resources Summary Report dated March 2007. APPENDIX A REGULATORY PERMITS, Page 2-(a of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??K??3- Should you have any questions regarding this matter, please call Greg Brown of our Regulatory Branch at 415-503-6791. Please address all correspondence to the Regulatory Branch and refer to the File Number at the head of this letter. If you would like to provide comments on our permit review process, please complete the Customer Survey Form available through the Forms and Contacts Block on our website: www.spn.usace.army.mil/regulatory. Sincerely, Enclosures Copies furnished w/o enclosures): Jane M. Hicks Chief, Regulatory Branch US FWS, Ventura, CA CA RWQCB, San Luis Obispo, CA Enrique Saavedra, Monterey County Dept. of Public Works, 168 West Alisal, 2nd Floor, Salinas, CA, 93901 APPENDIX A REGULATORY PERMITS, Page 2-7 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??L??Nationwide Permit 14 Linear Transportation Projects Activities required for the construction, expansion, modification, or improvement of linear transportation projects e.g., roads, highways, railways, trails, airport runways, and taxiways) in waters of the United States. For linear transportation projects in non-tidal waters, the discharge cannot cause the loss of greater than 12-acre of waters of the United States. For linear transportation projects in tidal waters, the discharge cannot cause the loss of greater than 1/3-acre of waters of the United States. Any stream channel modification, including bank stabilization, is limited to the minimum necessary to construct or protect the linear transportation project; such modifications must be in the immediate vicinity of the project. This NWP also authorizes temporary structures, fills, and work necessary to construct the linear transportation project. Appropriate measures must be taken to maintain normal downstream flows and minimize flooding to the maximum extent practicable, when temporary structures, work, and discharges, including cofferdams, are necessary for construction activities, access fills, or dewatering of construction sites. Temporary fills must consist of materials, and be placed in a manner, that will not be eroded by expected high flows. Temporary fills must be removed in their entirety and the affected areas returned to preconstruction elevations. The areas affected by temporary fills must be revegetated, as appropriate. This NWP cannot be used to authorize non-linear features commonly associated with transportation projects, such as vehicle maintenance or storage buildings, parking lots, train stations, or aircraft hangars. Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity if: 1) The loss of waters of the United States exceeds 1/10 acre; or 2) there is a discharge in a special aquatic site, including wetlands. See general condition 27.) Sections 10 and 404) Note: Some discharges for the construction of farm roads or forest roads, or temporary roads for moving mining equipment, may qualify for an exemption under Section 404(f) of the Clean Water Act see 33 CFR 323.4). Federal Register/ Vol. 72, No. 471 Monday, March 12, 2007/ Notices 11191 APPENDIX A REGULATORY PERMITS, Page 2- 9 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??M??Enclosure 2 Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as appropriate,: in addition to any regional or case-specific conditions imposed by the division engineer or district engineer. Prospective permittees should contact the appropriate Corps district office to determine if regional conditions have been imposed on an NWP. Prospective permittees should also contact the appropriate Corps district office to determine the status of Clean Water Act Section 401 water quality certification and/ or Coastal Zone Management Act consistency for an NWP. 1. Navigation. a) No activity may cause more than a minimal adverse effect on navigation. b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States. c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. 2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. Culverts placed in streams must be installed to maintain low flow conditions. 3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction e.g., through excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized. 4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable. 5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48. 6. Suitable Material. No activity may use unsuitable material e.g., trash, debris, car bodies, asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in toxic amounts see Section 307 of the Clean Water Act). 7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization. 8. Adverse Effects From Impoundments. If the activity creates an impoundment of water, adverse effects to the aquatic system due to accelerating the passage of water, and/or restricting Its flow must be minimized to the maximum extent practicable. 9. Management of Water Flows. To the maximum extent practicable, the preconstruction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization and storm water management activities, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the preconstruction course, condition, capacity, and location of open waters if it benefits the aquatic environment e.g., stream restoration or relocation activities). 10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-approved state or local floodplain management requirements. APPENDIX A REGULATORY PERMITS, Page"-.42- L?I of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??N??11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. 12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States during periods of low-flow or no-flow. 13. Removal of Temporary Fills. Temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The affected areas must be revegetated, as appropriate. 14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety. 15. Wild and Scenic Rivers. No activity may occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a study river" for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status. Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency in the area e.g., National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife Service). 16. Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights. 17. Endangered Species. a) No activity is authorized under any NWP which is likely to jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act ESA), or which will destroy or adversely modify the critical habitat of such species. No activity is authorized under any NWP which may affect" a listed species or critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been completed. b) Federal agencies should follow their own procedures for complying with the requirements of the ESA. Federal permittees must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. c) Non-federal permittees shall notify the district engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the project, or if the project is located in designated critical habitat, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally-listed endangered or threatened species or designated critical habitat, the pre-construction notification must include the name(s) of the endangered or threatened species that may be affected by the proposed work or that utilize the designated critical habitat that may be affected by the proposed work. The district engineer will determine whether the proposed activity may affect" or will have no effect" to listed species and?designated critical habitat and will notify the non-Federal applicant of the Corps' determination within 45 days of receipt of a complete pre-construction notification. In cases where the non-Federal applicant has identified listed species or critical habitat that might be affected or is in the vicinity of the project, and has so notified the Corps, the applicant shall not begin work until the Corps has provided notification the proposed activities will have no effect" on listed species or critical habitat, or until Section 7 consultation has been completed. d) As a result of formal or informal consultation with the FWS or NMFS the district engineer may add species specific regional endangered species conditions to the NWPs. e) Authorization of an activity by a NWP does not authorize the take" of a threatened or endangered species as defined under the ESA. In the absence of separate authorization e.g., an ESA Section 10 Permit, a Biological Opinion with incidental take" provisions, etc.) from the U.S. FWS or the NMFS, both lethal and non-lethal takes" of protected species are in violation of the ESA. Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the U.S. FWS and NMFS or their world wide Web pages at http://www.fws.govl and http://www.noaa.gov/fisheries.html respectively. 18. Historic Properties. a) In cases where the district engineer determines that the activity may affect properties listed, or eligible for listing, in the National Register of Historic Places, the activity is not authorized, until the requirements of Section 106 of the National Historic Preservation Act NHPA) have been satisfied. b) Federal permittees should follow APPENDIX A REGULATORY PERMITS, Page 3 0 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??O??their own procedures for complying with the requirements of Section 106 of the National Historic Preservation Act. Federal permittees must provide the district engineer with the appropriate. documentation to demonstrate compliance with those requirements. c) Non-federal permittees must submit a pre-construction notification to the district engineer if the authorized activity may have the potential to cause effects to any historic properties listed, determined to be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places, including previously unidentified properties. For such activities, the preconstruction notification must state which historic properties may be affected by the proposed work or include a vicinity map indicating the location of the historic properties or the potential for the presence of historic properties. Assistance regarding information on the location ofor potential for the presence of historic resources can be sought from the State Historic Preservation Officer: or Tribal Historic Preservation Officer, as appropriate, and the National Register of Historic Places see 33 CFR 330.4(g)). The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts, which may include background research, consultation, oral history interviews, sample field investigation, and field survey. Based on the information submitted and these efforts, the district engineer shall determine whether the proposed activity has the potential to cause an effect on the historic properties. Where the non-Federal applicant has identified historic properties which the activity may have the potential to cause effects and so notified the Corps, the non-Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects or that consultation under Section 106 of the NHPA has been completed. d) The district engineer will notify the prospective permittee within 45 days of receipt of a complete preconstruction notification whether NHPA Section 106 consultation is required. Section 106 consultation is not required when the Corps'determines that the activity does not have the potential to cause effects on historic properties see 36 CFR 800.3(a)). If NHPA section 106 consultation is required and will occur, the district engineer will notify the non-Federal applicant that he or she cannot begin work until Section 106.consultation is completed. e) Prospective permittees should be aware that section 110k of the NHPA 16 U.S.C. 470h-2(k)) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of Section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation specifying the circumstances, explaining the degree of damage to the integrity of any historic properties affected, and proposed mitigation, This documentation must include any views obtained from the applicant, SHPOTTHPO, appropriate Indian tribes if the undertaking occurs on or affects historic properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a legitimate interest in the impacts to the permitted activity on historic properties. 19. Designated Critical Resource Waters. Critical resource waters include, NOAA-designated marine sanctuaries, National Estuarine Research Reserves, state natural heritage sites, and outstanding national resource waters or other waters officially designated by a state as having particular environmental or ecological significance and identified by the district engineer after notice and opportunity for public comment. The district engineer may also designate additional critical resource waters after notice and opportunity for comment. a) Discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, and 50 for any activity within, or directly affecting, critical resource waters, including wetlands adjacent to such waters. b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, and 38, notification is required in accordance with general condition 27, for any activity proposed in the designated critical resource waters including wetlands adjacent to those waters. The district engineer may authorize activities under these NWPs only after it is determined that the impacts to the critical resource waters will be no more than minimal. 20. Mitigation. The district engineer will consider the following factors when determining appropriate and practicable mitigation necessary to ensure that adverse effects on the aquatic environment are minimal: a) The activity must be designed and constructed to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site i.e., on site). b) Mitigation in all its forms avoiding, minimizing, rectifying, reducing, or compensating) will be required to the extent necessary to ensure that the adverse effects to the aquatic environment are minimal. c) Compensatory mitigation at a minimum one-for-one ratio will be required for all wetland losses that exceed 1/10 acre and require preconstruction notification, unless the district engineer determines in writing that some other form of mitigation would be more environmentally appropriate and provides a project specific waiver of this requirement. For wetland losses of 1/10 acre or less that require pre- construction notification, the district engineer may determine on a case-by-case basis that compensatory mitigation is required to ensure that the activity results in minimal adverse effects on the aquatic environment. Since the likelihood APPENDIX A REGULATORY PERMITS, Page 3 1 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??P??of success is greater and the impacts to potentially valuable uplands are reduced, wetland restoration should be the first compensatory mitigation option considered. d) For losses of streams or other open waters that require pre- construction notification, the district engineer may require compensatory mitigation, such as stream restoration, to ensure that the activity results in minimal adverse effects on the aquatic environment. e) Compensatory mitigation will not be used to increase the acreage losses allowed by the acreage limits of the NWPs. For example, if an NWP has an acreage limit of 12 acre, it cannot be used to authorize any project resulting in the loss of greater than 12 acre of waters of the United States, even if compensatory mitigation is provided that replaces or restores some of the lost waters. However, compensatory mitigation can and should be used, as necessary, to ensure that a project already meeting the established acreage limits also satisfies the minimal impact requirement associated with the NWPs. f) Compensatory mitigation plans for projects in or near streams or other open waters will normally include a requirement for the establishment, maintenance, and legal protection e.g., conservation easements) of riparian areas next to open waters. In some cases, riparian areas may be the only compensatory mitigation required. Riparian areas should consist of native species. The width of the required riparian area will address documented water quality or aquatic habitat loss concerns. Normally, the riparian area will be 25 to 50 feet wide on each side of the stream, but the district engineer may require slightly wider riparian areas to address documented water quality or habitat loss concerns. Where both wetlands and open waters exist on the project site, the district engineer will determine the appropriate compensatory mitigation e.g., riparian areas and/or wetlands compensation) based on what is best for the aquatic environment on a watershed basis, In cases where riparian areas are determined to be the most appropriate form of compensatory mitigation, the district engineer may waive or reduce the requirement to provide wetland compensatory mitigation for wetland losses. g) Permittees may propose the use of mitigation banks, in-lieu fee arrangements or separate activity specific compensatory mitigation. In all cases, the mitigation provisions will specify the party responsible for accomplishing and/or complying with the mitigation plan. h) Where certain functions and services of waters of the United States are permanently adversely affected, such as the conversion of a forested or scrub-shrub wetland to a herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may be required to reduce the adverse effects of the project to the minimal level. 21. Water Quality. Where States and authorized Tribes, or EPA where applicable, have not previously certified compliance of an NWP with CWA Section 401, individual 401 Water Quality Certification must be obtained or waived see 33 CFR 330.4(c)). The district engineer or State or Tribe may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of water quality. 22. Coastal Zone Management. In coastal states where an NWP has not previously received a state coastal zone management consistency concurrence, an individual state coastal zone management consistency concurrence must be obtained, or a presumption of concurrence must occur see 33 CFR 330.4(d)). The district engineer or a State may require additional measures to ensure that the authorized activity is consistent with state coastal zone management requirements. 23. Regional and Case-By-Case Conditions. The activity must comply with any regional conditions that may have been added by the Division Engineer see 33 CFR 330.4(e)) and with any case specific conditions added by the Corps or by the state, Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone Management Act consistency determination. 24. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete project is prohibited, except when the acreage loss of waters of the United States authorized by the NWPs does not exceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a road crossing over tidal waters is constructed under NWP 14, with associated bank stabilization authorized by NWP 13, the maximum acreage loss of waters of the United States for the total project cannot exceed 1/3-acre. 25. Transfer of Nationwide Permit Verifications. If the permittee sells the property associated with a nationwide permit verification, the permittee may transfer the nationwide permit verification to the new owner by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the nationwide permit verification must be attached to the letter, and the letter must contain the following statement and signature: When the structures or work authorized by this nationwide permit are still in existence at the time the property is transferred, the terms and conditions of this nationwide permit, including any special conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this nationwide permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below." APPENDIX A REGULATORY PERMITS, Page 32_ of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Q??Transferee)- Date) 26. Compliance Certification. Each permittee who received a NWP verification from the Corps must submit a signed certification regarding the completed work and any required mitigation. The certification form must be forwarded by the Corps with the NWP verification letter and will include: a) A statement that the authorized work was done in accordance with the NWP authorization, including any general or specific conditions; b) A statement that any required mitigation was completed in accordance with the permit conditions; and c) The signature of the permittee certifying the completion of the work and mitigation. 27. Pre-Construction Notification. a) Timing. Where required by the terms of the NWP, the prospective permittee must notify the district engineer by submitting a pre-construction notif ication PCN) as early as possible. The district engineer must determine if the PCN is complete within 30 calendar days of the date of. receipt and, as a general rule, will request additional information necessary to make the PCN complete only once. However, if the prospective permittee does not provide all of the requested information, then the district engineer will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not commence until-all of the requested information has been received by the district engineer. The prospective permittee shall not begin the activity:.(1) Until notified in writing by the district engineer that the activity may proceed under the NWP with any special conditions imposed by the district or division engineer; or. 2) If 45 calendar days have passed from the district engineer's receipt of the complete PCN and the prospective permittee has not received written notice from the district or division engineer. However, if the permittee was required to notify the Corps pursuant to general condition 17 that listed species or critical habitat might be affected or in the vicinity of the project, or to notify the Corps pursuant to general condition 18 that the activity may have the potential to cause effects to historic properties, the permittee cannot begin the activity until receiving written notification from the Corps that is no effect" on listed species or no potential to cause effects" on historic properties, or that any consultation required under Section 7 of the Endangered Species Act see 33 CFR 330.4(f)) and/or Section 106 of the National Historic Preservation see 33 CFR 330.4(g)) is,completed. Also, work cannot begin under NWPs 21, 49, or 50 until the permittee has received written approval from the Corps. If the proposed activity requires a written waiver to exceed specified limits of an NWP, the permittee cannot begin the activity until the district engineer issues the waiver. If the.district ordivision engineer notifies the permittee in writing that an individual permit is required within 45 calendar days of receipt of a complete PCN, the permittee cannot begin the activity until an individual permit has been obtained. Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the,procedure set forth in 33 CFR 330.5(d)(2). b) Contents of Pre-Construction Notification: The PCN must be in writing and include the following information: 1) Name, address and telephone numbers of the prospective permittee; 2) Location of the proposed project; 3) A description of the proposed project; the project's purpose; direct and indirect adverse environmental effects the project would cause; any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize anypart of the proposed project or any related activity. The description should be sufficiently detailed to allow the district engineer to determine that the adverse effects of the project will be minimal and to determine the need for compensatory mitigation. Sketches should be provided when necessary to show that the activity complies with the terms of the NWP. Sketches usually clarify the project and when provided result in a quicker decision.); 4) The PCN must include a delineation of special aquatic sites and other waters of the United States on the project site. Wetland delineations must be prepared in accordance with the current method required by the Corps. The permittee may ask the Corps to delineate the special aquatic sites and other waters of the United States, but there may be a delay if the Corps does the delineation, especially if the project site is large or contains many waters of the United States. Furthermore, the 45 day period will not start until the delineation has been submitted to or completed by the Corps, where appropriate; 5) If the proposed activity will result in the loss of greater than 1/10 acre of wetlands and a PCN is required, the prospective permittee must submit a statement describing how the mitigation requirement will be satisfied. As an alternative, the prospective permittee may submit a conceptual or detailed mitigation plan. 6) If any listed species or designated critical habitat might be affected or Is in the vicinity of the project, or if the project is located in designated critical habitat, for non- Federal applicants the PCN must include the name(s) of those endangered or threatened species that might be affected by the proposed work or utilize the designated critical habitat that may be affected by the proposed work. Federal applicants must provide documentation demonstrating compliance with the Endangered Species Act; and 7) For an activity that may affect a historic property listed on, determined to be eligible for listing on, or potentially eligible for listing on, the National Register of Historic Places, for non-Federal applicants the PCN must state which historic property may be affected by the proposed work or include a vicinity map indicating the location of the historic property. APPENDIX A REGULATORY PERMITS, Page 3 3 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??R??Federal applicants must provide documentation demonstrating compliance with Section 106 of the National Historic Preservation Act. c) Form of Pre-Construction Notification: The standard individual permit application form Form ENG 4345) may be used, but the completed application form must clearly indicate that it is a PCN and must include all of the information required in paragraphs b)(1) through 7) of this general condition. A letter containing the required information may also be used. d) Agency Coordination: 1) The district engineer will consider any comments from Federal and state agencies concerning the proposed activity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the project's adverse environmental effects to a minimal level. 2) For all NWP 48 activities requiring pre-construction notification and for other NWP. activities requiring preconstruction notification to the district engineer that result in the loss of greater than 1/2-acre of waters of the United States, the district engineer will immediately provide e.g., via facsimile transmission, overnight mail, or other expeditious manner) a copy of the PCN to the appropriate Federal or state offices U.S. FWS, state natural resource or water quality agency, EPA, State Historic Preservation Officer SHPO) or Tribal Historic Preservation Office THPO), and, if appropriate, the NMFS). With the exception of NWP 37, these agencies will then have 10 calendar days from the date the material is transmitted to telephone or fax the district. engineer notice that they intend to provide substantive, site-specific comments. If so contacted by an agency, the district engineer will wait an additional 15 calendar days before making a decision on the preconstruction notification. The district engineer will fully consider agency comments received within the specified time frame, but will provide no response to the resource agency, except as provided below. The district engineer will indicate in the administrative record associated with each preconstruction notification that the resource agencies' concerns were considered. For NWP 37, the emergency watershed protection and rehabilitation activity may proceed immediately in cases where there is an unacceptable hazard to life or a significant loss of property or economic hardship will occur. The district engineer will consider any comments received to decide whether the NWP 37 authorization should be modified, suspended, or revoked in accordance with the procedures at 33 CFR 330.5. 3) In cases of where the prospective permittee is not a Federal agency, the district engineer will provide a response to NMFS within 30 calendar days of receipt of any Essential Fish Habitat conservation recommendations, as required by Section 305(b)(4)(B) of the Magnuson-Stevens Fishery Conservation and Management Act. 4) Applicants are encouraged to provide the Corps multiple copies of pre-construction notifications to expedite agency coordination. 5) For NWP 48 activities that require reporting, the district engineer will provide a copy of each report within 10 calendar days of receipt to the appropriate regional office of the NMFS. e) District Engineer's Decision: In reviewing the PCN for the proposed activity, the district engineer will determine whether the activity authorized by the NWP will result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public interest. If the proposed activity requires a PCN and will result in a loss of greater than 1/10 acre of wetlands, the prospective permittee should submit a mitigation proposal with the PCN. Applicants may also propose compensatory mitigation for projects with smaller impacts. The district engineer will consider any proposed compensatory mitigation the applicant has included in the proposal in determining whether the net adverse environmental effects to the aquatic environment of the proposed work are minimal. The compensatory mitigation proposal maybe either conceptual or detailed. If the district engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse effects on the aquatic environment are minimal, after considering mitigation, the district engineer will notify the permittee and include any conditions the district engineer deems necessary. The district engineer must approve any compensatory mitigation proposal before the permittee commences work. If the prospective permittee elects to submit a compensatory mitigation plan with the PCN, the district engineer will expeditiously review the proposed compensatory mitigation plan. The district engineer must review the plan within 45 calendar days of receiving a complete PCN and determine whether the proposed mitigation would ensure no more than minimal adverse effects on the aquatic environment. If the net adverse effects of the project on the aquatic environment after consideration of the compensatory mitigation proposal) are determined by the district engineer to be minimal, the district engineer will provide a timely written response to the applicant. The response will state that the project can proceed under the terms and conditions of the NWP. If the district engineer determines that the adverse effects of the proposed work are more than minimal, then the district engineer will notify the applicant either: 1) That the project does not qualify for authorization under the NWP and instruct the applicant on the procedures to seek authorization under an individual permit; 2) that the project is authorized under the NWP subject to the applicant's submission of a mitigation plan that would reduce the adverse effects on the aquatic environment to the minimal level; or 3) that the project is authorized under the NWP with specific modifications or conditions. Where the district engineer determines that mitigation is required to ensure no more than minimal adverse effects occur to the aquatic environment, the activity will be authorized within the 45-day PCN period. The authorization will include the necessary conceptual or specific mitigation or a requirement that the applicant submit a mitigation plan that would reduce the adverse effects on the aquatic environment to the minimal level. When mitigation is required, no work in waters of the United States may occur until the district engineer has approved a specific mitigation plan. APPENDIX A REGULATORY PERMITS, Page j of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??S??28. Single and Complete Project. The activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project. APPENDIX A REGULATORY PERMITS, Page 3-" of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??T??Enclosure 3 Permittee: Monterey County Dept. of Public Works File Number: 400399S Certification of Compliance for Nationwide Permit I hereby certify that the work authorized by the above referenced File Number and all required mitigation have been completed in accordance with the terms and conditions of this Nationwide Permit authorization." Permittee) Date) Return to: Greg Brown U.S. Army Corps of Engineers San Francisco District Regulatory Branch, CESPN-OR-R 1455 Market San Francisco, CA 94103-1398 APPENDIX A REGULATORY PERMITS, Page 3 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??U??DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94105-2197 Regulatory Branch SUBJECT: File Number 400399S Jeff Bray, LSA Associates 4200 Rocklin Rd, Suite 11B Rocldin, California 95677 Dear Mr. Bray: DEC 18 2007 This letter is written in response to your submittal of March 30, 2007 concerning Department of the Army authorization to construct a new pier in El Toro Creek in conjunction with the project to improve the intersection of State Route SR) 68 and San Benancio Road, halfway between the Cities of Salinas and Monterey, Monterey County, California. This action would result in the permanent fill of approximately 0.0002 acres of waters of the U.S. Based on a review of the information you submitted, your project qualifies for authorization under Department of the Army Nationwide Permit 14 Linear Transportation Projects 67 Fed. Reg. 2020, January 15, 2002), pursuant to Section 404 of the Clean Water Act 33 U.S.C. Section 1344). See Enclosure 1. All work shall be completed in accordance with the plans and drawings titled SR-68/San Benancio Road Intersection Improvement Project Features" included in Figures 2A and 2B of your application package. The project must be in compliance with the General Conditions cited in Enclosure 2 for this Nationwide Permit authorization to remain valid. Non-compliance with any condition could result in the suspension, modification or revocation of the authorization for your project, thereby requiring you to obtain an Individual Permit from the Corps. This Nationwide Permit authorization does not obviate the need to obtain other State or local approvals required by law. This authorization will remain valid for two years from the date of this letter, unless the Nationwide Permit is suspended, modified or revoked. If you have commenced work or are under contract to commence work prior to the suspension, or revocation of the Nationwide Permit and the project would not comply with the resulting Nationwide Permit authorization, you have twelve 12) months from that date to complete the project under the present terms and conditions of the Nationwide Permit. Upon completion of the project and all associated mitigation requirements, you shall sign and return the Certification of Compliance, Enclosure 3, verifying that you have complied with the terms and conditions of the permit. APPENDIX A REGULATORY PERMITS, Page 3 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??V??This authorization will not be effective until you have obtained a Section 401 water quality certification from the Regional Water Quality Control Board RWQCB). If the RWQCB fails to act on a valid request for certification within two 2) months after receipt of a complete application, the Corps will presume a waiver of water quality certification has been obtained. You shall submit a copy of the certification to the Corps prior to the commencement of work. To ensure compliance with this Nationwide Permit authorization, the following special conditions shall be implemented: 1. This Corps permit does not authorize you to take an endangered species. In order to legally take a listed species, you must have a separate authorization under the Endangered Species Act ESA) e.g., an ESA Section 10 permit or a Biological Opinion BO) under ESA Section 7 with incidental take" provisions with which you must comply). The enclosed U.S. Fish and Wildlife Service FWS) BO dated November 26, 2007 contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with incidental take" that is also specified in the BO. Your authorization under this Corps permit is conditional upon your compliance with all of the mandatory terms and conditions associated with incidental take authorized by the attached BO, whose terms and conditions are incorporated by reference in this permit. Failure to comply with the terms and conditions associated with incidental take of the BO, where a take of the listed species occurs, would constitute an unauthorized take and it would also constitute non- compliance with this Corps permit. The FWS is the appropriate authority to determine compliance with the terms and conditions of its BO and with the ESA. 2. To avoid impacting the identified archeological site CA-MNT-4/267, all work associated with this project along the northeast side of San Benancio Road, including the temporary access road used to stage the pile driver and construct the bridge falsework, must occur within the existing right-of-way, as outlined in the Environmentally Sensitive Area ESA) Action Plan and Figure 5C Revised Project Design Plans") contained in the Cultural Resources Summary Report dated March 2007. APPENDIX A REGULATORY PERMITS, Page 3' of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??W??3- Should you have any questions regarding this matter, please call Greg Brown of our Regulatory Branch at 415-503-6791. Please address all correspondence to the Regulatory Branch and refer to the File Number at the head of this letter. If you would like to provide comments on our permit review process, please complete the Customer Survey Form available through the Forms and Contacts Block on our website: www.spn.usace.army.mil/regulatory. Sincerely, Enclosures Copies furnished w/o enclosures): Jane M. Hicks Chief, Regulatory Branch US FWS, Ventura, CA CA RWQCB, San Luis Obispo, CA Enrique Saavedra, Monterey County Dept. of Public Works, 168 West Alisal, 2nd Floor, Salinas, CA, 93901 APPENDIX A REGULATORY PERMITS, Page 3 1 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??X??Nationwide Permit 14 Linear Transportation Projects Activities required for the construction, expansion, modification, or improvement of linear transportation projects e.g., roads, highways, railways, trails, airport runways, and taxiways) in waters of the United States. For linear transportation projects in non-tidal waters, the discharge cannot cause the loss of greater than 1/2-acre of waters of the United States. For linear transportation projects in tidal waters, the discharge cannot cause the loss of greater than 1/3-acre of waters of the United States. Any stream channel modification, including bank stabilization, is limited to the minimum necessary to construct or protect the linear transportation project; such modifications must be in the immediate vicinity of the project. This NWP also authorizes temporary structures, fills, and work necessary to construct the linear transportation project. Appropriate measures must be taken to maintain normal downstream flows and minimize flooding to the maximum extent practicable, when temporary structures, work, and discharges, including cofferdams, are necessary for construction activities, access fills, or dewatering of construction sites. Temporary fills must consist of materials, and be placed in a manner, that will not be eroded by expected high flows. Temporary fills must be removed in their entirety and the affected areas returned to preconstruction elevations. The areas affected by temporary fills must be revegetated, as appropriate. This NWP cannot be used to authorize non-linear features commonly associated with transportation projects, such as vehicle maintenance or storage buildings, parking lots, train stations, or aircraft hangars. Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity if: 1) The loss of waters of the United States exceeds 1/10 acre; or 2) there is a discharge in a special aquatic site, including wetlands, See general condition 27.) Sections 10 and 404) Note: Some discharges for the construction of farm roads or forest roads, or temporary roads for moving mining equipment, may qualify for an exemption under Section 404(f) of the Clean Water Act see 33 CFR 323.4). Federal Register / Vol. 72, No. 471 Monday, March 12, 2007/ Notices 11191 APPENDIX A REGULATORY PERMITS, Page of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Y??Enclosure 2 Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as appropriate, in addition to any regional or case-specific conditions imposed by the division engineer or district engineer. Prospective permittees should contact the appropriate Corps district office to determine if regional conditions have been imposed on an NWP. Prospective permittees should also contact the appropriate Corps district office to determine the status of Clean Water Act Section 401 water quality certification and/ or Coastal Zone Management Act consistency for an NWP. 1. Navigation. a) No activity may cause more than a minimal adverse effect on navigation. b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States. c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States; No claim shall be made against the United States on account of any such removal or alteration. 2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. Culverts placed in streams must be installed to maintain low flow conditions. 3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction e.g., through excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized. 4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable. 5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48. 6. Suitable Material. No activity may use unsuitable material e.g., trash, debris, car bodies, asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in toxic amounts see Section 307 of the Clean Water Act). 7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization. 8. Adverse Effects From Impoundments. If the activity creates an impoundment of water, adverse effects to the aquatic system due to accelerating the passage of water, and/or restricting its flow must be minimized to the maximum extent practicable. 9. Management of Water Flows. To the maximum extent practicable, the preconstruction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization and storm water management activities, except as provided below. The activity must be constructed to withstand expected high'flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the preconstruction course, condition, capacity, and location of open waters if it benefits the aquatic environment e.g., stream restoration or relocation activities). 10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-approved state or local floodplain management requirements. APPENDIX A REGULATORY PERMITS, Page 4/ of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??Z??11. Equipment Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. 12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States during periods of low-flow or no-flow. 13. Removal of Temporary Fills. Temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The affected areas must be revegetated, as appropriate. 14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety. 15. Wild and Scenic Rivers. No activity may occur in a component of the National Wild and Scenic River System, or in a river officiallydesignated by Congress as a study river" for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status. Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency in the area e.g., National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife Service). 16. Tribal Rights, No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights. 17. Endangered Species. a) No activity is authorized under any NWP which is likely to jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act ESA), or which will destroy or adversely modify the critical habitat of such species. No activity is authorized under any NWP which may affect" a listed species or critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been completed. b) Federal agencies should follow their own procedures for complying with the requirements of the ESA. Federal permittees must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. c) Non-federal permittees shall notify the district engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the project, or if the project is located in designated critical habitat, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally-listed endangered or threatened species or designated critical habitat, the pre-construction notification must include the name(s) of the endangered or threatened species that may be affected by the proposed work or that utilize the designated critical habitat that may be affected by the proposed work. The district engineer will determine whether the proposed activity may affect" or will have no effect" to listed species and'designated critical habitat and will notify the non-Federal applicant of the Corps' determination within 45 days of receipt of a complete pre-construction notification. In cases where the non-Federal applicant has identified listed species or critical habitat that might be affected or is in the vicinity of the project, and has so notified the Corps, the applicant shall not begin work until the Corps has provided notification the proposed activities will have no effect" on listed species or critical habitat, or until Section 7 consultation has been completed. d) As a result of formal or informal consultation with the FWS or NMFS the district engineer may add species specific regional endangered species conditions to the NWPs. e) Authorization of an activity by a NWP does not authorize the take" of a threatened or endangered species as defined under the ESA. In the absence of separate authorization e.g., an ESA Section 10 Permit, a Biological Opinion with incidental take" provisions, etc.) from the U.S. FWS or the NMFS, both lethal and non-lethal takes" of protected species are in violation of the ESA. Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the U.S. FWS and NMFS or their world wide Web pages at http://www.fws.govl and http://www.noaa.oov/fisheries,html respectively. 18. Historic Properties. a) In cases where the district engineer determines that the activity may affect properties listed, or eligible for listing, in the National Register of Historic Places, the activity is not authorized, until the requirements of Section 106 of the National Historic Preservation Act NHPA) have been satisfied. b) Federal permittees should follow APPENDIX A REGULATORY PERMITS, Page of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??[??their own procedures for complying with the requirements of Section 106 of the National Historic Preservation Act. Federal permittees must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. c) Non-federal permittees must submit a pre-construction notification to the district engineer if the authorized activity may have the potential to cause effects to any historic properties listed, determined to be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places, including previously unidentified properties. For such activities, the preconstruction notification must state which historic properties may be affected by the proposed work or include a vicinity map indicating-the location of the historic properties or the potential for the presence of historic properties. Assistance regarding information on the location of or potential for the presence of historic resources can be sought from the State Historic Preservation Officer or Tribal Historic Preservation Officer, as appropriate, and the National Register of Historic Places see-33 CFR 330.4(g)). The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts, which may include, background research, consultation, oral history interviews, sample field investigation, and field survey. Based on the information submitted and these efforts, the district engineer shall determine, whether the proposed activity has the potential to cause an effect on the historic, prope rties. Where the non-Federal applicant has identified historic properties which the activity may have the potential to cause effects and so notified the Corps, the non-Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects or that consultation under Section 106 of the NHPA has been completed. d) The district engineer will notify the prospective permittee within 45 days of receipt of a complete preconstruction notification whether NHPA Section 106. consultation Is required. Section 106 consultation is not required when the Corps determines that the activity does not have the potential to cause effects on historic properties see 36 CFR 800.3(a)). If NHPA section 106 consultation is required and will.occur, the district engineer will notify the non-Federal applicant that he or she cannot begin work until Section 106 consultation is completed. e) Prospective permittees should be aware that section 110k of the NHPA 16 U.S.C. 470h-2(k)) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of Section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP.and provide documentation specifying the circumstances, explaining the degree of damage to the integrity of any historic properties affected, and proposed mitigation. This documentation must include any views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the undertaking occurs on or affects historic properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a legitimate interest in the impacts to the permitted activity on historic properties. 