File #: WRAG 18-199    Name: New Source Water Report
Type: WR General Agenda Status: Agenda Ready
File created: 10/2/2018 In control: Water Resources Agency Board of Directors
On agenda: 10/15/2018 Final action:
Title: Consider receiving the New Source Water Report for the Castroville Seawater Intrusion Project.
Attachments: 1. Board Report, 2. MCWRA New Source Water - Final Report, 3. Board Order

Title

Consider receiving the New Source Water Report for the Castroville Seawater Intrusion Project.

 

Report

RECOMMENDATION:

It is recommended that the Monterey County Water Resources Agency Board of Directors:

 

Receive the New Sources Water Report for the Castroville Seawater Intrusion Project.

 

SUMMARY/DISCUSSION:

The Monterey County Water Resources Agency (MCWRA) and Monterey One Water (M1W), formerly known as Monterey Regional Water Pollution Control Agency (MRWPCA), entered into an Amended and Restated Water Recycling Agreement (Restated Agreement), which included consideration of the financing, design, construction, operation, maintenance, and replacement of New Source Water Facilities to provide approximately 4,381 acre-feet per year (AFY) of additional recycled water to MCWRA for use in the existing Castroville Seawater Intrusion Project (CSIP), a coastal irrigation project . In addition, M1W would be provided approximately 4,320 AFY of new source water to supplement the Pure Water Monterey Groundwater Replenishment Project which has been developed to provide drinking water. 

 

MCWRA currently obtains water from three sources: recycled wastewater from the Salinas Valley Reclamation Project (SVRP) (which has included industrial wastewater since 2015), surface water from the Salinas River Diversion Facility (SRDF), and water from CSIP supplemental groundwater wells. The objective of obtaining new source waters is to reduce the use of water from CSIP groundwater wells (“supplemental wells”).

 

In 2017, MCWRA and M1W contracted with Raftelis Financial Consultants, Inc. (Raftelis) to conduct a New Source Waters Study (Study). The purpose of the Study, and the report, is to provide a cost analysis for the operation, maintenance, and capital costs for New Source Water Facilities to determine specific rates and charges for final consideration. Through discussions with MCWRA and M1W the new source waters evaluated in this Study were narrowed to Blanco Drain and Reclamation Ditch, including existing source waters of treated wastewater, supplemental wells and Industrial Wastewater (IWW). The Salinas Pond Water Return Facilities will be considered independently and are discussed at the end of the report.

 

The report includes capital, operations, maintenance, and repair and replacement costs associated with developing New Source Water Facilities and provides incremental costs for CSIP operations under four different scenarios developed by MCWRA and M1W based on climate conditions and water rights for each water supply.

 

The major objectives of the Study included the following:

 

a.  Identify currently estimated operational costs of existing water sources;

b.  Review how historical demand has been accommodated by available source waters, including treated recycled water, Salinas River Diversion Facility (SRDF) surface water, and groundwater from supplemental wells;

c.  Determine the operational costs of new source waters;

d.  Review and confirm capital costs of new source waters;

e.  Calculate the marginal cost of new source waters above existing customers (growers) charges (Utility Charges);

f.  Evaluate various water supply blend scenarios to meet demand during a year with low rainfall (dry year), average rainfall (normal year), high rainfall (wet year), and low rainfall (dry year) with separate water rights compared to the historical baseline (base case);

g.  Derive the change in utility rates for each scenario while identifying the change in groundwater pumping to pursue the future sustainability goal of the basin; and

h.  Determine appropriate funding levels for both capital costs and operational costs associated with New Source Waters, which may require different funding mechanisms based on type of improvements and benefits conferred.

 

The Study and associated New Source Waters Report is the first step towards developing an Engineer’s report and assessment process.  Those future phases will be developed further in the near future.

 

COMMITTEE ACTION:

The Finance Committee received this report at the October 5, 2018 meeting.

 

OTHER AGENCY INVOLVEMENT:

Monterey One Water has assisted in the preparation of this report.

 

FINANCING:

There is no financial impact to receive this report.

 

Prepared by:          Shaunna Murray, Associate Water Resources Engineer, (831) 755-4860

 

 

Approved by:         ____________________________________________________

                               David E. Chardavoyne, General Manager, (831) 755-4860

 

 

Attachments:

1. New Source Water Report

2. Board Order