Title: Consider the following staff recommendations: Consider the following staff recommendations:
Attachments: 1. Completed Board Order, 2. Signed Board Report, 3. Engineer's Report - Freitas & Freitas

 

 

 

 

 

 

COMPLETED BOARD ORDER�"y��S-3

Before the Board of Supervisors in and for the

County of Monterey, State of California

Budget No: 09/10  126

Consider the following staff recommendations:

a. Authorize the expenditure of $155,000 from the County's Capital Projects Fund 402

to Aromas Water District for preparation of an Engineer's Report to include

surveying, engineering and design fees, Appraisers Fee, LAFCO Report Fee and

Environmental Document costs for the connection of Oak Ridge Mutual Water

Company and portion of Via Del Sol Drive Area to the Aromas Water System;

b. Transfer $155,000 from County Capital Projects Fund 402, Unit 8174, Account 7521,

Buildings and Improvements to Account 7201, Contributions to Other Agencies;

c. Authorize the County Administrative Officer to execute an Agreement with the

Aromas Water District outlining the Agreement Terms for Funding of specified work

and repayment via successful Proposition 218 Assessment District; and

d. Authorize, should Assessment District fail, the County funds provided to Aromas

Water District will be deemed a County Contribution without repayment. This item

was moved from the Consent Calendar)

Upon motion of Supervisor Calcagno, seconded by Supervisor Armenta, and carried by those

members present, the Board hereby:

a. Authorized the expenditure of $155,000 from the County's Capital Projects Fund 402 to

Aromas Water District for preparation of an Engineer's Report to include surveying,

engineering and design fees, Appraisers Fee, LAFCO Report Fee and Environmental

Document costs for the connection of Oak Ridge Mutual Water Company and portion of Via

Del Sol Drive Area to the Aromas Water System;

b. Transferred $155,000 from County Capital Projects Fund 402, Unit 8174, Account 7521,

Buildings and Improvements to Account 7201, Contributions to Other Agencies;

c. Authorized the County Administrative Officer to execute an Agreement with the Aromas

Water District outlining the Agreement Terms for Funding of specified work and repayment

via successful Proposition 218 Assessment District; and

d. Authorized, should Assessment District fail, the County funds provided to Aromas Water

District will be deemed a County Contribution without repayment. This item was moved

from the Consent Calendar)

PASSED AND ADOPTED this 13th day of April, 2010, by the following vote, to wit:

AYES: Supervisors Armenta, Calcagno, Salinas, Parker, Potter

NOES: None

ABSENT: None

I, Gail T. Borkowski, Clerk of the Board of Supervisors of the County of Monterey, State of California, hereby

certify that the foregoing is a true copy of an original order of said Board of Supervisors duly made and entered in

the minutes thereof of Minute Book 75 for the meeting on April 13, 2010.

Dated: April 16, 2010 Gail T. Borkowski, Clerk of the Board of Supervisors

County of Monterey, State of California

By

Deputy

 

 

BIB]

 

40285-U01

COMPLETED-U02

BOARD-U02

ORDER-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90678-U03

C15-U03

COMPLETED-U03

BOARD-U03

ORDER-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

 

 

SIGNED BOARD REPORTX��"y��MONTEREY COUNTY BOARD OF SUPERVISORS

9-3

MEETING: April 13, 2010 Consent) AGENDA NO.:

SUBJECT: 1. Authorize the expenditure of $155,000 from the County's Capital Projects

Fund 402 to Aromas Water District for preparation of an Engineer's

Report to include surveying, engineering and design fees, Appraisers Fee,

LAFCO Report Fee and Environmental Document costs for the

connection of Oak Ridge Mutual Water Company and portion of Via Del

Sol Drive Area to the Aromas Water System; and

2. Transfer $155,000 from County Capital Projects Fund 402, Unit 8174,

Account 7521, Buildings and Improvements to Account 7201,

Contributions to Other Agencies;

3. Authorize the County Administrative Officer to execute an Agreement

with the Aromas Water District outlining the Agreement Terms for

Funding of specified work and repayment via successful Proposition 218

Assessment District; and,

4. Authorize, should Assessment District fail, the County funds provided to

Aromas Water District will be deemed a County Contribution without

repayment.

DEPARTMENT: County Administrative Office

RECOMMENDATION:

It is Recommended that the Board of Supervisors:

1. Authorize the expenditure of $155,000 from the County's Capital Projects Fund 402 to

Aromas Water District for preparation of an Engineer's Report to include surveying,

engineering and design fees, Appraisers Fee, LAFCO Report Fee and Environmental

Document costs for the connection of Oak Ridge Mutual Water Company and portion of

Via Del Sol Drive Area to the Aromas Water System; and,

2. Transfer $155,000 from County Capital Projects Fund 402, Unit 8174, Account 7521,

Buildings and Improvements to Account 7201, Contributions to Other Agencies;

3. Authorize the County Administrative Officer to execute an Agreement with the Aromas

Water District outlining the Agreement Terms for Funding of specified work and

repayment via successful Proposition 218 Assessment District; and,

4. Authorize, should Assessment District fail, the County funds provided to Aromas Water

District will be deemed a County Contribution without repayment.

SUMMARY/DISCUSSION:

The Oak Ridge Mutual Water System is located in the County of Monterey and presently has an

inadequate supply of water. The County and Aromas Water District agreed that a Water System

Engineer's Study was necessary to determine the feasibility of Aromas replacing the Oak Ridge

distribution system, connecting to the Aromas system, providing an additional source of supply,

additional storage and operating the system. The County previously entered into an agreement

with Aromas Water District for $7,500 to provide funding for this Engineering Study. This

study provided the engineering work necessary to determine the feasibility of connecting Oak

Ridge Mutual Water Company and portions of Via Del Sol Drive Area to the Aromas Water

System. Under the Agreement, to the extent permitted by law, Aromas will repay the $7,500 to

the County if an assessment district is successfully formed to implement a project to connect Oak

Ridge and portions of Via Del Sol Drive Area to Aromas.

 

 

BIB]

 

40285-U01

SIGNED-U02

BOARD-U02

REPORT-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90679-U03

C10-U03

BOARD-U03

REPORTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

SIGNED BOARD REPORTX��"y��Preliminary conclusions have been identified for the connection. According to the Engineer's

Water System Study, Oak Ridge Mutual Water Company and the Via Del Sol Drive area could

be integrated into the water system of the Aromas Water District System." Attached is a copy

of the Water System Engineer's Report prepared by Freitas & Freitas, Engineering and Planning

Consultants, Inc. for Connection of Oak Ridge Mutual Water Company and Via Del Sol Drive

Area to Aromas Water District.)

In addition to the $7,500 previously provided by the County for the Water System Engineer's

Study there is a need to provide $155,000 in funding to Aromas Water District for preparation of

an Engineer's Report to include surveying, engineering and design fees, Appraisers Fee, LAFCO

Report Fee and Environmental Document costs for the connection of Oak Ridge Mutual Water

Company and portion of Via Del Sol Drive Area to the Aromas Water System. As with the

$7,500 previously provided if an assessment district is successfully formed to implement this

project, Aromas will repay the $155,000. Should a Proposition 218 Assessment fail, the County

funds provided to Aromas will be deemed a County Contribution without repayment. County

Counsel has determined that: The County of Monterey has a legitimate public purpose in the

use of its funds for this purpose. The project will contribute to the public health, safety, and

welfare by contributing to a project designed to provide potable water to certain County residents

in a situation where those citizens do not have a reliable source of potable water."

OTHER AGENCY INVOLVEMENT:

The Public Works Director has been apprised of the expenditure of $155,000 from the Capital

Projects Fund to provide to Aromas Water District. County Counsel will assist the County

Administrative Officer in development of the Agreement between the County and the Aromas

Water District for this $155,000 funding.

FINANCING:

There are sufficient appropriations in the Capital Projects Fund to provide for this $155,000

expenditure of funds for the preparation of this critical work.