19. Designated Critical Resource Waters. Critical resource waters include, NOAA-designated marine sanctuaries, National Estuarine Research Reserves, state natural heritage sites, and outstanding national resource waters or other waters officially designated by a state as having particular environmental or ecological significance and identified by the district engineer after notice and opportunity for public comment. The district engineer may also designate additional critical resource waters after notice and opportunity for comment. a) Discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, and 50 for any activity within, or directly affecting, critical resource waters, including wetlands adjacent to such waters. b) For NWPs 3, 8, 10, 13,15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, and 38, notification is required in accordance with general condition 27, for any activity proposed in the designated critical resource waters including wetlands adjacent to those waters. The district engineer may authorize activities under these NWPs only after it is determined that the impacts to the critical resource waters will be no more than minimal. 20. Mitigation. The district engineer will consider the following factors when determining appropriate and practicable mitigation necessary to ensure that adverse effects on the aquatic environment are minimal: a) The activity must be designed and constructed to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site i.e., on site). b) Mitigation in all its forms avoiding, minimizing, rectifying, reducing, or compensating) will be required to the extent necessary to ensure that the adverse effects to the aquatic environment are minimal. c) Compensatory mitigation at a minimum one-for-one ratio will be required for all wetland losses that exceed-1/10 acre and require preconstruction notification, unless the district engineer determines in writing that some other form of mitigation would be more environmentally appropriate and provides a project specific waiver of this requirement. For wetland losses of 1/10 acre or less that require pre- construction notification, the district engineer may determine on a case-by-case basis that compensatory mitigation is required to ensure that the activity results in minimal adverse effects on the aquatic environment. Since the likelihood APPENDIX A REGULATORY PERMITS, Page y3 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??\??of success is greater and the impacts to potentially valuable uplands are reduced, wetland restoration should be the first compensatory mitigation option considered. d) For losses of streams or other open waters that require pre- construction notification, the district engineer may require compensatory mitigation, such as stream restoration, to ensure that the activity results in minimal adverse effects on the aquatic environment. e) Compensatory mitigation will not be used to increase the acreage losses allowed by the acreage limits of the NWPs. For example, if an NWP has an acreage limit of 1/2 acre, it cannot be used to authorize any project resulting in the loss of greater than 12 acre of waters of the United States, even if compensatory mitigation is provided that replaces or restores some of the lost waters. However, compensatory mitigation can and should be used, as necessary, to ensure that a project already meeting the established acreage limits also satisfies the minimal impact requirement associated with the NWPs. f) Compensatory mitigation plans for projects in or near streams or other open waters will normally include a requirement for the establishment, maintenance, and legal protection e.g., conservation easements) of riparian areas next to open waters. In some cases, riparian areas may be the only compensatory mitigation required. Riparian areas should consist of native species. The width of the required riparian area will address documented water quality or aquatic habitat loss concerns. Normally, the riparian area will be 25 to 50 feet wide on each side of the stream, but the district engineer may require slightly wider riparian areas to address documented water quality or habitat loss concerns. Where both wetlands and open waters exist on the project site, the district engineer will determine the appropriate compensatory mitigation e.g., riparian areas and/or wetlands compensation) based on what is best for the aquatic environment on a watershed basis, In cases where riparian areas are determined to be the most appropriate form of compensatory mitigation, the district engineer may waive or reduce the requirement to provide wetland compensatory mitigation for wetland losses. g) Permittees may propose the use of mitigation banks, in-lieu fee arrangements or separate activity specific compensatory mitigation. In all cases, the mitigation provisions will specify the party responsible for accomplishing and/or complying with the mitigation plan. h) Where certain functions and services of waters of the United States are permanently adversely affected, such as the conversion of a forested or scrub-shrub wetland to a herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may be required to reduce the adverse effects of the project to the minimal level. 21. Water Quality. Where States and authorized Tribes, or EPA where applicable, have not previously certified compliance of an NWP with CWA Section 401, individual 401 Water Quality Certification must be obtained or waived see 33 CFR 330.4(c)). The district engineer or State or Tribe may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of water quality. 22. Coastal Zone Management. In coastal states where an NWP has not previously received a state coastal zone management consistency concurrence, an individual state coastal zone management consistency concurrence must be obtained, or a presumption of concurrence must occur see 33 CFR 330.4(d)). The district engineer or a State may require additional measures to ensure that the authorized activity is consistent with state coastal zone management requirements. 23. Regional and Case-By-Case Conditions. The activity must comply with any regional conditions that may have been added by the Division Engineer see 33 CFR 330.4(e)) and with any case specific conditions added by the Corps or by the state, Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone Management Act consistency determination. 24. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete project is prohibited, except when the acreage loss of waters of the United States authorized by the NWPs does not exceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a road crossing over tidal waters is constructed under NWP 14, with associated bank stabilization authorized by NWP 13, the maximum acreage loss of waters of the United States for the total project cannot exceed 1/3-acre. 25. Transfer of Nationwide Permit Verifications. If the permittee sells the property associated with a nationwide permit verification, the permittee may transfer the nationwide permit verification to the new owner by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the nationwide permit verification must be attached to the letter, and the letter must contain the following statement and signature: When the structures or work authorized by this nationwide permit are still in existence at the time the property is transferred, the terms and conditions of this nationwide permit, including any special conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this nationwide permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below." APPENDIX A REGULATORY PERMITS, Page of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??]??Transferee) Date) 26. Compliance Certification. Each permittee who received a NWP verification from the Corps must submit a signed certification regarding the completed work and any required mitigation. The certification form must be forwarded by the Corps with the NWP verification letter and will include: a) A statement that the authorized work was done in accordance with the NWP authorization, including any general or specific conditions; b) A statement that any required mitigation was completed in accordance with the permit conditions; and c) The signature of the permittee certifying the completion of the work and mitigation. 27. Pre-Construction Notification. a) Timing. Where required by the terms of the NWP, the prospective permittee must notify the district engineer by submitting a pre-construction notification PCN) as early as possible. The district engineer must determine if the PCN is complete within 30 calendar days of the date of receipt and, as a general rule, will request additional information necessary to make the PCN complete only once. However, if the prospective permittee does not provide all of the requested information, then the district engineer will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not commence until all of the requested information has been received by the district engineer. The prospective permittee shall not begin the activity:.(1) Until notified in writing by the district engineer that the activity may proceed under the NWP with any special conditions imposed by the district or division engineer; or. 2) If 45 calendar days have passed from the district engineer's receipt of the complete PCN and the prospective permittee has not received written notice from the district or division engineer. However, if the permittee was required.to notify the Corps pursuant to general condition 17 that listed species or critical habitat might be affected or in the vicinity of the project, or to notify the Corps pursuant to general condition 18 that the activity may have the potential to cause effects to historic properties, the permittee cannot begin the activity until receiving written notification from the Corps that is no effect" on listed species or no potential to cause effects" on historic properties, or that any consultation required under Section 7 of the Endangered Species Act see 33 CFR 330.4(f)) and/or Section 106 of the National Historic Preservation see 33 CFR 330.4(g)) is.completed. Also, work cannot begin under NWPs 21, 49, or 50 until the permittee has received written approval from the Corps. If the proposed activity requires a written waiver to exceed specified limits of an NWP, the permittee cannot begin the activity until the district-engineer issues the waiver. If the district or division engineer notifies the,permittee in writing that an individual permit is required within 45 calendar days of receipt of a complete PCN, the permittee cannot begin the activity until an individual permit has been obtained. Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2). b) Contents of Pre-Construction Notification: The PCN must be in writing and include the following information: 1) Name, address and telephone numbers of the prospective permittee; 2) Location of the proposed project; 3) A description of the proposed project; the project's purpose; direct and indirect adverse environmental effects the project would cause; any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity. The description should be sufficiently detailed to allow the district engineer to determine that the adverse effects of the project will be minimal and to determine the need for compensatory mitigation. Sketches should be provided when necessary to show that the activity complies with the terms of the NWP. Sketches usually clarify the project and when provided result in a quicker decision.); 4) The PCN must include a delineation of special aquatic sites and other waters of the United States on the project site. Wetland delineations must be prepared in accordance with the current method required by the Corps. The permittee may ask the Corps to delineate the special aquatic sites and other waters of the United States,.but there may be a delay if the Corps does the delineation, especially if the project site is large or contains many waters of the United States. Furthermore, the 45 day period will not start until the delineation has been submitted to or completed by the Corps, where appropriate; 5) if the proposed activity will result in the loss of greater than 1/10 acre of wetlands and a PCN is required, the prospective permittee must submit a statement describing how the mitigation requirement will be satisfied. As an alternative, the prospective permittee may submit a conceptual or detailed mitigation plan. 6) If any listed species or designated critical habitat might be affected or is in the vicinity of the project, or if the project is located in designated critical habitat, for non- Federal applicants the PCN must include the name(s) of those endangered or threatened species that might be affected by the proposed work or utilize the designated critical habitat that may be affected by the proposed work. Federal applicants must provide documentation demonstrating compliance with the Endangered Species Act; and 7) For an activity that may affect a historic property listed on, determined to be eligible for listing on, or potentially eligible for listing on, the National Register of Historic Places, for non-Federal applicants the PCN must state which historic property may be affected by the proposed work or include a vicinity map indicating the location of the historic property. APPENDIX A REGULATORY PERMITS, Page of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??^??Federal applicants must provide documentation demonstrating compliance with Section 106 of the National Historic Preservation Act. c) Form of Pre-Construction Notification: The standard individual permit application form Form ENG 4345) may be used, but the completed application form must clearly indicate that it is a PCN and must include all of the information required in paragraphs b)(1) through 7) of this general condition. A letter containing the required information may also be used. d) Agency Coordination: 1) The district engineer will consider any comments from Federal and state agencies concerning the proposed activity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the project's adverse environmental effects to a minimal level. 2) For all NWP 48 activities requiring pre-construction notification and for other NWP activities requiring preconstruction notification to the district engineer that result in the loss of greater than 12-acre of waters of the United States, the district engineer will immediately provide e.g., via facsimile transmission, overnight mail, or other expeditious manner) a copy of the PCN to the appropriate Federal or state offices U.S. FWS, state natural resource or water quality agency, EPA, State Historic Preservation Officer SHPO) or Tribal Historic Preservation Office THPO), and, if appropriate, the NMFS). With the exception of NWP 37, these agencies will then have 10 calendar days from the date the material is transmitted to telephone or fax the district. engineer notice that they intend to provide substantive, site-specific comments. If so contacted by an agency, the district engineer will wait an additional 15 calendar days before making a decision on the preconstruction notification. The district engineer will fully consider agency comments received within the specified time frame, but will provide no response to the resource agency, except as provided below. The district engineer will indicate in the administrative record associated with each preconstruction notification that the resource agencies' concerns were considered. For NWP 37, the emergency watershed protection and rehabilitation activity may proceed immediately in cases where there is an unacceptable hazard to life or a significant loss of property or economic hardship will occur. The district engineer will consider any comments received to decide whether the NWP 37 authorization should be modified, suspended, or revoked in accordance with the procedures at 33 CFR 330.5. 3) In cases of where the prospective permittee is not a Federal agency, the district engineer will provide a response to NMFS within 30 calendar days of receipt of any Essential Fish Habitat conservation recommendations, as required by Section 305(b)(4)(B) of the Magnuson-Stevens Fishery Conservation and Management Act. 4) Applicants are encouraged to provide the Corps multiple copies of pre-construction notifications to expedite agency coordination. 5) For NWP 48 activities that require reporting, the district engineer will provide a copy of each report within 10 calendar days of receipt to the appropriate regional office of the NMFS. e) District Engineer's Decision: In reviewing the PCN for the proposed activity, the district engineer will determine whether the activity authorized by the NWP will result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public interest. If the proposed activity requires a PCN and will result in a loss of greater than 1/10 acre of wetlands, the prospective permittee should submit a mitigation proposal with the PCN. Applicants may also propose compensatory mitigation for projects with smaller impacts. The district engineer will consider any proposed compensatory mitigation the applicant has included in the proposal in determining whether the net adverse environmental effects to the aquatic environment of the proposed work are minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the district engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse effects on the aquatic environment are minimal, after considering mitigation, the district engineer will notify the permittee and include any conditions the district engineer deems necessary. The district engineer must approve any compensatory mitigation proposal before the permittee commences work. If the prospective permittee elects to submit a compensatory mitigation plan with the PCN, the district engineer will expeditiously review the proposed compensatory mitigation plan. The district engineer must review the plan within 45 calendar days of receiving a complete PCN and determine whether the proposed mitigation would ensure no more than minimal adverse effects on the aquatic environment. If the net adverse effects of the project on the aquatic environment after consideration of the compensatory mitigation proposal) are determined by the district engineer to be minimal, the district engineer will provide a timely written response to the applicant. The response will state that the project can proceed under the terms and conditions of the NWP. If the district engineer determines that the adverse effects of the proposed work are more than minimal, then the district engineer will notify the applicant either: 1) That the project does not qualify for authorization under the NWP and instruct the applicant on the procedures to seek authorization under an individual permit; 2) that the project is authorized under the NWP subject to the applicant's submission of a mitigation plan that would reduce the adverse effects on the aquatic environment to the minimal level; or 3) that the project is authorized under the NWP with specific modifications or conditions. Where the district engineer determines that mitigation is required to ensure no more than minimal adverse effects occur to the aquatic environment, the activity will be authorized within the 45-day PCN period. The authorization will include the necessary conceptual or specific mitigation or a requirement that the applicant submit a mitigation plan that would reduce the adverse effects on the aquatic environment to the minimal level. When mitigation is required, no work in waters of the United States may occur until the district engineer has approved a specific mitigation plan. APPENDIX A REGULATORY PERMITS, Page Jf 6 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??_??28. Single and Complete Project. The activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project. APPENDIX A REGULATORY PERMITS, Page 47of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??`??Enclosure 3 Permittee: Monterey County Dept. of Public Works File Number: 4003995 Certification of Compliance for Nationwide Permit I hereby certify that the work authorized by the above referenced File Number and all required mitigation have been completed in accordance with the terms and conditions of this Nationwide Permit authorization." Permittee) Date) Return to: Greg Brown U.S. Army Corps of Engineers San Francisco District Regulatory Branch, CESPN-OR-R 1455 Market San Francisco, CA 94103-1398 APPENDIX A REGULATORY PERMITS, Page of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??a??California Regional Water Quality Control Board ms Central Coast Region Li d Ad n a a Secretary for Environmental Protection December 4, 2009 Enrique Saavedra County of Monterey 168 West Alisal Street Salinas, CA 93901 Dear Mr. Saavedra: Internet Address: http://www.waterboards.ca.gov/centralcoast/ 895 Aerovista Place, Suite 101, San Luis Obispo, California 93401 Phone 805) 549-3147 FAX 805) 543-0397 Arnold Schwarzenegger Governor WATER QUALITY CERTIFICATION NUMBER 32709WQ11 FOR THE STATE ROUTE 681SAN BENANCIO BROAD INTERSECTION IMPROVEMENTS PROJECT, MONTEREY COUNTY- Thank you for the opportunity to review your September 10, 2009 water quality certification application for the State Route 68/San Benancio Road Intersection. Improvements Project. The application was completed in September, 2009. The project proposes to widen San Benancio Road to 12 feet to provide a separate north-to-eastbound right-turn lane and an additional southbound merge lane, and to construct retaining walls along the east side of San Benancio Road. The project also- proposes to install one column and approximately 24.0 feet of widening to the bridge across El Toro Creek. The project will discharge to'EI Toro Creek. We have determined the project,. including proposed mitigation measures, will comply with water quality standards and other appropriate requirements, as defined by Title 23, Section 3831 v) of the California Code of Regulations. Your application demonstrates: a). you will take all practicable measures to-avoid impacts, b) where unavoidable temporary impacts take place, you will restore waters and vegetation to pre-project conditions as.quickly as practicable, and c) where unavoidable permanent impacts take place, the project will result in no net loss of wetland, riparian area, or headwater functions, including onsite habitat, habitat connectivity, floodwater retention, and pollutant removal. The Executive Officer hereby grants water quality certification, subject to the following conditions: SPECIAL CONDITIONS: 1. The project shall be carried out as described in the application, including all proposed time schedules. 2. The project area discharge shall not exceed 0.0002 acres. California Environmental Protection Agency APPENDIX A REGULATORY PERMIT; Pdfff 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??b??County of'Monterey Certification No. 32709WQ11 December 4, 2009 3. All proposed mitigation, monitoring, and Best Management Practices shall be' implemented in the manner and at the time(s) described in the application package. 