Title
a. Award a contract to Granite Construction Company, the lowest responsible bidder, for the Blanco Road Overlay, Project No. 1727, in the total amount of $2,806,179;
b. Approve the Performance and Payment Bonds executed and provided by Granite Construction Company;
c. Authorize a contingency, not to exceed 10% of the contract amount or $280,618, to provide funding for approved contract change orders;
d. Authorize the Resource Management Agency Director or Resource Management Agency Deputy Director of Public Works, Parks & Facilities to execute the contract and, subject to the terms of the Public Contract Code, approve change orders to the contract that do not exceed 10% of the original contract amount and do not significantly change the scope of work; and
e. Authorize the Resource Management Agency Director or Resource Management Agency Deputy Director of Public Works, Parks & Facilities to execute a Certificate of Completion and record a Notice of Completion with the County Recorder when the Director or Deputy Director determines that the contract is complete in all respects in accordance with Plans and Special Provisions for the construction of the Blanco Road Overlay, Project No. 1727, Granite Construction Company.
Report
RECOMMENDATION:
It is recommended that the Board of Supervisors:
a. Award a contract to Granite Construction Company, the lowest responsible bidder, for the Blanco Road Overlay, Project No. 1727, in the total amount of $2,806,179;
b. Approve the Performance and Payment Bonds executed and provided by Granite Construction Company;
c. Authorize a contingency, not to exceed 10% of the contract amount or $280,618, to provide funding for approved contract change orders;
d. Authorize the Resource Management Agency Director or Resource Management Agency Deputy Director of Public Works, Parks & Facilities to execute the contract and, subject to the terms of the Public Contract Code, approve change orders to the contract that do not exceed 10% of the original contract amount and do not significantly change the scope of work; and
e. Authorize the Resource Management Agency Director or Resource Management Agency Deputy Director of Public Works, Parks & Facilities to execute a Certificate of Completion and record a Notice of Completion with the County Recorder when the Director or Deputy Director determines that the contract is complete in all respects in accordance with Plans and Special Provisions for the construction of the Blanco Road Overlay, Project No. 1727, Granite Construction Company.
SUMMARY:
Approval of the recommended action will authorize the Resource Management Agency to award the Blanco Road Overlay project construction contract to Granite Construction Company as the lowest responsible, responsive bidder and proceed with construction. In general, the project consists of paving (2.4”) of hot mix asphalt concrete (HMA) along Blanco Road from Reservation Road to Davis Road, approximately 4.56 miles. Staff recommends including the additive alternate work which consists of replacing damaged Radar Speed Feedback signs, for a total construction cost of $2,806,179.
DISCUSSION:
The Project consists of rehabilitating existing asphalt concrete by machine grinding and paving two point four inches (2.4”) of hot mix asphalt concrete (HMA) including, but not limited to, clearing and grubbing, placing new survey monuments, installing loop detectors and performing traffic control. Project limits are along Blanco Road from Reservation Road to Davis Road, approximately 4.56 miles. The Engineer’s estimate for construction is $2,876,439.
On April 24, 2018, the Board of Supervisors approved the Plans and Special Provisions for the Blanco Road Overlay, Project No. 1727. The project was subsequently advertised and bids were opened on May 18, 2018. RMA received two (2) bids. The lowest responsible, responsive bidder was Granite Construction Company with a total bid of $2,806,179, which includes the base bid of $2,746,179 and the add alternate of $60,000. The second bidder was Granite Rock Company with a base bid amount of $2,781,618 and additive alternate of $40,000, for a total bid of $2,821,618. Having two (2) bids that are so close in cost, and within the engineer’s estimate, indicates good bids.
The project has been determined to be categorically exempt (Class 1) from the California Environmental Quality Act (CEQA) because it is to perform repair and maintenance of existing streets and similar facilities, which involves no expansion of an existing use (See CCR § 15301 Existing Facilities).
Construction is anticipated to begin in September 2018 and is scheduled to take three (3) months, meaning it would be completed in FY 2018-19.
OTHER AGENCY INVOLVEMENT:
The Office of the County Counsel, and Contracts/Purchasing, attended the bid opening and reviewed the low bid for conformance with applicable regulations. The Office of the County Counsel- Risk Management and Auditor-Controller’s Office, have reviewed and approved the Contract and Bonds as to form, fiscal terms, and insurance provisions, respectively.
FINANCING:
The total estimated project cost, including engineering, environmental, and construction is $3,471,023. Construction costs total $3,086,797, including $2,746,179 base bid plus $60,000 alternative addition and $280,618 for contingency.
RMA began the project in FY 2015-16, incurring $104,226 in costs, which were funded with Transient Occupancy Tax (TOT) contribution to the Road Fund. The project was then deferred in both FY 2016-17 and FY 2017-18 due to budget shortfalls, as the projects funding source, TOT, was redirected to restore at-risk positions. An additional $17,778 has been incurred this fiscal year, (FY 2017-18) funded with new Measure X funds. Total estimated project costs of $3,471,023 less expenditures incurred to date of $104,226 and $17,778, leave a remaining estimated project balance of $3,349,019. The recommended FY 2018-19 Road Fund 002, Appropriation Unit RMA012 budget includes $3,550,000 in appropriations, funded with Measure X funds, for this project, which is sufficient to cover the remaining costs. The recommended budget is scheduled to be adopted by the Board of Supervisors on June 26, 2018.
BOARD OF SUPERVISORS STRATEGIC INITIATIVES:
The project will overlay Blanco Road with hot-mix-asphalt from Reservation Road to Davis Road to extend the pavement life. The recommended action supports the following Board of Supervisors’ Strategic Initiatives:
__Economic Development
__Administration
__Health & Human Services
X Infrastructure
X Public Safety
Prepared by: Kyle Oyama, EIT, Assistant Engineer, (831) 755-5090
Approved by: Neville Pereira, Interim RMA Deputy Director of Public Works, Parks &
Facilities
Approved by: Carl P. Holm, AICP, RMA Director
The following attachments are on file with the Clerk of the Board:
Attachment A - Contract for Public Work, Insurance, & Bonds
Attachment B - Project Budget
Attachment C - Bid Summary
Attachment D - Location Map