Approved by:

Lew

Coun

Prepared By:

Rosie Pando

Assistant County Administrative Officer

Attachment  Water System Engineer's Report prepared by Freitas & Freitas, Engineering and

Planning Consultants, Inc. for Connection of Oak Ridge Mutual Water Company and Via Del

Sol Drive Area to Aromas Water District

cc: Yaz Emrani, Director of Public Works

Michael J. Miller, Auditor-Controller

Charles McKee, County Counsel

 

 

BIB]

 

40285-U01

SIGNED-U02

BOARD-U02

REPORT-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90679-U03

C10-U03

BOARD-U03

REPORTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

 

 

ENGINEER S REPORT - FREITAS &y�!�Freitas + Freitas

Engineering and Planning Consultants, Inc.

January 22, 2010

Ms. Vicki Morris

General Manager

Aromas Water District

P.O. Box 388

Aromas, CA 95004

Subject: Water System Engineer's Report

Connection of Oak Ridge Mutual Water Company/Via Del Sol Drive Area

Dear Ms. Morris:

10001

As you requested, we have prepared and revised the enclosed Water System Engineer's Report

for the addition of Oak Ridge Mutual Water Company and portions of Via Del Sol Drive to your

water system.

A connection to the existing pipeline in San Juan Road serving the Ballentree and Marilyn Estate

areas of Aromas Water District is feasible. The closest proximity of Aromas' system is a 6"

pipeline located at the intersection of San Juan Road and Dumbarton Road. A new 8" pipeline

would be constructed within Dunbarton Road to Oakridge Drive up to a new pump station

located at about elevation 375 feet on Oak Ridge Road. New 5/8" services and water meters

would be installed from the new pipeline to serve the new connections.

Below the new pump station the system would receive water from Ballantree Water Tanks

system. This tank is located at an elevation of 482 feet. All service connections below elevation

375 would be served off this tank pressure zone and would have a minimum of about 50 psi

pressure at the new service meter.

A new 50 gpm duplex pump station in Oak Ridge would be built at this 375 feet elevation to

pump trough a new 6" pipeline to the new 100,000 gallon tank located at the high point of Oak

Ridge Mutual Water System. This is about elevation 705 feet as shown on the USGS map. New

5/8" services and water meters would be installed from the new pipeline to serve the new

connections.

The new tank at elevation 705 feet would be high enough to feed water via gravity 6" pipeline

down to Via Del Sol Drive and thence to homes along this road. New 5/8" services and water

meters would be installed from the new pipeline to serve the new connections. Another storage

tank would not be required to serve Via Del Sol area.

The following preliminary conclusions have been identified for connection Oak Ridge Mutual

Water Company system to Aromas Water District System:

G:\10001 Oak Ridge Report\Oak Ridge ENGINEERS REPORT.doc

3233 Valencia Ave., Suite Al, Aptos, California 95003

831-688-1168 fr8tus@aol.com

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Ms. Vicki Morris

January 22, 2010

Page 2

1. Oak Ridge Mutual Water Company and the Via Del Sol Drive area could be integrated

into the water system of the Aromas Water District System as shown on the preliminary

plan enclosed with this report. The preliminary cost of construction would be $3,030,087.

2. Oak Ridge Mutual Water Company and the Via Del Sol Drive area would need to receive

approval from the Board of Directors of the Aromas Water District to connect up to their

water system.

3. Paying for the needed construction could be provided by a cash contribution from each

participant in the amount of $49,674 per member.

1. If financing of the proposed improvements were required, an assessment district in

accordance with California law could be set up such that government bonds could be sold

to finance the improvements. The preliminary cost of construction using an assessment

district would be $3,207,191. This would raise the contribution needed from each

member to about $52,577 not including interest required for yearly repayment of the

bonds issued by the assessment district.

If you have any questions, please call me.

Sincerely,

Michael J. Freitas

Freitas + Freitas Engineering and Planning Consultants, Inc.

Enclosure: Water System Engineer's Report

G:\10001 Oak Ridge Report\Oak Ridge ENGINEERS REPORT.doc

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�WATER SYSTEM ENGINEER'S REPORT

for

CONNECTION OF OAK RIDGE MUTUAL WATER

COMPANY & VIA DEL SOL DRIVE AREA

TOO

AROMAS WATER DISTRICT

AROMAS, CALIFORNIA

JANUARY 2010

Prepared By:

Michael J. Freitas RCE #23345

Freitas + Freitas Engineering And Planning Consultants, Inc.

3233 Valencia Ave, Suite Al

Aptos, California 95003

831-688-1168

FAX 831-688-1218

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�WATER SYSTEM ENGINEERS REPORT

CONNECTION OF OAK RIDGE MUTUAL WATER COMPANY

AND VIA DEL SOL DRIVE AREA TO AROMAS WATER DISTRICT

AROMAS. CALIFORNIA

Table of Contents

Transmittal Letter

Section

1. General Information

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

Oak Ridge Water System

Via Del Sol Water Systems

Aromas Water District

Water Source Flow Requirements

Storage

Preliminary Plan for Connection to Aromas Water District

Preliminary Construction Costs

Other Costs

Available Methods To Finance Improvements

Sequence of Tasks for Moving this Project Forward

Summary of Conclusions

Pale

1

1

Figures

1. Location Map for Oak Ridge Mutual Water, Via Del Sol and Aromas Water District 7

2. Oak Ridge Mutual Water Company and Via Del Sol Area 8

3. Preliminary Construction Plan 9

4. Enlarged Via Del Sol Drive Construction 10

Appendix A  Municipal Improvement Act of 1913 and Improvement Bond Act of 1915 11

Appendix B  Santa Cruz County Assessment District Checklist 13

Appendix C  Preliminary Assessment District Costs 14

Appendix D  Parcel Owners Contacted Who Wish to Be Included. 15

Table of Contents

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�WATER SYSTEM ENGINEER'S REPORT

For

CONNECTION OF OAK RIDGE MUTUAL WATER COMPANY AND VIA DEL SOL DRIVE AREA TO

AROMAS WATER DISTRICT

Aromas, California

1. General Information

Oak Ridge Mutual Water Company is a small rural mutual water company serving residences in the Dunbarton

Drive area of Aromas, California. This small mutual water company has insufficient water sources and wishes to be

adsorbed into Aromas Water District in Aromas. The Oak Ridge's system is located along Oak Ridge Road just

easterly of Dunbarton Road. Another area adjacent to Oak Ridge Mutual Water along Via Del Sol Drive also wishes

to be adsorbed into Aromas Water District. Shown on Figure 1- Location Map is the Aromas Water District, Oak

Ridge Mutual Water Company and Via Del Sol Drive area.

The Oakridge Mutual Water Company consists of an area off Dunbarton Road in Monterey County and serves

potentially 35 lots. At the present time 33 lots are developed and want to be served. However, only 19 homes are

connected to the present system. A list of parcel owners who were contacted and wish to be included in this report

are shown in Appendix D.

The Via Del Sol Drive area has 28 homes that also suffer from water supply sufficiency problems and also wish to

be adsorbed into Aromas Water District. A list of parcel owners who were contacted and wish to be included in this

report are shown in Appendix D.

Both areas are shown on Figure 2  Map of Oak Ridge Mutual Water Company and Via Del Sol Drive Area.

Therefore, the number of additional water services to Aromas Water District would be 64 residential water services.

All residences in the mutual water company system and along Via Del Sol Drive are provided with individual

wastewater disposal systems consisting of septic tanks and appropriately sized leachfields built to the standards of

Monterey County Environmental Health Department.

The Oak Ridge system operates as a mutual water company under the laws of the State of California The Via Del

Sol Drive homes have seven small shared water systems typically serving two or three homes with the remaining

homes having individual water systems. Both are governed by the Monterey County Health Department

requirements.

2. Oak Ridge Water System

The water system consists of 4 supply wells. They vary in depth from 195 feet to 300 feet. One approximately

10,000 gallon steel tank is provided for each of the two pressure zones. With the exception of periodic disinfection

of wells and tanks, no treatment of the water is performed. The lower zone tank receives the water from all four

wells. When the lower tank is nearly full, a transfer pump is activated, lifting water to the upper tank. The lower tank

is located about at elevation 400 feet and the upper tank is located about at elevation 650 feet. When insufficient

water is available from the wells, the lower tank cannot be filled sufficiently to activate the transfer pump. Thus the

upper tank cannot be refilled and homes served from this upper tank have no water. Homes within proximity of the

upper tank and on the top of the ridge are not served from the existing system.

