File #: PC 19-030    Name: PLN180394 - Vistra
Type: Planning Item Status: Agenda Ready
File created: 4/30/2019 In control: Monterey County Planning Commission
On agenda: 5/8/2019 Final action:
Title: PLN180394 - DUKE ENERGY MOSS LANDING LLC (VISTRA ENERGY CORPORATION) (CONTINUED FROM MARCH 27, 2019) Public hearing to consider an amendment to the Moss Landing Power Plant Master Plan to allow a battery energy storage system at the site. Project Location: 11283 Dolan Road, Moss Landing, North County Land Use Plan, Moss Landing Community Plan Proposed CEQA action: Adopt a Mitigated Negative Declaration
Attachments: 1. Staff Report, 2. Exhibit A - Project Data Sheet, 3. Exhibit B - Discussion, 4. Exhibit C - Draft Resolution, 5. Exhibit D - Vicinity Map, 6. Exhibit E - Re-circulated and Original Initial Study MND, 7. Exhibit F - Public Comments on MND, 8. Exhibit G - North County LUAC Minutes, 9. Exhibit H - Biology Letter (LIB190079), 10. Exhibit I - Updated Biology Letter (LIB190088), 11. Exhibit J - Traffic Assessment (LIB190012), 12. Exhibit K - Construction Management Plan

Title

PLN180394 - DUKE ENERGY MOSS LANDING LLC (VISTRA ENERGY CORPORATION) (CONTINUED FROM MARCH 27, 2019)

Public hearing to consider an amendment to the Moss Landing Power Plant Master Plan to allow a battery energy storage system at the site.

Project Location: 11283 Dolan Road, Moss Landing, North County Land Use Plan, Moss Landing Community Plan

Proposed CEQA action: Adopt a Mitigated Negative Declaration

Report

RECOMMENDATION:

It is recommended that the Planning Commission adopt a resolution to:

1.                     Adopt a Mitigated Negative Declaration;

2.                     Approve a Combined Development Permit consisting of a:

a.                     Coastal Administrative Permit amending the Moss Landing Power Plant Master Plan to change the use within an existing building from storage of electric generating turbines to establish of a 20-year life span battery energy storage system, and

b.                     Coastal Administrative Permit for development within 750 feet of a known archaeological site for the excavation and placement of the substation, replacement of an existing transformer, installation of new inverters and transformers on-site, and grading of approximately 3,750 cubic yards of cut; and

3.                     Adopt a Mitigation Monitoring and Reporting Program.

The attached draft resolution includes findings and evidence for consideration (Exhibit C).  Staff recommends approval of the project subject to 18 conditions of approval including two (2) mitigation measures.

 

PROJECT INFORMATION:

Agent: Eric Cherniss

Owner: Duke Energy Moss Landing LLC (Vistra Energy Corp.)

APN:  133-181-011-000

Zoning: HI (CZ)

Parcel Size: 137.5 acres

Plan Area: North County Land Use Plan, Moss Landing Community
Plan, Coastal Zone

Flagged and Staked: No

 

 

 

 

SUMMARY:

The project was heard before the Planning Commission on March 27, 2019. During this hearing, the Commission continued the hearing to May 29, 2019 to allow staff time to appropriately address comments and information submitted by California Department of Fish and Wildlife (CDFW) regarding the potential for sensitive species on the project site, specifically the California Tiger Salamander, Santa Cruz Long-Toed Salamander and Peregrine Falcon. Since this time, staff has worked with CDFW regarding their comments, added a mitigation measure to address the potential impact, and re-circulated the Initial Study/Mitigated Negative Declaration to disclose the new environmental impacts and proposed mitigation (Exhibit E).

 

The subject property is a 137.5 acre parcel located in Moss Landing’s industrial area, northeast of the Highway 1 and Dolan Road intersection. Adjoining the property to the north is PG&E’s electric transmission operations and maintenance headquarters, and to the south is Dolan Road and the Moss Landing Business Park. Moss Landing Harbor lies west of the property on the other side of Highway 1. See Exhibit D.

 

A 90 acre portion of the site is actively used and developed with electric power generation facilities, paved and unpaved parking areas, and access roads. The remaining 47.5 acres, east of the active portions and outside of the proposed project area, is the former fuel oil tank farm site. Demolition/cleanup of the fuel tanks and associated equipment in this area have been completed under a previous planning approval and the area is now unpaved and vacant. Reuse of this area is not proposed with this application.