4. Prior to implementation of any modifications to the project or mitigation measures, the Water Board and other interested agencies shall be notified in writing. 5. The discharge shall not do any of the following: a) directly or indirectly destabilize a bed of a receiving water, b) contribute to significant cumulative effects, c) cause pollution, contamination, or nuisance as defined by Water Code section 13050), d) adversely affect candidate, threatened, or endangered species, e) degrade water quality or beneficial uses, f) be toxic, g) include hazardous substances as defined by Water Code section 13050) or designated waste as defined by Water Code section 13173). STANDARD CONDITIONS: 1. This certification action is subject to modification or revocation upon administrative or judicial review, including review and amendment pursuant to section 13330 of the California Water Code and section 3867 of Title 23 of the California Code of Regulations 23 CCR). 2. This certification action is not intended to apply to any discharge,from any activity involving a hydroelectric facility requiring a Federal Energy Regulatory Commission FERC) license or an amendment to a FERC license unless the pertinent certification application was filed per to 23 CCR subsection 3855(b) and the application specifically identified that a FERC license or amendment to a FERC license was being sought. 3. The validity of any non-denial certification action shall be conditioned upon total payment of the fee required under 23 CCR section 3833, unless otherwise stated in writing by the certifying agency. 4. This certification is subject to the acquisition of all local, regional, state, and federal permits and approvals as required by law. Failure to meet any conditions contained herein or any the conditions contained in any other permit or approval issued by the State of California or any subdivision thereof may result in the revocation of this Certification and civil or criminal liability. 5. In the event of a violation or threatened violation of this certification, the violation or threatened violation shall be subject to any remedies, penalties, process or sanctions as provided for under state law. For purposes of Section 401(d) of the Clean Water Act, the applicability of any state law authorizing remedies, penalties, process or sanctions for the violation or threatened violation APPENDIX A REGULATORY PERMITS, f?4 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??c??County of Monterey Certification No 32709WQI1 December 4, 2009 constitutes a limitation necessary to assure compliance with the water quality standards and other pertinlent requirements incorporated into this certification. 6. In response to a suspected violation of any condition of this certification, the Water Board may require the holder of any permit or license subject to this certification to furnish, under penalty of perjury, any technical or monitoring reports the Water Board deems appropriate, provided that the burden, including costs, of the reports shall have a reasonable relationship to the need for the reports and the benefits obtained from the reports. Per California Code of Regulations Section 3857, we anticipate no further action on your application. Should new information come to our attention that indicates a water quality problem, we may reassess the conditions of this certification or issue Waste Discharge Requirements. If you have questions please contact Jennifer Epp at 805) 594-6181 or via email at jepp(c~waterboards.ca.gov or Phil Hammer at 805) 549-3882. Please mention the above-certification number in all future correspondence pertaining to this project: Sincerely, Roger W. Briggs Executive Officer S:\Section 401 Certification\Certifications\Monterey\State Route 68-San Benancio Road Intersection Improvements.doc cc: Namat Hosseinion Dokken Engineering 2365 Iron Point Road, Suite 200 Folsom,,CA 95630 Matthew W. Vandersande U.S. Army Corps of iEngineers Ventura Office Regulatory Section 2151 Allesandro Drive, Suite 110 Ventura, CA 93001 U.S. Army Corps of Engineers San Francisco District Regulatory Section 1455 Market Street, Floor 17 San Francisco, CA. 94103-1368 California Department of Fish and Game Lake and Streambed Alteration 1234 East Shaw Street Fresno, CA 93710 APPENDIX A REGULATORY PERMITS, Ppgeeg I0pf476 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??d??County of Monterey Certification No. 32709WQ1 I Suzanne Deleon California Department of Fish and Game Lake and Streambed Alteration PO Box 47 Yountville, CA 94599 401 Program Manager State Water Resources Control Board Division of Water Quality Stateboard401 a)waterboards.ca.gov R9-WTRB-MailboxCa)-epa.gov December 4, 2009 APPENDIX A REGULATORY PERMITS, Pegg to 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??e??r-IN California Regional WaterQuality Control Board da Adams Central Coast Region L'i n Secretary for Environmental Protection December 4, 2009 Enrique Saavedra County of Monterey 168 West Alisal Street Salinas, CA 93901 Dear Mr. Saavedra: Internet Address: http://www.waterboards.ca.gov/centralcoast/ 895 Aerovista Place, Suite 101, San Luis Obispo, California 93401 Phone 805) 549-3147 FAX 805) 543-0397 Arnold Schwarzenegger Governor WATER QUALITY CERTIFICATION NUMBER 32709WQ1I FOR THE STATE,ROUTE 681SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS PROJECT, MONTEREY COUNTY. Thank you for the opportunity to review your September 10, 2009 water quality certification application for the State Route 68/San Benancio Road Intersection improvements Project. The application was completed in September, 2009. The:. project proposes to widen San Benancio Road to 12 feet to provide a separate north-to-eastbound right-turn lane and an additional southbound merge lane, and to construct retaining walls along the east side of San Benancio Road. The project also- proposes to install one column and approximately 24.0 feet of widening to the bridge across El Toro Creek. The project will discharge to El Toro Creek. We have determined. the project,. including 1proposed mitigation measures, will comply with water quality standards and other appropriate requirements, as defined by Title 23, Section 3831(v) of the California Code of Regulations. Your application demonstrates: a). you will take all practicable measures to- avoid impacts, b) where unavoidable temporary impacts take place, you will restore waters and vegetation to pre-project conditions as quickly as practicable, and c) where unavoidable permanent impacts take place, the,project will result in no net loss of wetland, riparian area, or headwater functions, including onsite habitat, habitat connectivity, floodwater retention, and pollutant removal. The Executive Officer hereby grants water quality certification, subject to the following conditions: SPECIAL CONDITIONS: 1. The project shall be carried out as described in the application, including all proposed time schedules. 2. The project area discharge shall not exceed 0.:0002 acres. California Environmental Protection Agency APPENDIX A REGULATORY PERMI P' ie64 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??f??County of'Monterey Certification No. 32709WQ11 December 4, 2009 3. All proposed mitigation, monitoring, and Best Management Practices shall be, implemented in the manner and at the time(s) described in the application package. 4. Prior to implementation of any modifications to the project or mitigation measures, the Water Board and other interested agencies shall be notified in writing. 5. The discharge shall not do any of the following: a) directly or indirectly destabilize a bed of a receiving water, b) contribute to significant cumulative effects, c) cause pollution, contamination, or nuisance as defined by Water Code section 13050), d) adversely affect candidate, threatened, or endangered species, e) degrade water quality or beneficial uses, f) be toxic, g) include hazardous substances as defined by Water Code section 13050) or designated waste as defined by Water Code section 13173). STANDARD CONDITIONS: 1. This certification action is subject to modification or revocation upon administrative or judicial review, including review and amendment pursuant to section 13330 of the California Water Code and section 3867 of Title 23 of the California Code' of Regulations 23 CCR). 2. This certification action is not intended to apply to any discharge.from any activity involving a hydroelectric facility requiring a Federal Energy Regulatory Commission FERC) license or an amendment to a FERC license unless the pertinent certification application was filed per to 23 CCR subsection 3855(b) and the application specifically identified that a FERC license or amendment to a FERC license was being sought. 3. The validity of any non-denial certification action shall be conditioned upon total payment of the fee required under 23 CCR section 3833, unless otherwise stated in writing by the certifying agency. 4. This certification is subject to the acquisition of all local, regional, state, and federal permits and approvals as required by law. Failure'to meet any conditions contained herein or any the conditions contained in any other permit or approval issued by the State of California or any subdivision thereof may result in the revocation of this Certification and civil or criminal liability. 5. In the event of a violation or threatened violation of this certification, the violation or threatened violation shall be subject to any remedies, penalties, process or sanctions as provided for under state law. For purposes of Section 401(d) of the Clean Water Act, the applicability of any state law authorizing remedies, penalties, process or sanctions for the violation or threatened violation APPENDIX A REGULATORY PERMITS, efo4 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??g??County of Monterey Certification No. 32709WQ1 I Decem.ber 4, 2009 constitutes a limitation necessary to assure compliance with the water quality standards and other pertinent requirements incorporated into this certification. 6. In response to a suspected violation of any condition of this certification, the Water Board may require the holder of any permit or license subject to this certification to furnish, under penalty of perjury, any technical or monitoring reports the Water Board deems appropriate, provided that the burden, including costs, of the reports shall have a reasonable relationship to the need for the reports and the benefits obtained from the reports. Per California Code of Regulations Section 3857, we anticipate no further action on your application. Should new information come to our attention that indicates a water quality problem, we may reassess the conditions of this certification or issue Waste Discharge Requirements. If you have questions please contact Jennifer Epp at 805) 594-6181 or via email at jep.p(a.waterboards.ca.gov or Phil Hammer at 805) 549-3882. Please mention the above-certification number in all future correspondence pertaining to this project.:: Sincerely, Roger W. Briggs Executive LOffi'cer S:\Section 401 Certification\Certifications\Monterey\State'Route 68-San Benancio Road Intersection Improvements.doc cc: NNamat Hosseinion Dokken Engineering 2365 Iron Point Road, Suite 200 Folsom, CA 95630 Matthew W. Vandersande U.S. Army Corps of Engineers Ventura Office Regulatory Section 2151 Allesandro,:Drive, Suite 110 Ventura, CA 93001 U.S. Army Corps of Engineers San Francisco District Regulatory Section 1455 Market Street, Floor 17 San Francisco, CA. 94103-1368 California Department of Fish and Game Lake and Streambed Alteration 1234 East Shaw Street Fresno, CA 93710 O 76 APPENDIX A REGULATORY PERMITS, P~g J AT- BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??h??County of Monterey Certification No. 32709WQ1 I Suzanne Deleon California Department of Fish and Game Lake and Streambed Alteration PO Box 47 Yountville, CA 94599 401 Program Manager State Water Resources Control Board Division of Water Quality Stateboard401(a,waterboards.ca.gov R9-WTR8-Mailbox(u).epa.gov December 4, 2009 APPENDIX A REGULATORY PERMITS, 04%,P4 fob 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??i??Linda S Adams Secretary for Environmental Protection State Water Resources Control Board Division of Water Quality 1001 1 Street Sacramento, California 95814 916) 341-5537 Mailing Address: P.O. Box 1977 Sacramento, California- 95812-1977 Arnold Schwarzenegger Governor FAX 916) 341-5543 Internet Address: http://www.waterboards.ca.gov/water issues/programs/stormwater/ CHECKLIST FOR SUBMITTING A NOTICE OF INTENT In order for the State Water Resources Control Board to expeditiously process your Notice of Intent NOI), the following items must be submitted to either of the addresses indicated below: NOI please keep a copy for your files) with all applicable sections completed and original signature of the landowner or signatory agent; Check made out to the State Water Resources Control Board" See reverse for listing of fees by acre. The fee is based on the Total Acres to be Disturbed" for the life of the project. / 3. */ Site Map of the facility see NOI instructions). DO NOT SEND BLUEPRINTS U.S. Postal Service Address State Water Resources Control Board Division of Water Quality Attn: Storm Water Section P.O. Box 1977 Sacramento, CA 95812-1977 Overnight Mailing Address State Water Resources Control Board Division Of Water Quality Attn: Storm Water, 15th Floor 1001 I Street Sacramento, CA 95814 NOIs are processed in the order they are received. A NOI receipt letter will be mailed to the land owner within approximately two weeks. Incomplete NOI submittals will be returned to the landowner's address within the same timeframe and will specify the reason(s) for return. If you need a receipt letter by a specific date for example, to provide to a local agency), we advise that you submit your NOI thirty 30) days prior to the date the receipt letter is needed. Please do not call us to verify your NOI status. A copy of your NOI receipt letter will be available on our web page within twenty-four 24) hours of processing. Go to: http://www.waterboards.ca.c,ov/water issues/programs/stormwater/databases.shtml to retrieve an electronic copy of your NOI receipt letter. If you have any questions regarding this matter, please contact us at 916) 341-5537. APPENDIX A REGULATORY PERMITS, Page 5-7 of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??j??Construction Annual Fees by Acre Partial Acreage rounded to nearest whole number Acres Fee 21 Percent Ambient Total 0 $238 $50 $288 1 $262 $55 $317 2 $286 $60 $346 3 $310 $65 $375 4 $334 $70 $404 5 $358 $75 $433 6 $382 $80 $462 7 $406 $85 $491 8 $430 $90 $520 9 $454 $95 $549 10 $478 $100 $578 11 $502 $105 $607 12 $526 $110 $636 13 $550 $116 $666 14 $574 $121 $695 15 $598 $126 $724 16 $622 $131 $753 17 $646 $136 $782 18 $670 $141 $811 19 $694 $146 $840 20 $718 $151 $869 21 $742 $156 $898 22 $766 $161 $927 23 $790 $166 $956 24 $814 $171 $985 25 $838 $176 $1,014 26 $862 $181 $1,043 27 $886 $186 $1,072 28 $910 $191 $1,101 29 $934 $196 $1,130 30 $958 $201 $1,159 31 $982 $206 $1,188 32 $1,006 $211 $1,217 33 $1,030 $216 $1,246 34 $1,054 $221 $1,275 35 $1,078 $226 $1,304 36 $1,102 $231 $1,333 37 $1,126 $236 $1,362 38 $1,150 $242 $1,392 39 $1,174 $247 $1,421 40 $1,198 $252 $1,450 41 $1,222 $257 $1,479 42 $1,246 $262 $1,508 43 $1,270 $267 $1,537 44 $1,294 $272 $1,566 45 $1,318 $277 $1,595 46 $1,342 $282 $1,624 47 $1,366 $287 $1,653 48 $1,390 $292 $1,682 49 $1,414 $297 $1,711 50 $1,438 $302 $1,740 APPENDIX A REGULATORY PERMITS, Page 4e of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??k??State Water Resources Control Board NOTICE OF INTENT TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY WQ ORDER No. 99-08-DWQ) 1. NOI STATUS SEE INSTRUCTIONS Attachment 2 MARK ONLY ONE ITEM 1. 9 New Construction 2. Change of Information for WDID# II. PROPERTY OWNER Name County of Monterey Contact Person Enrique Saavedra Mailing Address 168 West Alisal Street Title Senior Civil Engineer City Salinas State CA Zip 93901 Phone 831) 755-8970 Owner Type check one) 1.[ Private Individual 2.[ Business 3.[K]Municipal 4.[ State 5.[ Federal 6.[ Other III. DEVELOPER/CONTRACTOR INFORMATION Developer/Contractor Doldcen Engineering Mailing Address 2365 Iron Point Road, Suite 200 City Folsom IV. CONSTRUCTION PROJECT INFORMATION Contact Person Namat Hosseinion Title Senior Environmental Planner State CA Zip 95630 Phone 916) 858-0642 Site/Project Name Site Contact Person State Route 68/San Benancio Road Improvement Project Enrique Saavedra Physical Address/Location Latitude Longitude County Just south of the SR-68/San Benancio Road Intersection 36 0 121 o Monterey City or nearest City) Zip Site Phone Number Emergency Phone Number Salinas 93908 831) 755-8970 916) 858-0642 A. Total size of construction site area: C. Percent of site imperviousness including rooftops): 3.23 Acres 4 64 D. Tract Number(s): % Before Construction: B. Total area to be disturbed: 3.23 Acres % of total 100 79.4 After Construction: % E. Mile Post Marker: F. Is the construction site part of a larger common plan of development or sale? G. Name of plan or development: YES NO N/A 8 /01 / 10 d J. Projected construction dates: H. Construction commencement ate: t: 10 / 15 / 11 8 / 1 /11 C l t di |1013| 9% omp e e projec Complete gra ng: 1. % of site to be mass graded: K. Type of Construction Check all that apply): 1. Residential 2. Commercial 3. Industrial 4.^ Reconstruction 5.[R Transportation 6. Utility Description: 7.7 Other Please List): V. BILLING INFORMATION SEND BILL TO: Name Contact Person OWNER as In II. above) DEVELOPER Mailing Address Phone/Fax as in III. above) City State Zip El OTHER enter information at right) APPENDIX A REGULATORY PERMITS, Page of 76 Page 1 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??l??VI. REGULATORY STATUS A. Has a local agency approved a required erosion/sediment control plan? YES NO Does the erosion/sediment control plan address construction activities such as infrastructure and structures? YES NO Name of local agency: County of Monterey Phone: 831) 755-8970 B. Is this project or any part thereof, subject to conditions imposed under a CWA Section 404 permit of 401 Water Quality Certification? YES No If yes, provide details: 401 Cert. Granted on December 4, 2009 attached) VII. RECEIVING WATER INFORMATION A. Does the storm water runoff from the construction site discharge to Check all that apply): 1. 9 Indirectly to waters of the U.S. 2. Storm drain system Enter owner's name: 3. Directly to waters of U.S. e.g. river, lake, creek, stream, bay, ocean, etc.) B. Name of receiving water: river, lake, creek, stream, bay, ocean): El Toro Creek VIII. IMPLEMENTATION OF NPDES PERMIT REQUIREMENTS A. STORM WATER POLLUTION PREVENTION PLAN SWPPP) check one) A SWPPP has been prepared for this facility and is available for review: Date Prepared: Date Amended: / A SWPPP will be prepared and ready for review by enter date): 8 / 1 / 10 A tentative schedule has been included in the SWPPP for activities such as grading, street construction, home construction, etc. B. MONITORING PROGRAM A monitoring and maintenance schedule has been developed that includes inspection of the construction BMPs before anticipated storm events and after actual storm events and is available for review. If checked above: A qualified person has been assigned responsibility for pre-storm and post-storm BMP inspections to identify effectiveness and necessary repairs or design changes YES ja NO Name: C. PERMIT COMPLIANCE RESPONSIBILITY Phone: A qualified person has been assigned responsibility to ensure full compliance with the Permit, and to implement all elements of the Storm Water Pollution Prevention Plan including: 1. Preparing an annual compliance evaluation YES NO Name: To be determined Phone: 2. Eliminating all unauthorized discharges YES M NO IX. VICINITY MAP AND FEE must show site location in relation to nearest named streets, intersections, etc.) Have you included a vicinity map with this submittal? X YES R NO Have you included payment of the annual fee with this submittal? YES NO X. CERTIFICATIONS I certify under penalty of law that this document and all attachments were prepared under my direction and supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment. In addition, I certify that I have read the entire General Permit, including all attachments, and agree to comply with and be bound by all of the provisions, requirements, and prohibitions of the permit, including the development and implementation of a Storm Water Pollution Prevention Plan and a Monitoring Program Plan will be complied with." Printed Name: Yazdan T. Emrani, P.E. Signature: Title: Director of Public Works Date: June 22, 2010 APPENDIX A REGULATORY PERMITS, Page & y of 76 Page 2 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??m??O O Q Swn Uc Cwwq PROJECT VICINITY |1013| Hvwwq Connly PROJECT AREA Q PASEO DE.VAQUEROS cREgl~;: PASEO HERMOSO i. FwaClnra Lewrr OAK~TREE REPLACEMENTAREA' t? FIGURE 1 300 600 METERS 1000 2000 FEET SOURCE: USGS 7.5' QUAD, SPRECKELS, MONTEREY,'CA. MEC2PeiA07) REGULATORY PERMITS, Page of 76 SR-68/San Benancio Road Intersection Improvement Vicinity Map 05-MON-68 KP 21.1/21.7 PM 13.1/13.5) 05-OH8100 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??n??111-IN California Regional Water Quality Control Board Central Coast Region d ams Linda r>. Secretaryfor Environmental Protection December 4, 2009 Enrique Saavedra County of Monterey 168 West Alisal Street Salinas, CA 93901 Dear Mr. Saavedra: Internet Address: http://www.waterboards.ca.gov/centralcoastJ 895 Aerovista Place, Suite 101, San Luis Obispo, California 93401 Phone 805) 549-3147 FAX 805) 543-0397 Arnold Schwarzenegger Governor WATER QUALITY CERTIFICATION NUMBER 32709WQ11 FOR THE STATEROUTE 681SAN BENANGIO ROAD INTERSECTION IMPROVEMENTSPROJECT, MONTEREY COUNTY. Thank you for the opportunity to review your September 10, 2009 water quality certification application for the State Route 68/San Benancio Road Intersection. Improvements Project. The application was completed in September, 2009. The project proposes to widen San Benancio Road to 12 feet to provide a separate north-to-eastbound right-turn lane and an additional southbound merge lane, and to construct retaining walls along the east side of San Benancio Road. The project also' proposes to install one column and approximately 24.0 feet of widening to the bridge across El Toro Creek. The project will discharge to El Toro Creek. We have determined the project,. including proposed mitigation measures, will comply with water quality standards and other appropriate requirements, as defined by Title 23, Section 3831(v) of the California Code of Regulations. Your application demonstrates: a).you will take all practicable measures to- avoid impacts, b) where unavoidable temporary impacts take place, you will restore waters and vegetation to pre-project conditions as,quickly as practicable, and c) where unavoidable permanent impacts take place, the project will result in no net loss of wetland, riparian area, or headwater functions, including onsite habitat, habitat connectivity, floodwater retention, and pollutant removal. The Executive Officer hereby grants water quality certification, subject to the following conditions: SPECIAL CONDITIONS: 1. The project shall be carried out as described in the application, including all proposed time schedules. 2. The project area discharge shall not exceed 0.0002 acres. California Environmental Protection Agency APPENDIX A REGULATORY PERMITT,PPag` pof 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??o??County of'Monterey Certification No. 32709WQl l December 4, 2009 3. All proposed mitigation, monitoring, and Best Management Practices shall be' implemented in the manner and at the time(s) described in the application package. 4. Prior to implementation of any modifications to the project or mitigation measures, the Water Board and other interested agencies shall be notified in writing. 