The water distribution system is 4" diameter pipe that does not meet current water system standard requirements.

This main line has only small 2-1/2" fire hydrants and as such provides only marginal fire protection.

In 1976 the Monterey Department of Environmental Health issued a water supply permit to serve a potential 44

connections to the Oakridge Mutual Water Company. A number of very large lots, that could be subdivided in the

future, received more then one connection shares). At the time of permitting, a sustained pumping test of the wells

produced a total of about 60gpm. By September of 1979, the production had declined to about 12 gpm. As a result

of this reduced water flow, the Monterey Department of Environmental Health prohibited the Water Company from

making additional connections. Since then no changes have been made to the water supply system and the

1

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�prohibition remains in effect.

Based on State and County Health requirements, a system with 44 connections requires a sustainable supply of

about 65 gpm, whereas 33 connections requires a supply of about 55 gpm. The Oak Ridge Mutual System clearly

has a source deficiency.

The apparent deficiency in supply became reality when during recent years water had to be trucked in during late

summer and fall to supplement the deficient water supply. Because of the system design, the Oakridge Mutual Water

Co. has the challenging task to explain to home owners in the lower pressure zone, who do not run out of water, that

there is a water supply problems in the upper zone and that people had run out of water. Implementation of

operational control strategies on the transfer pump may minimize this system deficiency.

3. Via Del Sol Drive Water System

The Via Del Sol Drive homes have seven small shared water systems typically serving two or three homes with the

remaining homes having individual water systems. There are no wells, pipelines or storage tanks in these shared

systems large enough to accommodate more residences.

4. Aromas Water District

The Aromas Water District was formed in 1959 with the development of a single community well to replace the

numerous individual private wells throughout the village of Aromas. The district now includes four discontinuous

areas; two of which extend into neighboring San Benito County. Geographically, the largest of the three

discontinuous areas includes the Rancho Larios subdivision 40 homes) in San Benito County, which is located

about 10 miles from the village of Aromas. These are also shown on Figure 1  Location Map.

The District provides potable drinking water and distributes it to customers throughout the District. The Monterey

County portion of the District is within the Pajaro groundwater basin. Water basin management is conducted by the

Pajaro Valley Water Management Agency PVWMA), which provides management parameters for all water

purveyors within the Pajaro basin. The PVWMA is one of the other agencies discussed in this report.

Water is pumped from operating wells to ten water storage tanks. The pipeline distribution system allows water

from the various wells to be mixed before entering the main water storage tank, the Pine Tree Tank. The District has

a total of about 153,000 lineal feet of pipelines to distribute water from the wells to the storage tanks and to District

customers.

As of September 2008 there were 890 connections with a maximum daily demand of 583 gpm 0.68 gpm per

connection). At this time it was estimated that within its approved LAFCO Sphere of Influence an additional

potential of 471 connections could be added with an additional maximum day demand of 320 gpm. The Districts

capacity was thus determined to be 1361 connections with a maximum day demand of 925 gpm.

The four existing production wells of the District San Juan, Pleasant Acres, Carpenteria and Marshall) have a

current capacity of 1,220 gpm.

5. Water Source Flow Reauirements

Using the maximum daily demand factor of 0.68 gpm per connection accepted for Aromas Water District, the

additional 64 connections for Oak Ridge Mutual and Via Del Sol Drive area would use about 43.5 gpm capacity of

Aromas Water District's capacity. This amount is currently available from the District.

6. Storage

A water system of 64 connections would require about 50,000 gallons of storage for domestic use only not counting

any fire protection storage. Storage of 100,000 gallons is recommended for this area to account for domestic use and

fire protection needs.

7. Preliminary Plan for Connection to Aromas Water District

Aromas Water District will require that all components of the connection system serving Oak Ridge and Via Del

Drive areas be new materials constructed in accordance with Aromas Water District and State Department of Health

Services Standards. Aromas Water Co. is not interested in providing only water through a master meter to provide

2

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�water to the area. They prefer that the area be annexed to their system and that Aromas Water District provide full

water service, including meter reading and maintenance of the system, including pipes, tanks and pumps. No

financial credit should be anticipated from Aromas Water District to Oakridge Mutual Water's system for its water

system.

A connection to the existing pipeline in San Juan Road serving the Ballentree and Marilyn Estate areas of Aromas

Water District is feasible. The closest proximity of Aromas' system is a 6" pipeline located at the intersection of San

Juan Road and Dunbarton Road. A new 8" pipeline would be constructed within Dunbarton Road to Oak Ridge

Drive up to a new pump station located at about elevation 375 feet on Oak Ridge Road. New 5/8" services and water

meters with backflow preventers would be installed from the new pipeline to serve the new connections.

Below the new Oak Ridge pump station the system would receive water from Ballentree Pump and Tank system.

Water is pumped from the San Juan Well system to the Ballentree System pipeline. The existing San Juan Well

booster pumps would need to be enlarged to accommodate the new services in this zone. Ballentree system has two

15,000 gallon tanks located at an elevation of 482 feet. All new Oak Ridge service connections below elevation 375

would be served off this tank pressure zone and would have a minimum of about 50 psi pressure at the new service

meter.

A new 50 gpm duplex pump station would be built at this 375 feet elevation to pump trough a new 6" pipeline to the

HOW 100,000 gation tank located at the high point of Oak Ridge Mutual Watei System. This is about elevation 705

feet as shown on the USGS map. New 5/8" services and water meters with backflow preventers would be installed

from the new pipeline to serve the new connections.

The new tank at elevation 700 feet would be high enough to feed water via gravity 6" pipeline down to Via Del Sol

Drive and thence to homes along this road. New 5/8" services and water meters would be installed from the new

pipeline to serve the new connections. Another storage tank would not be required to serve Via Del Sol area.

Aromas Water District policy is to serve each parcel with one water meter. Parcels with more than one residence

will have to have another meter or meters to serve additional residences.

This proposed water system is shown on Figure 3  Preliminary Construction Plan.

8. Preliminary Construction Costs

Shown on the following Table 1  Preliminary Construction Costs is a preliminary construction cost estimate for

the proposed water system improvements.

TABLE 1

PRELIMINARY CONSTRUCTION COSTS

Description

Enlarge San Juan Well Pumps

Connect to Existing Pipeline System

8" Water Main Piping

8" Gate Valves

6" Water Main Piping

6" Gate Valves

Single 5/8" Water Service

Fire Hydrants

Booster Pump Station

100,000 Gallon Tank

SCADA Radio System

Construction Contingencies

Construction Total

Quantity Unit Unit Cost Cost

I ea. $ 10,000 $ 10,000

1 ea. $ 2,500 $ 2,500

5,500 if $ 100 $ 550,000

12 ea. $ 2,250 $ 27,000

6,500 if. $ 90 $ 585,000

13 ea. $ 2,250 $ 29,250

61 ea. $ 2,500 $ 152,500

12 ea. $ 3,000 $ 36,000

1 ea. $ 100,000 $ 100,000

1 ea. $ 150,000 $ 150,000

1 ea. $ 30,000 $ 30,000

$ 1,672,250

10.00% $ 167,225

$ 1,839,475

3

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�9. Other Costs

There are other accumulative costs associated with the connection to the Aromas Water District:

1) The connection fee to Aromas

2) Reimbursement fee to Aromas Community Services District #98-1

3) Sphere of Influence Change and Annexation for Aromas Water District

4) Approval of Pajaro Valley Water Management Agency

5) Preparation of an Environmental Impact Document

6) Engineering, Inspection, Appraisal and other costs.

The Aromas Water District charges presently $10,843 for connection of each home to the water system. This cost

reflects payment for new consumers fair share for the Aromas water system and been determined and approved by

the Aromas Water District's Board of Directors.

The Aromas Community Service's District 98-1 was formed in 1998 by 29 land owners residing in the Ballentree

and Marilyn Lane area. They paid for construction of the pipeline to Aromas Water District system through the issue

of 20 year payoff bonds. Their agreement with the Aromas Water District requires that each new connection must

share in the entire cost of this pipeline. In other words, if one additional home is connected to this pipeline,

independent of its actual point of connection, it must share in the total cost of the pipeline. This concept is similar to

Aromas' connection fee referred to above. Payment is based on the remaining payoff value of the bonds at the time

of connection and thus decreases yearly from 1998.