 

The proposed project is an amendment to the Moss Landing Power Plant Master Plan to include the use of renewable energy storage systems and reuse an existing three-story building to allow the establishment of a Battery Energy Storage System (BESS) within 750 feet of a known archaeological site. This building is currently vacant and not in use. Turbines and equipment supporting the former power generation Units 1 through 5, which were mothballed and demolished between 1995 and 2005, were previously housed in this building.

 

BRIEF DISCUSSION:

The BESS has three (3) major components: a battery energy storage; a power conversion system; and a substation. First, the substation receives energy from the electrical grid; second the energy current gets converted through the power conversion system that consists of the inverters and transformers; and third, energy is stored within the battery energy storage until utilized during peak demand. When needed, stored energy is routed out from the batteries through the power conversion system and substation and into the electrical transmission grid. Ground disturbance is not proposed within the battery energy storage area or for replacement and installation of the power conversion system; however, grading of 3,750 cubic yards of excavation is proposed for the substation within a previously disturbed area. The substation as illustrated in Exhibit B is currently a paved area consisting of an existing transmission line and transformer. This is in the same general location where ground disturbance of up to 20 feet in depth occurred with the original power plant construction to install the supporting infrastructures for previous power generating Units 1 through 5.

 

 

The purpose of the project is to support renewable energy initiatives established by the State of California; specifically, to reduce the loss of energy procured from alternative energy sources, such as wind and solar, and aid in providing consistent reliable energy. This would occur through storage of power during off peak use times and dispersing that power back to the electrical grid for use during high peak use times. The proposed project consists of a 300 megawatt (MW) transmission-connected, standalone lithium ion BESS with four hours of storage and a 20-year life span, on the southwestern portion of the 137.5 acre subject parcel.

 

Land Use
Development of the property is subject to the policies and regulations contained in the 1982 General Plan (General Plan), North County Land Use Plan (NC LUP), Moss Landing Community Plan (MLCP), the Coastal Implementation Plan, Part 2 (CIP), and the Monterey County Zoning Ordinance (Title 20). Zoning of the property is Heavy Industrial, Coastal Zone which allows uses accessory to established industrial uses. As explained above, the project is for establishment of a BESS within an existing energy facility that will support the efficient storage and use of electricity. Therefore, the project is consistent with the land use designation and zoning. A portion of the project would require ground disturbance within a high archaeological zone and within 750-feet of a positive archaeological site.  However, grading activities will be taking place only within previously disturbed areas of the project site.  The project has been found to be consistent with NC LUP, MLCP, and CIP policies and regulations for such development and no issues remain. Construction, including asphalt removal and grading, would result in a temporary increase to traffic in the area. Consistent with the MLCP and CIP, this traffic will avoid Highway 1 and use the existing primary access along Dolan Road. Based on County resource information and staff’s site visit, due to the site’s existing conditions and the project’s components, submittal of a biological survey was not required. Consistent with biological policies and regulations contained in the NC LUP and CIP, the proposed project is not within development of environmentally sensitive habitat areas such as riparian corridors, wetlands, dunes, sites of known rare and endangered species of plants and animals, rookeries, major roosting and haul-out sites, and other wildlife breeding or nursery areas identified as identified as environmentally sensitive. However, comments received during the public review period for the environmental document revealed information of documented findings of special-status species within the project vicinity. Subsequently, two (2) biological assessments were provided for the project. Consistent with the NC LUP and CIP policies and regulations, development has been modified to include a mitigation measure and standard condition of approval have been incorporated into the project to reduce any potential impact to a less than significant level.

 

Coastal-Dependent

MLCP Figure 2 identifies the land use designation for the subject property as a Heavy Industrial - Coastal Dependent. MLCP Section 5.2.1.A - Coastal Dependent Industry, describes existing industries in Moss Landing and states that they “are generally dependent for their existence upon a location near the coastline, and as such are considered ‘coastal dependent’. These industries include commercial fishing, aquaculture, energy facilities and manufacturing facilities.”  This section recognizes that coastal dependent facilities shall be encouraged to expand within existing sites, and shall be allowed for growth consistent with the protection of the area’s natural resources. MLCP Section 5.2.1.A.2 identifies full buildout of the Moss Landing Power Plant and refers to policies contained in MLCP Section 5.5 for upgrading energy facilities. CIP Section 20.144.160.C.1.a states that coastal dependent industrial facilities should be encouraged to expand within existing sites before off-site expansion shall be considered. The project proposal is to establish a Battery Energy Storage System (BESS) within an existing industrial site. The BESS has three components: a batter energy storage, a power conversion system and a substation. The project is to re-use an existing three-story building, which previously housed power generating turbines, to store the batter energy storage. The power conversion system and substation will be located adjacent to the building within a paved and previously disturbed area. The land use designation requires coastal dependent uses, MLCP identifies energy facility as coastal dependent; therefore, the project, as proposed, is consistent with land use requirements for energy facilities and industrial development within the MLCP.

