Please note: this meeting's minutes have not been finalized yet. Actions taken on legislation and their results are not available.
Meeting Name: Monterey County Planning Commission Agenda status: Final
Meeting date/time: 10/30/2024 9:00 AM Minutes status: Draft  
Meeting location:
Published agenda: Agenda Agenda Accessible Agenda Accessible Agenda Published minutes: None Video en EspaƱol None  
Agenda packet: Agenda Packet Agenda Packet
Meeting video:  
Attachments:
File #Agenda #NameTypeTitleActionResultAction DetailsVideo
PC 24-114 1.NAARTAP REAPPOINTMENTSPlanning ItemNATIVE AMERICAN AND ARCHAEOLOGICAL RESOURCES TECHNICAL ADVISORY PANEL (NAARTAP) REAPPOINTMENTS   None None
PC 24-115 1.1Approval of Meeting minutesPlanning ItemApproval of the August 28, 2024, September 11, 2024 and September 25, 2024 Planning Commission Meeting minutes.   None None
PC 24-111 2.PLN190091 - ROBERT LOUIS STEVENSON SCHOOLPlanning ItemPLN190091 - ROBERT LOUIS STEVENSON SCHOOL Public hearing to consider the Robert Louis Stevenson School Campus Build-Out Plan, including the construction, replacement and expansion of institutional buildings and construction of student and faculty housing within 100 feet of environmentally sensitive habitat areas. Buildout includes the removal of 132 protected trees. Project Location: 3152 Forest Lake Road [Unit B, Unit C, Unit D, Unit E]; 1235, 1239, 1241 and 1243 Faculty Drive; 3151 Forest Lake Road; 1271 and 1275 Viscaino Road; 1223 Bristol Lane; 1225 and 1227 Silver Court; and 1201 and 1203 Benbow Place, Pebble Beach Proposed CEQA Action: Consider adoption of a Mitigated Negative Declaration pursuant to Section 15074 of the CEQA Guidelines   None None
PC 24-112 3.PLN210061 - JohnsonPlanning ItemPLN210061 - JOHNSON HAL W JR & ALLISON H Public hearing to consider variances to reduce the front setbacks and allow construction of a 4,921 square foot single-family residence, inclusive 803 square feet of non-habitable space for an attached garage and a mechanical room, and associated site improvements on slopes in excess of 30% and within 50 feet of a coastal bluff and 750 feet of known archaeological resources. Site improvements include removal of 6 protected trees; grading of 2,305 cubic yards of cut and 355 cubic yards of fill; a foundation system consisting of micropiles and soil nails; driveway and flatwork; retaining walls; an emergency fire access stairway; paving of the access road leading to the site; and utility improvements consisting of installation of a septic tank, centralized water quality treatment for Highway 1 Water Distribution System #12, an approximately 400 lineal feet sewer line. Project Location: 226 Highway 1, Carmel, Carmel Area Land Use Plan, Coastal Zone Proposed CEQA action: Adopt a Mitigated Negative Declaration pursuant to section 15074 of the C   None None
PC 24-113 4.PLN210306 CARMEL SELF STORAGE LLCPlanning ItemPLN210306 - CARMEL SELF STORAGE LLC Public hearing to consider construction of an 71,540 square foot two-story self-storage facility with an office and bathroom (5 buildings), removal of one oak tree, and associated drainage, driveway, and fencing improvements partially within 200 feet of the Carmel River floodplain. Project Location: terminus of Center Street near corner with Berwick, Carmel Valley, Carmel Valley Master Plan Proposed CEQA action: Adopt a Mitigated Negative Declaration pursuant to Section 15074 of the CEQA Guidelines   None None