a. Approve Amendment No. 1 to Utility Agreement No. DRB-36002 (Reimbursement Agreement or Agreement) between the County (LOCAL AGENCY) and Pacific Gas and Electric Company (OWNER) amending the estimated County share of the utility relocation costs from $2,495,361 to $4,110,722 which is approximately 79.5% of the actual net cost to PG&E estimated at $5,170,719 for the relocation of overhead transmission lines and electrical transmission poles needed for construction of the Davis Road Bridge Replacement and Road Widening Project, Project No. 3600; and
b. Authorize the Director of Public Works, Facilities, and Parks or their designee to execute Amendment No. 1 to Utility Agreement No. DRB-36002.
Report
RECOMMENDATION:
It is recommended that the Board of Supervisors:
a. Approve Amendment No. 1 to Utility Agreement No. DRB-36002 (Reimbursement Agreement or Agreement) between the County (LOCAL AGENCY) and Pacific Gas and Electric Company (OWNER) amending the estimated County share of the utility relocation costs from 2,495,316 to $4,110,722 which is approximately 79.5% of the actual net cost to PG&E estimated at $5,170,719 for the relocation of overhead transmission lines and electrical transmission poles needed for construction of the Davis Road Bridge Replacement and Road Widening Project, Project No. 3600; and
b. Authorize the Director of Public Works, Facilities, and Parks or their designee to execute Amendment No. 1 to Utility Agreement No. DRB-36002.
SUMMARY:
Approval of Amendment No. 1 to Utility Agreement No. DRB-36002 (“Agreement”) with Pacific Gas and Electric Company (PG&E) is necessary to relocate the overhead transmission lines and electrical transmission poles (utility poles) located adjacent to Davis Road between Blanco Road and the Salinas River. The utility poles are in conflict with the widening of Davis Road as proposed by the Davis Road Bridge Replacement and Road Widening Project (“Project”).
DISCUSSION:
On October ...