5. The discharge shall not do any of the following: a) directly or indirectly destabilize a bed of a receiving water, b) contribute to significant cumulative effects, c) cause pollution, contamination, or nuisance as defined by Water Code section 13050), d) adversely affect candidate, threatened, or endangered species, e) degrade water quality or beneficial uses, f) be toxic, g) include hazardous substances as defined by Water Code section 13050) or designated waste as defined by Water Code section 13173). STANDARD CONDITIONS: 1. This certification action is subject to modification or revocation upon administrative or judicial review, including review and amendment pursuant to section 13330 of the California Water Code and section 3867 of Title 23 of the California Code of Regulations 23 CCR). 2. This certification action is not intended to apply to any discharge from any activity involving a hydroelectric facility requiring a Federal Energy Regulatory Commission FERC) license or an amendment to a FERC license unless the pertinent certification application was filed per to 23 CCR subsection 3855(b) and the application specifically identified that a FERC license or amendment to a FERC license was being sought. 3. The validity of any non-denial certification action shall be conditioned upon total payment of the fee required under 23 CCR section 3833, unless otherwise stated in writing by the certifying agency. 4. This certification is subject to the acquisition of all local, regional, state, and federal permits and approvals as required by law. Failure'to meet any conditions contained herein or any the conditions contained in any other permit or approval issued by the State of California or any subdivision thereof may result in the revocation of this Certification and civil or criminal liability. 5. In the event of a violation or threatened violation of this certification, the violation or threatened violation shall be subject to any remedies, penalties, process or sanctions as provided for under state law. For purposes of Section 401(d) of the Clean Water Act, the applicability of any state law authorizing remedies, penalties, process or sanctions for the violation or threatened violation APPENDIX A REGULATORY PERMITS, P.a~e fo4 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??p??County of Monterey Certification No,. 32709WQ11 December 4, 2009 constitutes a limitation necessary to assure compliance with the water quality standards and other pertinent requirements incorporated into this certification. 6. In response to a suspected violation of any condition of this certification, the Water Board may require the holder of any permit or license subject to this certification to furnish, under penalty of perjury, any technical or monitoring reports the Water Board deems appropriate, provided that the burden, including costs, of the reports shall have a reasonable relationship to the need for the reports and the benefits obtained from the reports. Per California Code of Regulations Section 3857, we anticipate no further action on your application. Should new information come to our attention that indicates a water quality problem, we may reassess the conditions of this certification or issue Waste Discharge Requirements. If you have questions please contact Jennifer Epp at 805) 594-6181 or via email at jep.p(a)-waterboards.ca.gov or Phil Hammer at 805) 549-3882. Please mention the above,certification number in all future correspondence pertaining to this project: Sincerely, Roger WBriggs Executive LOfficer, S:\Section 401 Certification\CerUfications\Monterey\State'Route 68-San Benancio Road Intersection Improvements. doe cc: Namat Hosseinion U.S. Army Corps of Engineers Dokken Engineering San Francisco District 2365 Iron Point Road, Suite 200 Regulatory Section Folsom, CA 95630 1455 Market Street, Floor 17 San Francisco, CA. 94103-1368 Matthew W. Vandersande U.S. Army Corps of Engineers Ventura Office Regulatory Section 2151 Allesandro Drive, Suite 110 Ventura, CA 93001 California Department of Fish and Game Lake and Streambed Alteration 1234 East Shaw Street Fresno, CA 93710 APPENDIX A REGULATORY PERMITS, %b 10 e fo 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??q??County of Monterey Certification No. 32709WQ11 Suzanne Deleon California Department of Fish and Game Lake and Streambed Alteration PO Box 47 Yountville, CA 94599 401 Program Manager State Water Resources Control Board Division of Water Quality Stateboard401 nawaterboards.ca.gov R9-WTR8-Mailbox(a),epa.gov J December 4, 2009 APPENDIX A REGULATORY PERMITS, Ea g~_o.of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??r??APPENDIX A REGULATORY PERMITS, Page oof 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??s??1 Linda S Adams Secretaryfor Environmental Protection State Water Resources Control Board Division of Water Quality 1001 1 Street Sacramento, California 95814 916) 341-5537 Mailing Address: P.O. Box 1977 Sacramento, California 95812-1977 Arnold Schwarzenegger Governor FAX 916) 341-5543 Internet Address: http://www.waterboards.ca.gov/water issues/programs/stormwater/ CHECKLIST FOR SUBMITTING A NOTICE OF INTENT In order for the State Water Resources Control Board to expeditiously process your Notice of Intent NOT), the following items must be submitted to either of the addresses indicated below: 1. V NOT please keep a copy for your files) with all applicable sections completed and original signature of the landowner or signatory agent; 2. Check made out to the State Water Resources Control Board" See reverse for listing of fees by acre. The fee is based on the Total Acres to be Disturbed" for the life of the project. 3. Site Map of the facility see NO] instructions). DO NOT SEND BLUEPRINTS U.S. Postal Service Address Overnight Mailing Address State Water Resources Control Board State Water Resources Control Board Division of Water Quality Division Of Water Quality Attn: Storm Water Section Attn: Storm Water, 15th Floor P.O. Box 1977 1001 I Street Sacramento, CA 95812-1977 Sacramento, CA 95814 NOIs are processed in the order they are received. A NOT receipt letter will be mailed to the land owner within approximately two weeks. Incomplete NO] submittals will be returned to the landowner's address within the same timeframe and will specify the reason(s) for return. If you need a receipt letter by a specific date for example, to provide to a local agency), we advise that you submit your NOI thirty 30) days prior to the date the receipt letter is needed. Please do not call us to verify your NOT status. A copy of your NOT receipt letter will be available on our web page within twenty-four 24) hours of processing. Go to: http://www.waterboards.ca.gov/water issues/programs/stormwater/databases.shtml to retrieve an electronic copy of your NOT receipt letter. If you have any questions regarding this matter, please contact us at 916) 341-5537. APPENDIX A REGULATORY PERMITS, Page j of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??t??Construction Annual Fees by Acre Partial Acreage rounded to nearest whole number Acres Fee 21 Percent Ambient Total 0 $238 $50 $288 1 $262 $55 $317 2 $286 $60 $346 3 $310 $65 $375 4 $334 $70 $404 5 $358 $75 $433 6 $382 $80 $462 7 $406 $85 $491 8 $430 $90 $520 9 $454 $95 $549 10 $478 $100 $578 11 $502 $105 $607 12 $526 $110 $636 13 $550 $116 $666 14 $574 $121 $695 15 $598 $126 $724 16 $622 $131 $753 17 $646 $136 $782 18 $670 $141 $811 19 $694 $146 $840 20 $718 $151 $869 21 $742 $156 $898 22 $766 $161 $927 23 $790 $166 $956 24 $814 $171 $985 25 $838 $176 $1,014 26 $862 $181 $1,043 27 $886 $186 $1,072 28 $910 $191 $1,101 29 $934 $196 $1,130 30 $958 $201 $1,159 31 $982 $206 $1,188 32 $1,006 $211 $1,217 33 $1,030 $216 $1,246 34 $1,054 $221 $1,275 35 $1,078 $226 $1,304 36 $1,102 $231 $1,333 37 $1,126 $236 $1,362 38 $1,150 $242 $1,392 39 $1,174 $247 $1,421 40 $1,198 $252 $1,450 41 $1,222 $257 $1,479 42 $1,246 $262 $1,508 43 $1,270 $267 $1,537 44 $1,294 $272 $1,566 45 $1,318 $277 $1,595 46 $1,342 $282 $1,624 47 $1,366 $287 $1,653 48 $1,390 $292 $1,682 49 $1,414 $297 $1,711 50 $1,438 $302 $1,740 APPENDIX A REGULATORY PERMITS, Page of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??u??State Water Resources Control Board NOTICE OF INTENT TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY WO ORDER No. 99-08-DWQ) 1. NO[ STATUS SEE INSTRUCTIONS) II. PROPERTY OWNER Name County of Monterey Mailing Address 168 West Alisal Street City Salinas Contact Person Enrique Saavedra Title Senior Civil Engineer State CA Zip 93901 Owner Type check one) 1.1 Private Individual 2.[ Business 3.[K]Municipal 4.1 State III. DEVELOPER/CONTRACTOR INFORMATION Phone 831) 755-8970 5.[ Federal Attachment 2 6.[ Other Developer/Contractor Contact Person Dokken Engineering Namat Hosseinion Mailing Address Title 2365 Iron Point Road, Suite 200 Senior Environmental Planner City State Zip Phone Folsom CA 95630 916) 858-0642 IV. CONSTRUCTION PROJECT INFORMATION Site/Project Name Site Contact Person State Route 68/San Benancio Road Improvement Project Enrique Saavedra Physical Address/Location Latitude Longitude County Just south of the SR-68/San Benancio Road Intersection 36 0 121 Monterey City or nearest City) Zip Site Phone Number Emergency Phone Number Salinas 93908 831) 755-8970 916) 858-0642 A. Total size of construction site area: C. Percent of site imperviousness including rooftops): 3.23 Acres 64.4 D. Tract Number(s): Before Construction: B. Total area to be disturbed: 3.23 Acres % of total 100 79 4 After Construction: % E. Mile Post Marker: F. Is the construction site part of a larger common plan of development or sale? G. Name of plan or development: YES NO N/A 8 /01 / 10 d J. Projected construction dates: ate: H. Construction commencement ct: 10 15 / 11 8 / 1 /11 l t di C e |1013| 9% omp e proje ng: e Complet gra 1. % of site to be mass graded: K. Type of Construction Check all that apply): 1. Residential 2. Commercial 3. Industrial 4.^ Reconstruction 5.[e Transportation 6. Utility Description: 7. Other Please List): V. BILLING INFORMATION SEND BILL TO: Name Contact Person OWNER as in It. above) Mailing Address Phone/Fax DEVELOPER as in Ill. above) City State Zip OTHER enter information at right) /I Q APPENDIX A REGULATORY PERMITS, Page La 1 of 76 Page 1 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??v??VI. REGULATORY STATUS A. Has a local agency approved a required erosion/sediment control plan? YES NO Does the erosion/sediment control plan address construction activities such as infrastructure and structures? YES NO Name of local agency: County of Monterey Phone: 831) 755-8970 B. Is this project or any part thereof, subject to conditions imposed under a CWA Section 404 permit of 401 Water Quality Certification? YES No If yes, provide details: 401 Cert. Granted on December 4, 2009 attached) VII. RECEIVING WATER INFORMATION A. Does the storm water runoff from the construction site discharge to Check all that apply): 1. 91 Indirectly to waters of the U.S. 2. Storm drain system Enter owner's name: 3. Directly to waters of U.S. e.g., river, lake, creek, stream, bay, ocean, etc.) B. Name of receiving water: river, lake, creek, stream, bay, ocean): El Toro Creek VIII. IMPLEMENTATION OF NPDES PERMIT REQUIREMENTS A. STORM WATER POLLUTION PREVENTION PLAN SWPPP) check one) A SWPPP has been prepared for this facility and is available for review: Date Prepared: Date Amended: / A SWPPP will be prepared and ready for review by enter date): 8 / 1 / 10 A tentative schedule has been included in the SWPPP for activities such as grading, street construction, home construction, etc. B. MONITORING PROGRAM A monitoring and maintenance schedule has been developed that includes inspection of the construction BMPs before anticipated storm events and after actual storm events and is available for review. If checked above: A qualified person has been assigned responsibility for pre-storm and post-storm BMP inspections to identify effectiveness and necessary repairs or design changes YES K NO Name: C. PERMIT COMPLIANCE RESPONSIBILITY Phone: A qualified person has been assigned responsibility to ensure full compliance with the Permit, and to implement all elements of the Storm Water Pollution Prevention Plan including: 1. Preparing an annual compliance evaluation YES NO Name: To be determined Phone: 2. Eliminating all unauthorized discharges VI YES n NO IX. VICINITY MAP AND FEE must show site location in relation to nearest named streets, intersections, etc. Have you included a vicinity map with this submittal? YES NO Have you included payment of the annual fee with this submittal? YES NO X. CERTIFICATIONS I certify under penalty of law that this document and all attachments were prepared under my direction and supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment. In addition, I certify that I have read the entire General Permit, including all attachments, and agree to comply with and be bound by all of the provisions, requirements, and prohibitions of the permit, including the development and implementation of a Storm Water Pollution Prevention Plan and a Monitoring Program Plan will be complied with." Printed Name: Yazdan T. Emrani, P.E. Signature: Title: Director of Public Works Date: June 22, 2010 APPENDIX A REGULATORY PERMITS, Page 7 D of 76 Page 2 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??w??0 300 600 METERS 0 1000 2000 FEET SOURCE: USGS 7.5' QUAD, SPRECKELS, MONTEREY, CA. 1:1DEC23 0. 7) Page O FIGURE 1 SR-68/San Benancio Road Intersection Improvement Vicinity Map 05-MON-68 KP 21.1/21.7 PM 13.1/13.5) 05-01-18100 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??x??California Regional Water Quality Control Board Central Coast Region Linda Adams Secretaryfor Environmental Protection December 4, 2009 Enrique Saavedra County of Monterey 168 West Alisal Street Salinas, CA 93901 Dear Mr. Saavedra: Internet Address: http://www.waterboards.ca.gov/centralcoastl 895 Aerovista Place, Suite 101, San Luis Obispo, California 93401 Phone 805) 549-3147 FAX 805) 543-0397 Arnold Schwarzenegger Governor WATER QUALITY CERTIFICATION NUMBER 32709WQ1 I FOR THE STATE ROUTE 681SAN BENANCIO BROAD INTERSECTION IMP-ROVEME'NTS PROJECT, MONTEREY COUNTY. Thank you for the opportunity to review your September 10, 2009 water quality certification application for the State Route 68/San Benancio Road Intersection., improvements Project. The application was completed in September, 2009., The project proposes to widen San Benancio Road to 12 feet to provide a separate north-to-eastbound right-turn lane and an additional southbound merge lane, and to construct retaining walls along the east side of San Benancio Road. The project also- proposes to install one column and approximately 24.0 feet of widening to:the bridge across El Toro Creek. The project will discharge to El Toro Creek. We have determined the project,. including proposed mitigation measures, will comply with water quality standards and other appropriate requirements, as defined by Title 23, Section 3831(v) of the California Code of Regulations. Your application demonstrates: a). you will take all practicable measures to- avoid impacts, b) where unavoidable temporary impacts take place, you will restore waters and vegetation to pre-project conditions as,quickly as practicable, and c) where unavoidable permanent impacts take place, the project will result in no net loss of wetland, riparian area, or headwater functions, including onsite habitat, habitat connectivity, floodwater retention, and pollutant removal. The Executive Officer hereby grants water quality certification, subject to the following conditions: SPECIAL CONDITIONS: 1. The project shall be carried out as described in the application, including all proposed time schedules. 2. The project area discharge shall not exceed 0.0002 acres. California Environmental Protection Agency APPENDIX A REGULATORY PERMITcaPgffe Pe f 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??y??County of'Monterey Certification No. 32709WQ11 December 4, 2009 3. All proposed mitigation, monitoring, and Best Management Practices shall be' implemented in the manner and at the time(s) described in the application package. 4. Prior to implementation of any modifications to the project or mitigation measures, the Water Board and other interested agencies shall be notified in writing. 5. The discharge shall not do any of the following: a) directly or indirectly destabilize a bed of a receiving water, b) contribute to significant cumulative effects, c) cause pollution, contamination, or nuisance as defined by Water Code section 13050), d) adversely affect candidate, threatened, or endangered species, e) degrade water quality or beneficial uses, f) be toxic, g) include hazardous substances as defined by Water Code section 13050) or designated waste as defined by Water Code section 13173). STANDARD CONDITIONS: 1. This certification action is subject to modification or revocation upon administrative or judicial review, including review and amendment pursuant to section 13330 of the California Water Code and section 3867 of Title 23 of the California Code' of Regulations 23 CCR). 2. This certification action is not intended to apply to any discharge.from any activity involving a hydroelectric facility requiring a Federal Energy Regulatory Commission FERC) license or an amendment to a FERC license unless the pertinent certification application was filed per to 23 CCR subsection 3855(b) and the application specifically identified that a FERC license or amendment to a FERC license was being sought. 3. The validity of any non-denial certification action shall be conditioned upon total payment of the fee required under 23 CCR section 3833, unless otherwise stated in writing by the certifying agency. 4. This certification is subject to the acquisition of all local, regional, state, and federal permits and approvals as required by law. Failure"to meet any conditions contained herein or any the conditions contained in any other permit or approval issued by the State of California or any subdivision thereof may result in the revocation of this Certification and civil or criminal liability. 5. In the event of a violation or threatened violation of this certification, the violation or threatened violation shall be subject to any remedies, penalties, process or sanctions as provided for under state law. For purposes of Section 401(d) of the Clean Water Act, the applicability of any state law authorizing remedies, penalties, process or sanctions for the violation or threatened violation APPENDIX A REGULATORY PERMITS, Page T3 f? 76 rUge.VO BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??z??County of Monterey Certification No 32709WQ11 December 4, 2009 constitutes a limitation necessary to assure compliance with the water quality standards and other pertil ent requirements incorporated into this certification. 6. In response to a suspected violation of any condition of this certification, the Water Board may require the holder of any permit or license subject to this certification to furnish, under penalty of perjury, any technical or monitoring reports the Water Board deems appropriate, provided that the burden, including costs, of the reports shall have a reasonable relationship to the need for the reports and the benefits obtained from the reports. Per California Code of Regulations Section 3857, we anticipate no further action on your application. Should new information come to our attention that indicates a water quality problem, we may reassess the conditions of this certification or issue Waste Discharge Requirements. If you have questions please contact Jennifer E?pp at 805) 594-6181 or via email at iep.p(&_waterboards.ca.gov or Phil Hammer at 805) 549-3882. Please mention the above,certification number in all future correspondence pertaining to this project Sincerely, Roger W. Briggs Executive LOffiber' S:\Section 401 Certification\Certifications\Monterey\State Route 68-San Benancio Road Intersection Improvements.doc cc: Namat Hosseinion Dokken Engineering 2365 Iron Point Road, Suite 200 Folsom, CA 95630 Matthew W. Vandersande U.S. Army Corps of Engineers Ventura Office Regulatory Section 2151 Allesandro Drive, Suite 110 Ventura, CA 93001 U.S. Army Corps of Engineers San Francisco District Regulatory Section 1455 Market Street, Floor 17 San Francisco, CA. 94103-1368 California Department ofFish and Game Lake and Streambed Alteration 1234 East Shaw Street Fresno, CA 93710 APPENDIX A REGULATORY PERMITS, P~?e~f476 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??{??County of Monterey Certification No. 32709WQ11 Suzanne Deleon California Department of Fish and Game Lake and Streambed Alteration APO Box 47 Yountville, CA 94599 401 Program Manager State Water Resources Control Board Division of Water Quality Stateboard401 0~waterboards.ca.gov R9-WTR8-Mailbox(a.epa.aov J December 4, 2009 APPENDIX A REGULATORY PERMITS, Page 7 5r of 76 Pag 4 tQ4 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??|??APPENDIX A REGULATORY PERMITS, Page 7 I of 76 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??}??APPENDIX B MITIGATION MONITORING REPORTING PROGRAM Book One- San Benancio/State Route 68 Intersection Improvements B CONTRACT NO. 10-111065 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11??