The remaining balance on 3/01/2010 is $375,000. Thus, one new connection to this pipeline would have to pay

1/(29+1) of the total pipeline cost to connect to Aromas CSD 98-1. However, the more connections are made at one

time, the lower the individual connection charge. If all 64 properties are connected, the connection charge drops will

be about $4,032.

A Sphere of Influence change for Aromas Water District will have to be requested and approved from the Local

Agency Formation Commission LAFCO) and the new service areas annexed to Aromas Water District.

Approval of Pajaro Valley Water Management Agency will be required as Oak Ridge and Via Del Sol are out of the

area where water from PVWMA can be served.

As will be discussed further in this letter the preliminary construction total cost is not the total cost for the project.

The following other costs shown on Table 2  Other Construction Related Costs below must be included in the

project costs:

TABLE 2

OTHER CONSTRUCTION RELATED COSTS

1 Aromas Water Connection Fee 61 ea. $ 10,843 $ 661,423

2 Buy in To CSD 98-1 61 ea. $ 4,032 $ 245,952

3 County of Monterey Permit Fees    $ 10,000

4 Surveying, Engineering and Design fees   6% $ 110,369

5 Construction Inspection   6% $ 110,369

6 Appraisers Fee    $ 15,000

7 Title Fees and Recording Fees    $ 5,000

8 PG&E Service Fee    $ 2,500

9 LAFCO Report Fee    $ 10,000

10 Environmental Document    $ 10,000

11 Easement Costs    $ 10,000

Other Fees Total     $ 1,190,612

Total Construction Related Costs    $ 3,030,087

4

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�                     !�Therefore the Total Construction Related Costs are $3,030,087 which would be $49,673 for each of 61

connections.

10. Available Methods To Finance Improvements

Assuming that the Aromas Water District agrees to allow Oakridge Mutual Water Company to connect up to its

system, you would have to pay for the improvements as noted above. Three possible methods could be utilized to

pay for the work. These methods are as follows:

1. Cash Contribution by each connection.

2. Loan or Grant to Oak Ridge Mutual Water Company.

3. Formation of an Assessment District in accordance with the provisions of California Municipal

Improvement Act of 1913 and the Improvement Bond Act of 1915.

Cash Contributions

Cash contribution is self-explanatory. Each of the 64 connections would have to contribute prior to construction the

required amount without financing. As previously stated, the cash contribution for each connection would need to be

about $50,105 to cover the costs.

Luaus and G. ants

Depending on financial need, loans and grants are available through a revolving fund from the California

Department of Health Services DOHS) for small water providers to improve water treatment of their water systems.

It is very doubtful that Oak Ridge would qualify for a loan or grant of this type, Oak Ridge is affluent and the

mutual water company would not need to exist if water service was provided by the Aromas Water District.

Assessment Districts

Assessment Districts for water improvements have recently been completed in Santa Cruz County area. Aromas

Water District could be the public agency in charge of any assessment district type of financing. Basically,

construction of improvements is financed by sale of bonds by the public agency and secured through liens on the

properties benefited. Appendix A includes a description of how assessment districts operate.

Appendix B is a checklist and description of the procedure to set up a similar assessment district in another county.

Additional costs for assessment bond counsel, bond discount, county administration and other miscellaneous fees

are required with assessment district formation. Shown on Appendix C is a summation of project costs using the

assessment district as a method of financing. As can be seen, formation of an assessment district and sale of bonds

would add about $180,000 of additional costs to the project.

The Estimated Total Costs using assessment district financing would be $3,386474 or about $52,914 per connection.

11. Sequence of Tasks for Moving this Project Forward

As previously stated a number of work tasks and intergovernmental approvals need to be completed for this project

to be completed as described in the report above. Shown below is a list of tasks and approvals in sequential order

now thought to be necessary for the project completion:

Tasks

1. Approve This Report

2. Informal Vote of Property Owners to Proceed

3. Contract to Finance Final Engineering & Agency Approval Costs

4. Prepare Engineering Design

5. Prepare Environmental Document

6. Prepare LAFCO Approval & Annexation

7. Approval of PVWMA

8. Easement Appraisal and Acquisition

9. Proposition 218 Proceedings

10. Preparation of Assessment District Proceedings

5

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�

!�11. Receive Construction Bids for Project

12. Final Assessment District Approval and Selling of Bonds

13. Construction of the Project

14. Water Service to New Areas

11. Summary of Conclusions

The following preliminary conclusions have been identified for connection Oak Ridge Mutual Water Company

system to Aromas Water District System:

1. Oak Ridge Mutual Water Company and the Via Del Sol Drive area could be integrated into the water

system of the Aromas Water District System as shown on the preliminary plan enclosed with this report.

The preliminary cost of construction would be $3,030,087.

2. Oak Ridge Mutual Water Company and the Via Del Sol Drive area would need to receive approval from

the Board of Directors of the Aromas Water District to connect up to their water system.

3. Paying for the needed construction could be provided by a cash contribution from each participant in the

amount of $49,674 per member.

4. If financing of the proposed improvements were required, an assessment district in accordance with

California law could be set up such that government bonds could be sold to finance the improvements. The

preliminary cost of construction using an assessment district would be $3,207,191. This would raise the

contribution needed from each member to about $52,577 not including interest required for yearly

repayment of the bonds issued by the assessment district.

6

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�
!�San 1Wn

Wi0 r^'

Via Del Sol Drive

Figure 1

Location Map for Oak Ridge Mutual Wa er, Via Del Sol

Drive and Aromas Water District

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�

!� NOTEXTPAGE

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�

!�Existing 67'Pipeline in Sanuan Road

from Rea Tank

Construct 5,500 feet of 8"

Pipeline'to New Pump Station

at Elevation 375 Feet

Pump Station Construct Duplex Pump Station

r;

50 gpm capacity at Elevation 375 Feet

 

Construct 3,500 feet of 6" Pipeline from

Pump Station to New 100,000. Gallon

Water Storage Tank in RoadVay

Construct 100,000 Gallon Water Storage

Tank at High Point Elevation 705 Feet

Construct 3,000 feet of 6" Pipeline in Via Del

Sol Drive

4--Via Del Sol Drive

Echo Valley Road

Fi!ure 3

Preliminary Construction Plan

Addition of Oak Ridge and Via Del Sol Areas

Aromas Water District

9

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�See Figure 3 for Continuation

to San Juan Road

Oak Ridge Mutual Water

System 33 New Water Services

 

Construct 100,000 Gallon

Water Storage Tank at

High Point Elevation 700

Feet

Construct 3,000 feet of 6"

Pipeline in Via Del Sol Drive

 

Construct Duplex Pump

Station at Elevation 375

Feet

Construct 3,500 feet of 6"

Pipeline from Pump Station to

New 100,000 Gallon Water

Storage Tank in Roadway

Via Del Sol Area

28 New Water Services

Figure 4

Enlarged Via Del Sol Drive Construction

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Appendix A

Municipal Improvement Act of 1913 and Improvement Bond Act of 1915

The 1913 Act

The 1913 Act proceedings are generally as follows:

The public agency adopts the Resolution of Intention to order the improvement, briefly describing the proposed

improvement, specifying the exterior boundaries of the assessment district, providing for issuance of improvement

bonds, if any, declaring its intention to levy assessments to maintain, repair or improve the facility, if it so intends,

providing for the disposition of any surplus remaining in the improvement fund after completion of the

improvements, designating a contact person, and providing for a reserve fund.

The agency directs to preparation of an Engineer's Report that will contain:

a) Plans and specifications of the proposed improvements which need not be detailed), if not already

installed, and a general description of the works and other property to be acquired.

b) Descriptions of lands and easements to be acquired.

c) An estimate of the cost of the improvement and the costs of lands, rights of way, easements and

incidental expenses in connection with the improvement.

d) A diagram showing, as they existed at the time of the passage of the resolution of intention, all of

the following:

1)

2)

3)

The exterior boundaries of the assessment district.

The boundaries of any zones within the district.

