Skip to main content
 
Our Calendar tab is not syncing; Please use the Video Archive tab to access agendas and broadcasts
 
File #: 24-655    Name: E-Bike Ordinance
Type: General Agenda Item Status: Agenda Ready
File created: 9/27/2024 In control: Parks Commission
On agenda: 10/3/2024 Final action:
Title: Receive a report regarding a draft ordinance for E-bike and electric transportation use within the County of Monterey parks and open space; and provide comment or recommendations to staff.
Attachments: 1. Report, 2. Attachment A – E-bike Staff Report, 3. Attachment B – Parks Commission Minutes, 4. Attachment C – Ad Hoc Committee Report, 5. Attachment D – Draft E-bike Ordinance, 6. Attachment E – Updated (redline) Draft E-bike Ordinance
Date Action ByActionResultAction DetailsSearchable Meeting DetailsVideo
No records to display.

Title

Receive a report regarding a draft ordinance for E-bike and electric transportation use within the County of Monterey parks and open space; and provide comment or recommendations to staff.

Report
RECOMMENDATION:

It is recommended the Monterey County Parks Commission Receive a report regarding a draft ordinance for E-bike and electric transportation use within the County of Monterey parks and open space; and provide comment or recommendations to staff.

 

SUMMARY/HISTORY:

December 2, 2021 - County of Monterey Parks Commission received a comprehensive informational report regarding the use of electric bikes (E-bikes) within the County of Monterey parks and open space (Attachment A).  

 

December 1, 2022 - Parks staff provided a verbal update on E-bikes and an Ad Hoc Committee was formed to research E-bikes and report back to the full Commission with a recommendation on how to move forward with regulating E-bike use.  The Ad Hoc Committee consisted of Commissioners Getzeleman, Sanchez and Stracke.  Meeting minutes included (Attachment B).

 

July 7. 2023 - Ad Hoc Committee presented their research including a County-wide survey and provide a recommendation to the full Commission (Attachment C), at which time a robust discussion took place.  The Commission was split between regulating only E-bikes or all forms of non-vehicular electric transportation.  Consensus was reached with creating a speed limit for all forms of trail use transportation.  Parks staff also recommended including a trail etiquette policy that would improve trail safety between various user groups.  Parks staff stated they would return with a draft ordinance for consideration.  

 

June 6, 2024 - The draft ordinance was presented to the Parks Commission for review and comment and a robust discussion ensued.  The Commission was split in their consideration regarding e-bike classifications, maximum speed limit and passing speed limit.  The Commission advised staff to return at the next meeting with an updated draft ordinance for consideration.

October 3, 2024 - Revised draft ordinance presented to Commission for review and comment (Attachment E).

 

Prepared by:  Bryan Flores, Chief of Parks (831) 796-6425

Approved by:  Randell Ishii, MS, PE, TE, PTOE, Director of Public Works, Facilities, & Parks

 

Attachments:

Attachment A - E-bike staff report, December 1, 2021, carried from November 3, 2021

Attachment B - Parks Commission minutes, December 1, 2022

Attachment C - Ad Hoc Committee report, July 7, 2023

Attachment D - Draft E-bike ordinance, June 6, 2024

Attachment E - Updated (redline) Draft E-bike Ordinance