File #: RES 22-126    Name: Adopt SB 1 Project
Type: BoS Resolution Status: Passed
File created: 6/10/2022 In control: Board of Supervisors
On agenda: 6/21/2022 Final action: 6/21/2022
Title: Adopt a resolution: a. Adopting a list of projects funded by Senate Bill 1 (SB 1) for Fiscal Year 2022-23; and b. Authorizing the Director of Public Works, Facilities and Parks to submit the list to the California Transportation Committee (CTC).
Attachments: 1. Board Report, 2. Attach A - Resolution, 3. Attach B - SB1 Funded Projects FY 21-22, 4. Completed Board Order Item No. 97, 5. Completed Resolution Item No. 97
Title
Adopt a resolution:
a. Adopting a list of projects funded by Senate Bill 1 (SB 1) for Fiscal Year 2022-23; and
b. Authorizing the Director of Public Works, Facilities and Parks to submit the list to the California Transportation Committee (CTC).
Report
RECOMMENDATION:
It is recommended that the Board of Supervisors adopt a resolution:
a. Adopting a list of projects funded by Senate Bill 1 (SB 1) for Fiscal Year 2022-23; and
b. Authorizing the Director of Public Works, Facilities and Parks to submit the list to the California Transportation Committee (CTC).

SUMMARY/DISCUSSION:
Senate Bill 1, the Road Repair and Accountability Act of 2017, is a state legislative act that provides funding for transportation such as the state highway system and local street and road system. Funds are provided through the Road Maintenance and Rehabilitation Account (RMRA). Eligible uses under this account include, but are not limited to, road maintenance and rehabilitation; safety projects; railroad grade separations; complete street components, including active transportation purposes, pedestrian and bicycle safety projects, transit facilities, and drainage and storm water capture projects in conjunction with any other allowable project; traffic control devices; and to satisfy match requirements for federal and state funded projects.

By the end of the current fiscal year (FY 2021-22), Monterey County is anticipated to have received $9.3 million in SB 1 revenue. These funds were used to fund various projects throughout the County ranging from road reconstruction projects to routine roadside maintenance. Projects include Old Stage Road Reconstruction, Laureles Grade Culvert Lining, Alisal Road Reconstruction, and Countywide Striping project.

Prior to receiving an allocation of funds, cities and counties are required annually to provide to the CTC a list of projects to be funded by SB 1 through RMRA. In March of 2021, the CTC amended the Local Streets and Roads Funding P...