The lines and dimensions of each parcel of land within the district. The diagram may refer to the

assessor's map for a detailed description of the lines and dimensions of the parcels. Each parcel,

including each condominium interest, shall be given a separate number on the diagram.

e) A proposed assessment for each parcel in proportion to its estimated benefits from the improvement,

identifying parcels by diagram number and assessor's parcel number.

This report is filed with the public agency, which may modify the report in any respect. A resolution of preliminary

approval is adopted, and a time and place is set for public hearing, not less than thirty days after passage of the

resolution. Bids for the construction of the improvements and sale of the bonds can be called for, to be received at or

before the time fixed for the hearing. The notice inviting construction bids must be first published at least fourteen

days before the date set for receipt of the bids.

Prior to the public hearing on the assessment district the public agency shall adopt a resolution describing the

boundaries of the district by reference to a map. This map must be filed with the county recorder within fifteen days

after adoption of the resolution fixing the time and place of the hearing and in no event later than fifteen days prior

to such hearing.

Notices of adoption of the resolution of intention and of the public hearing are published and posted at least twenty

days prior to the date set for the public hearing. Posted notices must be posted conspicuously on all open streets

within the district, at not more than 300 feet apart, but not less than three in all.

At least twenty days before the day fixed for the hearing, notice of the adoption of the resolution of intention and the

filing of the report, setting time, place and purpose of the public hearing, stating estimated costs, the amount to be

assessed against the particular parcel covered by the notice, a statement as to the right to file written protest, and the

name and telephone number of a person to answer questions, must be mailed to all owners of property as their

names appear on the assessment roll or as known to the clerk.

After the public agency passes on the report, any interested person may object to the proposed improvement, to the

extent of the assessment district, or to the proposed assessment by filing a written protest with the clerk of the

11

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�agency at or before the time set for the hearing. The protest must identify the property in which the signer is

interested.

The public agency may remedy, revise and correct any error or informality, and may confirm, amend, alter, modify

or correct the assessment and diagram. However, the assessments cannot be increased unless consent from the

owner is obtained or an additional noticed hearing is conducted.

Protests may be withdrawn, in writing, at any time prior to the conclusion of the hearing. If protests against the

proposed improvements are not withdrawn by the owners of more than one-half of the area of the land to be

assessed, no further proceedings shall be taken for a period of one year, unless the protests are overruled by a four-

fifths affirmative vote of the legislative body.

The proposed assessment is confirmed as filed, as modified or as corrected, and the proposed improvement is

ordered to be made or acquired by resolution of the agency.

After confirmation by the public agency, the clerk files the final diagram and notice of assessment with the county

recorder, and the assessment and diagram with the appropriate local agency official. Upon recordation the

assessment becomes due and payable and establishes a lien on each parcel.

After recordation, the person designated as collection officer by the local agency mails a notice of recordation to

property owners and publishes said notice.

The 1915 Act

The provisions of the 1915 Act, when used in conjunction with the 1913 Act, are generally as follows:

After a thirty-day cash payment period, the designated collection officer makes and tiles a list of unpaid assessments

with the treasurer of the agency. A resolution determining unpaid assessments and providing for bond issue is

adopted and a copy filed with the county auditor.

The public agency determines the denominations of the bonds and the amount to mature each year. After printing

they are sold to the highest bidder or a sale is negotiated with a single underwriter. The proceeds of the sale are paid

into funds held by the local agency for the proceedings.

The assessments securing the bonds are a lien against the parcels of land on which they are made. The lien is

subordinate to all taxes and all special assessment liens previously imposed, but has priority over any subsequent

special assessment liens and all other liens, no matter when created.

A portion of each assessment is payable each year, in an amount sufficient to pay the principal and interest on the

bonds when due. This installment is payable in the same time and manner as the general taxes of the public agency

on real property. The county auditor keeps a record of the installments of principal and interest that are to be

collected each year.

The treasurer of the public agency keeps a separate redemption fund for each district, into which he deposits all

collected assessments and interest and penalties thereon. Out of this fund he pays the bond debt service when due,

making principal payments to redeem bonds each September 2, and paying interest each March 2 and September 2.

Any assessment may be paid in full before due, and if the amounts accumulated in the redemption fund from such

early payments are sufficient, the treasurer may redeem any bond before maturity.

If a parcel having an unpaid assessment is divided, the unpaid installments of the original assessment must be

segregated and apportioned to the newly created parcels in accordance with their benefit. An amended assessment

and amended assessment diagram must be prepared as required by law.

12

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�A endix B

Santa Cruz County Assessment District Checklist

13

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Constructing

Public Improvements

By

ASSESSMENT DISTRICT

COUNTY OF SANTA CRUZ

Department of Public Works

DRAFT

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Summary of Assessment District authority and procedure. March 15, 2001

1. Authority

A. There are a number of acts that deal with financing of municipal improvements, but one

which has been fundamental to assessment district formation in California is the

Municipal Improvement Act of 1913. Its provisions can be found in Division 12 of the

Streets and Highways Code of the State of California.

B. Effective November 1996, Proposition 218 affected the procedure required for formation

of assessment districts. The procedures required were added to the California State

Constitution by Proposition 218 under Article XIIID, Section 4.

H. Initiating the Process

A. Applicants request a form from Public Works to initiate the assessment district formation

process. On the form, applicants will describe the type of improvements desired, and the

location where the improvements are to be constructed. Applicants will submit a

$1000.00 deposit with the completed form. The $1000 deposit represents the initial

deposit for the preliminary work of assessment district formation to be performed at-cost

by County staff.

B. Applicants will be responsible for all costs associated with assessment district formation

and operation, and construction of the improvements. The bulk of the costs will be

included in the assessment placed on each parcel in the assessment district.

C. The County will work with the applicant to locate and qualify bond counsel, an

assessment engineer, and bond underwriters.

Ill. Procedure

A. Applicants circulate petitions to the owners of the parcels of land which are in the

proposed assessment district area of benefit. Tenants, if any, who are responsible for

paying special assessments on an included parcel may have a right to approve the

assessment superior to the parcel owner's right in such a special case. Sixty percent or

more of the owners or tenants in the special case mentioned) must signify approval of

proceeding-with assessment district formation for the process to continue. The petitions

will be accompanied by a map of the proposed boundaries of the assessment district and a

description of the proposed improvements.

B. When applicants determine that the required petition signoff has been achieved, the

petitions are submitted to Public Works, which will then examine and certify the petitions.

The first of four assessment district hearings by the Board of Supervisors can then be

scheduled.

C. The First Board Meeting considers the assessment district initiating resolutions, including

those which appoint the bond counsel, the assessment engineer, and the managing

underwriter. If the Board approves, the process moves forward.

D. The Engineer of Work assessment engineer) completes the Engineer's Report and files it

with the Clerk of the Board of Supervisors. The Engineer's Report contains plans and

specifications of the work of improvements, an estimate of the costs, spread of the

assessment and roll. description of lands and easements to be acquired. and an assessment

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�diagram.

E. The Second Board Meeting considers and adopts a resolution approving the Engineer's

Report and directs action pursuant to the approval.

F. The Clerk of the Board and the Engineer of Work complete and record the Map of the

Proposed Boundaries of the Assessment District within 15 days of the Second Board

Meeting.

G. Bond Counsel mails Notices of Proposed Assessment and Ballot to the property owners

and special case tenants, if any) at least 45 days before a public hearing at a subsequent

Board meeting.

H. A Third Board Meeting holds a public hearing for presentation of the assessment district

project and the taking of public testimony.

1. A Fourth Board Meeting at least seven days after the Third Board Meeting, and at least 45

days after Notices of Proposed Assessment and Ballots are sent, holds a public hearing to

hear formal protests, tally the ballots, and if majority approval is present, adopt the final

resolutions to proceed with the formation and financing of the assessment district.

IV. Important Considerations

A. Once the Notice of Assessments is filed subsequent to the Fourth and final) Board

Meeting, the owners of parcels receiving an assessment will have 30 days to pay the

assessment before it is included in the bond financing.

B. It should be noted that one of Proposition 218's primary intents was to make it easier for

those opposed to the assessment district to terminate the process by protest. In principle,

the process allows a simple majority by area or proportion of the proposed assessment,

presumably whichever is the lesser, to terminate the process at any point before the final

tally of ballots.