~??APPENDIX B Mitigation Monitoring and Reporting Program The County of Monterey and the Department of Transportation have developed a mitigation monitoring and reporting list for the State Route 68 at San Benancio Road Intersection Improvement Project. This list is designed to ensure that the mitigation measures identified in the Project's Environmental Document are implemented. The following table contains a list of the avoidance, minimization, and/or mitigation measures. For each measure, the table identifies timing of implementation, party responsible for implementation, completion check box, and space for initials. The County of Monterey is responsible for ensuring the implementation of all measures in this Mitigation Monitoring and Reporting List. Page I of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11????Responsible Compliance Actions Initials Required Timing Party* L m leted Mitigation Measure V-1 Landscape: Landscape and hardscape design features would a) Develop a) Final Design Dokken be incorporated into the project to the extent feasible. A Revegetation, tree Engineering revegetation, tree replacement, and landscape plan shall be replacement plan and incorporated into the final design of the project. Areas for landscape design plans landscaping would be revegetated with native grasses and/or & specifications shrubs that naturally occur in the area grasses only on slopes). b) Review & Approve b) Prior to Caltrans This plan would incorporate all applicable procedures and design Construction requirements as detailed in the Caltrans Highway Design Manual, c) Final grading, Plant c) During Contractor Section 902.1: Planting Guidelines November 2001). This plan & revegetate Construction would include performance criteria e.g., plant coverage/density, d) Ensure compliance d) During County plant types) that must be met to ensure that revegetation of with performance Construction Resident affected areas would be consistent with the existing natural measures identified in Engineer landscape. Specific architectural detail and aesthetic treatments the plans & RE) would be determined during final design and would follow the specifications Monterey County General Plan State Scenic Highway objectives and policies described in Section 3.0 of the Visual Impact Assessment, to ensure that the design and construction of the road structures blend into and complement the accepted scenic corridor. V-2 Bridge Railing: The bridge rails on the San Benancio Road a) Develop bridge rail a) Final Design Dokken El bridge over El Toro Creek would be a split-rail design Type ST- design plans & Engineering 20S Caltrans Bridge Standard Detail Sheet XS-16-205), which is specifications similar to the existing rail and would help to maintain the existing b) Review & Approve b) Prior to Caltrans rural character of the project site. design Construction c) Final grading, Plant c) During Contractor & revegetate Construction d) Ensure compliance d) During County RE with performance Construction measures identified in the plans & specifications * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 2 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Compliance Actions Responsible Mitigation Measure Required L Timin Party* Completed Initials V-3 Retaining Walls: Project retaining walls shall have a) Develop retaining a) Final Design Dokken architectural treatment such as color and texture, subject to the wall design plans & Engineering Department's review and approval, to reduce the visual impact of specifications the wall and allow the wall to blend with the rural character of the b) Review & Approve b) Prior to Caltrans surrounding environment. Retaining walls shall have the same design Construction architectural treatment as the other proposed retaining walls for c) Construct retaining c) During Contractor other projects within the State Route 68 corridor. All retaining walls Construction walls built as part of the project improvements shall receive the d) Ensure compliance d) During County RE Monterey Drystack Stone architectural surface treatment with with performance Construction integral colored concrete. measures identified in the plans & specifications V-4 Tree Removal: Minimize tree removal to the greatest extent a) Develop tree a) Final Design Dokken possible. Protect existing vegetation that would not be removed by replacement plan & Engineering the project behind Environmentally Sensitive Area fencing. specifications b) Review & Approve b) Prior to Caltrans design Construction c) Avoid tree removal c) During Contractor whenever feasible Construction d) Ensure compliance d) During Bio/Reveg with performance Construction consultant & measures identified in County RE the plans & specifications V-5 Cut Slopes: All disturbed slopes would receive erosion a) Implement erosion a) During Contractor El control and shall be seeded with native grasses. An alternative to control measures Construction plastic netting will be required for erosion control. specified by plans b) Ensure compliance b) During Bio/Reveg with performance Construction consultant & measures identified in County RE the plans & specifications * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 3 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Compliance Actions Responsible Party* Completed Initials Required Timing Mitigation Measure V-6 Utility Poles: Mitigation for the potential visual impact of the a) Develop utility pole a) Final Design Dokken El utility pole relocations and replacements includes: 1) painting relocation plans & Engineering adding color) or etching of metal poles, 2) reducing the number specifications of poles along State Route 68 within the project limits, and 3) b) Review & Approve b) Prior to County Proj. minimizing replacement pole height increases as much as feasible design Pole relocation Mgr PM) at all locations along State Route 68 within the project limits. Caltrans These measures would be coordinated among the consultant c) Relocate Utility c) Prior to PG&E engineer, the County, Caltrans, Pacific Gas and Electric, and other Poles, Minimize pole Construction utility companies as needed, and shall be implemented to the height whenever extent feasible. possible d) Ensure compliance d) During County RE with performance Construction measures identified in the plans & specifications BR-1: Environmentally Sensitive Areas ESA) shall be a) Designate ESA Prior to Bio/Reveg designated upstream of the existing bridge and at the downstream limits Construction consultant & east) edge of the temporary access road to prevent encroachment County RE into the riparian community adjacent to the work area. b) Install construction Prior to Contractor Environmentally Sensitive Area limits shall be marked using fencing Construction orange construction fencing and shall be maintained until c) Avoid ESAs During Contractor construction is complete. Construction d) Monitor Compliance During County RE Construction BR-2: Cut slopes would be left in roughened condition i.e., not a) Implement planting a) During Contractor El scraped smooth") to facilitate seed establishment on the slopes methods specified by Construction and would be revegetated by hydroseeding per Caltrans plans requirements. b) Ensure compliance b) During Bio/Reveg with performance Construction consultant & measures identified in County RE the plans & specifications * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 4 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Compliance Actions Responsible Required Timin Party* Completed Initials Mitigation Measure BR-3: The temporary access road would be covered in 6 inches of mulch during construction to minimize soil compactions and damage to underlying tree roots. Following construction, the temporary access road would be removed and the disturbed area regraded to pre-project contours. a) Implement protective measures specified by plans b) Ensure compliance with performance measures identified in the plans & specifications a) During Construction b) During Construction Contractor Bio/Reveg consultant & County RE El BR-4: Riparian habitat affected by the temporary access road a) Implement planting a) During Contractor El shall be revegetated with native species typically occurring in the measures specified by Construction reach of El Toro Creek. plans b) Ensure compliance b) During Bio/Reveg with performance Construction consultant & measures identified in County RE the plans & specifications BR-5: Coast live oak trees removed during project a) Identify & minimize a) Prior to Bio/Reveg El implementation would be replaced at a 6:1 ratio in the oak tree trees for removal Construction consultant & replacement areas onsite where feasible and offsite at Toro County RE Regional Park, in accordance with the Revegetation Guidelines. b) Remove trees b) During Contractor Revegetation would be monitored by a qualified Construction Biologist/Revegetation Specialist to be provided by the County c) Plant replacement c) After Contractor during construction and for at least three years following Oak Trees construction installation. d) Monitor and replace d) During County RE & as necessary Construction Contractor and 3 Years after Acceptance of Improvements * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 5 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Compliance Actions Responsible Mitigation Measure Required Timing Party* Completed Initials BR-6: During construction of the retaining walls, any live tree roots encountered during grading would be cut at a 90-degree angle with a sharp axe, pruners, or equivalent. a) Implement construction procedures specified by plans b) Ensure compliance with performance measures identified in the plans & specifications a) During Construction b) During Construction Contractor County RE El BR-7: The County would contract with a qualified Biologist/ a) Ensure qualified Prior to Dokken Revegetation Specialist to assist in preparing detailed construction consultant prepares Construction Engineering drawings and specifications for implementation of the revegetation revegetation plan effort. Following project construction and implementation of b) Ensure Biologist/ During & after Bio/Reveg revegetation measures, the Specialist shall assist with the Revegetation Specialist Construction Consultant & inspection as needed during the contracted plant establishment monitors implement) County RE period, as described below. implementation and plant establishment BR-8: Trees and other vegetation not shown on the plans to be a) Implement protective a) During Contractor El removed shall be protected from damage during construction. measures specified by Construction Where feasible, and to the maximum extent possible, native plans vegetation that must be removed for construction operations shall b) Ensure compliance b) During Bio/Reveg be cut off at ground level and shall not be grubbed. Removed with performance Construction consultant & portions of native vegetation shall be chipped and spread within measures identified in County RE the removal area. In areas where earthwork is required, where the plans & feasible, the top 6 inches of litter and topsoil would be salvaged specifications from the area to be affected. The salvaged material would be stockpiled in a weed-free location on the project site and shall be protected from erosion and overheating during construction. Materials salvaged from riparian areas shall be stockpiled separately from materials salvaged from upland areas. After heavy equipment operations are concluded in a disturbed area and the finish grade has been established, the appropriate stockpiled material shall be spread evenly on the ground before planting and seeding. * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 6 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Compliance Actions Responsible Party* Completed Initials Mitigation Measure Required Timing BR-9: Before salvaging topsoil in an area where salvaging a) Implement protective a) During Contractor topsoil is feasible) and again before starting any planting or measures specified by Construction seeding operations, all exotic plants/weeds would be killed and plans removed from all areas to be revegetated. Mechanical control b) Ensure compliance b) During Bio/Reveg methods should be employed, if feasible; however, heavy with performance Construction consultant & equipment e.g., bulldozers, backhoes) should not be used to measures identified in County RE eradicate exotic plants and weeds. In circumstances where the plans & mechanical control is not effective, it would be necessary to use specifications systemic herbicides that have been approved by the U.S. Environmental Protection Agency for use in aquatic situations e.g., Rodeo by Monsanto). BR-10: Plant materials for the revegetation effort would be a) Implement protective a) During Contractor locally obtained i.e., within a 5-mile radius of the project site, or measures specified by Construction as approved by the Biologist/Revegetation Specialist). The use of plans locally obtained materials, which are adapted to local conditions, b) Ensure compliance b) During Bio/Reveg increases the likelihood that revegetation would be successful and with performance Construction consultant & maintains the genetic integrity of the local ecosystem. For measures identified in County RE widespread herbaceous species e.g., California poppy) that are the plans & more likely to be genetically homogeneous, site specificity is a specifications less important consideration, and stock from commercial sources may be used if approved by the Biologist/Revegetation Specialist. BR-11: Arrangements would be made well in advance of the start a) Coordinate Within 2 Contractor of revegetation to ensure that plant materials are available at the procurement with the Weeks of appropriate time. Sufficient time would be allocated for seed Biologist/ Revegetation Issuance of collection and contract growing, if necessary up to 12 months Specialist and native Notice to may be required for some woody species). plant nurseries Proceed * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 7 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Compliance Actions Responsible Timing Initials Required Party* Completed Mitigation Measure BR-12: Appropriate native species would be planted and seeded a) Develop Final Design Contractor El throughout the mitigation areas in locations where the Specialist Revegetation, tree determines they are most likely to persist without human replacement plan and assistance after a period of establishment. Grasses and herbs landscape design plans would be hydro seeded or broadcast seeded if seed is broadcast, it & specifications should be raked into the soil). Trees and shrubs would be planted b) Implement planting During Contractor in irregular groupings to more closely resemble a natural setting methods specified by Construction and to take advantage of favorable microclimate conditions for plans each species. Included in the project plans and specifications, c) Ensure compliance During separate plant palettes and seed mixes would be prepared and with performance Construction Bio/Reveg would include specific information such as percent measures identified in consultant & purity/germination, application rates, container plant spacing, etc. the plans & County RE specifications BR-13: Compensation for the removal of the coast live oak trees a) Implement planting a) During Contractor El shall be implemented using replacement plantings at a 6:1 ratio. measures 6:1 Construction replacement) specified by plans b) During Bio/Reveg b) Ensure compliance Construction consultant & with performance County RE measures identified in the plans & specifications BR-14: Planting and seeding operations would take place a) Implement planting a) During Contractor El following completion of final grading and ground preparation i.e., measures specified by Construction weed removal and re-spreading of topsoil), preferably between plans October 15 and February 1. b) Ensure compliance b) During Bio/Reveg with performance Construction consultant & measures identified in County RE the plans & specifications * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 8 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Initials Tmun Party* Completed Required Mitigation Measure BR-15: Revegetation areas would be maintained by a qualified Landscape/ Revegetation Contractor for a minimum of 3 years following installation. Typically, the first year of maintenance is included in the construction contract and subsequent years of maintenance are contracted separately. In general, maintenance would include any activities required to meet the performance standards set for this mitigation program, including controlling erosion and invasive weeds throughout the duration of the contract(s). a) Implement planting measures specified by plans b) Ensure compliance with performance measures identified in the plans & specifications a) During Construction b) During Construction and 3 years after construction completion Contractor Bio/Reveg consultant & County RE El BR-16: The ongoing and final success criteria for this a) Implement planting a) During Contractor El revegetation plan would be developed as a goal to determine measures specified by Construction whether the revegetation effort is successful. Success criteria may plans include a percentage of total native vegetative cover and wildlife b) Ensure compliance b) During Bio/Reveg use similar to that of adjacent habitats. Compliance with these with CDFG 1602 Construction consultant & criteria will be based on satisfying the target functions and values permit condition #46 and 3 years County RE and on establishing the appropriate hydrologic regime following success criteria) of after cessation of human support e.g., irrigation, maintenance, 50% survival rate construction weeding, reseeding, etc.). completion BR-17: The revegetation effort would be monitored by a qualified a) Implement planting a) During Contractor El Biologist/ Revegetation Specialist during construction and for at measures specified by Construction least 3 years following installation, based on the length of time plans needed for the revegetation to meet the performance standards. b) Ensure compliance b) During Bio/Reveg Monitoring would include regular site visits to monitor the with performance Construction consultant & maintenance activities and annual performance monitoring to measures identified in and 3 years County RE collect data and assess the progress of the revegetation effort. The the plans & after purpose of monitoring is 1) to document that the desired riparian specifications construction habitat has been established, and 2) to identify any shortcomings completion so that appropriate corrective actions can be taken. Monitoring would include preparation of annual reports to be submitted to the applicable regulatory and resource agencies. * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 9 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Compliance Actions Responsible Initials Party* Completed Required Timing Mitigation Measure BR-18: Impacts to Waters of the United States shall be mitigated a) Pay in-lieu fee Prior to County PM E] for through the use of in-lieu fee mitigation in accordance with the Construction U.S. Army Corps of Engineers, San Francisco District's Interim b) Comply with permit During Contractor Guidelines for In-Lieu Fee Mitigation. The interim guidelines conditions Construction include an estimated fee schedule based on a 2:1 mitigation ratio. BR-19: Before issuance of a grading permit or other authorization a) Submit Permit Prior to County to proceed with project construction, the project proponent shall application Construction obtain any necessary permits e.g., from the U.S. Army Corps of Engineers and the Regional Water Quality Control Board). BR-20: Lane closures would be conducted at night. However, a) Coordinate a) During Contractor El bridge construction would be conducted primarily during daylight construction activities Construction hours to avoid disturbing bats potentially using the bridge structure b) Ensure compliance or adjacent trees at night. with performance b) During County RE measures identified in Construction the plans & specifications BR-21: In the event falsework has been constructed and work is a) Coordinate a) During Contractor El delayed for longer than 3 months, the falsework would be construction activities Construction completely covered with sheet material i.e., no netting) such as b) Ensure compliance visquine, or equivalent, to prevent bats from roosting on the with performance b) During County RE falsework. The cover would be maintained in good condition until measures identified in Construction work resumes. the plans & specifications BR-22: At least 15 days before the onset of activities, the a) Coordinate a) Before Contractor El applicant or project proponent shall submit the name(s) and construction activities Construction credentials of biologists who would conduct activities specified in b) Ensure compliance b) During Bio/Reveg the measures. No project activities shall begin until proponents with performance Construction consultant & have received written approval from the US Department of Fish measures identified in County RE and Wildlife Service Service) that the biologist(s) is qualified to the plans & conduct the work. specifications * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 10 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Initials Party* Completed Required Timing Mitigation Measure BR-23: A Service-approved biologist, provided by the County, a) Coordinate a) Before Contractor El shall survey the work site two weeks before the onset of activities. construction activities Construction If California red-legged frogs, tadpoles, or eggs are found, the b) Ensure compliance b) During Bio/Reveg approved biologist shall contact the Service to determine if with performance Construction consultant & moving any of these life-stages is appropriate. In making this measures identified in County RE determination, the Service shall consider if an appropriate the plans & relocation site exists. If the Service approves moving animals, the specifications approved biologist shall be allowed sufficient time to move California red-legged frogs from the work site before work activities begin. Only Service-approved biologists shall participate in activities associated with the capture, handling, and monitoring of the California red-legged frog. BR-24: Before any construction activities begin on a project, a a) Coordinate a) Before Contractor E] Service-approved biologist shall conduct a training session for all construction activities Construction construction personnel. At a minimum, the training shall include a b) Provide training for b) Before Bio/Reveg description of the California red-legged frog and its habitat, the construction crew Construction consultant & importance of the California red-legged frog and its habitat, the c) Ensure compliance c) During County RE general measures that are being implemented to conserve the with performance Construction California red-legged frog as they relate to the project, and the measures identified in boundaries within which the project may be accomplished. the plans & Brochures, books and briefings may be used in the training specifications session, provided that a qualified person is on hand to answer questions. * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page l l of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Initials Required Party* Completed Timing Mitigation Measure BR-25: A Service-approved biologist shall be present at the work a) Monitor construction a) During Contractor El site until such time as all removal of California red-legged frogs, activities Construction instruction of workers, and habitat disturbance have been b) Ensure compliance b) During Bio/Reveg completed. After this time, the contractor or permittee shall with performance Construction consultant & designate a person to monitor onsite compliance with all measures identified in County RE minimization measures. The Service-approved biologist shall the plans & ensure that this individual receives training in the identification of specifications the California red-legged frog. The monitor and the Service- approved biologist shall have the authority to halt any action that might result in impacts that exceed the levels anticipated by the U.S. Army Corps of Engineers and Service during review of the proposed action. If work is stopped, the U.S. Army Corps of Engineers and Service shall be notified immediately by the Service-approved biologist or onsite biological monitor. BR-26: During project activities, all trash that may attract a) Implement protective a) During Contractor El predators shall be properly contained, removed from the work site, measures specified by Construction and disposed of regularly. Following construction, all trash and plans construction debris shall be removed from work areas. b) Ensure compliance b) During Bio/Reveg with performance Construction consultant & measures identified in County RE the plans & specifications BR-27: All fueling and maintenance of vehicles and other a) Prepare spill a) Before Contractor El equipment and staging areas shall occur at least 65.6 feet from any response plan Construction riparian habitat or water body. The U.S. Army Corps of Engineers b) Implement b) During Contractor and permittee shall ensure contamination of habitat does not occur protective measures Construction during such operations. Before the onset of work, the U.S. Army specified by plans Corps of Engineers shall ensure that the permittee has prepared a c) Ensure compliance c) During Bio/Reveg plan to allow a prompt and effective response to any accidental with performance Construction consultant & spills. All workers shall be informed of the importance of measures identified in County RE preventing spills and of the appropriate measures to take should a the plans & spill occur. specifications * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 12 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Party* Completed Initials Required Timin Mitigation Measure BR-28: A Service-approved biologist shall ensure that the spread or introduction of invasive exotic plant species shall be avoided to the maximum extent possible. When practicable, invasive exotic plants in the project areas shall be removed. a) Implement protective measures specified by plans b) Ensure compliance with performance measures identified in the plans & specifications a) During Construction b) During Construction Contractor Bio/Reveg consultant & County RE El BR-29: Project sites shall be revegetated with an appropriate a) Develop a) Final Design Dokken El assemblage of native riparian wetland and upland vegetation Revegetation, tree Engineering suitable for the area. A species list and restoration and monitoring replacement plan and & plan shall be included with the project proposal for review and specifications approval by the Service and the U.S. Army Corps of Engineers. b) Review & Approve b) Prior to Caltrans, Such a plan must include, but not be limited to, location of the design Construction USACoE & restoration, species to be used, restoration techniques, time of year USFWS the work will be done, identifiable success criteria for completion, c) Final grading, plant c) During Contractor and remedial actions if the success criteria are not achieved. & revegetate Construction d) Ensure compliance d) During County with performance Construction Resident measures identified in Engineer the plans & RE) specifications * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 13 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Initials Part Completed Required Timing Mitigation Measure BR-30: Stream contours shall be returned to their original a) Implement protective a) During Contractor El condition at the end of project activities, unless consultation with measures specified by Construction the Service has determined that it is not beneficial to the species or plans feasible. b) Ensure compliance b) During Bio/Reveg with performance Construction consultant & measures identified in County RE the plans & specifications BR-31: The number of access routes, number and size of staging a) Implement protective a) During Contractor areas, and the total area of the activity shall be limited to the measures specified by Construction minimum necessary to achieve the project goal. Routes and plans boundaries shall be clearly demarcated, and these areas shall be b) Ensure compliance b) During Bio/Reveg outside of riparian and wetland areas. Where impacts occur in with performance Construction consultant & these staging areas and access routes, restoration shall occur. measures identified in County RE the plans & specifications BR-32: Work activities shall be completed between April 1 and a) Coordinate a) Before Contractor November 1. Should the proponent or applicant demonstrate a construction activities Construction need to conduct activities outside this period, the U.S. Army Corps b) Ensure compliance b) During Bio/Reveg of Engineers may authorize such activities after obtaining the with performance Construction consultant & Service's approval. measures identified in County RE the plans & specifications BR-33: To control erosion during and after project a) Implement erosion a) During Contractor implementation, the applicants shall implement best management control measures Construction practices, as identified by the appropriate Regional Water Quality specified by plans Control Board. b) Ensure compliance b) During Bio/Reveg with performance Construction consultant & measures identified in County RE the plans & specifications * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 14 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Initials Party* Completed Required Timing Mitigation Measure BR-34: If a work site is to be temporarily dewatered by pumping, a) Implement protective a) During Contractor E] intakes shall be completely screened with wire mesh not larger measures specified by Construction than 0.2 inch to prevent California red-legged frogs from entering plans the pump system. Water shall be released or pumped downstream b) Ensure compliance b) During Bio/Reveg at an appropriate rate to maintain downstream flows during with performance Construction consultant & construction. Upon completion of construction activities, any measures identified in County RE barriers to flow shall be removed in a manner that would allow the plans & flow to resume with the least disturbance to the substrate. specifications BR-35: A Service-approved biologist shall permanently remove, a) Implement protective a) During Contractor E] from the project area, any individuals of exotic species, such as measures specified by Construction bullfrogs, crayfish, and centratchid fishes, to the maximum extent plans possible. The permittee shall have the responsibility to ensure that b) Ensure compliance b) During Bio/Reveg his or her activities are in compliance with the California Fish and with performance Construction consultant & Game Code. measures identified in County RE the plans & specifications BR-36: Environmentally Sensitive Areas ESA) shall be a) Designate ESA Prior to Bio/Reveg El designated upstream of the existing bridge and at the downstream limits Construction consultant & east) edge of the temporary access road to prevent encroachment County RE into California red-legged frog habitat i.e., riparian vegetation) b) Install construction Prior to Contractor adjacent to the work area. Environmentally Sensitive Area limits fencing Construction shall be marked using orange construction fencing and shall be c) Avoid ESAs During Contractor maintained until construction is complete. Construction d) Monitor Compliance During County RE Construction BR-37: Following construction, the temporary access road would a) Implement protective a) At Contractor El be removed and the disturbed area regraded to pre-project measures specified by construction contours. plans conclusion b) Ensure compliance Bio/Reveg with performance b) At consultant & measures identified in construction County RE the plans & conclusion specifications * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 15 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Initials Party* Completed Required Tinting Mitigation Measure BR-38: Riparian habitat affected by the temporary access road shall be revegetated with native species typically occurring in the subject reach of El Toro Creek. a) Revegetate as specified by plans b) Ensure compliance with performance measures identified in the plans & specifications a) At construction conclusion b) At construction conclusion Contractor Bio/Reveg consultant & County RE BR-39: If possible, all trees and brush that would be affected by a) Coordinate a) Before Contractor project construction would be removed during the non-nesting construction activities Construction season between September 1 and February 15). If this is not b) Ensure compliance b) During Bio/Reveg possible and project construction is to begin during the nesting with performance Construction consultant & season February 16-August 31), all suitable nesting habitat within measures identified in County RE 500 feet of the limits of work shall be surveyed by a qualified the plans & biologist before starting construction-related activities. specifications BR-40: Surveys would be conducted no more than 14 days before a) Coordinate a) Before Contractor El the start of work. If an active nest is discovered, a buffer shall be construction activities Construction established around the nest and delineated using an orange b) Ensure compliance b) During Bio/Reveg construction fence or its equivalent. The buffer for raptor nests with performance Construction consultant & would be at least 500 feet, and the buffer for passerines would be measures identified in County RE at least 100 feet. The buffer shall be maintained in place until the the plans & end of the breeding season or until the young have fledged, as specifications determined by a qualified biologist. If no nesting is discovered, construction can begin as planned. Construction beginning during the non-nesting season and continuing into the nesting season shall not be subject to these measures. * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 16 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Initials Party* Completed Required Timing Mitigation Measure BR-41: A qualified biologist, provided by the County, shall a) Coordinate a) Before Contractor & survey the work site for California Tiger Salamander CTS) 72 construction activities Construction County RE hours prior to the onset of construction activities. If any CTS are found the qualified biologist shall contact the CDFG to b) Ensure compliance b) During Bio/Reveg determine if moving the CTS is appropriate. No construction with performance Construction consultant & shall commence until all CTS are removed from the project site. measures identified in County RE After the preconstruction surveys are completed, exclusionary the plans & fencing shall be installed around the southern facing slope north specifications of the creek to prevent CTS from entering the project site once construction has begun. BR-42: Before any construction activities begin on a project, a a) Coordinate a) Before Contractor & El qualified biologist shall conduct a training session for all construction activities Construction County RE construction personnel. At a minimum, the training shall include a b) Provide training for b) Before description of the CTS and its habitat, the importance of the CTS construction crew Construction Bio/Reveg and its habitat, the general measures that are being implemented to c) Ensure compliance c) During consultant & conserve the CTS as they relate to the project, and the boundaries with performance Construction County RE within which the project may be accomplished. Brochures, books measures identified in and briefings may be used in the training session, provided that a the plans & qualified person is on hand to answer questions. specifications BR-43: After the pre-construction surveys have been completed a) Monitor construction a) During Contractor & El and exclusionary fencing has been installed, a qualified biologist activities Construction County RE shall be present at the work site during construction activities on the southern facing slope north of the creek where potentially b) Ensure compliance b) During Bio/Reveg suitable CTS habitat occurs. The qualified biologist shall have the with performance Construction consultant & authority to halt any action that might result in impacts that exceed measures identified in County RE the levels anticipated by the CDFG during review of the proposed the plans & action. If work is stopped, the CDFG shall be notified immediately specifications by the qualified biologist. * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 17 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Initials Party* Completed Required Timing Mitigation Measure CR-1: The archaeological site shall be avoided during project a) Identify site a) Before Archeologist construction. No equipment shall be operated within, or otherwise Construction consultant enter, the archaeological site during construction. No construction b) Monitor construction b)During Contractor equipment or materials shall be stored within the archaeological activities Construction site. c) Ensure compliance b) During Archeologist with performance Construction consultant & measures identified in County RE the plans & specifications CR-2: No project personnel shall enter the archaeological site a) Monitor construction a)During Contractor El area unless accompanied by a qualified archaeologist. activities Construction b) Ensure compliance b) During Archeologist with performance Construction consultant & measures identified in County RE the plans & specifications CR-3: A qualified archaeologist and Native American a) Monitor construction a)During Native El representative if the Native American community so elects) shall activities Construction American monitor all ground-disturbing project construction activities Rep adjacent to the historical site. b) Ensure compliance b) During Archeologist with performance Construction consultant & measures identified in County RE the plans & specifications CR-4: In the event that cultural materials are identified during a) Stop Work a) During County RE construction, all ground-disturbing activities shall stop until a Construction Contractor qualified archaeologist can evaluate these materials. If the deposit b) Evaluate artifacts & b) During Archeologist is intact, an excavation plan must be developed and implemented, prepare excavation plan Construction consultant an analysis of these materials must be conducted, a report must be prepared, and the artifacts must be curated. * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 18 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK ONE - CONTRACT NO. 10-11???Responsible Compliance Actions Party* Completed Initials Mitigation Measure Required H min CR-5: If human remains are encountered, State Health and Safety a) Stop Work a) During County RE El Code 7050.5 states that no further disturbance shall occur until the Construction Contractor County Coroner has made a determination of origin and b) Evaluate remains & b) During Archeologist disposition pursuant to Public Resources Code Section 5097.98. notify County Coroner Construction consultant The County Coroner must be notified of the find immediately. If c) Conduct c) During County the remains are determined to be prehistoric, the Coroner will investigations & Construction Coroner notify the Native American Heritage Commission, which will notifications as identify and notify a most likely descendant. With permission of appropriate the landowner or his/her authorized representative, the descendant may inspect the site of the discovery. The descendant shall complete the inspection within 24 hours of notification by the Native American Heritage Commission. * The Resident Engineer RE) is responsible for all activities obligatory of the contractor. The RE should sign off for the contractor on all measures listed in the table as being a responsibility of the contractor. Page 19 of 19 State Route 68 at San Benancio Road Intersection Improvements Project BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40444-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BIB] 40453-U01 BOOK-U02 ONE-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94108-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???MONTEREY COUNTY BOARD OF SUPERVISORS GOVERNMENT CENTER, 168 W. ALISAL STREET, 1ST FLR, CONFERENCE ROOM 1032 SALINAS, CALIFORNIA 93901-2437 BOOK TWO BID FORM STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS STATE PROJECT NO. EA 05-0H8220 CONTRACT NO. 10-111065 NAME OF BIDDER BUSINESS P.O. BOX CITY, STATE, ZIP BUSINESS STREET ADDRESS Please include even ifP.O. Box used) CITY, STATE, ZIP TELEPHONE NO: AREA CODE FAX NO: AREA CODE CONTRACTOR LICENSE NO. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???BOOK TWO BID/PROPOSAL STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS STATE PROJECT NO. EA 05-0H8220 CONTRACT NO. 10-111065 TABLE OF CONTENTS Page No. BID FORM 3 LIST OF SUBCONTRACTORS 12 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION 14 PUBLIC CONTRACT CODE 15 NON-COLLUSION AFFIDAVIT 17 DEBARMENT AND SUSPENSION CERTIFICATION 18 STATEMENT CONCERNING EMPLOYMENT OF UNDOCUMENTED ALIENS 19 CONTRACTOR'S CERTIFICATE AS TO WORKER'S COMPENSATION 20 LIST OF SATISFIED PUBLIC AGENCIES 23 BIDDER'S BOND 24 STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 2 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???BID FORM STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS STATE PROJECT NO. EA 05-0H8220 CONTRACT NO. 10-111065 TO: MONTEREY COUNTY BOARD OF SUPERVISORS Government Center 168 W. Alisal Street, 1St Floor, Room 1032 Salinas, California 93901-2683 1. Pursuant to and in compliance with the Notice to Bidders Inviting Formal Bids and with the other documents relating thereto, the undersigned bidder, having become familiar with the terms of the contract, the local conditions affecting the performance of the contract, the cost of the work at the place where the work is to be done, the project plans and specifications, and the other contract documents, hereby proposes and agrees to perform within the time hereinafter set forth the said Specifications and shown on the plans accompanying them, and to provide and furnish any and all labor, materials, equipment, transportation, utilities, and services necessary to perform the contract and complete in a workmanlike manner all of the work required in connection with the following project: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS, STATE PROJECT NO. EA 05-068220, CONTRACT NO. 10- 111065, located in northern portion of Monterey County, all in strict conformity with the drawings and specifications and other contract documents, including all addenda, for the sum hereinafter stated: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS STATE PROJECT NO, EA 05-0H8220, CONTRACT NO. 10-111065 ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 1 066070 MAINTAIN TRAFFIC LS 1 $ $ 2 071325 TEMPORARY FENCE TYPE LF 3125 $ $ ESA) 3 073000A TEMPORARY STREAM LS 1 $ $ P) DIVERSION 4 074016 CONSTRUCTION SITE LS 1 $ $ MANAGEMENT 5 074019 PREPARE STORM WATER LS 1 $ $ POLLUTION PREVENTION PLAN 6 074028 TEMPORARY FIBER ROLL LF 1743 $ $ 7 074028A TEMPORARY LARGE FIBER LF 1144 $ $ ROLL 8 074033 TEMPORARY CONSTRUCTION EA 3 $ $ ENTRANCE 9 074034 TEMPORARY COVER SF 11300 $ $ STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 3 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???ITEM ITEM UNIT OF ESTIMATE UNIT PRICE ITEM TOTAL ITEM DESCRIPTION NO CODE MEASURE QUANTITY In Figures) In Figures) 10 074038 TEMPORARY DRAINAGE INLET EA 3 $ $ PROTECTION TYPE 3) 11 074041 STREET SWEEPING LS 1 $ $ 12 074042 TEMPORARY CONCRETE EA 4 $ $ WASHOUT PORTABLE) 13 074056 RAIN EVENT ACTION PLAN LS 1 $ $ 074057 SSTTOR WATER ANNUAL LS 1 $ $ 14 RT 074058 STORM WATER SAMPLING AND LS 1 $ $ 15 ANALYSIS DAY 120090 CONSTRUCTION AREA SIGNS LS 1 $ $ 16 120100 TRAFFIC CONTROL SYSTEM LS 1 $ $ 17 TRAFFIC STRIPE 120151 LF 21200 $ $ 18 PAINT) 120152 TEMPORARY PAVEMENT SF 500 $ $ 19 MARKING PAINT) PORTABLE CHANGEABLE 128650 EA 2 $ $ 20 MESSEAGE SIGN 129000 TEMPORARY RAILING TYPE K) LF 2320 $ $ 21 TEMPORARY ALTERNATIVE 129100 EA 7 $ $ 22 CRASH CUSHION SYSTEM REMOVE THERMOPLASTIC 150714 LF 20814 $ $ 23 TRAFFIC STRIPE REMOVE THERMOPLASTIC 150715 SF 665 $ $ 24 PAVEMENT MARKING 150722 REMOVE PAVEMENT MARKER EA 266 $ $ 25 ASPHALT CONCRETE REMOVE 150771 LF 195 $ $ 26 DIKE REMOVE 18" CORRUGATED 150806A LF 113 $ $ 27 STEEL PIPE 150820 REMOVE INLET EA 1 $ $ 28 152370A RELOCATE BUS STOP BENCH EA 2 $ $ 29 ROADSIDE SIGN O 152386 EA 5 $ $ 30 POST ONE ROADSIDE SIGN 152387 W EA 2 $ $ 31 T O POST 158210A RESET FENCE LF 111 $ $ 32 160101 CLEARING AND GRUBBING LS 1 $ $ 33 STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 4 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 190101 ROADWAY EXCAVATION CY 775 $ $ 34 192037 STRUCTURE EXCAVATION CY 985 $ $ 35 F) RETAINING WALL) 193013 STRUCTURE BACKFILL CY 472 $ $ 36 F) RETAINING WALL) 200001 HIGHWAY PLANTING LS 1 $ $ 37 202007 DUFF SY 1714 $ $ 38 202007 CHIPPED MATERIAL SF 9840 $ $ 39 203021 FIBER ROLL LF 1750 $ $ 40 203032 EROSION CONTROL AC 1 $ $ 41 HYDROSEED) 203038 ROLLED EROSION CONTROL SF 9659 $ $ 42 PRODUCT JUTE MESH) 204017 GROUP W) WILLOW TT EA 22 $ $ 43 ING) CU 204099 PLANT ESTABLISHMENT WORK LS 1 $ $ 44 208000 IRRIGATION SYSTEM LS 1 $ $ 45 260201 CLASS 2 AGGREGATE BASE CY 3224 $ $ 46 390132 HOT MIX ASPHALT TYPE A) TON 2256 $ $ 47 394048 PLACE HOT MIX ASPHALT LF 351 $ $ 48 CONCRETE DIKE TYPE E) 394073 PLACE HOT MIX ASPHALT LF 89 $ $ 49 CONCRETE DIKE TYPE A) 394074 PLACE HOT MIX ASPHALT LF 685 $ $ 50 CONCRETE DIKE TYPE C) 394090 PLACE HOT MIX ASPHALT SF 246 $ $ 51 MISCELLANEOUS AREA) 510060 STRUCTURAL CONCRETE, CY 339 $ $ 52 F) RETAINING WALL 510502 MINOR CONCRETE MINOR CY 1.61 $ $ 53 F) STRUCTURE) 511035A ARCHITECTURAL TREATMENT SF 3132 $ $ 54 F) TEXTURED CONCRETE) 520103 BAR REINFORCING STEEL LB 28400 $ $ 55 F, P) RETAINING WALL) 566011 ROADSIDE SIGN ONE POST EA 3 $ $ 56 650014 I 118" REINFORCED CONCRETE LF 106 $ $ 57 PIPE STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 5 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 650018 24" REINFORCED CONCRETE LF 186 $ $ 58 PIPE 690110 12" CORRUGATED STEEL PIPE LF 29 $ $ 59 DOWNDRAIN 705206 CONCRETE FLARED END 24 EA 1 $ $ 60 S ECTION 707417 RE I ORCED CONCRETE LF 15 $ $ 61 E PIPE E 721009 ROCK SLOPE PROTECTION CY 4 $ $ 62 FACING, METHOD B) 731517 MINOR CONCRETE GUTTER) CY 22 $ $ 63 F) 731623 MINOR CONCRETE CURB CY 3 $ $ 64 F) RAMP) 750500 MISCELLANEOUS IRON AND LB 1729 $ $ 65 F, P) STEEL 800321 CHAIN LINK FENCE TYPE CL-6, LF 72 $ $ 66 VINYL CLAD) 832002 METAL BEAM GUARD RAIL LF 624 $ $ 67 STEEL POST) 832070 VEGETATION SY 271 $ $ 68 CONTROL(MINOR CONCRETE) 839521 CABLE RAILING LF 394 $ $ 69 839541 TRANSITION RAILING TYPE EA 6 $ $ 70 WB) 839559 TERMINAL SYSTEM TYPE ET) EA 1 $ $ 71 839565 TERMINAL SYSTEM TYPE SRT) EA 3 $ $ 72 839701A CRETE BARRIER TYPE 60) CO LF 195 $ $ 73 N 840504 4" RMOPLASTIC TRAFFIC H LF 9620 $ $ 74 T E 75 840506 STRIPERMOPLASTIC TRAFFIC LF 1780 $ $ 840515 THERMOPLASTIC PAVEMENT SF 552 $ $ 76 MARKING 850111 PAVEMENT MARKER EA 260 $ $ 77 P) RETROREFLECTIVE) 861501 MOD INGIGNAL AND LS 1 $ $ 78 192003 STRUCTURE EXCAVATION CY 91 $ $ 79 F) BRIDGE) 192037 STRUCTURE EXCAVATION CY 283 $ $ 80 F) RETAINING WALL) 193003 F STRUCTURE BACKFILL BRIDGE CY 96 $ $ 81 STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 6 CONTRACT NO. 10- 11 1 065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 193013 STRUCTURE BACKFILL CY 312 $ $ 82 F) RETAINING WALL) 490519 DRIVE STEEL PILE HP 12 X 74) EA 18 $ $ 83 490566A FURNISH STEEL PILE HP 12 X LF 838 $ $ 84 P) 74) 490539 DRIVE STEEL PILE HP 14 X 117) EA 8 $ $ 85 490538 FURNISH STEEL PILE HP 14 X LF 372 $ $ 86 P) 117) 490514 DRIVE STEEL PILE HP 12 X 53) EA 30 $ $ 87 490566B FURNISH STEEL PILE HP 12 X LF 1,341 $ $ 88 P) 53) 510051 STRUCTURAL CONCRETE, CY 5.4 $ $ 89 F) BRIDGE FOOTING 510053 STRUCTURAL CONCRETE, CY 206.6 $ $ 90 F) BRIDGE 510060 STRUCTURAL CONCRETE, CY 250 $ $ 91 F) RETAINING WALL 510086 STRUCTURAL CONCRETE, CY 59 $ $ 92 F) APPROACH SLAB TYPE N) 510087 STRUCTURAL CONCRETE, CY 86 $ $ 93 F) APPROACH SLAB TYPE R) 519088 JOINT SEAL MR 1") LF 132 $ $ 94 520102 BAR RIENFORCING STEEL LB 58,300 $ $ 95 F, P) BRIDGE) 520103 BAR REINFORCING STEEL LB 14,100 $ $ 96 F, P) RETAINING WALL) 512203 FURNISH PRECAST PRESTRESSED CONCRETE EA 8 $ $ 97 P) GIRDER 40'-50') 512500 ERECT PRECAST PRESTRESSED EA 8 $ $ 98 CONCRETE GIRDER 750501 MISCELLANEOUS METAL LB 60 $ $ 99 F, P) BRIDGE) 839740 CALIFORNIA ST-10 BRIDGE LF 360 $ $ 100 F, P) RAIL 510800 PAVING NOTCH EXTENSION CF 48 $ $ 101 721009 ROCK SLOPE PROTECTION CY 0.20 $ $ 102 FACING, METHOD B) 511106 DRILL AND BOND DOWEL LF 140 $ $ 103 192020 STRUCTURE EXCAVATION CY 52 $ $ 104 F) TYPE D) 153235 CLEAN BRIDGE DECK SQFT 3840 $ $ 105 STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 7 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???ITEM NO ITEM CODE ITEM DESCRIPTION UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE In Figures) ITEM TOTAL In Figures) 153225A BRIDGE DECK METHACRYLATE RESIN SQFT 3840 $ $ 106 TREATMENT 540108 FURNISH BRIDGE DECK GAL 52 $ $ 107 TREATMENT MATERIAL 99990 MOBILIZATION 10% LS 1 $ $ 108 GRAND TOTAL $ 2. Bids are required for the entire work. The undersigned understands that the quantities given are approximate only, being given as a basis for the comparison of Bids, and the County of Monterey does not, expressly or by implication, agree that the actual amount of work shall correspond therewith, but reserves the right to increase or decrease the amount of any portion of the work, or to omit portions of the work, as may be deemed necessary without claim for damage or loss of anticipated profit and that payment shall be made only on the basis of the actual quantities of work performed. The bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for that purpose. In the case of unit basis items, the amount set forth under the Item Total" column shall be the product of the unit price bid and the estimated quantity for the item. The basis of award to the lowest responsive, responsible bidder will be the lowest TOTAL BID. The bid submitted must not contain erasures, interlineations, or other corrections unless each such correction is suitably authenticated by affixing in the margin immediately opposite the correction the surname or surnames of the person or persons signing the bid, in the named person's own handwriting. In case of discrepancy between the unit price and the item total price set forth for the item, the unit price shall prevail; provided, however, if the amount set forth as the unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, the amount set forth in the Item Total" column for the item shall prevail in accordance with the following: 1) As to lump sum items, the amount set forth in the Item Total" column shall be the unit price. 2) As to unit basis items, the amount set forth in the Item Total" column shall be divided by the estimated quantity for the item, and the price thus obtained shall be the unit price. 3. The undersigned has checked all of the above figures carefully and understands that the County of Monterey also referred to herein as Owner") will not be responsible for any errors and omissions on the part of the undersigned in making this bid. