File #: ZA 19-095    Name:
Type: Zoning Administrator Status: Scheduled AM
File created: 4/8/2019 In control: Monterey County Zoning Administrator
On agenda: 4/18/2019 Final action:
Title: PLN180508 - MUSSALLEM (AT&T WIRELESS) Public hearing to consider Use Permit for a new telecommunications facility on top of existing PG&E lattice power transmission tower increasing the height by 12 feet from approximately 87 feet to 99 feet. Project Location: 674 Crazy Horse Canyon Road, Salinas (Assessor's Parcel Number 125-291-053-000), North County Area Plan Proposed CEQA action: Exempt per 15303 of the CEQA Guidelines construction and location of limited numbers of new, small facilities or structures.
Attachments: 1. Staff Report, 2. Exhibit A - Project Data Sheet, 3. Exhibit B - Vicinity Map, 4. Exhibit C - Draft Resolution, 5. Exhibit D - Description of Wireless Facility, 6. Exhibit E - Site Coverage Map, 7. Exhibit F - Radio Frequency Report, 8. Exhibit G - Photo Simulations
Title
PLN180508 - MUSSALLEM (AT&T WIRELESS)
Public hearing to consider Use Permit for a new telecommunications facility on top of existing PG&E lattice power transmission tower increasing the height by 12 feet from approximately 87 feet to 99 feet.
Project Location: 674 Crazy Horse Canyon Road, Salinas (Assessor's Parcel Number 125-291-053-000), North County Area Plan
Proposed CEQA action: Exempt per 15303 of the CEQA Guidelines construction and location of limited numbers of new, small facilities or structures.
Report
RECOMMENDATION:
It is recommended that the Zoning Administrator:
a) Find the project in the installation of a new wireless communication facility to an existing PG&E lattice tower, which qualifies as a Class 3 Categorical Exemption per Section 15303 of the CEQA Guidelines (New Construction or Conversion of Small structures), and there are no exceptions pursuant to Section 15300.2; and
b) Approve a Use Permit to allow the installation for a new telecommunications facility consisting of twelve panel antennas on top of an existing PG&E lattice power transmission tower increasing the height by 12 feet from (87'-3" feet to 99'-3", with an equipment shelter and back-up generator installed at the base.
The attached resolution includes findings and evidence for consideration (Exhibit C). Staff recommends that the Zoning Administrator adopt the resolution approving PLN180508 subject to seven (7) conditions of approval.

PROJECT INFORMATION:
Agent: Tom Johnson, AT&T Wireless
Property Owner: Linda Mussallem
APN: 125-291-053-000
Parcel Size: 583.7 acres
Zoning: PG/40 (Rural Grazing/40-acre minimum)
Plan Area: North County Area Plan (Non-Coastal Advisory Committee)
Flagged and Staked: No

SUMMARY:
The applicant (Tom Johnson), representing AT&T Wireless, is requesting approval of a Use Permit to construct and operate a wireless communication facility at the location of an existing PG&E electrical transmission tower. Installation of the twelve panel a...