ZA 18-033
| 1. | | Zoning Administrator | PLN170734 - EPISCOPAL DIOCESE OF EL CAMINO REAL
(Precision Site Development DBA Sprint)
Public hearing to consider the installation of a wireless communications facility consisting of a 50-foot high monopole with eight (8) antennas, all associated transmission cables; outdoor cabinets, and fenced perimeter.
Proposed Location: 65000 Jolon Road, Lockwood
Proposed CEQA Action: Categorically Exempt per section 15303 of the CEQA Guidelines | | |
Action details
|
None
|
ZA 18-034
| 2. | | Zoning Administrator | PLN170802 - BRAY ALBERT L TR ET AL (VERIZON WIRELESS)
Public hearing to consider the construction of a 65-foot wireless telecommunication facility (WCF) disguised as a windmill
Project Location: Paris Valley Road, San Ardo, South County Area Plan
Proposed CEQA Action: Categorically Exempt per Section 15303 of the CEQA Guidelines. | | |
Action details
|
None
|
ZA 18-035
| 3. | | Zoning Administrator | PLN170893 - BUTLER KEITH L & MIREILLE O
Public hearing to consider the after-the-fact relocation of a driveway approved on a previous permit and after-the-fact removal of seven unhealthy Monterey pine trees.
Project Location: 220 Upper Walden Road, Carmel, Carmel Area Land Use Plan
Proposed CEQA Action: Categorically exempt per Sections 15303(e) and 15304 of the CEQA Guidelines | | |
Action details
|
None
|
ZA 18-037
| 4. | | Zoning Administrator | PLN170144 - WECKER
Public hearing to consider the construction of an accessory dwelling unit with an attached garage, and associated tree removal (1 oak, and 6 Monterey Pine) and development on slope exceeding 25 percent.
Project Location: 600 and 610 Viejo Road, Carmel, Greater Monterey Peninsula Area Plan
Proposed CEQA Action: Categorical Exemption pursuant to Section 15303 of the CEQA Guidelines. | | |
Action details
|
None
|