MIN 20-043
| A. | Acceptance of the June 24, 2020 Planning Commission Meeting Minutes. | Minutes | Acceptance of the June 24, 2020 Planning Commission Meeting Minutes. | | |
Action details
|
None
|
MIN 20-044
| B. | Acceptance of the July 8, 2020 Planning Commission Meeting Minutes | Minutes | Acceptance of the July 8, 2020 Planning Commission Meeting Minutes. | | |
Action details
|
None
|
PC 20-042
| 1. | PLN190183 - HEISLER | Planning Item | PLN190183 - HEISLER
Public hearing to consider a Lot Line Adjustment between two existing legal lots consisting of 7.24 acres (Parcel A - APNs 241-231-001, 241-231-003, 241-231-007), and 1.63 acres (Parcel B - APN 241-231-008), resulting in two legal lots of 7.06 acres (Parcel 1), and 1.81 acres (Parcel 2) to better align with existing structures and roads on the properties.
Project Location: 215 Upper Walden Road (APNs 241-231-001-000, 241-231-003-000, 241-231-007-000) and 90 Crest Road (APN 241-231-008-000), Carmel Area Land Use Plan, Coastal Zone
Proposed CEQA Action: Categorical Exemption pursuant to Section 15305(a) of the CEQA Guidelines. | | |
Action details
|
None
|
PC 20-043
| 2. | PLN180289 MILLER | Planning Item | PLN180289 - MILLER
Public hearing to consider the construction of a two-story single family dwelling with an attached garage (approximately 6,462 square feet) and the removal of four (4) oak trees.
Project Location: 24275 Via Malpaso, Monterey, Greater Monterey Peninsula Area Plan.
Proposed CEQA action: Categorically Exempt per §15303 (a) of the CEQA Guidelines | | |
Action details
|
None
|
PC 20-044
| 3. | PLN190253 DYNEGY MOSS LANDING LLC (VISTRA ENERGY) | Planning Item | PLN190253 - DYNEGY MOSS LANDING LLC (VISTRA ENERGY)
Public hearing to consider the installation of a 1,200-megawatt (MW) battery energy storage system (BESS), comprised of constructing of four (4) two-story buildings totaling of 391,200 square feet, installation of up to 500 inverters and converters, placement of two (2) substations totaling 92,000 square feet, and up to four (4) 150-foot monopole towers and one (1) 100-foot dead-end 500-kilovolt tower, on the Moss Landing Power Plant site.
Project Location: 11283 Dolan Road, Moss Landing, North County Land Use Plan, Moss Landing Community Plan, Coastal Zone
Proposed CEQA action: Adopt an Initial Study/Mitigated Negative Declaration that was prepared and circulated. | | |
Action details
|
None
|
PC 20-045
| 4. | GENERAL PLAN AMENDMENT – POLICY OS-10.11 (GREENHOUSE GAS REDUCTIONS) | Planning Item | GENERAL PLAN AMENDMENT - POLICY OS-10.11 (GREENHOUSE GAS REDUCTIONS)
a. Consider an early assessment of a proposed County-initiated amendment to the 2010 General Plan regarding Greenhouse Gas Reductions (Policy OS-10.11) consistent with state law and guidance.
b. Provide direction to staff relative to the suitability of the proposed General Plan Amendment in consideration of the context of all other amendments comprehensively and cumulatively.
Location: County-wide | | |
Action details
|
None
|