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 8 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11?? ?Symbols such as commas and dollar signs will be ignored and have no mathematical significance in establishing any unit price or item total or lump sums. Written unit prices, item totals and lump sums will be interpreted according to the number of digits and, if applicable, decimal placement. Cents symbols also have no significance in establishing any unit price or item total since all figures are assumed to be expressed in dollars and/or decimal fractions of a dollar. The foregoing provisions for the resolution of specific irregularities cannot be so comprehensive as to cover every omission, inconsistency, error or other irregularity which may occur in a bid. Any situation not specifically provided for will be determined in the discretion of the Owner, and that discretion will be exercised in the manner deemed by the Owner to best protect the public interest in the prompt and economical completion of the work. The decision of the Owner respecting the amount of a bid, or the existence or treatment of an irregularity in a bid, shall be final. 4. It is understood that the Owner reserves the right to reject any and all bids or waive any irregularities or informalities in the bidding. 5. This bid shall remain valid and will not be withdrawn by the undersigned bidder for a period of sixty 90) days from the date prescribed for opening of this bid. 6. Attached hereto are the following: 1) 2) 3) 9) 10) List of Subcontractors Equal Employment Opportunity Certification Public Contract Code Section 10285.1 Statement Section 10162 Questionnaire Section 10232 Statement Non-Collusion Affidavit Debarment and Suspension Certification Statement Concerning Employment of Undocumented Aliens Contractor's Certificate as to Worker's Compensation Contractor's Certification of Good-Faith Effort to Hire Monterey Bay Area Residents List of Satisfied Public Agencies Bidder's Bond 7. If this bid is accepted by the Owner, then the undersigned shall, within ten 10) business days after receipt of the Letter of Intent to Award, execute and deliver to the Owner a) a contract in the form set forth in the contract documents on which this bid is based, b) a payment bond for public works, as required by the contract documents, c) a performance bond, as similarly required, and d) insurance certificates showing all required insurance coverage. The undersigned will thereafter commence and complete the work within the time required by the contract documents. In the event the bidder to whom the Letter of Intent to Award Contract is given fails or STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 9 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11?? ?refuses to contract as required, including to post the required bonds, provide the insurance certificates, and return the executed copies of the agreement form within ten 10) business days from the date of receiving the Letter of Intent to Award Contract, the County may, at its option, determine that the bidder has abandoned the contract, reject the bid, and declare the bidder's security forfeited as damages and same shall become the property of the County of Monterey. 8. Notice of acceptance and any requests for additional information should be addressed to the undersigned at the following address: 9. The names of all persons interested in the foregoing proposal as principals are as follows: IMPORTANT NOTICE: If the bidder or other interested person is a corporation, state the legal name of the corporation, and the names of the president, secretary, treasurer, and manager thereof; if a partnership, state the name of the firm and the names of all the individual partners composing the firm; if the bidder or other interested person is an individual, state the first and last names in full and give all fictitious names under which the individual does business.) 10. By execution of this bid, the undersigned bidder declares that he or she is a contractor licensed in accordance with the Contractors' State License Law, as follows: Classification: License number: Expiration date: 11. ADDENDA This Bid is submitted with respect to the changes to the contract included in addenda number(s) and If the Bidder submits this bid without all issued addenda, the agency finds your bid nonresponsive. Fill in addenda numbers if addenda have been received and insert, in this Bid, any Engineer's Estimate sheets that were received as part of the addenda. By signing this Bid on the signature portion thereof, the Bidder acknowledges receipt of all addenda.) 12. Pursuant to Section 7103(b) of the Public Contract Code, in submitting a bid to the County, the bidder offers and agrees that if the bid is accepted, it will assign to the County all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act 15 USC. Section 15) or under the Cartwright Act Chapter 2 commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, materials, or services by the bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to the bidder. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 10 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11?? ?By my signature on this bid I certify, under penalty of perjury under the laws of the State of California, the foregoing questionnaire and statements of Public Contract Code Sections 10162, 10232 and 10285.1 are true and correct and the bidder has complied with the requirements of Section 8103 of the Fair Employment and Housing Commission Regulations Chapter 5, Title 2 of the California Administrative Code). By my signature on this Bid I further certify, under penalty of perjury under the laws of the State of California and the United States of America, the Equal Employment Opportunity Certification; the Title 49 Code of Federal Regulations, Part 29 Debarment and Suspension Certification; the Statement Concerning Employment of Undocumented Aliens; and the Contractor's Certification as to Worker's Compensation are true and correct. Dated: Bidder's Business Name By: Print Name: Title: By: Print Name: Title: NOTE: If bidder is a corporation, the full legal name of the corporation shall be set forth above together with the signatures of authorized officers or agents and the document shall bear the corporate seal; if bidder is a partnership, the full name of the firm shall be set forth above together with the signature of the partner or partners authorized to sign contracts on behalf of the partnership; and if bidder is an individual, his signature shall be placed above.) STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS I I CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???LIST OF SUBCONTRACTORS STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS STATE PROJECT NO. EA 05-0H8220, CONTRACT NO. 10-111065 In compliance with the Subletting and Subcontracting Fair Practices Act Chapter 4 commencing with Section 4100], Part 1, Division 2 of the Public Contract Code) and any amendments thereto, each bidder shall set forth below: a) the name and the location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement to be performed under this contract or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications in an amount in excess of one-half of one percent of the prime contractor's total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of one percent of the prime contractor's total bid or $10,000, whichever is greater, and b) the portion of the work which will be done by each subcontractor under this Act. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in this bid. If a prime contractor fails to specify a subcontractor or if a prime contractor specifies more than one subcontractor for the same portion of the work to be performed under the contract in excess of one-half of one percent of the prime contractor's total bid, he shall be deemed to have agreed that he is fully qualified to perform that portion himself, and that he shall perform that portion himself. No prime contractor whose bid is accepted shall: a) substitute any subcontractor, b) permit any subcontract to be voluntarily assigned or transferred or allow it to be performed by any one other than the original subcontractor listed in the original bid, or c) sublet or subcontract any portion of the work in excess of one-half of one percent of the prime contractor's total bid as to which his original bid did not designate a subcontractor, except as authorized in the Subletting and Subcontracting Fair Practices Act. Subletting or subcontracting of any portion of the work in excess of one-half of one percent of the prime contractor's total bid as to which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the authority awarding this contract setting forth the facts constituting the emergency or necessity. Location and Place Portion of Work Name of Subcontractor of Business STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 12 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11?? ?LIST OF SUBCONTRACTORS continue... Location and Place Portion of Work Name of Subcontractor of Business Check this box if no subcontractors are required to be listed for work or labor to be performed or services to be rendered. Bidder's business name By: Print Name: Title: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 13 CONTRACT NO. 10-1 11065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION The bidder proposed subcontractor hereby certifies that he has has not participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements. Note: The above Certification is part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Certification. Providing false information may result in criminal prosecution or administrative sanctions. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 14 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???PUBLIC CONTRACT CODE PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT In accordance with Public Contract Code Section 10285.1 Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has has not been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. Note: The bidder must place a check mark after has" or has not" in one of the blank spaces provided. PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No If the answer is yes, explain the circumstances in the following space. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 15 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???PUBLIC CONTRACT CODE SECTION 10232 STATEMENT In accordance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board. Note: The above Public Contract Code Statements and Questionnaire are part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of these Statements and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 16 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???NON-COLLUSION AFFIDAVIT Title 23 United State Code Section 112 and Public Contract Code Section 7106) To be executed by bidder and submitted with Bid State of California ss. County of In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 being first duly sworn, deposes and says 1) that he or she is of the party making the foregoing bid; 2) that the bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; 3) that the bid is genuine and not collusive or sham; 4) that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; 5) that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract to anyone interested in the proposed contract; 6) that all statements contained in the bid are true; and further, 7) that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Dated: Bidder's Business Name By: Print Name: Title: State of California County of Subscribed and sworn to before me on this day of 20 by proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. Notary Public Seal) Signature STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 17 CONTRACT NO. 10- 11 1 065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???DEBARMENT AND SUSPENSION CERTIFICATION Title 49, Code of Federal Regulations, Part 29 The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any person associated therewith in the capacity of owner, partner, director, officer, manager: is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any federal agency; has not been suspended, debarred, voluntarily excluded or determined ineligible by any federal agency within the past 3 years; does not have a proposed debarment pending; and, has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years. If there are any exceptions to this certification, insert the exceptions in the following space. Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action. Note: The above Certification is part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Certification. Providing false information may result in criminal prosecution or administrative sanctions. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 18 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???STATEMENT CONCERNING EMPLOYMENT OF UNDOCUMENTED ALIENS Public Contract Code Section 6101) In conformance with Public Contract Code Section 6101, the bidder certifies compliance with state and federal law with respect to the employment of undocumented aliens by signing this proposal on the signature portion thereof. Public Contract Code section 6101 provides that no state agency or department, as defined in Section 10335.7, that is subject to this code, shall award a public works or purchase contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works or purchase contract, who has, in the preceding five years, been convicted of violating a state or federal law respecting the employment of undocu- mented aliens Note: The above Statement is part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Statement. Providing false information may result in criminal prosecution or administrative sanctions. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 19 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???CONTRACTOR'S CERTIFICATE AS TO WORKER'S COMPENSATION Labor Code Section 1861) Labor Code Section 3700 provides, in relevant part: Every employer except the State shall secure the payment of compensation in one or more of the following ways: a) By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this State. b) By securing from the Director of Industrial Relations a certificate of consent to self-insure either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees." I certify that I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract. Note: The above Certificate is part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Certificate. Providing false information may result in criminal prosecution or administrative sanctions. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 20 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???CONTRACTOR'S CERTIFICATION OF GOOD-FAITH EFFORT TO HIRE MONTEREY BAY AREA RESIDENTS Monterey County Code Section 5.08.120) I CERTIFY THAT I am aware of the provision of Monterey County Code Section 5.08.120. Monterey County Code Section 5.08.120 provides, in relevant part: A. General Provisions. Unless such a provision would conflict with a state or federal law or regulation applicable to a particular contract for public works of improvement, all County contracts for public works of improvement shall contain provisions pursuant to which the contractor promises to make a good-faith effort to hire qualified individuals who are, and have been for at least one 1) year prior to the opening of bids, residents of the Monterey Bay Area in sufficient numbers so that no less than fifty percent 50%) of the contractors total construction work force, including any subcontractor work force, measured in labor work hours, is comprised of Monterey Bay Area residents. B. Non-responsive Bidder Declaration: Enforcement. If any contractor submitting a bid for a contract for public works of improvement fails to abide by the good-faith local hiring provisions of this Section, the contractor may be declared by the Board to be a non- responsive bidder for purposes of this Chapter. If a contractor lists in his or her bid a subcontractor who is currently disqualified under the terms of this Section, the Board may declare said contractor to be a non-responsive bidder for purposes of this Chapter. If the Board finds that a contractor to whom a contract for public works of improvement has been awarded has failed to comply with the good-faith hiring provisions of this Section during the performance of the contract, the Board may disqualify the contractor from bidding on any County contract for public works of improvement for a period of one 1) year from the date of the Board's disqualification. A subsequent violation of this Section by a contractor may result in disqualification by the Board for a period of three 3) years from the date of the subsequent disqualification. C. Binding on Subcontractors. Every contractor entering into a contract for public works of improvement subject to the provisions of this Section shall include in each and every subcontract for work, laborers, or materialmen relating to the project the requirement that the subcontractor promises to make a good-faith effort to hire qualified individuals who are, and have been for at least one 1) year prior to the opening of bids, residents of the Monterey Bay Area. If the Board finds that any subcontractor has failed during the performance of the subcontract to comply with its promise to contractor, the Board may disqualify said subcontractor from submitting or being listed in any bid for any County contract for public works of improvement for a period of one 1) year from the date of the Board's disqualification. A subsequent violation by a subcontractor may result in disqualification by the Board for a period of three 3) years from the date of the subsequent disqualification." STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 21 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???I FURTHER CERTIFY AS FOLLOWS check the box that applies): I CERTIFY that at least 50% of the total construction work force on the project, including any subcontractor work force, measured in labor work hours, will be comprised of qualified individuals who to the best of my knowledge are, and have been for at least one 1) year prior to the effective date of the opening of bids, Monterey Bay Area residents. Evidence that I will comply with this requirement is as follows please use additional pages to provide supporting evidence and/or documentation, as necessary): I CERTIFY that I promise to make a good-faith effort to hire qualified individuals who, to the best of my knowledge, are, and have been for at least one 1) year prior to the effective date of the opening of bids, residents of the Monterey Bay Area in sufficient numbers such that no less than fifty percent 50%) of the total construction work force on the project, including any subcontractor work force, measured in labor work hours, will be comprised of Monterey Bay Area residents. Evidence of my promise to make a good- faith effort will be as follows please use additional pages to provide supporting evidence and/or documentation, as necessary): I CERTIFY that I do not comply with and am unable to promise to make a good-faith effort to comply with the good-faith local hiring provisions set forth in Monterey County Code Section 5.08.120. I declare under penalty of perjury under the laws of the State of California that the foregoing certification is true and correct. Executed on date) at city/state) Bidder's Business Name Signature: Print Name: Title: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 22 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???LIST OF SATISFIED PUBLIC AGENCIES Two minimum) Agency Name Project Name Contact Person Award Date Phone No. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 23 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???BIDDER'S BOND WHEREAS, the Principal named below has submitted the accompanying bid to the County of Monterey, a political subdivision of the State of California hereinafter called County"), for the following project: STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS. WHEREAS, Principal as bidder, is required to furnish a bond executed by an admitted surety in connection with said bid, to secure timely execution of the contract and delivery of the bonds and insurance certificates, in the event that the contract is awarded to Principal; and WHEREAS, the Principal has submitted the above-mentioned bid to the County, for which bids are to be opened at city of where bid opening), California, on, date bid opening). NOW, THERFORE, we PRINCIPAL, and as SURETY, are held and firmly bound into the County of Monterey in the penal sum of Dollars $ J, which sum is not less than ten percent 10%) of the total amount of the base bid amount including all alternates submitted by the said above-named Principal to the County of Monterey, for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, to the County of Monterey we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, That If the aforesaid Principal is awarded the contract and, within the time and manner required under the specifications, after the prescribed forms are presented to him for signature, enters into a written contract, in the prescribed form, in accordance with the bid, and files two bonds with the County of Monterey, one to guarantee faithful performance and the other to guarantee payment for labor and materials, as required by law and said contract documents, then this obligation shall be null and void; otherwise, it shall be and remain in full force and virtue. Surety hereby stipulates and agrees that no change, extension of time, alternation or addition to the terms of the contract on the call for bids, or to the work to be performed thereunder, or the specifications accompanying the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of said contract or the call for bids, or to the work of to the specifications. If the County brings suit upon this bond and judgment is recovered, the Surety shall pay all litigation expenses incurred by the County in such suit, including attorney's fees, court costs, expert witness fees and investigation expenses. STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 24 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012 BOOK TWO - CONTRACT NO. 10-11???IN WITNESS WHEREOF the above-bounden parties have executed this instrument under their several seals this day of 20 the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. Corporate Seal) Principal By Name and Title Corporate Seal) Surety By Name and Title Attach: 1) Copy of authorization for signatory for Principal, and 2) original or certified copy of unresolved appointment, power of attorney, by laws, or other instrument entitling or authorizing person executing bond on behalf of Surety to do so). STATE ROUTE 68 AT SAN BENANCIO ROAD INTERSECTION IMPROVEMENTS 25 CONTRACT NO. 10-111065 BIB] 40394-U01 BOOK-U02 TWO-U02 U02 CONTRACT-U02 NO.-U02 10-111065-U02 LI21329-U03 FO21330-U03 FO85769-U03 FO89518-U03 MG89556-U03 AS89575-U03 AS89581-U03 AI93754-U03 DO94109-U03 C1-U03 GENERAL-U03 DOCUMENTS-U03 8/4/2010-U04 RIVASR-U04 15366-U05 3-U06 A.-U07 CONDUCT-U07 A-U07 PUBLIC-U07 HEARING-U07 TO-U07 CONSIDER-U07 MODIFICATIONS-U07 TO-U07 MITIGATION-U07 MONITORING-U07 REPORTING-U07 PROGRAM-U07 STATE-U07 300-PUBLIC-U08 WORKS-U08 FERNANDEZ-U09 VERONICA-U09 FERNANDEZV-U10 7/19/2010-U011 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS-U012 BY-U012 SUBSTITUTING-U012 EQUIVALENT-U012 OR-U012 MORE-U012 EFFECTIVE-U012 MITIGATION-U012 MEASURES;-U012 B.-U012 CONSIDER-U012 ADOPTING-U012 A-U012 RESOLUTION-U012 MAKING-U012 APPROPRIATE-U012 FINDINGS-U012 ADOPTING-U012 MITIGATION-U012 MONITORING-U012 REPORTING-U012 PROGRAM-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS;-U012 C.-U012 CONSIDER-U012 APPROVING-U012 PLANS-U012 SPECIAL-U012 PROVISIONS-U012 STATE-U012 ROUTE-U012 68-U012 AT-U012 SAN-U012 BENANCIO-U012 ROAD-U012 INTERSECTION-U012 IMPROVEMENTS,-U012 STATE-U012 PROJECT-U012 NO.-U012 EA-U012 05-0H8220,-U012 CONTRACT-U012 NO.-U012 10-111065;-U012 D.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 SIGN-U012 APPROVED-U012 PLANS-U012 SPECIFICATIONS;-U012 E.-U012 CONSIDER-U012 AUTHORIZING-U012 DIRECTOR-U012 OF-U012 PUBLIC-U012 WORKS-U012 TO-U012 ADVERTISE-U012 NOTICE-U012 TO-U012 BIDDERS"-U012 IN-U012 CALIFORNIAN-U012 ON-U012 JANUARY-U012 17,-U012 2011-U012 JANUARY-U012 24,-U012 2011,-U012 CONTINGENT-U012 UPON-U012 PASSAGE-U012 OF-U012 STATE-U012 BUDGET.-U012