C. Because the assessment district improvements are to be funded by municipal bonds, which

are then paid off with the assessments, the actual requirement for approval of the

assessment district is yes" votes by two-thirds of the property owners affected.

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�PRELIMINARY FORM

COUNTY OF SANTA CRUZ

DEPARTMENT OF PUBLIC WORKS

REQUEST FOR PETITION TO FORM AN ASSESSMENT DISTRICT

NOTE: Please print or type

1. Name of Applicant:

Address) City)

Telephone)

2. Describe type of improvements desired:

Zip)

I_ Where are the desired imprnv m nta needed? Attach map pr z-

NOTE:  Describe the limits of the needed improvements, where

they should start and end):

4. Approximate number of land owners who will pay for the improvements:

5. State reasons why improvements are needed now:

I AM WILLING to circulate a petition among my neighbors, who would

benefit from these improvements, to obtain their signatures re-

questing the construction of the work under special assessment

district proceedings.

It would be beneficial if at least

three property owners within the

proposed limits of work sign this

request.

A $1000 cash deposit payable to the County of Santa Cruz is re-

quired with the submittal of this Request.

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�TO BEGIN WITH..........

Q. What is an Assessment District?

A. Assessment District" refers to a special area or district

where public improvements, such as curbs, gutters., pavement,

sidewalks, storm drains, street lights, sanitary sewers,

water facilities, and street trees, can be constructed and/

or installed by means of Special Assessment Proceedings.

Q. What do you mean  Special Assessment Proceedings"?

A. It's a-reasonable and equitable way by which you and a ma-

jority of neighbors can obtain needed improvements in your

neighborhood and pay your fair share of the costs over a

period of time at low, interest rates.

Q. Tell me more  what's the authority?

A. This is provided by a State Law and referred to as the Mu-

nicipal Improvement Act of 1913". If you're interested in

looking further into this, it is in Division 12 of the Streets

and Highways Code of the State of California, obtainable in

most libraries.

Q. How do I benefit?

A. Here are a few of the usual benefits:

a) Historically, property values are increased substantially

more than the cost of the improvements.

b) Cleaner, neater appearance of neighborhood.

c) Better traffic movement.

d) Fewer drainage problems  like standing water and property

flooding,

e) Improved health conditions by the replacement of septic

tanks with properly designed sewers.

f) Elimination of septic tank pumping costs.

g) Safer pedestrian travel with new sidewalks.

h) A safer neighborhood with new street lights.

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Q. Who pays for improvements?

A. You, the property owner.

Q. Why doesn't the County" pay for them?

A. Because the County" is you"...And if this were the practice,

you would end up paying for everybody else's improvements. The

assessment district procedure is the fairest  because you pay

your proportionate share of the total cost based upon the benefit

you receive.

Q. But how about all the taxes I pay each year, and the gas tax

money, end money from traffic fines, etc?

A. Generally speaking, this revenue cannot legally be used for

improvements of purely local benefit. It's the policy,in this

and most other counties to require that local improvements be

paid for by the benefiting property, and not out of general tax

revenues which are needed for other things  such as road

maintenance, etc.

O.K., LET'S DO SOMETHING ABOUT IT::::::::

Q. How do I start such improvements?

A. Contact the Department of Public Works, 701 Ocean Street, Santa

Cruz, California, Phone 425-2133.

Q. What do I ask-for?

A. A preliminary form on which you may hire a private bonding attor-

ney to prepare a formal petition to create-an assessment

district.

Q. What details must I give on the preliminary form?

A. Describe the type of improvements desired, and the location where

they are needed. Also briefly explain why the improvements are

needed now. After filling out the form, take it to your attorney

and mail a copy to the County together with a $1000.00 deposit

payable to the County of Santa Cruz.

Q. What is the next step?

A. You should then hire a consulting engineer to make a preliminary

feasibility study to determine suggested limits of the work, the

type of improvements, and a rough cost estimate.

If the project is deemed feasible, request your bonding attorney

to prepare a legal petition for signatures of those landowners

desiring the improvements. You will be given the petition to

circulate for your neighbor's signatures.

2-

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Q. Whom should I get to sign it?

A. Property owners who will benefit from the work. An engineer

from the private consulting firm will tell you what streets

and property are involved  if you are in doubt.

Q. How many should sign it?

A. Signatures accounting for sixty percent of the area of property

subject to assessment would be sufficient  but more is desir-

able. If you can get every benefiting property owner to sign

it, that's best.

Q. Who gets the completed petition after I get as many signatures

as possible?

A. Bring or mail it to the consulting engineering firm.

Q. Is there anything else that my neighbors and I have to do then?

A. No...except to keep in contact with your engineer and attorney

Q.

A.

if you want to follow the status of the job.

How will I know if my petition is granted or not?

Your engineer will send you a letter telling you what action

the Board of Supervisors took on your petition.

Q. Are petitions very often denied?

A. No..providing you have enough signatures of property owners

who benefit, and the proposed work is feasible.

Q. May work ever be started without a petition... or without a

sixty percent petition?

A. Yes. Bx a 4/5ths vote, the Board of Supervisors can start an

assessment proceeding at any time by declaring that the public

interest requires it if a health hazard exists, such as the

lack of sanitary sewers, would be a typical example.

LET'S ASSUME THE PETITION IS ADEQUATE

Q. What happens then?

A. The Board of Supervisors adopts a Resolution of Intention" to

conduct the proceedings. and appoints the Director of Public

Works as the Engineer of Work". A bonding attorney is also

appointed and a consulting engineer is hired to design the

proposed improvements, Plans and specitications are then pre-

3-

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�pared, along with any necessary maps and descriptions of ease-

ments and property to be acquired. Detailed cost estimates for

construction and incidental expenses are prepared. Approximate

or typical assessment charges are estimated.

Q. Is there anything I can do to help?

A. Yes. If you're asked to grant a right of way, recognize that

it's only so the improvements can be put in. The County can't

do any work on private property. Cooperation will be to your

advantage. Payments to purchase land, along with the legal,

appraisal, and court expenses encountered when land is condemned

simply are added to the total project cost to be shared by the

adjoining property owners.

Q. How will I know when the job is ready to commence, so I can

protest what I may not like about it?

A. The Board of Supervisors will adopt a Resolution Appointing

Time and Place of Hearing on Engineer's Report," and all bene-

fiting property owners will be notified by letter, by a news-

rand c-e en  a a Dy--p-s.--

time and place that the Board of Supervisors will hear and con-

sider protests.

The letter Notice to Property Owners) containing the

assessment number, parcel number, and estimated assessment for

each parcel, is mailed at least 20 days prior to the date fixed

for the hearing.

Q. How does the County know whether I'm an owner?

A. The County's tax assessment roll provides the listing of pro-

perty owners and their addresses. If you recently purchased

your property, the name of the previous owner may still be

listed..... so advise the Department of Public works if your

name does not appear on the list of property owners.

Q. Suppose-I don't receive the notice. Will my property still be

assessed?

A. Yes. Under State law it is sufficient to mail notices

listed on the County's last tax assessment roll. to owners

THE PUBLIC HEARING AND RECEIPT OF BIDS

Q. If I am not in favor of the work proposed... what should I do?

A. Mail your written protest to the Clerk of the Board of Super-

visors describing the reason why you do not wish the work to

proceed before the time fixed for the public hearing. Any pro-

test received after this time on the day of the hearing would

be late", and doesn't have to be considered, by law.

4-

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Q. What's the basic purpose of this public hearing?

A. To decide whether or not to construct the improvements. The bids

are received before the hearing and the results are announced be-

fore the hearing is opened. The property owner will then know

whether the estimated assessment figures in the mailed notices

are just right, too high, or too low.

Q. If I favor the project... should I attend the hearing?

A. It will be helpful to the Board of Supervisors if they are aware

of those in favor of the work.

Q.

Can I protest that my estimated assessment is too high?

A. Yes. File your written protest with the Clerk of the Board of

Supervisors prior to the Public Hearing, describing the reasons

why you consider your individual estimated assessment is too high.

Q. If several of my neighoors and I want to protest, do we all have

to write separate letters and all appear at the hearing?

A. No...you can all sign your names to the same letter, but don't

forget to identify each property represented. At�the hearing,

it's best if you agree on a spokesperson to,representthe group.

