Legislation Details

File #: PC 22-048    Name: PLN200118 - CALTRANS STATE ROUTE 156 INTERCHANGE ROUNDABOUTS CASTROVILLE
Type: Planning Item Status: Agenda Ready
File created: 6/3/2022 In control: County of Monterey Planning Commission
On agenda: 6/8/2022 Final action:
Title: PLN200118 - CALTRANS STATE ROUTE 156 INTERCHANGE ROUNDABOUTS CASTROVILLE Public hearing to consider a Coastal Development Permit allowing the construction of three roundabouts to replace the existing Castroville Boulevard signalized intersection. Two of the three roundabouts will connect Highway 156 with Castroville Boulevard, just east of the existing intersection, by adding eastbound and westbound off ramps leading to a roundabout (on the north of the highway for westbound traffic and south side of the highway for eastbound traffic). Roundabouts will be connected by a bridge over the highway. The third roundabout will be located near the intersection of Castroville Blvd and Cielo Azul Road. The project will also provide a new Class 1 mixed use bicycle and pedestrian path. The improvements will be located within 100 feet of environmentally sensitive habitat. This hearing was continued from the May 25, 2022, Planning Commission meeting. Project Location: Highway 156 between Castrovil...
Attachments: 1. Staff Report, 2. Exhibit A – Detailed Project Discussion, 3. Exhibit B – Local Coastal Plan Consistency Matrix, 4. Exhibit C – NEPA and CEQA Re-Validation Form, 5. Exhibit D – Project Plans
Title
PLN200118 - CALTRANS STATE ROUTE 156 INTERCHANGE ROUNDABOUTS CASTROVILLE
Public hearing to consider a Coastal Development Permit allowing the construction of three roundabouts to replace the existing Castroville Boulevard signalized intersection. Two of the three roundabouts will connect Highway 156 with Castroville Boulevard, just east of the existing intersection, by adding eastbound and westbound off ramps leading to a roundabout (on the north of the highway for westbound traffic and south side of the highway for eastbound traffic). Roundabouts will be connected by a bridge over the highway. The third roundabout will be located near the intersection of Castroville Blvd and Cielo Azul Road. The project will also provide a new Class 1 mixed use bicycle and pedestrian path. The improvements will be located within 100 feet of environmentally sensitive habitat. This hearing was continued from the May 25, 2022, Planning Commission meeting.

Project Location: Highway 156 between Castroville Boulevard (postmile R1.40) and the Moro Cojo Slough Bridge (postmile 1.60).
Proposed CEQA Action: Consider a Final Environmental Impact Report/Environmental Impact Statement (FEIR/EIS) previously certified by the California Department of Transportation for the State Route 156 West Corridor Project on January 31, 2013 (SCH#1999111063).
Report
RECOMMENDATION
It is recommended that the Planning Commission:
a. Receive a report and presentation on the State Route 156 Interchange Roundabouts project;
b. Continue the hearing to the June 29, 2022 Planning Commission hearing; and
c. Direct staff to return with written findings, evidence and conditions of approval, as appropriate.

PROJECT INFORMATION
Owner: California Department of Transportation
Planning File Number: PLN200118
Project Location: Highway 156 between Castroville Boulevard (postmile R1.40) and the Moro Cojo Slough Bridge (postmile 1.60)
APNs: 133-071-010-000, 133-071-011-000, 133-071-012-000, 133-071-013-000, 13...

Click here for full text