File #: WRAFIN 24-080    Name: AECOM Amendment No. 7
Type: WRA FInance Item Status: Agenda Ready
File created: 9/27/2024 In control: Water Resources Agency Finance Committee
On agenda: 10/4/2024 Final action:
Title: Consider recommending to the full Board approval Amendment No. 7 to the Agreement for Professional Services with AECOM Technical Services, Inc. and adjust the Fee Schedule of the Agreement to increase hourly labor rates according to the direct labor rate schedule; and authorize the General Manager to execute the amendment. (Staff Presenting: Guillermo Alvarez)
Attachments: 1. Board Report, 2. Amendment No.7, 3. Agreement for Professional Services, 4. Amendment Nos. 1, 2, 3, 4, 5 and 6

Title

Consider recommending to the full Board approval Amendment No. 7 to the Agreement for Professional Services with AECOM Technical Services, Inc. and adjust the Fee Schedule of the Agreement to increase hourly labor rates according to the direct labor rate schedule; and authorize the General Manager to execute the amendment. (Staff Presenting: Guillermo Alvarez)                

Report

RECOMMENDATION:

It is recommended that the Monterey County Water Resources Agency Board of Directors:

 

Approve Amendment No. 7 to the Agreement for Professional Services with AECOM Technical Services, Inc. and adjust the Fee Schedule of the Agreement to increase hourly labor rates according to the direct labor rate schedule; and authorize the General Manager to execute the amendment.                  

 

SUMMARY/DISCUSSION:

An Agreement for Professional Services with AECOM Technical Services, Inc. to perform updated seismic stability and deformation analysis of the Nacimiento Dam embankment and underlying streambed sands and gravels (Exhibit A) was approved by the Board of Directors on May 18, 2020.  The work includes drilling and material sample collection from the dam embankment and underlying foundation materials.  The total amount payable for this work is $883,000.  The Agreement also included a separate scope of work for annual safety surveillance and performance evaluation of San Antonio Dam (Exhibit B), which was completed in June 2021.

 

Amendment No. 1 was approved by the Board of Directors on July 19, 2021, to add a scope of work for annual safety surveillance and performance evaluation of San Antonio Dam (Exhibit D), which was completed in June 2022.  Amendment No. 1 included an hourly rate increase of approximately 1.5 percent from the original Agreement.

 

Amendment No. 2 was approved by the General Manager on June 29, 2022, to extend the term of the Agreement from June 30, 2022, to June 30, 2025.

 

Amendment No. 3 was approved by the board of Directors on November 3, 2022, to amends the payment provisions of the Agreement to increase the hourly rates paid for seismic stability and deformation analysis by approximately three percent.  Rates are rounded to the nearest dollar, providing actual increases ranging from 2.8 to 3.2 percent.  The total Agreement amount of $883,000 for seismic stability and deformation analysis described in Exhibit A does not change.  Exhibit F of proposed Amendment No. 3 provides payment provisions identical to the original Agreement and Amendment No. 1 with updated hourly rates.    

 

Amendment No. 4 was approved by the General Manager on September 14, 2023, to amend the payment provisions of the Agreement to increase the hourly rates paid for services provided by AECOM. Amendment No. 5 was approved to increase the dollar amount by $230,000 for a new contract total not to exceed $1,225,588 to complete the seismic stability analysis work underway at Nacimiento Dam. Due to the delays in approval of the seismic evaluation drilling plan by FERC and DSOD, and ongoing projects at the Dams, the remaining value of the current contract is $655,412. The seismic stability evaluation planned under this contract was estimated at $883,000 per the project’s scope of work. A payout shortfall of ± $230,000, compared to the estimate for work under this contract, has been identified requiring an amendment.

 

Amendment No. 6 was approved by the Board of Directors to the Agreement for Professional Services with AECOM Technical Services, Inc to increase the dollar amount by $420,673 for a new contract total not to exceed $1,645,689 to complete the Plunge Pool Rock Outcrop Removal design at the Nacimiento Dam Spillway; and authorize the General Manager to execute the amendment.

 

This amendment to the Agreement with AECOM will adjust the Fee Schedule of the Agreement to increase hourly labor rates according to the direct labor rate schedule in Exhibit J.

 

OTHER AGENCY INVOLVEMENT:

FERC and DSOD approval may be needed for some projects under this contract.

 

FINANCING:

Funds have been identified within the Agency’s current FY 24 budget from Fund 116, Dams Operation and Maintenance.

 

Prepared by:   Guillermo Alvarez, Water Resources Engineer (831) 279-6144

Approved by:  Ara Azhderian, General Manager, (831) 755-8982                     

 

Attachments:

1.                        Amendment No. 7

2.                     Agreement for Professional Services

3.                     Amendment Nos 1, 2, 3, 4, 5 and 6