Q. Can I still protest, even though I signed the original petition?

A. Yes, you can change your mind  but you should have a very good

reason for doing so.

Q.

How many protests does it take to kill the project?

A. It isn't really how many"; it's the percentage of area owned by

protestants that is being assessed within the assessment district

that counts.

Q. What percentage does it take then?

A. Over 50% by area) protest would prevail, unless the Board of

Supervisors, by a four-fifths vote, overrules the protests.

Q. Can a protest be withdrawn?

A. No, not legally" withdrawn, but the Board of Supervisors will

recognize such withdrawal before the Board votes on your project.

Q. Can I ever re-start the same project, once it is protested out?

A. Yes  after six months.

5-

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Q. Does the County construct the improvements?

A. No. All work must be publicly advertised for competitive bids

from licensed contractors.

Q. Is my final assessment based on the contractor's low bid?

A. Yes, and in addition to the contractor's costs, incidental ex-

penses are added. They include costs for engineering, inspec-

tion costs, right of way costs, survey costs, legal fees, bond

printing, etc.

Q. Does a contract have to be awarded to the lowest responsible

bidder?

A. If it's a reasonable bid.. yes!

Q. What if the low bid is unreasonably high?

A. The following alternatives are available:

a7-rejrtaa l-i bids- and re a ve- ti Se fz-ne-w-b'id-s

b) reject all bids and abandon the project.

c) schedule a public hearing to decide whether to award, re-

advertise, or abandon the project.

Q. Is a contract ever awarded when the low bid is higher than the

Engineer's estimate?

A. Sometimes, yes..when the low bid is obviously competitive in

comparison with other bids, or if changed conditions have in-

creased prices since the estimate was made.

Q. If there is little opposition to the project and an insufficient

number of protests, what happens then?

A. The Board adopts a Resolution Approving the Engineer's Report,

Ordering the Work, and Confirming the Assessment" and the con-

tract is then-awarded.

AFTER THE PUBLIC HEARING

Q. When will the work start?

A. Within about 30 days after the award of the contract.

Q. What happens after the improvements are satisfactorily completed?

A. After the work has been completed, the Department of Public Works

certifies the fact of completion and the Board of Supervisors ac-

cepts the work and files a Notice of Completion.

6-

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Q. Will the completed improvements be maintained by the County?

A. Yes...at no additional cost to the people in the assessment

district.

Q. When must I pay the assessment?

A. After the Board of Supervisors confirms the assessment, the assess-

ment roll and diagram are filed with the County Surveyor and the

Notice of Assessment is recorded in the office of the County Re-

corder. A Notice to Pav Assessment is then mailed to the owners

of each parcel assessed. The notice shows the date of recordation

and the expiration date of the cash payment period, which is 30

days after recotdaticn.

Q. What if I can't or don't want to pay in cash?

A. Your total assessment, less any portion paid within thet30 day

period is pooled with the District's remaining assessment. Bonds

are issued on this remainder and are repaid over a period of about

15 years, together with accrued interest.

Q. When do I make my payments?

A. Your billing will be included on your regular County annual tax

bill.

Q. Does this apply to all projects?

A. It applies to all projects financed through the Improvement Bond

Act of 1915."* This is the bond act usually used.

Q. What happens if I don't pay on time?

A. Penalties and interest are assessed, the same as County taxes.

Q. Can I complete the payments of my whole assessment before it's

due?

A. Yes..after bonds have been issued, assessments may be paid and

properties cleared of the lien of the assessment by payment of

the total of the following sums:

a) any installment of principal and interest which has been posted

to the tax roll for the current fiscal year;

o) the unpaid balance of principal plus 5% thereof;

c) the amount of any delinquencies including penalties, interest

and costs;

d) estimated cost of calling bonds; and

e) interest to the date of call unless included in a) above.

Q. What happens if I sell?

A. The buyer assumes the unpaid assessment. However, some lenders

require the assessment to be paid off when a new mortgage is ob-

tained.

7-

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Appendix C

Preliminary Assessment District Costs

14

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Appendix C

Preliminary Assessment District Costs

Oak Ridge Mutual Water Co.!Via Del Sol

CONSTRUCTION COSTS

Item # Description Ouanti Unit Unit Cost Cost

1 Enlarge San Juan Booster Pumps 1 ea. $ 10,000 $ 10,000

2 Connect to Existing Pipeline System 1 ea. $ 2,500 $ 2,500

3 8" Water Main Piping 5,500 If. $ 100 $ 550,000

4 8" Gate Valves 12 ea. $ 2,250 $ 27,000

5 6" Water Main Piping 6,500 If. $ 90 $ 585,000

6 6" Gate Valves 13 ea. $ 2,250 $ 29,250

7 Single 5/8" Water Service 61 ea. $ 2,500 $ 152,500

8 Fire Hydrants 12 ea. $ 3,000 $ 36,000

9 Booster Pump Station 1 ea. $ 100,000 $ 100,000

10 100,000 Gallon Tank 1 ea. $ 150,000 $ 150,000

11 SCADA Radio System 1 ea. $ 30,000 $ 30,000

Subtotal    $ 1,672,250

Construction Contingencies   10.00% $ 167,225

Construction Total    $ 1,839,475

OTHER CONSTRUCTION RELATED COSTS   

I Aromas Water Connection Fee 61 ea. $ 10,843 $ 661,423

2 Buy in To CSD 98-1 61 ea. $ 4,032 $ 245,952

3 County of Monterey Permit Fees    $ 10,000

4 Surveying, Engineering and Design fees   6% $ 110,369

5 Construction Inspection   6% $ 110,369

6 Appraisers Fee    $ 15,000

7 Title Fees and Recording Fees    $ 5,000

8 PG&E Service Fee    $ 2,500

9 LAFCO Report Fee    $ 10,000

10 Environmental Document    $ 10,000

11 Easement Costs    $ 10,000

Other Fees Total    S 1,190,612

Total Construction Related Costs    $ 3,030,087

ASSESSMENT DISTRICT COSTS   

Assessment Fees   

I Bond Counsel Fee   2.5% $ 75,752

2 Bond Counsel Expenses    $ 3,250

3 Bond Counsel Additional Costs    $ 7,500

4 Trustee's fee    $ 5,000

Assessment Fees Subtotal    $ 91,502

Bonding Fees   

I Bond discount 2% of bond amount)   2% $ 60,602

2 Bond Printing, advertising and issue costs    $ 10,000

Bonding Fees Subtotal    $ 70,602

Assessment Engineering    S 15,000

Total Assessment District Costs    $ 177,104

ENGINEER'S ESTIMATE TOTAL COSTS    $ 3,207,191

Cost Per Connection  61  $ 52,577

1

Oak Ridge Water System Cost Estimate.xis

1/21/2010-3:24 PM

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!�Appendix D

List of Interested Property Owners

15

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y� !� Oak Ride Drive   

1 141-071-015-000 GUELLO Ginny 19306 Oak Ride Drive Aromas

2 141-071-014-000 BEERS, Terry & Melissa

19312 Oak Ridge Drive Aromas

3 141-071-026-000 BONGERS, Hans 19364 Oak Ridge Drive Aromas

4 141-081-008 OWES Joe & Christine 19230 Ride Drive

Oak Aromas

5 141-071-025 BRONNAR, Lorran or Atkinson?

