File #: RES 20-032    Name: Bradley Road Bridge Scour Repair Project
Type: BoS Resolution Status: Passed - RMA Administration
File created: 3/9/2020 In control: Board of Supervisors
On agenda: 3/24/2020 Final action: 3/24/2020
Title: Adopt a Resolution to: a. Adopt a Mitigated Negative Declaration for the Bradley Road Bridge Scour Repair Project, Project No. 3852, Federal Aid Project No. BHLO - 5944 (100); b. Adopt a Mitigation Monitoring and Reporting Program; c. Authorize Resource Management Agency (RMA) to proceed with finalizing the design for the Bradley Road Bridge Scour Repair Project; and d. Authorize the RMA Director or the RMA Deputy Director of Public Works & Facilities to acquire Right of Way for the Bradley Road Bridge Scour Repair Project.
Sponsors: Public Works / RMA
Attachments: 1. Board Report, 2. Attachment A - Project Budget, 3. Attachment B - Location Map, 4. Attachment C - Board Resolution, 5. Exhibit A - IS MND with Mitigation Monitoring Reporting Plan, 6. Item No. 37 Completed Board Order & Resolution
Title Adopt a Resolution to:
a. Adopt a Mitigated Negative Declaration for the Bradley Road Bridge Scour Repair Project, Project No. 3852, Federal Aid Project No. BHLO - 5944 (100);
b. Adopt a Mitigation Monitoring and Reporting Program;
c. Authorize Resource Management Agency (RMA) to proceed with finalizing the design for the Bradley Road Bridge Scour Repair Project; and
d. Authorize the RMA Director or the RMA Deputy Director of Public Works & Facilities to acquire Right of Way for the Bradley Road Bridge Scour Repair Project.
Report
RECOMMENDATIONS:
It is recommended that the Board of Supervisors:
a. Adopt a Mitigated Negative Declaration for the Bradley Road Bridge Scour Repair Project, Project No. 3852, Federal Aid Project No. BRLO - 5944 (100);
b. Adopt a Mitigation Monitoring and Reporting Program with 53 mitigation measures;
c. Authorize the Resource Management Agency (RMA) - Public Works, Facilities & Parks to proceed with finalizing the design the Bradley Road Bridge Scour Repair Project: and
d. Authorize the RMA Director or the RMA Deputy Director of Public Works & Facilities to acquire Right of Way for the Bradley Road Bridge Scour Repair Project

SUMMARY/DISCUSSION:
The proposed Bridge Scour Repair Project (Project) on Bradley Road is to address existing scour issues by installing scour protection on the substructure of the Bradley Road Bridge (Bridge No. 44C-0050). The proposed scour project on the existing bridge over Salinas River will upgrade the bridge to meet current Caltrans bridge standards.

The bridge is located approximately 5 miles north of the Monterey County/San Luis Obispo
County border, just west of Bradley and approximately 1/4 miles east of U.S. Route 101 (US-101). Bradley Road is an existing two-lane road (one lane in each direction) that is classified by the California Road System (CRS) Maps as a Minor Collector. The bridge was originally constructed in 1931 and widened in 1954. The existing bridge is approximately 1,668...

Click here for full text