File #: BC 18-101    Name: San Jerardo Budget Appropriation
Type: Budget Committee Status: Agenda Ready
File created: 9/17/2018 In control: Budget Committee
On agenda: 10/10/2018 Final action:
Title: Support authorizing the Auditor-Controller to amend the FY 2018-19 Boronda County Sanitation District - Zone 2 San Jerardo Adopted Budget, Fund 157, Appropriation Unit RMA046, to increase appropriations by $182,670, financed by existing fund balance, for repairs to the San Jerardo water system control panel, fire pump, pump house, and perimeter fencing.
Attachments: 1. BC Report, 2. Attachment A-BCSD Zone2 SanJerardo FY17/18 Bgt, 3. Attachment B-BCSD Zone2 SanJerardo FY18/19 Bdgt
Date Action ByActionResultAction DetailsSearchable Meeting DetailsVideo
No records to display.

Title
Support authorizing the Auditor-Controller to amend the FY 2018-19 Boronda County Sanitation District - Zone 2 San Jerardo Adopted Budget, Fund 157, Appropriation Unit RMA046, to increase appropriations by $182,670, financed by existing fund balance, for repairs to the San Jerardo water system control panel, fire pump, pump house, and perimeter fencing.
Report
RECOMMENDATION:
It is recommended that the Budget Committee:
Support authorizing the Auditor-Controller to amend the FY 2018-19 Boronda County Sanitation District - Zone 2 San Jerardo Adopted Budget, Fund 157, Appropriation Unit RMA046, to increase appropriations by $182,670, financed by existing fund balance, for repairs to the San Jerardo water system control panel, fire pump, pump house, and perimeter fencing.

SUMMARY/DISCUSSION:
The Boronda County Sanitation District - Zone 2 San Jerardo (BCSD - Zone 2 SJ) operates the water system that provides potable water to the residents of the San Jerardo Housing Cooperative, Inc. During a winter storm on February 17, 2017, severe winds caused a large eucalyptus tree to fall, resulting in damage to the water system control panel, fire pump, pump house, and perimeter fencing. A temporary bypass was set up to keep the water system functioning.

Based on a recommendation from MCSI, the contract water system operator, bids will be solicited for installation of a temporary control panel while the damaged control panel is removed for system testing and repair. The estimated cost to install a temporary system is $19,000. A worst-case scenario cost estimate to rebuild and reinstall the permanent control panel is $92,000; however, the costs could be less depending on the extent and severity of the damage to panel's components. Staff is preparing bid documents for completion of the permanent repairs.

The damaged fire pump is scheduled for a complete diagnosis (or diagnostics) to determine required repairs. Based on a preliminary assessment, only a new eng...