19355 Oak Ridge Drive Aromas

6 141-081-004 TAYLOR, Judy & BROWN, Shirley 19260 Oak Ride Drive Aromas

7 141-081-009 WOOLDRIDGE, Brent & Terri 19290 Oak Ridge Drive Aromas

8 141-081-010-000 BUENO, Juana & JAREGUI Oscar 19294 Oak Ridge Drive Aromas

9 141-071-003-000 ERAOLO Richard & Angie 3698 orwood Ave. San Jose

10 141-071-033-000 CHASCO, Maria inch 141-171-030) 19345 Oak Ridge Drive Aromas

11 141-081-012-000 CHU Gene & Joan 19210 Oak Ride Drive Aromas

12 141-071-019-000 CRANE, Scott 19388 Oak Ridge Drive Aromas

13 141-071-013-000 FONG, Frank & May 19920 Merritt Drive Cupertino

 

14

141-071-027-000 NTONIO, Jose & GONZALEZ,

Michaela

19366

Oak Ridge Drive

Aromas

 

15

141-071-041-000 DONNELLY, Beth & HARTFORD,

chard

19332

Oak Ridge Drive

Aromas

16 141-081-003-000 HUBBARD, Jon & Judi 19275 Oak Ridge Drive Aromas

17 141-081-013-000 KEIM, Janes & Dianne 774 Mays Blvd, StelO Incline Village

18 141-071-039-000 SAGAL, Mark & KEITH, Margaret 13940 Oak Ridge Drive Aromas

19 141-071-029-000 IVERMORE Michael 7468 Leafwood Drive Salinas

20 141-081-011-000 McCAULEY, Mac & Ann 19200 Oak Ridge Drive Aromas

21 141-071-016-000 THOMAS, Christopher & Heidi 19300 Oak Ridge Drive Aromas

 

22

141-071-035-000 CORONEL, Emilio & Lily Also

Sakra, Rosemary)

19341

Oak Ridge Drive

Aromas

23 141-071-022-000 UNEZ Juan & Ana 19356 Oak Ridge Drive Aromas

24 141-081-014-000 SCRODIN, Dan & Debbie 19240  Oak Ridge Drive Aromas

25 141-081-005-000 SWANSON, Randy & Denise 19285 Oak Ridge Drive Aromas

26 141-081-007-000 TAYLOR, Irene c/o Judy Taylo 19276 Oak Ridge Drive Aromas

27 141-071-038-000 TOMASELLO, Frank 19338 Oak Ridge Drive Aromas

28 141-071-018-000 KECK, Jeff& Candie 19392 Oak Ridge Drive Aromas

29 141-071-034-000 VEACH, Jack 19329 Oak Ridge Drive Aromas

30 141-071-028-000 WEBER, Mark 19370 Oak Ridge Drive Aromas

31 141-071-017-000 WEBSTER, John & Oralee 19384 Oak Ridge Drive Aromas

32 141-071-040-000 UMARAN Andrew & Carol 19336 Oak Ridge Drive Aromas

1331 141-011-005-000 HIGGENBOTTOM, Dorothy  Dumbarton Rd Aromas

16

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012

 

 

ENGINEER S REPORT - FREITAS &y�!!� Via Del Sol Area   

 Parcel # Name House # Street city

1 127-171-015-000 MONROE, Roger and Dorinda 1101 Via Del Sol Salinas

 

2

127-171-014-000 MOLLER, Jay Et Al Chiodo,

Frank]

1125

Via Del Sol

Salinas

3 127-171-029-000 ROGERS, Timothy 1143 Via Del Sol Salinas

4 127-171-030-000 HUFFSTUTLAT, Steven 1145 Via Del Sol Salinas

5 127-171-028-000 CONTRERAS, Pablo & Alicia 1141 Via Del Sol Salinas

6 127-171-012-000 LEMMON, Jason & Katie 1147 Via Del Sol Salinas

 

7

127-171-011-000 DOUCET, Reginald, Jr. &

Odessa

1149

Via Del Sol

Salinas

 

8

127-171-010-000 HOLLOWELL, Stanley

S.Peterson-Dad)

1155

Via Del Sol

Salinas

9- 197-1721-001-000 PERALES No- an &Martha 1146 Via Del Sol SRIinn-q

10 127-171-026-000 McGOWAN, Glen & Sandra 1177 Via Del Sol Salinas

 

11

127-171-027-000 KUSANOVICH, Stephen &

Laura

1169

Via Del Sol

Salinas

12 127-192-002-000 RUSSO, Jack, Jr. & Julie 1179 Via Del Sol Salinas

 

13

127-191-019-000 CHITWOOD, Howard &

Charlene

1174

Via Del Sol

Salinas

14 127-191-018-000 PERRY, Robert & Martha 1172 Via Del Sol Salinas

15 127-191-013-000 PLACENCIA, Horacio 1178 Via Del Sol Salinas

16 127-191-015-000 PERALES, Rita Trust 1148 Via Del Sol Salinas

17 127-191-022-000 BURL, Emiliano & Lilia 5900 Via Del Sol Salinas

18 127-191-029-000 NUNEZ, Robert 1182 Via Del Sol Salinas

19 127-191-024-000 BENZO Elias & Sandra 1180 Via Del Sol Salinas

20 127-191-009-000 ELDER, Daryl & Alisa   Salinas

21 127-191-010-000 BOBBITT, Peter & Donna 1184 1/2 Via Del Sol Salinas

22 127-191-011-000 BRYAN, Jack & Barbara 1184 Via Del Sol Salinas

23 127-191-008-000 ELDER, Daryl & Alisa 1188 Via Del Sol Salinas

24 127-191-034-000 BARAJAS, Miguel & Leonor 1226 Via Del Sol Salinas

25 127-191-035-000 DONNELLY, Ercilia & Mark 1228 Via Del Sol Salinas

26 127-191-031-000 SOLANO, Robert & Dava 1224 Via Del Sol Salinas

27 127-191-032-000 TOLF, Doris 1222  A Via Del Sol Salinas

28 127-191-033-000 PULSEY, David & Deborah 1192 Via Del Sol Salinas

    

17

 

 

BIB]

 

40285-U01

ENGINEER-U02

S-U02

REPORT-U02

U02

FREITAS-U02

&-U02

FREITAS-U02

LI21329-U03

FO21330-U03

FO85769-U03

FO86069-U03

MG86107-U03

AS86126-U03

AS86127-U03

AI90285-U03

DO90680-U03

C1-U03

GENERAL-U03

DOCUMENTS-U03

4/16/2010-U04

RIVASR-U04

14836-U05

3-U06

CONSIDER-U07

FOLLOWING-U07

STAFF-U07

RECOMMENDATIONS:-U07

MONTEREY-U08

COUNTY-U08

RIVAS-U09

ROBERT-U09

RIVASR-U10

4/5/2010-U011

A.-U012

AUTHORIZE-U012

EXPENDITURE-U012

OF-U012

$155,000-U012

COUNTY-U012

S-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

PREPARATION-U012

OF-U012

AN-U012

ENGINEER-U012

S-U012

REPORT-U012

TO-U012

INCLUDE-U012

SURVEYING,-U012

ENGINEERING-U012

DESIGN-U012

FEES,-U012

APPRAISERS-U012

FEE,-U012

LAFCO-U012

REPORT-U012

FEE-U012

ENVIRONMENTAL-U012

DOCUMENT-U012

COSTS-U012

CONNECTION-U012

OF-U012

OAK-U012

RIDGE-U012

MUTUAL-U012

WATER-U012

COMPANY-U012

PORTION-U012

OF-U012

VIA-U012

DEL-U012

SOL-U012

DRIVE-U012

AREA-U012

TO-U012

AROMAS-U012

WATER-U012

SYSTEM;-U012

B.-U012

TRANSFER-U012

$155,000-U012

COUNTY-U012

CAPITAL-U012

PROJECTS-U012

FUND-U012

402,-U012

UNIT-U012

8174,-U012

ACCOUNT-U012

7521,-U012

BUILDINGS-U012

IMPROVEMENTS-U012

TO-U012

ACCOUNT-U012

7201,-U012

CONTRIBUTIONS-U012

TO-U012

OTHER-U012

AGENCIES;-U012

C.-U012

AUTHORIZE-U012

COUNTY-U012

ADMINISTRATIVE-U012

OFFICER-U012

TO-U012

EXECUTE-U012

AN-U012

AGREEMENT-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

OUTLINING-U012

AGREEMENT-U012

TERMS-U012

FUNDING-U012

OF-U012

SPECIFIED-U012

WORK-U012

REPAYMENT-U012

VIA-U012

SUCCESSFUL-U012

PROPOSITION-U012

218-U012

ASSESSMENT-U012

DISTRICT;-U012

D.-U012

AUTHORIZE,-U012

ASSESSMENT-U012

DISTRICT-U012

FAIL,-U012

COUNTY-U012

FUNDS-U012

PROVIDED-U012

TO-U012

AROMAS-U012

WATER-U012

DISTRICT-U012

BE-U012

DEEMED-U012

A-U012

COUNTY-U012

CONTRIBUTION-U012

WITHOUT-U012

REPAYMENT.-U012