PC 25-048
| 1. | PLN220251 - Ardua 31 LLC | Planning Item | PLN220251 - ARDUA 31 LLC
Continued from June 26, 2024 and August 14, 2024 - Public hearing to consider construction of a 5,412 square foot single-family dwelling with an attached 984 square foot garage and associated site improvements, including the removal of 56 Monterey pine trees and 595 cubic yards of cut and 415 cubic yards of fill.
Project Location: 1272 Viscaino Road, Pebble Beach
Proposed CEQA action: Find the project qualifies for a Class 3 Categorical Exemption pursuant to CEQA Guidelines section 15303, and there are no exceptions pursuant to Guidelines section 15300.2. | | |
None
|
None
|
PC 25-049
| 2. | PLN210061 – JOHNSON HAL W JR & ALLISON H | Planning Item | PLN210061 - JOHNSON HAL W JR & ALLISON H
Continued from October 30, 2024 - Public hearing to consider allowing construction of a 3,525 square foot single-family residence, inclusive of a 244 square foot single-car garage and associated site improvements; approximately 3,095 square feet of development on slopes in excess of 30%, 500 square feet of which is for the residence and 2,611 for the associated site improvements; removal of four protected trees; development within 50 feet of a coastal bluff; and development within 750 feet of known archaeological resources. Site improvements include grading with approximately 700 cubic yards of cut and 390 cubic yards of fill, resulting in net cut of 310 cubic yards; driveway and flatwork; tiered retaining walls; an emergency fire access stairway; paving of the access road leading to the site; and utility improvements consisting of installation of a septic tank, centralized water quality treatment for Highway 1 Water Distribution System #12, and an approximately 400 lineal feet sewer line.
Project Location: 226 Highway 1, Carmel, Carmel Are | | |
None
|
None
|
PC 25-051
| 3. | PLN240149 - RISDEL INC. AND QUAIL MEADOWS HOMEOWNERS ASSOCIATION | Planning Item | PLN240149 - RISDEL INC. AND QUAIL MEADOWS HOMEOWNERS ASSOCIATION
Public hearing to consider a Lot Line Adjustment between three lots of record - Parcel 1 (10 acres); Parcel 2 (2.5 acres), and Parcel 3 (181.42 acres), resulting in three parcels of 9.32 acres (Adjusted Parcel 1), 2.72 acres (Adjusted Parcel 2), and 181.88 acres (Adjusted Parcel 3), construction of a 3,500 square foot subterranean garage, development on slopes in excess of 25%, and the removal of five trees including four oaks and one Monterey pine.
Project Location: Quail Meadows Subdivision - 5477 and 5479 Covey Court, and a non-addressed parcel, Carmel Valley Master Plan
Proposed CEQA action: Find the project Categorically Exempt pursuant to CEQA Guidelines sections 15303 and 15305, with no exceptions under Section 15300.2 | | |
None
|
None
|
PC 25-050
| 4. | PLN240113 - AGUILAR CARLOS & KIMBERLY TRS | Planning Item | PLN240113 - AGUILAR CARLOS & KIMBERLY TRS
Public hearing to consider the construction of an approximately 3,230 square foot single-family dwelling with an attached 530 square foot garage, and 1,164 square feet of new patios and walkways.
Project Location: 151 Robley Road, Salinas, Toro Area Plan.
Proposed CEQA action: Find the project Categorically Exempt pursuant to CEQA Guidelines section 15303, and there are no exceptions pursuant to Guidelines section 15300.2. | | |
None
|
None
|
PC 25-052
| 5. | ADMINISTRATIVE INTERPRETATION - REPLACEMENT DEVELOPMENT IN A SITE PLAN REVIEW ZONING DISTRICT, DESIGN CONTROL ZONING DISTRICT, AND VISUAL SENSITIVITY ZONING DISTRICT | Planning Item | ADMINISTRATIVE INTERPRETATION - REPLACEMENT DEVELOPMENT IN A SITE PLAN REVIEW ZONING DISTRICT, DESIGN CONTROL ZONING DISTRICT, AND VISUAL SENSITIVITY ZONING DISTRICT | | |
None
|
None
|