 

Master Plan

MLCP general policy 5.5.2.2 states that future expansions, improvements or other development shall be considered in accordance with master plans for the industrial facilities at the Moss Landing Power Plant. NC CIP Section 20.144.060.C.1.c requires amendments to the master plans for uses, expansions and other development not inconformity with the approved master plan. As such, the applicant proposes to amend the master plan (Exhibit C) to include the use of storing renewable energy; therefore, the project, as proposed, is consistent with the MLCP and NC CIP.  The Moss Landing Power Plant Master Plan encompasses the entire 137+ acre site, so this amendment functionally is adding the proposed use to the overall allowed uses on the site.  The amendment is specific as to the location of the project, which is contained within and adjacent to the three-story building, which formerly housed the power generating turbines.  This amendment is not adding any new impact areas to the Master Plan, as the entirety of the project is proposed on previously developed land.   

 

Design Review

The subject property is not located within a Design Control Zoning District; however, NC LUP Chapter 5.6, MLCP - Visual Resources and Community Character provides policies for protection of scenic and visual resources of the area, specifically in the Public Viewshed. These policies are implemented through regulation contained in CIP Section 20.144.160.D. A project site is considered to be in the Public Viewshed if any portion of the proposed development is visible from or impedes the visual access to the Moss Landing Community, harbor and dunes from Highway 1 or any other public viewing area. The project is located on an adjacent property to Highway 1 to the east. An onsite inspection was performed and was determined that site improvements would not be visible from and would not impede views of the community, harbor, or dunes from Highway 1 because it is located east of Highway 1 and the project makes use of the existing infrastructure and development at the site. Existing development on the property is related to power generation and transmission and is industrial in character. The proposed development will not change the industrial character of the site.

 

California Environmental Quality Act (CEQA)

The project did not qualify for an exemption under CEQA and potential impacts were identified during environmental review. An Initial Study/ Mitigated Negative Declaration or “IS/MND” (Exhibit E) was prepared and circulated for public review. The IS/MND identified potential impacts to air quality, cultural resources, geology/soils, greenhouse gas emissions, hazard/hazardous materials, hydrology and water quality, land use/planning, transportation/traffic and tribal cultural resources. These potential impacts were determined to be a less than significant impact or less than significant with mitigation measures as briefly discussed below and within the attached Detailed Discussion (Exhibit B). Comment letters from the California Department of Fish and Wildlife (CDFW) and Caltrans were received during the IS/MND public review period. The comments from CDFW identified potential impacts to biological resources. After further review and analysis, a Re-circulated IS/MND to appropriately disclose the new environmental impact was prepared and circulated for public review (Exhibit E). The public review comment period is from April 5, 2019 through May 6, 2019. At the time the staff report was prepared and distributed to the Planning Commission, no comments were received. If any comments are received prior to the end of business day on May 6, 2019, these comments will be analyzed and further provided to the Commission at the hearing.

 

Biological Resources:

The original IS/MND identified the project would have no impact to biological resources as the development area is not located in, or within 100-feet of, an environmentally sensitive habitat area such as riparian corridors, wetlands, dunes, sites of known rare and endangered species of plants and animals, rookeries, major roosting and haul-out sites, and other wildlife breeding or nursery areas identified as environmentally sensitive. The project includes ground disturbance in areas that have been previously developed and critical habitat for special status animal species was not identified on the site. This information was confirmed during staff’s site visit and demonstrated in letters prepared by two biologists submitted by the applicant.

 

Comments from CDFW:

The County received a comment letter from the California Department of Fish and Wildlife (CDFW) that stated there was a potential for special-status species such as California Tiger Salamander (CTS), Santa Cruz Long-toed Salamander (SCLTS) and Peregrine Falcon to be encountered at the project site and recommended eight (8) mitigation measures, all of which was not described in the original IS/MND. As briefly discussed above and further explained in Exhibit B, the description of existing site conditions have been amplified and the applicant provided information from a biologist clarifying that while the species may be present in the vicinity, the possibility of impacts to these special-status species is minimal. Given this possibility, specific sections of this IS/MND were re-circulated for public review to disclose the possible impacts to Biological Resources. A new Mitigation Measure and standard condition of approval have been incorporated into the project to reduce this impact to a less than significant level (Condition No. 18 - MM02 - CTS/SCLTS Environmental Education and Operational Program). The mitigation measure will require anyone working on the site to be trained on the identification of sensitive species, identify occupied burrows and breeding pools and establish protocols for rare cases of encountering such species.

 

Traffic/transportation:

The operational component of the project would not significantly increase vehicle trips to and from the subject property. However, temporary traffic impacts would be caused by an increase in vehicle trips during the construction phase of project. It is anticipated that construction activities will occur over a 14 month period resulting in a maximum of 420 employees and maximum daily peak vehicle trips of 924. These trips would have the potential to increase the amount of traffic generated on the proposed haul routes as explained in Exhibit B. This was addressed by project design which includes a Construction Management Plan (CMP) that limits the number of employees onsite to ensure they would not exceed the number of employees at the Moss Landing Power Plant during routine repair and maintenance operations that occur periodically throughout the year. MLCP Section 5.2.2 states that the primary transportation emphasis of the Coastal Act is to preserve highway capacity for coastal access and coastal dependent land uses and recommends a reduction in the number access points from the Highway 1 to minimize hazardous and congested conditions. In accordance with CIP Section 20.144.120.A, a traffic assessment was provided for the project (Exhibit K) and through implementation of the CMP, this assessment identified that temporary construction vehicle trips would be less than significant.

 

                     Comments from Caltrans:

A Construction Management Plan was provided for the project that describes traffic initiatives to reduce the amount of vehicle trips and prohibit the use of Highway 1 for access. Caltrans requests that a monitoring plan or report be incorporated for the duration of the project. The project has been conditioned for the applicant to submit a Final CMP (Condition No. 11 of Exhibit C) that requires the applicant to monitor and report on compliance with the CMP traffic initiatives.

 

Tribal Cultural Resources:

The subject property is located in the aboriginal territory of the Ohlone/Costanan-Esselen Nation (OCEN). In accordance with Public Resource Code 21080.3.1, tribal consultation occurred between County staff and OCEN on December 11, 2018. During consultation, OCEN identified that the area of proposed development has the potential to contain cultural resources significant to the tribe. A mitigation measure was recommended for a Native American Tribal Monitor from OCEN to be present during excavation of the substation area, see Conditions of Approval in Exhibit C.

 

OTHER AGENCY INVOLVEMENT:

The following agencies have reviewed the project:

Environmental Health Bureau

RMA-Public Works

RMA-Environmental Services

North County Fire Protection District

Cal-Trans

California Department of Fish and Wildlife

 

LAND USE ADVISORY COMMITTEE:

The project was referred to the North County Land Use Advisory Committee (LUAC) for review on November 7, 2018. The LUAC recommended approval of the project as proposed with a vote of 6 to zero, with 3 members absent (Exhibit G). 

 

Prepared by:                     Jacquelyn M. Nickerson, Assistant Planner, Ext. 5240

Reviewed by:                     Craig Spencer, Interim RMA Planning Services Manager

Approved by:                     John M. Dugan, FAICP RMA Deputy Director of Land Use and

                     Development Services

 

 

 

The following attachments are on file with the RMA:

Exhibit A - Project Data Sheet

Exhibit B - Detailed Discussion

Exhibit C - Draft Resolution, including:

                     Conditions of approval

                     Site plans

                     Moss Landing Power Plant Site Master Plan

Exhibit D - Vicinity Map

Exhibit E - Recirculated and Original Initial Study/Mitigated Negative Declaration

Exhibit F - Comments on Initial Study/Mitigated Negative Declaration

Exhibit G - North County LUAC Minutes

Exhibit H - Biology Letter (LIB190079)

Exhibit I - Updated Biology Letter (LIB190088)

Exhibit J - Traffic Assessment (LIB190012)

Exhibit K - Construction Management Plan

 

cc: Front Counter Copy; Planning Commission; California Coastal Commission; Brandon Swanson, Acting Chief of Planning; Craig Spencer, Acting RMA Planning Manager; Eric Cherniss, Vistra Energy Corporation, Agent; Duke Energy Moss Landing LLC, Owner; Sheila Sannadan, Interested Party; Kevin Vickers, Interested Party; Navi Dhillon, Interested Party; Christopher Carr, Interested Party; Julie A. Vance, California Department of Fish and Wildlife; John Olejnik, Caltrans; Hanna Muegge; Monterey Bay Air Resources District; The Open Monterey Project (Molly Erickson); LandWatch (Executive Director); Project File PLN180394